Condensed Version on Soft Ramp Feature:
Utility Parallel:
1. Soft Ramp in and out of Base Load, Import.
2. Utility CB Aux must be closed before Gen breaker will close
3. If utility Aux is opened during operation the Gen CB will immediately open
4. Taking Switch Gear ECS to CDS will cause soft ramp and then opens Gen breaker
Multi-Unit Standby:
1. Utility Aux must be opened or Gen CB will not close
2. When a Generator closes to a hot bus it will assume load without a soft ramp
3. When the run request is removed all generators CBโ€™s will immediately open
4. If a SWGR ECS is placed into CDS the generator will soft ramp and open Gen CB
5. Gen Demand Priority.
. 0 When a generator CB is closed to the buss there is no soft ramp
loading.
0 When a generator is removed from the buss there is a soft ramp
unload and then the CB is opened
RC Mode:
1. Once the generator CB is closed to the buss the PLC no longer has load control,
so soft ramp is not possible.
2. If the SWGR ECS is placed in CDS the Gen CB will immediately open
3. If the generator is removed based on Generator Demand Priority logic the
breaker will immediately open

More Related Content

What's hot

Jozi Power Fact Sheet 2016_FEB_opt
Jozi Power Fact Sheet 2016_FEB_optJozi Power Fact Sheet 2016_FEB_opt
Jozi Power Fact Sheet 2016_FEB_opt
Willem Schoeman
ย 
TEAM 2 MEGR 3156 SPRING 2015
TEAM 2 MEGR 3156 SPRING 2015TEAM 2 MEGR 3156 SPRING 2015
TEAM 2 MEGR 3156 SPRING 2015
Peter Burke
ย 
Synchronous motor
Synchronous motorSynchronous motor
Synchronous motor
Zulfiqar Mangrio
ย 
14+synchronous+motors
14+synchronous+motors14+synchronous+motors
14+synchronous+motors
huseyin28
ย 

What's hot (20)

Utility & Generator Paralleling System
Utility & Generator Paralleling SystemUtility & Generator Paralleling System
Utility & Generator Paralleling System
ย 
Stepper motor
Stepper motorStepper motor
Stepper motor
ย 
How to wire an ON-OFF-ON switch for both backlighting and indication
How to wire an ON-OFF-ON switch for both backlighting and indicationHow to wire an ON-OFF-ON switch for both backlighting and indication
How to wire an ON-OFF-ON switch for both backlighting and indication
ย 
motors
motorsmotors
motors
ย 
Jozi Power Fact Sheet 2016_FEB_opt
Jozi Power Fact Sheet 2016_FEB_optJozi Power Fact Sheet 2016_FEB_opt
Jozi Power Fact Sheet 2016_FEB_opt
ย 
Micro stepping mode for stepper motor
Micro stepping mode for stepper motorMicro stepping mode for stepper motor
Micro stepping mode for stepper motor
ย 
Automotive starting system.
Automotive starting system.Automotive starting system.
Automotive starting system.
ย 
Amp 1035 d_specsheet
Amp 1035 d_specsheetAmp 1035 d_specsheet
Amp 1035 d_specsheet
ย 
ppt on induction generator
ppt on induction generatorppt on induction generator
ppt on induction generator
ย 
TEAM 2 MEGR 3156 SPRING 2015
TEAM 2 MEGR 3156 SPRING 2015TEAM 2 MEGR 3156 SPRING 2015
TEAM 2 MEGR 3156 SPRING 2015
ย 
Hydro electric
Hydro electricHydro electric
Hydro electric
ย 
Synchronous motor
Synchronous motorSynchronous motor
Synchronous motor
ย 
09 elec 08
09 elec 0809 elec 08
09 elec 08
ย 
Complexity in integration high voltage and ventilation systems Warwick Young
Complexity in integration   high voltage and ventilation systems Warwick YoungComplexity in integration   high voltage and ventilation systems Warwick Young
Complexity in integration high voltage and ventilation systems Warwick Young
ย 
Stepper Motor
Stepper MotorStepper Motor
Stepper Motor
ย 
Induction generator
Induction generatorInduction generator
Induction generator
ย 
Stepper motor interfacing
Stepper motor interfacingStepper motor interfacing
Stepper motor interfacing
ย 
14+synchronous+motors
14+synchronous+motors14+synchronous+motors
14+synchronous+motors
ย 
Faraday's experiment report
Faraday's experiment reportFaraday's experiment report
Faraday's experiment report
ย 
Stepper motor
Stepper motorStepper motor
Stepper motor
ย 

Similar to Soft ramp

Battery Charging
Battery ChargingBattery Charging
Battery Charging
Ping-Chin Huang
ย 
Reps0033 00 remote start input functions for cat gccp 1.2 control panels
Reps0033 00 remote start input functions for cat gccp 1.2 control panelsReps0033 00 remote start input functions for cat gccp 1.2 control panels
Reps0033 00 remote start input functions for cat gccp 1.2 control panels
PILARMARTINEZ569125
ย 
Sop 6.6 kv switchboard edited
Sop 6.6 kv switchboard editedSop 6.6 kv switchboard edited
Sop 6.6 kv switchboard edited
prabagaran16
ย 
Stepper motors
Stepper motorsStepper motors
Stepper motors
Manish Bhagat
ย 
DOCUMENT FOR SOTF PROTECTION FINAL
DOCUMENT FOR SOTF PROTECTION FINALDOCUMENT FOR SOTF PROTECTION FINAL
DOCUMENT FOR SOTF PROTECTION FINAL
EKANANDHAN G
ย 
E70 CCB2 Brake system for WAG 9 Locomotive.pptx
E70 CCB2 Brake system for WAG 9 Locomotive.pptxE70 CCB2 Brake system for WAG 9 Locomotive.pptx
E70 CCB2 Brake system for WAG 9 Locomotive.pptx
SATYANARAYANABODDULA
ย 
12-QoS&Clock configuration.pdf
12-QoS&Clock configuration.pdf12-QoS&Clock configuration.pdf
12-QoS&Clock configuration.pdf
ssuserbe19ff
ย 
Dg synchronisation process
Dg synchronisation processDg synchronisation process
Dg synchronisation process
VNIT Nagpur
ย 

Similar to Soft ramp (20)

Battery Charging
Battery ChargingBattery Charging
Battery Charging
ย 
Reps0033 00 remote start input functions for cat gccp 1.2 control panels
Reps0033 00 remote start input functions for cat gccp 1.2 control panelsReps0033 00 remote start input functions for cat gccp 1.2 control panels
Reps0033 00 remote start input functions for cat gccp 1.2 control panels
ย 
Flbs36 sf6 switch disconnector
Flbs36 sf6 switch disconnectorFlbs36 sf6 switch disconnector
Flbs36 sf6 switch disconnector
ย 
Sop 6.6 kv switchboard edited
Sop 6.6 kv switchboard editedSop 6.6 kv switchboard edited
Sop 6.6 kv switchboard edited
ย 
Stepper motors
Stepper motorsStepper motors
Stepper motors
ย 
WORK METHOD STATEMENT for Crane function check.docx
WORK METHOD STATEMENT for Crane function check.docxWORK METHOD STATEMENT for Crane function check.docx
WORK METHOD STATEMENT for Crane function check.docx
ย 
Sop 6.6 kv switchboard
Sop 6.6 kv switchboardSop 6.6 kv switchboard
Sop 6.6 kv switchboard
ย 
SCR COMMUTATION PART 2
SCR COMMUTATION PART 2SCR COMMUTATION PART 2
SCR COMMUTATION PART 2
ย 
Flbs36 36 kv switch disconnector
Flbs36 36 kv switch disconnectorFlbs36 36 kv switch disconnector
Flbs36 36 kv switch disconnector
ย 
Low Voltage System GE Gas Turbine Simple
Low Voltage System GE Gas Turbine SimpleLow Voltage System GE Gas Turbine Simple
Low Voltage System GE Gas Turbine Simple
ย 
Vk
VkVk
Vk
ย 
CONTROL OF ELECTRICAL MACHINES
CONTROL OF ELECTRICAL MACHINESCONTROL OF ELECTRICAL MACHINES
CONTROL OF ELECTRICAL MACHINES
ย 
DOCUMENT FOR SOTF PROTECTION FINAL
DOCUMENT FOR SOTF PROTECTION FINALDOCUMENT FOR SOTF PROTECTION FINAL
DOCUMENT FOR SOTF PROTECTION FINAL
ย 
Unit 3 steppermotors
Unit 3 steppermotorsUnit 3 steppermotors
Unit 3 steppermotors
ย 
RLS type indoor SF6 load break switch(Disconnector)
RLS type indoor SF6 load break switch(Disconnector)RLS type indoor SF6 load break switch(Disconnector)
RLS type indoor SF6 load break switch(Disconnector)
ย 
Electrical substation (one and half breaker scheme)
Electrical substation (one and half breaker scheme)Electrical substation (one and half breaker scheme)
Electrical substation (one and half breaker scheme)
ย 
E70 CCB2 Brake system for WAG 9 Locomotive.pptx
E70 CCB2 Brake system for WAG 9 Locomotive.pptxE70 CCB2 Brake system for WAG 9 Locomotive.pptx
E70 CCB2 Brake system for WAG 9 Locomotive.pptx
ย 
12-QoS&Clock configuration.pdf
12-QoS&Clock configuration.pdf12-QoS&Clock configuration.pdf
12-QoS&Clock configuration.pdf
ย 
Dg synchronisation process
Dg synchronisation processDg synchronisation process
Dg synchronisation process
ย 
"Electrical Overhaul: Powering Efficiency in Refinery Turnarounds"
"Electrical Overhaul: Powering Efficiency in Refinery Turnarounds""Electrical Overhaul: Powering Efficiency in Refinery Turnarounds"
"Electrical Overhaul: Powering Efficiency in Refinery Turnarounds"
ย 

Recently uploaded

Top Rated Call Girls In chittoor ๐Ÿ“ฑ {7001035870} VIP Escorts chittoor
Top Rated Call Girls In chittoor ๐Ÿ“ฑ {7001035870} VIP Escorts chittoorTop Rated Call Girls In chittoor ๐Ÿ“ฑ {7001035870} VIP Escorts chittoor
Top Rated Call Girls In chittoor ๐Ÿ“ฑ {7001035870} VIP Escorts chittoor
dharasingh5698
ย 
Call Now โ‰ฝ 9953056974 โ‰ผ๐Ÿ” Call Girls In New Ashok Nagar โ‰ผ๐Ÿ” Delhi door step de...
Call Now โ‰ฝ 9953056974 โ‰ผ๐Ÿ” Call Girls In New Ashok Nagar  โ‰ผ๐Ÿ” Delhi door step de...Call Now โ‰ฝ 9953056974 โ‰ผ๐Ÿ” Call Girls In New Ashok Nagar  โ‰ผ๐Ÿ” Delhi door step de...
Call Now โ‰ฝ 9953056974 โ‰ผ๐Ÿ” Call Girls In New Ashok Nagar โ‰ผ๐Ÿ” Delhi door step de...
9953056974 Low Rate Call Girls In Saket, Delhi NCR
ย 
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
SUHANI PANDEY
ย 
Call Girls In Bangalore โ˜Ž 7737669865 ๐Ÿฅต Book Your One night Stand
Call Girls In Bangalore โ˜Ž 7737669865 ๐Ÿฅต Book Your One night StandCall Girls In Bangalore โ˜Ž 7737669865 ๐Ÿฅต Book Your One night Stand
Call Girls In Bangalore โ˜Ž 7737669865 ๐Ÿฅต Book Your One night Stand
amitlee9823
ย 

Recently uploaded (20)

DC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equationDC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equation
ย 
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
ย 
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
COST-EFFETIVE  and Energy Efficient BUILDINGS ptxCOST-EFFETIVE  and Energy Efficient BUILDINGS ptx
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
ย 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdf
ย 
2016EF22_0 solar project report rooftop projects
2016EF22_0 solar project report rooftop projects2016EF22_0 solar project report rooftop projects
2016EF22_0 solar project report rooftop projects
ย 
Top Rated Call Girls In chittoor ๐Ÿ“ฑ {7001035870} VIP Escorts chittoor
Top Rated Call Girls In chittoor ๐Ÿ“ฑ {7001035870} VIP Escorts chittoorTop Rated Call Girls In chittoor ๐Ÿ“ฑ {7001035870} VIP Escorts chittoor
Top Rated Call Girls In chittoor ๐Ÿ“ฑ {7001035870} VIP Escorts chittoor
ย 
Introduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaIntroduction to Serverless with AWS Lambda
Introduction to Serverless with AWS Lambda
ย 
22-prompt engineering noted slide shown.pdf
22-prompt engineering noted slide shown.pdf22-prompt engineering noted slide shown.pdf
22-prompt engineering noted slide shown.pdf
ย 
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the start
ย 
Unleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapUnleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leap
ย 
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
ย 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - V
ย 
Call Now โ‰ฝ 9953056974 โ‰ผ๐Ÿ” Call Girls In New Ashok Nagar โ‰ผ๐Ÿ” Delhi door step de...
Call Now โ‰ฝ 9953056974 โ‰ผ๐Ÿ” Call Girls In New Ashok Nagar  โ‰ผ๐Ÿ” Delhi door step de...Call Now โ‰ฝ 9953056974 โ‰ผ๐Ÿ” Call Girls In New Ashok Nagar  โ‰ผ๐Ÿ” Delhi door step de...
Call Now โ‰ฝ 9953056974 โ‰ผ๐Ÿ” Call Girls In New Ashok Nagar โ‰ผ๐Ÿ” Delhi door step de...
ย 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdf
ย 
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
ย 
Call Girls In Bangalore โ˜Ž 7737669865 ๐Ÿฅต Book Your One night Stand
Call Girls In Bangalore โ˜Ž 7737669865 ๐Ÿฅต Book Your One night StandCall Girls In Bangalore โ˜Ž 7737669865 ๐Ÿฅต Book Your One night Stand
Call Girls In Bangalore โ˜Ž 7737669865 ๐Ÿฅต Book Your One night Stand
ย 
Work-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxWork-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptx
ย 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghly
ย 
Block diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptBlock diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.ppt
ย 
Hostel management system project report..pdf
Hostel management system project report..pdfHostel management system project report..pdf
Hostel management system project report..pdf
ย 

Soft ramp

  • 1. Intelligent Switchgear Organization LLC A Caterpillar Electric Power Business 4955 Marconi Drive โ€ข Alpharetta, GA 30005 (770) 442-9442 โ€ข Fax: (770) 664-6302 Condensed Version on Soft Ramp Feature: Utility Parallel: 1. Soft Ramp in and out of Base Load, Import. 2. Utility CB Aux must be closed before Gen breaker will close 3. If utility Aux is opened during operation the Gen CB will immediately open 4. Taking Switch Gear ECS to CDS will cause soft ramp and then opens Gen breaker Multi-Unit Standby: 1. Utility Aux must be opened or Gen CB will not close 2. When a Generator closes to a hot bus it will assume load without a soft ramp 3. When the run request is removed all generators CBโ€™s will immediately open 4. If a SWGR ECS is placed into CDS the generator will soft ramp and open Gen CB 5. Gen Demand Priority. . 0 When a generator CB is closed to the buss there is no soft ramp loading. 0 When a generator is removed from the buss there is a soft ramp unload and then the CB is opened RC Mode: 1. Once the generator CB is closed to the buss the PLC no longer has load control, so soft ramp is not possible. 2. If the SWGR ECS is placed in CDS the Gen CB will immediately open 3. If the generator is removed based on Generator Demand Priority logic the breaker will immediately open