2. ◦ 1. How is the performance of the existing road traffic conditions before and after the
construction of the Serang-Tambakrejo Southern Cross Road?
◦ 2. How much is the savings in Vehicle Operational Costs (BOK) and time value due to the
southern causeway of Serang Tambakrejo?
◦ 3. What are the Operational and Maintenance Costs and Asset Value Depreciation
(depreciation)?
◦ 4. How is the feasibility of the construction of the Serang-Tambakrejo Southern Cross Road in
terms of traffic and economic feasibility?
◦ 5. How much is the loss or depreciation as well as the profit from the social sector and
production around the area?