SlideShare una empresa de Scribd logo
1 de 63
Descargar para leer sin conexión
Construction
Project
Management
Yo u r C o m pa n y N a m e
Agenda of Construction Management
Understand project scope and analyzing
client requirement
Analyze the understand all the phases of construction
management and develop a plan for its efficient delivery
Add text here
Add text here
Add text here
2
Table of Content
01. Introduction 05. Risk Analysis
02. Project Analysis 06. Quality Assurance Plan
03. Regulatory Requirement 07. Construction Waste Management
04. Construction Phases 08. Measuring our Efforts
3
Table of Content
01. Introduction
✓ Construction Project requirement and Deliverables
✓ Client Requirement for Construction Project
✓ Construction Project Scope & Description
4
Construction Project Requirements and Deliverables
The purpose of the following slide is to analyze the project based on its requirements and deliverables. The requirement can be construction of residential complex for 5000 people with parking of 2500
cars . The deliverable can be a 5 phased project plan.
This slide is 100% editable. Adapt it to your needs and capture your audience's attention.
Project Requirements
✓ Residential complex for 5000 people
✓ Parking complex for 2500 cars
✓ 20 commercial complex for shops
✓ Add text here
✓ Add text here
✓ Add text here
Construction of residential project having the
following facilities
✓ Design
✓ Pre-construction phase
✓ Procurement
✓ Construction phase
✓ Post construction
✓ Add text here
The project can be completed within 5-year span by
ABC Corp in 5 project phases
Project Deliverables
5
Construction Project Scope and Description
The purpose of the following slide is to provide an overview of the construction project that is undertaken by the company, this slide analyses the description of the project, its location, the duration and
cost.
Project Duration
✓ Expected date of beginning- 6 March 2020
✓ Expected end date- 6 March 2023
Project Cost
✓ USD – 3.5 MM
Add Text Here
✓ Add Text Here
✓ Add Text Here
Project Location
Chicago, Illinois
Add location here
Project Description
✓ Construction of residential buildings & parking lots for 5,000 people
✓ Parking space for 250 vehicles
✓ Construction contract for of 5 years
✓ Add text here
✓ Add text here
This slide is 100% editable. Adapt it to your needs and capture your audience's attention.
6
Requirements that are Specified by Clients
The following slide analyses the multiple requirements of client such as speed cost and time. The provided table highlights various client needs such as on-time procurement, Low cost of construction
and on time project completion.
Client Needs Description Comments
On-Time Possession
✓ Fast & on time possession of the property
✓ Add text here
✓ Procurement of the residential complex within 2 year of initial
investment
✓ Add text here
Low Cost of Construction
✓ Low cost of the project
✓ Low material cost
✓ Low cost of construction equipment
✓ Low cost of the procuring the material for construction
✓ Add text here
On-Time Project Completion
✓ Timely & effective completion & delivery of the project
✓ Add text here
✓ Add text here
✓ Add text here
Add Text Here
✓ Add text here
✓ Add text here
✓ Add text here
✓ Add text here
Add Text Here
✓ Add text here
✓ Add text here
✓ Add text here
✓ Add text here
This slide is 100% editable. Adapt it to your needs and capture your audience's attention.
7
Table of Content
02. Project Analysis
✓ Construction Project Cost Analysis
✓ Power & Electricity Requirement
✓ Structural Details of Construction Project
✓ Electricity Provider Rate Comparison
8
Construction Project Cost Analysis (1/2)
The following slide displays the various cost that are associated with the construction project these cost can be divided into two major parts such as sales price breakdown and construction cost
breakdown.
This slide is 100% editable. Adapt it to your needs and capture your audience's attention.
9
Sales Price Breakdown Average
Finished Lot Cost (incl. financing cost) $67,551
Total Construction Cost $184,125
Financing Cost $6,669
Overhead & General Expenses $16,306
Marketing Cost $4,645
Text Here $ 10,174
Text Here $21,148
Construction Cost Breakdown Average
Building Permit Fees $3,107
Impact Fee $2,850
Water and Sewer Inspection $2,952
Excavation, Foundation & Backfill $17,034
Steel $1,012
Framing & Trusses $24,904
Sheathing $2,142
Windows $6,148
Exterior Doors $2,150
Interior Doors & Hardware $2,883
Stairs $1,052
Roof Shingles $5,256
Siding $8,739
Gutters & Downspouts $870
Plumbing $10,990
Electrical Wiring $8,034
Lighting Fixtures $2,193
HVAC $8,760
Insulation $3,399
Drywall $8,125
Text Here $6,005
Text Here $10,395
Text Here $3,619
Text Here $8,363
Text Here $3,736
Other $19,487
Total XXXXXX
Construction Project Cost Analysis (2/2)
The following slide displays the various cost that are associated with the construction project. Various components of the cost can be labor ,construction equipment , procurement cost and travel cost.
ITEM Mth-1 Mth-2 Mth-3 Mth-4 Mth-5 Mth-6 Mth-7 Mth-8 Mth-9 Mth-10 Mth-11 Mth-12
Labor 0 0 0 0 0 0 0 0 0 0 0 0
Equipment for Construction 0 0 0 0 0 0 0 0 0 0 0 0
Procurement Cost 0 0 0 0 0 0 0 0 0 0 0 0
Travel 0 0 0 0 0 0 0 0 0 0 0 0
Other 0 0 0 0 0 0 0 0 0 0 0 0
Total Cost 0 0 0 0 0 0 0 0 0 0 0 0
Accumulated Cost 0 0 0 0 0 0 0 0 0 0 0 0
Project: ABC Site Construction
Date: 06-march-2020
This slide is 100% editable. Adapt it to your needs and capture your audience's attention.
10
Structural Details of Construction Project
The purpose of the following slide is to provide structural detail of the construction project. These project details include per square feet area of the construction complex, its description etc.
This slide is 100% editable. Adapt it to your needs and capture your audience's attention.
Area Description Area Per Sq. Ft Comments
Residential Complex
Residential 2bhk &
3bhk flats
25000 Add comments here
Parking Space
Parking space for
2500 cars
12000 Add comments here
Commercial Complex
Commercial Complex
for 20 shops
3000 Add comments here
Add text here Add text here XXXX Add comments here
Add text here Add text here XXXX Add comments here
11
Power and Electricity Requirement for Construction Project
The following slide displays the power and electricity requirement of the project. The provided table displays multiple sources from which electricity can be generated. These sources can be solar panels,
Geothermal power or wind energy.
Energy Generation Mode Initial Cost of Procurement USD Maintenance Cost USD Comments
Solar Panels 45,000 10,000
✓ Long Battery life
✓ High Durability
✓ Add text Here
Natural Gas 50,000 24,000
✓ High Durability
✓ Can be Hazardous
✓ Add Text Here
Add Text Here 60,000 15,000
✓ High cost of procurement and
implementation
✓ Low Durability
Add Text Here XXXX XXXXX
✓ Add Text Here
✓ Add Text Here
Requirement
✓ Number of Household - 300
✓ Commercial Stores - 45
✓ Light Poles - 120
✓ Add Text Here - XXX
✓ Add Text Here - XXX
✓ Add Text Here - XXX
This slide is 100% editable. Adapt it to your needs and capture your audience's attention.
12
Electricity Provider Rate Comparison for Construction Management
The purpose of the following slide is to compare multiple electricity provider in the area based on the IR cost per kilowatt , their rate flexibility and the minimum usage fee.
Electricity Providers in State Cost Per Kilowatt Hour Fixed Rate of Variable Rate Minimum Usage Fees Add Parameter Here
Electricity Provider 1 14 cent Fixed rate Yes Add text here
Electricity Provider 2 20 cent Variable and fixed rate Yes Add text here
Electricity Provider 3 12 cent Variable rates No Add text here
Add Provider Here XXXX Add text here XX Add text here
Add Provider Here XXXX Add text here XX Add text here
This slide is 100% editable. Adapt it to your needs and capture your audience's attention.
13
Table of Content
✓ Checklist for Certificates
✓ Construction Permit Application Process
03. Regulatory Requirement
14
Certificate Checklist for Construction Project
The The Purpose of this slide is to show the regulatory requirements that the organization needs to meet in order to initiate the project, the following table shows multiple regulations and whether the
organization has them or not.
Regulations & Permit Yes or No
ABC Permit Yes
Engineering & Architect License Yes
General Contract Licensee Yes
Trade Contract Licensee No
US Federal Construction Project Yes
Installation of:
✓ Alarms
✓ Fall Protection
✓ Ad Text Here
Yes
No
Yes
Add Text Here XXX
Add Text Here XXX
Add Text Here XXX
Add Text Here XXX
This slide is 100% editable. Adapt it to your needs and capture your audience's attention.
15
Construction Permit Application Process
following slide displays the application for construction permit and the entire application process. The following slide also highlights the stage in which the process is right now.
This slide is 100% editable. Adapt it to your needs and capture your audience's attention.
16
Submit Permit Application
Plans Reviewed for
Code Compliance
Non Compliant Compliant
Corrections and
Comments Provided
Plans Stamped as Approved
& Construction may Begin
Revise and Resubmit drawings
& Specifications
Inspectio(S)
Process
Begins
Does not Pass
Inspection(s)
Pass Inspection(s)
Corrections Made in Field
& Re-Inspected
Certificate of
Occupancy Issued
Application Submitted on 31 Oct 2019
If Inspection not Approved
Corrections to be made
and
re-inspection of the site
is to be done
Expected date of
Application Approval
07 January 2020
Current Application Status
Construction Map
Approved, Site
Inspection Pending
Table of Content
04. Construction Phases
✓ Layout and Design
✓ Construction Phase
✓ Procurement
✓ Post Construction
17
Layout and Design
for Construction Project
18
Total Complex Overview and Plan (1/2)
The purpose of this slide is to display the layout and planning of the apartment of the new construction site. The slides also provides an overview of the plan provided.
Overview
25000 square feet of residential space
Residential space with 2BHK, 3bhk and penthouses
Parking for 2500 vehicles
Add text here
Add text here
This slide is 100% editable. Adapt it to your needs and capture your audience's attention.
19
Total Complex Overview and Plan with Video Holder (2/2)
The purpose of this slide is to display the layout and planning of the apartment of the new construction site. The slides also provides an overview of the plan provided.
Overview
25000 square feet of residential space
Residential space with 2BHK, 3bhk and penthouses
Parking for 2500 vehicles
Add text here
Add text here
This slide is 100% editable. Adapt it to your needs and capture your audience's attention.
20
Building Layout and Plan (1/3)
The purpose of this slide is to display the layout and planning of the apartment of the new construction site. The slides also provides an overview of the plan same.
Overview
3 BHK Layout
Add text here
2 Washrooms
3 Galleries
Add text here
This slide is 100% editable. Adapt it to your needs and capture your audience's attention.
21
Overview
3 BHK Layout
Add text here
2 Washrooms
3 Galleries
Add text here
Building Layout and Plan with Video Holder (2/3)
The purpose of this slide is to display the layout and planning of the apartment of the new construction site. The slides also provides an overview of the plan same.
This slide is 100% editable. Adapt it to your needs and capture your audience's attention.
22
Overview
3 BHK Layout
Add text here
2 Washrooms
3 Galleries
Add text here
Building Layout and Plan with Video Holder (3/3)
The purpose of this slide is to display the layout and planning of the apartment of the new construction site. The slides also provides an overview of the plan provided.
This slide is 100% editable. Adapt it to your needs and capture your audience's attention.
23
Parking Layout and Plan (1/2)
The purpose of this slide is to display the layout and planning of the parking space of the new construction site. The slides also provides an overview of the plan of the same.
Overview
Parking of 2500 vehicles
3 Parking spots per
house occupants
Open space parking for
1500 vehicles
Underground parking for
1000 vehicles
Underground vehicles
parking height 7 Ft
Add text here
This slide is 100% editable. Adapt it to your needs and capture your audience's attention.
24
Overview
Parking of 2500 vehicles
3 Parking spots per
house occupants
Open space parking for
1500 vehicles
Underground parking for
1000 vehicles
Underground vehicles
parking height 7 Ft
Add text here
Parking Layout and Plan with Video Holder (2/2)
The purpose of this slide is to display the layout and planning of the apartment of the new construction site. The slides also provides an overview of the plan provided.
This slide is 100% editable. Adapt it to your needs and capture your audience's attention.
25
Storage Plan for Construction Management
The following slide displays a storage plan for the construction site. The provided table highlights that material that needs to be stored, whether they will be stored On-Site or Off-Site.
Material
Onsite Offsite
Storage Unit 1 Storage Unit 2 Warehouse Location
Cement Bags Yes No No NA
Wooden Logs Yes Yes No NA
Steel Rods No Yes No NA
Glass Panels No No Soft Storage Warehouse Chicago XYZ Avenue
Add Text Here Add Text Here Add Text Here Add Text Here Add Text Here
Add Text Here Add Text Here Add Text Here Add Text Here Add Text Here
This slide is 100% editable. Adapt it to your needs and capture your audience's attention.
26
Procurement Stage for Construction
Management
27
Material Required for Construction Project
The following slide displays material required for the construction project along with the quantity required.
This slide is 100% editable. Adapt it to your needs and capture your audience's attention.
28
$ 7,31,700
1000 SQFT.
(Build up area)
16.5% Finishers
✓ Paint- 4.1%
✓ Tiles- 8.0%
✓ Bricks- 4.4%
24.6% Steel
12.3% Sand
22.8% Fittings
✓ Window- 3.0%
✓ Doors- 3.4%
✓ Plumbing- 5.5%
✓ Electrical- 6.6%
✓ CP+ Sanitary- 4.1%
16.4% Cement
7.4%
Aggregates
Gravel
Quantity
Required
Vendor 1 USD
per piece
Vendor 2 USD
per piece
Vendor 3 USD
per piece
Selected
Vendor
Comments
10,000 Bags 18 17 16 Vendor 3
✓ Add comments here
✓ Add comments here
20,000 Bags 11 10 15 Vendor 2
✓ Add comments here
✓ Add comments here
5000 Bags 22 25 20 Vendor 3
✓ Add comments here
✓ Add comments here
2,000 Beams 45 40 41 Vendor 2
✓ Add comments here
✓ Add comments here
50 Ltrs. 40 35 38 Vendor 2
✓ Add comments here
✓ Add comments here
Na XX XX XX Add text here
✓ Add comments here
✓ Add comments here
Vendor Selection for Construction Material
The following slide compares multiple vendors through which the organization can procure its material. The provided table highlights multiple criteria such as the quality required and per piece cost.
Finishing Material
(Paint polisher)
Cement
Sand
Aggregates
Gravels
Steel
Fittings
Material
Required
This slide is 100% editable. Adapt it to your needs and capture your audience's attention.
29
Machinery Required for Construction Work
The following slide displays machinery required for the construction project. These machineries can be earth moving equipment, Construction Vehicles, Material Handling Equipment etc.
This slide is 100% editable. Adapt it to your needs and capture your audience's attention.
Earth Moving Equipment
✓ Excavators
✓ Graders
✓ Loaders
✓ Skid Loader
✓ Backhoe
✓ Bulldozer Trenchers
✓ Scrapers Wheeled
✓ Loading Shovel
Construction Vehicles
✓ Lorry
✓ Dumber
✓ Trailers
✓ Tanker
✓ Add Text Here
Material Handling Equipment
✓ Crane
✓ Conveyors
✓ Hoists
✓ Forklift
✓ Add Text Here
Construction Equipment
✓ Concrete Mixtures
✓ Compactors
✓ Paver
✓ Road Roller
✓ Add Text Here
✓ Add Text Here
✓ Add Text Here
Add Text Here
✓ Add Text Here
✓ Add Text Here
✓ Add Text Here
✓ Add Text Here
✓ Add Text Here
30
Equipment Quantity Owned Purchase Vendor 1 Pricing PP $ Vendor 2 Pricing PP $ Vendor 3 Pricing PP $ Comments
Excavators 3 2 1 7,000 8,000 9,000 Purchase from Vendor 1
Backhoe 1 0 1
7,000
9,000 8,000 Purchase from Vendor 1
Bulldozer 5 2 3 9,000 8,000
7,000
Purchase from Vendor 3
Wheel Tractor 5 3 2 8,000 9,000
7,000
Purchase from Vendor 3
Tower Crane 2 2 0 XX XX XX XX
Dump Trucks 8 7 1
7,000
8,000 9,000 Purchase from Vendor 1
Add Text Here XX XX XX XXXX XXXX XXXX Add Text here
Vendor Selection for Construction Equipment
The purpose of this slide is to analyze the equipment procurement plan of the organization. The provided table analyzes the rates offered by multiple vendors the quantity required by the organization and
the name of equipment's.
This slide is 100% editable. Adapt it to your needs and capture your audience's attention.
31
Our Insurance Requirement for Construction Management
The purpose of the following slide is to show the type of insurance that is required by the company. These insurance can be of three type: People insurance, Asset- insurance and liability insurance.
Assets
✓ Property Insurance
✓ Content Insurance
✓ Business Interruption Insurance
✓ Vehicle Insurance
✓ Account Receivable Insurance
Liability
✓ General Liability Insurance
✓ Product Liability Insurance
✓ Professional Liability Insurance
People
✓ Life Insurance
✓ Disability Insurance
✓ Partnership Insurance
✓ Medical Insurance
✓ Key Personal Insurance
This slide is 100% editable. Adapt it to your needs and capture your audience's attention.
32
Vendor Selection for Construction Management
The following slide compares multiple vendors through which the organization can purchase insurance . The provided table highlights multiple criteria based on which the organization can choose their
insurance provider.
Our Requirement
✓ People insurance for 400 employees
✓ Asset insurance for major machineries
✓ Liability insurance
✓ Add text here
✓ Add text here
✓ Add text here
Insurance Types
Insurance
Provider 1
Insurance
Provider 2
Insurance
Provider 3
Insurance
Provider 4
Comments
People Insurance Yes No Yes Yes
✓ Add comments here
✓ Add comments here
Asset Insurance No No Yes Yes
✓ Add comments here
✓ Add comments here
Lability Insurance Yes Yes Yes No
✓ Add comments here
✓ Add comments here
100% Reimbursement No Yes Yes No
✓ Add comments here
✓ Add comments here
Cost Per Year $7,500 $5,000 $6,000 $4,000 Purchase from Insurance Provider 3
This slide is 100% editable. Adapt it to your needs and capture your audience's attention.
33
60%
51%
71%
75%
42%
51%
Text Here
Labor
Force
Equipment
Oprator
Human
Resourse
Architect
Engineer
67%
31%
73%
50%
38%
62%
519
Women
412
Men 971
Full Time People
932.23
Full Time
Equivalent Staff
6Working
Days per week
127
Part-Time Staff
Median Salary for
Men
Women
Text here
Text here
Workforce Requirement
purpose of this slide is to analyze the workforce requirement of the construction project, the provided slide analyses the diversity of workforce along with the salary and working hours per day.
This graph/chart is linked to excel, and changes automatically based on data. Just left click on it and select “Edit Data”.
34
Hiring Plan for Construction Project
The following slide analysis multiple platforms for recruitment by highlighting the various forms of recruitment such as Internal recruitment, external recruitment, social and web recruitment and print
advertisement.
Our
Requirements
✓ On-site Engineers : 15
✓ Machinery Operators : 25
✓ Accountants : 5
✓ Human Resource Personal : 2
✓ Add Text Here : XX
✓ Construction Workers : 200
Recruitment
Platforms
Internal Recruitment
✓ Promote current employees
✓ Offer temporary employee
permanent contract
✓ Hire retired employee as freelancer
✓ Add text here
External Recruitment
✓ Outsourcing the employment
✓ Hiring through school college and universities
✓ Add text here
✓ Add text here
Social & Web Recruitment
✓ E-mail
✓ Social media platform: Facebook, Twitter & LinkedIn
✓ Online Recruitment Portals
✓ Company Website
✓ Add text here
Print Advertisement
✓ News Paper
✓ Magazines
✓ Pamphlets
✓ Add text here
✓ Add text here
This slide is 100% editable. Adapt it to your needs and capture your audience's attention.
35
Construction Phase in Construction
Management
36
Construction Site Access and Layout
The following slide displays a map of the entire construction site shows various areas such as entry point, the office space, excavation ground etc to ensure the smooth and safe functioning of the project.
Details
House Foundation- 25,000 Sq. ft
Office Space- 3*500 Sq. ft
Steel Depot- 1,000 sq. ft
Add text here
Add text here
This slide is 100% editable. Adapt it to your needs and capture your audience's attention.
37
Construction Process for Construction Management
The following slide displays the construction process of the organization along with a timeline.
This slide is 100% editable. Adapt it to your needs and capture your audience's attention.
38
Selecting a Contractor Financing
Windows &
Exterior Doors
HVAC
Plans
Site Preparation
Permits & Insurance
Foundation
Framing
Roof & Siding
Interior
Exterior Paint
Landscaping
Punch List
Finished Project
Warranty Period
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec
Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec
Jan
Feb
2020
2021
2022
Inspections
Utilities
20 Feb
Post Construction Commissioning
The purpose of the following slide is to display the process of commissioning during after the completion of construction project.
This slide is 100% editable. Adapt it to your needs and capture your audience's attention.
Commissioning by Project Phase
Pre- Design
Build
Commissioning Team
OPR+ BOD
Development
Design
Develop Overall
Commissioning Plan
Develop Level 1,2,3
Commissioning
Documents
Review Design for
Commissioning
Readiness
Construction
Execute Level 1,2,3
Commissioning
Develop Level 4 & 5
Commissioning Script
Commissioning
Execute Level 4 & 5
Commissioning
Rest to Normal
Configuration
Final Site
Clean Up
Turnover/
Re-Commissioning
Verify IT Equipment
Dual Corded
Develop
Commissioning Script
Execute
Commissioning
Activities
39
Construction Project Team
The purpose of the following slide is to show the entire construction project team . The team members can be C Level individual, Architects Designers and Contractors.
Champions
Project Manager/
Client Representative
Project Sponsor
Project Board
Contractor
Sub- Contractor Suppliers
User Panels
Lead Consultant
Other Consultants Lead Designer
✓ Cost Consultant
✓ CDM Co- Ordinator
✓ Specialist
Consultants ✓ Architect
✓ Services Engineer
✓ Structural Engineer
✓ Specialist Designers
Design Team
Board of Directors
Independent
Client Advisers
This slide is 100% editable. Adapt it to your needs and capture your audience's attention.
40
Table of Content
✓ Risk Identification
✓ Risk Impact and Likelihood Matrix
✓ Risk Mitigation Strategies
05. Risk Analysis
41
Risk Identification for Construction Management
The purpose of the following slide is to identify the various risks that are associated with the construction project. The risk can financial, socio Political, Environmental and construction related.
This slide is 100% editable. Adapt it to your needs and capture your audience's attention.
42
Risk Identification
for
Construction
Management
Environmental Risk
✓ Natural Disasters
✓ Recession
✓ War
✓ Add Text Here
Construction Related Risk
✓ Material Shortage
✓ Labor Union Strike
✓ Unwanted Delay in Construction
Work
✓ Add Text Here
Financial Risk
✓ Shortfall of Investment
✓ Poor Performance of
Economy
✓ Budget Deficit
✓ Low Sale of Project
✓ Add Text Here
✓ Add Text Here
Socio Political Risk
✓ Regulatory Compliances
✓ Change in Rules &
Regulations
✓ Taxes
✓ Add Text Here
✓ Add Text Here
Construction Risk Impact and Likelihood Matrix
The purpose of the following slide is to analyze the impact and likelihood of multiple risks that may effect organization.
Insignificant Minor Moderate Major Catastrophic
Almost certain Add text here Add text here
Unwanted delay in
construction work
Labor union strike Material shortage
Likely Add text here Add text here Add text here Add text here Add text here
Possible Add text here Financial shortfall Budget deficit Add text here Add text here
Unlikely Add text here Add text here Add text here Add text here Add text here
Rare Recession Regulatory compliances War Add text here Add text here
Likelihood
Impact/ Consequences
This slide is 100% editable. Adapt it to your needs and capture your audience's attention.
43
Risk Mitigation Strategies for Construction Management
The purpose of this slide is to show various mitigation strategies for multiple risks such as investment shortfall, labor force strike etc.
Risk Mitigation Strategy Comments
Investment Shortfall
✓ Reserves for financial deficit
✓ Fund raising through selling apartments & providing possession
upon full construction
✓ Add comments here
✓ Add comment here
Labor Force Strike
✓ Strike insurance to prevent losses that might be incurred during
strike
✓ Setting up a negotiation committee for negotiations with the
labor union
✓ Add comments here
✓ Add comment here
Budget Deficit
✓ Reduction in miscellaneous expenses
✓ Reconsideration of budgetary policy
✓ Add comments here
✓ Add comment here
Damages due to Natural Disaster
✓ Insurance with vendor who provides human machinery & liability
insurance
✓ Add text here
✓ Add comments here
✓ Add comment here
Add Text Here
✓ Add text here
✓ Add text here
✓ Add comments here
✓ Add comment here
Add Text Here
✓ Add text here
✓ Add text here
✓ Add comments here
✓ Add comment here
This slide is 100% editable. Adapt it to your needs and capture your audience's attention.
44
Table of Content
✓ Quality Assurance of Sale Process
✓ Quality Assurance Process
06. Quality Assurance Plan
45
Quality Assurance Plan in Sales
The purpose of the following slide is to show the entire process quality assurance in sales. The provided flowchart shows a 4 steps of ensuring quality.
Quality Control Flowchart
Quality Maintenance along the Process
This slide is 100% editable. Adapt it to your needs and capture your audience's attention.
46
Customer Satisfaction
Survey and Management
Customer Complaint
Management
Step 1 Step 2
Design Quality Control
Process Point
Assessment
Revision of Design
Revision
Management
After- sales
Quality Control
Step 4
Supply Chain Quality Control
Supplier
Quality Control
Incoming Material
Quality Control
Staff Training
and
Assessment
Inspection
and Approval
Step 3
Press Quality Control
Production
Preparation Inspection
Production Flow
Revision Management
Process
Quality Control
Quality Assurance Process for Construction Management
The purpose of the following slide is to show the entire process quality assurance in construction process . The provided process shows the construction quality plan and material inspection and test
plan.
This slide is 100% editable. Adapt it to your needs and capture your audience's attention.
Construction Quality Control Plans Inspection & Test Plan
47
Table of Content
✓ Identifying the Type of Waste in Construction Management
✓ Construction Waste Management Plan
07. Construction Waste Management
48
Identifying the type of Waste in Construction Management
The purpose of the following slide is to Categorize different types of wate that can be generated during the construction project. These waste can be wood,glass and plastic.
Types of
Construction
Waste
Construction Waste
✓ Concrete: Non-Hazardous
✓ Bricks: Non-Hazardous
✓ Tiles & Ceramics: Non-Hazardous
✓ Add text here
✓ Add text here
Wood, Glass & Plastic
✓ Untreated Woods: Non-Hazardous
✓ Uncontaminated Glass: Non-hazardous
✓ Treated Woods: Hazardous Waste
✓ Treated Glass: Hazardous Waste
✓ Add text here
Add Text Here
✓ Add text here
✓ Add text here
✓ Add text here
✓ Add text here
Add Text Here
✓ Add text here
✓ Add text here
✓ Add text here
✓ Add text here
This slide is 100% editable. Adapt it to your needs and capture your audience's attention.
49
Waste Description Re-Use Onsite Off-site Recycle On Site Off-Site Dispose On Site Off-Site
Bricks Yes Yes Yes
Add Text Here Yes Yes Yes
Add Text Here Yes Yes Yes
Plastic Pipes Yes Yes Yes
Plastic Wirings Yes Yes Yes
Add Text Here Yes Yes Yes
Bio-Chemical Yes Yes Yes
Lead Yes Yes Yes
Add Text Here Yes Yes
Construction Waste Management Plan
The purpose of the following slide is to display a waste management plan for the construction project. The provided table highlights the 3 categories of waste that are Inert, Non- Hazard and Hazard.
Inert
Non-
Hazard
Hazard
This slide is 100% editable. Adapt it to your needs and capture your audience's attention.
50
Table of Content
08. Measuring our Efforts
51
Projected Launch Date
107 Days
Friday,15th December
Completed
Planning
Completed
Design
Waiting
Commissioning
Pre-Construction 67% In Progress
Project Management Dashboard
The following slide displays the project management dashboard that tracks multiple activates of the project. It highlights the project launch date, the overdue task and project budget.
Overdue Task Deadline Employee
1 Day Add text here 2017-08-15 Paula
4 Days Add text here 2017-08-06 Kate
10 Days Add text here 2017-08-01 Nancy
24 Days Add text here 2017-07-18 George
Employee Task Deadline Workload
Kate Add text here 2017-08-15
George Add text here 2017-08-06
Nancy Add text here 2017-08-01
Paula Add text here 2017-07-18
67%
55%
48% 45%
30%
George Nancy Richard Kate Paula
$0K
$20K
$40K
$60K
Total Budget Budget Amont Used Target Amount Used
Total Budget- $52,000
Remaining- $87,70
Currently- 8.1% (Over Target)
Overdue Task
Upcoming Deadlines
Project Budget
Workload
34%
56%
15%
11%
This graph/chart is linked to excel, and changes automatically based on data. Just left click on it and select “Edit Data”.
52
Construction Project Management Icons Slide
53
Additional Slides
01. Clustered Bar
02. Stacked Column
03. Magnifying Glass
04. Timeline
05. Our Mission
06. Post It Notes
07. Our Financial
08. Venn
09. Thank you
54
Clustered Bar
0 0.5 1 1.5 2 2.5 3 3.5 4 4.5 5
Category 1
Category 2
Category 3
Category 4
Sales
Product 01
Product 02
Product 01
This graph/chart is linked to excel, and
changes automatically based on data.
Just left click on it and select “Edit Data”.
Product 02
This graph/chart is linked to excel, and
changes automatically based on data.
Just left click on it and select “Edit Data”.
55
Stacked Column
Product 01
This graph/chart is linked to excel, and
changes automatically based on data.
Just left click on it and select “Edit Data”.
Product 02
This graph/chart is linked to excel, and
changes automatically based on data.
Just left click on it and select “Edit Data”.
4.3
2.5
-3.5
-4.5
2.4
4.4
-1.8
-0.8
-6
-4
-2
0
2
4
6
8
Sales
Product
01
Product
02
56
Magnifying Glass
01
This slide is 100%
editable. Adapt it to
your needs and
capture your
audience's attention.
Text Here
02
This slide is 100%
editable. Adapt it to
your needs and
capture your
audience's attention.
Text Here
03
This slide is 100%
editable. Adapt it to
your needs and
capture your
audience's attention.
Text Here
04
This slide is 100%
editable. Adapt it to
your needs and
capture your
audience's attention.
Text Here
57
Timeline
2016 2017 2018 2019 2020
Text Here
This slide is 100% editable.
Adapt it to your needs
and capture your
audience's attention.
Text Here
This slide is 100% editable.
Adapt it to your needs
and capture your
audience's attention.
Text Here
This slide is 100% editable.
Adapt it to your needs
and capture your
audience's attention.
Text Here
This slide is 100% editable.
Adapt it to your needs
and capture your
audience's attention.
Text Here
This slide is 100% editable.
Adapt it to your needs
and capture your
audience's attention.
58
Our Mission
Mission
This slide is 100% editable. Adapt it to your
needs and capture your audience's attention.
Goal
This slide is 100% editable. Adapt it to your
needs and capture your audience's attention.
Vision
This slide is 100% editable. Adapt it to your
needs and capture your audience's attention.
59
Post It Notes
Text Here
This slide is 100%
editable. Adapt it to
your needs and
capture your
audience's attention.
Text Here
This slide is 100%
editable. Adapt it to
your needs and
capture your
audience's attention.
Text Here
This slide is 100%
editable. Adapt it to
your needs and
capture your
audience's attention.
Text Here
This slide is 100%
editable. Adapt it to
your needs and
capture your
audience's attention.
60
Our Financial
79%
56%
39%
15%
This slide is 100% editable. Adapt it to your needs
and capture your audience's attention.
Text Here
This slide is 100% editable. Adapt it to your needs
and capture your audience's attention.
Text Here
This slide is 100% editable. Adapt it to your needs
and capture your audience's attention.
Text Here
This slide is 100% editable. Adapt it to your needs
and capture your audience's attention.
Text Here
61
Venn
25%
75%
35%
This slide is 100%
editable. Adapt it to
your needs and
capture your
audience's attention.
Text Here
This slide is 100%
editable. Adapt it to
your needs and
capture your
audience's attention.
Text Here
This slide is 100%
editable. Adapt it to
your needs and
capture your
audience's attention.
Text Here
62
Thank You
Address
# street number, city, state
Contact Number
0123456789
Email Address
emailaddress123@gmail.com
63

Más contenido relacionado

La actualidad más candente

Construction phases
Construction phasesConstruction phases
Construction phasesMeesum Zaidi
 
Stages In Construction
Stages In ConstructionStages In Construction
Stages In ConstructionAB MAKASANA
 
Construction process
Construction processConstruction process
Construction processMazen Al-Qadi
 
Construction Project Management
Construction Project ManagementConstruction Project Management
Construction Project Managementjohnkirth1898
 
Construction planning - Construction Technology and Project Management
Construction planning - Construction Technology and Project ManagementConstruction planning - Construction Technology and Project Management
Construction planning - Construction Technology and Project Managementsrinivas2036
 
An introduction to taking off building quantities
An introduction to taking off building quantities An introduction to taking off building quantities
An introduction to taking off building quantities Arshad Mohanut
 
Construction Management (1st Lecture)
Construction Management (1st Lecture) Construction Management (1st Lecture)
Construction Management (1st Lecture) Muhammad Aljalali
 
Construction project management
Construction project managementConstruction project management
Construction project managementSenthil Kannan
 
Construction Project management
Construction Project management Construction Project management
Construction Project management Anupama holla
 
Lecture 1 introduction to construction procurement process.
Lecture 1   introduction to construction procurement process.Lecture 1   introduction to construction procurement process.
Lecture 1 introduction to construction procurement process.Aszahari Aie
 
Construction productivity
Construction productivityConstruction productivity
Construction productivitySunil Manjeri
 
CONSTRUCTION PLANNING AND SCHEDULING-MODULE 1.pptx
CONSTRUCTION PLANNING AND SCHEDULING-MODULE 1.pptxCONSTRUCTION PLANNING AND SCHEDULING-MODULE 1.pptx
CONSTRUCTION PLANNING AND SCHEDULING-MODULE 1.pptxsurekha1287
 
Construction planning & management
Construction planning & managementConstruction planning & management
Construction planning & managementManit Agarwal
 
Construction Project Management
Construction Project Management Construction Project Management
Construction Project Management Rajat Nainwal
 
Construction project management
Construction project managementConstruction project management
Construction project managementsaif hasan
 
Types of Contract in Construction Management
Types of Contract in Construction ManagementTypes of Contract in Construction Management
Types of Contract in Construction ManagementShahin MB
 
Project management in construction
Project management in constructionProject management in construction
Project management in constructionNAVNEET KUMAR JHA
 

La actualidad más candente (20)

Construction phases
Construction phasesConstruction phases
Construction phases
 
Stages In Construction
Stages In ConstructionStages In Construction
Stages In Construction
 
Construction process
Construction processConstruction process
Construction process
 
Construction Project Management
Construction Project ManagementConstruction Project Management
Construction Project Management
 
TENDER DOCUMENT
TENDER DOCUMENTTENDER DOCUMENT
TENDER DOCUMENT
 
Construction planning - Construction Technology and Project Management
Construction planning - Construction Technology and Project ManagementConstruction planning - Construction Technology and Project Management
Construction planning - Construction Technology and Project Management
 
An introduction to taking off building quantities
An introduction to taking off building quantities An introduction to taking off building quantities
An introduction to taking off building quantities
 
Construction Management (1st Lecture)
Construction Management (1st Lecture) Construction Management (1st Lecture)
Construction Management (1st Lecture)
 
Construction project management
Construction project managementConstruction project management
Construction project management
 
Construction Project management
Construction Project management Construction Project management
Construction Project management
 
Lecture 1 introduction to construction procurement process.
Lecture 1   introduction to construction procurement process.Lecture 1   introduction to construction procurement process.
Lecture 1 introduction to construction procurement process.
 
Construction productivity
Construction productivityConstruction productivity
Construction productivity
 
CONSTRUCTION PLANNING AND SCHEDULING-MODULE 1.pptx
CONSTRUCTION PLANNING AND SCHEDULING-MODULE 1.pptxCONSTRUCTION PLANNING AND SCHEDULING-MODULE 1.pptx
CONSTRUCTION PLANNING AND SCHEDULING-MODULE 1.pptx
 
Quantity take off
Quantity take offQuantity take off
Quantity take off
 
Construction planning & management
Construction planning & managementConstruction planning & management
Construction planning & management
 
Construction Project Management
Construction Project Management Construction Project Management
Construction Project Management
 
Construction project management
Construction project managementConstruction project management
Construction project management
 
Types of Contract in Construction Management
Types of Contract in Construction ManagementTypes of Contract in Construction Management
Types of Contract in Construction Management
 
Project management in construction
Project management in constructionProject management in construction
Project management in construction
 
WORKS MANAGEMENT IN CPWD PART-I
WORKS MANAGEMENT IN CPWD PART-IWORKS MANAGEMENT IN CPWD PART-I
WORKS MANAGEMENT IN CPWD PART-I
 

Similar a Construction Project Management

Construction Management PowerPoint Presentation Slides
Construction Management PowerPoint Presentation SlidesConstruction Management PowerPoint Presentation Slides
Construction Management PowerPoint Presentation SlidesSlideTeam
 
Concrete Driveway Construction Proposal PowerPoint Presentation Slides
Concrete Driveway Construction Proposal PowerPoint Presentation SlidesConcrete Driveway Construction Proposal PowerPoint Presentation Slides
Concrete Driveway Construction Proposal PowerPoint Presentation SlidesSlideTeam
 
How To Prioritize Project Activities Powerpoint Presentation Slides
How To Prioritize Project Activities Powerpoint Presentation SlidesHow To Prioritize Project Activities Powerpoint Presentation Slides
How To Prioritize Project Activities Powerpoint Presentation SlidesSlideTeam
 
Structural Engineering Project Proposal PowerPoint Presentation Slides
Structural Engineering Project Proposal PowerPoint Presentation SlidesStructural Engineering Project Proposal PowerPoint Presentation Slides
Structural Engineering Project Proposal PowerPoint Presentation SlidesSlideTeam
 
Website Handling And Maintenance Proposal PowerPoint Presentation Slides
Website Handling And Maintenance Proposal PowerPoint Presentation SlidesWebsite Handling And Maintenance Proposal PowerPoint Presentation Slides
Website Handling And Maintenance Proposal PowerPoint Presentation SlidesSlideTeam
 
Engineering Service Proposal Template PowerPoint Presentation Slides
Engineering Service Proposal Template PowerPoint Presentation SlidesEngineering Service Proposal Template PowerPoint Presentation Slides
Engineering Service Proposal Template PowerPoint Presentation SlidesSlideTeam
 
Engineering Project Proposal Template PowerPoint Presentation Slides
Engineering Project Proposal Template PowerPoint Presentation SlidesEngineering Project Proposal Template PowerPoint Presentation Slides
Engineering Project Proposal Template PowerPoint Presentation SlidesSlideTeam
 
Website Development Proposal PowerPoint Presentation Slides
Website Development Proposal PowerPoint Presentation SlidesWebsite Development Proposal PowerPoint Presentation Slides
Website Development Proposal PowerPoint Presentation SlidesSlideTeam
 
Concrete Proposal Template PowerPoint Presentation Slides
Concrete Proposal Template PowerPoint Presentation SlidesConcrete Proposal Template PowerPoint Presentation Slides
Concrete Proposal Template PowerPoint Presentation SlidesSlideTeam
 
Proposal For Project Cost Breakdown PowerPoint Presentation Slides
Proposal For Project Cost Breakdown PowerPoint Presentation SlidesProposal For Project Cost Breakdown PowerPoint Presentation Slides
Proposal For Project Cost Breakdown PowerPoint Presentation SlidesSlideTeam
 
Civil Engineering Construction Proposal PowerPoint Presentation Slides
Civil Engineering Construction Proposal PowerPoint Presentation SlidesCivil Engineering Construction Proposal PowerPoint Presentation Slides
Civil Engineering Construction Proposal PowerPoint Presentation SlidesSlideTeam
 
Civil Engineering Project Proposal PowerPoint Presentation Slides
Civil Engineering Project Proposal PowerPoint Presentation SlidesCivil Engineering Project Proposal PowerPoint Presentation Slides
Civil Engineering Project Proposal PowerPoint Presentation SlidesSlideTeam
 
Proposal For Project Cost PowerPoint Presentation Slides
 Proposal For Project Cost PowerPoint Presentation Slides Proposal For Project Cost PowerPoint Presentation Slides
Proposal For Project Cost PowerPoint Presentation SlidesSlideTeam
 
Business Transformation Proposal PowerPoint Presentation Slides
Business Transformation Proposal PowerPoint Presentation SlidesBusiness Transformation Proposal PowerPoint Presentation Slides
Business Transformation Proposal PowerPoint Presentation SlidesSlideTeam
 
Business Transformation Proposal Powerpoint Presentation Slides
Business Transformation Proposal Powerpoint Presentation SlidesBusiness Transformation Proposal Powerpoint Presentation Slides
Business Transformation Proposal Powerpoint Presentation SlidesSlideTeam
 
Construction Services And Maintenance Proposal PowerPoint Presentation Slides
Construction Services And Maintenance Proposal PowerPoint Presentation SlidesConstruction Services And Maintenance Proposal PowerPoint Presentation Slides
Construction Services And Maintenance Proposal PowerPoint Presentation SlidesSlideTeam
 
House Transformation Proposal PowerPoint Presentation Slides
House Transformation Proposal PowerPoint Presentation SlidesHouse Transformation Proposal PowerPoint Presentation Slides
House Transformation Proposal PowerPoint Presentation SlidesSlideTeam
 
Project Conclusion PowerPoint Presentation Slides
Project Conclusion PowerPoint Presentation SlidesProject Conclusion PowerPoint Presentation Slides
Project Conclusion PowerPoint Presentation SlidesSlideTeam
 
Transformation Implementation Proposal PowerPoint Presentation Slides
Transformation Implementation Proposal PowerPoint Presentation SlidesTransformation Implementation Proposal PowerPoint Presentation Slides
Transformation Implementation Proposal PowerPoint Presentation SlidesSlideTeam
 
Project Conclusion Powerpoint Presentation Slides
Project Conclusion Powerpoint Presentation SlidesProject Conclusion Powerpoint Presentation Slides
Project Conclusion Powerpoint Presentation SlidesSlideTeam
 

Similar a Construction Project Management (20)

Construction Management PowerPoint Presentation Slides
Construction Management PowerPoint Presentation SlidesConstruction Management PowerPoint Presentation Slides
Construction Management PowerPoint Presentation Slides
 
Concrete Driveway Construction Proposal PowerPoint Presentation Slides
Concrete Driveway Construction Proposal PowerPoint Presentation SlidesConcrete Driveway Construction Proposal PowerPoint Presentation Slides
Concrete Driveway Construction Proposal PowerPoint Presentation Slides
 
How To Prioritize Project Activities Powerpoint Presentation Slides
How To Prioritize Project Activities Powerpoint Presentation SlidesHow To Prioritize Project Activities Powerpoint Presentation Slides
How To Prioritize Project Activities Powerpoint Presentation Slides
 
Structural Engineering Project Proposal PowerPoint Presentation Slides
Structural Engineering Project Proposal PowerPoint Presentation SlidesStructural Engineering Project Proposal PowerPoint Presentation Slides
Structural Engineering Project Proposal PowerPoint Presentation Slides
 
Website Handling And Maintenance Proposal PowerPoint Presentation Slides
Website Handling And Maintenance Proposal PowerPoint Presentation SlidesWebsite Handling And Maintenance Proposal PowerPoint Presentation Slides
Website Handling And Maintenance Proposal PowerPoint Presentation Slides
 
Engineering Service Proposal Template PowerPoint Presentation Slides
Engineering Service Proposal Template PowerPoint Presentation SlidesEngineering Service Proposal Template PowerPoint Presentation Slides
Engineering Service Proposal Template PowerPoint Presentation Slides
 
Engineering Project Proposal Template PowerPoint Presentation Slides
Engineering Project Proposal Template PowerPoint Presentation SlidesEngineering Project Proposal Template PowerPoint Presentation Slides
Engineering Project Proposal Template PowerPoint Presentation Slides
 
Website Development Proposal PowerPoint Presentation Slides
Website Development Proposal PowerPoint Presentation SlidesWebsite Development Proposal PowerPoint Presentation Slides
Website Development Proposal PowerPoint Presentation Slides
 
Concrete Proposal Template PowerPoint Presentation Slides
Concrete Proposal Template PowerPoint Presentation SlidesConcrete Proposal Template PowerPoint Presentation Slides
Concrete Proposal Template PowerPoint Presentation Slides
 
Proposal For Project Cost Breakdown PowerPoint Presentation Slides
Proposal For Project Cost Breakdown PowerPoint Presentation SlidesProposal For Project Cost Breakdown PowerPoint Presentation Slides
Proposal For Project Cost Breakdown PowerPoint Presentation Slides
 
Civil Engineering Construction Proposal PowerPoint Presentation Slides
Civil Engineering Construction Proposal PowerPoint Presentation SlidesCivil Engineering Construction Proposal PowerPoint Presentation Slides
Civil Engineering Construction Proposal PowerPoint Presentation Slides
 
Civil Engineering Project Proposal PowerPoint Presentation Slides
Civil Engineering Project Proposal PowerPoint Presentation SlidesCivil Engineering Project Proposal PowerPoint Presentation Slides
Civil Engineering Project Proposal PowerPoint Presentation Slides
 
Proposal For Project Cost PowerPoint Presentation Slides
 Proposal For Project Cost PowerPoint Presentation Slides Proposal For Project Cost PowerPoint Presentation Slides
Proposal For Project Cost PowerPoint Presentation Slides
 
Business Transformation Proposal PowerPoint Presentation Slides
Business Transformation Proposal PowerPoint Presentation SlidesBusiness Transformation Proposal PowerPoint Presentation Slides
Business Transformation Proposal PowerPoint Presentation Slides
 
Business Transformation Proposal Powerpoint Presentation Slides
Business Transformation Proposal Powerpoint Presentation SlidesBusiness Transformation Proposal Powerpoint Presentation Slides
Business Transformation Proposal Powerpoint Presentation Slides
 
Construction Services And Maintenance Proposal PowerPoint Presentation Slides
Construction Services And Maintenance Proposal PowerPoint Presentation SlidesConstruction Services And Maintenance Proposal PowerPoint Presentation Slides
Construction Services And Maintenance Proposal PowerPoint Presentation Slides
 
House Transformation Proposal PowerPoint Presentation Slides
House Transformation Proposal PowerPoint Presentation SlidesHouse Transformation Proposal PowerPoint Presentation Slides
House Transformation Proposal PowerPoint Presentation Slides
 
Project Conclusion PowerPoint Presentation Slides
Project Conclusion PowerPoint Presentation SlidesProject Conclusion PowerPoint Presentation Slides
Project Conclusion PowerPoint Presentation Slides
 
Transformation Implementation Proposal PowerPoint Presentation Slides
Transformation Implementation Proposal PowerPoint Presentation SlidesTransformation Implementation Proposal PowerPoint Presentation Slides
Transformation Implementation Proposal PowerPoint Presentation Slides
 
Project Conclusion Powerpoint Presentation Slides
Project Conclusion Powerpoint Presentation SlidesProject Conclusion Powerpoint Presentation Slides
Project Conclusion Powerpoint Presentation Slides
 

Más de SlideTeam

Customer Support And Services Guide Powerpoint Presentation Slides
Customer Support And Services Guide Powerpoint Presentation SlidesCustomer Support And Services Guide Powerpoint Presentation Slides
Customer Support And Services Guide Powerpoint Presentation SlidesSlideTeam
 
Word Of Mouth WOM Marketing Strategies To Build Brand Awareness Powerpoint Pr...
Word Of Mouth WOM Marketing Strategies To Build Brand Awareness Powerpoint Pr...Word Of Mouth WOM Marketing Strategies To Build Brand Awareness Powerpoint Pr...
Word Of Mouth WOM Marketing Strategies To Build Brand Awareness Powerpoint Pr...SlideTeam
 
Strategic Staff Engagement Action Plan Powerpoint Presentation Slides
Strategic Staff Engagement Action Plan Powerpoint Presentation SlidesStrategic Staff Engagement Action Plan Powerpoint Presentation Slides
Strategic Staff Engagement Action Plan Powerpoint Presentation SlidesSlideTeam
 
Traditional Marketing Channel Analysis Powerpoint Presentation Slides Mkt Cd
Traditional Marketing Channel Analysis Powerpoint Presentation Slides Mkt CdTraditional Marketing Channel Analysis Powerpoint Presentation Slides Mkt Cd
Traditional Marketing Channel Analysis Powerpoint Presentation Slides Mkt CdSlideTeam
 
Integrating Asset Tracking System To Enhance Operational Effectiveness Comple...
Integrating Asset Tracking System To Enhance Operational Effectiveness Comple...Integrating Asset Tracking System To Enhance Operational Effectiveness Comple...
Integrating Asset Tracking System To Enhance Operational Effectiveness Comple...SlideTeam
 
Designing And Implementing Brand Leadership Strategy Powerpoint Presentation ...
Designing And Implementing Brand Leadership Strategy Powerpoint Presentation ...Designing And Implementing Brand Leadership Strategy Powerpoint Presentation ...
Designing And Implementing Brand Leadership Strategy Powerpoint Presentation ...SlideTeam
 
How Amazon Generates Revenues Across Globe Powerpoint Presentation Slides Str...
How Amazon Generates Revenues Across Globe Powerpoint Presentation Slides Str...How Amazon Generates Revenues Across Globe Powerpoint Presentation Slides Str...
How Amazon Generates Revenues Across Globe Powerpoint Presentation Slides Str...SlideTeam
 
Guide For Effective Event Marketing Powerpoint Presentation Slides Mkt Cd
Guide For Effective Event Marketing Powerpoint Presentation Slides Mkt CdGuide For Effective Event Marketing Powerpoint Presentation Slides Mkt Cd
Guide For Effective Event Marketing Powerpoint Presentation Slides Mkt CdSlideTeam
 
Managing Business Customers Technology Powerpoint Presentation Slides
Managing Business Customers Technology Powerpoint Presentation SlidesManaging Business Customers Technology Powerpoint Presentation Slides
Managing Business Customers Technology Powerpoint Presentation SlidesSlideTeam
 
Unearthing Apples Billion Dollar Branding Secret Powerpoint Presentation Slid...
Unearthing Apples Billion Dollar Branding Secret Powerpoint Presentation Slid...Unearthing Apples Billion Dollar Branding Secret Powerpoint Presentation Slid...
Unearthing Apples Billion Dollar Branding Secret Powerpoint Presentation Slid...SlideTeam
 
Developing Flexible Working Practices To Improve Employee Engagement Powerpoi...
Developing Flexible Working Practices To Improve Employee Engagement Powerpoi...Developing Flexible Working Practices To Improve Employee Engagement Powerpoi...
Developing Flexible Working Practices To Improve Employee Engagement Powerpoi...SlideTeam
 
Product Corporate And Umbrella Branding Powerpoint Presentation Slides Brandi...
Product Corporate And Umbrella Branding Powerpoint Presentation Slides Brandi...Product Corporate And Umbrella Branding Powerpoint Presentation Slides Brandi...
Product Corporate And Umbrella Branding Powerpoint Presentation Slides Brandi...SlideTeam
 
Communication Channels And Strategies For Shareholder Engagement Powerpoint P...
Communication Channels And Strategies For Shareholder Engagement Powerpoint P...Communication Channels And Strategies For Shareholder Engagement Powerpoint P...
Communication Channels And Strategies For Shareholder Engagement Powerpoint P...SlideTeam
 
Responsible Tech Playbook To Leverage Business Ethics Powerpoint Presentation...
Responsible Tech Playbook To Leverage Business Ethics Powerpoint Presentation...Responsible Tech Playbook To Leverage Business Ethics Powerpoint Presentation...
Responsible Tech Playbook To Leverage Business Ethics Powerpoint Presentation...SlideTeam
 
Generating Leads Through Targeted Digital Marketing Campaign Powerpoint Prese...
Generating Leads Through Targeted Digital Marketing Campaign Powerpoint Prese...Generating Leads Through Targeted Digital Marketing Campaign Powerpoint Prese...
Generating Leads Through Targeted Digital Marketing Campaign Powerpoint Prese...SlideTeam
 
Boosting Profits With New And Effective Sales Strategic Plan Powerpoint Prese...
Boosting Profits With New And Effective Sales Strategic Plan Powerpoint Prese...Boosting Profits With New And Effective Sales Strategic Plan Powerpoint Prese...
Boosting Profits With New And Effective Sales Strategic Plan Powerpoint Prese...SlideTeam
 
ChatGPT IT Powerpoint Presentation Slides
ChatGPT IT Powerpoint Presentation SlidesChatGPT IT Powerpoint Presentation Slides
ChatGPT IT Powerpoint Presentation SlidesSlideTeam
 
Methods To Implement Traditional Marketing Powerpoint Presentation Slides Mkt Cd
Methods To Implement Traditional Marketing Powerpoint Presentation Slides Mkt CdMethods To Implement Traditional Marketing Powerpoint Presentation Slides Mkt Cd
Methods To Implement Traditional Marketing Powerpoint Presentation Slides Mkt CdSlideTeam
 
Comprehensive Guide To Sports Marketing Strategy Powerpoint Presentation Slid...
Comprehensive Guide To Sports Marketing Strategy Powerpoint Presentation Slid...Comprehensive Guide To Sports Marketing Strategy Powerpoint Presentation Slid...
Comprehensive Guide To Sports Marketing Strategy Powerpoint Presentation Slid...SlideTeam
 
Global Shift Towards Flexible Working Powerpoint Presentation Slides
Global Shift Towards Flexible Working Powerpoint Presentation SlidesGlobal Shift Towards Flexible Working Powerpoint Presentation Slides
Global Shift Towards Flexible Working Powerpoint Presentation SlidesSlideTeam
 

Más de SlideTeam (20)

Customer Support And Services Guide Powerpoint Presentation Slides
Customer Support And Services Guide Powerpoint Presentation SlidesCustomer Support And Services Guide Powerpoint Presentation Slides
Customer Support And Services Guide Powerpoint Presentation Slides
 
Word Of Mouth WOM Marketing Strategies To Build Brand Awareness Powerpoint Pr...
Word Of Mouth WOM Marketing Strategies To Build Brand Awareness Powerpoint Pr...Word Of Mouth WOM Marketing Strategies To Build Brand Awareness Powerpoint Pr...
Word Of Mouth WOM Marketing Strategies To Build Brand Awareness Powerpoint Pr...
 
Strategic Staff Engagement Action Plan Powerpoint Presentation Slides
Strategic Staff Engagement Action Plan Powerpoint Presentation SlidesStrategic Staff Engagement Action Plan Powerpoint Presentation Slides
Strategic Staff Engagement Action Plan Powerpoint Presentation Slides
 
Traditional Marketing Channel Analysis Powerpoint Presentation Slides Mkt Cd
Traditional Marketing Channel Analysis Powerpoint Presentation Slides Mkt CdTraditional Marketing Channel Analysis Powerpoint Presentation Slides Mkt Cd
Traditional Marketing Channel Analysis Powerpoint Presentation Slides Mkt Cd
 
Integrating Asset Tracking System To Enhance Operational Effectiveness Comple...
Integrating Asset Tracking System To Enhance Operational Effectiveness Comple...Integrating Asset Tracking System To Enhance Operational Effectiveness Comple...
Integrating Asset Tracking System To Enhance Operational Effectiveness Comple...
 
Designing And Implementing Brand Leadership Strategy Powerpoint Presentation ...
Designing And Implementing Brand Leadership Strategy Powerpoint Presentation ...Designing And Implementing Brand Leadership Strategy Powerpoint Presentation ...
Designing And Implementing Brand Leadership Strategy Powerpoint Presentation ...
 
How Amazon Generates Revenues Across Globe Powerpoint Presentation Slides Str...
How Amazon Generates Revenues Across Globe Powerpoint Presentation Slides Str...How Amazon Generates Revenues Across Globe Powerpoint Presentation Slides Str...
How Amazon Generates Revenues Across Globe Powerpoint Presentation Slides Str...
 
Guide For Effective Event Marketing Powerpoint Presentation Slides Mkt Cd
Guide For Effective Event Marketing Powerpoint Presentation Slides Mkt CdGuide For Effective Event Marketing Powerpoint Presentation Slides Mkt Cd
Guide For Effective Event Marketing Powerpoint Presentation Slides Mkt Cd
 
Managing Business Customers Technology Powerpoint Presentation Slides
Managing Business Customers Technology Powerpoint Presentation SlidesManaging Business Customers Technology Powerpoint Presentation Slides
Managing Business Customers Technology Powerpoint Presentation Slides
 
Unearthing Apples Billion Dollar Branding Secret Powerpoint Presentation Slid...
Unearthing Apples Billion Dollar Branding Secret Powerpoint Presentation Slid...Unearthing Apples Billion Dollar Branding Secret Powerpoint Presentation Slid...
Unearthing Apples Billion Dollar Branding Secret Powerpoint Presentation Slid...
 
Developing Flexible Working Practices To Improve Employee Engagement Powerpoi...
Developing Flexible Working Practices To Improve Employee Engagement Powerpoi...Developing Flexible Working Practices To Improve Employee Engagement Powerpoi...
Developing Flexible Working Practices To Improve Employee Engagement Powerpoi...
 
Product Corporate And Umbrella Branding Powerpoint Presentation Slides Brandi...
Product Corporate And Umbrella Branding Powerpoint Presentation Slides Brandi...Product Corporate And Umbrella Branding Powerpoint Presentation Slides Brandi...
Product Corporate And Umbrella Branding Powerpoint Presentation Slides Brandi...
 
Communication Channels And Strategies For Shareholder Engagement Powerpoint P...
Communication Channels And Strategies For Shareholder Engagement Powerpoint P...Communication Channels And Strategies For Shareholder Engagement Powerpoint P...
Communication Channels And Strategies For Shareholder Engagement Powerpoint P...
 
Responsible Tech Playbook To Leverage Business Ethics Powerpoint Presentation...
Responsible Tech Playbook To Leverage Business Ethics Powerpoint Presentation...Responsible Tech Playbook To Leverage Business Ethics Powerpoint Presentation...
Responsible Tech Playbook To Leverage Business Ethics Powerpoint Presentation...
 
Generating Leads Through Targeted Digital Marketing Campaign Powerpoint Prese...
Generating Leads Through Targeted Digital Marketing Campaign Powerpoint Prese...Generating Leads Through Targeted Digital Marketing Campaign Powerpoint Prese...
Generating Leads Through Targeted Digital Marketing Campaign Powerpoint Prese...
 
Boosting Profits With New And Effective Sales Strategic Plan Powerpoint Prese...
Boosting Profits With New And Effective Sales Strategic Plan Powerpoint Prese...Boosting Profits With New And Effective Sales Strategic Plan Powerpoint Prese...
Boosting Profits With New And Effective Sales Strategic Plan Powerpoint Prese...
 
ChatGPT IT Powerpoint Presentation Slides
ChatGPT IT Powerpoint Presentation SlidesChatGPT IT Powerpoint Presentation Slides
ChatGPT IT Powerpoint Presentation Slides
 
Methods To Implement Traditional Marketing Powerpoint Presentation Slides Mkt Cd
Methods To Implement Traditional Marketing Powerpoint Presentation Slides Mkt CdMethods To Implement Traditional Marketing Powerpoint Presentation Slides Mkt Cd
Methods To Implement Traditional Marketing Powerpoint Presentation Slides Mkt Cd
 
Comprehensive Guide To Sports Marketing Strategy Powerpoint Presentation Slid...
Comprehensive Guide To Sports Marketing Strategy Powerpoint Presentation Slid...Comprehensive Guide To Sports Marketing Strategy Powerpoint Presentation Slid...
Comprehensive Guide To Sports Marketing Strategy Powerpoint Presentation Slid...
 
Global Shift Towards Flexible Working Powerpoint Presentation Slides
Global Shift Towards Flexible Working Powerpoint Presentation SlidesGlobal Shift Towards Flexible Working Powerpoint Presentation Slides
Global Shift Towards Flexible Working Powerpoint Presentation Slides
 

Último

Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...Seta Wicaksana
 
Digital Transformation in the PLM domain - distrib.pdf
Digital Transformation in the PLM domain - distrib.pdfDigital Transformation in the PLM domain - distrib.pdf
Digital Transformation in the PLM domain - distrib.pdfJos Voskuil
 
Kenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith PereraKenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith Pereraictsugar
 
8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCR8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCRashishs7044
 
Ms Motilal Padampat Sugar Mills vs. State of Uttar Pradesh & Ors. - A Milesto...
Ms Motilal Padampat Sugar Mills vs. State of Uttar Pradesh & Ors. - A Milesto...Ms Motilal Padampat Sugar Mills vs. State of Uttar Pradesh & Ors. - A Milesto...
Ms Motilal Padampat Sugar Mills vs. State of Uttar Pradesh & Ors. - A Milesto...ShrutiBose4
 
Call Girls in DELHI Cantt, ( Call Me )-8377877756-Female Escort- In Delhi / Ncr
Call Girls in DELHI Cantt, ( Call Me )-8377877756-Female Escort- In Delhi / NcrCall Girls in DELHI Cantt, ( Call Me )-8377877756-Female Escort- In Delhi / Ncr
Call Girls in DELHI Cantt, ( Call Me )-8377877756-Female Escort- In Delhi / Ncrdollysharma2066
 
2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis Usage2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis UsageNeil Kimberley
 
Organizational Structure Running A Successful Business
Organizational Structure Running A Successful BusinessOrganizational Structure Running A Successful Business
Organizational Structure Running A Successful BusinessSeta Wicaksana
 
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCRashishs7044
 
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deckPitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deckHajeJanKamps
 
Marketplace and Quality Assurance Presentation - Vincent Chirchir
Marketplace and Quality Assurance Presentation - Vincent ChirchirMarketplace and Quality Assurance Presentation - Vincent Chirchir
Marketplace and Quality Assurance Presentation - Vincent Chirchirictsugar
 
International Business Environments and Operations 16th Global Edition test b...
International Business Environments and Operations 16th Global Edition test b...International Business Environments and Operations 16th Global Edition test b...
International Business Environments and Operations 16th Global Edition test b...ssuserf63bd7
 
Intro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdfIntro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdfpollardmorgan
 
Global Scenario On Sustainable and Resilient Coconut Industry by Dr. Jelfina...
Global Scenario On Sustainable  and Resilient Coconut Industry by Dr. Jelfina...Global Scenario On Sustainable  and Resilient Coconut Industry by Dr. Jelfina...
Global Scenario On Sustainable and Resilient Coconut Industry by Dr. Jelfina...ictsugar
 
8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCR8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCRashishs7044
 
PSCC - Capability Statement Presentation
PSCC - Capability Statement PresentationPSCC - Capability Statement Presentation
PSCC - Capability Statement PresentationAnamaria Contreras
 
Memorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQMMemorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQMVoces Mineras
 

Último (20)

Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...
 
Digital Transformation in the PLM domain - distrib.pdf
Digital Transformation in the PLM domain - distrib.pdfDigital Transformation in the PLM domain - distrib.pdf
Digital Transformation in the PLM domain - distrib.pdf
 
Kenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith PereraKenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith Perera
 
8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCR8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCR
 
Ms Motilal Padampat Sugar Mills vs. State of Uttar Pradesh & Ors. - A Milesto...
Ms Motilal Padampat Sugar Mills vs. State of Uttar Pradesh & Ors. - A Milesto...Ms Motilal Padampat Sugar Mills vs. State of Uttar Pradesh & Ors. - A Milesto...
Ms Motilal Padampat Sugar Mills vs. State of Uttar Pradesh & Ors. - A Milesto...
 
Call Girls in DELHI Cantt, ( Call Me )-8377877756-Female Escort- In Delhi / Ncr
Call Girls in DELHI Cantt, ( Call Me )-8377877756-Female Escort- In Delhi / NcrCall Girls in DELHI Cantt, ( Call Me )-8377877756-Female Escort- In Delhi / Ncr
Call Girls in DELHI Cantt, ( Call Me )-8377877756-Female Escort- In Delhi / Ncr
 
2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis Usage2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis Usage
 
Organizational Structure Running A Successful Business
Organizational Structure Running A Successful BusinessOrganizational Structure Running A Successful Business
Organizational Structure Running A Successful Business
 
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
 
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deckPitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
 
Call Us ➥9319373153▻Call Girls In North Goa
Call Us ➥9319373153▻Call Girls In North GoaCall Us ➥9319373153▻Call Girls In North Goa
Call Us ➥9319373153▻Call Girls In North Goa
 
Marketplace and Quality Assurance Presentation - Vincent Chirchir
Marketplace and Quality Assurance Presentation - Vincent ChirchirMarketplace and Quality Assurance Presentation - Vincent Chirchir
Marketplace and Quality Assurance Presentation - Vincent Chirchir
 
Japan IT Week 2024 Brochure by 47Billion (English)
Japan IT Week 2024 Brochure by 47Billion (English)Japan IT Week 2024 Brochure by 47Billion (English)
Japan IT Week 2024 Brochure by 47Billion (English)
 
International Business Environments and Operations 16th Global Edition test b...
International Business Environments and Operations 16th Global Edition test b...International Business Environments and Operations 16th Global Edition test b...
International Business Environments and Operations 16th Global Edition test b...
 
Intro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdfIntro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdf
 
Global Scenario On Sustainable and Resilient Coconut Industry by Dr. Jelfina...
Global Scenario On Sustainable  and Resilient Coconut Industry by Dr. Jelfina...Global Scenario On Sustainable  and Resilient Coconut Industry by Dr. Jelfina...
Global Scenario On Sustainable and Resilient Coconut Industry by Dr. Jelfina...
 
8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCR8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCR
 
PSCC - Capability Statement Presentation
PSCC - Capability Statement PresentationPSCC - Capability Statement Presentation
PSCC - Capability Statement Presentation
 
Memorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQMMemorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQM
 
No-1 Call Girls In Goa 93193 VIP 73153 Escort service In North Goa Panaji, Ca...
No-1 Call Girls In Goa 93193 VIP 73153 Escort service In North Goa Panaji, Ca...No-1 Call Girls In Goa 93193 VIP 73153 Escort service In North Goa Panaji, Ca...
No-1 Call Girls In Goa 93193 VIP 73153 Escort service In North Goa Panaji, Ca...
 

Construction Project Management

  • 2. Agenda of Construction Management Understand project scope and analyzing client requirement Analyze the understand all the phases of construction management and develop a plan for its efficient delivery Add text here Add text here Add text here 2
  • 3. Table of Content 01. Introduction 05. Risk Analysis 02. Project Analysis 06. Quality Assurance Plan 03. Regulatory Requirement 07. Construction Waste Management 04. Construction Phases 08. Measuring our Efforts 3
  • 4. Table of Content 01. Introduction ✓ Construction Project requirement and Deliverables ✓ Client Requirement for Construction Project ✓ Construction Project Scope & Description 4
  • 5. Construction Project Requirements and Deliverables The purpose of the following slide is to analyze the project based on its requirements and deliverables. The requirement can be construction of residential complex for 5000 people with parking of 2500 cars . The deliverable can be a 5 phased project plan. This slide is 100% editable. Adapt it to your needs and capture your audience's attention. Project Requirements ✓ Residential complex for 5000 people ✓ Parking complex for 2500 cars ✓ 20 commercial complex for shops ✓ Add text here ✓ Add text here ✓ Add text here Construction of residential project having the following facilities ✓ Design ✓ Pre-construction phase ✓ Procurement ✓ Construction phase ✓ Post construction ✓ Add text here The project can be completed within 5-year span by ABC Corp in 5 project phases Project Deliverables 5
  • 6. Construction Project Scope and Description The purpose of the following slide is to provide an overview of the construction project that is undertaken by the company, this slide analyses the description of the project, its location, the duration and cost. Project Duration ✓ Expected date of beginning- 6 March 2020 ✓ Expected end date- 6 March 2023 Project Cost ✓ USD – 3.5 MM Add Text Here ✓ Add Text Here ✓ Add Text Here Project Location Chicago, Illinois Add location here Project Description ✓ Construction of residential buildings & parking lots for 5,000 people ✓ Parking space for 250 vehicles ✓ Construction contract for of 5 years ✓ Add text here ✓ Add text here This slide is 100% editable. Adapt it to your needs and capture your audience's attention. 6
  • 7. Requirements that are Specified by Clients The following slide analyses the multiple requirements of client such as speed cost and time. The provided table highlights various client needs such as on-time procurement, Low cost of construction and on time project completion. Client Needs Description Comments On-Time Possession ✓ Fast & on time possession of the property ✓ Add text here ✓ Procurement of the residential complex within 2 year of initial investment ✓ Add text here Low Cost of Construction ✓ Low cost of the project ✓ Low material cost ✓ Low cost of construction equipment ✓ Low cost of the procuring the material for construction ✓ Add text here On-Time Project Completion ✓ Timely & effective completion & delivery of the project ✓ Add text here ✓ Add text here ✓ Add text here Add Text Here ✓ Add text here ✓ Add text here ✓ Add text here ✓ Add text here Add Text Here ✓ Add text here ✓ Add text here ✓ Add text here ✓ Add text here This slide is 100% editable. Adapt it to your needs and capture your audience's attention. 7
  • 8. Table of Content 02. Project Analysis ✓ Construction Project Cost Analysis ✓ Power & Electricity Requirement ✓ Structural Details of Construction Project ✓ Electricity Provider Rate Comparison 8
  • 9. Construction Project Cost Analysis (1/2) The following slide displays the various cost that are associated with the construction project these cost can be divided into two major parts such as sales price breakdown and construction cost breakdown. This slide is 100% editable. Adapt it to your needs and capture your audience's attention. 9 Sales Price Breakdown Average Finished Lot Cost (incl. financing cost) $67,551 Total Construction Cost $184,125 Financing Cost $6,669 Overhead & General Expenses $16,306 Marketing Cost $4,645 Text Here $ 10,174 Text Here $21,148 Construction Cost Breakdown Average Building Permit Fees $3,107 Impact Fee $2,850 Water and Sewer Inspection $2,952 Excavation, Foundation & Backfill $17,034 Steel $1,012 Framing & Trusses $24,904 Sheathing $2,142 Windows $6,148 Exterior Doors $2,150 Interior Doors & Hardware $2,883 Stairs $1,052 Roof Shingles $5,256 Siding $8,739 Gutters & Downspouts $870 Plumbing $10,990 Electrical Wiring $8,034 Lighting Fixtures $2,193 HVAC $8,760 Insulation $3,399 Drywall $8,125 Text Here $6,005 Text Here $10,395 Text Here $3,619 Text Here $8,363 Text Here $3,736 Other $19,487 Total XXXXXX
  • 10. Construction Project Cost Analysis (2/2) The following slide displays the various cost that are associated with the construction project. Various components of the cost can be labor ,construction equipment , procurement cost and travel cost. ITEM Mth-1 Mth-2 Mth-3 Mth-4 Mth-5 Mth-6 Mth-7 Mth-8 Mth-9 Mth-10 Mth-11 Mth-12 Labor 0 0 0 0 0 0 0 0 0 0 0 0 Equipment for Construction 0 0 0 0 0 0 0 0 0 0 0 0 Procurement Cost 0 0 0 0 0 0 0 0 0 0 0 0 Travel 0 0 0 0 0 0 0 0 0 0 0 0 Other 0 0 0 0 0 0 0 0 0 0 0 0 Total Cost 0 0 0 0 0 0 0 0 0 0 0 0 Accumulated Cost 0 0 0 0 0 0 0 0 0 0 0 0 Project: ABC Site Construction Date: 06-march-2020 This slide is 100% editable. Adapt it to your needs and capture your audience's attention. 10
  • 11. Structural Details of Construction Project The purpose of the following slide is to provide structural detail of the construction project. These project details include per square feet area of the construction complex, its description etc. This slide is 100% editable. Adapt it to your needs and capture your audience's attention. Area Description Area Per Sq. Ft Comments Residential Complex Residential 2bhk & 3bhk flats 25000 Add comments here Parking Space Parking space for 2500 cars 12000 Add comments here Commercial Complex Commercial Complex for 20 shops 3000 Add comments here Add text here Add text here XXXX Add comments here Add text here Add text here XXXX Add comments here 11
  • 12. Power and Electricity Requirement for Construction Project The following slide displays the power and electricity requirement of the project. The provided table displays multiple sources from which electricity can be generated. These sources can be solar panels, Geothermal power or wind energy. Energy Generation Mode Initial Cost of Procurement USD Maintenance Cost USD Comments Solar Panels 45,000 10,000 ✓ Long Battery life ✓ High Durability ✓ Add text Here Natural Gas 50,000 24,000 ✓ High Durability ✓ Can be Hazardous ✓ Add Text Here Add Text Here 60,000 15,000 ✓ High cost of procurement and implementation ✓ Low Durability Add Text Here XXXX XXXXX ✓ Add Text Here ✓ Add Text Here Requirement ✓ Number of Household - 300 ✓ Commercial Stores - 45 ✓ Light Poles - 120 ✓ Add Text Here - XXX ✓ Add Text Here - XXX ✓ Add Text Here - XXX This slide is 100% editable. Adapt it to your needs and capture your audience's attention. 12
  • 13. Electricity Provider Rate Comparison for Construction Management The purpose of the following slide is to compare multiple electricity provider in the area based on the IR cost per kilowatt , their rate flexibility and the minimum usage fee. Electricity Providers in State Cost Per Kilowatt Hour Fixed Rate of Variable Rate Minimum Usage Fees Add Parameter Here Electricity Provider 1 14 cent Fixed rate Yes Add text here Electricity Provider 2 20 cent Variable and fixed rate Yes Add text here Electricity Provider 3 12 cent Variable rates No Add text here Add Provider Here XXXX Add text here XX Add text here Add Provider Here XXXX Add text here XX Add text here This slide is 100% editable. Adapt it to your needs and capture your audience's attention. 13
  • 14. Table of Content ✓ Checklist for Certificates ✓ Construction Permit Application Process 03. Regulatory Requirement 14
  • 15. Certificate Checklist for Construction Project The The Purpose of this slide is to show the regulatory requirements that the organization needs to meet in order to initiate the project, the following table shows multiple regulations and whether the organization has them or not. Regulations & Permit Yes or No ABC Permit Yes Engineering & Architect License Yes General Contract Licensee Yes Trade Contract Licensee No US Federal Construction Project Yes Installation of: ✓ Alarms ✓ Fall Protection ✓ Ad Text Here Yes No Yes Add Text Here XXX Add Text Here XXX Add Text Here XXX Add Text Here XXX This slide is 100% editable. Adapt it to your needs and capture your audience's attention. 15
  • 16. Construction Permit Application Process following slide displays the application for construction permit and the entire application process. The following slide also highlights the stage in which the process is right now. This slide is 100% editable. Adapt it to your needs and capture your audience's attention. 16 Submit Permit Application Plans Reviewed for Code Compliance Non Compliant Compliant Corrections and Comments Provided Plans Stamped as Approved & Construction may Begin Revise and Resubmit drawings & Specifications Inspectio(S) Process Begins Does not Pass Inspection(s) Pass Inspection(s) Corrections Made in Field & Re-Inspected Certificate of Occupancy Issued Application Submitted on 31 Oct 2019 If Inspection not Approved Corrections to be made and re-inspection of the site is to be done Expected date of Application Approval 07 January 2020 Current Application Status Construction Map Approved, Site Inspection Pending
  • 17. Table of Content 04. Construction Phases ✓ Layout and Design ✓ Construction Phase ✓ Procurement ✓ Post Construction 17
  • 18. Layout and Design for Construction Project 18
  • 19. Total Complex Overview and Plan (1/2) The purpose of this slide is to display the layout and planning of the apartment of the new construction site. The slides also provides an overview of the plan provided. Overview 25000 square feet of residential space Residential space with 2BHK, 3bhk and penthouses Parking for 2500 vehicles Add text here Add text here This slide is 100% editable. Adapt it to your needs and capture your audience's attention. 19
  • 20. Total Complex Overview and Plan with Video Holder (2/2) The purpose of this slide is to display the layout and planning of the apartment of the new construction site. The slides also provides an overview of the plan provided. Overview 25000 square feet of residential space Residential space with 2BHK, 3bhk and penthouses Parking for 2500 vehicles Add text here Add text here This slide is 100% editable. Adapt it to your needs and capture your audience's attention. 20
  • 21. Building Layout and Plan (1/3) The purpose of this slide is to display the layout and planning of the apartment of the new construction site. The slides also provides an overview of the plan same. Overview 3 BHK Layout Add text here 2 Washrooms 3 Galleries Add text here This slide is 100% editable. Adapt it to your needs and capture your audience's attention. 21
  • 22. Overview 3 BHK Layout Add text here 2 Washrooms 3 Galleries Add text here Building Layout and Plan with Video Holder (2/3) The purpose of this slide is to display the layout and planning of the apartment of the new construction site. The slides also provides an overview of the plan same. This slide is 100% editable. Adapt it to your needs and capture your audience's attention. 22
  • 23. Overview 3 BHK Layout Add text here 2 Washrooms 3 Galleries Add text here Building Layout and Plan with Video Holder (3/3) The purpose of this slide is to display the layout and planning of the apartment of the new construction site. The slides also provides an overview of the plan provided. This slide is 100% editable. Adapt it to your needs and capture your audience's attention. 23
  • 24. Parking Layout and Plan (1/2) The purpose of this slide is to display the layout and planning of the parking space of the new construction site. The slides also provides an overview of the plan of the same. Overview Parking of 2500 vehicles 3 Parking spots per house occupants Open space parking for 1500 vehicles Underground parking for 1000 vehicles Underground vehicles parking height 7 Ft Add text here This slide is 100% editable. Adapt it to your needs and capture your audience's attention. 24
  • 25. Overview Parking of 2500 vehicles 3 Parking spots per house occupants Open space parking for 1500 vehicles Underground parking for 1000 vehicles Underground vehicles parking height 7 Ft Add text here Parking Layout and Plan with Video Holder (2/2) The purpose of this slide is to display the layout and planning of the apartment of the new construction site. The slides also provides an overview of the plan provided. This slide is 100% editable. Adapt it to your needs and capture your audience's attention. 25
  • 26. Storage Plan for Construction Management The following slide displays a storage plan for the construction site. The provided table highlights that material that needs to be stored, whether they will be stored On-Site or Off-Site. Material Onsite Offsite Storage Unit 1 Storage Unit 2 Warehouse Location Cement Bags Yes No No NA Wooden Logs Yes Yes No NA Steel Rods No Yes No NA Glass Panels No No Soft Storage Warehouse Chicago XYZ Avenue Add Text Here Add Text Here Add Text Here Add Text Here Add Text Here Add Text Here Add Text Here Add Text Here Add Text Here Add Text Here This slide is 100% editable. Adapt it to your needs and capture your audience's attention. 26
  • 27. Procurement Stage for Construction Management 27
  • 28. Material Required for Construction Project The following slide displays material required for the construction project along with the quantity required. This slide is 100% editable. Adapt it to your needs and capture your audience's attention. 28 $ 7,31,700 1000 SQFT. (Build up area) 16.5% Finishers ✓ Paint- 4.1% ✓ Tiles- 8.0% ✓ Bricks- 4.4% 24.6% Steel 12.3% Sand 22.8% Fittings ✓ Window- 3.0% ✓ Doors- 3.4% ✓ Plumbing- 5.5% ✓ Electrical- 6.6% ✓ CP+ Sanitary- 4.1% 16.4% Cement 7.4% Aggregates Gravel
  • 29. Quantity Required Vendor 1 USD per piece Vendor 2 USD per piece Vendor 3 USD per piece Selected Vendor Comments 10,000 Bags 18 17 16 Vendor 3 ✓ Add comments here ✓ Add comments here 20,000 Bags 11 10 15 Vendor 2 ✓ Add comments here ✓ Add comments here 5000 Bags 22 25 20 Vendor 3 ✓ Add comments here ✓ Add comments here 2,000 Beams 45 40 41 Vendor 2 ✓ Add comments here ✓ Add comments here 50 Ltrs. 40 35 38 Vendor 2 ✓ Add comments here ✓ Add comments here Na XX XX XX Add text here ✓ Add comments here ✓ Add comments here Vendor Selection for Construction Material The following slide compares multiple vendors through which the organization can procure its material. The provided table highlights multiple criteria such as the quality required and per piece cost. Finishing Material (Paint polisher) Cement Sand Aggregates Gravels Steel Fittings Material Required This slide is 100% editable. Adapt it to your needs and capture your audience's attention. 29
  • 30. Machinery Required for Construction Work The following slide displays machinery required for the construction project. These machineries can be earth moving equipment, Construction Vehicles, Material Handling Equipment etc. This slide is 100% editable. Adapt it to your needs and capture your audience's attention. Earth Moving Equipment ✓ Excavators ✓ Graders ✓ Loaders ✓ Skid Loader ✓ Backhoe ✓ Bulldozer Trenchers ✓ Scrapers Wheeled ✓ Loading Shovel Construction Vehicles ✓ Lorry ✓ Dumber ✓ Trailers ✓ Tanker ✓ Add Text Here Material Handling Equipment ✓ Crane ✓ Conveyors ✓ Hoists ✓ Forklift ✓ Add Text Here Construction Equipment ✓ Concrete Mixtures ✓ Compactors ✓ Paver ✓ Road Roller ✓ Add Text Here ✓ Add Text Here ✓ Add Text Here Add Text Here ✓ Add Text Here ✓ Add Text Here ✓ Add Text Here ✓ Add Text Here ✓ Add Text Here 30
  • 31. Equipment Quantity Owned Purchase Vendor 1 Pricing PP $ Vendor 2 Pricing PP $ Vendor 3 Pricing PP $ Comments Excavators 3 2 1 7,000 8,000 9,000 Purchase from Vendor 1 Backhoe 1 0 1 7,000 9,000 8,000 Purchase from Vendor 1 Bulldozer 5 2 3 9,000 8,000 7,000 Purchase from Vendor 3 Wheel Tractor 5 3 2 8,000 9,000 7,000 Purchase from Vendor 3 Tower Crane 2 2 0 XX XX XX XX Dump Trucks 8 7 1 7,000 8,000 9,000 Purchase from Vendor 1 Add Text Here XX XX XX XXXX XXXX XXXX Add Text here Vendor Selection for Construction Equipment The purpose of this slide is to analyze the equipment procurement plan of the organization. The provided table analyzes the rates offered by multiple vendors the quantity required by the organization and the name of equipment's. This slide is 100% editable. Adapt it to your needs and capture your audience's attention. 31
  • 32. Our Insurance Requirement for Construction Management The purpose of the following slide is to show the type of insurance that is required by the company. These insurance can be of three type: People insurance, Asset- insurance and liability insurance. Assets ✓ Property Insurance ✓ Content Insurance ✓ Business Interruption Insurance ✓ Vehicle Insurance ✓ Account Receivable Insurance Liability ✓ General Liability Insurance ✓ Product Liability Insurance ✓ Professional Liability Insurance People ✓ Life Insurance ✓ Disability Insurance ✓ Partnership Insurance ✓ Medical Insurance ✓ Key Personal Insurance This slide is 100% editable. Adapt it to your needs and capture your audience's attention. 32
  • 33. Vendor Selection for Construction Management The following slide compares multiple vendors through which the organization can purchase insurance . The provided table highlights multiple criteria based on which the organization can choose their insurance provider. Our Requirement ✓ People insurance for 400 employees ✓ Asset insurance for major machineries ✓ Liability insurance ✓ Add text here ✓ Add text here ✓ Add text here Insurance Types Insurance Provider 1 Insurance Provider 2 Insurance Provider 3 Insurance Provider 4 Comments People Insurance Yes No Yes Yes ✓ Add comments here ✓ Add comments here Asset Insurance No No Yes Yes ✓ Add comments here ✓ Add comments here Lability Insurance Yes Yes Yes No ✓ Add comments here ✓ Add comments here 100% Reimbursement No Yes Yes No ✓ Add comments here ✓ Add comments here Cost Per Year $7,500 $5,000 $6,000 $4,000 Purchase from Insurance Provider 3 This slide is 100% editable. Adapt it to your needs and capture your audience's attention. 33
  • 34. 60% 51% 71% 75% 42% 51% Text Here Labor Force Equipment Oprator Human Resourse Architect Engineer 67% 31% 73% 50% 38% 62% 519 Women 412 Men 971 Full Time People 932.23 Full Time Equivalent Staff 6Working Days per week 127 Part-Time Staff Median Salary for Men Women Text here Text here Workforce Requirement purpose of this slide is to analyze the workforce requirement of the construction project, the provided slide analyses the diversity of workforce along with the salary and working hours per day. This graph/chart is linked to excel, and changes automatically based on data. Just left click on it and select “Edit Data”. 34
  • 35. Hiring Plan for Construction Project The following slide analysis multiple platforms for recruitment by highlighting the various forms of recruitment such as Internal recruitment, external recruitment, social and web recruitment and print advertisement. Our Requirements ✓ On-site Engineers : 15 ✓ Machinery Operators : 25 ✓ Accountants : 5 ✓ Human Resource Personal : 2 ✓ Add Text Here : XX ✓ Construction Workers : 200 Recruitment Platforms Internal Recruitment ✓ Promote current employees ✓ Offer temporary employee permanent contract ✓ Hire retired employee as freelancer ✓ Add text here External Recruitment ✓ Outsourcing the employment ✓ Hiring through school college and universities ✓ Add text here ✓ Add text here Social & Web Recruitment ✓ E-mail ✓ Social media platform: Facebook, Twitter & LinkedIn ✓ Online Recruitment Portals ✓ Company Website ✓ Add text here Print Advertisement ✓ News Paper ✓ Magazines ✓ Pamphlets ✓ Add text here ✓ Add text here This slide is 100% editable. Adapt it to your needs and capture your audience's attention. 35
  • 36. Construction Phase in Construction Management 36
  • 37. Construction Site Access and Layout The following slide displays a map of the entire construction site shows various areas such as entry point, the office space, excavation ground etc to ensure the smooth and safe functioning of the project. Details House Foundation- 25,000 Sq. ft Office Space- 3*500 Sq. ft Steel Depot- 1,000 sq. ft Add text here Add text here This slide is 100% editable. Adapt it to your needs and capture your audience's attention. 37
  • 38. Construction Process for Construction Management The following slide displays the construction process of the organization along with a timeline. This slide is 100% editable. Adapt it to your needs and capture your audience's attention. 38 Selecting a Contractor Financing Windows & Exterior Doors HVAC Plans Site Preparation Permits & Insurance Foundation Framing Roof & Siding Interior Exterior Paint Landscaping Punch List Finished Project Warranty Period Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb 2020 2021 2022 Inspections Utilities 20 Feb
  • 39. Post Construction Commissioning The purpose of the following slide is to display the process of commissioning during after the completion of construction project. This slide is 100% editable. Adapt it to your needs and capture your audience's attention. Commissioning by Project Phase Pre- Design Build Commissioning Team OPR+ BOD Development Design Develop Overall Commissioning Plan Develop Level 1,2,3 Commissioning Documents Review Design for Commissioning Readiness Construction Execute Level 1,2,3 Commissioning Develop Level 4 & 5 Commissioning Script Commissioning Execute Level 4 & 5 Commissioning Rest to Normal Configuration Final Site Clean Up Turnover/ Re-Commissioning Verify IT Equipment Dual Corded Develop Commissioning Script Execute Commissioning Activities 39
  • 40. Construction Project Team The purpose of the following slide is to show the entire construction project team . The team members can be C Level individual, Architects Designers and Contractors. Champions Project Manager/ Client Representative Project Sponsor Project Board Contractor Sub- Contractor Suppliers User Panels Lead Consultant Other Consultants Lead Designer ✓ Cost Consultant ✓ CDM Co- Ordinator ✓ Specialist Consultants ✓ Architect ✓ Services Engineer ✓ Structural Engineer ✓ Specialist Designers Design Team Board of Directors Independent Client Advisers This slide is 100% editable. Adapt it to your needs and capture your audience's attention. 40
  • 41. Table of Content ✓ Risk Identification ✓ Risk Impact and Likelihood Matrix ✓ Risk Mitigation Strategies 05. Risk Analysis 41
  • 42. Risk Identification for Construction Management The purpose of the following slide is to identify the various risks that are associated with the construction project. The risk can financial, socio Political, Environmental and construction related. This slide is 100% editable. Adapt it to your needs and capture your audience's attention. 42 Risk Identification for Construction Management Environmental Risk ✓ Natural Disasters ✓ Recession ✓ War ✓ Add Text Here Construction Related Risk ✓ Material Shortage ✓ Labor Union Strike ✓ Unwanted Delay in Construction Work ✓ Add Text Here Financial Risk ✓ Shortfall of Investment ✓ Poor Performance of Economy ✓ Budget Deficit ✓ Low Sale of Project ✓ Add Text Here ✓ Add Text Here Socio Political Risk ✓ Regulatory Compliances ✓ Change in Rules & Regulations ✓ Taxes ✓ Add Text Here ✓ Add Text Here
  • 43. Construction Risk Impact and Likelihood Matrix The purpose of the following slide is to analyze the impact and likelihood of multiple risks that may effect organization. Insignificant Minor Moderate Major Catastrophic Almost certain Add text here Add text here Unwanted delay in construction work Labor union strike Material shortage Likely Add text here Add text here Add text here Add text here Add text here Possible Add text here Financial shortfall Budget deficit Add text here Add text here Unlikely Add text here Add text here Add text here Add text here Add text here Rare Recession Regulatory compliances War Add text here Add text here Likelihood Impact/ Consequences This slide is 100% editable. Adapt it to your needs and capture your audience's attention. 43
  • 44. Risk Mitigation Strategies for Construction Management The purpose of this slide is to show various mitigation strategies for multiple risks such as investment shortfall, labor force strike etc. Risk Mitigation Strategy Comments Investment Shortfall ✓ Reserves for financial deficit ✓ Fund raising through selling apartments & providing possession upon full construction ✓ Add comments here ✓ Add comment here Labor Force Strike ✓ Strike insurance to prevent losses that might be incurred during strike ✓ Setting up a negotiation committee for negotiations with the labor union ✓ Add comments here ✓ Add comment here Budget Deficit ✓ Reduction in miscellaneous expenses ✓ Reconsideration of budgetary policy ✓ Add comments here ✓ Add comment here Damages due to Natural Disaster ✓ Insurance with vendor who provides human machinery & liability insurance ✓ Add text here ✓ Add comments here ✓ Add comment here Add Text Here ✓ Add text here ✓ Add text here ✓ Add comments here ✓ Add comment here Add Text Here ✓ Add text here ✓ Add text here ✓ Add comments here ✓ Add comment here This slide is 100% editable. Adapt it to your needs and capture your audience's attention. 44
  • 45. Table of Content ✓ Quality Assurance of Sale Process ✓ Quality Assurance Process 06. Quality Assurance Plan 45
  • 46. Quality Assurance Plan in Sales The purpose of the following slide is to show the entire process quality assurance in sales. The provided flowchart shows a 4 steps of ensuring quality. Quality Control Flowchart Quality Maintenance along the Process This slide is 100% editable. Adapt it to your needs and capture your audience's attention. 46 Customer Satisfaction Survey and Management Customer Complaint Management Step 1 Step 2 Design Quality Control Process Point Assessment Revision of Design Revision Management After- sales Quality Control Step 4 Supply Chain Quality Control Supplier Quality Control Incoming Material Quality Control Staff Training and Assessment Inspection and Approval Step 3 Press Quality Control Production Preparation Inspection Production Flow Revision Management Process Quality Control
  • 47. Quality Assurance Process for Construction Management The purpose of the following slide is to show the entire process quality assurance in construction process . The provided process shows the construction quality plan and material inspection and test plan. This slide is 100% editable. Adapt it to your needs and capture your audience's attention. Construction Quality Control Plans Inspection & Test Plan 47
  • 48. Table of Content ✓ Identifying the Type of Waste in Construction Management ✓ Construction Waste Management Plan 07. Construction Waste Management 48
  • 49. Identifying the type of Waste in Construction Management The purpose of the following slide is to Categorize different types of wate that can be generated during the construction project. These waste can be wood,glass and plastic. Types of Construction Waste Construction Waste ✓ Concrete: Non-Hazardous ✓ Bricks: Non-Hazardous ✓ Tiles & Ceramics: Non-Hazardous ✓ Add text here ✓ Add text here Wood, Glass & Plastic ✓ Untreated Woods: Non-Hazardous ✓ Uncontaminated Glass: Non-hazardous ✓ Treated Woods: Hazardous Waste ✓ Treated Glass: Hazardous Waste ✓ Add text here Add Text Here ✓ Add text here ✓ Add text here ✓ Add text here ✓ Add text here Add Text Here ✓ Add text here ✓ Add text here ✓ Add text here ✓ Add text here This slide is 100% editable. Adapt it to your needs and capture your audience's attention. 49
  • 50. Waste Description Re-Use Onsite Off-site Recycle On Site Off-Site Dispose On Site Off-Site Bricks Yes Yes Yes Add Text Here Yes Yes Yes Add Text Here Yes Yes Yes Plastic Pipes Yes Yes Yes Plastic Wirings Yes Yes Yes Add Text Here Yes Yes Yes Bio-Chemical Yes Yes Yes Lead Yes Yes Yes Add Text Here Yes Yes Construction Waste Management Plan The purpose of the following slide is to display a waste management plan for the construction project. The provided table highlights the 3 categories of waste that are Inert, Non- Hazard and Hazard. Inert Non- Hazard Hazard This slide is 100% editable. Adapt it to your needs and capture your audience's attention. 50
  • 51. Table of Content 08. Measuring our Efforts 51
  • 52. Projected Launch Date 107 Days Friday,15th December Completed Planning Completed Design Waiting Commissioning Pre-Construction 67% In Progress Project Management Dashboard The following slide displays the project management dashboard that tracks multiple activates of the project. It highlights the project launch date, the overdue task and project budget. Overdue Task Deadline Employee 1 Day Add text here 2017-08-15 Paula 4 Days Add text here 2017-08-06 Kate 10 Days Add text here 2017-08-01 Nancy 24 Days Add text here 2017-07-18 George Employee Task Deadline Workload Kate Add text here 2017-08-15 George Add text here 2017-08-06 Nancy Add text here 2017-08-01 Paula Add text here 2017-07-18 67% 55% 48% 45% 30% George Nancy Richard Kate Paula $0K $20K $40K $60K Total Budget Budget Amont Used Target Amount Used Total Budget- $52,000 Remaining- $87,70 Currently- 8.1% (Over Target) Overdue Task Upcoming Deadlines Project Budget Workload 34% 56% 15% 11% This graph/chart is linked to excel, and changes automatically based on data. Just left click on it and select “Edit Data”. 52
  • 54. Additional Slides 01. Clustered Bar 02. Stacked Column 03. Magnifying Glass 04. Timeline 05. Our Mission 06. Post It Notes 07. Our Financial 08. Venn 09. Thank you 54
  • 55. Clustered Bar 0 0.5 1 1.5 2 2.5 3 3.5 4 4.5 5 Category 1 Category 2 Category 3 Category 4 Sales Product 01 Product 02 Product 01 This graph/chart is linked to excel, and changes automatically based on data. Just left click on it and select “Edit Data”. Product 02 This graph/chart is linked to excel, and changes automatically based on data. Just left click on it and select “Edit Data”. 55
  • 56. Stacked Column Product 01 This graph/chart is linked to excel, and changes automatically based on data. Just left click on it and select “Edit Data”. Product 02 This graph/chart is linked to excel, and changes automatically based on data. Just left click on it and select “Edit Data”. 4.3 2.5 -3.5 -4.5 2.4 4.4 -1.8 -0.8 -6 -4 -2 0 2 4 6 8 Sales Product 01 Product 02 56
  • 57. Magnifying Glass 01 This slide is 100% editable. Adapt it to your needs and capture your audience's attention. Text Here 02 This slide is 100% editable. Adapt it to your needs and capture your audience's attention. Text Here 03 This slide is 100% editable. Adapt it to your needs and capture your audience's attention. Text Here 04 This slide is 100% editable. Adapt it to your needs and capture your audience's attention. Text Here 57
  • 58. Timeline 2016 2017 2018 2019 2020 Text Here This slide is 100% editable. Adapt it to your needs and capture your audience's attention. Text Here This slide is 100% editable. Adapt it to your needs and capture your audience's attention. Text Here This slide is 100% editable. Adapt it to your needs and capture your audience's attention. Text Here This slide is 100% editable. Adapt it to your needs and capture your audience's attention. Text Here This slide is 100% editable. Adapt it to your needs and capture your audience's attention. 58
  • 59. Our Mission Mission This slide is 100% editable. Adapt it to your needs and capture your audience's attention. Goal This slide is 100% editable. Adapt it to your needs and capture your audience's attention. Vision This slide is 100% editable. Adapt it to your needs and capture your audience's attention. 59
  • 60. Post It Notes Text Here This slide is 100% editable. Adapt it to your needs and capture your audience's attention. Text Here This slide is 100% editable. Adapt it to your needs and capture your audience's attention. Text Here This slide is 100% editable. Adapt it to your needs and capture your audience's attention. Text Here This slide is 100% editable. Adapt it to your needs and capture your audience's attention. 60
  • 61. Our Financial 79% 56% 39% 15% This slide is 100% editable. Adapt it to your needs and capture your audience's attention. Text Here This slide is 100% editable. Adapt it to your needs and capture your audience's attention. Text Here This slide is 100% editable. Adapt it to your needs and capture your audience's attention. Text Here This slide is 100% editable. Adapt it to your needs and capture your audience's attention. Text Here 61
  • 62. Venn 25% 75% 35% This slide is 100% editable. Adapt it to your needs and capture your audience's attention. Text Here This slide is 100% editable. Adapt it to your needs and capture your audience's attention. Text Here This slide is 100% editable. Adapt it to your needs and capture your audience's attention. Text Here 62
  • 63. Thank You Address # street number, city, state Contact Number 0123456789 Email Address emailaddress123@gmail.com 63