SlideShare a Scribd company logo
1 of 120
Welcome to
Training Program on GUIDED TOUR OF ASMETraining Program on GUIDED TOUR OF ASME
CODESCODES
Presented byPresented by
P. S. KULKARNIP. S. KULKARNI
Agenda - session 1Agenda - session 1
• This session will provide:
– An introduction to Codes and
Standards
– Objectives of Codes/ Standards.
– ASME Code System.
– Introduction To ASME Sec. VIII-1
• Approximate duration – 8.0 Hours
CODE
Credibility
Collective Knowledge
and Experience
2 S
Safety
(Plant, Personnel, People)
Standardization
2 C
WHY ADOPT CODES ?
Common pressure vessel codes
• ASME Sec VIII Div 1 and Div 2
• BS 5500
• IS 2825
• Ad Merk Blatter (German)
• AFNOR (French)
ASME Codes
Issue freq. : New edition every 3 years, on 1st
July
latest edition was on 1st July 04.
Addenda : In-between revisions, issued yearly
also on 1st July.
2004 Edn. & '04 add. --- 1st July '04
2005 Addenda --- 1st July '05
2006 Addenda --- 1st July '06
Again new edition - 2007 (1st July)
Applicability : Edition & Addendas effective 6 months from date of issue
(i.e. 1st
Jan of next year)
Issued by : American society of mechanical Engineers, New
York.
ASME SEC. VIII DIV. 1
Pressure vessels within scope:
• Vessels having inside diameter above 6 in.
• Vessels designed for pressures above 15 psig and not
exceeding 3000 psi.
• Unfired steam boilers, evaporators,
Heat exchangers
ASME Sec. VIII div.1--Excluded from scope
• Piping system & components beyond
battery limits.
• Vessels covered by other sections
• Vessels for human occupancy
• Pressure containers which are integral
part of rotating machinery.
ASME Boiler & Pressure Vessel Codes
ASME Codes give stipulations and guidelines for the design,
materials, manufacture and testing of pressure vessels. These are
issued by the American Society of Mechanical Engineers, New York.
The codes were first issued in 1915. Since then, many changes have
been made and new sections added to the code as need arose. It is
a LIVE code and is revised and updated periodically. It keeps pace
with time and is responsive to its users.
In its present from the ASME Code System is a follows
• Section I Power Boilers.
• Section II Material specifications.
 Part A Ferrous materials,
 Part B Non Ferrous Materials
 Part C Welding rods, electrodes,
filler metals.
 Part D Material properties.
CODE SYSTEM
CODE SYSTEM
• Section III Nuclear Power Plant Components.
Section IV Heating Boilers.
• Section V Non destructive Examinations.
• Section VI Care and operation of Heating Boilers.
• Section VII Rules for care of Power Boilers.
• Section VIII Division 1 - Pressure Vessels
Division 2 Alternative Rules ( Pr. Vessel)
Division 3 Rules for constructive of High
Pressure Vessels.
• Section IX Welding and Brazing Qualifications.
CODE SYSTEM, cont’d
Section X Fiber glass reinforced Plastic Pressure
Vessels.
Section XI Rules for in service inspection of Nuclear
Power Plant Components.
APPLICABILITY
The editions and addenda become applicable after
six months from date of issue. Thus, 1st
Jan. 2000,
the construction of Pressure Vessels shall be as per
1998 edition and 1999 addenda. However, for old
contracts spilling over beyond 1st
Jan 2000, the old
applicable edition and addenda are valid.
CODE INTERPRETATION
ASME issue written replies know as "Interpretations" to
the inquiries concerning technical aspects of the code
.These are issued twice in a year (July and December) and
are sent to "Edition - subscribers" as up-date service.
CODE CASES
Boiler and Pressure Vessels committee meets regularly to
consider
Proposed additions and revisions to the code. At the same
time it may formulate code cases to clarify ' Intent' of
existing requirements. These are published as code Case
books. It is published along with new editions and
supplements are automatically sent to subscribers of code
case book till new edition ispublished.
ASME Sec. VIII Div. 1 has five different parts
Part 1 : UG – General requirements (Design requirements)
Part 2 : Material Specific Requirements
UCS – Carbon steel & low alloy steel
UHA – High alloy steels
UNF – Non ferrous metallurgy
Part 3 : Fabrication method specific requirements
UW – Welded construction
UF – Forging construction
Part 4 : Mandatory Appendices &
Part 5 : Non mandatory Appendices
Types of vesselsTypes of vessels
• Cylindrical – Horizontal or Vertical
• Spherical
Steps in design -1Steps in design -1
• Find service conditions & metallurgy.
• Ensure ductility at service conditions
• Calculate thickness required (TR).
Steps in design -2Steps in design -2
• Design thickness = TR + Corr Allow
• Roundup to commercially available thickness
to get nominal thickness
• Find MAWP from nominal thickness
Solve a problem
Calculate the minimum thickness of a cylindrical shell of inside diameter
4000mm, tan to tan length of 8300mm and a design pr. of 100 Kg/sq cmg.
Design temperature of the vessel is 343 C
Material of construction – ASTM A 516 Gr 70
Allowable stress of vessel at 343 C = 16500 psi
Corrosion allowance = 3.0 mm
Efficiency of the weld joint – 1.0
24
25
26
UW – 3 : WELD JOINTS CATEGORIES.
UW – 3 : WELD JOINTS CATEGORIES.
Category A :
1 Longitudinal weld joints in main shell or nozzles.
2 Any welded joints in spherical shell.
3. Any welded joints in Dished Head.
4. Circumferential Seam , Hemisph. head to shell.
UW – 3 : WELD JOINTS CATEGORIES.
Category B :
1 Circumferential seam in main shell, or nozzle
2 Circumferential seam connecting formed head (other
than hemi-spherical head) to shell.
UW – 3 : WELD JOINTS CATEGORIES. Contd.
Category C :
• Weld joints connecting flanges, tube sheets, flat
head to main shell or Nozzles
(Flange Welds)
Category D:
• Welds joining communicating chamber or nozzle
to the main shell / heads.
(Attachment Welds).
Types of endsTypes of ends
FLAT HEADS :
– For low pressures up to 5 kg/sqcm
FORMED HEADS :
– Torispherical
• Generally used up to 15 kg/sqcm
– Ellipsoidal
• Generally used between 15 to 25 kg/sqcm
– Hemispherical
• Generally used above 25 kg/sqcm.
CONICAL HEADS : for Special purposes.
35
For spherical shells / head :
t = P x R / (2SE - 0.2P) ….for Thickness
P = 2SEt / (R + 0.2t)….for MAWP
FORMED HEADS
For Torisph. Heads : (L = Crown Rad., r = 0.06 x L)
t, = 0.885 x P x L / (SE - 0.1P)… for Thickness
P = SEt / ( 0.885L + 0.1 t ) … for MAWP
For Ellipsoidal Heads : ( 2 : 1 type)
t = P x D / (2SE - 0.2P) ….for Thickness
P = 2SEt / (D + 0.2t) ….for MAWP
UW-11 :RT and UT EXAMINATIONS
Full Radiography is required in following cases :
• All butt welds of vessels for lethal substances
• If thickness exceeds given in table UCS-57, UHA - 33,
• Butt welds of unfired boilers, with design pr. > 50 psi.
• For all other vessels, All cat. A welds full radiography .
Cat. B & C welds which intersect the Cat. A welds shall be
spot radiographed.
• Radiography is not required of category B and C butt
welds in nozzles less than NPS 10 or 1 1/8 in. thick.
UW-11 :RT and UT EXAMINATIONS…contd.
1 Spot Radiography : Spot RT of Butt joints if
design efficiency is selected for spot radiography.
2 No Radiography : No RT of weld joints if design efficiency is
selected for no radiography or vessel is designed for external
pressure
3 Ultrasonic examination : May be substituted for RT only for
the final closure seam of a pressure vessel.
41
42
v
v
v
v
43
44
45
46
UW – 12 :WELDED JOINT TYPES
UW – 12 :WELDED JOINT EFFICIENCY
RT – 1 : Full Radiography ( E=1) :
Full length radiography of all butt welds
RT – 2 : Full Radiography ( E=1):
Cat – A: Full length radiography
Cat – B: Spot RT per [UW – 11 (a) 5 (b)]
RT – 3 : Spot radiography ( E= 0.85)
RT – 4 : No radiography ( E= 0.7)
Some key points:Some key points:
55
Out of roundness of Shell
Difference between the maximum and minimum inside diameter measured at
any cross section of the vessel shall not exceed 1% of the nominal diameter at
that cross section under consideration.
The diameter can be measured from either inside or outside. If measured from
outside shall be corrected for the thickness at that cross section.
57
NOZZLE REINFORCEMENT
Required area of Reinforcement = d X tr
d= Diameter of finished opening
tr = Required thickness of shell or head.
Reinforcement is waived off for single openings if:
1. finished opening size is 3 1/2" or less diameter in shell or head of
thickness 3/8" or less; or
2. finished opening size 2 3/8" or less diameter
in shell or head of thickness over 3/8";
UCS-66 : IMPACT TESTING
1 MDMT - Thickness point falls on or above the relevant
curve. Impact test is not required
(Curve UCS – 66 )
2 Impact test is must, if MDMT < 120 deg F, and:
Thickness Of welded part > 4”
Thickness for Non-welded part > 6”
3 Test normally required for MDMT < -55 deg. F
64
65
66
67
68
69
70
71
IMPACT TESTING EXEMPTION -- UG-20 (f) :
Impact test exempt for if,
Materials are P No 1, Gr. No. 1 and 2
1. Materials of curve A : thickness < 0.5 inch
2. Materials curve B, C, D : thickness < 1.0 inch
3. Hydrostatic test performed as required
4. Design temp = -20 deg F to 650deg.F
5. No cyclic or thermal shock loading
IMPACT TESTINGEXEMPTION…….contd.
1 UCS-68 (c) : If PWHT is performed when not a Code
requirement, reduction of 30 deg. F (17 0
C) in impact testing
exemption temp.(from Fig UCS-66) may be given for P No. 1
materials
2 If coincident ratio is < 1, Reduction to exemption temperature
may be given as per UCS-66.1
74
75
76
77
78
79
80
81
82
83
84
• PWHT temperature is higher of the two for dissimilar metal joints
UW-40 : POST-WELD HEAT TREATMENT
• PWHT is Code Requirement if thickness exceeds
those given in tables for respective materials .
• Furnace PWHT method is preferred .
• Min. Overlap for PWHT in multiple heats = 5 ft.
• Local PWHT : Min Soak Band = weld width + Lesser of
2’’ or t. and it shall extend full 360 deg for circ. Joint
· Still air cooling permitted below 800 deg .F.
UCS-56: POST-WELD HEAT TREATMENT
· Max. Loading temp in furnace = 800 deg .F
· Max. heating rate 400 deg F/hr/inch of thickness.
· Soaking period as per UCS-56 tables.
· Temp difference between hottest and coldest
parts of vessel shall not exceed 150 deg .F
· Max. cooling rate = 500 deg .F /hr/inch of thk.
· Max. offloading temp = 800 deg. F
88
89
90
91
92
93
94
95
96
Summary of NDT
NDE OF PRESSURE VESSELS
Selection of a particular NDT technique :
Applicable NDT methods / Welding Discontinuities
Discontinuities
Applicable NDT Methods
RT T PT MT VT ET
Porosity √ * √a *b
√a *
Slag Inclusion √ √ NA *b
NA *
Incomplete fusion * √ NA *b
NA *
Incomplete Penetration √ √ NA * NA *
Undercut √ * * * √ *
Overlap
NA
* √ √ * *
Cracks * √ √a
√b
√a
√
Laminations
NA
√
√a,c
√b,c
√a,c NA
Applicable NDT methods for Weld joint types
Joints
NDT Methods
RT UT PT MT VT ET
Butt √ √ √ √ √ √
Corner * √ √ √ √ *
T * √ √ √ √ *
Lap * * √ √ √ *
Note to NDT Table
a. Surface
b. Surface and slightly subsurface
c. Weld preparation or edge of base metal
√ Applicable method
* Marginal applicability depending on other factors.
101
102
103
104
105
106
107
108
109
110
UG-99 : HYDROSTATIC TEST
• Min. Inspection pressure = Test pressure / 1.3
• Hydrostatic Test pr. = 1.3 X MAWP X stress ratio
Stress ratio = Stress at test temp./Stress at design temp.
• Any non-hazardous liquid may be used for the test.
• Min. Test temp = MDMT + 30 deg. F ( 17 C )
• Inspection temperature <= 120 deg. F.
• The MAWP may be same as Design pr.
• Test gauge range = 1.5 to 4 times test pr.
UG-100 : PNEUMATIC TESTS
• Pneumatic test is used instead of hydro when:
• Vessels cannot be safely filled with water
• Vessels in service in which traces of
testing liquid cannot be tolerated
• Test pr = 1.1 X MAWP X stress ratio.
• Test temp shall exceed MDMT by 30 deg F.
• Pr. Gauge range = 1.5 to 4 times test pressure
Safety precautions for Pneumatic Test
• All welds around openings and attachment welds
with throat >= 6mm ( 0.25”) to be MT or PT tested
• The pr. shall be first raised to 50% of the test pr.
• The pressure then shall be reduced to a value of
test pressure /1.1 , to permit inspection.
• Then the pressure shall be raised in steps of
10% of test pr. To reach full test pressure
CODE STAMPING
Each pressure vessel shall be marked with the following :
1) The official Code U Symbol or the official UM Symbol.
2) Name of the Manufacturer of the pressure vessel
preceded by the words "certified by";
3) Max. allowable working pressure ---- psi at ---- 0
F.
4) Minimum design metal temperature ---- 0
F ----psi
5) Manufacturer's serial number;
6) Year built.
115
116
117
v
118
Thank You forThank You for
youryour
Time and AttentionTime and Attention

More Related Content

What's hot

Asme section ii c new
Asme section ii c newAsme section ii c new
Asme section ii c newJithu John
 
An introduction to pressure vessels
An introduction to pressure vesselsAn introduction to pressure vessels
An introduction to pressure vesselsRajendra Prajapati
 
Presentation on wpqr wps asme_ix
Presentation on wpqr wps asme_ixPresentation on wpqr wps asme_ix
Presentation on wpqr wps asme_ixmayank0738
 
Piping Training course-How to be an Expert in Pipe & Fittings for Oil & Gas c...
Piping Training course-How to be an Expert in Pipe & Fittings for Oil & Gas c...Piping Training course-How to be an Expert in Pipe & Fittings for Oil & Gas c...
Piping Training course-How to be an Expert in Pipe & Fittings for Oil & Gas c...Varun Patel
 
How to write a Welding Procedure Specification (ISO 15614-1
How to write a Welding Procedure Specification (ISO 15614-1How to write a Welding Procedure Specification (ISO 15614-1
How to write a Welding Procedure Specification (ISO 15614-1Tiago Pereira
 
Piping components, materials, codes and standards part 1- pipe
Piping components, materials, codes and standards   part 1- pipePiping components, materials, codes and standards   part 1- pipe
Piping components, materials, codes and standards part 1- pipeAlireza Niakani
 
Power Piping ASME Guide.PDF
Power Piping ASME Guide.PDFPower Piping ASME Guide.PDF
Power Piping ASME Guide.PDFTeddy Setiady
 
Pipe Hydrotest , Inspection, Visual and Dimensional Inspection & Marking
Pipe Hydrotest , Inspection, Visual and Dimensional Inspection & MarkingPipe Hydrotest , Inspection, Visual and Dimensional Inspection & Marking
Pipe Hydrotest , Inspection, Visual and Dimensional Inspection & MarkingVarun Patel
 
Simple Piping design
Simple Piping designSimple Piping design
Simple Piping designMusa Sabri
 
ASME B31.3 Training Course
ASME B31.3 Training CourseASME B31.3 Training Course
ASME B31.3 Training CourseMeena Rezkallah
 

What's hot (20)

Pressure vessel types
Pressure vessel typesPressure vessel types
Pressure vessel types
 
Asme section ii c new
Asme section ii c newAsme section ii c new
Asme section ii c new
 
An introduction to pressure vessels
An introduction to pressure vesselsAn introduction to pressure vessels
An introduction to pressure vessels
 
Presentation on wpqr wps asme_ix
Presentation on wpqr wps asme_ixPresentation on wpqr wps asme_ix
Presentation on wpqr wps asme_ix
 
Asme b31,pressure piping code
Asme b31,pressure piping codeAsme b31,pressure piping code
Asme b31,pressure piping code
 
Piping Training course-How to be an Expert in Pipe & Fittings for Oil & Gas c...
Piping Training course-How to be an Expert in Pipe & Fittings for Oil & Gas c...Piping Training course-How to be an Expert in Pipe & Fittings for Oil & Gas c...
Piping Training course-How to be an Expert in Pipe & Fittings for Oil & Gas c...
 
How to Qualify a Welding Procedure
How to Qualify a Welding ProcedureHow to Qualify a Welding Procedure
How to Qualify a Welding Procedure
 
How to write a Welding Procedure Specification (ISO 15614-1
How to write a Welding Procedure Specification (ISO 15614-1How to write a Welding Procedure Specification (ISO 15614-1
How to write a Welding Procedure Specification (ISO 15614-1
 
Piping components, materials, codes and standards part 1- pipe
Piping components, materials, codes and standards   part 1- pipePiping components, materials, codes and standards   part 1- pipe
Piping components, materials, codes and standards part 1- pipe
 
Shell rolling procedure
Shell rolling procedureShell rolling procedure
Shell rolling procedure
 
Pwht1
Pwht1Pwht1
Pwht1
 
Piping ppt1
Piping ppt1Piping ppt1
Piping ppt1
 
Power Piping ASME Guide.PDF
Power Piping ASME Guide.PDFPower Piping ASME Guide.PDF
Power Piping ASME Guide.PDF
 
Inspection of-pressure-vessels
Inspection of-pressure-vesselsInspection of-pressure-vessels
Inspection of-pressure-vessels
 
Pipe Hydrotest , Inspection, Visual and Dimensional Inspection & Marking
Pipe Hydrotest , Inspection, Visual and Dimensional Inspection & MarkingPipe Hydrotest , Inspection, Visual and Dimensional Inspection & Marking
Pipe Hydrotest , Inspection, Visual and Dimensional Inspection & Marking
 
WPS & WPQ
WPS & WPQWPS & WPQ
WPS & WPQ
 
Simple Piping design
Simple Piping designSimple Piping design
Simple Piping design
 
ASME B31.3 Training Course
ASME B31.3 Training CourseASME B31.3 Training Course
ASME B31.3 Training Course
 
How to produce PQR
How to produce PQRHow to produce PQR
How to produce PQR
 
Piping presentation part ii 2
Piping presentation part ii 2Piping presentation part ii 2
Piping presentation part ii 2
 

Viewers also liked

Design by Analysis - A general guideline for pressure vessel
Design by Analysis - A general guideline for pressure vesselDesign by Analysis - A general guideline for pressure vessel
Design by Analysis - A general guideline for pressure vesselAnalyzeForSafety
 
Microsoft Excel Presentation
Microsoft Excel PresentationMicrosoft Excel Presentation
Microsoft Excel PresentationRam Bhandari
 
Compact Heat Exchangers
Compact Heat ExchangersCompact Heat Exchangers
Compact Heat Exchangersadlinilda
 
Fundamentals of heat exchanger design
Fundamentals of heat exchanger designFundamentals of heat exchanger design
Fundamentals of heat exchanger designJuan Guillermo
 
Pressure vessels
Pressure vessels  Pressure vessels
Pressure vessels GPTraining
 
Heat exchangers and types
Heat exchangers and typesHeat exchangers and types
Heat exchangers and typesGopesh Chilveri
 
Heat exchanger design handbook
Heat exchanger design handbookHeat exchanger design handbook
Heat exchanger design handbookvijayabhaskar83
 
Ut P5 (Product Tech.)
Ut P5 (Product Tech.)Ut P5 (Product Tech.)
Ut P5 (Product Tech.)rajrkamal
 
Api 570 course material
Api 570 course materialApi 570 course material
Api 570 course materialTASSIO DOURADO
 
Api 1104 study guide
Api 1104 study guideApi 1104 study guide
Api 1104 study guideHani Mohamad
 
Heat Exchangers
Heat ExchangersHeat Exchangers
Heat ExchangersSABIC
 

Viewers also liked (16)

Design by Analysis - A general guideline for pressure vessel
Design by Analysis - A general guideline for pressure vesselDesign by Analysis - A general guideline for pressure vessel
Design by Analysis - A general guideline for pressure vessel
 
Microsoft Excel Presentation
Microsoft Excel PresentationMicrosoft Excel Presentation
Microsoft Excel Presentation
 
Compact Heat Exchangers
Compact Heat ExchangersCompact Heat Exchangers
Compact Heat Exchangers
 
Fundamentals of heat exchanger design
Fundamentals of heat exchanger designFundamentals of heat exchanger design
Fundamentals of heat exchanger design
 
Ut P4
Ut P4Ut P4
Ut P4
 
Pressure vessels
Pressure vessels  Pressure vessels
Pressure vessels
 
Heat exchangers and types
Heat exchangers and typesHeat exchangers and types
Heat exchangers and types
 
Ut P3
Ut P3Ut P3
Ut P3
 
Heat exchanger design handbook
Heat exchanger design handbookHeat exchanger design handbook
Heat exchanger design handbook
 
Ut P2
Ut P2Ut P2
Ut P2
 
Heat exchangers
Heat exchangersHeat exchangers
Heat exchangers
 
Ut P5 (Product Tech.)
Ut P5 (Product Tech.)Ut P5 (Product Tech.)
Ut P5 (Product Tech.)
 
Heat exchangers
Heat exchangersHeat exchangers
Heat exchangers
 
Api 570 course material
Api 570 course materialApi 570 course material
Api 570 course material
 
Api 1104 study guide
Api 1104 study guideApi 1104 study guide
Api 1104 study guide
 
Heat Exchangers
Heat ExchangersHeat Exchangers
Heat Exchangers
 

Similar to ASME Section VIII Div 1. design training

Introduction to ASME VIII Div 1 (ATS).pdf
Introduction to ASME VIII Div 1 (ATS).pdfIntroduction to ASME VIII Div 1 (ATS).pdf
Introduction to ASME VIII Div 1 (ATS).pdfdeckyantony
 
Purje Juha, Inspecta Tarkastus (Suomija), „Visagino VAE projektas. Techniniai...
Purje Juha, Inspecta Tarkastus (Suomija), „Visagino VAE projektas. Techniniai...Purje Juha, Inspecta Tarkastus (Suomija), „Visagino VAE projektas. Techniniai...
Purje Juha, Inspecta Tarkastus (Suomija), „Visagino VAE projektas. Techniniai...Versli Lietuva (Enterprise Lithuania)
 
Purje Juha, Inspecta Tarkastus (Suomija), „Visagino VAE projektas. Techniniai...
Purje Juha, Inspecta Tarkastus (Suomija), „Visagino VAE projektas. Techniniai...Purje Juha, Inspecta Tarkastus (Suomija), „Visagino VAE projektas. Techniniai...
Purje Juha, Inspecta Tarkastus (Suomija), „Visagino VAE projektas. Techniniai...Denis Senin
 
Min ambient temp considerations
Min ambient temp considerationsMin ambient temp considerations
Min ambient temp considerationsRajendra Chakole
 
office final ppt [7760835] final update
office final ppt [7760835] final updateoffice final ppt [7760835] final update
office final ppt [7760835] final updateAashish Soin
 
ship_catalog on home w_0 watermark etc
ship_catalog on home w_0 watermark etc ship_catalog on home w_0 watermark etc
ship_catalog on home w_0 watermark etc DRP Joint
 
02 custodie eng
02 custodie eng02 custodie eng
02 custodie engHai Pham
 
Inoxtech Presentation Marbella 11 Nov 08
Inoxtech Presentation Marbella 11 Nov 08Inoxtech Presentation Marbella 11 Nov 08
Inoxtech Presentation Marbella 11 Nov 08Mattia Agnoletto
 
Weld Improvement Example in Offshore Oil & Gas
Weld Improvement Example in Offshore Oil & GasWeld Improvement Example in Offshore Oil & Gas
Weld Improvement Example in Offshore Oil & GasImran Choudury
 
Heat Exchanger - Design, Construction and Working
Heat Exchanger - Design, Construction and WorkingHeat Exchanger - Design, Construction and Working
Heat Exchanger - Design, Construction and WorkingAbhishek Srivastav
 
Basicsofheatexchanger shellandtube-150226051621-conversion-gate02
Basicsofheatexchanger shellandtube-150226051621-conversion-gate02Basicsofheatexchanger shellandtube-150226051621-conversion-gate02
Basicsofheatexchanger shellandtube-150226051621-conversion-gate02Carlos Filho
 
06612 iec zerti_rz11_e
06612 iec zerti_rz11_e06612 iec zerti_rz11_e
06612 iec zerti_rz11_eCesar Chilet
 
Storage vessel design
Storage vessel designStorage vessel design
Storage vessel designMASUKUMARA1
 
2015 Arc Flash Conference MV Switchgear Standards
2015 Arc Flash Conference MV Switchgear Standards2015 Arc Flash Conference MV Switchgear Standards
2015 Arc Flash Conference MV Switchgear StandardsBryan Johnson
 
Pipelines welding handbook_welding_techn
Pipelines welding handbook_welding_technPipelines welding handbook_welding_techn
Pipelines welding handbook_welding_technAshraf Shaikh
 

Similar to ASME Section VIII Div 1. design training (20)

pipe-stress-analysis-work.ppt
pipe-stress-analysis-work.pptpipe-stress-analysis-work.ppt
pipe-stress-analysis-work.ppt
 
API_510_for_Exam.pdf
API_510_for_Exam.pdfAPI_510_for_Exam.pdf
API_510_for_Exam.pdf
 
Introduction to ASME VIII Div 1 (ATS).pdf
Introduction to ASME VIII Div 1 (ATS).pdfIntroduction to ASME VIII Div 1 (ATS).pdf
Introduction to ASME VIII Div 1 (ATS).pdf
 
Borusan Mannesmann
Borusan MannesmannBorusan Mannesmann
Borusan Mannesmann
 
Purje Juha, Inspecta Tarkastus (Suomija), „Visagino VAE projektas. Techniniai...
Purje Juha, Inspecta Tarkastus (Suomija), „Visagino VAE projektas. Techniniai...Purje Juha, Inspecta Tarkastus (Suomija), „Visagino VAE projektas. Techniniai...
Purje Juha, Inspecta Tarkastus (Suomija), „Visagino VAE projektas. Techniniai...
 
Purje Juha, Inspecta Tarkastus (Suomija), „Visagino VAE projektas. Techniniai...
Purje Juha, Inspecta Tarkastus (Suomija), „Visagino VAE projektas. Techniniai...Purje Juha, Inspecta Tarkastus (Suomija), „Visagino VAE projektas. Techniniai...
Purje Juha, Inspecta Tarkastus (Suomija), „Visagino VAE projektas. Techniniai...
 
Min ambient temp considerations
Min ambient temp considerationsMin ambient temp considerations
Min ambient temp considerations
 
office final ppt [7760835] final update
office final ppt [7760835] final updateoffice final ppt [7760835] final update
office final ppt [7760835] final update
 
ship_catalog on home w_0 watermark etc
ship_catalog on home w_0 watermark etc ship_catalog on home w_0 watermark etc
ship_catalog on home w_0 watermark etc
 
02 custodie eng
02 custodie eng02 custodie eng
02 custodie eng
 
Inoxtech Presentation Marbella 11 Nov 08
Inoxtech Presentation Marbella 11 Nov 08Inoxtech Presentation Marbella 11 Nov 08
Inoxtech Presentation Marbella 11 Nov 08
 
Weld Improvement Example in Offshore Oil & Gas
Weld Improvement Example in Offshore Oil & GasWeld Improvement Example in Offshore Oil & Gas
Weld Improvement Example in Offshore Oil & Gas
 
06 - MCCB & ACB - Fuji Electric
06 - MCCB & ACB - Fuji Electric06 - MCCB & ACB - Fuji Electric
06 - MCCB & ACB - Fuji Electric
 
Heat Exchanger - Design, Construction and Working
Heat Exchanger - Design, Construction and WorkingHeat Exchanger - Design, Construction and Working
Heat Exchanger - Design, Construction and Working
 
Basicsofheatexchanger shellandtube-150226051621-conversion-gate02
Basicsofheatexchanger shellandtube-150226051621-conversion-gate02Basicsofheatexchanger shellandtube-150226051621-conversion-gate02
Basicsofheatexchanger shellandtube-150226051621-conversion-gate02
 
06612 iec zerti_rz11_e
06612 iec zerti_rz11_e06612 iec zerti_rz11_e
06612 iec zerti_rz11_e
 
Internship Report
Internship ReportInternship Report
Internship Report
 
Storage vessel design
Storage vessel designStorage vessel design
Storage vessel design
 
2015 Arc Flash Conference MV Switchgear Standards
2015 Arc Flash Conference MV Switchgear Standards2015 Arc Flash Conference MV Switchgear Standards
2015 Arc Flash Conference MV Switchgear Standards
 
Pipelines welding handbook_welding_techn
Pipelines welding handbook_welding_technPipelines welding handbook_welding_techn
Pipelines welding handbook_welding_techn
 

Recently uploaded

Call Girls Meghani Nagar 7397865700 Independent Call Girls
Call Girls Meghani Nagar 7397865700  Independent Call GirlsCall Girls Meghani Nagar 7397865700  Independent Call Girls
Call Girls Meghani Nagar 7397865700 Independent Call Girlsssuser7cb4ff
 
原版1:1定制堪培拉大学毕业证(UC毕业证)#文凭成绩单#真实留信学历认证永久存档
原版1:1定制堪培拉大学毕业证(UC毕业证)#文凭成绩单#真实留信学历认证永久存档原版1:1定制堪培拉大学毕业证(UC毕业证)#文凭成绩单#真实留信学历认证永久存档
原版1:1定制堪培拉大学毕业证(UC毕业证)#文凭成绩单#真实留信学历认证永久存档208367051
 
Top 10 Modern Web Design Trends for 2025
Top 10 Modern Web Design Trends for 2025Top 10 Modern Web Design Trends for 2025
Top 10 Modern Web Design Trends for 2025Rndexperts
 
2024新版美国旧金山州立大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree
2024新版美国旧金山州立大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree2024新版美国旧金山州立大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree
2024新版美国旧金山州立大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degreeyuu sss
 
专业一比一美国亚利桑那大学毕业证成绩单pdf电子版制作修改#真实工艺展示#真实防伪#diploma#degree
专业一比一美国亚利桑那大学毕业证成绩单pdf电子版制作修改#真实工艺展示#真实防伪#diploma#degree专业一比一美国亚利桑那大学毕业证成绩单pdf电子版制作修改#真实工艺展示#真实防伪#diploma#degree
专业一比一美国亚利桑那大学毕业证成绩单pdf电子版制作修改#真实工艺展示#真实防伪#diploma#degreeyuu sss
 
在线办理ohio毕业证俄亥俄大学毕业证成绩单留信学历认证
在线办理ohio毕业证俄亥俄大学毕业证成绩单留信学历认证在线办理ohio毕业证俄亥俄大学毕业证成绩单留信学历认证
在线办理ohio毕业证俄亥俄大学毕业证成绩单留信学历认证nhjeo1gg
 
group_15_empirya_p1projectIndustrial.pdf
group_15_empirya_p1projectIndustrial.pdfgroup_15_empirya_p1projectIndustrial.pdf
group_15_empirya_p1projectIndustrial.pdfneelspinoy
 
定制(CQU文凭证书)中央昆士兰大学毕业证成绩单原版一比一
定制(CQU文凭证书)中央昆士兰大学毕业证成绩单原版一比一定制(CQU文凭证书)中央昆士兰大学毕业证成绩单原版一比一
定制(CQU文凭证书)中央昆士兰大学毕业证成绩单原版一比一Fi ss
 
1比1办理美国北卡罗莱纳州立大学毕业证成绩单pdf电子版制作修改
1比1办理美国北卡罗莱纳州立大学毕业证成绩单pdf电子版制作修改1比1办理美国北卡罗莱纳州立大学毕业证成绩单pdf电子版制作修改
1比1办理美国北卡罗莱纳州立大学毕业证成绩单pdf电子版制作修改yuu sss
 
办理学位证(SFU证书)西蒙菲莎大学毕业证成绩单原版一比一
办理学位证(SFU证书)西蒙菲莎大学毕业证成绩单原版一比一办理学位证(SFU证书)西蒙菲莎大学毕业证成绩单原版一比一
办理学位证(SFU证书)西蒙菲莎大学毕业证成绩单原版一比一F dds
 
8377877756 Full Enjoy @24/7 Call Girls in Nirman Vihar Delhi NCR
8377877756 Full Enjoy @24/7 Call Girls in Nirman Vihar Delhi NCR8377877756 Full Enjoy @24/7 Call Girls in Nirman Vihar Delhi NCR
8377877756 Full Enjoy @24/7 Call Girls in Nirman Vihar Delhi NCRdollysharma2066
 
办理(UC毕业证书)查尔斯顿大学毕业证成绩单原版一比一
办理(UC毕业证书)查尔斯顿大学毕业证成绩单原版一比一办理(UC毕业证书)查尔斯顿大学毕业证成绩单原版一比一
办理(UC毕业证书)查尔斯顿大学毕业证成绩单原版一比一z xss
 
Unveiling the Future: Columbus, Ohio Condominiums Through the Lens of 3D Arch...
Unveiling the Future: Columbus, Ohio Condominiums Through the Lens of 3D Arch...Unveiling the Future: Columbus, Ohio Condominiums Through the Lens of 3D Arch...
Unveiling the Future: Columbus, Ohio Condominiums Through the Lens of 3D Arch...Yantram Animation Studio Corporation
 
PORTFOLIO DE ARQUITECTURA CRISTOBAL HERAUD 2024
PORTFOLIO DE ARQUITECTURA CRISTOBAL HERAUD 2024PORTFOLIO DE ARQUITECTURA CRISTOBAL HERAUD 2024
PORTFOLIO DE ARQUITECTURA CRISTOBAL HERAUD 2024CristobalHeraud
 
Dubai Calls Girl Tapes O525547819 Real Tapes Escort Services Dubai
Dubai Calls Girl Tapes O525547819 Real Tapes Escort Services DubaiDubai Calls Girl Tapes O525547819 Real Tapes Escort Services Dubai
Dubai Calls Girl Tapes O525547819 Real Tapes Escort Services Dubaikojalkojal131
 
'CASE STUDY OF INDIRA PARYAVARAN BHAVAN DELHI ,
'CASE STUDY OF INDIRA PARYAVARAN BHAVAN DELHI ,'CASE STUDY OF INDIRA PARYAVARAN BHAVAN DELHI ,
'CASE STUDY OF INDIRA PARYAVARAN BHAVAN DELHI ,Aginakm1
 
(办理学位证)约克圣约翰大学毕业证,KCL成绩单原版一比一
(办理学位证)约克圣约翰大学毕业证,KCL成绩单原版一比一(办理学位证)约克圣约翰大学毕业证,KCL成绩单原版一比一
(办理学位证)约克圣约翰大学毕业证,KCL成绩单原版一比一D SSS
 
办理(麻省罗威尔毕业证书)美国麻省大学罗威尔校区毕业证成绩单原版一比一
办理(麻省罗威尔毕业证书)美国麻省大学罗威尔校区毕业证成绩单原版一比一办理(麻省罗威尔毕业证书)美国麻省大学罗威尔校区毕业证成绩单原版一比一
办理(麻省罗威尔毕业证书)美国麻省大学罗威尔校区毕业证成绩单原版一比一diploma 1
 
Design and Managing Service in the field of tourism and hospitality industry
Design and Managing Service in the field of tourism and hospitality industryDesign and Managing Service in the field of tourism and hospitality industry
Design and Managing Service in the field of tourism and hospitality industryrioverosanniejoy
 
Call Girls in Ashok Nagar Delhi ✡️9711147426✡️ Escorts Service
Call Girls in Ashok Nagar Delhi ✡️9711147426✡️ Escorts ServiceCall Girls in Ashok Nagar Delhi ✡️9711147426✡️ Escorts Service
Call Girls in Ashok Nagar Delhi ✡️9711147426✡️ Escorts Servicejennyeacort
 

Recently uploaded (20)

Call Girls Meghani Nagar 7397865700 Independent Call Girls
Call Girls Meghani Nagar 7397865700  Independent Call GirlsCall Girls Meghani Nagar 7397865700  Independent Call Girls
Call Girls Meghani Nagar 7397865700 Independent Call Girls
 
原版1:1定制堪培拉大学毕业证(UC毕业证)#文凭成绩单#真实留信学历认证永久存档
原版1:1定制堪培拉大学毕业证(UC毕业证)#文凭成绩单#真实留信学历认证永久存档原版1:1定制堪培拉大学毕业证(UC毕业证)#文凭成绩单#真实留信学历认证永久存档
原版1:1定制堪培拉大学毕业证(UC毕业证)#文凭成绩单#真实留信学历认证永久存档
 
Top 10 Modern Web Design Trends for 2025
Top 10 Modern Web Design Trends for 2025Top 10 Modern Web Design Trends for 2025
Top 10 Modern Web Design Trends for 2025
 
2024新版美国旧金山州立大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree
2024新版美国旧金山州立大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree2024新版美国旧金山州立大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree
2024新版美国旧金山州立大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree
 
专业一比一美国亚利桑那大学毕业证成绩单pdf电子版制作修改#真实工艺展示#真实防伪#diploma#degree
专业一比一美国亚利桑那大学毕业证成绩单pdf电子版制作修改#真实工艺展示#真实防伪#diploma#degree专业一比一美国亚利桑那大学毕业证成绩单pdf电子版制作修改#真实工艺展示#真实防伪#diploma#degree
专业一比一美国亚利桑那大学毕业证成绩单pdf电子版制作修改#真实工艺展示#真实防伪#diploma#degree
 
在线办理ohio毕业证俄亥俄大学毕业证成绩单留信学历认证
在线办理ohio毕业证俄亥俄大学毕业证成绩单留信学历认证在线办理ohio毕业证俄亥俄大学毕业证成绩单留信学历认证
在线办理ohio毕业证俄亥俄大学毕业证成绩单留信学历认证
 
group_15_empirya_p1projectIndustrial.pdf
group_15_empirya_p1projectIndustrial.pdfgroup_15_empirya_p1projectIndustrial.pdf
group_15_empirya_p1projectIndustrial.pdf
 
定制(CQU文凭证书)中央昆士兰大学毕业证成绩单原版一比一
定制(CQU文凭证书)中央昆士兰大学毕业证成绩单原版一比一定制(CQU文凭证书)中央昆士兰大学毕业证成绩单原版一比一
定制(CQU文凭证书)中央昆士兰大学毕业证成绩单原版一比一
 
1比1办理美国北卡罗莱纳州立大学毕业证成绩单pdf电子版制作修改
1比1办理美国北卡罗莱纳州立大学毕业证成绩单pdf电子版制作修改1比1办理美国北卡罗莱纳州立大学毕业证成绩单pdf电子版制作修改
1比1办理美国北卡罗莱纳州立大学毕业证成绩单pdf电子版制作修改
 
办理学位证(SFU证书)西蒙菲莎大学毕业证成绩单原版一比一
办理学位证(SFU证书)西蒙菲莎大学毕业证成绩单原版一比一办理学位证(SFU证书)西蒙菲莎大学毕业证成绩单原版一比一
办理学位证(SFU证书)西蒙菲莎大学毕业证成绩单原版一比一
 
8377877756 Full Enjoy @24/7 Call Girls in Nirman Vihar Delhi NCR
8377877756 Full Enjoy @24/7 Call Girls in Nirman Vihar Delhi NCR8377877756 Full Enjoy @24/7 Call Girls in Nirman Vihar Delhi NCR
8377877756 Full Enjoy @24/7 Call Girls in Nirman Vihar Delhi NCR
 
办理(UC毕业证书)查尔斯顿大学毕业证成绩单原版一比一
办理(UC毕业证书)查尔斯顿大学毕业证成绩单原版一比一办理(UC毕业证书)查尔斯顿大学毕业证成绩单原版一比一
办理(UC毕业证书)查尔斯顿大学毕业证成绩单原版一比一
 
Unveiling the Future: Columbus, Ohio Condominiums Through the Lens of 3D Arch...
Unveiling the Future: Columbus, Ohio Condominiums Through the Lens of 3D Arch...Unveiling the Future: Columbus, Ohio Condominiums Through the Lens of 3D Arch...
Unveiling the Future: Columbus, Ohio Condominiums Through the Lens of 3D Arch...
 
PORTFOLIO DE ARQUITECTURA CRISTOBAL HERAUD 2024
PORTFOLIO DE ARQUITECTURA CRISTOBAL HERAUD 2024PORTFOLIO DE ARQUITECTURA CRISTOBAL HERAUD 2024
PORTFOLIO DE ARQUITECTURA CRISTOBAL HERAUD 2024
 
Dubai Calls Girl Tapes O525547819 Real Tapes Escort Services Dubai
Dubai Calls Girl Tapes O525547819 Real Tapes Escort Services DubaiDubai Calls Girl Tapes O525547819 Real Tapes Escort Services Dubai
Dubai Calls Girl Tapes O525547819 Real Tapes Escort Services Dubai
 
'CASE STUDY OF INDIRA PARYAVARAN BHAVAN DELHI ,
'CASE STUDY OF INDIRA PARYAVARAN BHAVAN DELHI ,'CASE STUDY OF INDIRA PARYAVARAN BHAVAN DELHI ,
'CASE STUDY OF INDIRA PARYAVARAN BHAVAN DELHI ,
 
(办理学位证)约克圣约翰大学毕业证,KCL成绩单原版一比一
(办理学位证)约克圣约翰大学毕业证,KCL成绩单原版一比一(办理学位证)约克圣约翰大学毕业证,KCL成绩单原版一比一
(办理学位证)约克圣约翰大学毕业证,KCL成绩单原版一比一
 
办理(麻省罗威尔毕业证书)美国麻省大学罗威尔校区毕业证成绩单原版一比一
办理(麻省罗威尔毕业证书)美国麻省大学罗威尔校区毕业证成绩单原版一比一办理(麻省罗威尔毕业证书)美国麻省大学罗威尔校区毕业证成绩单原版一比一
办理(麻省罗威尔毕业证书)美国麻省大学罗威尔校区毕业证成绩单原版一比一
 
Design and Managing Service in the field of tourism and hospitality industry
Design and Managing Service in the field of tourism and hospitality industryDesign and Managing Service in the field of tourism and hospitality industry
Design and Managing Service in the field of tourism and hospitality industry
 
Call Girls in Ashok Nagar Delhi ✡️9711147426✡️ Escorts Service
Call Girls in Ashok Nagar Delhi ✡️9711147426✡️ Escorts ServiceCall Girls in Ashok Nagar Delhi ✡️9711147426✡️ Escorts Service
Call Girls in Ashok Nagar Delhi ✡️9711147426✡️ Escorts Service
 

ASME Section VIII Div 1. design training

  • 1. Welcome to Training Program on GUIDED TOUR OF ASMETraining Program on GUIDED TOUR OF ASME CODESCODES Presented byPresented by P. S. KULKARNIP. S. KULKARNI
  • 2. Agenda - session 1Agenda - session 1 • This session will provide: – An introduction to Codes and Standards – Objectives of Codes/ Standards. – ASME Code System. – Introduction To ASME Sec. VIII-1 • Approximate duration – 8.0 Hours
  • 3. CODE Credibility Collective Knowledge and Experience 2 S Safety (Plant, Personnel, People) Standardization 2 C WHY ADOPT CODES ?
  • 4. Common pressure vessel codes • ASME Sec VIII Div 1 and Div 2 • BS 5500 • IS 2825 • Ad Merk Blatter (German) • AFNOR (French)
  • 5. ASME Codes Issue freq. : New edition every 3 years, on 1st July latest edition was on 1st July 04. Addenda : In-between revisions, issued yearly also on 1st July. 2004 Edn. & '04 add. --- 1st July '04 2005 Addenda --- 1st July '05 2006 Addenda --- 1st July '06 Again new edition - 2007 (1st July) Applicability : Edition & Addendas effective 6 months from date of issue (i.e. 1st Jan of next year) Issued by : American society of mechanical Engineers, New York.
  • 6. ASME SEC. VIII DIV. 1 Pressure vessels within scope: • Vessels having inside diameter above 6 in. • Vessels designed for pressures above 15 psig and not exceeding 3000 psi. • Unfired steam boilers, evaporators, Heat exchangers
  • 7. ASME Sec. VIII div.1--Excluded from scope • Piping system & components beyond battery limits. • Vessels covered by other sections • Vessels for human occupancy • Pressure containers which are integral part of rotating machinery.
  • 8.
  • 9. ASME Boiler & Pressure Vessel Codes ASME Codes give stipulations and guidelines for the design, materials, manufacture and testing of pressure vessels. These are issued by the American Society of Mechanical Engineers, New York. The codes were first issued in 1915. Since then, many changes have been made and new sections added to the code as need arose. It is a LIVE code and is revised and updated periodically. It keeps pace with time and is responsive to its users.
  • 10. In its present from the ASME Code System is a follows • Section I Power Boilers. • Section II Material specifications.  Part A Ferrous materials,  Part B Non Ferrous Materials  Part C Welding rods, electrodes, filler metals.  Part D Material properties. CODE SYSTEM
  • 11. CODE SYSTEM • Section III Nuclear Power Plant Components. Section IV Heating Boilers. • Section V Non destructive Examinations. • Section VI Care and operation of Heating Boilers. • Section VII Rules for care of Power Boilers. • Section VIII Division 1 - Pressure Vessels Division 2 Alternative Rules ( Pr. Vessel) Division 3 Rules for constructive of High Pressure Vessels. • Section IX Welding and Brazing Qualifications.
  • 12. CODE SYSTEM, cont’d Section X Fiber glass reinforced Plastic Pressure Vessels. Section XI Rules for in service inspection of Nuclear Power Plant Components.
  • 13. APPLICABILITY The editions and addenda become applicable after six months from date of issue. Thus, 1st Jan. 2000, the construction of Pressure Vessels shall be as per 1998 edition and 1999 addenda. However, for old contracts spilling over beyond 1st Jan 2000, the old applicable edition and addenda are valid.
  • 14. CODE INTERPRETATION ASME issue written replies know as "Interpretations" to the inquiries concerning technical aspects of the code .These are issued twice in a year (July and December) and are sent to "Edition - subscribers" as up-date service.
  • 15. CODE CASES Boiler and Pressure Vessels committee meets regularly to consider Proposed additions and revisions to the code. At the same time it may formulate code cases to clarify ' Intent' of existing requirements. These are published as code Case books. It is published along with new editions and supplements are automatically sent to subscribers of code case book till new edition ispublished.
  • 16. ASME Sec. VIII Div. 1 has five different parts Part 1 : UG – General requirements (Design requirements) Part 2 : Material Specific Requirements UCS – Carbon steel & low alloy steel UHA – High alloy steels UNF – Non ferrous metallurgy Part 3 : Fabrication method specific requirements UW – Welded construction UF – Forging construction Part 4 : Mandatory Appendices & Part 5 : Non mandatory Appendices
  • 17.
  • 18. Types of vesselsTypes of vessels • Cylindrical – Horizontal or Vertical • Spherical
  • 19.
  • 20. Steps in design -1Steps in design -1 • Find service conditions & metallurgy. • Ensure ductility at service conditions • Calculate thickness required (TR).
  • 21. Steps in design -2Steps in design -2 • Design thickness = TR + Corr Allow • Roundup to commercially available thickness to get nominal thickness • Find MAWP from nominal thickness
  • 22.
  • 23. Solve a problem Calculate the minimum thickness of a cylindrical shell of inside diameter 4000mm, tan to tan length of 8300mm and a design pr. of 100 Kg/sq cmg. Design temperature of the vessel is 343 C Material of construction – ASTM A 516 Gr 70 Allowable stress of vessel at 343 C = 16500 psi Corrosion allowance = 3.0 mm Efficiency of the weld joint – 1.0
  • 24. 24
  • 25. 25
  • 26. 26
  • 27. UW – 3 : WELD JOINTS CATEGORIES.
  • 28. UW – 3 : WELD JOINTS CATEGORIES. Category A : 1 Longitudinal weld joints in main shell or nozzles. 2 Any welded joints in spherical shell. 3. Any welded joints in Dished Head. 4. Circumferential Seam , Hemisph. head to shell.
  • 29. UW – 3 : WELD JOINTS CATEGORIES. Category B : 1 Circumferential seam in main shell, or nozzle 2 Circumferential seam connecting formed head (other than hemi-spherical head) to shell.
  • 30. UW – 3 : WELD JOINTS CATEGORIES. Contd. Category C : • Weld joints connecting flanges, tube sheets, flat head to main shell or Nozzles (Flange Welds) Category D: • Welds joining communicating chamber or nozzle to the main shell / heads. (Attachment Welds).
  • 31. Types of endsTypes of ends FLAT HEADS : – For low pressures up to 5 kg/sqcm FORMED HEADS : – Torispherical • Generally used up to 15 kg/sqcm – Ellipsoidal • Generally used between 15 to 25 kg/sqcm – Hemispherical • Generally used above 25 kg/sqcm. CONICAL HEADS : for Special purposes.
  • 32.
  • 33.
  • 34.
  • 35. 35
  • 36. For spherical shells / head : t = P x R / (2SE - 0.2P) ….for Thickness P = 2SEt / (R + 0.2t)….for MAWP FORMED HEADS For Torisph. Heads : (L = Crown Rad., r = 0.06 x L) t, = 0.885 x P x L / (SE - 0.1P)… for Thickness P = SEt / ( 0.885L + 0.1 t ) … for MAWP For Ellipsoidal Heads : ( 2 : 1 type) t = P x D / (2SE - 0.2P) ….for Thickness P = 2SEt / (D + 0.2t) ….for MAWP
  • 37.
  • 38.
  • 39. UW-11 :RT and UT EXAMINATIONS Full Radiography is required in following cases : • All butt welds of vessels for lethal substances • If thickness exceeds given in table UCS-57, UHA - 33, • Butt welds of unfired boilers, with design pr. > 50 psi. • For all other vessels, All cat. A welds full radiography . Cat. B & C welds which intersect the Cat. A welds shall be spot radiographed. • Radiography is not required of category B and C butt welds in nozzles less than NPS 10 or 1 1/8 in. thick.
  • 40. UW-11 :RT and UT EXAMINATIONS…contd. 1 Spot Radiography : Spot RT of Butt joints if design efficiency is selected for spot radiography. 2 No Radiography : No RT of weld joints if design efficiency is selected for no radiography or vessel is designed for external pressure 3 Ultrasonic examination : May be substituted for RT only for the final closure seam of a pressure vessel.
  • 41. 41
  • 43. 43
  • 44. 44
  • 45. 45
  • 46. 46
  • 47.
  • 48. UW – 12 :WELDED JOINT TYPES
  • 49. UW – 12 :WELDED JOINT EFFICIENCY RT – 1 : Full Radiography ( E=1) : Full length radiography of all butt welds RT – 2 : Full Radiography ( E=1): Cat – A: Full length radiography Cat – B: Spot RT per [UW – 11 (a) 5 (b)] RT – 3 : Spot radiography ( E= 0.85) RT – 4 : No radiography ( E= 0.7)
  • 50.
  • 51.
  • 52. Some key points:Some key points:
  • 53.
  • 54.
  • 55. 55
  • 56. Out of roundness of Shell Difference between the maximum and minimum inside diameter measured at any cross section of the vessel shall not exceed 1% of the nominal diameter at that cross section under consideration. The diameter can be measured from either inside or outside. If measured from outside shall be corrected for the thickness at that cross section.
  • 57. 57
  • 58. NOZZLE REINFORCEMENT Required area of Reinforcement = d X tr d= Diameter of finished opening tr = Required thickness of shell or head. Reinforcement is waived off for single openings if: 1. finished opening size is 3 1/2" or less diameter in shell or head of thickness 3/8" or less; or 2. finished opening size 2 3/8" or less diameter in shell or head of thickness over 3/8";
  • 59.
  • 60.
  • 61.
  • 62.
  • 63. UCS-66 : IMPACT TESTING 1 MDMT - Thickness point falls on or above the relevant curve. Impact test is not required (Curve UCS – 66 ) 2 Impact test is must, if MDMT < 120 deg F, and: Thickness Of welded part > 4” Thickness for Non-welded part > 6” 3 Test normally required for MDMT < -55 deg. F
  • 64. 64
  • 65. 65
  • 66. 66
  • 67. 67
  • 68. 68
  • 69. 69
  • 70. 70
  • 71. 71
  • 72. IMPACT TESTING EXEMPTION -- UG-20 (f) : Impact test exempt for if, Materials are P No 1, Gr. No. 1 and 2 1. Materials of curve A : thickness < 0.5 inch 2. Materials curve B, C, D : thickness < 1.0 inch 3. Hydrostatic test performed as required 4. Design temp = -20 deg F to 650deg.F 5. No cyclic or thermal shock loading
  • 73. IMPACT TESTINGEXEMPTION…….contd. 1 UCS-68 (c) : If PWHT is performed when not a Code requirement, reduction of 30 deg. F (17 0 C) in impact testing exemption temp.(from Fig UCS-66) may be given for P No. 1 materials 2 If coincident ratio is < 1, Reduction to exemption temperature may be given as per UCS-66.1
  • 74. 74
  • 75. 75
  • 76. 76
  • 77. 77
  • 78. 78
  • 79. 79
  • 80. 80
  • 81. 81
  • 82. 82
  • 83. 83
  • 84. 84
  • 85. • PWHT temperature is higher of the two for dissimilar metal joints UW-40 : POST-WELD HEAT TREATMENT • PWHT is Code Requirement if thickness exceeds those given in tables for respective materials . • Furnace PWHT method is preferred . • Min. Overlap for PWHT in multiple heats = 5 ft. • Local PWHT : Min Soak Band = weld width + Lesser of 2’’ or t. and it shall extend full 360 deg for circ. Joint
  • 86. · Still air cooling permitted below 800 deg .F. UCS-56: POST-WELD HEAT TREATMENT · Max. Loading temp in furnace = 800 deg .F · Max. heating rate 400 deg F/hr/inch of thickness. · Soaking period as per UCS-56 tables. · Temp difference between hottest and coldest parts of vessel shall not exceed 150 deg .F · Max. cooling rate = 500 deg .F /hr/inch of thk. · Max. offloading temp = 800 deg. F
  • 87.
  • 88. 88
  • 89. 89
  • 90. 90
  • 91. 91
  • 92. 92
  • 93. 93
  • 94. 94
  • 95. 95
  • 96. 96
  • 98. NDE OF PRESSURE VESSELS Selection of a particular NDT technique : Applicable NDT methods / Welding Discontinuities Discontinuities Applicable NDT Methods RT T PT MT VT ET Porosity √ * √a *b √a * Slag Inclusion √ √ NA *b NA * Incomplete fusion * √ NA *b NA * Incomplete Penetration √ √ NA * NA * Undercut √ * * * √ * Overlap NA * √ √ * * Cracks * √ √a √b √a √ Laminations NA √ √a,c √b,c √a,c NA
  • 99. Applicable NDT methods for Weld joint types Joints NDT Methods RT UT PT MT VT ET Butt √ √ √ √ √ √ Corner * √ √ √ √ * T * √ √ √ √ * Lap * * √ √ √ *
  • 100. Note to NDT Table a. Surface b. Surface and slightly subsurface c. Weld preparation or edge of base metal √ Applicable method * Marginal applicability depending on other factors.
  • 101. 101
  • 102. 102
  • 103. 103
  • 104. 104
  • 105. 105
  • 106. 106
  • 107. 107
  • 108. 108
  • 109. 109
  • 110. 110
  • 111. UG-99 : HYDROSTATIC TEST • Min. Inspection pressure = Test pressure / 1.3 • Hydrostatic Test pr. = 1.3 X MAWP X stress ratio Stress ratio = Stress at test temp./Stress at design temp. • Any non-hazardous liquid may be used for the test. • Min. Test temp = MDMT + 30 deg. F ( 17 C ) • Inspection temperature <= 120 deg. F. • The MAWP may be same as Design pr. • Test gauge range = 1.5 to 4 times test pr.
  • 112. UG-100 : PNEUMATIC TESTS • Pneumatic test is used instead of hydro when: • Vessels cannot be safely filled with water • Vessels in service in which traces of testing liquid cannot be tolerated • Test pr = 1.1 X MAWP X stress ratio. • Test temp shall exceed MDMT by 30 deg F. • Pr. Gauge range = 1.5 to 4 times test pressure
  • 113. Safety precautions for Pneumatic Test • All welds around openings and attachment welds with throat >= 6mm ( 0.25”) to be MT or PT tested • The pr. shall be first raised to 50% of the test pr. • The pressure then shall be reduced to a value of test pressure /1.1 , to permit inspection. • Then the pressure shall be raised in steps of 10% of test pr. To reach full test pressure
  • 114. CODE STAMPING Each pressure vessel shall be marked with the following : 1) The official Code U Symbol or the official UM Symbol. 2) Name of the Manufacturer of the pressure vessel preceded by the words "certified by"; 3) Max. allowable working pressure ---- psi at ---- 0 F. 4) Minimum design metal temperature ---- 0 F ----psi 5) Manufacturer's serial number; 6) Year built.
  • 115. 115
  • 116. 116
  • 117. 117 v
  • 118. 118
  • 119.
  • 120. Thank You forThank You for youryour Time and AttentionTime and Attention