Prepared by:-
Er. Simarpreet Singh
A.P, Civil Engg.
ACET, Amritsar
TABLE OF CONTENTS
 One Room Building
 Concrete work in foundation (Center line and
separate wall method)
 Brickwork in footing (Center line and separate wall
method)
 Brickwork in walls (Center line and separate wall
method)
 Two Rooms Building
 Concrete work in foundation (Center line and
separate wall method)
5m
4m
0.3m
0.3m
0.5m
0.6m
0.9m
0.4m
0.6m
3.5m
Section at A-A’ and B-B’
Thickness of footing and foundation is 30 cm each
A
A’
B B’
Plan
0.9 m
5.3m
4.3 m
Total Center line = 5.3+5.3+4.3+4.3=19.2 m
Width = 0.9 m Total Qty of concrete in foundation= (19.2×0.9×0.3) cum
Center Line Method
0.9 m
5.3m
6.2m
4.3 m
3.4 m
Separate Wall Method
Width = 0.9 m Total Qty of concrete in fdn= (2×6.2×0.9×0.3) + (2×3.4×0.9×0.3)cum
Long Wall = 5.3+0.9=6.2 m Short Wall = 4.3-0.9=3.4 m
0.6 m
5.3m
4.3 m
Total Center line = 5.3+5.3+4.3+4.3=19.2 m
Width = 0.6 m Total Qty of brickwork in Ist footing= (19.2×0.6×0.3) cum
Center Line Method
0.6 m
5.3m
5.9 m
4.3 m
3.7 m
Width = 0.6 m
Separate Wall Method
Long Wall = 5.3+0.6=5.9 m Short Wall = 4.3-0.6=3.7 m
Total Qty of brickwork in Ist footing= (2×5.9×0.6×0.3) + (2×3.7×0.6×0.3)cum
5.3m
4.3 m
0.3 m
Total Center line = 5.3+5.3+4.3+4.3=19.2 m
Width = 0.3 m Total Qty of brickwork in walls= (19.2×0.3×3.5) cum
Center Line Method
5.6 m
5.3m
4.3 m
4 m
0.3 m
Width = 0.3 m
Separate Wall Method
Long Wall = 5.3+0.3=5.6 m Short Wall = 4.3-0.3=4.0 m
Total Qty of brickwork in walls= (2×5.6×0.3×3.5) + (2×4.0×0.3×3.5)cum
5m
4m
0.3m
0.3m
0.5m
0.6m
0.9m
0.4m
0.6m
3.5m
Section at A-A’ and B-B’
Thickness of footing and foundation is 30 cm each
A
A’
B B’
Plan
Center Line Method
Total Center line = 5.3+5.3+5.3+5.3+4.3+4.3+4.3=34.1 m
Width = 0.9 m Total Qty of concrete in fdn= (34.1×0.9×0.3)
5.3m 5.3m
4.3 m
0.9 m
Intermediate wall
– (2×0.9×(0.9/2) ×0.3)cum
Separate Wall Method
Long Wall = 5.3+5.3+0.9=11.5 m Short Wall = 4.3-0.9=3.4 m
Width = 0.9 m Total Qty of concrete in fdn= (2×11.5×0.9×0.3)
5.3m 5.3m
4.3 m
0.9 m
11.5 m
3.4m
Intermediate wall
+ (3×3.4×0.9×0.3)cum
Building estimation methods

More Related Content

What's hot

Long wall and short wall method 2
Long wall and short wall method 2Long wall and short wall method 2
Long wall and short wall method 2Saiyyed Akbar
 
Rates Analysis For Calculating Material and Labour for building works
Rates Analysis For Calculating Material and Labour for building works  Rates Analysis For Calculating Material and Labour for building works
Rates Analysis For Calculating Material and Labour for building works ALI HYDER GADHI
 
Chapter 3 shallow foundations
Chapter 3 shallow foundationsChapter 3 shallow foundations
Chapter 3 shallow foundationsKHUSHBU SHAH
 
SPECIFICATION AND ESTIMATION
SPECIFICATION AND ESTIMATIONSPECIFICATION AND ESTIMATION
SPECIFICATION AND ESTIMATIONAr Naveen Naveen
 
Estimating, administrative approval, technical sanction, budget provision
Estimating, administrative approval, technical sanction, budget provisionEstimating, administrative approval, technical sanction, budget provision
Estimating, administrative approval, technical sanction, budget provisionAshwiniChaudhari13
 
Estimation and Costing - Contracts
Estimation and Costing - ContractsEstimation and Costing - Contracts
Estimation and Costing - Contractssrinivas2036
 
Estimation and Costing
Estimation and Costing Estimation and Costing
Estimation and Costing Vijay325
 
CONCRETE MIX DESIGN
CONCRETE MIX DESIGNCONCRETE MIX DESIGN
CONCRETE MIX DESIGNNikul Gopani
 
QUANTITY SURVEYING
QUANTITY SURVEYINGQUANTITY SURVEYING
QUANTITY SURVEYINGlizwi nyandu
 

What's hot (20)

Long wall and short wall method 2
Long wall and short wall method 2Long wall and short wall method 2
Long wall and short wall method 2
 
Rates Analysis For Calculating Material and Labour for building works
Rates Analysis For Calculating Material and Labour for building works  Rates Analysis For Calculating Material and Labour for building works
Rates Analysis For Calculating Material and Labour for building works
 
Earthwork
EarthworkEarthwork
Earthwork
 
Long wall and short wall method 3
Long wall and short wall method 3Long wall and short wall method 3
Long wall and short wall method 3
 
Types of estimates
Types of estimatesTypes of estimates
Types of estimates
 
Chapter 3 shallow foundations
Chapter 3 shallow foundationsChapter 3 shallow foundations
Chapter 3 shallow foundations
 
rate analysis
rate analysisrate analysis
rate analysis
 
Curing of concrete
Curing of concreteCuring of concrete
Curing of concrete
 
Center line method 1
Center line method 1Center line method 1
Center line method 1
 
SPECIFICATION AND ESTIMATION
SPECIFICATION AND ESTIMATIONSPECIFICATION AND ESTIMATION
SPECIFICATION AND ESTIMATION
 
Long wall and short wall method 4
Long wall and short wall method 4Long wall and short wall method 4
Long wall and short wall method 4
 
Estimating, administrative approval, technical sanction, budget provision
Estimating, administrative approval, technical sanction, budget provisionEstimating, administrative approval, technical sanction, budget provision
Estimating, administrative approval, technical sanction, budget provision
 
Vacuum concrete
Vacuum concreteVacuum concrete
Vacuum concrete
 
Approximate estimate
Approximate estimateApproximate estimate
Approximate estimate
 
Estimation and Costing - Contracts
Estimation and Costing - ContractsEstimation and Costing - Contracts
Estimation and Costing - Contracts
 
Estimation and Costing
Estimation and Costing Estimation and Costing
Estimation and Costing
 
Earthwork and excavation
Earthwork  and  excavationEarthwork  and  excavation
Earthwork and excavation
 
Foundation types
Foundation typesFoundation types
Foundation types
 
CONCRETE MIX DESIGN
CONCRETE MIX DESIGNCONCRETE MIX DESIGN
CONCRETE MIX DESIGN
 
QUANTITY SURVEYING
QUANTITY SURVEYINGQUANTITY SURVEYING
QUANTITY SURVEYING
 

Viewers also liked

Nrega Technical Aspects Of Execution Of Works By S.Anwar Hussain
Nrega Technical Aspects Of Execution Of Works  By S.Anwar HussainNrega Technical Aspects Of Execution Of Works  By S.Anwar Hussain
Nrega Technical Aspects Of Execution Of Works By S.Anwar HussainAnwar Hussain
 
Introduction to Civil Engineering (Harsh Gupta)
Introduction to Civil Engineering (Harsh Gupta)Introduction to Civil Engineering (Harsh Gupta)
Introduction to Civil Engineering (Harsh Gupta)Harsh Gupta
 
Enlistment rules2014 07
Enlistment rules2014 07Enlistment rules2014 07
Enlistment rules2014 07Ptpg Stuc
 
estimation and quantity surveying
estimation and quantity surveyingestimation and quantity surveying
estimation and quantity surveyingsooricivil
 
Estimation of a residential building
Estimation of a residential buildingEstimation of a residential building
Estimation of a residential buildingVardhaman Sethia
 
Analysis of rates for labour and material
Analysis of rates for labour and materialAnalysis of rates for labour and material
Analysis of rates for labour and materialALI HYDER GADHI
 
Estimation and quantity surveying
Estimation and quantity surveyingEstimation and quantity surveying
Estimation and quantity surveyingAwanish Shukla
 
Estimation and costing
Estimation and costingEstimation and costing
Estimation and costingGanesh Murugan
 
RESEARCH METHOD - SAMPLING
RESEARCH METHOD - SAMPLINGRESEARCH METHOD - SAMPLING
RESEARCH METHOD - SAMPLINGHafizah Hajimia
 

Viewers also liked (10)

Nrega Technical Aspects Of Execution Of Works By S.Anwar Hussain
Nrega Technical Aspects Of Execution Of Works  By S.Anwar HussainNrega Technical Aspects Of Execution Of Works  By S.Anwar Hussain
Nrega Technical Aspects Of Execution Of Works By S.Anwar Hussain
 
Introduction to Civil Engineering (Harsh Gupta)
Introduction to Civil Engineering (Harsh Gupta)Introduction to Civil Engineering (Harsh Gupta)
Introduction to Civil Engineering (Harsh Gupta)
 
WORKS MANAGEMENT IN CPWD PART-I
WORKS MANAGEMENT IN CPWD PART-IWORKS MANAGEMENT IN CPWD PART-I
WORKS MANAGEMENT IN CPWD PART-I
 
Enlistment rules2014 07
Enlistment rules2014 07Enlistment rules2014 07
Enlistment rules2014 07
 
estimation and quantity surveying
estimation and quantity surveyingestimation and quantity surveying
estimation and quantity surveying
 
Estimation of a residential building
Estimation of a residential buildingEstimation of a residential building
Estimation of a residential building
 
Analysis of rates for labour and material
Analysis of rates for labour and materialAnalysis of rates for labour and material
Analysis of rates for labour and material
 
Estimation and quantity surveying
Estimation and quantity surveyingEstimation and quantity surveying
Estimation and quantity surveying
 
Estimation and costing
Estimation and costingEstimation and costing
Estimation and costing
 
RESEARCH METHOD - SAMPLING
RESEARCH METHOD - SAMPLINGRESEARCH METHOD - SAMPLING
RESEARCH METHOD - SAMPLING
 

Similar to Building estimation methods

E.C.V detail estimate By centre line and Long wall short wall method
E.C.V detail estimate By centre line and Long wall short wall methodE.C.V detail estimate By centre line and Long wall short wall method
E.C.V detail estimate By centre line and Long wall short wall methodYusuf Challawala
 
Pgche centreline presentation
Pgche centreline presentationPgche centreline presentation
Pgche centreline presentationAnthonyward
 
1. UNIT -I ESTIMATION OF BUILDINGS.pdf
1. UNIT -I ESTIMATION OF BUILDINGS.pdf1. UNIT -I ESTIMATION OF BUILDINGS.pdf
1. UNIT -I ESTIMATION OF BUILDINGS.pdfAnuPriya323
 
Design example of a six storey building project report
Design example of a six storey building project reportDesign example of a six storey building project report
Design example of a six storey building project reportPraba Haran
 

Similar to Building estimation methods (7)

E.C.V detail estimate By centre line and Long wall short wall method
E.C.V detail estimate By centre line and Long wall short wall methodE.C.V detail estimate By centre line and Long wall short wall method
E.C.V detail estimate By centre line and Long wall short wall method
 
LONG WALL AND SHORT WALL METHOD-6
LONG WALL AND SHORT WALL METHOD-6LONG WALL AND SHORT WALL METHOD-6
LONG WALL AND SHORT WALL METHOD-6
 
Long wall and short wall method 5
Long wall and short wall method 5Long wall and short wall method 5
Long wall and short wall method 5
 
tpp3k
tpp3ktpp3k
tpp3k
 
Pgche centreline presentation
Pgche centreline presentationPgche centreline presentation
Pgche centreline presentation
 
1. UNIT -I ESTIMATION OF BUILDINGS.pdf
1. UNIT -I ESTIMATION OF BUILDINGS.pdf1. UNIT -I ESTIMATION OF BUILDINGS.pdf
1. UNIT -I ESTIMATION OF BUILDINGS.pdf
 
Design example of a six storey building project report
Design example of a six storey building project reportDesign example of a six storey building project report
Design example of a six storey building project report
 

Recently uploaded

Single or Multiple melodic lines structure
Single or Multiple melodic lines structureSingle or Multiple melodic lines structure
Single or Multiple melodic lines structuredhanjurrannsibayan2
 
Graduate Outcomes Presentation Slides - English
Graduate Outcomes Presentation Slides - EnglishGraduate Outcomes Presentation Slides - English
Graduate Outcomes Presentation Slides - Englishneillewis46
 
Vishram Singh - Textbook of Anatomy Upper Limb and Thorax.. Volume 1 (1).pdf
Vishram Singh - Textbook of Anatomy  Upper Limb and Thorax.. Volume 1 (1).pdfVishram Singh - Textbook of Anatomy  Upper Limb and Thorax.. Volume 1 (1).pdf
Vishram Singh - Textbook of Anatomy Upper Limb and Thorax.. Volume 1 (1).pdfssuserdda66b
 
SOC 101 Demonstration of Learning Presentation
SOC 101 Demonstration of Learning PresentationSOC 101 Demonstration of Learning Presentation
SOC 101 Demonstration of Learning Presentationcamerronhm
 
On National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan FellowsOn National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan FellowsMebane Rash
 
ICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptxICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptxAreebaZafar22
 
Key note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdfKey note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdfAdmir Softic
 
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptxMaritesTamaniVerdade
 
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...Nguyen Thanh Tu Collection
 
How to Create and Manage Wizard in Odoo 17
How to Create and Manage Wizard in Odoo 17How to Create and Manage Wizard in Odoo 17
How to Create and Manage Wizard in Odoo 17Celine George
 
Accessible Digital Futures project (20/03/2024)
Accessible Digital Futures project (20/03/2024)Accessible Digital Futures project (20/03/2024)
Accessible Digital Futures project (20/03/2024)Jisc
 
Food safety_Challenges food safety laboratories_.pdf
Food safety_Challenges food safety laboratories_.pdfFood safety_Challenges food safety laboratories_.pdf
Food safety_Challenges food safety laboratories_.pdfSherif Taha
 
Salient Features of India constitution especially power and functions
Salient Features of India constitution especially power and functionsSalient Features of India constitution especially power and functions
Salient Features of India constitution especially power and functionsKarakKing
 
How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17Celine George
 
Spellings Wk 3 English CAPS CARES Please Practise
Spellings Wk 3 English CAPS CARES Please PractiseSpellings Wk 3 English CAPS CARES Please Practise
Spellings Wk 3 English CAPS CARES Please PractiseAnaAcapella
 
Fostering Friendships - Enhancing Social Bonds in the Classroom
Fostering Friendships - Enhancing Social Bonds  in the ClassroomFostering Friendships - Enhancing Social Bonds  in the Classroom
Fostering Friendships - Enhancing Social Bonds in the ClassroomPooky Knightsmith
 
Unit-V; Pricing (Pharma Marketing Management).pptx
Unit-V; Pricing (Pharma Marketing Management).pptxUnit-V; Pricing (Pharma Marketing Management).pptx
Unit-V; Pricing (Pharma Marketing Management).pptxVishalSingh1417
 
Understanding Accommodations and Modifications
Understanding  Accommodations and ModificationsUnderstanding  Accommodations and Modifications
Understanding Accommodations and ModificationsMJDuyan
 
1029-Danh muc Sach Giao Khoa khoi 6.pdf
1029-Danh muc Sach Giao Khoa khoi  6.pdf1029-Danh muc Sach Giao Khoa khoi  6.pdf
1029-Danh muc Sach Giao Khoa khoi 6.pdfQucHHunhnh
 

Recently uploaded (20)

Single or Multiple melodic lines structure
Single or Multiple melodic lines structureSingle or Multiple melodic lines structure
Single or Multiple melodic lines structure
 
Graduate Outcomes Presentation Slides - English
Graduate Outcomes Presentation Slides - EnglishGraduate Outcomes Presentation Slides - English
Graduate Outcomes Presentation Slides - English
 
Vishram Singh - Textbook of Anatomy Upper Limb and Thorax.. Volume 1 (1).pdf
Vishram Singh - Textbook of Anatomy  Upper Limb and Thorax.. Volume 1 (1).pdfVishram Singh - Textbook of Anatomy  Upper Limb and Thorax.. Volume 1 (1).pdf
Vishram Singh - Textbook of Anatomy Upper Limb and Thorax.. Volume 1 (1).pdf
 
SOC 101 Demonstration of Learning Presentation
SOC 101 Demonstration of Learning PresentationSOC 101 Demonstration of Learning Presentation
SOC 101 Demonstration of Learning Presentation
 
On National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan FellowsOn National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan Fellows
 
ICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptxICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptx
 
Key note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdfKey note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdf
 
Mehran University Newsletter Vol-X, Issue-I, 2024
Mehran University Newsletter Vol-X, Issue-I, 2024Mehran University Newsletter Vol-X, Issue-I, 2024
Mehran University Newsletter Vol-X, Issue-I, 2024
 
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
 
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
 
How to Create and Manage Wizard in Odoo 17
How to Create and Manage Wizard in Odoo 17How to Create and Manage Wizard in Odoo 17
How to Create and Manage Wizard in Odoo 17
 
Accessible Digital Futures project (20/03/2024)
Accessible Digital Futures project (20/03/2024)Accessible Digital Futures project (20/03/2024)
Accessible Digital Futures project (20/03/2024)
 
Food safety_Challenges food safety laboratories_.pdf
Food safety_Challenges food safety laboratories_.pdfFood safety_Challenges food safety laboratories_.pdf
Food safety_Challenges food safety laboratories_.pdf
 
Salient Features of India constitution especially power and functions
Salient Features of India constitution especially power and functionsSalient Features of India constitution especially power and functions
Salient Features of India constitution especially power and functions
 
How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17
 
Spellings Wk 3 English CAPS CARES Please Practise
Spellings Wk 3 English CAPS CARES Please PractiseSpellings Wk 3 English CAPS CARES Please Practise
Spellings Wk 3 English CAPS CARES Please Practise
 
Fostering Friendships - Enhancing Social Bonds in the Classroom
Fostering Friendships - Enhancing Social Bonds  in the ClassroomFostering Friendships - Enhancing Social Bonds  in the Classroom
Fostering Friendships - Enhancing Social Bonds in the Classroom
 
Unit-V; Pricing (Pharma Marketing Management).pptx
Unit-V; Pricing (Pharma Marketing Management).pptxUnit-V; Pricing (Pharma Marketing Management).pptx
Unit-V; Pricing (Pharma Marketing Management).pptx
 
Understanding Accommodations and Modifications
Understanding  Accommodations and ModificationsUnderstanding  Accommodations and Modifications
Understanding Accommodations and Modifications
 
1029-Danh muc Sach Giao Khoa khoi 6.pdf
1029-Danh muc Sach Giao Khoa khoi  6.pdf1029-Danh muc Sach Giao Khoa khoi  6.pdf
1029-Danh muc Sach Giao Khoa khoi 6.pdf
 

Building estimation methods

  • 1. Prepared by:- Er. Simarpreet Singh A.P, Civil Engg. ACET, Amritsar
  • 2. TABLE OF CONTENTS  One Room Building  Concrete work in foundation (Center line and separate wall method)  Brickwork in footing (Center line and separate wall method)  Brickwork in walls (Center line and separate wall method)  Two Rooms Building  Concrete work in foundation (Center line and separate wall method)
  • 3.
  • 4. 5m 4m 0.3m 0.3m 0.5m 0.6m 0.9m 0.4m 0.6m 3.5m Section at A-A’ and B-B’ Thickness of footing and foundation is 30 cm each A A’ B B’ Plan
  • 5. 0.9 m 5.3m 4.3 m Total Center line = 5.3+5.3+4.3+4.3=19.2 m Width = 0.9 m Total Qty of concrete in foundation= (19.2×0.9×0.3) cum Center Line Method
  • 6. 0.9 m 5.3m 6.2m 4.3 m 3.4 m Separate Wall Method Width = 0.9 m Total Qty of concrete in fdn= (2×6.2×0.9×0.3) + (2×3.4×0.9×0.3)cum Long Wall = 5.3+0.9=6.2 m Short Wall = 4.3-0.9=3.4 m
  • 7. 0.6 m 5.3m 4.3 m Total Center line = 5.3+5.3+4.3+4.3=19.2 m Width = 0.6 m Total Qty of brickwork in Ist footing= (19.2×0.6×0.3) cum Center Line Method
  • 8. 0.6 m 5.3m 5.9 m 4.3 m 3.7 m Width = 0.6 m Separate Wall Method Long Wall = 5.3+0.6=5.9 m Short Wall = 4.3-0.6=3.7 m Total Qty of brickwork in Ist footing= (2×5.9×0.6×0.3) + (2×3.7×0.6×0.3)cum
  • 9. 5.3m 4.3 m 0.3 m Total Center line = 5.3+5.3+4.3+4.3=19.2 m Width = 0.3 m Total Qty of brickwork in walls= (19.2×0.3×3.5) cum Center Line Method
  • 10. 5.6 m 5.3m 4.3 m 4 m 0.3 m Width = 0.3 m Separate Wall Method Long Wall = 5.3+0.3=5.6 m Short Wall = 4.3-0.3=4.0 m Total Qty of brickwork in walls= (2×5.6×0.3×3.5) + (2×4.0×0.3×3.5)cum
  • 11.
  • 12. 5m 4m 0.3m 0.3m 0.5m 0.6m 0.9m 0.4m 0.6m 3.5m Section at A-A’ and B-B’ Thickness of footing and foundation is 30 cm each A A’ B B’ Plan
  • 13. Center Line Method Total Center line = 5.3+5.3+5.3+5.3+4.3+4.3+4.3=34.1 m Width = 0.9 m Total Qty of concrete in fdn= (34.1×0.9×0.3) 5.3m 5.3m 4.3 m 0.9 m Intermediate wall – (2×0.9×(0.9/2) ×0.3)cum
  • 14. Separate Wall Method Long Wall = 5.3+5.3+0.9=11.5 m Short Wall = 4.3-0.9=3.4 m Width = 0.9 m Total Qty of concrete in fdn= (2×11.5×0.9×0.3) 5.3m 5.3m 4.3 m 0.9 m 11.5 m 3.4m Intermediate wall + (3×3.4×0.9×0.3)cum