The document provides an overview of a construction management project. It includes sections on project analysis, regulatory requirements, construction phases including layout and design, construction, procurement, and post-construction. The construction project involves building a residential complex for 5,000 people with parking for 2,500 cars and 20 commercial complexes. Key details covered include the project scope, costs, timelines, required materials and machinery.
2. Agenda of Construction Management
2
Understand project scope and analyzing client
requirement
Analyze the understand all the phases of
construction management and develop a plan for
its efficient delivery
Add text here
Add text here
Add text here
4. 4
Introduction
➢ Construction Project requirement and Deliverables
➢ Client Requirement for Construction Project
➢ Construction Project Scope & Description
Table of Content
5. Construction Project Requirements and Deliverables
5
Project Requirements
➢ Residential complex for 5000 people
➢ Parking complex for 2500 cars
➢ 20 commercial complex for shops
➢ Add text here
➢ Add text here
➢ Add text here
Construction of residential project having the
following facilities
Project Deliverables
➢ Design
➢ Pre-construction phase
➢ Procurement
➢ Construction phase
➢ Post construction
➢ Add text here
The project can be completed within 5-year span by
ABC Corp in 5 project phases
The purpose of the following slide is to analyze the project based on its requirements and deliverables. The requirement can be construction of residential complex for 5000 people with parking of 2500 cars . The deliverable can
be a 5 phased project plan.
This slide is 100% editable. Adapt it to your needs and capture your audience's attention.
6. Construction Project Scope and Description
6
Project Description
➢ Construction of residential buildings & parking lots for
5,000 people
➢ Parking space for 250 vehicles
➢ Construction contract for of 5 years
➢ Add text here
➢ Add text here
Chicago, Illinois Add location here
Project Location
Project Duration
➢ Expected date of
beginning- 6
March 2020
➢ Expected end
date- 6 March
2023
Add Text Here
➢ Add Text Here
➢ Add Text Here
Project Cost
USD – 3.5 MM
The purpose of the following slide is to provide an overview of the construction project that is undertaken by the company, this slide analyses the description of the project, its location, the duration and cost.
This slide is 100% editable. Adapt it to your needs and capture your audience's attention.
7. Requirements that are Specified by Clients
7
Client Needs Description Comments
On-Time Possession
➢ Fast & on time possession of the property
➢ Add text here
➢ Procurement of the residential complex within 2 year of
initial investment
➢ Add text here
Low Cost of Construction
➢ Low cost of the project
➢ Low material cost
➢ Low cost of construction equipment
➢ Low cost of the procuring the material for construction
➢ Add text here
On-Time Project Completion
➢ Timely & effective completion & delivery of the project
➢ Add text here
➢ Add text here
➢ Add text here
Add Text Here
➢ Add text here
➢ Add text here
➢ Add text here
➢ Add text here
Add Text Here
➢ Add text here
➢ Add text here
➢ Add text here
➢ Add text here
This slide is 100% editable. Adapt it to your needs and capture your audience's attention.
The following slide analyses the multiple requirements of client such as speed cost and time. The provided table highlights various client needs such as on-time procurement, Low cost of construction and on time project
completion.
8. 8
Table of Content
➢ Construction Project Cost Analysis
➢ Power & Electricity Requirement
➢ Structural Details of Construction Project
➢ Electricity Provider Rate Comparison
Project Analysis
9. Construction Project Cost Analysis (1/2)
9
Sales Price Breakdown Average
Finished Lot Cost (incl. financing cost) $67,551
Total Construction Cost $184,125
Financing Cost $6,669
Overhead & General Expenses $16,306
Marketing Cost $4,645
Text Here $ 10,174
Text Here $21,148
Construction Cost Breakdown Average
Building Permit Fees $3,107
Impact Fee $2,850
Water and Sewer Inspection $2,952
Excavation, Foundation & Backfill $17,034
Steel $1,012
Framing & Trusses $24,904
Sheathing $2,142
Windows $6,148
Exterior Doors $2,150
Interior Doors & Hardware $2,883
Stairs $1,052
Roof Shingles $5,256
Siding $8,739
Gutters & Downspouts $870
Plumbing $10,990
Electrical Wiring $8,034
Lighting Fixtures $2,193
HVAC $8,760
Insulation $3,399
Drywall $8,125
Text Here $6,005
Text Here $10,395
Text Here $3,619
Text Here $8,363
Text Here $3,736
Other $19,487
Total XXXXXX
The following slide displays the various cost that are associated with the construction project these cost can be divided into two major parts such as sales price breakdown and construction cost breakdown.
This slide is 100% editable. Adapt it to your needs and capture your audience's attention.
10. Construction Project Cost Analysis (2/2)
10
ITEM Mth-1 Mth-2 Mth-3 Mth-4 Mth-5 Mth-6 Mth-7 Mth-8 Mth-9 Mth-10 Mth-11 Mth-12
Labor 0 0 0 0 0 0 0 0 0 0 0 0
Equipment for
Construction
0 0 0 0 0 0 0 0 0 0 0 0
Procurement Cost 0 0 0 0 0 0 0 0 0 0 0 0
Travel 0 0 0 0 0 0 0 0 0 0 0 0
Other 0 0 0 0 0 0 0 0 0 0 0 0
Total Cost 0 0 0 0 0 0 0 0 0 0 0 0
Accumulated Cost 0 0 0 0 0 0 0 0 0 0 0 0
Project: ABC Site Construction
Date: 06-march-2020
The following slide displays the various cost that are associated with the construction project. Various components of the cost can be labor ,construction equipment , procurement cost and travel cost.
This slide is 100% editable. Adapt it to your needs and capture your audience's attention.
11. Structural Details of Construction Project
11
Area Description Area Per Sq. Ft Comments
Residential Complex Residential 2bhk & 3bhk flats 25000 Add comments here
Parking Space Parking space for 2500 cars 12000 Add comments here
Commercial Complex Commercial Complex for 20 shops 3000 Add comments here
Add text here Add text here XXXX Add comments here
Add text here Add text here XXXX Add comments here
This slide is 100% editable. Adapt it to your needs and capture your audience's attention.
The purpose of the following slide is to provide structural detail of the construction project. These project details include per square feet area of the construction complex, its description etc.
12. Requirement
Power and Electricity Requirement for Construction Project
12
Energy Generation Mode Initial Cost of Procurement USD Maintenance Cost USD Comments
Solar Panels 45,000 10,000
➢ Long Battery life
➢ High Durability
➢ Add text Here
Natural Gas 50,000 24,000
➢ High Durability
➢ Can be Hazardous
➢ Add Text Here
Add Text Here 60,000 15,000
➢ High cost of procurement and
implementation
➢ Low Durability
Add Text Here XXXX XXXXX
➢ Add Text Here
➢ Add Text Here
➢ Number of Household - 300
➢ Commercial Stores - 45
➢ Light Poles - 120
➢ Add Text Here - XXX
➢ Add Text Here - XXX
➢ Add Text Here - XXX
The following slide displays the power and electricity requirement of the project. The provided table displays multiple sources from which electricity can be generated. These sources can be solar panels, Geothermal power or
wind energy.
This slide is 100% editable. Adapt it to your needs and capture your audience's attention.
13. Electricity Provider Rate Comparison for Construction Management
13
Electricity Providers in State Cost Per Kilowatt Hour Fixed Rate of Variable Rate Minimum Usage Fees Add Parameter Here
Electricity Provider 1 14 cent Fixed rate Yes Add text here
Electricity Provider 2 20 cent Variable and fixed rate Yes Add text here
Electricity Provider 3 12 cent Variable rates No Add text here
Add Provider Here XXXX Add text here XX Add text here
Add Provider Here XXXX Add text here XX Add text here
This slide is 100% editable. Adapt it to your needs and capture your audience's attention.
The following slide displays the power and electricity requirement of the project. The provided table displays multiple sources from which electricity can be generated. These sources can be solar panels, Geothermal power or
wind energy.
14. 14
Table of Content
➢ Checklist for Certificates
➢ Construction Permit Application Process
Regulatory Requirement
15. Certificate Checklist for Construction Project
15
The Purpose of this slide is to show the regulatory requirements that the organization needs to meet in order to initiate the project, the following table shows multiple regulations and whether the organization has them or not.
Regulations & Permit Yes or No
ABC Permit Yes
Engineering & Architect License Yes
General Contract Licensee Yes
Trade Contract Licensee No
US Federal Construction Project Yes
Installation of:
➢ Alarms
➢ Fall Protection
➢ Ad Text Here
Yes
No
Yes
Add Text Here XXX
Add Text Here XXX
Add Text Here XXX
Add Text Here XXX
This slide is 100% editable. Adapt it to your needs and capture your audience's attention.
16. Construction Permit Application Process
16
Submit Permit Application
Plans
Reviewed for
Code Compliance
Non Compliant Compliant
Correction and
Comment Provided
Corrections Made in
Field & Re-Inspected
Plans Stamped as Approved
& Construction may Begin
Revise and Resubmit
drawings & Specifications
Does not Pass
Inspection(s)
Pass
Inspection(s)
Certificate of
Occupancy Issued
Inspection(S)
Process Begins
31 Oct
2019
Corrections to be made &
re-inspection of the site is to be done
07 January 2020
Construction Map Approved, Site
Inspection Pending
Application
Submitted on
If Inspection
not approved
Expected date of
Application Approval
Current
Application Status
The following slide displays the application for construction permit and the entire application process. The following slide also highlights the stage in which the process is right now.
This slide is 100% editable. Adapt it to your needs and capture your audience's attention.
19. Total Complex Overview and Plan (1/2)
19
The purpose of this slide is to display the layout and planning of the apartment of the new construction site. The slides also provides an overview of the plan provided.
Overview
25000 square feet of residential space
Residential space with 2BHK, 3bhk and
penthouses
Parking for 2500 vehicles
Add text here
Add text here
This slide is 100% editable. Adapt it to your needs and capture your audience's attention.
20. Total Complex Overview and Plan with Video Holder (2/2)
20
Overview
25000 square feet of residential space
Residential space with 2BHK, 3bhk and
penthouses
Parking for 2500 vehicles
Add text here
Add text here
The purpose of this slide is to display the layout and planning of the apartment of the new construction site. The slides also provides an overview of the plan provided.
This slide is 100% editable. Adapt it to your needs and capture your audience's attention.
21. Building Layout and Plan (1/3)
21
The purpose of this slide is to display the layout and planning of the apartment of the new construction site. The slides also provides an overview of the plan same.
This slide is 100% editable. Adapt it to your needs and capture your audience's attention.
Overview
3 BHK Layout
3 Galleries
2 Washrooms
Add text here
Add text here
22. Building Layout and Plan with Video Holder (2/3)
22
Overview
3 BHK Layout
3 Galleries
2 Washrooms
Add text here
Add text here
he purpose of this slide is to display the layout and planning of the apartment of the new construction site. The slides also provides an overview of the plan same.
This slide is 100% editable. Adapt it to your needs and capture your audience's attention.
23. Building Layout and Plan with Video Holder (3/3)
23
Overview
3 BHK Layout
3 Galleries
2 Washrooms
Add text here
Add text here
The purpose of this slide is to display the layout and planning of the apartment of the new construction site. The slides also provides an overview of the plan provided.
This slide is 100% editable. Adapt it to your needs and capture your audience's attention.
24. Parking Layout and Plan (1/2)
24
Overview
Parking of 2500 vehicles
Underground vehicles parking height 7 Ft
Open space parking for 1500 vehicles
3 Parking spots per house occupants
Underground parking for 1000 vehicles
Add text here
The purpose of this slide is to display the layout and planning of the parking space of the new construction site. The slides also provides an overview of the plan of the same.
This slide is 100% editable. Adapt it to your needs and capture your audience's attention.
25. Parking Layout and Plan with Video Holder (2/2)
25
The purpose of this slide is to display the layout and planning of the apartment of the new construction site. The slides also provides an overview of the plan provided.
This slide is 100% editable. Adapt it to your needs and capture your audience's attention.
Overview
Parking of 2500 vehicles
Underground vehicles parking height 7 Ft
Open space parking for 1500 vehicles
3 Parking spots per house occupants
Underground parking for 1000 vehicles
Add text here
26. Storage Plan for Construction Management
26
Onsite Offsite
Storage Unit 1 Storage Unit 2 Warehouse Location
Cement Bags Yes No No NA
Wooden Logs Yes Yes No NA
Steel Rods No Yes No NA
Glass Panels No No Soft Storage Warehouse Chicago XYZ Avenue
Add Text Here Add Text Here Add Text Here Add Text Here Add Text Here
Add Text Here Add Text Here Add Text Here Add Text Here Add Text Here
Material
The following slide displays a storage plan for the construction site. The provided table highlights that material that needs to be stored, whether they will be stored On-Site or Off-Site.
This slide is 100% editable. Adapt it to your needs and capture your audience's attention.
28. Material Required for Construction Project
28
24.6% Steel 7.4% Aggregated Gravels
22.8% Fittings
➢ Window- 3.0%
➢ Doors- 3.4%
➢ Plumbing- 5.5%
➢ Electrical- 6.6%
➢ CP+ Sanitary- 4.1%
12.3% Sand
16.4% Cement
16.5% Finishers
➢ Paint- 4.1%
➢ Tiles- 8.0%
➢ Bricks- 4.4%
$ 7,31,700
1000 SQFT.
(Build up area)
The following slide displays material required for the construction project along with the quantity required.
This slide is 100% editable. Adapt it to your needs and capture your audience's attention.
29. Vendor Selection for Construction Material
29
Material
Required
Quantity
Required
Vendor 1 USD
per piece
Vendor 2 USD
per piece
Vendor 3 USD
per piece
Selected
Vendor
Comments
Cement 10,000 Bags 18 17 16 Vendor 3
➢ Add comments here
➢ Add comments here
Sand 20,000 Bags 11 10 15 Vendor 2
➢ Add comments here
➢ Add comments here
Aggregates
Gravels
5000 Bags 22 25 20 Vendor 3
➢ Add comments here
➢ Add comments here
Steel 2,000 Beams 45 40 41 Vendor 2
➢ Add comments here
➢ Add comments here
Finishing Material
(Paint polisher)
50 Ltrs. 40 35 38 Vendor 2
➢ Add comments here
➢ Add comments here
Fittings Na XX XX XX Add text here
➢ Add comments here
➢ Add comments here
This slide is 100% editable. Adapt it to your needs and capture your audience's attention.
The following slide compares multiple vendors through which the organization can procure its material. The provided table highlights multiple criteria such as the quality required and per piece cost.
30. Machinery Required for Construction Work
30
➢ Excavators
➢ Graders
➢ Loaders
➢ Skid Loader
➢ Backhoe
➢ Bulldozer Trenchers
➢ Scrapers Wheeled
➢ Loading Shovel
Earth Moving Equipment
➢ Crane
➢ Conveyors
➢ Hoists
➢ Forklift
➢ Add Text Here
Material Handling Equipment
➢ Lorry
➢ Dumber
➢ Trailers
➢ Tanker
➢ Add Text Here
Construction Vehicles
➢ Concrete Mixtures
➢ Compactors
➢ Paver
➢ Road Roller
➢ Add Text Here
➢ Add Text Here
➢ Add Text Here
Construction Equipment
➢ Add Text Here
➢ Add Text Here
➢ Add Text Here
➢ Add Text Here
➢ Add Text Here
Add Text Here
The following slide displays machinery required for the construction project. These machineries can be earth moving equipment, Construction Vehicles, Material Handling Equipment etc.
This slide is 100% editable. Adapt it to your needs and capture your audience's attention.
31. Vendor Selection for Construction Equipment
31
Equipment Quantity Owned Purchase Vendor 1 Pricing PP $ Vendor 2 Pricing PP $ Vendor 3 Pricing PP $ Comments
Excavators 3 2 1 7,000 8,000 9,000 Purchase from Vendor 1
Backhoe 1 0 1
7,000
9,000 8,000 Purchase from Vendor 1
Bulldozer 5 2 3 9,000 8,000
7,000
Purchase from Vendor 3
Wheel Tractor 5 3 2 8,000 9,000
7,000
Purchase from Vendor 3
Tower Crane 2 2 0 XX XX XX XX
Dump Trucks 8 7 1
7,000
8,000 9,000 Purchase from Vendor 1
Add Text Here XX XX XX XXXX XXXX XXXX Add Text here
The purpose of this slide is to analyze the equipment procurement plan of the organization. The provided table analyzes the rates offered by multiple vendors the quantity required by the organization and the name of
equipment's.
This slide is 100% editable. Adapt it to your needs and capture your audience's attention.
32. Our Insurance Requirement for Construction Management
32
Assets
➢ Property Insurance
➢ Content Insurance
➢ Business Interruption Insurance
➢ Vehicle Insurance
➢ Account Receivable Insurance
Liability
➢ General Liability Insurance
➢ Product Liability Insurance
➢ Professional Liability Insurance
People
➢ Life Insurance
➢ Disability Insurance
➢ Partnership Insurance
➢ Medical Insurance
➢ Key Personal Insurance
This slide is 100% editable. Adapt it to your needs and capture your audience's attention.
The purpose of the following slide is to show the type of insurance that is required by the company. These insurance can be of three type: People insurance, Asset- insurance and liability insurance.
33. Our Requirement
Vendor Selection for Construction Management
33
Insurance Types
Insurance
Provider 1
Insurance
Provider 2
Insurance
Provider 3
Insurance
Provider 4
Comments
People Insurance Yes No Yes Yes
› Add comments here
› Add comments here
Asset Insurance No No Yes Yes
› Add comments here
› Add comments here
Lability Insurance Yes Yes Yes No
› Add comments here
› Add comments here
100% Reimbursement No Yes Yes No
› Add comments here
› Add comments here
Cost Per Year $7,500 $5,000 $6,000 $4,000 Purchase from Insurance Provider 3
➢ People insurance for 400 employees
➢ Asset insurance for major machineries
➢ Liability insurance
➢ Add text here
➢ Add text here
➢ Add text here
The following slide compares multiple vendors through which the organization can purchase insurance . The provided table highlights multiple criteria based on which the organization can choose their insurance provider.
This slide is 100% editable. Adapt it to your needs and capture your audience's attention.
35. Hiring Plan for Construction Project
35
This slide is 100% editable. Adapt it to your needs and capture your audience's attention.
The following slide analysis multiple platforms for recruitment by highlighting the various forms of recruitment such as Internal recruitment, external recruitment, social and web recruitment and print advertisement.
External Recruitment
➢ Outsourcing the employment
➢ Hiring through school college and universities
➢ Add text here
➢ Add text here
Print Advertisement
➢ News Paper
➢ Magazines
➢ Pamphlets
➢ Add text here
➢ Add text here
Social & Web Recruitment
➢ E-mail
➢ Social media platform: Facebook, Twitter &
LinkedIn
➢ Online Recruitment Portals
➢ Company Website
➢ Add text here
Internal Recruitment
➢ Promote current employees
➢ Offer temporary employee permanent contract
➢ Hire retired employee as freelancer
➢ Add text here
Recruitment
Platforms
Our
Requirements
➢ On-site Engineers : 15
➢ Machinery Operators : 25
➢ Accountants : 5
➢ Human Resource Personal : 2
➢ Add Text Here : XX
➢ Construction Workers : 200
37. Construction Site Access and Layout
37
Details
House Foundation- 25,000 Sq. ft
Office Space- 3*500 Sq. ft
Add Text Here
Steel Depot- 1,000 sq. ft
Add Text Here
The following slide displays a map of the entire construction site shows various areas such as entry point, the office space, excavation ground etc to ensure the smooth and safe functioning of the project.
This slide is 100% editable. Adapt it to your needs and capture your audience's attention.
38. Construction Process for Construction Management
38
Plans
Site Preparation
Permits & Insurance
Foundation
Framing
Roof & Siding
Interior
Exterior Paint
Landscaping
Punch List
Finished Project
Warranty Period
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec
Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec
Jan
Feb
2020
2021
2022
Inspections
Utilities
Windows &
Exterior Doors
HVAC
Selecting a Contractor Financing
20 Feb
The following slide displays the construction process of the organization along with a timeline.
This slide is 100% editable. Adapt it to your needs and capture your audience's attention.
39. Post Construction Commissioning
39
Construction
Execute Level 1,2,3
Commissioning
Develop Level 4 & 5
Commissioning Script
Pre- Design
Build
Commissioning Team
OPR+ BOD
Development
Commissioning
Execute Level 4 & 5
Commissioning
Rest to Normal
Configuration
Final Site
Clean Up
Turnover/
Re-Commissioning
Verify IT Equipment
Dual Corded
Develop
Commissioning Script
Execute
Commissioning Activities
Design
Develop Overall
Commissioning Plan
Develop Level 1,2,3
Commissioning Documents
Review Design for
Commissioning Readiness
Commissioning by Project Phase
This slide is 100% editable. Adapt it to your needs and capture your audience's attention.
The purpose of the following slide is to display the process of commissioning during after the completion of construction project.
40. Construction Project Team
40
➢ Cost Consultant
➢ CDM Co- Ordinator
➢ Specialist
Consultants ➢ Architect
➢ Services Engineer
➢ Structural Engineer
➢ Specialist Designers
Lead Consultant
Other Consultants Lead Designer
Design Team
Sub- Contractor Suppliers
Contractor
Independent
Client Advisers
Project Sponsor
User
Panels
Champions
Project Manager/
Client Representative
Project Board
Board of Directors
The purpose of the following slide is to show the entire construction project team . The team members can be C Level individual, Architects Designers and Contractors.
This slide is 100% editable. Adapt it to your needs and capture your audience's attention.
41. 41
Table of Content
➢ Risk Identification
➢ Risk Mitigation Strategies
➢ Risk Impact and Likelihood Matrix
Risk Analysis
42. Risk Identification for Construction Management
42
Financial
Risk
➢ Shortfall of Investment
➢ Poor Performance of
Economy
➢ Budget Deficit
➢ Low Sale of Project
➢ Add Text Here
➢ Add Text Here
Socio
Political Risk
➢ Regulatory
Compliances
➢ Change in Rules &
Regulations
➢ Taxes
➢ Add Text Here
➢ Add Text Here
Environmental
Risk
➢ Natural Disasters
➢ Recession
➢ War
➢ Add Text Here
Construction
Related Risk
➢ Material Shortage
➢ Labor Union Strike
➢ Unwanted Delay in
Construction Work
➢ Add Text Here
This slide is 100% editable. Adapt it to your needs and capture your audience's attention.
The purpose of the following slide is to identify the various risks that are associated with the construction project. The risk can financial, socio Political, Environmental and construction related.
43. Construction Risk Impact and Likelihood Matrix
43
Insignificant Minor Moderate Major Catastrophic
Almost certain Add text here Add text here
Unwanted delay in
construction work
Labor union strike Material shortage
Likely Add text here Add text here Add text here Add text here Add text here
Possible Add text here Financial shortfall Budget deficit Add text here Add text here
Unlikely Add text here Add text here Add text here Add text here Add text here
Rare Recession Regulatory compliances War Add text here Add text here
Likelihood
Impact/ Consequences
This slide is 100% editable. Adapt it to your needs and capture your audience's attention.
The purpose of the following slide is to analyze the impact and likelihood of multiple risks that may effect organization.
44. Risk Mitigation Strategies for Construction Management
44
Risk Mitigation Strategy Comments
Investment Shortfall
➢ Reserves for financial deficit
➢ Fund raising through selling apartments & providing possession upon full
construction
➢ Add comments here
➢ Add comment here
Labor Force Strike
➢ Strike insurance to prevent losses that might be incurred during strike
➢ Setting up a negotiation committee for negotiations with the labor union
➢ Add comments here
➢ Add comment here
Budget Deficit
➢ Reduction in miscellaneous expenses
➢ Reconsideration of budgetary policy
➢ Add comments here
➢ Add comment here
Damages due to Natural Disaster
➢ Insurance with vendor who provides human machinery & liability insurance
➢ Add text here
➢ Add comments here
➢ Add comment here
Add Text Here
➢ Add text here
➢ Add text here
➢ Add comments here
➢ Add comment here
Add Text Here
➢ Add text here
➢ Add text here
➢ Add comments here
➢ Add comment here
The purpose of this slide is to show various mitigation strategies for multiple risks such as investment shortfall, labor force strike etc.
This slide is 100% editable. Adapt it to your needs and capture your audience's attention.
46. Quality Assurance Plan in Sales
46
Quality Maintenance along the Process
Customer Satisfaction Survey
and Management
Customer Complaint
Management
Press Quality Control
➢ Production Preparation
Inspection
➢ Production Flow Revision
Management
Process Quality Control
Supply Chain Quality
Control
➢ Supplier Quality Control
➢ Incoming Material Quality
➢ Control
Inspection & Approval
Staff Training and Assessment
Design Quality Control
➢ Process Point Assessment
➢ Revision Of Design
After- sales Quality Control
Revision Management
Step 1 Step 2 Step 3 Step 4
Quality Control Flowchart
The purpose of the following slide is to show the entire process quality assurance in sales. The provided flowchart shows a 4 steps of ensuring quality.
This slide is 100% editable. Adapt it to your needs and capture your audience's attention.
47. Quality Assurance Process for Construction Management
47
Inspection & Test Plan
Construction Quality Control Plans
The purpose of the following slide is to show the entire process quality assurance in construction process . The provided process shows the construction quality plan and material inspection and test plan
This slide is 100% editable. Adapt it to your needs and capture your audience's attention.
48. 48
Table of Content
➢ Identifying the Type of Waste in
Construction Management
➢ Construction Waste Management Plan
Construction Waste Management
49. ➢ Concrete: Non-Hazardous
➢ Bricks: Non-Hazardous
➢ Tiles & Ceramics: Non-Hazardous
➢ Add text here
➢ Add text here
Construction Waste
➢ Untreated Woods: Non-Hazardous
➢ Uncontaminated Glass: Non-hazardous
➢ Treated Woods: Hazardous Waste
➢ Treated Glass: Hazardous Waste
➢ Add text here
Wood, Glass & Plastic
➢ Add text here
➢ Add text here
➢ Add text here
➢ Add text here
Add Text Here
➢ Add text here
➢ Add text here
➢ Add text here
➢ Add text here
Add Text Here
Identifying the type of Waste in Construction Management
49
Types of
Construction Waste
The purpose of the following slide is to Categorize different types of wate that can be generated during the construction project. These waste can be wood,glass and plastic.
This slide is 100% editable. Adapt it to your needs and capture your audience's attention.
50. Construction Waste Management Plan
50
Waste Description Re-Use Onsite Off-site Recycle On Site Off-Site Dispose On Site Off-Site
Bricks Yes Yes Yes
Add Text Here Yes Yes Yes
Add Text Here Yes Yes Yes
Plastic Pipes Yes Yes Yes
Plastic Wirings Yes Yes Yes
Add Text Here Yes Yes Yes
Bio-Chemical Yes Yes Yes
Lead Yes Yes Yes
Add Text Here Yes Yes
Non- Hazard
Hazard
Inert
This slide is 100% editable. Adapt it to your needs and capture your audience's attention.
The purpose of the following slide is to display a waste management plan for the construction project. The provided table highlights the 3 categories of waste that are Inert, Non- Hazard and Hazard.
52. Project Management Dashboard
52
Overdue Task Deadline Employee
1 Day Add text here 2017-08-15 Paula
4 Days Add text here 2017-08-06 Kate
10 Days Add text here 2017-08-01 Nancy
24 Days Add text here 2017-07-18 George
Employee Task Deadline Workload
Kate Add text here 2017-08-15
George Add text here 2017-08-06
Nancy Add text here 2017-08-01
Paula Add text here 2017-07-18
67%
55%
48% 45%
30%
George Nancy Richard Kate Paula
$0K
$20K
$40K
$60K
Total Budget Budget Amont Used Target Amount Used
Total Budget- $52,000
Remaining- $87,70
Currently- 8.1% (Over Target)
Overdue Task
Upcoming Deadlines
Project Budget
Workload
34%
56%
15%
11%
Projected Launch
Date
107 Days
Friday,15th December
Completed
Planning
Completed
Design
Waiting
Commissioning
Pre-
Construction
In Progress
67%
The following slide displays the project management dashboard that tracks multiple activates of the project. It highlights the project launch date, the overdue task and project budget.
This slide is 100% editable. Adapt it to your needs and capture your audience's attention.
54. 04 Timeline
01 Bar Chart
02 Clustered Column - Line
03 Magnifying Glass
05 Our Mission
06 Post It Notes
07 Puzzle
08 Our Financial
09 Venn
10 Our Goal
11 Thank You
Additional
Slides
54
55. Bar Chart
55
220
210
180
150
100
80
350
270
230
200
150
100
0 50 100 150 200 250 300 350 400 450 500 550 600
2020
2019
2018
2017
2016
2015
Years
01 Product
This graph/chart is linked to excel, and
changes automatically based on data. Just left
click on it and select “Edit Data”.
02 Product
This graph/chart is linked to excel, and
changes automatically based on data. Just left
click on it and select “Edit Data”.
56. Clustered Column - Line
56
Years 2020
30
45
55
77
0
1
2
3
4
5
6
0
10
20
30
40
50
60
70
80
90
100
Q 1 Q 2 Q 3 Q 4
Sales
in
Million
01 Product
This graph/chart is linked to excel, and
changes automatically based on data. Just left
click on it and select “Edit Data”.
02 Product
This graph/chart is linked to excel, and
changes automatically based on data. Just left
click on it and select “Edit Data”.
57. Magnifying Glass
57
02
01 03
Text Here
This slide is 100% editable. Adapt it to
your needs and capture your
audience's attention.
Text Here
This slide is 100% editable. Adapt it to
your needs and capture your
audience's attention.
Text Here
This slide is 100% editable. Adapt it to
your needs and capture your
audience's attention.
58. Timeline
58
2016
This slide is 100%
editable. Adapt it to
your needs and
capture your
audience's attention.
2017
This slide is 100%
editable. Adapt it to
your needs and
capture your
audience's attention.
2018
This slide is 100%
editable. Adapt it to
your needs and
capture your
audience's attention.
2019
This slide is 100%
editable. Adapt it to
your needs and
capture your
audience's attention.
2020
This slide is 100%
editable. Adapt it to
your needs and
capture your
audience's attention.
59. 59
Our Mission
Mission
This slide is 100% editable. Adapt it to your needs and
capture your audience's attention.
Goal
This slide is 100% editable. Adapt it to your needs
and capture your audience's attention.
Vision
This slide is 100% editable. Adapt it to your
needs and capture your audience's attention.
61. Puzzle
61
This slide is 100% editable. Adapt
it to your needs and capture your
audience's attention.
Text Here
This slide is 100% editable. Adapt
it to your needs and capture your
audience's attention.
Text Here
This slide is 100% editable. Adapt
it to your needs and capture your
audience's attention.
Text Here
This slide is 100% editable. Adapt
it to your needs and capture your
audience's attention.
Text Here
This slide is 100% editable. Adapt
it to your needs and capture your
audience's attention.
Text Here
01 02 03 04 05
62. Our Financial
62
45% 85% 30%
Euro
This slide is 100% editable. Adapt it
to your needs and capture your
audience's attention.
Dollar
This slide is 100% editable. Adapt it
to your needs and capture your
audience's attention.
Pound
This slide is 100% editable. Adapt it
to your needs and capture your
audience's attention.
63. Venn
63
01 02 03
This slide is 100% editable. Adapt
it to your needs and capture your
audience's attention.
Text Here
This slide is 100% editable. Adapt
it to your needs and capture your
audience's attention.
Text Here
This slide is 100% editable. Adapt
it to your needs and capture your
audience's attention.
Text Here