SlideShare a Scribd company logo
1 of 26
MAIN OFFICE & JAKARTA FACTORY
KAV. A-1 BEKASI FAJAR INDUSTRIAL ESTATE
MM2100 INDUSTRIAL TOWN, CIBITUNG
BEKASI 17520, WEST JAVA – INDONESIA
TEL : (62-21) 898 – 0320 (HUNTING)
FAX : (62-21) 898 – 1092, 898 – 1063, 898 – 1118
SEMARANG FACTORY
Jl. DR. SETIABUDI 104, SUMURBOTO 50269
SEMARANG - INDONESIA
TEL : (62-24) 747 – 4447 (HUNTING)
FAX : (62-24) 747 - 2450
MT Periodic Report
Quality Assurance Division
Prepared By: Muhammad Fajar Asri & Vincent Alfianto
Mentor: Tri Nurdhanto
Co-mentor: Waris Andika
Mentor: Tri Nurdhanto
Co-mentor: Waris Andika
Prepared By: Muhammad Fajar Asri & Vincent Alfianto
Outline Presentation
Key Learning
Objectives
Activity
Timeline
Assignment’s
Overview
OUTLINE
Mentor: Tri Nurdhanto
Co-mentor: Waris Andika
Prepared By: Muhammad Fajar Asri & Vincent Alfianto
Quote
With or without a plan, there’s
a chance of failure. Planning
award purpose and offers
control of things.
Mentor: Tri Nurdhanto
Co-mentor: Waris Andika
Prepared By: Muhammad Fajar Asri & Vincent Alfianto
1. Key Learning Objectives
1. Quality Activity on PT Fumira Jakarta Factory
2. Implementation of Workload Analysis Method to Review Full
Time Equivalent Quality Activity on Continuous Galvanizing
Line
Mentor: Tri Nurdhanto
Co-mentor: Waris Andika
Prepared By: Muhammad Fajar Asri & Vincent Alfianto
• Quality Activity
CGL
• Quality excellence
& PDCA concept
• Brief explanation
about WLA
8/3-11/3
15/3-19/3
•Quality Activity
CGL based on
WLA
•WLA concept and
data implementation
from QC CGL
•Brief explanation
about CCL process
•Quality activity
CCL
•Quality activity
Finish Product
•Supplier quality
issue
22/3-26/3
29/3-1/4 (plan)
•Basic leadership
concept
•Data management
•Standardization
•Quality issue
customer
5/4-9/4 (plan)
Week
1
Week
3
Week
5
Week
2
Week
4
2. Activity Timeline
Mentor: Tri Nurdhanto
Co-mentor: Waris Andika
Prepared By: Muhammad Fajar Asri & Vincent Alfianto
3. Assignment’s Overview Week 1
3.1. Observing Quality Activity on CGL
Zinc coating test Measure the dimension
of the strip Bending test
Mentor: Tri Nurdhanto
Co-mentor: Waris Andika
Prepared By: Muhammad Fajar Asri & Vincent Alfianto
Tensile strength test Ball impact test Hardness test
3. Assignment’s Overview Week 1
3.1. Observing Quality Activity on CGL
Mentor: Tri Nurdhanto
Co-mentor: Waris Andika
Prepared By: Muhammad Fajar Asri & Vincent Alfianto
3.2. Observing Quality Activity on CGL based on WLA
3. Assignment’s Overview Week 2
Data
collecting
activity
Observing Q-
Act CGL (Zinc
Pot Comp.)
Mentor: Tri Nurdhanto
Co-mentor: Waris Andika
Prepared By: Muhammad Fajar Asri & Vincent Alfianto
Workload Analysis is an activity to calculate the number of people and the time needed to do a
certain job.
Effective
Not
Effective
Value
Adding
Effective
Effective
Non-Value Adding Activities
3. Assignment’s Overview
3.3. Workload Analysis
3.3.1. Definition of Workload Analysis (WLA) Method
Mentor: Tri Nurdhanto
Co-mentor: Waris Andika
Prepared By: Muhammad Fajar Asri & Vincent Alfianto
3. Assignment’s Overview
3.3.2 Implementation Step for WLA
There are 3 main steps for the implementation of Workload Analysis (WLA) method:
Step 1. Specify the scope of the analysis quality
The analysis is focused on the inspection Activity on CGL. This include the incoming process that
is checked by QC inspector especially for CRC 0,2 mm thickness.
3.3. Workload Analysis
Incoming
Continuous
Galvanizing
Process
SPM
Hardness & Uji
Tarik
Dimensi
Defek visual
inspeksi
Komposisi &
temperature
zinc pot
TLV
Mentor: Tri Nurdhanto
Co-mentor: Waris Andika
Prepared By: Muhammad Fajar Asri & Vincent Alfianto
Chromate
Passivation
Delivery
Konduktivitas
dan temperatur
kondensat
Konsentrasi
dan temperatur
chromate
Defek visual
inspeksi
Dimensi
Uji impak
Uji kekerasan Berat coating Uji tarik
Uji bending
3. Assignment’s Overview
3.3.2 Implementation Step for WLA
There are 3 main steps for the implementation of Workload Analysis (WLA) method:
Step 1. Specify the scope of the analysis quality
The analysis is focused on the inspection Activity on CGL. This include the incoming process that
is checked by QC inspector especially for 0,2 thick CR.
3.3. Workload Analysis
Mentor: Tri Nurdhanto
Co-mentor: Waris Andika
Prepared By: Muhammad Fajar Asri & Vincent Alfianto
3.3.2 Implementation Step for WLA
Step 2. Analyze the detail of work’s flow
process (with assistance from Mr. Waris
Andika)
After following QC inspector working, we list
all type of activities done by the inspector. Then
specify the time that each activity takes.
3. Assignment’s Overview
3.3. Workload Analysis
Mentor: Tri Nurdhanto
Co-mentor: Waris Andika
Prepared By: Muhammad Fajar Asri & Vincent Alfianto
3.3.2 Implementation Step for WLA
Step 3. Calculate the workload (with assistance of Mr. Tri Nurdhanto)
Summary:
1. For 0,2 mm CCR thickness, the inspector workload is under 80%. As the thickness increase, the
inspector workload increased drastically.
2. Walking between delivery CGL to Lab CGL is classified as non-value added which can be
improve in the future based on existing condition.
16.4
6.5
58.9
9.8 4.8
96.3
0.0
20.0
40.0
60.0
80.0
100.0
120.0
140.0
0,25 mm-0,45 mm
26.6
9.7
84.4
13.2
4.8
138.6
0.0
20.0
40.0
60.0
80.0
100.0
120.0
140.0
0,5mm-1,2mm
Kind of Activity
Workload(%)
17.9
6.2
36.0
8.7 4.8
78,5
0.0
20.0
40.0
60.0
80.0
100.0
120.0
140.0
0,2 mm
3. Assignment’s Overview
3.3. Workload Analysis
Mentor: Tri Nurdhanto
Co-mentor: Waris Andika
Prepared By: Muhammad Fajar Asri & Vincent Alfianto
3.4. Observing Quality Issue on Cold Roll Coil (CRC)
Case: 0,2 mm thickness was inspected and found to be rusted on CRC
Rust on the CRC surface Rust on the CRC side
Inspection in the raw material warehouse
3. Assignment’s Overview Week 3
Mentor: Tri Nurdhanto
Co-mentor: Waris Andika
Prepared By: Muhammad Fajar Asri & Vincent Alfianto
3. Assignment’s Overview Week 3
3.5. Observing Quality Activity on CCL with Mr. Waris
Quality activity on CCL production is divided by three main process, which is Entry CCL
(raw material, parco, and bonderite), Center CCL (visual inspection), and delivery CCL
(color product)
Entry CCL Center CCL
Defek visual
inspeksi
pH &
Konsentrasi
Bonderite
Temperatur ,
Konsentrasi ,
dan pH Parco
Defek visual
inspeksi
Mentor: Tri Nurdhanto
Co-mentor: Waris Andika
Prepared By: Muhammad Fajar Asri & Vincent Alfianto
3. Assignment’s Overview Week 3
3.5. Observing Quality Activity on CCL with Mr. Waris
Quality activity on CCL production is divided by three main process, which is Entry CCL
(raw material, parco, and bonderite), Center CCL (visual inspection), and delivery CCL
(color product)
Delivery CCL
Defek visual
inspeksi
Ujitebal lapis
color
DeltaE color UjiImpak
Uji bending
Erichsen
Cupping Test
Cross cut
Pencil
hardnesstest
Mentor: Tri Nurdhanto
Co-mentor: Waris Andika
Prepared By: Muhammad Fajar Asri & Vincent Alfianto
Color Test Bending Test Erichson Cupping
3. Assignment’s Overview Week 3
3.5. Observing Quality Activity on CCL with Mr. Waris
Mentor: Tri Nurdhanto
Co-mentor: Waris Andika
Prepared By: Muhammad Fajar Asri & Vincent Alfianto
Ball Impact Test Paint Thickness Test Rubbing Test
3. Assignment’s Overview Week 3
3.5. Observing Quality Activity on CCL with Mr. Waris
Mentor: Tri Nurdhanto
Co-mentor: Waris Andika
Prepared By: Muhammad Fajar Asri & Vincent Alfianto
3.6. Observing Quality Activity on Finish Product with Mr. Waris
Shearing line /
Laminating
Forming
Dimensi (panjang, tebal, dan lebar), panjang
diagonal, dan visual inspeksi
Dimensi (panjang, tebal dan lebar) dan visual
inspeksi
Corrugating
Dimensi (panjang, tebal, dan lebar), berat, dimensi
corrugating, dan visual inspeksi
3. Assignment’s Overview Week 3
Mentor: Tri Nurdhanto
Co-mentor: Waris Andika
Prepared By: Muhammad Fajar Asri & Vincent Alfianto
Small Coil
Dimensi (Panjang counter & aktual, tebal dan lebar)
dan visual inspeksi
Attachment Pengecekan berdasarkan standard profile
Observing
Corrugating line
with Mr. Waris
3. Assignment’s Overview Week 3
3.6. Observing Quality Activity on Finish Product (FP) with Mr. Waris
Mentor: Tri Nurdhanto
Co-mentor: Waris Andika
Prepared By: Muhammad Fajar Asri & Vincent Alfianto
3. Assignment’s Overview
3.7.1 Visual Management Information Board
Planning
PAPAN INFORMASI
PEOPLE
GENERAL INFORMATION
QC ACTIVITY
TATA TERTIB
JADWAL SHIFT MINGGUAN
TUJUAN DAN TARGET MUTU
DEPARTEMEN
KRITERIA GI 0,2 COLOR
HARD
STANDAR KETEBALAN
DAFTAR KONTAK
DARURAT
ALAT PENDUKUNG QCD
KALENDER
NAMA DEFECT GI DAN COLOR
COIL/SHEET
PROGRESS QUALITY FEB. 2021
Mentor: Tri Nurdhanto
Co-mentor: Waris Andika
Prepared By: Muhammad Fajar Asri & Vincent Alfianto
No Waktu Kegiatan
1 15 Maret 2021 Mendiskusikan rencana
manajemen visual ke SPV
Laboratorium CGL
2 18 Maret 2021 – 22 Maret 2021 Eksekusi
3 23 Maret 2021 Evaluasi
3. Assignment’s Overview
3.7.1 Visual Management Information Board
Planning
Mentor: Tri Nurdhanto
Co-mentor: Waris Andika
Prepared By: Muhammad Fajar Asri & Vincent Alfianto
3. Assignment’s Overview
3.7.1 Visual Management Information Board
Inprogress
PIC: SPV at CGL Lab
Mentor: Tri Nurdhanto
Co-mentor: Waris Andika
Prepared By: Muhammad Fajar Asri & Vincent Alfianto
Latar Belakang Pemilihan Masalah
• Adanya papan laporan quality harian
yang tidak dimanfaatkan sejak 10 Juli
2020
• Pengintegrasian problem & problem
solving seluruh departemen di QA
PIC: SPV at CGL Lab (TBC)
3. Assignment’s Overview
3.7.2 Visual Management Quality Assurance Board
Planning
Mentor: Tri Nurdhanto
Co-mentor: Waris Andika
Prepared By: Muhammad Fajar Asri & Vincent Alfianto
Manfaat
• Semua anggota mengetahui kondisi
terkini di QA.
• Brainstorming pemecahan masalah di
QA dapat dilakukan oleh semua
anggota.
QUALITY ASSURANCE BOARD
No Tgl/Bln Problem Type Problem Status Ket.
• Memudahkan briefing leader yang
dilakukan setiap pagi.
PIC: SPV at CGL Lab (TBC)
3. Assignment’s Overview
3.7.2 Visual Management Quality Assurance Board
Planning
Mentor: Tri Nurdhanto
Co-mentor: Waris Andika
Prepared By: Muhammad Fajar Asri & Vincent Alfianto
No Waktu Kegiatan
1 29 Maret 2021 Mendiskusikan rencana
manajemen visual ke SPV
Laboratorium CGL & QA Manajer
2 30 Maret 2021 – 31 Maret 2021 Eksekusi
3 5 April 2021 Evaluasi
3. Assignment’s Overview
3.7.2 Visual Management Quality Assurance Board
Planning

More Related Content

Similar to MT Periodic Report - Muhammad Fajar Asri.pptx

final-year-project-latest
final-year-project-latestfinal-year-project-latest
final-year-project-latest
Lasitha Konara
 
Project brief
Project brief Project brief
Project brief
PK146
 

Similar to MT Periodic Report - Muhammad Fajar Asri.pptx (20)

D1.2 Interim study on co-creation practices
D1.2 Interim study on co-creation practicesD1.2 Interim study on co-creation practices
D1.2 Interim study on co-creation practices
 
Cognitive Apprenticeship in Accounting Education
Cognitive Apprenticeship in Accounting EducationCognitive Apprenticeship in Accounting Education
Cognitive Apprenticeship in Accounting Education
 
final-year-project-latest
final-year-project-latestfinal-year-project-latest
final-year-project-latest
 
project report erp
project report erpproject report erp
project report erp
 
A case study on productivity improvement of wearing insert and cutting ring
A case study on productivity improvement of wearing insert and cutting ringA case study on productivity improvement of wearing insert and cutting ring
A case study on productivity improvement of wearing insert and cutting ring
 
Work Effectively and Sustainably_Student Practical Assessment.docx
Work Effectively and Sustainably_Student Practical Assessment.docxWork Effectively and Sustainably_Student Practical Assessment.docx
Work Effectively and Sustainably_Student Practical Assessment.docx
 
Internal auditor training by Er. Manish Dwivedi
Internal auditor training by Er. Manish DwivediInternal auditor training by Er. Manish Dwivedi
Internal auditor training by Er. Manish Dwivedi
 
construction quality improvement- Presentation
construction quality improvement- Presentationconstruction quality improvement- Presentation
construction quality improvement- Presentation
 
Ukfc minor thesis
Ukfc minor thesisUkfc minor thesis
Ukfc minor thesis
 
IT Student Programme 2016
IT Student Programme 2016IT Student Programme 2016
IT Student Programme 2016
 
Tejas krishna_apparel_internship_report
Tejas krishna_apparel_internship_reportTejas krishna_apparel_internship_report
Tejas krishna_apparel_internship_report
 
Revised scheme abriged
Revised scheme abrigedRevised scheme abriged
Revised scheme abriged
 
Project brief
Project brief Project brief
Project brief
 
India Energy Security Scenarios Calculator - BTech Project
India Energy Security Scenarios Calculator - BTech ProjectIndia Energy Security Scenarios Calculator - BTech Project
India Energy Security Scenarios Calculator - BTech Project
 
Vm report-most-updated-2
Vm report-most-updated-2Vm report-most-updated-2
Vm report-most-updated-2
 
MGMT2718 Human Resource Management.docx
MGMT2718 Human Resource Management.docxMGMT2718 Human Resource Management.docx
MGMT2718 Human Resource Management.docx
 
PMO Daily Operations using Scrum Methodology
PMO Daily Operations using Scrum MethodologyPMO Daily Operations using Scrum Methodology
PMO Daily Operations using Scrum Methodology
 
research report
research reportresearch report
research report
 
CIOB_Code_of_Quality_Management.pdf
CIOB_Code_of_Quality_Management.pdfCIOB_Code_of_Quality_Management.pdf
CIOB_Code_of_Quality_Management.pdf
 
CIOB_Code_of_Quality_Management.pdf
CIOB_Code_of_Quality_Management.pdfCIOB_Code_of_Quality_Management.pdf
CIOB_Code_of_Quality_Management.pdf
 

More from SintaMarlina3 (12)

Rekapitulasi Hasil MCU Karyawan Tahunan 2024
Rekapitulasi Hasil MCU Karyawan Tahunan 2024Rekapitulasi Hasil MCU Karyawan Tahunan 2024
Rekapitulasi Hasil MCU Karyawan Tahunan 2024
 
Materi Safety Talk Persiapan Libur Lebaran
Materi Safety Talk Persiapan Libur LebaranMateri Safety Talk Persiapan Libur Lebaran
Materi Safety Talk Persiapan Libur Lebaran
 
Hazids Training Hazard Identification and Risk Control HSE.ppt
Hazids Training Hazard Identification and Risk Control HSE.pptHazids Training Hazard Identification and Risk Control HSE.ppt
Hazids Training Hazard Identification and Risk Control HSE.ppt
 
JSA PJB - Penanggulangan Bahaya Covid19 (1).docx
JSA PJB - Penanggulangan Bahaya Covid19 (1).docxJSA PJB - Penanggulangan Bahaya Covid19 (1).docx
JSA PJB - Penanggulangan Bahaya Covid19 (1).docx
 
SOSIALISASI PROSEDUR baru dan review lifting activity.pptx
SOSIALISASI PROSEDUR baru dan review lifting activity.pptxSOSIALISASI PROSEDUR baru dan review lifting activity.pptx
SOSIALISASI PROSEDUR baru dan review lifting activity.pptx
 
Meeting P2K3 28-03-23.pdf
Meeting P2K3 28-03-23.pdfMeeting P2K3 28-03-23.pdf
Meeting P2K3 28-03-23.pdf
 
Materi Safety Induction GE 2019 Muara Karang FULL 32 SLIDES (1).pptx
Materi Safety Induction GE 2019 Muara Karang FULL 32 SLIDES (1).pptxMateri Safety Induction GE 2019 Muara Karang FULL 32 SLIDES (1).pptx
Materi Safety Induction GE 2019 Muara Karang FULL 32 SLIDES (1).pptx
 
K3LL Gedung Resinda Park Mall.pptx
K3LL Gedung Resinda Park Mall.pptxK3LL Gedung Resinda Park Mall.pptx
K3LL Gedung Resinda Park Mall.pptx
 
SAFETY RIDING.pptx
SAFETY RIDING.pptxSAFETY RIDING.pptx
SAFETY RIDING.pptx
 
TARGET HSE.pptx
TARGET HSE.pptxTARGET HSE.pptx
TARGET HSE.pptx
 
342441534-Materi-Training-5R-New.ppt
342441534-Materi-Training-5R-New.ppt342441534-Materi-Training-5R-New.ppt
342441534-Materi-Training-5R-New.ppt
 
01. Dasar-Dasar Keselamatan dan Kesehatan Kerja (K3) rev.pptx
01. Dasar-Dasar Keselamatan dan Kesehatan Kerja (K3) rev.pptx01. Dasar-Dasar Keselamatan dan Kesehatan Kerja (K3) rev.pptx
01. Dasar-Dasar Keselamatan dan Kesehatan Kerja (K3) rev.pptx
 

Recently uploaded

Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Kandungan 087776558899
 
Verification of thevenin's theorem for BEEE Lab (1).pptx
Verification of thevenin's theorem for BEEE Lab (1).pptxVerification of thevenin's theorem for BEEE Lab (1).pptx
Verification of thevenin's theorem for BEEE Lab (1).pptx
chumtiyababu
 
Integrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - NeometrixIntegrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - Neometrix
Neometrix_Engineering_Pvt_Ltd
 
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
AldoGarca30
 
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments""Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
mphochane1998
 

Recently uploaded (20)

DC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equationDC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equation
 
AIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech studentsAIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech students
 
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
 
Verification of thevenin's theorem for BEEE Lab (1).pptx
Verification of thevenin's theorem for BEEE Lab (1).pptxVerification of thevenin's theorem for BEEE Lab (1).pptx
Verification of thevenin's theorem for BEEE Lab (1).pptx
 
A Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna MunicipalityA Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna Municipality
 
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
COST-EFFETIVE  and Energy Efficient BUILDINGS ptxCOST-EFFETIVE  and Energy Efficient BUILDINGS ptx
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
 
Introduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaIntroduction to Serverless with AWS Lambda
Introduction to Serverless with AWS Lambda
 
GEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLE
GEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLEGEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLE
GEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLE
 
Integrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - NeometrixIntegrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - Neometrix
 
Engineering Drawing focus on projection of planes
Engineering Drawing focus on projection of planesEngineering Drawing focus on projection of planes
Engineering Drawing focus on projection of planes
 
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
 
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced LoadsFEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
 
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
 
School management system project Report.pdf
School management system project Report.pdfSchool management system project Report.pdf
School management system project Report.pdf
 
Unleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapUnleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leap
 
Online electricity billing project report..pdf
Online electricity billing project report..pdfOnline electricity billing project report..pdf
Online electricity billing project report..pdf
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.ppt
 
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptxHOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . ppt
 
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments""Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
 

MT Periodic Report - Muhammad Fajar Asri.pptx

  • 1. MAIN OFFICE & JAKARTA FACTORY KAV. A-1 BEKASI FAJAR INDUSTRIAL ESTATE MM2100 INDUSTRIAL TOWN, CIBITUNG BEKASI 17520, WEST JAVA – INDONESIA TEL : (62-21) 898 – 0320 (HUNTING) FAX : (62-21) 898 – 1092, 898 – 1063, 898 – 1118 SEMARANG FACTORY Jl. DR. SETIABUDI 104, SUMURBOTO 50269 SEMARANG - INDONESIA TEL : (62-24) 747 – 4447 (HUNTING) FAX : (62-24) 747 - 2450 MT Periodic Report Quality Assurance Division Prepared By: Muhammad Fajar Asri & Vincent Alfianto Mentor: Tri Nurdhanto Co-mentor: Waris Andika
  • 2. Mentor: Tri Nurdhanto Co-mentor: Waris Andika Prepared By: Muhammad Fajar Asri & Vincent Alfianto Outline Presentation Key Learning Objectives Activity Timeline Assignment’s Overview OUTLINE
  • 3. Mentor: Tri Nurdhanto Co-mentor: Waris Andika Prepared By: Muhammad Fajar Asri & Vincent Alfianto Quote With or without a plan, there’s a chance of failure. Planning award purpose and offers control of things.
  • 4. Mentor: Tri Nurdhanto Co-mentor: Waris Andika Prepared By: Muhammad Fajar Asri & Vincent Alfianto 1. Key Learning Objectives 1. Quality Activity on PT Fumira Jakarta Factory 2. Implementation of Workload Analysis Method to Review Full Time Equivalent Quality Activity on Continuous Galvanizing Line
  • 5. Mentor: Tri Nurdhanto Co-mentor: Waris Andika Prepared By: Muhammad Fajar Asri & Vincent Alfianto • Quality Activity CGL • Quality excellence & PDCA concept • Brief explanation about WLA 8/3-11/3 15/3-19/3 •Quality Activity CGL based on WLA •WLA concept and data implementation from QC CGL •Brief explanation about CCL process •Quality activity CCL •Quality activity Finish Product •Supplier quality issue 22/3-26/3 29/3-1/4 (plan) •Basic leadership concept •Data management •Standardization •Quality issue customer 5/4-9/4 (plan) Week 1 Week 3 Week 5 Week 2 Week 4 2. Activity Timeline
  • 6. Mentor: Tri Nurdhanto Co-mentor: Waris Andika Prepared By: Muhammad Fajar Asri & Vincent Alfianto 3. Assignment’s Overview Week 1 3.1. Observing Quality Activity on CGL Zinc coating test Measure the dimension of the strip Bending test
  • 7. Mentor: Tri Nurdhanto Co-mentor: Waris Andika Prepared By: Muhammad Fajar Asri & Vincent Alfianto Tensile strength test Ball impact test Hardness test 3. Assignment’s Overview Week 1 3.1. Observing Quality Activity on CGL
  • 8. Mentor: Tri Nurdhanto Co-mentor: Waris Andika Prepared By: Muhammad Fajar Asri & Vincent Alfianto 3.2. Observing Quality Activity on CGL based on WLA 3. Assignment’s Overview Week 2 Data collecting activity Observing Q- Act CGL (Zinc Pot Comp.)
  • 9. Mentor: Tri Nurdhanto Co-mentor: Waris Andika Prepared By: Muhammad Fajar Asri & Vincent Alfianto Workload Analysis is an activity to calculate the number of people and the time needed to do a certain job. Effective Not Effective Value Adding Effective Effective Non-Value Adding Activities 3. Assignment’s Overview 3.3. Workload Analysis 3.3.1. Definition of Workload Analysis (WLA) Method
  • 10. Mentor: Tri Nurdhanto Co-mentor: Waris Andika Prepared By: Muhammad Fajar Asri & Vincent Alfianto 3. Assignment’s Overview 3.3.2 Implementation Step for WLA There are 3 main steps for the implementation of Workload Analysis (WLA) method: Step 1. Specify the scope of the analysis quality The analysis is focused on the inspection Activity on CGL. This include the incoming process that is checked by QC inspector especially for CRC 0,2 mm thickness. 3.3. Workload Analysis Incoming Continuous Galvanizing Process SPM Hardness & Uji Tarik Dimensi Defek visual inspeksi Komposisi & temperature zinc pot TLV
  • 11. Mentor: Tri Nurdhanto Co-mentor: Waris Andika Prepared By: Muhammad Fajar Asri & Vincent Alfianto Chromate Passivation Delivery Konduktivitas dan temperatur kondensat Konsentrasi dan temperatur chromate Defek visual inspeksi Dimensi Uji impak Uji kekerasan Berat coating Uji tarik Uji bending 3. Assignment’s Overview 3.3.2 Implementation Step for WLA There are 3 main steps for the implementation of Workload Analysis (WLA) method: Step 1. Specify the scope of the analysis quality The analysis is focused on the inspection Activity on CGL. This include the incoming process that is checked by QC inspector especially for 0,2 thick CR. 3.3. Workload Analysis
  • 12. Mentor: Tri Nurdhanto Co-mentor: Waris Andika Prepared By: Muhammad Fajar Asri & Vincent Alfianto 3.3.2 Implementation Step for WLA Step 2. Analyze the detail of work’s flow process (with assistance from Mr. Waris Andika) After following QC inspector working, we list all type of activities done by the inspector. Then specify the time that each activity takes. 3. Assignment’s Overview 3.3. Workload Analysis
  • 13. Mentor: Tri Nurdhanto Co-mentor: Waris Andika Prepared By: Muhammad Fajar Asri & Vincent Alfianto 3.3.2 Implementation Step for WLA Step 3. Calculate the workload (with assistance of Mr. Tri Nurdhanto) Summary: 1. For 0,2 mm CCR thickness, the inspector workload is under 80%. As the thickness increase, the inspector workload increased drastically. 2. Walking between delivery CGL to Lab CGL is classified as non-value added which can be improve in the future based on existing condition. 16.4 6.5 58.9 9.8 4.8 96.3 0.0 20.0 40.0 60.0 80.0 100.0 120.0 140.0 0,25 mm-0,45 mm 26.6 9.7 84.4 13.2 4.8 138.6 0.0 20.0 40.0 60.0 80.0 100.0 120.0 140.0 0,5mm-1,2mm Kind of Activity Workload(%) 17.9 6.2 36.0 8.7 4.8 78,5 0.0 20.0 40.0 60.0 80.0 100.0 120.0 140.0 0,2 mm 3. Assignment’s Overview 3.3. Workload Analysis
  • 14. Mentor: Tri Nurdhanto Co-mentor: Waris Andika Prepared By: Muhammad Fajar Asri & Vincent Alfianto 3.4. Observing Quality Issue on Cold Roll Coil (CRC) Case: 0,2 mm thickness was inspected and found to be rusted on CRC Rust on the CRC surface Rust on the CRC side Inspection in the raw material warehouse 3. Assignment’s Overview Week 3
  • 15. Mentor: Tri Nurdhanto Co-mentor: Waris Andika Prepared By: Muhammad Fajar Asri & Vincent Alfianto 3. Assignment’s Overview Week 3 3.5. Observing Quality Activity on CCL with Mr. Waris Quality activity on CCL production is divided by three main process, which is Entry CCL (raw material, parco, and bonderite), Center CCL (visual inspection), and delivery CCL (color product) Entry CCL Center CCL Defek visual inspeksi pH & Konsentrasi Bonderite Temperatur , Konsentrasi , dan pH Parco Defek visual inspeksi
  • 16. Mentor: Tri Nurdhanto Co-mentor: Waris Andika Prepared By: Muhammad Fajar Asri & Vincent Alfianto 3. Assignment’s Overview Week 3 3.5. Observing Quality Activity on CCL with Mr. Waris Quality activity on CCL production is divided by three main process, which is Entry CCL (raw material, parco, and bonderite), Center CCL (visual inspection), and delivery CCL (color product) Delivery CCL Defek visual inspeksi Ujitebal lapis color DeltaE color UjiImpak Uji bending Erichsen Cupping Test Cross cut Pencil hardnesstest
  • 17. Mentor: Tri Nurdhanto Co-mentor: Waris Andika Prepared By: Muhammad Fajar Asri & Vincent Alfianto Color Test Bending Test Erichson Cupping 3. Assignment’s Overview Week 3 3.5. Observing Quality Activity on CCL with Mr. Waris
  • 18. Mentor: Tri Nurdhanto Co-mentor: Waris Andika Prepared By: Muhammad Fajar Asri & Vincent Alfianto Ball Impact Test Paint Thickness Test Rubbing Test 3. Assignment’s Overview Week 3 3.5. Observing Quality Activity on CCL with Mr. Waris
  • 19. Mentor: Tri Nurdhanto Co-mentor: Waris Andika Prepared By: Muhammad Fajar Asri & Vincent Alfianto 3.6. Observing Quality Activity on Finish Product with Mr. Waris Shearing line / Laminating Forming Dimensi (panjang, tebal, dan lebar), panjang diagonal, dan visual inspeksi Dimensi (panjang, tebal dan lebar) dan visual inspeksi Corrugating Dimensi (panjang, tebal, dan lebar), berat, dimensi corrugating, dan visual inspeksi 3. Assignment’s Overview Week 3
  • 20. Mentor: Tri Nurdhanto Co-mentor: Waris Andika Prepared By: Muhammad Fajar Asri & Vincent Alfianto Small Coil Dimensi (Panjang counter & aktual, tebal dan lebar) dan visual inspeksi Attachment Pengecekan berdasarkan standard profile Observing Corrugating line with Mr. Waris 3. Assignment’s Overview Week 3 3.6. Observing Quality Activity on Finish Product (FP) with Mr. Waris
  • 21. Mentor: Tri Nurdhanto Co-mentor: Waris Andika Prepared By: Muhammad Fajar Asri & Vincent Alfianto 3. Assignment’s Overview 3.7.1 Visual Management Information Board Planning PAPAN INFORMASI PEOPLE GENERAL INFORMATION QC ACTIVITY TATA TERTIB JADWAL SHIFT MINGGUAN TUJUAN DAN TARGET MUTU DEPARTEMEN KRITERIA GI 0,2 COLOR HARD STANDAR KETEBALAN DAFTAR KONTAK DARURAT ALAT PENDUKUNG QCD KALENDER NAMA DEFECT GI DAN COLOR COIL/SHEET PROGRESS QUALITY FEB. 2021
  • 22. Mentor: Tri Nurdhanto Co-mentor: Waris Andika Prepared By: Muhammad Fajar Asri & Vincent Alfianto No Waktu Kegiatan 1 15 Maret 2021 Mendiskusikan rencana manajemen visual ke SPV Laboratorium CGL 2 18 Maret 2021 – 22 Maret 2021 Eksekusi 3 23 Maret 2021 Evaluasi 3. Assignment’s Overview 3.7.1 Visual Management Information Board Planning
  • 23. Mentor: Tri Nurdhanto Co-mentor: Waris Andika Prepared By: Muhammad Fajar Asri & Vincent Alfianto 3. Assignment’s Overview 3.7.1 Visual Management Information Board Inprogress PIC: SPV at CGL Lab
  • 24. Mentor: Tri Nurdhanto Co-mentor: Waris Andika Prepared By: Muhammad Fajar Asri & Vincent Alfianto Latar Belakang Pemilihan Masalah • Adanya papan laporan quality harian yang tidak dimanfaatkan sejak 10 Juli 2020 • Pengintegrasian problem & problem solving seluruh departemen di QA PIC: SPV at CGL Lab (TBC) 3. Assignment’s Overview 3.7.2 Visual Management Quality Assurance Board Planning
  • 25. Mentor: Tri Nurdhanto Co-mentor: Waris Andika Prepared By: Muhammad Fajar Asri & Vincent Alfianto Manfaat • Semua anggota mengetahui kondisi terkini di QA. • Brainstorming pemecahan masalah di QA dapat dilakukan oleh semua anggota. QUALITY ASSURANCE BOARD No Tgl/Bln Problem Type Problem Status Ket. • Memudahkan briefing leader yang dilakukan setiap pagi. PIC: SPV at CGL Lab (TBC) 3. Assignment’s Overview 3.7.2 Visual Management Quality Assurance Board Planning
  • 26. Mentor: Tri Nurdhanto Co-mentor: Waris Andika Prepared By: Muhammad Fajar Asri & Vincent Alfianto No Waktu Kegiatan 1 29 Maret 2021 Mendiskusikan rencana manajemen visual ke SPV Laboratorium CGL & QA Manajer 2 30 Maret 2021 – 31 Maret 2021 Eksekusi 3 5 April 2021 Evaluasi 3. Assignment’s Overview 3.7.2 Visual Management Quality Assurance Board Planning

Editor's Notes

  1. SAMPAIKAN INSIGHT
  2. SAMPAIKAN INSIGHT
  3. SAMPAIKAN INSIGHT
  4. Penjelasan lanjutan yang tidak tercantum: Workload analysis is used to understand the volume of job, the number of human resource and to identify employee competency. It’s used to further improve the non value adding activity used in the working hour.
  5. SAMPAIKAN INSIGHT