Credentials of the company
Hyderabad Pollution Controls Limited is now a 36 year old
company, briefly called POLCONS, engaged in design,
engineering, manufacture, supply, erection, testing and
commissioning of Industrial Air Pollution Control equipments
and Air Handling Systems.
This company was incorporated in the year 1978. In the last 36
Years Polcons have installed Hundreds of Ventilation Plants, and
Air Pollution Control Systems; in many Large Public Sector
Undertakings and many more Private enterprises.
 Axial Flow Fans: Industrial Axial Flow Fans
Industrial Axial Fans
 Centrifugal Fans
 Cyclones
 Pneumatic Conveying Units
 Bag Filters
 Air Washer Unit
 Cartridge Filter Dust Collector
 Man Coolers
 Industrial Fans
 Boiler ID Fans
 FD Fans
 ID Fans
Km.ppt
Km.ppt
PROJECTS LIST: (VENTILATION PACKAGES)
 BHEL – Ramachandrapuram-HYDERABAD Coil Winding Hall Pressurised Ventilation System
 MAHAGENCO-Bhusawal Thermal Power Station (2x500MW)
 MAHAGENCO-New Parli TPP (1x250mw) & Paras TPS (1x250mw)-Unit-II
 MAHAGENCO-New Parli TPP (1x250mw) & Paras TPS (1x250mw)-Unit-I
 NTPC-Kahalgaon Super Thermal Power Station (KSTPP) Unit-3;4&5 (3 X 500MW)
 UPRVUNL-Parichha Thermal Power Station (PTPS) Unit-3&4 (2 X 210MW)
 HPGCL-Tau Devilal Thermal Power Station (TDTPS) Unit-7&8 (2 X 250MW)
 RRVUNL-KotaThermal Power Station (KTPS) Stage-IV (1 X 195MW)
 RRVUNL-Suratgarh Thermal Power Station (STPS) Stage-III (1 X 250MW)
 RRVUNL-Suratgarh Thermal Power Station (STPS) Stage-II(2 X 250MW)
 MSEB-Khaperkheda Thermal Power Station Unit-3 & 4 (2 X 210MW)
 APSEB-Nagarjuna Sagar Power House (NSPH) Hydel Project Nalgonda
 APSEB-Lower Sileru Hydro Electric Scheme (LSHES) Mothugudem Khammam district,
 APSEB-Vijayawada Thermal Power Station (VTPS) Stage-III (2 X 210MW)
 APSEB-Kothagudem Thermal Power Station (KTPS) Stage-V (2 X 250MW)
 MSEB-Chandrapur Thermal Power Station (CTPS) Unit-7 (1X 500MW)
 APSEB-Rayalseema Thermal Power Project (RTPP) Stage-I (2 X 210MW)
 The discussion with Mr G Ravishankar, Director Operations,
POLCONS, Hyderabad revealed that the project erection is one
of the most critical phase in their entire operations.
 The huge sizes of their indusrtial Fans, their ducting and
the proper erection and fitment is highly critical of skill, practical
experience and strong understanding of Project Management.
 He emphasised the need for close interaction between
the users and the infrastructure developers and the capacity and
understanding to mitigate the risks while executing the project.
 The Company have installed a
large number of Cyclones in
various projects especially in
Thermal Power pllants and
Cement manufacturing
companies.
 Cyclones are most commonly
used equipment in dust
separation.
 The Cyclones are of remarkably
high efficiency where only few
milligrams of dust is escaping in
the exhaust air.
 High efficiency compile to
International Standards of
emission
 The discussion on the Project Completion and the Process
improvement has resulted in the following:-
o Complete understanding of the Project.
o The Factors that can delay or derail the Project.
o The Risk associated with the Factors.
o The Knowledge gained from the past on big
projects.
o Eliminate wasteful activities.
o Simplify the Process.
o The last and not the least ` THE COMMON SENCE’.
 The process improvement has resulted in:-
o 18% Cost Cutting on Project Costing.
o Better coordination with Suppliers.
o Timely supply of materials according to progress of
work, reduced inventory.
o Permanent staff reduction of 25%.
o Able survive stiff competetion.
o Could undertake Projects Abroad.
Km.ppt
Km.ppt

Más contenido relacionado

La actualidad más candente

Experience Certificate
Experience CertificateExperience Certificate
Experience CertificateJashim Pd-2
 
Industrial engineering – case study
Industrial engineering – case studyIndustrial engineering – case study
Industrial engineering – case studyJephin S John
 
Solar Systems By Tecso Projects Limited, Vadodara
Solar Systems By Tecso Projects Limited, VadodaraSolar Systems By Tecso Projects Limited, Vadodara
Solar Systems By Tecso Projects Limited, VadodaraIndiaMART InterMESH Limited
 
Projects - Lead operations process engineer
Projects - Lead operations process engineerProjects - Lead operations process engineer
Projects - Lead operations process engineerChris Owen
 
AC And DC Geared Motors by Strategi Automation Solutions Pvt. Ltd., Bengaluru
AC And DC Geared Motors by Strategi Automation Solutions Pvt. Ltd., BengaluruAC And DC Geared Motors by Strategi Automation Solutions Pvt. Ltd., Bengaluru
AC And DC Geared Motors by Strategi Automation Solutions Pvt. Ltd., BengaluruIndiaMART InterMESH Limited
 
A-Umar Saeed-Nestle Summer Associate Program-2014
A-Umar Saeed-Nestle Summer Associate Program-2014A-Umar Saeed-Nestle Summer Associate Program-2014
A-Umar Saeed-Nestle Summer Associate Program-2014Umar Saeed
 

La actualidad más candente (11)

Experience Certificate
Experience CertificateExperience Certificate
Experience Certificate
 
Industrial engineering – case study
Industrial engineering – case studyIndustrial engineering – case study
Industrial engineering – case study
 
DNSTW SUBSTATION A
DNSTW SUBSTATION ADNSTW SUBSTATION A
DNSTW SUBSTATION A
 
DNSTW SUBSTATION C
DNSTW SUBSTATION CDNSTW SUBSTATION C
DNSTW SUBSTATION C
 
Solar Systems By Tecso Projects Limited, Vadodara
Solar Systems By Tecso Projects Limited, VadodaraSolar Systems By Tecso Projects Limited, Vadodara
Solar Systems By Tecso Projects Limited, Vadodara
 
Projects - Lead operations process engineer
Projects - Lead operations process engineerProjects - Lead operations process engineer
Projects - Lead operations process engineer
 
DNSTW SUBSTATION B
DNSTW SUBSTATION BDNSTW SUBSTATION B
DNSTW SUBSTATION B
 
AC And DC Geared Motors by Strategi Automation Solutions Pvt. Ltd., Bengaluru
AC And DC Geared Motors by Strategi Automation Solutions Pvt. Ltd., BengaluruAC And DC Geared Motors by Strategi Automation Solutions Pvt. Ltd., Bengaluru
AC And DC Geared Motors by Strategi Automation Solutions Pvt. Ltd., Bengaluru
 
DNSTW OCB
DNSTW OCBDNSTW OCB
DNSTW OCB
 
BHEL ,Varanasi Presentation Report
BHEL ,Varanasi Presentation ReportBHEL ,Varanasi Presentation Report
BHEL ,Varanasi Presentation Report
 
A-Umar Saeed-Nestle Summer Associate Program-2014
A-Umar Saeed-Nestle Summer Associate Program-2014A-Umar Saeed-Nestle Summer Associate Program-2014
A-Umar Saeed-Nestle Summer Associate Program-2014
 

Destacado

The Ecova Blueprint - Total Energy and Sustainabiliity Management
The Ecova Blueprint - Total Energy and Sustainabiliity Management The Ecova Blueprint - Total Energy and Sustainabiliity Management
The Ecova Blueprint - Total Energy and Sustainabiliity Management Shannon Scheiwiller, MBA
 
For My Beloved Dad
For My Beloved DadFor My Beloved Dad
For My Beloved DadDyah S
 
มหาชาติหรือมหาเวสสันดรชาดก
มหาชาติหรือมหาเวสสันดรชาดกมหาชาติหรือมหาเวสสันดรชาดก
มหาชาติหรือมหาเวสสันดรชาดกSasiporn Boonrod
 
The sleeping giant_-_when_energy_prices_awake_whitepaper
The sleeping giant_-_when_energy_prices_awake_whitepaperThe sleeping giant_-_when_energy_prices_awake_whitepaper
The sleeping giant_-_when_energy_prices_awake_whitepaperShannon Scheiwiller, MBA
 
The sleeping giant_-_when_energy_prices_awake_whitepaper
The sleeping giant_-_when_energy_prices_awake_whitepaperThe sleeping giant_-_when_energy_prices_awake_whitepaper
The sleeping giant_-_when_energy_prices_awake_whitepaperShannon Scheiwiller, MBA
 
Gaji pp 22 tnh 2013
Gaji pp 22 tnh 2013Gaji pp 22 tnh 2013
Gaji pp 22 tnh 2013Ponex Zaza
 
Gaji pp 22 tnh 2013
Gaji pp 22 tnh 2013Gaji pp 22 tnh 2013
Gaji pp 22 tnh 2013Ponex Zaza
 
มหาชาติหรือมหาเวสสันดรชาดก
มหาชาติหรือมหาเวสสันดรชาดกมหาชาติหรือมหาเวสสันดรชาดก
มหาชาติหรือมหาเวสสันดรชาดกSasiporn Boonrod
 
มหาชาติหรือมหาเวสสันดรชาดก
มหาชาติหรือมหาเวสสันดรชาดกมหาชาติหรือมหาเวสสันดรชาดก
มหาชาติหรือมหาเวสสันดรชาดกSasiporn Boonrod
 
71.KEY ACCOUNT MANAGEMENT
71.KEY ACCOUNT MANAGEMENT71.KEY ACCOUNT MANAGEMENT
71.KEY ACCOUNT MANAGEMENTphanulimDr
 
Presentacion alarmas inalambricas
Presentacion alarmas inalambricasPresentacion alarmas inalambricas
Presentacion alarmas inalambricascarlos roa
 
Strukturmenwa 120402032825-phpapp02
Strukturmenwa 120402032825-phpapp02Strukturmenwa 120402032825-phpapp02
Strukturmenwa 120402032825-phpapp02Ponex Zaza
 
70 START UP WHO SAID...YOU CAN'T DO IT?
70 START UP WHO SAID...YOU CAN'T DO IT?70 START UP WHO SAID...YOU CAN'T DO IT?
70 START UP WHO SAID...YOU CAN'T DO IT?phanulimDr
 

Destacado (14)

The Ecova Blueprint - Total Energy and Sustainabiliity Management
The Ecova Blueprint - Total Energy and Sustainabiliity Management The Ecova Blueprint - Total Energy and Sustainabiliity Management
The Ecova Blueprint - Total Energy and Sustainabiliity Management
 
For My Beloved Dad
For My Beloved DadFor My Beloved Dad
For My Beloved Dad
 
มหาชาติหรือมหาเวสสันดรชาดก
มหาชาติหรือมหาเวสสันดรชาดกมหาชาติหรือมหาเวสสันดรชาดก
มหาชาติหรือมหาเวสสันดรชาดก
 
The sleeping giant_-_when_energy_prices_awake_whitepaper
The sleeping giant_-_when_energy_prices_awake_whitepaperThe sleeping giant_-_when_energy_prices_awake_whitepaper
The sleeping giant_-_when_energy_prices_awake_whitepaper
 
The sleeping giant_-_when_energy_prices_awake_whitepaper
The sleeping giant_-_when_energy_prices_awake_whitepaperThe sleeping giant_-_when_energy_prices_awake_whitepaper
The sleeping giant_-_when_energy_prices_awake_whitepaper
 
Gaji pp 22 tnh 2013
Gaji pp 22 tnh 2013Gaji pp 22 tnh 2013
Gaji pp 22 tnh 2013
 
Gaji pp 22 tnh 2013
Gaji pp 22 tnh 2013Gaji pp 22 tnh 2013
Gaji pp 22 tnh 2013
 
มหาชาติหรือมหาเวสสันดรชาดก
มหาชาติหรือมหาเวสสันดรชาดกมหาชาติหรือมหาเวสสันดรชาดก
มหาชาติหรือมหาเวสสันดรชาดก
 
มหาชาติหรือมหาเวสสันดรชาดก
มหาชาติหรือมหาเวสสันดรชาดกมหาชาติหรือมหาเวสสันดรชาดก
มหาชาติหรือมหาเวสสันดรชาดก
 
71.KEY ACCOUNT MANAGEMENT
71.KEY ACCOUNT MANAGEMENT71.KEY ACCOUNT MANAGEMENT
71.KEY ACCOUNT MANAGEMENT
 
Presentacion alarmas inalambricas
Presentacion alarmas inalambricasPresentacion alarmas inalambricas
Presentacion alarmas inalambricas
 
Strukturmenwa 120402032825-phpapp02
Strukturmenwa 120402032825-phpapp02Strukturmenwa 120402032825-phpapp02
Strukturmenwa 120402032825-phpapp02
 
Penulisan laporan
Penulisan laporanPenulisan laporan
Penulisan laporan
 
70 START UP WHO SAID...YOU CAN'T DO IT?
70 START UP WHO SAID...YOU CAN'T DO IT?70 START UP WHO SAID...YOU CAN'T DO IT?
70 START UP WHO SAID...YOU CAN'T DO IT?
 

Similar a Km.ppt

Jurg hauptli resume
Jurg hauptli resumeJurg hauptli resume
Jurg hauptli resumeJurg Hauptli
 
Co Profile-Comfort Air Systems Fze
Co Profile-Comfort Air Systems FzeCo Profile-Comfort Air Systems Fze
Co Profile-Comfort Air Systems FzeLalit Dhirmalani
 
Hydrogen Peroxide Plant - TASNIM Chemical Complex, Bangladesh
Hydrogen Peroxide Plant - TASNIM Chemical Complex, Bangladesh Hydrogen Peroxide Plant - TASNIM Chemical Complex, Bangladesh
Hydrogen Peroxide Plant - TASNIM Chemical Complex, Bangladesh Nuberg Engineering
 
INVENTA-Machinery Group -2015 - B1
INVENTA-Machinery Group -2015 - B1INVENTA-Machinery Group -2015 - B1
INVENTA-Machinery Group -2015 - B1Asis Banerjie
 
Industrial Placement Report
Industrial Placement ReportIndustrial Placement Report
Industrial Placement ReportBhavishya Sehgal
 
Case Study: Office Complex Cooling
Case Study: Office Complex CoolingCase Study: Office Complex Cooling
Case Study: Office Complex CoolingVianca Damani
 
Prashant_rai_Mech8 yrs final
Prashant_rai_Mech8 yrs finalPrashant_rai_Mech8 yrs final
Prashant_rai_Mech8 yrs finalprashant rai
 
Analysis of Various Cement grinding Systems with Respect to Power Consumption...
Analysis of Various Cement grinding Systems with Respect to Power Consumption...Analysis of Various Cement grinding Systems with Respect to Power Consumption...
Analysis of Various Cement grinding Systems with Respect to Power Consumption...Karan Walia
 
Muhammad asif cv may-2016
Muhammad asif cv     may-2016Muhammad asif cv     may-2016
Muhammad asif cv may-2016MUHAMMAD ASIF
 
Analysis of 4 Way Catalytic Convertor with Pollutant Reduction Technique
Analysis of 4 Way Catalytic Convertor  with Pollutant Reduction TechniqueAnalysis of 4 Way Catalytic Convertor  with Pollutant Reduction Technique
Analysis of 4 Way Catalytic Convertor with Pollutant Reduction TechniqueIRJET Journal
 
Suprotim dey LATEST CV
Suprotim dey  LATEST CVSuprotim dey  LATEST CV
Suprotim dey LATEST CVSuprotim Dey
 

Similar a Km.ppt (20)

SahilResume
SahilResumeSahilResume
SahilResume
 
Jurg hauptli resume
Jurg hauptli resumeJurg hauptli resume
Jurg hauptli resume
 
madhankumar new CV 2016 june...
madhankumar new CV 2016 june...madhankumar new CV 2016 june...
madhankumar new CV 2016 june...
 
Madhankumar new cv 2016 june6985
Madhankumar new cv 2016 june6985Madhankumar new cv 2016 june6985
Madhankumar new cv 2016 june6985
 
Co Profile-Comfort Air Systems Fze
Co Profile-Comfort Air Systems FzeCo Profile-Comfort Air Systems Fze
Co Profile-Comfort Air Systems Fze
 
RAJENDRA SHARMA CV
RAJENDRA SHARMA CVRAJENDRA SHARMA CV
RAJENDRA SHARMA CV
 
Madhankumar new cv 2016 june6985
Madhankumar new cv 2016 june6985Madhankumar new cv 2016 june6985
Madhankumar new cv 2016 june6985
 
Hydrogen Peroxide Plant - TASNIM Chemical Complex, Bangladesh
Hydrogen Peroxide Plant - TASNIM Chemical Complex, Bangladesh Hydrogen Peroxide Plant - TASNIM Chemical Complex, Bangladesh
Hydrogen Peroxide Plant - TASNIM Chemical Complex, Bangladesh
 
INVENTA-Machinery Group -2015 - B1
INVENTA-Machinery Group -2015 - B1INVENTA-Machinery Group -2015 - B1
INVENTA-Machinery Group -2015 - B1
 
CV-VA- March2016
CV-VA- March2016CV-VA- March2016
CV-VA- March2016
 
Industrial Placement Report
Industrial Placement ReportIndustrial Placement Report
Industrial Placement Report
 
CV-ZTUFAIL2016
CV-ZTUFAIL2016CV-ZTUFAIL2016
CV-ZTUFAIL2016
 
Case Study: Office Complex Cooling
Case Study: Office Complex CoolingCase Study: Office Complex Cooling
Case Study: Office Complex Cooling
 
Case Study: Office Complex Cooling
Case Study: Office Complex CoolingCase Study: Office Complex Cooling
Case Study: Office Complex Cooling
 
Prashant_rai_Mech8 yrs final
Prashant_rai_Mech8 yrs finalPrashant_rai_Mech8 yrs final
Prashant_rai_Mech8 yrs final
 
Analysis of Various Cement grinding Systems with Respect to Power Consumption...
Analysis of Various Cement grinding Systems with Respect to Power Consumption...Analysis of Various Cement grinding Systems with Respect to Power Consumption...
Analysis of Various Cement grinding Systems with Respect to Power Consumption...
 
Presented by Munjal Rangwala
Presented by Munjal RangwalaPresented by Munjal Rangwala
Presented by Munjal Rangwala
 
Muhammad asif cv may-2016
Muhammad asif cv     may-2016Muhammad asif cv     may-2016
Muhammad asif cv may-2016
 
Analysis of 4 Way Catalytic Convertor with Pollutant Reduction Technique
Analysis of 4 Way Catalytic Convertor  with Pollutant Reduction TechniqueAnalysis of 4 Way Catalytic Convertor  with Pollutant Reduction Technique
Analysis of 4 Way Catalytic Convertor with Pollutant Reduction Technique
 
Suprotim dey LATEST CV
Suprotim dey  LATEST CVSuprotim dey  LATEST CV
Suprotim dey LATEST CV
 

Último

Test_document_upload_SQL_minimum_fourteen
Test_document_upload_SQL_minimum_fourteenTest_document_upload_SQL_minimum_fourteen
Test_document_upload_SQL_minimum_fourteenolgaz9
 
ANIn Coimbatore March 2024 | Agile & AI in Project Management by Dhilipkumar ...
ANIn Coimbatore March 2024 | Agile & AI in Project Management by Dhilipkumar ...ANIn Coimbatore March 2024 | Agile & AI in Project Management by Dhilipkumar ...
ANIn Coimbatore March 2024 | Agile & AI in Project Management by Dhilipkumar ...AgileNetwork
 
How the Heck do you Teach Level Design? Educating in the Studio
How the Heck do you Teach Level Design? Educating in the StudioHow the Heck do you Teach Level Design? Educating in the Studio
How the Heck do you Teach Level Design? Educating in the StudioChristopher Totten
 
The Role of Fishbone Diagram in Analyzing Cause and Effect
The Role of Fishbone Diagram in Analyzing Cause and EffectThe Role of Fishbone Diagram in Analyzing Cause and Effect
The Role of Fishbone Diagram in Analyzing Cause and EffectCIToolkit
 
Making Sense of Multiple Ideas with Affinity Diagrams
Making Sense of Multiple Ideas with Affinity DiagramsMaking Sense of Multiple Ideas with Affinity Diagrams
Making Sense of Multiple Ideas with Affinity DiagramsCIToolkit
 
Forget Fiverr : Fractional Employment the ins and outs
Forget Fiverr : Fractional Employment the ins and outsForget Fiverr : Fractional Employment the ins and outs
Forget Fiverr : Fractional Employment the ins and outsStephan Koning
 
Empowering Resilience & Strategic Growth: Insights for Emerging Leaders
Empowering Resilience & Strategic Growth: Insights for Emerging LeadersEmpowering Resilience & Strategic Growth: Insights for Emerging Leaders
Empowering Resilience & Strategic Growth: Insights for Emerging LeadersMahmoud Rabie
 
What is 5S principles of trainers for training institutions.pdf
What is 5S principles of trainers for training institutions.pdfWhat is 5S principles of trainers for training institutions.pdf
What is 5S principles of trainers for training institutions.pdfBALASUNDARESAN M
 
Value Stream Map: A Visual Approach to Process Optimization
Value Stream Map: A Visual Approach to Process OptimizationValue Stream Map: A Visual Approach to Process Optimization
Value Stream Map: A Visual Approach to Process OptimizationCIToolkit
 
Tackling Fake Agility w/ Johanna Rothman
Tackling Fake Agility w/ Johanna RothmanTackling Fake Agility w/ Johanna Rothman
Tackling Fake Agility w/ Johanna RothmanStefan Wolpers
 
An Important Step Toward Process Improvement
An Important Step Toward Process ImprovementAn Important Step Toward Process Improvement
An Important Step Toward Process ImprovementCIToolkit
 
A3 Thinking: A Structured Approach to Problem Solving
A3 Thinking: A Structured Approach to Problem SolvingA3 Thinking: A Structured Approach to Problem Solving
A3 Thinking: A Structured Approach to Problem SolvingCIToolkit
 
Improving Operations through Observation and Gemba Walks
Improving Operations through Observation and Gemba WalksImproving Operations through Observation and Gemba Walks
Improving Operations through Observation and Gemba WalksCIToolkit
 
HR for Non HR_Learning and Development.
HR for Non HR_Learning  and Development.HR for Non HR_Learning  and Development.
HR for Non HR_Learning and Development.azischin
 
Applying the PDCA Cycle: A Blueprint for Continuous Improvement
Applying the PDCA Cycle: A Blueprint for Continuous ImprovementApplying the PDCA Cycle: A Blueprint for Continuous Improvement
Applying the PDCA Cycle: A Blueprint for Continuous ImprovementCIToolkit
 
Organizations in a Future with Generative AI
Organizations in a Future with Generative AIOrganizations in a Future with Generative AI
Organizations in a Future with Generative AIKye Andersson
 
Roadway to GDSC- Session 1 Powerpoint Presentation
Roadway to GDSC- Session 1 Powerpoint PresentationRoadway to GDSC- Session 1 Powerpoint Presentation
Roadway to GDSC- Session 1 Powerpoint Presentationgdscghrcem
 
Analyzing and Monitoring Processes through Time Value Mapping
Analyzing and Monitoring Processes through Time Value MappingAnalyzing and Monitoring Processes through Time Value Mapping
Analyzing and Monitoring Processes through Time Value MappingCIToolkit
 
From Command Line to Reporting Line: The Diary of a First-Time EM
From Command Line to Reporting Line: The Diary of a First-Time EMFrom Command Line to Reporting Line: The Diary of a First-Time EM
From Command Line to Reporting Line: The Diary of a First-Time EMGloria Chow
 

Último (20)

Test_document_upload_SQL_minimum_fourteen
Test_document_upload_SQL_minimum_fourteenTest_document_upload_SQL_minimum_fourteen
Test_document_upload_SQL_minimum_fourteen
 
ANIn Coimbatore March 2024 | Agile & AI in Project Management by Dhilipkumar ...
ANIn Coimbatore March 2024 | Agile & AI in Project Management by Dhilipkumar ...ANIn Coimbatore March 2024 | Agile & AI in Project Management by Dhilipkumar ...
ANIn Coimbatore March 2024 | Agile & AI in Project Management by Dhilipkumar ...
 
How the Heck do you Teach Level Design? Educating in the Studio
How the Heck do you Teach Level Design? Educating in the StudioHow the Heck do you Teach Level Design? Educating in the Studio
How the Heck do you Teach Level Design? Educating in the Studio
 
Capacity2 - Briefing and Facilitation training slides
Capacity2 - Briefing and Facilitation training slidesCapacity2 - Briefing and Facilitation training slides
Capacity2 - Briefing and Facilitation training slides
 
The Role of Fishbone Diagram in Analyzing Cause and Effect
The Role of Fishbone Diagram in Analyzing Cause and EffectThe Role of Fishbone Diagram in Analyzing Cause and Effect
The Role of Fishbone Diagram in Analyzing Cause and Effect
 
Making Sense of Multiple Ideas with Affinity Diagrams
Making Sense of Multiple Ideas with Affinity DiagramsMaking Sense of Multiple Ideas with Affinity Diagrams
Making Sense of Multiple Ideas with Affinity Diagrams
 
Forget Fiverr : Fractional Employment the ins and outs
Forget Fiverr : Fractional Employment the ins and outsForget Fiverr : Fractional Employment the ins and outs
Forget Fiverr : Fractional Employment the ins and outs
 
Empowering Resilience & Strategic Growth: Insights for Emerging Leaders
Empowering Resilience & Strategic Growth: Insights for Emerging LeadersEmpowering Resilience & Strategic Growth: Insights for Emerging Leaders
Empowering Resilience & Strategic Growth: Insights for Emerging Leaders
 
What is 5S principles of trainers for training institutions.pdf
What is 5S principles of trainers for training institutions.pdfWhat is 5S principles of trainers for training institutions.pdf
What is 5S principles of trainers for training institutions.pdf
 
Value Stream Map: A Visual Approach to Process Optimization
Value Stream Map: A Visual Approach to Process OptimizationValue Stream Map: A Visual Approach to Process Optimization
Value Stream Map: A Visual Approach to Process Optimization
 
Tackling Fake Agility w/ Johanna Rothman
Tackling Fake Agility w/ Johanna RothmanTackling Fake Agility w/ Johanna Rothman
Tackling Fake Agility w/ Johanna Rothman
 
An Important Step Toward Process Improvement
An Important Step Toward Process ImprovementAn Important Step Toward Process Improvement
An Important Step Toward Process Improvement
 
A3 Thinking: A Structured Approach to Problem Solving
A3 Thinking: A Structured Approach to Problem SolvingA3 Thinking: A Structured Approach to Problem Solving
A3 Thinking: A Structured Approach to Problem Solving
 
Improving Operations through Observation and Gemba Walks
Improving Operations through Observation and Gemba WalksImproving Operations through Observation and Gemba Walks
Improving Operations through Observation and Gemba Walks
 
HR for Non HR_Learning and Development.
HR for Non HR_Learning  and Development.HR for Non HR_Learning  and Development.
HR for Non HR_Learning and Development.
 
Applying the PDCA Cycle: A Blueprint for Continuous Improvement
Applying the PDCA Cycle: A Blueprint for Continuous ImprovementApplying the PDCA Cycle: A Blueprint for Continuous Improvement
Applying the PDCA Cycle: A Blueprint for Continuous Improvement
 
Organizations in a Future with Generative AI
Organizations in a Future with Generative AIOrganizations in a Future with Generative AI
Organizations in a Future with Generative AI
 
Roadway to GDSC- Session 1 Powerpoint Presentation
Roadway to GDSC- Session 1 Powerpoint PresentationRoadway to GDSC- Session 1 Powerpoint Presentation
Roadway to GDSC- Session 1 Powerpoint Presentation
 
Analyzing and Monitoring Processes through Time Value Mapping
Analyzing and Monitoring Processes through Time Value MappingAnalyzing and Monitoring Processes through Time Value Mapping
Analyzing and Monitoring Processes through Time Value Mapping
 
From Command Line to Reporting Line: The Diary of a First-Time EM
From Command Line to Reporting Line: The Diary of a First-Time EMFrom Command Line to Reporting Line: The Diary of a First-Time EM
From Command Line to Reporting Line: The Diary of a First-Time EM
 

Km.ppt

  • 1. Satish K F-5 PRN - 15020441330
  • 2. Credentials of the company Hyderabad Pollution Controls Limited is now a 36 year old company, briefly called POLCONS, engaged in design, engineering, manufacture, supply, erection, testing and commissioning of Industrial Air Pollution Control equipments and Air Handling Systems. This company was incorporated in the year 1978. In the last 36 Years Polcons have installed Hundreds of Ventilation Plants, and Air Pollution Control Systems; in many Large Public Sector Undertakings and many more Private enterprises.
  • 3.  Axial Flow Fans: Industrial Axial Flow Fans Industrial Axial Fans  Centrifugal Fans  Cyclones  Pneumatic Conveying Units  Bag Filters  Air Washer Unit  Cartridge Filter Dust Collector  Man Coolers  Industrial Fans  Boiler ID Fans  FD Fans  ID Fans
  • 6. PROJECTS LIST: (VENTILATION PACKAGES)  BHEL – Ramachandrapuram-HYDERABAD Coil Winding Hall Pressurised Ventilation System  MAHAGENCO-Bhusawal Thermal Power Station (2x500MW)  MAHAGENCO-New Parli TPP (1x250mw) & Paras TPS (1x250mw)-Unit-II  MAHAGENCO-New Parli TPP (1x250mw) & Paras TPS (1x250mw)-Unit-I  NTPC-Kahalgaon Super Thermal Power Station (KSTPP) Unit-3;4&5 (3 X 500MW)  UPRVUNL-Parichha Thermal Power Station (PTPS) Unit-3&4 (2 X 210MW)  HPGCL-Tau Devilal Thermal Power Station (TDTPS) Unit-7&8 (2 X 250MW)  RRVUNL-KotaThermal Power Station (KTPS) Stage-IV (1 X 195MW)  RRVUNL-Suratgarh Thermal Power Station (STPS) Stage-III (1 X 250MW)  RRVUNL-Suratgarh Thermal Power Station (STPS) Stage-II(2 X 250MW)  MSEB-Khaperkheda Thermal Power Station Unit-3 & 4 (2 X 210MW)  APSEB-Nagarjuna Sagar Power House (NSPH) Hydel Project Nalgonda  APSEB-Lower Sileru Hydro Electric Scheme (LSHES) Mothugudem Khammam district,  APSEB-Vijayawada Thermal Power Station (VTPS) Stage-III (2 X 210MW)  APSEB-Kothagudem Thermal Power Station (KTPS) Stage-V (2 X 250MW)  MSEB-Chandrapur Thermal Power Station (CTPS) Unit-7 (1X 500MW)  APSEB-Rayalseema Thermal Power Project (RTPP) Stage-I (2 X 210MW)
  • 7.  The discussion with Mr G Ravishankar, Director Operations, POLCONS, Hyderabad revealed that the project erection is one of the most critical phase in their entire operations.  The huge sizes of their indusrtial Fans, their ducting and the proper erection and fitment is highly critical of skill, practical experience and strong understanding of Project Management.  He emphasised the need for close interaction between the users and the infrastructure developers and the capacity and understanding to mitigate the risks while executing the project.
  • 8.  The Company have installed a large number of Cyclones in various projects especially in Thermal Power pllants and Cement manufacturing companies.  Cyclones are most commonly used equipment in dust separation.  The Cyclones are of remarkably high efficiency where only few milligrams of dust is escaping in the exhaust air.  High efficiency compile to International Standards of emission
  • 9.  The discussion on the Project Completion and the Process improvement has resulted in the following:- o Complete understanding of the Project. o The Factors that can delay or derail the Project. o The Risk associated with the Factors. o The Knowledge gained from the past on big projects. o Eliminate wasteful activities. o Simplify the Process. o The last and not the least ` THE COMMON SENCE’.
  • 10.  The process improvement has resulted in:- o 18% Cost Cutting on Project Costing. o Better coordination with Suppliers. o Timely supply of materials according to progress of work, reduced inventory. o Permanent staff reduction of 25%. o Able survive stiff competetion. o Could undertake Projects Abroad.