SUPERVISOR CV for ONSHORE and OFFSHORE MECHANICAL, MANTENANCE, CONSTRUCTION in ENGINEERING JOBS

S
27YEARS GULF EXPERIENCE CVIN OIL&GAS (1989 T0 2016)
NAME AND ADDRESS SALEEM PUTHIYA PONNAMBATH
FOR COMMUNICATION SAAF, 20/198A,
M.S.BABURAJ ROAD, P.O. KALLAI,
CALICUT DISTRICT-673003,
KERALA STATE, INDIA.
PHONE LAND: 0091-495-2321651, (INDIA_CALICUT)
PHONE MOBILE: 0091--9846471611, 8547221651, 9567195076 (INDIA_CALICUT)
E-MAIL: saleemsakki123@hotmail.com, yahoo.com AND gmail.com
PRESENT POSITION…….
..…… MECHANICAL SUPERVISOR for OIL &GAS REFINERY and OFFSHORE
.…... OIL&GAS WELL STATION in MAINTENANCE ENGINEERING JOBs
PREVIOUS POSITIONS…….
 MECHANICAL SUPERVISOR, MAINTENANCE OF STATIC AND ROTATING EQUIPMENTS
 GENARAL FOREMAN PIPING, CONSTRUCTION AND MAINTENANCE
 GENERAL FOREMAN, PIPING AND CONSTRUCTION
 PIPING FOREMAN, FABRICATION AND INSTALLATION
 FOREMAN GENERAL CONSTRUCTION WORK
OPTIONAL SKILLS
 SAFETY OBSERVATION ON SITE AND HAZARD IDENTIFICATION ON WORK AREA
 REFACTORY AND INSULATION FOR PIPING AND ROTATING EQUIPMENT REMEDIALACTIVITIES
 SCAFFOLDING SUPERVISOR (COURSE CERTIFIED IN QATAR)
 PLANT EQUIPMENT MAINTENANCE, REPAIR, OVERHAUL AND INSTALLATION
 MATERIALS COORDINATION AND SURVEY FOR CONSTRUCTION AND SHUTDOWN
 HEAVY STRUCTURAL FABRICATION AND ERECTION ON OFFSHORE LOCATION
 RIGGING WORKS LIKE HEAVY EQUIPMENT REPLACEMENT AND INSTALLATION
 USING COMPUTER SINCE 1996. PROGRAMS, LIKE WORD, EXCEL, P. POINT, OUTLOOK Etc.
OBJECTIVE
 HIGHLY MOTIVATED TO REACH ON TARGET & FUTURE GOALS INCLUDE EDUCATIONAL LEADING ON ANY CIRCUMSTANCES
 SOLID WORK HISTORY ONSHORE & OFFSHORE, REPUTATION AS A TEAM HOLDER AND PASSION FOR HELPING EACH OTHERS
 DEMONSTRATE THE STANDARD, NEW IDEAAND PRECAUTIONS TO INTERACT WITH MULTINATION COWORKERS
 RELIABLE WORKER, WITH ABILITY AND QUICKLY LEARN NEW CONCEPTS REQUIRMENT ON PROJECTS AND PLANTS
EDUCATIONAL QUALIFICATION
: DIPLOMA IN MECHANICAL ENGINEERING
Institute of Engineering Technology (Recognized by Government of Kerala)
Irinjalakuda, Thrissur, Kerala State.
: JUNIOR TECHNICAL BASICS
Junior Technical School, West Hill, Calicut-5.
ADDED COURSE CERTIFICATES
1, PERSONAL SAFETY & SOCIAL RESPONSIBILITIES (22/05/2002)
2, PERSONAL SURVIVAL TECHNIQUES (18/05/2002)
3, ELEMENTARY FIRST AID (09/05/2002)
4, FIRE PREVENTION AND FIRE FIGHTING (29/05/2002)
5, PTW RECEIVER COURSE (18/09/16 in Qatar QP and Saudi Arabia in Rabigh 10/12/17 and Yasref 20/01/18)
6, HUET COURSE (19/03/2017)
7, S.C.B.A. SET FAMILIARIZATION COURSE (23/12/2014)
8, BASIC SLINGER / RIGGING SAFETY TRAINING (09/02/2016)
9, BASIC SCAFFOLDING SUPERVISOR AWARENESS (08/10/2013)
PERSONNAL INFORMATION
NATIONALITY : INDIAN (Settled in Calicut, Kerala)
DATE OF BIRTH : 31st JANUARY 1966
PASSPORT NUMBER : M2829382 (Validity – 13 OCT 2024, Issued From KOZHIKODE)
DRIVING LICENSE : SN 04003502244315 in Saudi Arabia 27/02/2025, L No 7864/97D in India 30/01/2016.
MARITALAND FAMILY STATUS : MARRIED AND THREE CHILDREN (Boy18 Years. Girls 15 Years and 6 Years)
EXPECTATIONS…………………………...CONSIDARE THE VALUE OF EXPERIEANCE
Page 1 of 5
RESPONSIBILITIES & PART OF EXPERIENCE IN OILAND
GAS, OFFSHORE AND ONSHORE FIELD
1. SAFETY OBSERVATION, HAZARD IDENTIFICATION AND SAFETY CONTROL MEASURE A) TOOL TALK ABOUT SAFE WORK
PROCEDURE B) WORK INSTRUCTION C) K.Y ACTIVITIES (HAZARD PREDICTION PROGRAM) D) J.S.A (JOB SAFETY ANALYSIS)
Safety is everybody’s responsibility, but there is gentle way to feeding in memory that will reduce unsafe act. All personal must keep in attention and knowledge about
the situation and safe work requirement. All time PPE (personal protective equipment), proper GAS monitoring and permit required for all works, especially Hazards and
Dangers. Precaution & Protective Equipment keep to use and take Responsibilities.
2. PERSONAL TRAINING PROGRAM AND SCHEDULE
All personal must be trained and suitable for particular work activities. So we must have training method like Plant Safety Induction, Work at Height, Fire Watcher,
Confined Space Entry, Hole Watcher, H2S and Gas Awareness, Hot Work Permit, LOTO (Lock Out Tag Out), HIRA (Hazard Identification Risk Assessment), PTW
(Permit to Work Course of Receiver, Issuer)
3. MAINTENANCE AND SHUTDOWN
Maintenance keeps in quality on work request or work order. A quality job must be given to more and extra life on equipment’s, steel sections and pipe work. IN
SHUTDOWN... Take survey and verify readiness before execution on all works. And all information must give detailed in scope of work summary. Pre-fab as much as
possible and arrange equipment, tools and job materials on nearest location. Make sure out-standing materials on time at site. Utilize man power to reduce workload.
3. DOCUMENTATION, DRAWINGS AND SURVEY
Check received Document, Drawing and carried survey for work, materials and dimensional requirements for maximum length. Co-ordinate and plan about work. Check
materials availability and order. After fabrication job arrange pressure test, inspection and blasting and painting. Then make completion certificate to submit. Keep
documents for insurance and future reference.
4. MATERIALS HANDLING AND STORE KEEPING
Materials must be in standard specification because it concerning safety and health risks. The entire item must have heat no material code and details of size on it.
Survey all the items in the store and tags on with lot number make stock card with location for quantity issued and received. Keep all material certificate and documents.
Materials should have proper covering to protection and store
5. PIPING AND STEEL STRUCTURAL FABRICATION
All kind of Fabrication works like new structure and pipe work, Modifications and Remedial works on live line & new, liquid gas Pipeline and Hot work activities in live
plant Fabrication Erection and Extensions works many size of Structure on onshore and offshore. Oil well jackets, Tubular and Hollow Section Boat landing, Pipe work
& Supports are familiar
6. WELDING QUALITY AND INSPECTION PROCEDURE
All the welds keep as a quality weld. Clean the surface preheats if required and use baking, holding, working ovens to keep electrodes efficiency. Use procedure when
weld give to qualified welder. Achieve good welds better than loss of weld. Prepare good joints and use consumable correctly. Weld has to be inspected (RT, UT, DPI,
MPI) as required in the drawing
7. RIGGING, RIGGING TOOLS AND EQUIPMENTS
Plan the Rigging movement. When heavy equipment, Structural steel works or Pipe works to move on Locate or position in any elevation arrange perfect signal
person. Use equipment’s certified and don't overload on it, inspect them before use, Stop unsafe act, after use store properly
8. SCAFFOLDING ERECTION, DISMANTLING AND INSPECTION
Surveying to erect scaffolding and arrange tubes, fittings & boards to build as per load and requirement. Inspect erected scaffolding with check list to approve. Then
put tags on. Follow the OSHA & BS regulations. Orderly dismantle start from top.
9. BLASTING AND INTERNAL / EXTERNAL COATING (SSPC / NACE)
The three elements needed for corrosion to occur, Anode, Cathode and Electrolyte. So Coating system placing a barrier between the electrolyte and anodic and cathodic
areas, before coating or painting surface preparation is required the most one is Grit Blasting used by garnet and check blasting profile. As per specification. Coating apply
micro thick layer and keep dry hours and next layer.
10. TESTING AND INSTALLATION
Pressure test will be on test pressure, and remove certified equipment from system like control valve, orifice plate, thermowell, flow meter, flow indicator & working
pressure gauge. Use Drawings, P & ID, and Equipment Instructions to complete installation. And Use punch list to complete system requirements.
11. HOT WORK AND SITE PREPARATIONS
Hot work at live plant is very care full activity. Make permit and prepare protective safety equipment on work location. Keep precautions, take care hazards and clean
around area, system and tools for hot works. Make sure system and pipe lines properly depressurized, drained, N2 Purged and required isolation taken. Habitat work
point to control Heat, Naked flames, arcs, Flying particles or sparks. Make Gas test to sure oil & gas free at work site.
12. CERTIFICATION AND CALIBRATION
All certification required equipment put it in list with due date for re-calibration. Show the expiry date sticker on equipment’s. Store equipment’s and calibration tools in
proper way to next use. Color coding and Re-certification of rigging tackles to check thoroughly. Never use rejected items and as soon as remove from work site. Each
items check properly every time before to use, it’s very important.
13. CONSUMABLE AND TOOLS
Provide better quality tools and consumables then will get more life and long period to use and safe to work. After use tool will clean and keep on place. Monitor all
the consumable usage and keep record how much issued and where used it.
14. EQUIPMENT MAINTENANCE AND REPAIRS
All daily working Equipment must maintain constantly it’s in daily, weekly, monthly become overall check. All activity in running machinery keeps in record to repairs
& maintenance properly. Loose parts & consumption like Oil, Fan belt, Filter, Battery keep in stock. Try to shoot out before trouble and avoid break down it will reduce
repairs & maintenance cost. Before major repair or overhaul make sure all spare parts a tools ready and working condition.
15. CREW CHANGING AND UPDATING I.D CARD AND TRAINING COURSE
Make crew list with complete information like personal details, Leave due and expiry date of I.D Cards, B.A & HUET Course cards etc. And prepare one certificate holder
file for Welders, Riggers, Safflowers, Painting inspector, welding inspector, N.D.T Technician Certificate etc. Follow re-certification and update all information.
Page 2 of 5
EXPERIENCE IN SHORT
PERIOD..........AUGUST 2014 TO DECEMBER 2016
EMPLOYER 6) SANKYU SAUDI ARABIACO, Solid Handling Operation & GMS Maintenance Department
POSITION MAINTAIN AS A MECHANICAL SUPERVISOR. Static, Rotating and General Maintenance
CLIENT 8) YASREF, Yanbu Aramco Sinopec Refining Company
9) PETRO RABIGH, Refining and Petrochemical Company
PROJECT 10) MAIN MAINTENANCE CONTRACTOR IN YASREF
JOB DESCRIPTION: In Yasref We have permanent base crew for plant routine maintenance and general maintenance service team, my
responsibilities to fulfill technical support and base crew requirements and plant rotating equipment and process equipment repair,
overhaul, system modification, replacement, insulation, refractory, emergency leak sealing on system live line, internal cleaning, blasting,
coating. And Handling MOC (Management of Change) estimating, ordering materials, providing requirement each targets and
engineering controlling, cost controlling and time limits to archive the target on time. There is back up emergency crew to utilize in unit
like DCU, CDU, HCK, AIR LIQUID, GASOLINE, SULFUR, UTILITY, TANKFARM, SP-3, PS-7 and DHT. Also successfully complete
2016 shut duwn
PERIOD..........JUNE 2003 TO JULY 2014
EMPLOYER 5) HALUL OFFSHORE SERVICES CO WLL, Construction & Maintenance Department
POSITION MAINTAIN AS A MECHANICAL SUPERVISOR CUM GENERAL FOREMAN
CLIENT 7) QATAR PETROLEUM (Q.P) OFFSHORE DIVISION
PROJECT 9) GTC Contract No. GTC/171/FS (O)/02) Offshore Field and Halul Island in Qatar.
JOB DESCRIPTION: There is Construction and Maintenance job on going...., my responsibility for Maintenance jobs including
Shutdown on Qatar Petroleum production platforms PS1, PS2, PS3, PS4 and Halul Terminal. Like Repair, Replacement, Renewal,
Remedial job and Overhauling Plant Equipment’s and Supporting to specialist for major repair and venture parts. It’s in any time for
Emergency. Most of big part we are construct in Halul Island like Boat landing, Platform Extension, Channel Buoy, Hanger Buoy,
Manifold and Hook-up, HP, LP, Process Pipe Line work. And Blasting, Painting, Scaffolding, Flashing, Line Testing and Inspection
Etc. We are specialist for all kind Flare Tips Fabrication and Replacement. As well as Liquid dirty oil burning tips. All the Rigging
activities on wellhead jackets and production platforms Like loading unloading for facilities, and Equipment installation and erection on
right position.
PERIOD..........MAY 1998 TO MAY 2003
EMPLOYER 4) MANSAL OFFSHORE Q.S.C, Construction & Maintenance Department.
POSITION MAINTAIN AS A MECHANICAL GENERAL FOREMAN
CLIENT 7) QATAR PETROLEUM (Q.P) OFFSHORE DIVISION
PROJECT 9) GTC Contract No. GTC/111/FS (O)/02) Offshore Field and Halul Island in Qatar.
JOB DESCRIPTION: There is Construction and Maintenance job on going...., My Responsible for Maintenance jobs including
Shutdown on Q.P Offshore production platforms PS1, PS2, PS3, PS4 and Halul Terminal. Like Repair, Replacement, Renewal,
Remedial job and Overhauling Plant Equipment’s and Supporting to specialist for major repair and venture parts. It’s in any time for
Emergency. Most of big part we are constructing in Halul Island like Boat landing, Platform Extension, Channel Buoy, Hanger Buoy,
Manifold and Hook-up, H.P, L.P, Process Pipe Line work. And Blasting, Painting, Scaffolding, Flashing, Line Testing and Inspection
Etc. We are responsible for all kind of mechanical emergency job in around all Q.P facilities on offshore.
Page 3 of 5
EXPERIENCE IN SHORT
PERIOD.........JUNE 1997 TO FEB. 1998
EMPLOYER 3) CONSOLIDATED CONTRACTORS INTERNATIONAL COMPANY LTD (CCIC)
POSITION AS A PIPING FOREMAN
CLIENT 6) JGC / KELLOGG, Raslaffan, Doha, Qatar.
PROJECT 8) RAS GAS ONSHORE LNG FACILITIES (RLL) Raslaffan, Doha, Qatar.
JOB DESCRIPTION: In RLL Project I got responsibilities to keep schedules. Checking materials availability and arrange bill of
materials as per drawing, spools wise to proceed fabrication. And lead the work shop fabrication crew and Welding completed spools
keep clear and Transfer to yard for inspection, painting, covering and marking completed spools keeping with tags in lay down area as
per requirement of site installation. There was Train I and II spools in above ground and underground all around 8500 spools in CS,
LTCS, SS, Cu Ni and Galvanized metals. Have to keep record for big target. Daily, weekly, and monthly production reports and spool
movement for installation. All document to keep as per ISO 9000 series
PERIOD...........JUNE 1995 TO MAY 1997
EMPLOYER 3) CONSOLIDATED CONTRACTORS INTERNATIONAL COMPANY LTD (CCIC)
POSITION AS A PIPING FOREMAN
CLIENT 5) CHIYODA
PROJECT 7) QATAR GAS LNG PROJECT (QLNG), Raslaffan, Doha, Qatar.
JOB DESCRIPTION: In QLNG Project CCIC has three fabrication work shop (CS, LTCS, SS,) my responsibilities in stainless steel
(SS) spools fabrication work shop. There were leading 50 workers in 10 crews. As per priorities wise releasing drawing, arranging
materials, and issuing to crew. Checking spool dimensions as per drawing orientation and component requirements and take out spools
from fabrication shop to inspection and sending to blasting/painting. Keeping daily report, weekly progress reporting, schedule
updating and arrange tool talk for safety and environment.
PERIOD..........NOV. 1994 TO APRIL 1995
EMPLOYER 2) BUILDERS & ENGINEERS
POSITION AS A FOREMAN (GENERAL)
CLIENT 4) L & T
PROJECT 6) R.A.P.P
JOB DESCRIPTION: There were two heavy condensers to build heavy water cooling system. My duty is materials & equipment
receiving and keeping as per drawings priority wise in both condenser area, phase I and phase II. Received all materials in 6 month and
kept one by one as near as to installation point as per priority. Height marked heat numbers and item numbers on all bit and piece. Local
labor are their work force for documentation. All the prefabricated items and equipment’s are stored and noted in record document as
area wise marked for finding out to install. Lay out both condenser as per plan drawing and plant elevation. Locate all the important
points’ equipment position in all elevation for equipment’s erecting on location.
Page 4 of 5
EXPERIENCE IN SHORT
PERIOD...........DEC. 1990 T0 APRIL 1994
EMPLOYER 1) TAMIMI CONSTRUCTION DIVISION
“TAFMEC” AND “TAFCON”
POSITION AS A PIPING FOREMAN
CLIENT 3) SAUDI SHINWHA COMPANY
2) NATIONAL METHANOL COMPANY
1) SAUDI ARAMCO
PROJECT 5) NAPC, Safaniya, Saudi Arabia.
JOB DESCRIPTION: it was my last project in Tamimi Co. We got "FBE"(Fusion Bound Epoxy) internal coated spools fabrications in
our company work shop. Received FBE coated pipes, fittings and start as per drawing 48" die header 28. M long in three pieces. We
used better method to protect internal coating from cutting welding burns. We shoot out falls in the drawings and carried out site survey
to renew the drawings. Work has been completed on right time
PROJECT 4) OSBL MECHANICAL PROJECT, Jubail Industrial city, Saudi Arabia.
JOB DESCRIPTION: We had prefabricated spools erection and lot of field joints in various size of pipe. Our crew got responsible on
flare line. Every process line connecting to flare line. It’s running big and big bore to flare in high elevation and Hanged small bore
pipe rack along with Flare line for utility lines and Flare related like pilot gas and igniters etc. The entire job we completed on
schedule. And company take extra job to erect number of pump & modify pipe spool belongs to pump for Alignment purpose.
PROJECT 3) UR – RAZI II, Jubail Industrial city, Saudi Arabia.
JOB DESCRIPTION: There was to erect spare Boiler and commissioning to live utility systems in live plant. My responsible to
layout & erect Boiler and Equipment on concrete foundation base. We got one Japanese guy instructor from Boiler Company Align
and elevation checks on all Base plates for boiler and around equipment grouting bolt holes. We brought Boiler near to foundation
load transfer to temporary beam structure with roller & slide-in onto foundation. Lifted by jack & removed structure
PROJECT 2) GOSP I TO IV, Ainakkal, Saudi Arabia.
JOB DESCRIPTION: There was an expansion works in four manifold station and maintenance works during individual shutdown.
We fabricate Supports, Spools and test expansion Spools. And arrange everything in each tie-in points for shutdown preparations.
Erect Supports, Manifold and one by one Spool. All Flange tighten, Spools secured and all component fixed on system. We got
experience from previous shutdown to complete other Manifold in better time. And we got good result.
PROJECT 1) AINDAR & SHEDGUM “WIPS” (Water Injection Pump Station), Ainakkal, Saudi Arabia.
JOB DESCRIPTION : I was held complete responsibilities in shop fabrication of internal coated pipes, in various size range of pipe
2" to 36" diameter. During fabrication I establish more method to protect internal coating from cutting& welding burns. Complete
spool as per shutdown priority and keeping proper end covering to save internal coating. During shutdown we had 10 days non-stop
job in AINDAR and 10 days in SHEDGUM.
Page 5 of 5

Recomendados

CV Piping Supervisor por
CV Piping SupervisorCV Piping Supervisor
CV Piping SupervisorDelfim Moreira
1.1K vistas4 diapositivas
Cv mechanical supervisor por
Cv mechanical supervisorCv mechanical supervisor
Cv mechanical supervisorJames Ct
6.3K vistas4 diapositivas
Amjad CV Pipeing sup 2016 por
Amjad CV Pipeing sup 2016Amjad CV Pipeing sup 2016
Amjad CV Pipeing sup 2016Amjad Goraya
3.2K vistas3 diapositivas
RESUME PIPING SUPERVISOR por
RESUME PIPING SUPERVISORRESUME PIPING SUPERVISOR
RESUME PIPING SUPERVISORNOORUDDIN SHAIKH
24.7K vistas4 diapositivas
Karthik Resume por
Karthik Resume Karthik Resume
Karthik Resume KARTHIK NATARAJAN
990 vistas4 diapositivas
Leo Doc (CV)A(Mechanical Supervisor) por
Leo Doc (CV)A(Mechanical Supervisor)Leo Doc (CV)A(Mechanical Supervisor)
Leo Doc (CV)A(Mechanical Supervisor)Leonardo David
1.9K vistas9 diapositivas

Más contenido relacionado

La actualidad más candente

Offshore shift supervisor cum Offshore Construction Superintendent por
Offshore shift supervisor cum Offshore Construction SuperintendentOffshore shift supervisor cum Offshore Construction Superintendent
Offshore shift supervisor cum Offshore Construction SuperintendentMuhammad MuhdKhairul
1.7K vistas21 diapositivas
Cv for qc inspector mechanical por
Cv for qc inspector mechanicalCv for qc inspector mechanical
Cv for qc inspector mechanicalShaik Ghouse
11.5K vistas7 diapositivas
Mechanical Maintenance Supervisor CV por
Mechanical  Maintenance  Supervisor CVMechanical  Maintenance  Supervisor CV
Mechanical Maintenance Supervisor CVvaithiya nathan
20.7K vistas10 diapositivas
PIPING SUPERVISOR RESUME por
PIPING SUPERVISOR RESUME  PIPING SUPERVISOR RESUME
PIPING SUPERVISOR RESUME Raghavendra Velayutharaja
31K vistas7 diapositivas
Rizwan Piping Supervisor por
Rizwan Piping SupervisorRizwan Piping Supervisor
Rizwan Piping SupervisorRizwan Haider
1K vistas8 diapositivas
Resume- Rotating Equipment supervisor por
Resume- Rotating Equipment supervisorResume- Rotating Equipment supervisor
Resume- Rotating Equipment supervisornitin mokal
4K vistas3 diapositivas

La actualidad más candente(20)

Offshore shift supervisor cum Offshore Construction Superintendent por Muhammad MuhdKhairul
Offshore shift supervisor cum Offshore Construction SuperintendentOffshore shift supervisor cum Offshore Construction Superintendent
Offshore shift supervisor cum Offshore Construction Superintendent
Muhammad MuhdKhairul1.7K vistas
Cv for qc inspector mechanical por Shaik Ghouse
Cv for qc inspector mechanicalCv for qc inspector mechanical
Cv for qc inspector mechanical
Shaik Ghouse11.5K vistas
Mechanical Maintenance Supervisor CV por vaithiya nathan
Mechanical  Maintenance  Supervisor CVMechanical  Maintenance  Supervisor CV
Mechanical Maintenance Supervisor CV
vaithiya nathan20.7K vistas
Resume- Rotating Equipment supervisor por nitin mokal
Resume- Rotating Equipment supervisorResume- Rotating Equipment supervisor
Resume- Rotating Equipment supervisor
nitin mokal4K vistas
Anas M H Mechanical Piping Engineer 2016 por Anas M H
Anas M H Mechanical Piping Engineer 2016Anas M H Mechanical Piping Engineer 2016
Anas M H Mechanical Piping Engineer 2016
Anas M H1K vistas
En-Waleed Ibrahim Sr. Construction Piping Engineer cv por waleed ibrahim
En-Waleed Ibrahim Sr. Construction Piping Engineer     cvEn-Waleed Ibrahim Sr. Construction Piping Engineer     cv
En-Waleed Ibrahim Sr. Construction Piping Engineer cv
waleed ibrahim1.8K vistas
CV Field Mechanical and Piping Engineer por Popovici Adrian
CV Field  Mechanical  and Piping EngineerCV Field  Mechanical  and Piping Engineer
CV Field Mechanical and Piping Engineer
Popovici Adrian2.3K vistas
QA/QC Mechanical and Welding Inspector por Asad Ahsan
QA/QC Mechanical and Welding InspectorQA/QC Mechanical and Welding Inspector
QA/QC Mechanical and Welding Inspector
Asad Ahsan3.4K vistas
Nasheem CV- Commissioning Technician por Naseem Ansari
Nasheem CV- Commissioning TechnicianNasheem CV- Commissioning Technician
Nasheem CV- Commissioning Technician
Naseem Ansari1.7K vistas
CV for Static & Package Equipment Engineer (PMC) - V.M.Rao. por Madhava Rao V
CV for Static & Package Equipment Engineer (PMC) - V.M.Rao.CV for Static & Package Equipment Engineer (PMC) - V.M.Rao.
CV for Static & Package Equipment Engineer (PMC) - V.M.Rao.
Madhava Rao V2.3K vistas
Cv of qaqc, inspection engineer, welding, painting & coating inspector. s.san... por Sangilimuthu Samiayyah
Cv of qaqc, inspection engineer, welding, painting & coating inspector. s.san...Cv of qaqc, inspection engineer, welding, painting & coating inspector. s.san...
Cv of qaqc, inspection engineer, welding, painting & coating inspector. s.san...
Sangilimuthu Samiayyah24.6K vistas
Piping foreman resume Binoy tc por BINOY TC
Piping foreman resume Binoy tcPiping foreman resume Binoy tc
Piping foreman resume Binoy tc
BINOY TC3.9K vistas
Mechanical Technician por Rashid Minhas
Mechanical TechnicianMechanical Technician
Mechanical Technician
Rashid Minhas3.3K vistas
MEP Supervisor por Arun Arun
MEP SupervisorMEP Supervisor
MEP Supervisor
Arun Arun3.2K vistas

Destacado

C.V por
C.VC.V
C.Vasaad hadey
1.1K vistas14 diapositivas
SITE MECHANICAL SUPERVISOR - Copy por
SITE MECHANICAL SUPERVISOR - CopySITE MECHANICAL SUPERVISOR - Copy
SITE MECHANICAL SUPERVISOR - Copyyoussef youssef
1.9K vistas8 diapositivas
Jasmine Barksdale Professional Resume Resumes %25282%2529 (1) por
Jasmine Barksdale Professional Resume  Resumes %25282%2529 (1)Jasmine Barksdale Professional Resume  Resumes %25282%2529 (1)
Jasmine Barksdale Professional Resume Resumes %25282%2529 (1)Jasmine Barksdale
639 vistas4 diapositivas
RESUME - Abhay Paranjape por
RESUME - Abhay ParanjapeRESUME - Abhay Paranjape
RESUME - Abhay ParanjapeAbhay Paranjape
808 vistas5 diapositivas
Madan 0816 por
Madan 0816Madan 0816
Madan 0816Madan Gupta
579 vistas6 diapositivas
Actuators por
ActuatorsActuators
ActuatorsAnurag Chaudhary
14.3K vistas21 diapositivas

Destacado(18)

SITE MECHANICAL SUPERVISOR - Copy por youssef youssef
SITE MECHANICAL SUPERVISOR - CopySITE MECHANICAL SUPERVISOR - Copy
SITE MECHANICAL SUPERVISOR - Copy
youssef youssef1.9K vistas
Jasmine Barksdale Professional Resume Resumes %25282%2529 (1) por Jasmine Barksdale
Jasmine Barksdale Professional Resume  Resumes %25282%2529 (1)Jasmine Barksdale Professional Resume  Resumes %25282%2529 (1)
Jasmine Barksdale Professional Resume Resumes %25282%2529 (1)
Jasmine Barksdale639 vistas
E&I QA QC SUPERVISOR....ORGINAL 2 por mohammad tanweer
E&I QA QC  SUPERVISOR....ORGINAL 2E&I QA QC  SUPERVISOR....ORGINAL 2
E&I QA QC SUPERVISOR....ORGINAL 2
mohammad tanweer3.7K vistas
Biotech job descriptions salary ranges por Syed Shahid Ali
Biotech job descriptions salary rangesBiotech job descriptions salary ranges
Biotech job descriptions salary ranges
Syed Shahid Ali3.6K vistas
MECHANICAL SUPERVISOR 007 por REHAN MUMTAZ
MECHANICAL SUPERVISOR 007MECHANICAL SUPERVISOR 007
MECHANICAL SUPERVISOR 007
REHAN MUMTAZ1.8K vistas
Digital marketing manager por kianmartin943
Digital marketing managerDigital marketing manager
Digital marketing manager
kianmartin943593 vistas
Golam Md. Enamul Haque por memasum13
Golam Md. Enamul HaqueGolam Md. Enamul Haque
Golam Md. Enamul Haque
memasum13624 vistas
Cpil submissions on cji's remark revised por cjarindia
Cpil submissions on cji's remark revisedCpil submissions on cji's remark revised
Cpil submissions on cji's remark revised
cjarindia536 vistas
USAJOBS - Resumes por Jonathon Orr
USAJOBS - ResumesUSAJOBS - Resumes
USAJOBS - Resumes
Jonathon Orr1.9K vistas
Ernie Engr. Supervisor or Commissioning Engr. - Updated por Ernesto Costorio
Ernie Engr. Supervisor or Commissioning Engr. - UpdatedErnie Engr. Supervisor or Commissioning Engr. - Updated
Ernie Engr. Supervisor or Commissioning Engr. - Updated
Ernesto Costorio496 vistas
Mark J. Russell -current resume por Mark Russell
Mark J. Russell -current resumeMark J. Russell -current resume
Mark J. Russell -current resume
Mark Russell1.4K vistas

Similar a SUPERVISOR CV for ONSHORE and OFFSHORE MECHANICAL, MANTENANCE, CONSTRUCTION in ENGINEERING JOBS

Jayshish (1) por
Jayshish (1)Jayshish (1)
Jayshish (1)jayshish patel
313 vistas7 diapositivas
Shibu Thomas-CV por
Shibu Thomas-CVShibu Thomas-CV
Shibu Thomas-CVSHIBU THOMAS
590 vistas5 diapositivas
Profile kumaresan por
Profile        kumaresanProfile        kumaresan
Profile kumaresanKumaresan Arumainathan
275 vistas7 diapositivas
OH&S Audit Report- JSW Nandyal.doc por
OH&S Audit Report- JSW Nandyal.docOH&S Audit Report- JSW Nandyal.doc
OH&S Audit Report- JSW Nandyal.docMirza Saifullah Baig
150 vistas15 diapositivas
T.rajakumar.cv por
T.rajakumar.cvT.rajakumar.cv
T.rajakumar.cvrajakumar kumar
236 vistas11 diapositivas
Latest update CV por
Latest update CVLatest update CV
Latest update CVKishore Kumar
247 vistas5 diapositivas

Similar a SUPERVISOR CV for ONSHORE and OFFSHORE MECHANICAL, MANTENANCE, CONSTRUCTION in ENGINEERING JOBS(20)

Mechanical resume (1) por jesu lambert
Mechanical resume (1)Mechanical resume (1)
Mechanical resume (1)
jesu lambert468 vistas
srini cv latest por Srini vasan
srini cv latestsrini cv latest
srini cv latest
Srini vasan700 vistas
Shaikh Mohammed Soaeb Abdulvahab por shaikh soaeb
Shaikh Mohammed Soaeb AbdulvahabShaikh Mohammed Soaeb Abdulvahab
Shaikh Mohammed Soaeb Abdulvahab
shaikh soaeb85 vistas
iain loudon CV 2016 por Iain Loudon
iain loudon CV 2016iain loudon CV 2016
iain loudon CV 2016
Iain Loudon140 vistas

SUPERVISOR CV for ONSHORE and OFFSHORE MECHANICAL, MANTENANCE, CONSTRUCTION in ENGINEERING JOBS

  • 1. 27YEARS GULF EXPERIENCE CVIN OIL&GAS (1989 T0 2016) NAME AND ADDRESS SALEEM PUTHIYA PONNAMBATH FOR COMMUNICATION SAAF, 20/198A, M.S.BABURAJ ROAD, P.O. KALLAI, CALICUT DISTRICT-673003, KERALA STATE, INDIA. PHONE LAND: 0091-495-2321651, (INDIA_CALICUT) PHONE MOBILE: 0091--9846471611, 8547221651, 9567195076 (INDIA_CALICUT) E-MAIL: saleemsakki123@hotmail.com, yahoo.com AND gmail.com PRESENT POSITION……. ..…… MECHANICAL SUPERVISOR for OIL &GAS REFINERY and OFFSHORE .…... OIL&GAS WELL STATION in MAINTENANCE ENGINEERING JOBs PREVIOUS POSITIONS…….  MECHANICAL SUPERVISOR, MAINTENANCE OF STATIC AND ROTATING EQUIPMENTS  GENARAL FOREMAN PIPING, CONSTRUCTION AND MAINTENANCE  GENERAL FOREMAN, PIPING AND CONSTRUCTION  PIPING FOREMAN, FABRICATION AND INSTALLATION  FOREMAN GENERAL CONSTRUCTION WORK OPTIONAL SKILLS  SAFETY OBSERVATION ON SITE AND HAZARD IDENTIFICATION ON WORK AREA  REFACTORY AND INSULATION FOR PIPING AND ROTATING EQUIPMENT REMEDIALACTIVITIES  SCAFFOLDING SUPERVISOR (COURSE CERTIFIED IN QATAR)  PLANT EQUIPMENT MAINTENANCE, REPAIR, OVERHAUL AND INSTALLATION  MATERIALS COORDINATION AND SURVEY FOR CONSTRUCTION AND SHUTDOWN  HEAVY STRUCTURAL FABRICATION AND ERECTION ON OFFSHORE LOCATION  RIGGING WORKS LIKE HEAVY EQUIPMENT REPLACEMENT AND INSTALLATION  USING COMPUTER SINCE 1996. PROGRAMS, LIKE WORD, EXCEL, P. POINT, OUTLOOK Etc. OBJECTIVE  HIGHLY MOTIVATED TO REACH ON TARGET & FUTURE GOALS INCLUDE EDUCATIONAL LEADING ON ANY CIRCUMSTANCES  SOLID WORK HISTORY ONSHORE & OFFSHORE, REPUTATION AS A TEAM HOLDER AND PASSION FOR HELPING EACH OTHERS  DEMONSTRATE THE STANDARD, NEW IDEAAND PRECAUTIONS TO INTERACT WITH MULTINATION COWORKERS  RELIABLE WORKER, WITH ABILITY AND QUICKLY LEARN NEW CONCEPTS REQUIRMENT ON PROJECTS AND PLANTS EDUCATIONAL QUALIFICATION : DIPLOMA IN MECHANICAL ENGINEERING Institute of Engineering Technology (Recognized by Government of Kerala) Irinjalakuda, Thrissur, Kerala State. : JUNIOR TECHNICAL BASICS Junior Technical School, West Hill, Calicut-5. ADDED COURSE CERTIFICATES 1, PERSONAL SAFETY & SOCIAL RESPONSIBILITIES (22/05/2002) 2, PERSONAL SURVIVAL TECHNIQUES (18/05/2002) 3, ELEMENTARY FIRST AID (09/05/2002) 4, FIRE PREVENTION AND FIRE FIGHTING (29/05/2002) 5, PTW RECEIVER COURSE (18/09/16 in Qatar QP and Saudi Arabia in Rabigh 10/12/17 and Yasref 20/01/18) 6, HUET COURSE (19/03/2017) 7, S.C.B.A. SET FAMILIARIZATION COURSE (23/12/2014) 8, BASIC SLINGER / RIGGING SAFETY TRAINING (09/02/2016) 9, BASIC SCAFFOLDING SUPERVISOR AWARENESS (08/10/2013) PERSONNAL INFORMATION NATIONALITY : INDIAN (Settled in Calicut, Kerala) DATE OF BIRTH : 31st JANUARY 1966 PASSPORT NUMBER : M2829382 (Validity – 13 OCT 2024, Issued From KOZHIKODE) DRIVING LICENSE : SN 04003502244315 in Saudi Arabia 27/02/2025, L No 7864/97D in India 30/01/2016. MARITALAND FAMILY STATUS : MARRIED AND THREE CHILDREN (Boy18 Years. Girls 15 Years and 6 Years) EXPECTATIONS…………………………...CONSIDARE THE VALUE OF EXPERIEANCE Page 1 of 5
  • 2. RESPONSIBILITIES & PART OF EXPERIENCE IN OILAND GAS, OFFSHORE AND ONSHORE FIELD 1. SAFETY OBSERVATION, HAZARD IDENTIFICATION AND SAFETY CONTROL MEASURE A) TOOL TALK ABOUT SAFE WORK PROCEDURE B) WORK INSTRUCTION C) K.Y ACTIVITIES (HAZARD PREDICTION PROGRAM) D) J.S.A (JOB SAFETY ANALYSIS) Safety is everybody’s responsibility, but there is gentle way to feeding in memory that will reduce unsafe act. All personal must keep in attention and knowledge about the situation and safe work requirement. All time PPE (personal protective equipment), proper GAS monitoring and permit required for all works, especially Hazards and Dangers. Precaution & Protective Equipment keep to use and take Responsibilities. 2. PERSONAL TRAINING PROGRAM AND SCHEDULE All personal must be trained and suitable for particular work activities. So we must have training method like Plant Safety Induction, Work at Height, Fire Watcher, Confined Space Entry, Hole Watcher, H2S and Gas Awareness, Hot Work Permit, LOTO (Lock Out Tag Out), HIRA (Hazard Identification Risk Assessment), PTW (Permit to Work Course of Receiver, Issuer) 3. MAINTENANCE AND SHUTDOWN Maintenance keeps in quality on work request or work order. A quality job must be given to more and extra life on equipment’s, steel sections and pipe work. IN SHUTDOWN... Take survey and verify readiness before execution on all works. And all information must give detailed in scope of work summary. Pre-fab as much as possible and arrange equipment, tools and job materials on nearest location. Make sure out-standing materials on time at site. Utilize man power to reduce workload. 3. DOCUMENTATION, DRAWINGS AND SURVEY Check received Document, Drawing and carried survey for work, materials and dimensional requirements for maximum length. Co-ordinate and plan about work. Check materials availability and order. After fabrication job arrange pressure test, inspection and blasting and painting. Then make completion certificate to submit. Keep documents for insurance and future reference. 4. MATERIALS HANDLING AND STORE KEEPING Materials must be in standard specification because it concerning safety and health risks. The entire item must have heat no material code and details of size on it. Survey all the items in the store and tags on with lot number make stock card with location for quantity issued and received. Keep all material certificate and documents. Materials should have proper covering to protection and store 5. PIPING AND STEEL STRUCTURAL FABRICATION All kind of Fabrication works like new structure and pipe work, Modifications and Remedial works on live line & new, liquid gas Pipeline and Hot work activities in live plant Fabrication Erection and Extensions works many size of Structure on onshore and offshore. Oil well jackets, Tubular and Hollow Section Boat landing, Pipe work & Supports are familiar 6. WELDING QUALITY AND INSPECTION PROCEDURE All the welds keep as a quality weld. Clean the surface preheats if required and use baking, holding, working ovens to keep electrodes efficiency. Use procedure when weld give to qualified welder. Achieve good welds better than loss of weld. Prepare good joints and use consumable correctly. Weld has to be inspected (RT, UT, DPI, MPI) as required in the drawing 7. RIGGING, RIGGING TOOLS AND EQUIPMENTS Plan the Rigging movement. When heavy equipment, Structural steel works or Pipe works to move on Locate or position in any elevation arrange perfect signal person. Use equipment’s certified and don't overload on it, inspect them before use, Stop unsafe act, after use store properly 8. SCAFFOLDING ERECTION, DISMANTLING AND INSPECTION Surveying to erect scaffolding and arrange tubes, fittings & boards to build as per load and requirement. Inspect erected scaffolding with check list to approve. Then put tags on. Follow the OSHA & BS regulations. Orderly dismantle start from top. 9. BLASTING AND INTERNAL / EXTERNAL COATING (SSPC / NACE) The three elements needed for corrosion to occur, Anode, Cathode and Electrolyte. So Coating system placing a barrier between the electrolyte and anodic and cathodic areas, before coating or painting surface preparation is required the most one is Grit Blasting used by garnet and check blasting profile. As per specification. Coating apply micro thick layer and keep dry hours and next layer. 10. TESTING AND INSTALLATION Pressure test will be on test pressure, and remove certified equipment from system like control valve, orifice plate, thermowell, flow meter, flow indicator & working pressure gauge. Use Drawings, P & ID, and Equipment Instructions to complete installation. And Use punch list to complete system requirements. 11. HOT WORK AND SITE PREPARATIONS Hot work at live plant is very care full activity. Make permit and prepare protective safety equipment on work location. Keep precautions, take care hazards and clean around area, system and tools for hot works. Make sure system and pipe lines properly depressurized, drained, N2 Purged and required isolation taken. Habitat work point to control Heat, Naked flames, arcs, Flying particles or sparks. Make Gas test to sure oil & gas free at work site. 12. CERTIFICATION AND CALIBRATION All certification required equipment put it in list with due date for re-calibration. Show the expiry date sticker on equipment’s. Store equipment’s and calibration tools in proper way to next use. Color coding and Re-certification of rigging tackles to check thoroughly. Never use rejected items and as soon as remove from work site. Each items check properly every time before to use, it’s very important. 13. CONSUMABLE AND TOOLS Provide better quality tools and consumables then will get more life and long period to use and safe to work. After use tool will clean and keep on place. Monitor all the consumable usage and keep record how much issued and where used it. 14. EQUIPMENT MAINTENANCE AND REPAIRS All daily working Equipment must maintain constantly it’s in daily, weekly, monthly become overall check. All activity in running machinery keeps in record to repairs & maintenance properly. Loose parts & consumption like Oil, Fan belt, Filter, Battery keep in stock. Try to shoot out before trouble and avoid break down it will reduce repairs & maintenance cost. Before major repair or overhaul make sure all spare parts a tools ready and working condition. 15. CREW CHANGING AND UPDATING I.D CARD AND TRAINING COURSE Make crew list with complete information like personal details, Leave due and expiry date of I.D Cards, B.A & HUET Course cards etc. And prepare one certificate holder file for Welders, Riggers, Safflowers, Painting inspector, welding inspector, N.D.T Technician Certificate etc. Follow re-certification and update all information. Page 2 of 5
  • 3. EXPERIENCE IN SHORT PERIOD..........AUGUST 2014 TO DECEMBER 2016 EMPLOYER 6) SANKYU SAUDI ARABIACO, Solid Handling Operation & GMS Maintenance Department POSITION MAINTAIN AS A MECHANICAL SUPERVISOR. Static, Rotating and General Maintenance CLIENT 8) YASREF, Yanbu Aramco Sinopec Refining Company 9) PETRO RABIGH, Refining and Petrochemical Company PROJECT 10) MAIN MAINTENANCE CONTRACTOR IN YASREF JOB DESCRIPTION: In Yasref We have permanent base crew for plant routine maintenance and general maintenance service team, my responsibilities to fulfill technical support and base crew requirements and plant rotating equipment and process equipment repair, overhaul, system modification, replacement, insulation, refractory, emergency leak sealing on system live line, internal cleaning, blasting, coating. And Handling MOC (Management of Change) estimating, ordering materials, providing requirement each targets and engineering controlling, cost controlling and time limits to archive the target on time. There is back up emergency crew to utilize in unit like DCU, CDU, HCK, AIR LIQUID, GASOLINE, SULFUR, UTILITY, TANKFARM, SP-3, PS-7 and DHT. Also successfully complete 2016 shut duwn PERIOD..........JUNE 2003 TO JULY 2014 EMPLOYER 5) HALUL OFFSHORE SERVICES CO WLL, Construction & Maintenance Department POSITION MAINTAIN AS A MECHANICAL SUPERVISOR CUM GENERAL FOREMAN CLIENT 7) QATAR PETROLEUM (Q.P) OFFSHORE DIVISION PROJECT 9) GTC Contract No. GTC/171/FS (O)/02) Offshore Field and Halul Island in Qatar. JOB DESCRIPTION: There is Construction and Maintenance job on going...., my responsibility for Maintenance jobs including Shutdown on Qatar Petroleum production platforms PS1, PS2, PS3, PS4 and Halul Terminal. Like Repair, Replacement, Renewal, Remedial job and Overhauling Plant Equipment’s and Supporting to specialist for major repair and venture parts. It’s in any time for Emergency. Most of big part we are construct in Halul Island like Boat landing, Platform Extension, Channel Buoy, Hanger Buoy, Manifold and Hook-up, HP, LP, Process Pipe Line work. And Blasting, Painting, Scaffolding, Flashing, Line Testing and Inspection Etc. We are specialist for all kind Flare Tips Fabrication and Replacement. As well as Liquid dirty oil burning tips. All the Rigging activities on wellhead jackets and production platforms Like loading unloading for facilities, and Equipment installation and erection on right position. PERIOD..........MAY 1998 TO MAY 2003 EMPLOYER 4) MANSAL OFFSHORE Q.S.C, Construction & Maintenance Department. POSITION MAINTAIN AS A MECHANICAL GENERAL FOREMAN CLIENT 7) QATAR PETROLEUM (Q.P) OFFSHORE DIVISION PROJECT 9) GTC Contract No. GTC/111/FS (O)/02) Offshore Field and Halul Island in Qatar. JOB DESCRIPTION: There is Construction and Maintenance job on going...., My Responsible for Maintenance jobs including Shutdown on Q.P Offshore production platforms PS1, PS2, PS3, PS4 and Halul Terminal. Like Repair, Replacement, Renewal, Remedial job and Overhauling Plant Equipment’s and Supporting to specialist for major repair and venture parts. It’s in any time for Emergency. Most of big part we are constructing in Halul Island like Boat landing, Platform Extension, Channel Buoy, Hanger Buoy, Manifold and Hook-up, H.P, L.P, Process Pipe Line work. And Blasting, Painting, Scaffolding, Flashing, Line Testing and Inspection Etc. We are responsible for all kind of mechanical emergency job in around all Q.P facilities on offshore. Page 3 of 5
  • 4. EXPERIENCE IN SHORT PERIOD.........JUNE 1997 TO FEB. 1998 EMPLOYER 3) CONSOLIDATED CONTRACTORS INTERNATIONAL COMPANY LTD (CCIC) POSITION AS A PIPING FOREMAN CLIENT 6) JGC / KELLOGG, Raslaffan, Doha, Qatar. PROJECT 8) RAS GAS ONSHORE LNG FACILITIES (RLL) Raslaffan, Doha, Qatar. JOB DESCRIPTION: In RLL Project I got responsibilities to keep schedules. Checking materials availability and arrange bill of materials as per drawing, spools wise to proceed fabrication. And lead the work shop fabrication crew and Welding completed spools keep clear and Transfer to yard for inspection, painting, covering and marking completed spools keeping with tags in lay down area as per requirement of site installation. There was Train I and II spools in above ground and underground all around 8500 spools in CS, LTCS, SS, Cu Ni and Galvanized metals. Have to keep record for big target. Daily, weekly, and monthly production reports and spool movement for installation. All document to keep as per ISO 9000 series PERIOD...........JUNE 1995 TO MAY 1997 EMPLOYER 3) CONSOLIDATED CONTRACTORS INTERNATIONAL COMPANY LTD (CCIC) POSITION AS A PIPING FOREMAN CLIENT 5) CHIYODA PROJECT 7) QATAR GAS LNG PROJECT (QLNG), Raslaffan, Doha, Qatar. JOB DESCRIPTION: In QLNG Project CCIC has three fabrication work shop (CS, LTCS, SS,) my responsibilities in stainless steel (SS) spools fabrication work shop. There were leading 50 workers in 10 crews. As per priorities wise releasing drawing, arranging materials, and issuing to crew. Checking spool dimensions as per drawing orientation and component requirements and take out spools from fabrication shop to inspection and sending to blasting/painting. Keeping daily report, weekly progress reporting, schedule updating and arrange tool talk for safety and environment. PERIOD..........NOV. 1994 TO APRIL 1995 EMPLOYER 2) BUILDERS & ENGINEERS POSITION AS A FOREMAN (GENERAL) CLIENT 4) L & T PROJECT 6) R.A.P.P JOB DESCRIPTION: There were two heavy condensers to build heavy water cooling system. My duty is materials & equipment receiving and keeping as per drawings priority wise in both condenser area, phase I and phase II. Received all materials in 6 month and kept one by one as near as to installation point as per priority. Height marked heat numbers and item numbers on all bit and piece. Local labor are their work force for documentation. All the prefabricated items and equipment’s are stored and noted in record document as area wise marked for finding out to install. Lay out both condenser as per plan drawing and plant elevation. Locate all the important points’ equipment position in all elevation for equipment’s erecting on location. Page 4 of 5
  • 5. EXPERIENCE IN SHORT PERIOD...........DEC. 1990 T0 APRIL 1994 EMPLOYER 1) TAMIMI CONSTRUCTION DIVISION “TAFMEC” AND “TAFCON” POSITION AS A PIPING FOREMAN CLIENT 3) SAUDI SHINWHA COMPANY 2) NATIONAL METHANOL COMPANY 1) SAUDI ARAMCO PROJECT 5) NAPC, Safaniya, Saudi Arabia. JOB DESCRIPTION: it was my last project in Tamimi Co. We got "FBE"(Fusion Bound Epoxy) internal coated spools fabrications in our company work shop. Received FBE coated pipes, fittings and start as per drawing 48" die header 28. M long in three pieces. We used better method to protect internal coating from cutting welding burns. We shoot out falls in the drawings and carried out site survey to renew the drawings. Work has been completed on right time PROJECT 4) OSBL MECHANICAL PROJECT, Jubail Industrial city, Saudi Arabia. JOB DESCRIPTION: We had prefabricated spools erection and lot of field joints in various size of pipe. Our crew got responsible on flare line. Every process line connecting to flare line. It’s running big and big bore to flare in high elevation and Hanged small bore pipe rack along with Flare line for utility lines and Flare related like pilot gas and igniters etc. The entire job we completed on schedule. And company take extra job to erect number of pump & modify pipe spool belongs to pump for Alignment purpose. PROJECT 3) UR – RAZI II, Jubail Industrial city, Saudi Arabia. JOB DESCRIPTION: There was to erect spare Boiler and commissioning to live utility systems in live plant. My responsible to layout & erect Boiler and Equipment on concrete foundation base. We got one Japanese guy instructor from Boiler Company Align and elevation checks on all Base plates for boiler and around equipment grouting bolt holes. We brought Boiler near to foundation load transfer to temporary beam structure with roller & slide-in onto foundation. Lifted by jack & removed structure PROJECT 2) GOSP I TO IV, Ainakkal, Saudi Arabia. JOB DESCRIPTION: There was an expansion works in four manifold station and maintenance works during individual shutdown. We fabricate Supports, Spools and test expansion Spools. And arrange everything in each tie-in points for shutdown preparations. Erect Supports, Manifold and one by one Spool. All Flange tighten, Spools secured and all component fixed on system. We got experience from previous shutdown to complete other Manifold in better time. And we got good result. PROJECT 1) AINDAR & SHEDGUM “WIPS” (Water Injection Pump Station), Ainakkal, Saudi Arabia. JOB DESCRIPTION : I was held complete responsibilities in shop fabrication of internal coated pipes, in various size range of pipe 2" to 36" diameter. During fabrication I establish more method to protect internal coating from cutting& welding burns. Complete spool as per shutdown priority and keeping proper end covering to save internal coating. During shutdown we had 10 days non-stop job in AINDAR and 10 days in SHEDGUM. Page 5 of 5