The above provides the local details in respect of the SMP-wide policy presented in the preceding sections of this Plan
document. These details must be read in the context of the wider-scales issues and policy implications, as reported therein.
Severn Estuary SMP2 Review – Final Report
1
WENTLOOGE
This Theme area contains the Policy Units WEN 1 and WEN 2.
It starts at Lamby Way Landfill Site drain/outfall on the west shoreline of the Severn Estuary,
and ends on the River Ebbw (west bank) at the Maesglas railway bridge.
The Key Policy Drivers in this area are:
• International nature conservation sites – Severn Estuary SAC, SPA and Ramsar;
• Critical infrastructure – railway line, electricity substations;
• Residential developments.
The above provides the local details in respect of the SMP-wide policy presented in the preceding sections of this Plan
document. These details must be read in the context of the wider-scales issues and policy implications, as reported therein.
Severn Estuary SMP2 Review – Final Report
2
The above provides the local details in respect of the SMP-wide policy presented in the preceding sections of this Plan
document. These details must be read in the context of the wider-scales issues and policy implications, as reported therein.
Severn Estuary SMP2 Review – Final Report
3
Policy Unit: WEN 1 - Lamby Way landfill site drain to Sluice House
Farm (Tarwick Rhyne)
The above provides the local details in respect of the SMP-wide policy presented in the preceding sections of this Plan
document. These details must be read in the context of the wider-scales issues and policy implications, as reported therein.
Severn Estuary SMP2 Review – Final Report
4
Preferred Policies to Implement the Plan:
Epoch
Preferred
Policy
Comments
0 to 20
years
(2025)
HTL
The Short Term policy for this unit is Hold The Line
The existing defences will remain in place with some maintenance, managing
the risk of flooding and erosion impacts to a large, mainly agricultural area.
Rumney Great Wharf is likely to to erode as sea levels rise. Actions should
take account of potential impacts in linked Policy Units (CAR 1, CAR 2, CAR 3,
and WEN 2). Investigations of future potential for MR should start in this
epoch. All stakeholders should be involved. Future MR will help manage
impacts from sea level rise and create new habitat.
HTL does not guarantee funding to build or maintain current or future defences
or to counter sea level rise.
20 to 50
years
(2055)
HTL
The Medium Term policy for this unit is Hold The Line
The existing defences will come to the end of their serviceable life in this
epoch. HTL recommends that defences are replaced. Opportunities to create
habitat and help manage the impacts of sea level rise through MR should be
investigated when the position of any new defences is chosen. The position of
new defences and the impacts of erosion at Rumney Great Wharf need to be
investigated in more detail. Long term erosion rates are unclear and should be
monitored. Saltmarsh in front of any new defences will continue to erode -
other, similar habitat should be created elsewhere in the estuary to
maintain/improve the condition of the European protected sites. Actions
should take account of potential impacts in linked Policy Units (CAR 1, CAR 2,
CAR 3, and WEN 2).
HTL does not guarantee funding to build or maintain current or future defences
or to counter sea level rise.
50 to 100
years
(2105)
HTL
The Long Term policy for this unit is Hold The Line
Defences are likely to have been reconstructed in the previous epoch and
should be maintained. Long term erosion rates are unclear and should be
monitored. Actions may be needed to ensure new defences are not
undermined. Saltmarsh in front of new defences will continue to erode - other,
similar habitat should be created elsewhere. The potential for MR should be
investigated to create a long term sustainable defence.
HTL does not guarantee funding to build or maintain current or future defences
or to counter sea level rise.
The above provides the local details in respect of the SMP-wide policy presented in the preceding sections of this Plan
document. These details must be read in the context of the wider-scales issues and policy implications, as reported therein.
Severn Estuary SMP2 Review – Final Report
5
Economics
Policy
Unit
Existing
SMP1 Policy
Time Period
(epoch)
SMP2 Assessment
0-
20
20-
50
50-
100
Preferred Plan Present
Value Damages
Preferred Plan Present
Value Defence Costs
WEN 1
HTL (or
Realignment)
HTL HTL HTL
£568m
(CAR1-3, WEN1-2 total)
£24m
(CAR1-3, WEN1-2 total)
The preferred policy is economically viable for the linked Policy Units of CAR 1, CAR 2, CAR 3, WEN 1 and
WEN 2. The costs and damages of the preferred policy in the table above relate to actions taken in all
linked policy units.
The above provides the local details in respect of the SMP-wide policy presented in the preceding sections of this Plan
document. These details must be read in the context of the wider-scales issues and policy implications, as reported therein.
Severn Estuary SMP2 Review – Final Report
6
Predicted Implication of the Preferred Plan for the WEN 1 Policy Unit
Time
Period
Management Activities
Property, Land Use and
Human Health
Nature Conservation –
including Earth Heritage,
Geology and Biodiversity
Landscape Character
and Visual Amenity
Historic
Environment
Amenity and
Recreational Use
0 – 20
years
The current defences will
remain in place.
Maintenance will help to
prolong the residual life of
the defences.
Defences will reduce the
risk of impacts of flooding
on existing property, land
use or human health.
A HTL policy will not impact
the nature conservation
sites during this time period.
Works should take account
of possible environmental
impacts and the need for an
EIA.
A HTL policy will not
impact on landscape
character and visual
amenity during this epoch
as existing defences are
expected to remain in
place
Defences will manage
the risk of flooding to
the historic
environment,
including Gwent
Levels Historic
Landscape Area.
Defences will manage
the risk of flooding on
amenity or recreational
value of the land.
20 – 50
years
The current earth
embankment defences
are expected to come to
the end of their
serviceable life in this
epoch and should be
replaced. There are
some privately owned
defences in this policy
unit that could offer a
second line of defence.
How these are utilised
should be investigated
when new defences are
considered.
Defences will reduce the
risk of impacts of flooding
on existing property, land
use or human health.
Coastal squeeze will occur
which will result in loss of
intertidal habitats of Severn
N2K sites. The Gwent
Levels, Rumney and
Peterstone SSSI terrestrial
habitats will be protected.
Works should take account
of possible environmental
impacts and the need for an
EIA.
Defences are likely to need
reconstruction during this
(or the next) epoch. Any
increase in the height of
the new defences will
affect local landscape -
increasing presence in the
landscape. Landscape will
also alter as saltmarsh in
front of new defences
erodes. Higher defences
will also create a visual
impact with defences
disrupting views.
Defences will manage
the risk of flooding to
the historic
environment,
including Gwent
Levels Historic
Landscape Area.
Defences will manage the
risk of flooding on
amenity or recreational
value of the land.
50 – 100
years
An on-going maintenance
programme should be
established including the
monitoring of shoreline
erosion as sea level rise
increases. Private
defences should be
maintained if they are part
of the flood management
strategy. Public funding
for this is not guaranteed.
Defences will reduce the
risk of impacts of flooding
on existing property, land
use or human health.
Coastal squeeze will occur
which will result in loss of
intertidal habitats of the
Severn N2K sites. The
Gwent Levels, Rumney and
Peterstone SSSI terrestrial
habitats will be protected.
Works should take account
of possible environmental
impacts and the need for an
EIA.
Any increase in the height
of defences will affect local
landscape - increasing
presence in the landscape.
Landscape will also alter
as saltmarsh in front of
new defences erodes.
Higher defences will also
create a visual impact with
defences disrupting views.
Defences will manage
the risk of flooding to
the historic
environment,
including Gwent
Levels Historic
Landscape Area.
Defences will manage the
risk of flooding on
amenity or recreational
value of the land.
The above provides the local details in respect of the SMP-wide policy presented in the preceding sections of this Plan
document. These details must be read in the context of the wider-scales issues and policy implications, as reported therein.
Severn Estuary SMP2 Review – Final Report
7
Policy Unit: WEN 2 - Sluice House Farm (Tarwick Rhyne) to the River
Ebbw (west bank) at Maesglas Railway Bridge
The above provides the local details in respect of the SMP-wide policy presented in the preceding sections of this Plan
document. These details must be read in the context of the wider-scales issues and policy implications, as reported therein.
Severn Estuary SMP2 Review – Final Report
8
The above provides the local details in respect of the SMP-wide policy presented in the preceding sections of this Plan
document. These details must be read in the context of the wider-scales issues and policy implications, as reported therein.
Severn Estuary SMP2 Review – Final Report
9
Preferred Policies to Implement the Plan:
Epoch
Preferred
Policy
Comments
0 to 20
years
(2025)
HTL
The short term policy for this unit is Hold The Line
The existing defences will remain in place in the short term with some
maintenance, managing the risk of flooding and erosion impacts to a large
area of mainly agricultural Land and important infrastructure (road, rail,
electricity). Erosion of Peterstone Great Wharf will increase as sea levels rise
Actions should take account of potential impacts in linked Policy Units (CAR
1, CAR 2, CAR 3, and WEN 1). Investigations of future potential for MR
should start in this epoch. All stakeholders should be involved. Future MR
will help manage impacts from sea level rise and create new habitat.
HTL does not guarantee funding to build or maintain current or future
defences or to counter sea level rise.
20 to 50
years
(2055)
HTL
The medium term policy for this unit is Hold The Line
The existing defences will come to the end of their serviceable life in this
epoch. HTL recommends that defences are replaced. The position of new
defences and the impact on erosion rates should be considered in more
detail. Opportunities to create habitat and help manage the impacts of sea
level rise through MR should be investigated when the position of any new
defences is chosen. Erosion of Peterstone Great Wharf will increase as sea
levels rise. Actions should take account of potential impacts in linked Policy
Units (CAR 1, CAR 2, CAR 3, and WEN 1).
HTL does not guarantee funding to build or maintain current or future
defences or to counter sea level rise.
50 to 100
years
(2105)
HTL
The long term policy for this unit is Hold The Line
Defences are likely to have been reconstructed in the previous epoch and
should be maintained. Erosion of Peterstone Great Wharf will increase as
sea levels rise. Actions may be needed to ensure new defences are not
undermined. Intertidal habitat in front of any new defences will continue to
erode – other, similar habitat should be created elsewhere in the estuary to
maintain/improve the condition of the European protected sites. The
potential for MR should be investigated to create a long term sustainable
defence. Actions should take account of potential impacts in linked Policy
Units (CAR 1, CAR 2, CAR 3, and WEN 1).
HTL does not guarantee funding to build or maintain current or future
defences or to counter sea level rise.
The above provides the local details in respect of the SMP-wide policy presented in the preceding sections of this Plan
document. These details must be read in the context of the wider-scales issues and policy implications, as reported therein.
Severn Estuary SMP2 Review – Final Report
10
Economics
Policy
Unit
Existing
SMP1
Policy
Time Period
(epoch)
SMP2 Assessment
0-
20
20-
50
50-
100
Preferred Plan Present Value
Damages
Preferred Plan Present Value
Defence Costs
WEN 2 HTL HTL HTL HTL
£568m (CAR1-3, WEN1-2
total)
£24m (CAR1-3, WEN1-2 total)
The preferred policy is economically viable for the linked Policy Units of CAR 1, CAR 2, CAR 3, WEN 1,
and WEN 2. The costs and damages of the preferred policy in the table above relate to actions taken in all
linked policy units.
The above provides the local details in respect of the SMP-wide policy presented in the preceding sections of this Plan
document. These details must be read in the context of the wider-scales issues and policy implications, as reported therein.
Severn Estuary SMP2 Review – Final Report
11
Predicted Implication of the Preferred Plan for the WEN 2 Policy Unit
Time
Period
Management Activities
Property, Land Use and
Human Health
Nature Conservation –
including Earth
Heritage, Geology and
Biodiversity
Landscape Character and
Visual Amenity
Historic Environment
Amenity and
Recreational Use
0 – 20
years
The current defences will
remain in place.
Maintenance will help to
prolong the residual life of
the defences. Studies to
help inform the potential
for MR should be
undertaken.
Defences reduce the risk
of impacts from flooding
to existing property, land
use or human health.
A HTL policy will not
impact the nature
conservation sites during
this time period. Works
should take account of
possible environmental
impacts and the need for
an EIA.
Limited erosion and flood
risk under a HTL policy will
not impact on existing
landscape and visual
amenity
Defences will manage
the risk of flooding to
the historic
environment, including
Gwent Levels Historic
Landscape Area.
Defences will manage the
risk of flooding to amenity
or recreational value of
the land.
20 – 50
years
The current earth
embankment defences
are expected to come to
the end of their
serviceable life in this
epochand should be
replaced. The position of
new defences should be
investigated, including
opportunity for MR.
Defences reduce the risk
of impacts from flooding
to existing property, land
use or human health.
Realignment of defences
could lead to a loss of
property / land but reduce
the risk of impacts from
flooding to areas behind
the new defences.
Losses will depend on the
location of new defences.
Coastal squeeze will
occur which will result in
loss of intertidal habitats
within Severn N2K sites.
The Gwent Levels St
Brides SSSI terrestrial
habitats will be
protected. Realignment
of defences could lead to
a loss of terrestrial
habitat. Works should
take account of possible
environmental impacts
and the need for an EIA.
Defences are likely to need
reconstruction during this
epoch. Any increase in the
height of the new defences
will affect local landscape -
increasing presence in the
landscape. Landscape will
also alter as Peterstone
Great Wharf erodes. Higher
defences will also create a
visual impact with defences
disrupting views.
Realignment of defences will
alter the landscape, but may
be less visually intrusive
than higher defences in their
current location.
Defences will manage
the risk of flooding to
the historic environment
including Gwent Levels
Historic Landscape
Area. Realignment of
defences could lead to
the loss of historic
environment features
and alter the historic
landscape.
Defences will manage the
risk of flooding on
amenity or recreational
value of the land.
Realignment of defences
could lead to the loss of
recreational assets.
PRoW / coastal path may
need to be re-routed.
The above provides the local details in respect of the SMP-wide policy presented in the preceding sections of this Plan
document. These details must be read in the context of the wider-scales issues and policy implications, as reported therein.
Severn Estuary SMP2 Review – Final Report
12
Time
Period
Management Activities
Property, Land Use and
Human Health
Nature Conservation –
including Earth
Heritage, Geology and
Biodiversity
Landscape Character and
Visual Amenity
Historic Environment
Amenity and
Recreational Use
50 – 100
years
An on-going maintenance
programme should be
established including the
monitoring of shoreline
erosion as sea level rise
increases. The potential
for MR should be
investigated.
Defences reduce the risk
of impacts from flooding
to existing property, land
use or human health.
Realignment of defences
could lead to a loss of
property / land but reduce
the risk of impacts from
flooding to areas behind
the new defences.
Losses will depend on the
location of new defences
Coastal squeeze will
occur which will result in
loss of intertidal habitats
within Severn N2K sites.
The Gwent Levels St
Brides SSSI terrestrial
habitats will be
protected. Realignment
of defences could lead to
a loss of terrestrial
habitat. Works should
take account of possible
environmental impacts
and the need for an EIA.
Any increase in the height of
the new defences will affect
local landscape - increasing
presence in the landscape.
Landscape will also alter as
Peterstone Great Wharf
erodes. Higher defences will
also create a visual impact
with defences disrupting
views. Realignment of
defences will alter the
landscape, but may be less
visually intrusive than higher
defences in their current
location.
Defences will manage
the risk of flooding to
the historic environment
including Gwent Levels
Historic Landscape
Area. Realignment of
defences could lead to
the loss of historic
environment features
and alter the historic
landscape.
Defences will manage the
risk of flooding on
amenity or recreational
value of the land.
Realignment of defences
could lead to the loss of
recreational assets.
PRoW / coastal path may
need to be re-routed.

More Related Content

What's hot

Smp2 part b policy statements bristol only_final
Smp2 part b policy statements bristol only_finalSmp2 part b policy statements bristol only_final
Smp2 part b policy statements bristol only_finalSevern Estuary
 
Smp2 part b policy statements cardiff only_final
Smp2 part b policy statements cardiff only_finalSmp2 part b policy statements cardiff only_final
Smp2 part b policy statements cardiff only_finalSevern Estuary
 
Appendix f policy development and appraisal final_dec2010
Appendix f policy development and appraisal final_dec2010Appendix f policy development and appraisal final_dec2010
Appendix f policy development and appraisal final_dec2010Severn Estuary
 
Smp2 part b policy statements kingston seymour only_final
Smp2 part b policy statements kingston seymour only_finalSmp2 part b policy statements kingston seymour only_final
Smp2 part b policy statements kingston seymour only_finalSevern Estuary
 
Multi-Hazard Mitigation Presentation
Multi-Hazard Mitigation PresentationMulti-Hazard Mitigation Presentation
Multi-Hazard Mitigation PresentationTown of Dennis, MA
 
Smp2 part b policy statements holms only_final
Smp2 part b policy statements holms only_finalSmp2 part b policy statements holms only_final
Smp2 part b policy statements holms only_finalSevern Estuary
 
NAP Expo 2015 Session VII, II National strategies on integrating CCA, Vietnam
NAP Expo 2015 Session VII, II National strategies on integrating CCA, VietnamNAP Expo 2015 Session VII, II National strategies on integrating CCA, Vietnam
NAP Expo 2015 Session VII, II National strategies on integrating CCA, VietnamNAP Events
 
Flood erosioncontrolfs4
Flood erosioncontrolfs4Flood erosioncontrolfs4
Flood erosioncontrolfs4Jeenn Cano
 
Nelsonquarrylanteigne 121011161032-phpapp01
Nelsonquarrylanteigne 121011161032-phpapp01Nelsonquarrylanteigne 121011161032-phpapp01
Nelsonquarrylanteigne 121011161032-phpapp01Louisette Lanteigne
 
ICM Act of South Africa most recent - as amended wef May 2015
ICM Act of South Africa most recent - as amended wef May 2015ICM Act of South Africa most recent - as amended wef May 2015
ICM Act of South Africa most recent - as amended wef May 2015Niel Malan
 
RIVER BASIN MANAGEMENT 1997
RIVER BASIN MANAGEMENT 1997RIVER BASIN MANAGEMENT 1997
RIVER BASIN MANAGEMENT 1997IWRS Society
 
Sn woodfibre update-01
Sn woodfibre update-01Sn woodfibre update-01
Sn woodfibre update-01Clarissa Brown
 
Eacc bangladesh
Eacc bangladeshEacc bangladesh
Eacc bangladeshwiriana
 
Eacc ghana
Eacc ghanaEacc ghana
Eacc ghanawiriana
 

What's hot (19)

Smp2 part b policy statements bristol only_final
Smp2 part b policy statements bristol only_finalSmp2 part b policy statements bristol only_final
Smp2 part b policy statements bristol only_final
 
Smp2 part b policy statements cardiff only_final
Smp2 part b policy statements cardiff only_finalSmp2 part b policy statements cardiff only_final
Smp2 part b policy statements cardiff only_final
 
Appendix f policy development and appraisal final_dec2010
Appendix f policy development and appraisal final_dec2010Appendix f policy development and appraisal final_dec2010
Appendix f policy development and appraisal final_dec2010
 
Smp2 part b policy statements kingston seymour only_final
Smp2 part b policy statements kingston seymour only_finalSmp2 part b policy statements kingston seymour only_final
Smp2 part b policy statements kingston seymour only_final
 
Multi-Hazard Mitigation Presentation
Multi-Hazard Mitigation PresentationMulti-Hazard Mitigation Presentation
Multi-Hazard Mitigation Presentation
 
Smp2 part b policy statements holms only_final
Smp2 part b policy statements holms only_finalSmp2 part b policy statements holms only_final
Smp2 part b policy statements holms only_final
 
NAP Expo 2015 Session VII, II National strategies on integrating CCA, Vietnam
NAP Expo 2015 Session VII, II National strategies on integrating CCA, VietnamNAP Expo 2015 Session VII, II National strategies on integrating CCA, Vietnam
NAP Expo 2015 Session VII, II National strategies on integrating CCA, Vietnam
 
Alaska
AlaskaAlaska
Alaska
 
Flood erosioncontrolfs4
Flood erosioncontrolfs4Flood erosioncontrolfs4
Flood erosioncontrolfs4
 
Nelsonquarrylanteigne 121011161032-phpapp01
Nelsonquarrylanteigne 121011161032-phpapp01Nelsonquarrylanteigne 121011161032-phpapp01
Nelsonquarrylanteigne 121011161032-phpapp01
 
Nelson quarry lanteigne
Nelson quarry lanteigneNelson quarry lanteigne
Nelson quarry lanteigne
 
backgrounder_lmfls
backgrounder_lmflsbackgrounder_lmfls
backgrounder_lmfls
 
ICM Act of South Africa most recent - as amended wef May 2015
ICM Act of South Africa most recent - as amended wef May 2015ICM Act of South Africa most recent - as amended wef May 2015
ICM Act of South Africa most recent - as amended wef May 2015
 
RIVER BASIN MANAGEMENT 1997
RIVER BASIN MANAGEMENT 1997RIVER BASIN MANAGEMENT 1997
RIVER BASIN MANAGEMENT 1997
 
Sn woodfibre update-01
Sn woodfibre update-01Sn woodfibre update-01
Sn woodfibre update-01
 
Executive Summary
Executive SummaryExecutive Summary
Executive Summary
 
Eacc bangladesh
Eacc bangladeshEacc bangladesh
Eacc bangladesh
 
7ErosSediCntrlMthds
7ErosSediCntrlMthds7ErosSediCntrlMthds
7ErosSediCntrlMthds
 
Eacc ghana
Eacc ghanaEacc ghana
Eacc ghana
 

Viewers also liked

Appendix e issues and features final_dec2010
Appendix e issues and features final_dec2010Appendix e issues and features final_dec2010
Appendix e issues and features final_dec2010Severn Estuary
 
Perceptum Education Workshop Istanbul
Perceptum Education Workshop IstanbulPerceptum Education Workshop Istanbul
Perceptum Education Workshop Istanbulperceptumedu
 
Mi universidad
Mi universidadMi universidad
Mi universidadlilyprens
 
Evaluation question 1
Evaluation question 1Evaluation question 1
Evaluation question 1Jessica Reeve
 
El deporte
El deporteEl deporte
El deportemateo896
 
clase 15.03.16
clase 15.03.16clase 15.03.16
clase 15.03.16deny lama
 
Factibilidades
FactibilidadesFactibilidades
Factibilidadesdeny lama
 

Viewers also liked (7)

Appendix e issues and features final_dec2010
Appendix e issues and features final_dec2010Appendix e issues and features final_dec2010
Appendix e issues and features final_dec2010
 
Perceptum Education Workshop Istanbul
Perceptum Education Workshop IstanbulPerceptum Education Workshop Istanbul
Perceptum Education Workshop Istanbul
 
Mi universidad
Mi universidadMi universidad
Mi universidad
 
Evaluation question 1
Evaluation question 1Evaluation question 1
Evaluation question 1
 
El deporte
El deporteEl deporte
El deporte
 
clase 15.03.16
clase 15.03.16clase 15.03.16
clase 15.03.16
 
Factibilidades
FactibilidadesFactibilidades
Factibilidades
 

Similar to Local Details and Wider Context

Smp2 part b policy statements sharpness-sev cross only_final
Smp2 part b policy statements sharpness-sev cross only_finalSmp2 part b policy statements sharpness-sev cross only_final
Smp2 part b policy statements sharpness-sev cross only_finalSevern Estuary
 
Smp2 part a main report final
Smp2 part a main report finalSmp2 part a main report final
Smp2 part a main report finalSevern Estuary
 
Appendix i part b _hra_final_dec2010
Appendix i part b _hra_final_dec2010Appendix i part b _hra_final_dec2010
Appendix i part b _hra_final_dec2010Severn Estuary
 
Smp2 part b policy statements intro sections_final
Smp2 part b policy statements intro sections_finalSmp2 part b policy statements intro sections_final
Smp2 part b policy statements intro sections_finalSevern Estuary
 
Appendix d theme review final_dec2010a
Appendix d theme review final_dec2010aAppendix d theme review final_dec2010a
Appendix d theme review final_dec2010aSevern Estuary
 
DEIR Resiliency Plan San Tim Canyon
DEIR Resiliency Plan San Tim CanyonDEIR Resiliency Plan San Tim Canyon
DEIR Resiliency Plan San Tim CanyonBrian Robey
 
Community engagement on adaptation to sea level change
Community engagement on adaptation to sea level changeCommunity engagement on adaptation to sea level change
Community engagement on adaptation to sea level changeNeil Dufty
 
Appendix g preferred management approach testing final_dec2010
Appendix g preferred management approach testing final_dec2010Appendix g preferred management approach testing final_dec2010
Appendix g preferred management approach testing final_dec2010Severn Estuary
 
Climate Change Impact On Cliff Instability And Erosion
Climate Change Impact On Cliff Instability And ErosionClimate Change Impact On Cliff Instability And Erosion
Climate Change Impact On Cliff Instability And ErosionRoger_Moore
 
Appendix i part a sea_final_dec2010
Appendix i part a sea_final_dec2010Appendix i part a sea_final_dec2010
Appendix i part a sea_final_dec2010Severn Estuary
 
Climate Tipping Points and the Insurance Sector
Climate Tipping Points and the Insurance SectorClimate Tipping Points and the Insurance Sector
Climate Tipping Points and the Insurance SectorOpen Knowledge
 
Flood management systems
Flood management systemsFlood management systems
Flood management systemsCKMCforstudents
 
Louisiana In-Lieu-Fee Wetland Mitigation Program Proposal
Louisiana In-Lieu-Fee Wetland Mitigation Program Proposal Louisiana In-Lieu-Fee Wetland Mitigation Program Proposal
Louisiana In-Lieu-Fee Wetland Mitigation Program Proposal George Howard
 
Disaster risk management in cambodia
Disaster risk management in cambodiaDisaster risk management in cambodia
Disaster risk management in cambodiaThành Nguyễn
 
NAP Expo 2015 Session III, II Ecosystem-based Adaptation in the Pacific Islands
NAP Expo 2015 Session III, II Ecosystem-based Adaptation in the Pacific IslandsNAP Expo 2015 Session III, II Ecosystem-based Adaptation in the Pacific Islands
NAP Expo 2015 Session III, II Ecosystem-based Adaptation in the Pacific IslandsNAP Events
 
Appendix h economics final dec2010
Appendix h economics final dec2010Appendix h economics final dec2010
Appendix h economics final dec2010Severn Estuary
 
Smp2 part c action plan final
Smp2 part c action plan finalSmp2 part c action plan final
Smp2 part c action plan finalSevern Estuary
 
004 Future Coastal Flood and Erosion Risk Management Schemes at Southsea and ...
004 Future Coastal Flood and Erosion Risk Management Schemes at Southsea and ...004 Future Coastal Flood and Erosion Risk Management Schemes at Southsea and ...
004 Future Coastal Flood and Erosion Risk Management Schemes at Southsea and ...djhutch
 

Similar to Local Details and Wider Context (20)

Smp2 part b policy statements sharpness-sev cross only_final
Smp2 part b policy statements sharpness-sev cross only_finalSmp2 part b policy statements sharpness-sev cross only_final
Smp2 part b policy statements sharpness-sev cross only_final
 
Smp2 part a main report final
Smp2 part a main report finalSmp2 part a main report final
Smp2 part a main report final
 
Appendix i part b _hra_final_dec2010
Appendix i part b _hra_final_dec2010Appendix i part b _hra_final_dec2010
Appendix i part b _hra_final_dec2010
 
Smp2 part b policy statements intro sections_final
Smp2 part b policy statements intro sections_finalSmp2 part b policy statements intro sections_final
Smp2 part b policy statements intro sections_final
 
Appendix d theme review final_dec2010a
Appendix d theme review final_dec2010aAppendix d theme review final_dec2010a
Appendix d theme review final_dec2010a
 
DEIR Resiliency Plan San Tim Canyon
DEIR Resiliency Plan San Tim CanyonDEIR Resiliency Plan San Tim Canyon
DEIR Resiliency Plan San Tim Canyon
 
Community engagement on adaptation to sea level change
Community engagement on adaptation to sea level changeCommunity engagement on adaptation to sea level change
Community engagement on adaptation to sea level change
 
Appendix g preferred management approach testing final_dec2010
Appendix g preferred management approach testing final_dec2010Appendix g preferred management approach testing final_dec2010
Appendix g preferred management approach testing final_dec2010
 
Climate Change Impact On Cliff Instability And Erosion
Climate Change Impact On Cliff Instability And ErosionClimate Change Impact On Cliff Instability And Erosion
Climate Change Impact On Cliff Instability And Erosion
 
Appendix i part a sea_final_dec2010
Appendix i part a sea_final_dec2010Appendix i part a sea_final_dec2010
Appendix i part a sea_final_dec2010
 
Climate Tipping Points and the Insurance Sector
Climate Tipping Points and the Insurance SectorClimate Tipping Points and the Insurance Sector
Climate Tipping Points and the Insurance Sector
 
Flood management systems
Flood management systemsFlood management systems
Flood management systems
 
Louisiana In-Lieu-Fee Wetland Mitigation Program Proposal
Louisiana In-Lieu-Fee Wetland Mitigation Program Proposal Louisiana In-Lieu-Fee Wetland Mitigation Program Proposal
Louisiana In-Lieu-Fee Wetland Mitigation Program Proposal
 
Disaster risk management in cambodia
Disaster risk management in cambodiaDisaster risk management in cambodia
Disaster risk management in cambodia
 
NAP Expo 2015 Session III, II Ecosystem-based Adaptation in the Pacific Islands
NAP Expo 2015 Session III, II Ecosystem-based Adaptation in the Pacific IslandsNAP Expo 2015 Session III, II Ecosystem-based Adaptation in the Pacific Islands
NAP Expo 2015 Session III, II Ecosystem-based Adaptation in the Pacific Islands
 
Summary lecture 2
Summary lecture 2Summary lecture 2
Summary lecture 2
 
Appendix h economics final dec2010
Appendix h economics final dec2010Appendix h economics final dec2010
Appendix h economics final dec2010
 
East Cornwall CFMP
East Cornwall CFMPEast Cornwall CFMP
East Cornwall CFMP
 
Smp2 part c action plan final
Smp2 part c action plan finalSmp2 part c action plan final
Smp2 part c action plan final
 
004 Future Coastal Flood and Erosion Risk Management Schemes at Southsea and ...
004 Future Coastal Flood and Erosion Risk Management Schemes at Southsea and ...004 Future Coastal Flood and Erosion Risk Management Schemes at Southsea and ...
004 Future Coastal Flood and Erosion Risk Management Schemes at Southsea and ...
 

More from Severn Estuary

Appendix k metadata and bibliographic database final_dec2010
Appendix k metadata and bibliographic database final_dec2010Appendix k metadata and bibliographic database final_dec2010
Appendix k metadata and bibliographic database final_dec2010Severn Estuary
 
Appendix j wfd assessment final_dec2010
Appendix j wfd assessment final_dec2010Appendix j wfd assessment final_dec2010
Appendix j wfd assessment final_dec2010Severn Estuary
 
Appendix i part a sea annexes_final_dec2010
Appendix i part a sea annexes_final_dec2010Appendix i part a sea annexes_final_dec2010
Appendix i part a sea annexes_final_dec2010Severn Estuary
 
Appendix b stakeholder engagement and consultation final_dec2010
Appendix b stakeholder engagement and consultation final_dec2010Appendix b stakeholder engagement and consultation final_dec2010
Appendix b stakeholder engagement and consultation final_dec2010Severn Estuary
 
Appendix c baseline understanding final_dec2010
Appendix c baseline understanding final_dec2010Appendix c baseline understanding final_dec2010
Appendix c baseline understanding final_dec2010Severn Estuary
 
Appendix a development of the smp2 final_dec2010
Appendix a development of the smp2 final_dec2010Appendix a development of the smp2 final_dec2010
Appendix a development of the smp2 final_dec2010Severn Estuary
 

More from Severn Estuary (6)

Appendix k metadata and bibliographic database final_dec2010
Appendix k metadata and bibliographic database final_dec2010Appendix k metadata and bibliographic database final_dec2010
Appendix k metadata and bibliographic database final_dec2010
 
Appendix j wfd assessment final_dec2010
Appendix j wfd assessment final_dec2010Appendix j wfd assessment final_dec2010
Appendix j wfd assessment final_dec2010
 
Appendix i part a sea annexes_final_dec2010
Appendix i part a sea annexes_final_dec2010Appendix i part a sea annexes_final_dec2010
Appendix i part a sea annexes_final_dec2010
 
Appendix b stakeholder engagement and consultation final_dec2010
Appendix b stakeholder engagement and consultation final_dec2010Appendix b stakeholder engagement and consultation final_dec2010
Appendix b stakeholder engagement and consultation final_dec2010
 
Appendix c baseline understanding final_dec2010
Appendix c baseline understanding final_dec2010Appendix c baseline understanding final_dec2010
Appendix c baseline understanding final_dec2010
 
Appendix a development of the smp2 final_dec2010
Appendix a development of the smp2 final_dec2010Appendix a development of the smp2 final_dec2010
Appendix a development of the smp2 final_dec2010
 

Recently uploaded

webinaire-green-mirror-episode-2-Smart contracts and virtual purchase agreeme...
webinaire-green-mirror-episode-2-Smart contracts and virtual purchase agreeme...webinaire-green-mirror-episode-2-Smart contracts and virtual purchase agreeme...
webinaire-green-mirror-episode-2-Smart contracts and virtual purchase agreeme...Cluster TWEED
 
(NANDITA) Hadapsar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune ...
(NANDITA) Hadapsar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune ...(NANDITA) Hadapsar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune ...
(NANDITA) Hadapsar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune ...ranjana rawat
 
BOOK Call Girls in (Dwarka) CALL | 8377087607 Delhi Escorts Services
BOOK Call Girls in (Dwarka) CALL | 8377087607 Delhi Escorts ServicesBOOK Call Girls in (Dwarka) CALL | 8377087607 Delhi Escorts Services
BOOK Call Girls in (Dwarka) CALL | 8377087607 Delhi Escorts Servicesdollysharma2066
 
Sustainable Clothing Strategies and Challenges
Sustainable Clothing Strategies and ChallengesSustainable Clothing Strategies and Challenges
Sustainable Clothing Strategies and ChallengesDr. Salem Baidas
 
VIP Call Girls Service Chaitanyapuri Hyderabad Call +91-8250192130
VIP Call Girls Service Chaitanyapuri Hyderabad Call +91-8250192130VIP Call Girls Service Chaitanyapuri Hyderabad Call +91-8250192130
VIP Call Girls Service Chaitanyapuri Hyderabad Call +91-8250192130Suhani Kapoor
 
VIP Call Girls Mahadevpur Colony ( Hyderabad ) Phone 8250192130 | ₹5k To 25k ...
VIP Call Girls Mahadevpur Colony ( Hyderabad ) Phone 8250192130 | ₹5k To 25k ...VIP Call Girls Mahadevpur Colony ( Hyderabad ) Phone 8250192130 | ₹5k To 25k ...
VIP Call Girls Mahadevpur Colony ( Hyderabad ) Phone 8250192130 | ₹5k To 25k ...Suhani Kapoor
 
Horizon Net Zero Dawn – keynote slides by Ben Abraham
Horizon Net Zero Dawn – keynote slides by Ben AbrahamHorizon Net Zero Dawn – keynote slides by Ben Abraham
Horizon Net Zero Dawn – keynote slides by Ben Abrahamssuserbb03ff
 
VIP Call Girl Gorakhpur Aashi 8250192130 Independent Escort Service Gorakhpur
VIP Call Girl Gorakhpur Aashi 8250192130 Independent Escort Service GorakhpurVIP Call Girl Gorakhpur Aashi 8250192130 Independent Escort Service Gorakhpur
VIP Call Girl Gorakhpur Aashi 8250192130 Independent Escort Service GorakhpurSuhani Kapoor
 
Call On 6297143586 Pimpri Chinchwad Call Girls In All Pune 24/7 Provide Call...
Call On 6297143586  Pimpri Chinchwad Call Girls In All Pune 24/7 Provide Call...Call On 6297143586  Pimpri Chinchwad Call Girls In All Pune 24/7 Provide Call...
Call On 6297143586 Pimpri Chinchwad Call Girls In All Pune 24/7 Provide Call...tanu pandey
 
Hot Call Girls |Delhi |Preet Vihar ☎ 9711199171 Book Your One night Stand
Hot Call Girls |Delhi |Preet Vihar ☎ 9711199171 Book Your One night StandHot Call Girls |Delhi |Preet Vihar ☎ 9711199171 Book Your One night Stand
Hot Call Girls |Delhi |Preet Vihar ☎ 9711199171 Book Your One night Standkumarajju5765
 
Call Girls Magarpatta Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Magarpatta Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Magarpatta Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Magarpatta Call Me 7737669865 Budget Friendly No Advance Bookingroncy bisnoi
 
DENR EPR Law Compliance Updates April 2024
DENR EPR Law Compliance Updates April 2024DENR EPR Law Compliance Updates April 2024
DENR EPR Law Compliance Updates April 2024itadmin50
 
VIP Kolkata Call Girl Kalighat 👉 8250192130 Available With Room
VIP Kolkata Call Girl Kalighat 👉 8250192130  Available With RoomVIP Kolkata Call Girl Kalighat 👉 8250192130  Available With Room
VIP Kolkata Call Girl Kalighat 👉 8250192130 Available With Roomdivyansh0kumar0
 
Call Girls In Faridabad(Ballabgarh) Book ☎ 8168257667, @4999
Call Girls In Faridabad(Ballabgarh) Book ☎ 8168257667, @4999Call Girls In Faridabad(Ballabgarh) Book ☎ 8168257667, @4999
Call Girls In Faridabad(Ballabgarh) Book ☎ 8168257667, @4999Tina Ji
 
Call Girls In Okhla DELHI ~9654467111~ Short 1500 Night 6000
Call Girls In Okhla DELHI ~9654467111~ Short 1500 Night 6000Call Girls In Okhla DELHI ~9654467111~ Short 1500 Night 6000
Call Girls In Okhla DELHI ~9654467111~ Short 1500 Night 6000Sapana Sha
 
Mumbai Call Girls, 💞 Prity 9892124323, Navi Mumbai Call girls
Mumbai Call Girls, 💞  Prity 9892124323, Navi Mumbai Call girlsMumbai Call Girls, 💞  Prity 9892124323, Navi Mumbai Call girls
Mumbai Call Girls, 💞 Prity 9892124323, Navi Mumbai Call girlsPooja Nehwal
 

Recently uploaded (20)

webinaire-green-mirror-episode-2-Smart contracts and virtual purchase agreeme...
webinaire-green-mirror-episode-2-Smart contracts and virtual purchase agreeme...webinaire-green-mirror-episode-2-Smart contracts and virtual purchase agreeme...
webinaire-green-mirror-episode-2-Smart contracts and virtual purchase agreeme...
 
Green Banking
Green Banking Green Banking
Green Banking
 
(NANDITA) Hadapsar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune ...
(NANDITA) Hadapsar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune ...(NANDITA) Hadapsar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune ...
(NANDITA) Hadapsar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune ...
 
BOOK Call Girls in (Dwarka) CALL | 8377087607 Delhi Escorts Services
BOOK Call Girls in (Dwarka) CALL | 8377087607 Delhi Escorts ServicesBOOK Call Girls in (Dwarka) CALL | 8377087607 Delhi Escorts Services
BOOK Call Girls in (Dwarka) CALL | 8377087607 Delhi Escorts Services
 
Sustainable Clothing Strategies and Challenges
Sustainable Clothing Strategies and ChallengesSustainable Clothing Strategies and Challenges
Sustainable Clothing Strategies and Challenges
 
9953056974 ,Low Rate Call Girls In Adarsh Nagar Delhi 24hrs Available
9953056974 ,Low Rate Call Girls In Adarsh Nagar  Delhi 24hrs Available9953056974 ,Low Rate Call Girls In Adarsh Nagar  Delhi 24hrs Available
9953056974 ,Low Rate Call Girls In Adarsh Nagar Delhi 24hrs Available
 
VIP Call Girls Service Chaitanyapuri Hyderabad Call +91-8250192130
VIP Call Girls Service Chaitanyapuri Hyderabad Call +91-8250192130VIP Call Girls Service Chaitanyapuri Hyderabad Call +91-8250192130
VIP Call Girls Service Chaitanyapuri Hyderabad Call +91-8250192130
 
Call Girls In Pratap Nagar꧁❤ 🔝 9953056974🔝❤꧂ Escort ServiCe
Call Girls In Pratap Nagar꧁❤ 🔝 9953056974🔝❤꧂ Escort ServiCeCall Girls In Pratap Nagar꧁❤ 🔝 9953056974🔝❤꧂ Escort ServiCe
Call Girls In Pratap Nagar꧁❤ 🔝 9953056974🔝❤꧂ Escort ServiCe
 
VIP Call Girls Mahadevpur Colony ( Hyderabad ) Phone 8250192130 | ₹5k To 25k ...
VIP Call Girls Mahadevpur Colony ( Hyderabad ) Phone 8250192130 | ₹5k To 25k ...VIP Call Girls Mahadevpur Colony ( Hyderabad ) Phone 8250192130 | ₹5k To 25k ...
VIP Call Girls Mahadevpur Colony ( Hyderabad ) Phone 8250192130 | ₹5k To 25k ...
 
Horizon Net Zero Dawn – keynote slides by Ben Abraham
Horizon Net Zero Dawn – keynote slides by Ben AbrahamHorizon Net Zero Dawn – keynote slides by Ben Abraham
Horizon Net Zero Dawn – keynote slides by Ben Abraham
 
VIP Call Girl Gorakhpur Aashi 8250192130 Independent Escort Service Gorakhpur
VIP Call Girl Gorakhpur Aashi 8250192130 Independent Escort Service GorakhpurVIP Call Girl Gorakhpur Aashi 8250192130 Independent Escort Service Gorakhpur
VIP Call Girl Gorakhpur Aashi 8250192130 Independent Escort Service Gorakhpur
 
Call On 6297143586 Pimpri Chinchwad Call Girls In All Pune 24/7 Provide Call...
Call On 6297143586  Pimpri Chinchwad Call Girls In All Pune 24/7 Provide Call...Call On 6297143586  Pimpri Chinchwad Call Girls In All Pune 24/7 Provide Call...
Call On 6297143586 Pimpri Chinchwad Call Girls In All Pune 24/7 Provide Call...
 
young Whatsapp Call Girls in Delhi Cantt🔝 9953056974 🔝 escort service
young Whatsapp Call Girls in Delhi Cantt🔝 9953056974 🔝 escort serviceyoung Whatsapp Call Girls in Delhi Cantt🔝 9953056974 🔝 escort service
young Whatsapp Call Girls in Delhi Cantt🔝 9953056974 🔝 escort service
 
Hot Call Girls |Delhi |Preet Vihar ☎ 9711199171 Book Your One night Stand
Hot Call Girls |Delhi |Preet Vihar ☎ 9711199171 Book Your One night StandHot Call Girls |Delhi |Preet Vihar ☎ 9711199171 Book Your One night Stand
Hot Call Girls |Delhi |Preet Vihar ☎ 9711199171 Book Your One night Stand
 
Call Girls Magarpatta Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Magarpatta Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Magarpatta Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Magarpatta Call Me 7737669865 Budget Friendly No Advance Booking
 
DENR EPR Law Compliance Updates April 2024
DENR EPR Law Compliance Updates April 2024DENR EPR Law Compliance Updates April 2024
DENR EPR Law Compliance Updates April 2024
 
VIP Kolkata Call Girl Kalighat 👉 8250192130 Available With Room
VIP Kolkata Call Girl Kalighat 👉 8250192130  Available With RoomVIP Kolkata Call Girl Kalighat 👉 8250192130  Available With Room
VIP Kolkata Call Girl Kalighat 👉 8250192130 Available With Room
 
Call Girls In Faridabad(Ballabgarh) Book ☎ 8168257667, @4999
Call Girls In Faridabad(Ballabgarh) Book ☎ 8168257667, @4999Call Girls In Faridabad(Ballabgarh) Book ☎ 8168257667, @4999
Call Girls In Faridabad(Ballabgarh) Book ☎ 8168257667, @4999
 
Call Girls In Okhla DELHI ~9654467111~ Short 1500 Night 6000
Call Girls In Okhla DELHI ~9654467111~ Short 1500 Night 6000Call Girls In Okhla DELHI ~9654467111~ Short 1500 Night 6000
Call Girls In Okhla DELHI ~9654467111~ Short 1500 Night 6000
 
Mumbai Call Girls, 💞 Prity 9892124323, Navi Mumbai Call girls
Mumbai Call Girls, 💞  Prity 9892124323, Navi Mumbai Call girlsMumbai Call Girls, 💞  Prity 9892124323, Navi Mumbai Call girls
Mumbai Call Girls, 💞 Prity 9892124323, Navi Mumbai Call girls
 

Local Details and Wider Context

  • 1. The above provides the local details in respect of the SMP-wide policy presented in the preceding sections of this Plan document. These details must be read in the context of the wider-scales issues and policy implications, as reported therein. Severn Estuary SMP2 Review – Final Report 1 WENTLOOGE This Theme area contains the Policy Units WEN 1 and WEN 2. It starts at Lamby Way Landfill Site drain/outfall on the west shoreline of the Severn Estuary, and ends on the River Ebbw (west bank) at the Maesglas railway bridge. The Key Policy Drivers in this area are: • International nature conservation sites – Severn Estuary SAC, SPA and Ramsar; • Critical infrastructure – railway line, electricity substations; • Residential developments.
  • 2. The above provides the local details in respect of the SMP-wide policy presented in the preceding sections of this Plan document. These details must be read in the context of the wider-scales issues and policy implications, as reported therein. Severn Estuary SMP2 Review – Final Report 2
  • 3. The above provides the local details in respect of the SMP-wide policy presented in the preceding sections of this Plan document. These details must be read in the context of the wider-scales issues and policy implications, as reported therein. Severn Estuary SMP2 Review – Final Report 3 Policy Unit: WEN 1 - Lamby Way landfill site drain to Sluice House Farm (Tarwick Rhyne)
  • 4. The above provides the local details in respect of the SMP-wide policy presented in the preceding sections of this Plan document. These details must be read in the context of the wider-scales issues and policy implications, as reported therein. Severn Estuary SMP2 Review – Final Report 4 Preferred Policies to Implement the Plan: Epoch Preferred Policy Comments 0 to 20 years (2025) HTL The Short Term policy for this unit is Hold The Line The existing defences will remain in place with some maintenance, managing the risk of flooding and erosion impacts to a large, mainly agricultural area. Rumney Great Wharf is likely to to erode as sea levels rise. Actions should take account of potential impacts in linked Policy Units (CAR 1, CAR 2, CAR 3, and WEN 2). Investigations of future potential for MR should start in this epoch. All stakeholders should be involved. Future MR will help manage impacts from sea level rise and create new habitat. HTL does not guarantee funding to build or maintain current or future defences or to counter sea level rise. 20 to 50 years (2055) HTL The Medium Term policy for this unit is Hold The Line The existing defences will come to the end of their serviceable life in this epoch. HTL recommends that defences are replaced. Opportunities to create habitat and help manage the impacts of sea level rise through MR should be investigated when the position of any new defences is chosen. The position of new defences and the impacts of erosion at Rumney Great Wharf need to be investigated in more detail. Long term erosion rates are unclear and should be monitored. Saltmarsh in front of any new defences will continue to erode - other, similar habitat should be created elsewhere in the estuary to maintain/improve the condition of the European protected sites. Actions should take account of potential impacts in linked Policy Units (CAR 1, CAR 2, CAR 3, and WEN 2). HTL does not guarantee funding to build or maintain current or future defences or to counter sea level rise. 50 to 100 years (2105) HTL The Long Term policy for this unit is Hold The Line Defences are likely to have been reconstructed in the previous epoch and should be maintained. Long term erosion rates are unclear and should be monitored. Actions may be needed to ensure new defences are not undermined. Saltmarsh in front of new defences will continue to erode - other, similar habitat should be created elsewhere. The potential for MR should be investigated to create a long term sustainable defence. HTL does not guarantee funding to build or maintain current or future defences or to counter sea level rise.
  • 5. The above provides the local details in respect of the SMP-wide policy presented in the preceding sections of this Plan document. These details must be read in the context of the wider-scales issues and policy implications, as reported therein. Severn Estuary SMP2 Review – Final Report 5 Economics Policy Unit Existing SMP1 Policy Time Period (epoch) SMP2 Assessment 0- 20 20- 50 50- 100 Preferred Plan Present Value Damages Preferred Plan Present Value Defence Costs WEN 1 HTL (or Realignment) HTL HTL HTL £568m (CAR1-3, WEN1-2 total) £24m (CAR1-3, WEN1-2 total) The preferred policy is economically viable for the linked Policy Units of CAR 1, CAR 2, CAR 3, WEN 1 and WEN 2. The costs and damages of the preferred policy in the table above relate to actions taken in all linked policy units.
  • 6. The above provides the local details in respect of the SMP-wide policy presented in the preceding sections of this Plan document. These details must be read in the context of the wider-scales issues and policy implications, as reported therein. Severn Estuary SMP2 Review – Final Report 6 Predicted Implication of the Preferred Plan for the WEN 1 Policy Unit Time Period Management Activities Property, Land Use and Human Health Nature Conservation – including Earth Heritage, Geology and Biodiversity Landscape Character and Visual Amenity Historic Environment Amenity and Recreational Use 0 – 20 years The current defences will remain in place. Maintenance will help to prolong the residual life of the defences. Defences will reduce the risk of impacts of flooding on existing property, land use or human health. A HTL policy will not impact the nature conservation sites during this time period. Works should take account of possible environmental impacts and the need for an EIA. A HTL policy will not impact on landscape character and visual amenity during this epoch as existing defences are expected to remain in place Defences will manage the risk of flooding to the historic environment, including Gwent Levels Historic Landscape Area. Defences will manage the risk of flooding on amenity or recreational value of the land. 20 – 50 years The current earth embankment defences are expected to come to the end of their serviceable life in this epoch and should be replaced. There are some privately owned defences in this policy unit that could offer a second line of defence. How these are utilised should be investigated when new defences are considered. Defences will reduce the risk of impacts of flooding on existing property, land use or human health. Coastal squeeze will occur which will result in loss of intertidal habitats of Severn N2K sites. The Gwent Levels, Rumney and Peterstone SSSI terrestrial habitats will be protected. Works should take account of possible environmental impacts and the need for an EIA. Defences are likely to need reconstruction during this (or the next) epoch. Any increase in the height of the new defences will affect local landscape - increasing presence in the landscape. Landscape will also alter as saltmarsh in front of new defences erodes. Higher defences will also create a visual impact with defences disrupting views. Defences will manage the risk of flooding to the historic environment, including Gwent Levels Historic Landscape Area. Defences will manage the risk of flooding on amenity or recreational value of the land. 50 – 100 years An on-going maintenance programme should be established including the monitoring of shoreline erosion as sea level rise increases. Private defences should be maintained if they are part of the flood management strategy. Public funding for this is not guaranteed. Defences will reduce the risk of impacts of flooding on existing property, land use or human health. Coastal squeeze will occur which will result in loss of intertidal habitats of the Severn N2K sites. The Gwent Levels, Rumney and Peterstone SSSI terrestrial habitats will be protected. Works should take account of possible environmental impacts and the need for an EIA. Any increase in the height of defences will affect local landscape - increasing presence in the landscape. Landscape will also alter as saltmarsh in front of new defences erodes. Higher defences will also create a visual impact with defences disrupting views. Defences will manage the risk of flooding to the historic environment, including Gwent Levels Historic Landscape Area. Defences will manage the risk of flooding on amenity or recreational value of the land.
  • 7. The above provides the local details in respect of the SMP-wide policy presented in the preceding sections of this Plan document. These details must be read in the context of the wider-scales issues and policy implications, as reported therein. Severn Estuary SMP2 Review – Final Report 7 Policy Unit: WEN 2 - Sluice House Farm (Tarwick Rhyne) to the River Ebbw (west bank) at Maesglas Railway Bridge
  • 8. The above provides the local details in respect of the SMP-wide policy presented in the preceding sections of this Plan document. These details must be read in the context of the wider-scales issues and policy implications, as reported therein. Severn Estuary SMP2 Review – Final Report 8
  • 9. The above provides the local details in respect of the SMP-wide policy presented in the preceding sections of this Plan document. These details must be read in the context of the wider-scales issues and policy implications, as reported therein. Severn Estuary SMP2 Review – Final Report 9 Preferred Policies to Implement the Plan: Epoch Preferred Policy Comments 0 to 20 years (2025) HTL The short term policy for this unit is Hold The Line The existing defences will remain in place in the short term with some maintenance, managing the risk of flooding and erosion impacts to a large area of mainly agricultural Land and important infrastructure (road, rail, electricity). Erosion of Peterstone Great Wharf will increase as sea levels rise Actions should take account of potential impacts in linked Policy Units (CAR 1, CAR 2, CAR 3, and WEN 1). Investigations of future potential for MR should start in this epoch. All stakeholders should be involved. Future MR will help manage impacts from sea level rise and create new habitat. HTL does not guarantee funding to build or maintain current or future defences or to counter sea level rise. 20 to 50 years (2055) HTL The medium term policy for this unit is Hold The Line The existing defences will come to the end of their serviceable life in this epoch. HTL recommends that defences are replaced. The position of new defences and the impact on erosion rates should be considered in more detail. Opportunities to create habitat and help manage the impacts of sea level rise through MR should be investigated when the position of any new defences is chosen. Erosion of Peterstone Great Wharf will increase as sea levels rise. Actions should take account of potential impacts in linked Policy Units (CAR 1, CAR 2, CAR 3, and WEN 1). HTL does not guarantee funding to build or maintain current or future defences or to counter sea level rise. 50 to 100 years (2105) HTL The long term policy for this unit is Hold The Line Defences are likely to have been reconstructed in the previous epoch and should be maintained. Erosion of Peterstone Great Wharf will increase as sea levels rise. Actions may be needed to ensure new defences are not undermined. Intertidal habitat in front of any new defences will continue to erode – other, similar habitat should be created elsewhere in the estuary to maintain/improve the condition of the European protected sites. The potential for MR should be investigated to create a long term sustainable defence. Actions should take account of potential impacts in linked Policy Units (CAR 1, CAR 2, CAR 3, and WEN 1). HTL does not guarantee funding to build or maintain current or future defences or to counter sea level rise.
  • 10. The above provides the local details in respect of the SMP-wide policy presented in the preceding sections of this Plan document. These details must be read in the context of the wider-scales issues and policy implications, as reported therein. Severn Estuary SMP2 Review – Final Report 10 Economics Policy Unit Existing SMP1 Policy Time Period (epoch) SMP2 Assessment 0- 20 20- 50 50- 100 Preferred Plan Present Value Damages Preferred Plan Present Value Defence Costs WEN 2 HTL HTL HTL HTL £568m (CAR1-3, WEN1-2 total) £24m (CAR1-3, WEN1-2 total) The preferred policy is economically viable for the linked Policy Units of CAR 1, CAR 2, CAR 3, WEN 1, and WEN 2. The costs and damages of the preferred policy in the table above relate to actions taken in all linked policy units.
  • 11. The above provides the local details in respect of the SMP-wide policy presented in the preceding sections of this Plan document. These details must be read in the context of the wider-scales issues and policy implications, as reported therein. Severn Estuary SMP2 Review – Final Report 11 Predicted Implication of the Preferred Plan for the WEN 2 Policy Unit Time Period Management Activities Property, Land Use and Human Health Nature Conservation – including Earth Heritage, Geology and Biodiversity Landscape Character and Visual Amenity Historic Environment Amenity and Recreational Use 0 – 20 years The current defences will remain in place. Maintenance will help to prolong the residual life of the defences. Studies to help inform the potential for MR should be undertaken. Defences reduce the risk of impacts from flooding to existing property, land use or human health. A HTL policy will not impact the nature conservation sites during this time period. Works should take account of possible environmental impacts and the need for an EIA. Limited erosion and flood risk under a HTL policy will not impact on existing landscape and visual amenity Defences will manage the risk of flooding to the historic environment, including Gwent Levels Historic Landscape Area. Defences will manage the risk of flooding to amenity or recreational value of the land. 20 – 50 years The current earth embankment defences are expected to come to the end of their serviceable life in this epochand should be replaced. The position of new defences should be investigated, including opportunity for MR. Defences reduce the risk of impacts from flooding to existing property, land use or human health. Realignment of defences could lead to a loss of property / land but reduce the risk of impacts from flooding to areas behind the new defences. Losses will depend on the location of new defences. Coastal squeeze will occur which will result in loss of intertidal habitats within Severn N2K sites. The Gwent Levels St Brides SSSI terrestrial habitats will be protected. Realignment of defences could lead to a loss of terrestrial habitat. Works should take account of possible environmental impacts and the need for an EIA. Defences are likely to need reconstruction during this epoch. Any increase in the height of the new defences will affect local landscape - increasing presence in the landscape. Landscape will also alter as Peterstone Great Wharf erodes. Higher defences will also create a visual impact with defences disrupting views. Realignment of defences will alter the landscape, but may be less visually intrusive than higher defences in their current location. Defences will manage the risk of flooding to the historic environment including Gwent Levels Historic Landscape Area. Realignment of defences could lead to the loss of historic environment features and alter the historic landscape. Defences will manage the risk of flooding on amenity or recreational value of the land. Realignment of defences could lead to the loss of recreational assets. PRoW / coastal path may need to be re-routed.
  • 12. The above provides the local details in respect of the SMP-wide policy presented in the preceding sections of this Plan document. These details must be read in the context of the wider-scales issues and policy implications, as reported therein. Severn Estuary SMP2 Review – Final Report 12 Time Period Management Activities Property, Land Use and Human Health Nature Conservation – including Earth Heritage, Geology and Biodiversity Landscape Character and Visual Amenity Historic Environment Amenity and Recreational Use 50 – 100 years An on-going maintenance programme should be established including the monitoring of shoreline erosion as sea level rise increases. The potential for MR should be investigated. Defences reduce the risk of impacts from flooding to existing property, land use or human health. Realignment of defences could lead to a loss of property / land but reduce the risk of impacts from flooding to areas behind the new defences. Losses will depend on the location of new defences Coastal squeeze will occur which will result in loss of intertidal habitats within Severn N2K sites. The Gwent Levels St Brides SSSI terrestrial habitats will be protected. Realignment of defences could lead to a loss of terrestrial habitat. Works should take account of possible environmental impacts and the need for an EIA. Any increase in the height of the new defences will affect local landscape - increasing presence in the landscape. Landscape will also alter as Peterstone Great Wharf erodes. Higher defences will also create a visual impact with defences disrupting views. Realignment of defences will alter the landscape, but may be less visually intrusive than higher defences in their current location. Defences will manage the risk of flooding to the historic environment including Gwent Levels Historic Landscape Area. Realignment of defences could lead to the loss of historic environment features and alter the historic landscape. Defences will manage the risk of flooding on amenity or recreational value of the land. Realignment of defences could lead to the loss of recreational assets. PRoW / coastal path may need to be re-routed.