SlideShare una empresa de Scribd logo
1 de 12
Descargar para leer sin conexión
Building Information
Modeling (B.I.M.)
Building Information Services
SEC Courtyard
• BIM knows what a wall is, what it is made out of, what color it is, how big it is and where it
is. All of the intelligent parameters of a BIM model can be defined by the owner. Things
like model, size and color are just a few examples.
• With BIM, we no longer think in a horizontal environment, we begin thinking vertically.
In our current space management process, we can track space and space types in
AutoCAD, but with Revit, we can track and define every existing condition within a
building.
• With BIM, our drawings are more than flat lines, they become a virtual building.
• The BIM can quickly track and report the space, occupancy, department, occupant, area
and volume. Within BIM, our drawings and spreadsheets are one. The cross walk of data
from one program to the other no longer needed. If data within the drawing changes, the
spreadsheet within the BIM is updated instantly.
B.I.M. is more than just 3D design, it’s intelligent!
Bryant-Denny Stadium – in development
Smart Drawings
Once the BIM is created, there is virtually nothing that can’t be viewed or stored within the drawings.
No more going to the plan room to find information, things can be viewed in a virtual, real time
environment, from anywhere at any time. Links can be placed within the drawing to take you directly
to information provided in the building repository.
• View elevations and change vantage points on the fly
• View sections and change cut planes on the fly
• Shade and color fill rooms instantly, by room or department, complete with legends
• Generate walkthroughs for any area in the building as needed
• View current real time schedules
• 3D renderings from any vantage point, both inside and outside the building
Adams Hall - completed
B.I.M. for
Space/Facilities Management
• Archival and Retrieval of Material & Vendor Data
• Material or Equipment Inventories
• Space and Asset Management
• Building Security
• Emergency Preparedness & Evacuation Plans
• Energy Analysis
• Renovation Planning, Design, Construction
• Maintenance & Replacement Scheduling
• Life Cycle Analysis
At this point we have incorporated mostly room/space data in to our models. We will continue to add
data to our models as needed. Our models are a living virtual building and will be modified as changes
are made to the buildings.
Ferguson Center - completed
The following slides are samples of our B.I.M. files and this will be available on Estus for use
throughout campus.
Building-Information-Modeling.ppt
Building-Information-Modeling.ppt
Building-Information-Modeling.ppt
By using a cut away floor plan (like the building below) we are able to more accurately
show building features that can benefit UAPD, EHS and improve wayfinding within a
building.
Numbe
r Name Level FICM Capacity Occupancy Area College Department Org. Name Org. Number HazardousMaterials
1301 Research Laboratory Level 1 250 - Research/Non Class Lab. 597.14 SF College of Arts and Sciences Natural Sciences BiologicalSciences 204411 Contains Hazardous Materials
1302 Research Service Level 1 255 - Research/Non Class Lab. Service 152.13 SF College of Arts and Sciences Natural Sciences BiologicalSciences 204411
1303 Research Laboratory Level 1 250 - Research/Non Class Lab. 899.05 SF College of Arts and Sciences Natural Sciences BiologicalSciences 204411 Contains Hazardous Materials
1304 Research Service Level 1 255 - Research/Non Class Lab. Service 150.72 SF College of Arts and Sciences Natural Sciences BiologicalSciences 204411
1305 Office Level 1 310 - Office 620.20 SF College of Arts and Sciences Natural Sciences BiologicalSciences 204411
1306 Research Laboratory Level 1 250 - Research/Non Class Lab. 887.59 SF College of Arts and Sciences Natural Sciences BiologicalSciences 204411 Contains Hazardous Materials
1307 Research Laboratory Level 1 250 - Research/Non Class Lab. 104.46 SF College of Arts and Sciences Natural Sciences BiologicalSciences 204411
1308 Research Laboratory Level 1 250 - Research/Non Class Lab. 97.14 SF College of Arts and Sciences Natural Sciences BiologicalSciences 204411
1309 Research Laboratory Level 1 250 - Research/Non Class Lab. 99.63 SF College of Arts and Sciences Natural Sciences BiologicalSciences 204411
1310 Research Laboratory Level 1 250 - Research/Non Class Lab. 110.33 SF College of Arts and Sciences Natural Sciences BiologicalSciences 204411
1311 Research Laboratory Level 1 250 - Research/Non Class Lab. 110.87 SF College of Arts and Sciences Natural Sciences BiologicalSciences 204411
1312 Research Laboratory Level 1 250 - Research/Non Class Lab. 117.79 SF College of Arts and Sciences Natural Sciences BiologicalSciences 204411
1313 Research Service Level 1 255 - Research/Non Class Lab. Service 137.72 SF College of Arts and Sciences Natural Sciences BiologicalSciences 204411
1314 Office Level 1 310 - Office 171.54 SF College of Arts and Sciences Natural Sciences BiologicalSciences 204411
1315 Office Level 1 310 - Office 173.61 SF College of Arts and Sciences Natural Sciences BiologicalSciences 204411
1316 Office Level 1 310 - Office 169.56 SF College of Arts and Sciences Natural Sciences BiologicalSciences 204411
1317 Office Level 1 310 - Office 173.61 SF College of Arts and Sciences Natural Sciences BiologicalSciences 204411
1318 Office Level 1 310 - Office 166.57 SF College of Arts and Sciences Natural Sciences BiologicalSciences 204411
Below is a sample of the spreadsheet that is generated from our BIM model. The difference
between our BIM spreadsheet and normal space data sheets is that ours is directly linked to
our BIM model and changes as the drawing changes, therefore eliminating the crosswalk
between two different programs.
The amount of data that we can track within our model is limitless. We can also create links
within our data to link to Estus documents (such as warranty information, specifications
etc).
These are two aerial views of the SEC area of campus
showing Shelby Hall, SEC, SERC, HM Comer and Bevill.
As we complete buildings, we will have the ability to
view existing conditions of any zone on campus.
Who will benefit from the use of BIM?
• Construction and Planning
• Facilities Administration
• Building Information Services
• Furnishings and Design
• Public Safety
• University Planning
• EHS
• Athletics
• Housing
• Logistics and Support Services
• Academic Affairs
We are developing the most critical buildings first, in the same manner we did when developing the CAD floor plans in 2008.
BIS anticipates having all buildings located on the main campus modeled by early 2014.
Ridgecrest South Entry

Más contenido relacionado

Similar a Building-Information-Modeling.ppt

Jll Presentation Cpa And Bohler Arch And Laser Scanning
Jll Presentation Cpa And Bohler Arch And Laser ScanningJll Presentation Cpa And Bohler Arch And Laser Scanning
Jll Presentation Cpa And Bohler Arch And Laser ScanningRICHBUTKUS
 
An Economic Analysis on Automated Construction Safety
An Economic Analysis on Automated Construction SafetyAn Economic Analysis on Automated Construction Safety
An Economic Analysis on Automated Construction SafetyRita Yi Man Li
 
BIM and other softwares
BIM and other softwaresBIM and other softwares
BIM and other softwaresRuchy Lakhani
 
20150915CPD EOA BIM for small practices
20150915CPD EOA BIM for small practices20150915CPD EOA BIM for small practices
20150915CPD EOA BIM for small practicesEwa Ostrowska
 
lifecycle-bim-gis-user-group-april-2017
lifecycle-bim-gis-user-group-april-2017lifecycle-bim-gis-user-group-april-2017
lifecycle-bim-gis-user-group-april-2017Dale Ritchie
 
Digital data & its use in geotechnical design & construction
Digital data & its use in geotechnical design & constructionDigital data & its use in geotechnical design & construction
Digital data & its use in geotechnical design & constructionRemedy Geotechnics Ltd
 
Onkar Interntship PPT.pptx
Onkar Interntship PPT.pptxOnkar Interntship PPT.pptx
Onkar Interntship PPT.pptxshaik saifulla
 
BuildingSmart COBie presentation March 2014
BuildingSmart COBie presentation March 2014BuildingSmart COBie presentation March 2014
BuildingSmart COBie presentation March 2014Graham H Stewart
 
Doing more with less
Doing more with lessDoing more with less
Doing more with lessmnico
 
20161111whatisbimwhatareitsbenefitstotheconstructionindustry 161201111424
20161111whatisbimwhatareitsbenefitstotheconstructionindustry 16120111142420161111whatisbimwhatareitsbenefitstotheconstructionindustry 161201111424
20161111whatisbimwhatareitsbenefitstotheconstructionindustry 161201111424Anshad cp
 
Mutation management in BIM models during O&M: presentation - Niels van de Ven
Mutation management in BIM models during O&M: presentation - Niels van de VenMutation management in BIM models during O&M: presentation - Niels van de Ven
Mutation management in BIM models during O&M: presentation - Niels van de VenNiels van de Ven
 
Research Sruti
Research SrutiResearch Sruti
Research Srutisrutin
 
2015-0713_ASHE_CHCO-BIMpresentation_REV
2015-0713_ASHE_CHCO-BIMpresentation_REV2015-0713_ASHE_CHCO-BIMpresentation_REV
2015-0713_ASHE_CHCO-BIMpresentation_REVPaula Davison
 

Similar a Building-Information-Modeling.ppt (20)

Bimarabia6en
Bimarabia6enBimarabia6en
Bimarabia6en
 
Jll Presentation Cpa And Bohler Arch And Laser Scanning
Jll Presentation Cpa And Bohler Arch And Laser ScanningJll Presentation Cpa And Bohler Arch And Laser Scanning
Jll Presentation Cpa And Bohler Arch And Laser Scanning
 
An Economic Analysis on Automated Construction Safety
An Economic Analysis on Automated Construction SafetyAn Economic Analysis on Automated Construction Safety
An Economic Analysis on Automated Construction Safety
 
BIM and other softwares
BIM and other softwaresBIM and other softwares
BIM and other softwares
 
20150915CPD EOA BIM for small practices
20150915CPD EOA BIM for small practices20150915CPD EOA BIM for small practices
20150915CPD EOA BIM for small practices
 
lifecycle-bim-gis-user-group-april-2017
lifecycle-bim-gis-user-group-april-2017lifecycle-bim-gis-user-group-april-2017
lifecycle-bim-gis-user-group-april-2017
 
Building information modeling services new zealand
Building information modeling services new zealand  Building information modeling services new zealand
Building information modeling services new zealand
 
BIM case study
BIM case studyBIM case study
BIM case study
 
Bi marabia7en
Bi marabia7enBi marabia7en
Bi marabia7en
 
Digital data & its use in geotechnical design & construction
Digital data & its use in geotechnical design & constructionDigital data & its use in geotechnical design & construction
Digital data & its use in geotechnical design & construction
 
Bim overview
Bim overviewBim overview
Bim overview
 
Onkar Interntship PPT.pptx
Onkar Interntship PPT.pptxOnkar Interntship PPT.pptx
Onkar Interntship PPT.pptx
 
BuildingSmart COBie presentation March 2014
BuildingSmart COBie presentation March 2014BuildingSmart COBie presentation March 2014
BuildingSmart COBie presentation March 2014
 
Doing more with less
Doing more with lessDoing more with less
Doing more with less
 
BIM and the Lighting Industry
 BIM and the Lighting Industry BIM and the Lighting Industry
BIM and the Lighting Industry
 
20161111whatisbimwhatareitsbenefitstotheconstructionindustry 161201111424
20161111whatisbimwhatareitsbenefitstotheconstructionindustry 16120111142420161111whatisbimwhatareitsbenefitstotheconstructionindustry 161201111424
20161111whatisbimwhatareitsbenefitstotheconstructionindustry 161201111424
 
What is BIM?
What is BIM?What is BIM?
What is BIM?
 
Mutation management in BIM models during O&M: presentation - Niels van de Ven
Mutation management in BIM models during O&M: presentation - Niels van de VenMutation management in BIM models during O&M: presentation - Niels van de Ven
Mutation management in BIM models during O&M: presentation - Niels van de Ven
 
Research Sruti
Research SrutiResearch Sruti
Research Sruti
 
2015-0713_ASHE_CHCO-BIMpresentation_REV
2015-0713_ASHE_CHCO-BIMpresentation_REV2015-0713_ASHE_CHCO-BIMpresentation_REV
2015-0713_ASHE_CHCO-BIMpresentation_REV
 

Último

Phase noise transfer functions.pptx
Phase noise transfer      functions.pptxPhase noise transfer      functions.pptx
Phase noise transfer functions.pptxSaiGouthamSunkara
 
Lecture 1: Basics of trigonometry (surveying)
Lecture 1: Basics of trigonometry (surveying)Lecture 1: Basics of trigonometry (surveying)
Lecture 1: Basics of trigonometry (surveying)Bahzad5
 
Summer training report on BUILDING CONSTRUCTION for DIPLOMA Students.pdf
Summer training report on BUILDING CONSTRUCTION for DIPLOMA Students.pdfSummer training report on BUILDING CONSTRUCTION for DIPLOMA Students.pdf
Summer training report on BUILDING CONSTRUCTION for DIPLOMA Students.pdfNaveenVerma126
 
GENERAL CONDITIONS FOR CONTRACTS OF CIVIL ENGINEERING WORKS
GENERAL CONDITIONS  FOR  CONTRACTS OF CIVIL ENGINEERING WORKS GENERAL CONDITIONS  FOR  CONTRACTS OF CIVIL ENGINEERING WORKS
GENERAL CONDITIONS FOR CONTRACTS OF CIVIL ENGINEERING WORKS Bahzad5
 
Vertical- Machining - Center - VMC -LMW-Machine-Tool-Division.pptx
Vertical- Machining - Center - VMC -LMW-Machine-Tool-Division.pptxVertical- Machining - Center - VMC -LMW-Machine-Tool-Division.pptx
Vertical- Machining - Center - VMC -LMW-Machine-Tool-Division.pptxLMW Machine Tool Division
 
The relationship between iot and communication technology
The relationship between iot and communication technologyThe relationship between iot and communication technology
The relationship between iot and communication technologyabdulkadirmukarram03
 
sdfsadopkjpiosufoiasdoifjasldkjfl a asldkjflaskdjflkjsdsdf
sdfsadopkjpiosufoiasdoifjasldkjfl a asldkjflaskdjflkjsdsdfsdfsadopkjpiosufoiasdoifjasldkjfl a asldkjflaskdjflkjsdsdf
sdfsadopkjpiosufoiasdoifjasldkjfl a asldkjflaskdjflkjsdsdfJulia Kaye
 
A Seminar on Electric Vehicle Software Simulation
A Seminar on Electric Vehicle Software SimulationA Seminar on Electric Vehicle Software Simulation
A Seminar on Electric Vehicle Software SimulationMohsinKhanA
 
ChatGPT-and-Generative-AI-Landscape Working of generative ai search
ChatGPT-and-Generative-AI-Landscape Working of generative ai searchChatGPT-and-Generative-AI-Landscape Working of generative ai search
ChatGPT-and-Generative-AI-Landscape Working of generative ai searchrohitcse52
 
How to Write a Good Scientific Paper.pdf
How to Write a Good Scientific Paper.pdfHow to Write a Good Scientific Paper.pdf
How to Write a Good Scientific Paper.pdfRedhwan Qasem Shaddad
 
me3493 manufacturing technology unit 1 Part A
me3493 manufacturing technology unit 1 Part Ame3493 manufacturing technology unit 1 Part A
me3493 manufacturing technology unit 1 Part Akarthi keyan
 
Transforming Process Safety Management: Challenges, Benefits, and Transition ...
Transforming Process Safety Management: Challenges, Benefits, and Transition ...Transforming Process Safety Management: Challenges, Benefits, and Transition ...
Transforming Process Safety Management: Challenges, Benefits, and Transition ...soginsider
 
Mohs Scale of Hardness, Hardness Scale.pptx
Mohs Scale of Hardness, Hardness Scale.pptxMohs Scale of Hardness, Hardness Scale.pptx
Mohs Scale of Hardness, Hardness Scale.pptxKISHAN KUMAR
 
EPE3163_Hydro power stations_Unit2_Lect2.pptx
EPE3163_Hydro power stations_Unit2_Lect2.pptxEPE3163_Hydro power stations_Unit2_Lect2.pptx
EPE3163_Hydro power stations_Unit2_Lect2.pptxJoseeMusabyimana
 
Dev.bg DevOps March 2024 Monitoring & Logging
Dev.bg DevOps March 2024 Monitoring & LoggingDev.bg DevOps March 2024 Monitoring & Logging
Dev.bg DevOps March 2024 Monitoring & LoggingMarian Marinov
 
Multicomponent Spiral Wound Membrane Separation Model.pdf
Multicomponent Spiral Wound Membrane Separation Model.pdfMulticomponent Spiral Wound Membrane Separation Model.pdf
Multicomponent Spiral Wound Membrane Separation Model.pdfGiovanaGhasary1
 

Último (20)

Phase noise transfer functions.pptx
Phase noise transfer      functions.pptxPhase noise transfer      functions.pptx
Phase noise transfer functions.pptx
 
Lecture 1: Basics of trigonometry (surveying)
Lecture 1: Basics of trigonometry (surveying)Lecture 1: Basics of trigonometry (surveying)
Lecture 1: Basics of trigonometry (surveying)
 
Summer training report on BUILDING CONSTRUCTION for DIPLOMA Students.pdf
Summer training report on BUILDING CONSTRUCTION for DIPLOMA Students.pdfSummer training report on BUILDING CONSTRUCTION for DIPLOMA Students.pdf
Summer training report on BUILDING CONSTRUCTION for DIPLOMA Students.pdf
 
GENERAL CONDITIONS FOR CONTRACTS OF CIVIL ENGINEERING WORKS
GENERAL CONDITIONS  FOR  CONTRACTS OF CIVIL ENGINEERING WORKS GENERAL CONDITIONS  FOR  CONTRACTS OF CIVIL ENGINEERING WORKS
GENERAL CONDITIONS FOR CONTRACTS OF CIVIL ENGINEERING WORKS
 
Litature Review: Research Paper work for Engineering
Litature Review: Research Paper work for EngineeringLitature Review: Research Paper work for Engineering
Litature Review: Research Paper work for Engineering
 
Lecture 2 .pdf
Lecture 2                           .pdfLecture 2                           .pdf
Lecture 2 .pdf
 
Vertical- Machining - Center - VMC -LMW-Machine-Tool-Division.pptx
Vertical- Machining - Center - VMC -LMW-Machine-Tool-Division.pptxVertical- Machining - Center - VMC -LMW-Machine-Tool-Division.pptx
Vertical- Machining - Center - VMC -LMW-Machine-Tool-Division.pptx
 
The relationship between iot and communication technology
The relationship between iot and communication technologyThe relationship between iot and communication technology
The relationship between iot and communication technology
 
sdfsadopkjpiosufoiasdoifjasldkjfl a asldkjflaskdjflkjsdsdf
sdfsadopkjpiosufoiasdoifjasldkjfl a asldkjflaskdjflkjsdsdfsdfsadopkjpiosufoiasdoifjasldkjfl a asldkjflaskdjflkjsdsdf
sdfsadopkjpiosufoiasdoifjasldkjfl a asldkjflaskdjflkjsdsdf
 
A Seminar on Electric Vehicle Software Simulation
A Seminar on Electric Vehicle Software SimulationA Seminar on Electric Vehicle Software Simulation
A Seminar on Electric Vehicle Software Simulation
 
Présentation IIRB 2024 Chloe Dufrane.pdf
Présentation IIRB 2024 Chloe Dufrane.pdfPrésentation IIRB 2024 Chloe Dufrane.pdf
Présentation IIRB 2024 Chloe Dufrane.pdf
 
ChatGPT-and-Generative-AI-Landscape Working of generative ai search
ChatGPT-and-Generative-AI-Landscape Working of generative ai searchChatGPT-and-Generative-AI-Landscape Working of generative ai search
ChatGPT-and-Generative-AI-Landscape Working of generative ai search
 
How to Write a Good Scientific Paper.pdf
How to Write a Good Scientific Paper.pdfHow to Write a Good Scientific Paper.pdf
How to Write a Good Scientific Paper.pdf
 
me3493 manufacturing technology unit 1 Part A
me3493 manufacturing technology unit 1 Part Ame3493 manufacturing technology unit 1 Part A
me3493 manufacturing technology unit 1 Part A
 
Transforming Process Safety Management: Challenges, Benefits, and Transition ...
Transforming Process Safety Management: Challenges, Benefits, and Transition ...Transforming Process Safety Management: Challenges, Benefits, and Transition ...
Transforming Process Safety Management: Challenges, Benefits, and Transition ...
 
Mohs Scale of Hardness, Hardness Scale.pptx
Mohs Scale of Hardness, Hardness Scale.pptxMohs Scale of Hardness, Hardness Scale.pptx
Mohs Scale of Hardness, Hardness Scale.pptx
 
Présentation IIRB 2024 Marine Cordonnier.pdf
Présentation IIRB 2024 Marine Cordonnier.pdfPrésentation IIRB 2024 Marine Cordonnier.pdf
Présentation IIRB 2024 Marine Cordonnier.pdf
 
EPE3163_Hydro power stations_Unit2_Lect2.pptx
EPE3163_Hydro power stations_Unit2_Lect2.pptxEPE3163_Hydro power stations_Unit2_Lect2.pptx
EPE3163_Hydro power stations_Unit2_Lect2.pptx
 
Dev.bg DevOps March 2024 Monitoring & Logging
Dev.bg DevOps March 2024 Monitoring & LoggingDev.bg DevOps March 2024 Monitoring & Logging
Dev.bg DevOps March 2024 Monitoring & Logging
 
Multicomponent Spiral Wound Membrane Separation Model.pdf
Multicomponent Spiral Wound Membrane Separation Model.pdfMulticomponent Spiral Wound Membrane Separation Model.pdf
Multicomponent Spiral Wound Membrane Separation Model.pdf
 

Building-Information-Modeling.ppt

  • 1. Building Information Modeling (B.I.M.) Building Information Services SEC Courtyard
  • 2. • BIM knows what a wall is, what it is made out of, what color it is, how big it is and where it is. All of the intelligent parameters of a BIM model can be defined by the owner. Things like model, size and color are just a few examples. • With BIM, we no longer think in a horizontal environment, we begin thinking vertically. In our current space management process, we can track space and space types in AutoCAD, but with Revit, we can track and define every existing condition within a building. • With BIM, our drawings are more than flat lines, they become a virtual building. • The BIM can quickly track and report the space, occupancy, department, occupant, area and volume. Within BIM, our drawings and spreadsheets are one. The cross walk of data from one program to the other no longer needed. If data within the drawing changes, the spreadsheet within the BIM is updated instantly. B.I.M. is more than just 3D design, it’s intelligent! Bryant-Denny Stadium – in development
  • 3. Smart Drawings Once the BIM is created, there is virtually nothing that can’t be viewed or stored within the drawings. No more going to the plan room to find information, things can be viewed in a virtual, real time environment, from anywhere at any time. Links can be placed within the drawing to take you directly to information provided in the building repository. • View elevations and change vantage points on the fly • View sections and change cut planes on the fly • Shade and color fill rooms instantly, by room or department, complete with legends • Generate walkthroughs for any area in the building as needed • View current real time schedules • 3D renderings from any vantage point, both inside and outside the building Adams Hall - completed
  • 4. B.I.M. for Space/Facilities Management • Archival and Retrieval of Material & Vendor Data • Material or Equipment Inventories • Space and Asset Management • Building Security • Emergency Preparedness & Evacuation Plans • Energy Analysis • Renovation Planning, Design, Construction • Maintenance & Replacement Scheduling • Life Cycle Analysis At this point we have incorporated mostly room/space data in to our models. We will continue to add data to our models as needed. Our models are a living virtual building and will be modified as changes are made to the buildings. Ferguson Center - completed
  • 5. The following slides are samples of our B.I.M. files and this will be available on Estus for use throughout campus.
  • 9. By using a cut away floor plan (like the building below) we are able to more accurately show building features that can benefit UAPD, EHS and improve wayfinding within a building.
  • 10. Numbe r Name Level FICM Capacity Occupancy Area College Department Org. Name Org. Number HazardousMaterials 1301 Research Laboratory Level 1 250 - Research/Non Class Lab. 597.14 SF College of Arts and Sciences Natural Sciences BiologicalSciences 204411 Contains Hazardous Materials 1302 Research Service Level 1 255 - Research/Non Class Lab. Service 152.13 SF College of Arts and Sciences Natural Sciences BiologicalSciences 204411 1303 Research Laboratory Level 1 250 - Research/Non Class Lab. 899.05 SF College of Arts and Sciences Natural Sciences BiologicalSciences 204411 Contains Hazardous Materials 1304 Research Service Level 1 255 - Research/Non Class Lab. Service 150.72 SF College of Arts and Sciences Natural Sciences BiologicalSciences 204411 1305 Office Level 1 310 - Office 620.20 SF College of Arts and Sciences Natural Sciences BiologicalSciences 204411 1306 Research Laboratory Level 1 250 - Research/Non Class Lab. 887.59 SF College of Arts and Sciences Natural Sciences BiologicalSciences 204411 Contains Hazardous Materials 1307 Research Laboratory Level 1 250 - Research/Non Class Lab. 104.46 SF College of Arts and Sciences Natural Sciences BiologicalSciences 204411 1308 Research Laboratory Level 1 250 - Research/Non Class Lab. 97.14 SF College of Arts and Sciences Natural Sciences BiologicalSciences 204411 1309 Research Laboratory Level 1 250 - Research/Non Class Lab. 99.63 SF College of Arts and Sciences Natural Sciences BiologicalSciences 204411 1310 Research Laboratory Level 1 250 - Research/Non Class Lab. 110.33 SF College of Arts and Sciences Natural Sciences BiologicalSciences 204411 1311 Research Laboratory Level 1 250 - Research/Non Class Lab. 110.87 SF College of Arts and Sciences Natural Sciences BiologicalSciences 204411 1312 Research Laboratory Level 1 250 - Research/Non Class Lab. 117.79 SF College of Arts and Sciences Natural Sciences BiologicalSciences 204411 1313 Research Service Level 1 255 - Research/Non Class Lab. Service 137.72 SF College of Arts and Sciences Natural Sciences BiologicalSciences 204411 1314 Office Level 1 310 - Office 171.54 SF College of Arts and Sciences Natural Sciences BiologicalSciences 204411 1315 Office Level 1 310 - Office 173.61 SF College of Arts and Sciences Natural Sciences BiologicalSciences 204411 1316 Office Level 1 310 - Office 169.56 SF College of Arts and Sciences Natural Sciences BiologicalSciences 204411 1317 Office Level 1 310 - Office 173.61 SF College of Arts and Sciences Natural Sciences BiologicalSciences 204411 1318 Office Level 1 310 - Office 166.57 SF College of Arts and Sciences Natural Sciences BiologicalSciences 204411 Below is a sample of the spreadsheet that is generated from our BIM model. The difference between our BIM spreadsheet and normal space data sheets is that ours is directly linked to our BIM model and changes as the drawing changes, therefore eliminating the crosswalk between two different programs. The amount of data that we can track within our model is limitless. We can also create links within our data to link to Estus documents (such as warranty information, specifications etc).
  • 11. These are two aerial views of the SEC area of campus showing Shelby Hall, SEC, SERC, HM Comer and Bevill. As we complete buildings, we will have the ability to view existing conditions of any zone on campus.
  • 12. Who will benefit from the use of BIM? • Construction and Planning • Facilities Administration • Building Information Services • Furnishings and Design • Public Safety • University Planning • EHS • Athletics • Housing • Logistics and Support Services • Academic Affairs We are developing the most critical buildings first, in the same manner we did when developing the CAD floor plans in 2008. BIS anticipates having all buildings located on the main campus modeled by early 2014. Ridgecrest South Entry