This document provides an overview of construction project management. It includes an agenda that analyzes client requirements and construction phases. Various tables outline the construction project scope, costs, regulatory requirements, layout and design plans, procurement needs, and construction phases. The document appears to be a presentation on managing an overall construction project.
2. Agenda of Construction Management
Understand project scope and analyzing
client requirement
Analyze the understand all the phases of construction
management and develop a plan for its efficient delivery
Add text here
Add text here
Add text here
2
3. Table of Content
01. Introduction 05. Risk Analysis
02. Project Analysis 06. Quality Assurance Plan
03. Regulatory Requirement 07. Construction Waste Management
04. Construction Phases 08. Measuring our Efforts
3
4. Table of Content
01. Introduction
✓ Construction Project requirement and Deliverables
✓ Client Requirement for Construction Project
✓ Construction Project Scope & Description
4
5. Construction Project Requirements and Deliverables
The purpose of the following slide is to analyze the project based on its requirements and deliverables. The requirement can be construction of residential complex for 5000 people with parking of 2500
cars . The deliverable can be a 5 phased project plan.
This slide is 100% editable. Adapt it to your needs and capture your audience's attention.
Project Requirements
✓ Residential complex for 5000 people
✓ Parking complex for 2500 cars
✓ 20 commercial complex for shops
✓ Add text here
✓ Add text here
✓ Add text here
Construction of residential project having the
following facilities
✓ Design
✓ Pre-construction phase
✓ Procurement
✓ Construction phase
✓ Post construction
✓ Add text here
The project can be completed within 5-year span by
ABC Corp in 5 project phases
Project Deliverables
5
6. Construction Project Scope and Description
The purpose of the following slide is to provide an overview of the construction project that is undertaken by the company, this slide analyses the description of the project, its location, the duration and
cost.
Project Duration
✓ Expected date of beginning- 6 March 2020
✓ Expected end date- 6 March 2023
Project Cost
✓ USD – 3.5 MM
Add Text Here
✓ Add Text Here
✓ Add Text Here
Project Location
Chicago, Illinois
Add location here
Project Description
✓ Construction of residential buildings & parking lots for 5,000 people
✓ Parking space for 250 vehicles
✓ Construction contract for of 5 years
✓ Add text here
✓ Add text here
This slide is 100% editable. Adapt it to your needs and capture your audience's attention.
6
7. Requirements that are Specified by Clients
The following slide analyses the multiple requirements of client such as speed cost and time. The provided table highlights various client needs such as on-time procurement, Low cost of construction
and on time project completion.
Client Needs Description Comments
On-Time Possession
✓ Fast & on time possession of the property
✓ Add text here
✓ Procurement of the residential complex within 2 year of initial
investment
✓ Add text here
Low Cost of Construction
✓ Low cost of the project
✓ Low material cost
✓ Low cost of construction equipment
✓ Low cost of the procuring the material for construction
✓ Add text here
On-Time Project Completion
✓ Timely & effective completion & delivery of the project
✓ Add text here
✓ Add text here
✓ Add text here
Add Text Here
✓ Add text here
✓ Add text here
✓ Add text here
✓ Add text here
Add Text Here
✓ Add text here
✓ Add text here
✓ Add text here
✓ Add text here
This slide is 100% editable. Adapt it to your needs and capture your audience's attention.
7
8. Table of Content
02. Project Analysis
✓ Construction Project Cost Analysis
✓ Power & Electricity Requirement
✓ Structural Details of Construction Project
✓ Electricity Provider Rate Comparison
8
9. Construction Project Cost Analysis (1/2)
The following slide displays the various cost that are associated with the construction project these cost can be divided into two major parts such as sales price breakdown and construction cost
breakdown.
This slide is 100% editable. Adapt it to your needs and capture your audience's attention.
9
Sales Price Breakdown Average
Finished Lot Cost (incl. financing cost) $67,551
Total Construction Cost $184,125
Financing Cost $6,669
Overhead & General Expenses $16,306
Marketing Cost $4,645
Text Here $ 10,174
Text Here $21,148
Construction Cost Breakdown Average
Building Permit Fees $3,107
Impact Fee $2,850
Water and Sewer Inspection $2,952
Excavation, Foundation & Backfill $17,034
Steel $1,012
Framing & Trusses $24,904
Sheathing $2,142
Windows $6,148
Exterior Doors $2,150
Interior Doors & Hardware $2,883
Stairs $1,052
Roof Shingles $5,256
Siding $8,739
Gutters & Downspouts $870
Plumbing $10,990
Electrical Wiring $8,034
Lighting Fixtures $2,193
HVAC $8,760
Insulation $3,399
Drywall $8,125
Text Here $6,005
Text Here $10,395
Text Here $3,619
Text Here $8,363
Text Here $3,736
Other $19,487
Total XXXXXX
10. Construction Project Cost Analysis (2/2)
The following slide displays the various cost that are associated with the construction project. Various components of the cost can be labor ,construction equipment , procurement cost and travel cost.
ITEM Mth-1 Mth-2 Mth-3 Mth-4 Mth-5 Mth-6 Mth-7 Mth-8 Mth-9 Mth-10 Mth-11 Mth-12
Labor 0 0 0 0 0 0 0 0 0 0 0 0
Equipment for Construction 0 0 0 0 0 0 0 0 0 0 0 0
Procurement Cost 0 0 0 0 0 0 0 0 0 0 0 0
Travel 0 0 0 0 0 0 0 0 0 0 0 0
Other 0 0 0 0 0 0 0 0 0 0 0 0
Total Cost 0 0 0 0 0 0 0 0 0 0 0 0
Accumulated Cost 0 0 0 0 0 0 0 0 0 0 0 0
Project: ABC Site Construction
Date: 06-march-2020
This slide is 100% editable. Adapt it to your needs and capture your audience's attention.
10
11. Structural Details of Construction Project
The purpose of the following slide is to provide structural detail of the construction project. These project details include per square feet area of the construction complex, its description etc.
This slide is 100% editable. Adapt it to your needs and capture your audience's attention.
Area Description Area Per Sq. Ft Comments
Residential Complex
Residential 2bhk &
3bhk flats
25000 Add comments here
Parking Space
Parking space for
2500 cars
12000 Add comments here
Commercial Complex
Commercial Complex
for 20 shops
3000 Add comments here
Add text here Add text here XXXX Add comments here
Add text here Add text here XXXX Add comments here
11
12. Power and Electricity Requirement for Construction Project
The following slide displays the power and electricity requirement of the project. The provided table displays multiple sources from which electricity can be generated. These sources can be solar panels,
Geothermal power or wind energy.
Energy Generation Mode Initial Cost of Procurement USD Maintenance Cost USD Comments
Solar Panels 45,000 10,000
✓ Long Battery life
✓ High Durability
✓ Add text Here
Natural Gas 50,000 24,000
✓ High Durability
✓ Can be Hazardous
✓ Add Text Here
Add Text Here 60,000 15,000
✓ High cost of procurement and
implementation
✓ Low Durability
Add Text Here XXXX XXXXX
✓ Add Text Here
✓ Add Text Here
Requirement
✓ Number of Household - 300
✓ Commercial Stores - 45
✓ Light Poles - 120
✓ Add Text Here - XXX
✓ Add Text Here - XXX
✓ Add Text Here - XXX
This slide is 100% editable. Adapt it to your needs and capture your audience's attention.
12
13. Electricity Provider Rate Comparison for Construction Management
The purpose of the following slide is to compare multiple electricity provider in the area based on the IR cost per kilowatt , their rate flexibility and the minimum usage fee.
Electricity Providers in State Cost Per Kilowatt Hour Fixed Rate of Variable Rate Minimum Usage Fees Add Parameter Here
Electricity Provider 1 14 cent Fixed rate Yes Add text here
Electricity Provider 2 20 cent Variable and fixed rate Yes Add text here
Electricity Provider 3 12 cent Variable rates No Add text here
Add Provider Here XXXX Add text here XX Add text here
Add Provider Here XXXX Add text here XX Add text here
This slide is 100% editable. Adapt it to your needs and capture your audience's attention.
13
14. Table of Content
✓ Checklist for Certificates
✓ Construction Permit Application Process
03. Regulatory Requirement
14
15. Certificate Checklist for Construction Project
The The Purpose of this slide is to show the regulatory requirements that the organization needs to meet in order to initiate the project, the following table shows multiple regulations and whether the
organization has them or not.
Regulations & Permit Yes or No
ABC Permit Yes
Engineering & Architect License Yes
General Contract Licensee Yes
Trade Contract Licensee No
US Federal Construction Project Yes
Installation of:
✓ Alarms
✓ Fall Protection
✓ Ad Text Here
Yes
No
Yes
Add Text Here XXX
Add Text Here XXX
Add Text Here XXX
Add Text Here XXX
This slide is 100% editable. Adapt it to your needs and capture your audience's attention.
15
16. Construction Permit Application Process
following slide displays the application for construction permit and the entire application process. The following slide also highlights the stage in which the process is right now.
This slide is 100% editable. Adapt it to your needs and capture your audience's attention.
16
Submit Permit Application
Plans Reviewed for
Code Compliance
Non Compliant Compliant
Corrections and
Comments Provided
Plans Stamped as Approved
& Construction may Begin
Revise and Resubmit drawings
& Specifications
Inspectio(S)
Process
Begins
Does not Pass
Inspection(s)
Pass Inspection(s)
Corrections Made in Field
& Re-Inspected
Certificate of
Occupancy Issued
Application Submitted on 31 Oct 2019
If Inspection not Approved
Corrections to be made
and
re-inspection of the site
is to be done
Expected date of
Application Approval
07 January 2020
Current Application Status
Construction Map
Approved, Site
Inspection Pending
17. Table of Content
04. Construction Phases
✓ Layout and Design
✓ Construction Phase
✓ Procurement
✓ Post Construction
17
19. Total Complex Overview and Plan (1/2)
The purpose of this slide is to display the layout and planning of the apartment of the new construction site. The slides also provides an overview of the plan provided.
Overview
25000 square feet of residential space
Residential space with 2BHK, 3bhk and penthouses
Parking for 2500 vehicles
Add text here
Add text here
This slide is 100% editable. Adapt it to your needs and capture your audience's attention.
19
20. Total Complex Overview and Plan with Video Holder (2/2)
The purpose of this slide is to display the layout and planning of the apartment of the new construction site. The slides also provides an overview of the plan provided.
Overview
25000 square feet of residential space
Residential space with 2BHK, 3bhk and penthouses
Parking for 2500 vehicles
Add text here
Add text here
This slide is 100% editable. Adapt it to your needs and capture your audience's attention.
20
21. Building Layout and Plan (1/3)
The purpose of this slide is to display the layout and planning of the apartment of the new construction site. The slides also provides an overview of the plan same.
Overview
3 BHK Layout
Add text here
2 Washrooms
3 Galleries
Add text here
This slide is 100% editable. Adapt it to your needs and capture your audience's attention.
21
22. Overview
3 BHK Layout
Add text here
2 Washrooms
3 Galleries
Add text here
Building Layout and Plan with Video Holder (2/3)
The purpose of this slide is to display the layout and planning of the apartment of the new construction site. The slides also provides an overview of the plan same.
This slide is 100% editable. Adapt it to your needs and capture your audience's attention.
22
23. Overview
3 BHK Layout
Add text here
2 Washrooms
3 Galleries
Add text here
Building Layout and Plan with Video Holder (3/3)
The purpose of this slide is to display the layout and planning of the apartment of the new construction site. The slides also provides an overview of the plan provided.
This slide is 100% editable. Adapt it to your needs and capture your audience's attention.
23
24. Parking Layout and Plan (1/2)
The purpose of this slide is to display the layout and planning of the parking space of the new construction site. The slides also provides an overview of the plan of the same.
Overview
Parking of 2500 vehicles
3 Parking spots per
house occupants
Open space parking for
1500 vehicles
Underground parking for
1000 vehicles
Underground vehicles
parking height 7 Ft
Add text here
This slide is 100% editable. Adapt it to your needs and capture your audience's attention.
24
25. Overview
Parking of 2500 vehicles
3 Parking spots per
house occupants
Open space parking for
1500 vehicles
Underground parking for
1000 vehicles
Underground vehicles
parking height 7 Ft
Add text here
Parking Layout and Plan with Video Holder (2/2)
The purpose of this slide is to display the layout and planning of the apartment of the new construction site. The slides also provides an overview of the plan provided.
This slide is 100% editable. Adapt it to your needs and capture your audience's attention.
25
26. Storage Plan for Construction Management
The following slide displays a storage plan for the construction site. The provided table highlights that material that needs to be stored, whether they will be stored On-Site or Off-Site.
Material
Onsite Offsite
Storage Unit 1 Storage Unit 2 Warehouse Location
Cement Bags Yes No No NA
Wooden Logs Yes Yes No NA
Steel Rods No Yes No NA
Glass Panels No No Soft Storage Warehouse Chicago XYZ Avenue
Add Text Here Add Text Here Add Text Here Add Text Here Add Text Here
Add Text Here Add Text Here Add Text Here Add Text Here Add Text Here
This slide is 100% editable. Adapt it to your needs and capture your audience's attention.
26
28. Material Required for Construction Project
The following slide displays material required for the construction project along with the quantity required.
This slide is 100% editable. Adapt it to your needs and capture your audience's attention.
28
$ 7,31,700
1000 SQFT.
(Build up area)
16.5% Finishers
✓ Paint- 4.1%
✓ Tiles- 8.0%
✓ Bricks- 4.4%
24.6% Steel
12.3% Sand
22.8% Fittings
✓ Window- 3.0%
✓ Doors- 3.4%
✓ Plumbing- 5.5%
✓ Electrical- 6.6%
✓ CP+ Sanitary- 4.1%
16.4% Cement
7.4%
Aggregates
Gravel
29. Quantity
Required
Vendor 1 USD
per piece
Vendor 2 USD
per piece
Vendor 3 USD
per piece
Selected
Vendor
Comments
10,000 Bags 18 17 16 Vendor 3
✓ Add comments here
✓ Add comments here
20,000 Bags 11 10 15 Vendor 2
✓ Add comments here
✓ Add comments here
5000 Bags 22 25 20 Vendor 3
✓ Add comments here
✓ Add comments here
2,000 Beams 45 40 41 Vendor 2
✓ Add comments here
✓ Add comments here
50 Ltrs. 40 35 38 Vendor 2
✓ Add comments here
✓ Add comments here
Na XX XX XX Add text here
✓ Add comments here
✓ Add comments here
Vendor Selection for Construction Material
The following slide compares multiple vendors through which the organization can procure its material. The provided table highlights multiple criteria such as the quality required and per piece cost.
Finishing Material
(Paint polisher)
Cement
Sand
Aggregates
Gravels
Steel
Fittings
Material
Required
This slide is 100% editable. Adapt it to your needs and capture your audience's attention.
29
30. Machinery Required for Construction Work
The following slide displays machinery required for the construction project. These machineries can be earth moving equipment, Construction Vehicles, Material Handling Equipment etc.
This slide is 100% editable. Adapt it to your needs and capture your audience's attention.
Earth Moving Equipment
✓ Excavators
✓ Graders
✓ Loaders
✓ Skid Loader
✓ Backhoe
✓ Bulldozer Trenchers
✓ Scrapers Wheeled
✓ Loading Shovel
Construction Vehicles
✓ Lorry
✓ Dumber
✓ Trailers
✓ Tanker
✓ Add Text Here
Material Handling Equipment
✓ Crane
✓ Conveyors
✓ Hoists
✓ Forklift
✓ Add Text Here
Construction Equipment
✓ Concrete Mixtures
✓ Compactors
✓ Paver
✓ Road Roller
✓ Add Text Here
✓ Add Text Here
✓ Add Text Here
Add Text Here
✓ Add Text Here
✓ Add Text Here
✓ Add Text Here
✓ Add Text Here
✓ Add Text Here
30
31. Equipment Quantity Owned Purchase Vendor 1 Pricing PP $ Vendor 2 Pricing PP $ Vendor 3 Pricing PP $ Comments
Excavators 3 2 1 7,000 8,000 9,000 Purchase from Vendor 1
Backhoe 1 0 1
7,000
9,000 8,000 Purchase from Vendor 1
Bulldozer 5 2 3 9,000 8,000
7,000
Purchase from Vendor 3
Wheel Tractor 5 3 2 8,000 9,000
7,000
Purchase from Vendor 3
Tower Crane 2 2 0 XX XX XX XX
Dump Trucks 8 7 1
7,000
8,000 9,000 Purchase from Vendor 1
Add Text Here XX XX XX XXXX XXXX XXXX Add Text here
Vendor Selection for Construction Equipment
The purpose of this slide is to analyze the equipment procurement plan of the organization. The provided table analyzes the rates offered by multiple vendors the quantity required by the organization and
the name of equipment's.
This slide is 100% editable. Adapt it to your needs and capture your audience's attention.
31
32. Our Insurance Requirement for Construction Management
The purpose of the following slide is to show the type of insurance that is required by the company. These insurance can be of three type: People insurance, Asset- insurance and liability insurance.
Assets
✓ Property Insurance
✓ Content Insurance
✓ Business Interruption Insurance
✓ Vehicle Insurance
✓ Account Receivable Insurance
Liability
✓ General Liability Insurance
✓ Product Liability Insurance
✓ Professional Liability Insurance
People
✓ Life Insurance
✓ Disability Insurance
✓ Partnership Insurance
✓ Medical Insurance
✓ Key Personal Insurance
This slide is 100% editable. Adapt it to your needs and capture your audience's attention.
32
33. Vendor Selection for Construction Management
The following slide compares multiple vendors through which the organization can purchase insurance . The provided table highlights multiple criteria based on which the organization can choose their
insurance provider.
Our Requirement
✓ People insurance for 400 employees
✓ Asset insurance for major machineries
✓ Liability insurance
✓ Add text here
✓ Add text here
✓ Add text here
Insurance Types
Insurance
Provider 1
Insurance
Provider 2
Insurance
Provider 3
Insurance
Provider 4
Comments
People Insurance Yes No Yes Yes
✓ Add comments here
✓ Add comments here
Asset Insurance No No Yes Yes
✓ Add comments here
✓ Add comments here
Lability Insurance Yes Yes Yes No
✓ Add comments here
✓ Add comments here
100% Reimbursement No Yes Yes No
✓ Add comments here
✓ Add comments here
Cost Per Year $7,500 $5,000 $6,000 $4,000 Purchase from Insurance Provider 3
This slide is 100% editable. Adapt it to your needs and capture your audience's attention.
33
34. 60%
51%
71%
75%
42%
51%
Text Here
Labor
Force
Equipment
Oprator
Human
Resourse
Architect
Engineer
67%
31%
73%
50%
38%
62%
519
Women
412
Men 971
Full Time People
932.23
Full Time
Equivalent Staff
6Working
Days per week
127
Part-Time Staff
Median Salary for
Men
Women
Text here
Text here
Workforce Requirement
purpose of this slide is to analyze the workforce requirement of the construction project, the provided slide analyses the diversity of workforce along with the salary and working hours per day.
This graph/chart is linked to excel, and changes automatically based on data. Just left click on it and select “Edit Data”.
34
35. Hiring Plan for Construction Project
The following slide analysis multiple platforms for recruitment by highlighting the various forms of recruitment such as Internal recruitment, external recruitment, social and web recruitment and print
advertisement.
Our
Requirements
✓ On-site Engineers : 15
✓ Machinery Operators : 25
✓ Accountants : 5
✓ Human Resource Personal : 2
✓ Add Text Here : XX
✓ Construction Workers : 200
Recruitment
Platforms
Internal Recruitment
✓ Promote current employees
✓ Offer temporary employee
permanent contract
✓ Hire retired employee as freelancer
✓ Add text here
External Recruitment
✓ Outsourcing the employment
✓ Hiring through school college and universities
✓ Add text here
✓ Add text here
Social & Web Recruitment
✓ E-mail
✓ Social media platform: Facebook, Twitter & LinkedIn
✓ Online Recruitment Portals
✓ Company Website
✓ Add text here
Print Advertisement
✓ News Paper
✓ Magazines
✓ Pamphlets
✓ Add text here
✓ Add text here
This slide is 100% editable. Adapt it to your needs and capture your audience's attention.
35
37. Construction Site Access and Layout
The following slide displays a map of the entire construction site shows various areas such as entry point, the office space, excavation ground etc to ensure the smooth and safe functioning of the project.
Details
House Foundation- 25,000 Sq. ft
Office Space- 3*500 Sq. ft
Steel Depot- 1,000 sq. ft
Add text here
Add text here
This slide is 100% editable. Adapt it to your needs and capture your audience's attention.
37
38. Construction Process for Construction Management
The following slide displays the construction process of the organization along with a timeline.
This slide is 100% editable. Adapt it to your needs and capture your audience's attention.
38
Selecting a Contractor Financing
Windows &
Exterior Doors
HVAC
Plans
Site Preparation
Permits & Insurance
Foundation
Framing
Roof & Siding
Interior
Exterior Paint
Landscaping
Punch List
Finished Project
Warranty Period
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec
Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec
Jan
Feb
2020
2021
2022
Inspections
Utilities
20 Feb
39. Post Construction Commissioning
The purpose of the following slide is to display the process of commissioning during after the completion of construction project.
This slide is 100% editable. Adapt it to your needs and capture your audience's attention.
Commissioning by Project Phase
Pre- Design
Build
Commissioning Team
OPR+ BOD
Development
Design
Develop Overall
Commissioning Plan
Develop Level 1,2,3
Commissioning
Documents
Review Design for
Commissioning
Readiness
Construction
Execute Level 1,2,3
Commissioning
Develop Level 4 & 5
Commissioning Script
Commissioning
Execute Level 4 & 5
Commissioning
Rest to Normal
Configuration
Final Site
Clean Up
Turnover/
Re-Commissioning
Verify IT Equipment
Dual Corded
Develop
Commissioning Script
Execute
Commissioning
Activities
39
40. Construction Project Team
The purpose of the following slide is to show the entire construction project team . The team members can be C Level individual, Architects Designers and Contractors.
Champions
Project Manager/
Client Representative
Project Sponsor
Project Board
Contractor
Sub- Contractor Suppliers
User Panels
Lead Consultant
Other Consultants Lead Designer
✓ Cost Consultant
✓ CDM Co- Ordinator
✓ Specialist
Consultants ✓ Architect
✓ Services Engineer
✓ Structural Engineer
✓ Specialist Designers
Design Team
Board of Directors
Independent
Client Advisers
This slide is 100% editable. Adapt it to your needs and capture your audience's attention.
40
42. Risk Identification for Construction Management
The purpose of the following slide is to identify the various risks that are associated with the construction project. The risk can financial, socio Political, Environmental and construction related.
This slide is 100% editable. Adapt it to your needs and capture your audience's attention.
42
Risk Identification
for
Construction
Management
Environmental Risk
✓ Natural Disasters
✓ Recession
✓ War
✓ Add Text Here
Construction Related Risk
✓ Material Shortage
✓ Labor Union Strike
✓ Unwanted Delay in Construction
Work
✓ Add Text Here
Financial Risk
✓ Shortfall of Investment
✓ Poor Performance of
Economy
✓ Budget Deficit
✓ Low Sale of Project
✓ Add Text Here
✓ Add Text Here
Socio Political Risk
✓ Regulatory Compliances
✓ Change in Rules &
Regulations
✓ Taxes
✓ Add Text Here
✓ Add Text Here
43. Construction Risk Impact and Likelihood Matrix
The purpose of the following slide is to analyze the impact and likelihood of multiple risks that may effect organization.
Insignificant Minor Moderate Major Catastrophic
Almost certain Add text here Add text here
Unwanted delay in
construction work
Labor union strike Material shortage
Likely Add text here Add text here Add text here Add text here Add text here
Possible Add text here Financial shortfall Budget deficit Add text here Add text here
Unlikely Add text here Add text here Add text here Add text here Add text here
Rare Recession Regulatory compliances War Add text here Add text here
Likelihood
Impact/ Consequences
This slide is 100% editable. Adapt it to your needs and capture your audience's attention.
43
44. Risk Mitigation Strategies for Construction Management
The purpose of this slide is to show various mitigation strategies for multiple risks such as investment shortfall, labor force strike etc.
Risk Mitigation Strategy Comments
Investment Shortfall
✓ Reserves for financial deficit
✓ Fund raising through selling apartments & providing possession
upon full construction
✓ Add comments here
✓ Add comment here
Labor Force Strike
✓ Strike insurance to prevent losses that might be incurred during
strike
✓ Setting up a negotiation committee for negotiations with the
labor union
✓ Add comments here
✓ Add comment here
Budget Deficit
✓ Reduction in miscellaneous expenses
✓ Reconsideration of budgetary policy
✓ Add comments here
✓ Add comment here
Damages due to Natural Disaster
✓ Insurance with vendor who provides human machinery & liability
insurance
✓ Add text here
✓ Add comments here
✓ Add comment here
Add Text Here
✓ Add text here
✓ Add text here
✓ Add comments here
✓ Add comment here
Add Text Here
✓ Add text here
✓ Add text here
✓ Add comments here
✓ Add comment here
This slide is 100% editable. Adapt it to your needs and capture your audience's attention.
44
45. Table of Content
✓ Quality Assurance of Sale Process
✓ Quality Assurance Process
06. Quality Assurance Plan
45
46. Quality Assurance Plan in Sales
The purpose of the following slide is to show the entire process quality assurance in sales. The provided flowchart shows a 4 steps of ensuring quality.
Quality Control Flowchart
Quality Maintenance along the Process
This slide is 100% editable. Adapt it to your needs and capture your audience's attention.
46
Customer Satisfaction
Survey and Management
Customer Complaint
Management
Step 1 Step 2
Design Quality Control
Process Point
Assessment
Revision of Design
Revision
Management
After- sales
Quality Control
Step 4
Supply Chain Quality Control
Supplier
Quality Control
Incoming Material
Quality Control
Staff Training
and
Assessment
Inspection
and Approval
Step 3
Press Quality Control
Production
Preparation Inspection
Production Flow
Revision Management
Process
Quality Control
47. Quality Assurance Process for Construction Management
The purpose of the following slide is to show the entire process quality assurance in construction process . The provided process shows the construction quality plan and material inspection and test
plan.
This slide is 100% editable. Adapt it to your needs and capture your audience's attention.
Construction Quality Control Plans Inspection & Test Plan
47
48. Table of Content
✓ Identifying the Type of Waste in Construction Management
✓ Construction Waste Management Plan
07. Construction Waste Management
48
49. Identifying the type of Waste in Construction Management
The purpose of the following slide is to Categorize different types of wate that can be generated during the construction project. These waste can be wood,glass and plastic.
Types of
Construction
Waste
Construction Waste
✓ Concrete: Non-Hazardous
✓ Bricks: Non-Hazardous
✓ Tiles & Ceramics: Non-Hazardous
✓ Add text here
✓ Add text here
Wood, Glass & Plastic
✓ Untreated Woods: Non-Hazardous
✓ Uncontaminated Glass: Non-hazardous
✓ Treated Woods: Hazardous Waste
✓ Treated Glass: Hazardous Waste
✓ Add text here
Add Text Here
✓ Add text here
✓ Add text here
✓ Add text here
✓ Add text here
Add Text Here
✓ Add text here
✓ Add text here
✓ Add text here
✓ Add text here
This slide is 100% editable. Adapt it to your needs and capture your audience's attention.
49
50. Waste Description Re-Use Onsite Off-site Recycle On Site Off-Site Dispose On Site Off-Site
Bricks Yes Yes Yes
Add Text Here Yes Yes Yes
Add Text Here Yes Yes Yes
Plastic Pipes Yes Yes Yes
Plastic Wirings Yes Yes Yes
Add Text Here Yes Yes Yes
Bio-Chemical Yes Yes Yes
Lead Yes Yes Yes
Add Text Here Yes Yes
Construction Waste Management Plan
The purpose of the following slide is to display a waste management plan for the construction project. The provided table highlights the 3 categories of waste that are Inert, Non- Hazard and Hazard.
Inert
Non-
Hazard
Hazard
This slide is 100% editable. Adapt it to your needs and capture your audience's attention.
50
52. Projected Launch Date
107 Days
Friday,15th December
Completed
Planning
Completed
Design
Waiting
Commissioning
Pre-Construction 67% In Progress
Project Management Dashboard
The following slide displays the project management dashboard that tracks multiple activates of the project. It highlights the project launch date, the overdue task and project budget.
Overdue Task Deadline Employee
1 Day Add text here 2017-08-15 Paula
4 Days Add text here 2017-08-06 Kate
10 Days Add text here 2017-08-01 Nancy
24 Days Add text here 2017-07-18 George
Employee Task Deadline Workload
Kate Add text here 2017-08-15
George Add text here 2017-08-06
Nancy Add text here 2017-08-01
Paula Add text here 2017-07-18
67%
55%
48% 45%
30%
George Nancy Richard Kate Paula
$0K
$20K
$40K
$60K
Total Budget Budget Amont Used Target Amount Used
Total Budget- $52,000
Remaining- $87,70
Currently- 8.1% (Over Target)
Overdue Task
Upcoming Deadlines
Project Budget
Workload
34%
56%
15%
11%
This graph/chart is linked to excel, and changes automatically based on data. Just left click on it and select “Edit Data”.
52
54. Additional Slides
01. Clustered Bar
02. Stacked Column
03. Magnifying Glass
04. Timeline
05. Our Mission
06. Post It Notes
07. Our Financial
08. Venn
09. Thank you
54
55. Clustered Bar
0 0.5 1 1.5 2 2.5 3 3.5 4 4.5 5
Category 1
Category 2
Category 3
Category 4
Sales
Product 01
Product 02
Product 01
This graph/chart is linked to excel, and
changes automatically based on data.
Just left click on it and select “Edit Data”.
Product 02
This graph/chart is linked to excel, and
changes automatically based on data.
Just left click on it and select “Edit Data”.
55
56. Stacked Column
Product 01
This graph/chart is linked to excel, and
changes automatically based on data.
Just left click on it and select “Edit Data”.
Product 02
This graph/chart is linked to excel, and
changes automatically based on data.
Just left click on it and select “Edit Data”.
4.3
2.5
-3.5
-4.5
2.4
4.4
-1.8
-0.8
-6
-4
-2
0
2
4
6
8
Sales
Product
01
Product
02
56
57. Magnifying Glass
01
This slide is 100%
editable. Adapt it to
your needs and
capture your
audience's attention.
Text Here
02
This slide is 100%
editable. Adapt it to
your needs and
capture your
audience's attention.
Text Here
03
This slide is 100%
editable. Adapt it to
your needs and
capture your
audience's attention.
Text Here
04
This slide is 100%
editable. Adapt it to
your needs and
capture your
audience's attention.
Text Here
57
58. Timeline
2016 2017 2018 2019 2020
Text Here
This slide is 100% editable.
Adapt it to your needs
and capture your
audience's attention.
Text Here
This slide is 100% editable.
Adapt it to your needs
and capture your
audience's attention.
Text Here
This slide is 100% editable.
Adapt it to your needs
and capture your
audience's attention.
Text Here
This slide is 100% editable.
Adapt it to your needs
and capture your
audience's attention.
Text Here
This slide is 100% editable.
Adapt it to your needs
and capture your
audience's attention.
58
59. Our Mission
Mission
This slide is 100% editable. Adapt it to your
needs and capture your audience's attention.
Goal
This slide is 100% editable. Adapt it to your
needs and capture your audience's attention.
Vision
This slide is 100% editable. Adapt it to your
needs and capture your audience's attention.
59
60. Post It Notes
Text Here
This slide is 100%
editable. Adapt it to
your needs and
capture your
audience's attention.
Text Here
This slide is 100%
editable. Adapt it to
your needs and
capture your
audience's attention.
Text Here
This slide is 100%
editable. Adapt it to
your needs and
capture your
audience's attention.
Text Here
This slide is 100%
editable. Adapt it to
your needs and
capture your
audience's attention.
60
61. Our Financial
79%
56%
39%
15%
This slide is 100% editable. Adapt it to your needs
and capture your audience's attention.
Text Here
This slide is 100% editable. Adapt it to your needs
and capture your audience's attention.
Text Here
This slide is 100% editable. Adapt it to your needs
and capture your audience's attention.
Text Here
This slide is 100% editable. Adapt it to your needs
and capture your audience's attention.
Text Here
61
62. Venn
25%
75%
35%
This slide is 100%
editable. Adapt it to
your needs and
capture your
audience's attention.
Text Here
This slide is 100%
editable. Adapt it to
your needs and
capture your
audience's attention.
Text Here
This slide is 100%
editable. Adapt it to
your needs and
capture your
audience's attention.
Text Here
62
63. Thank You
Address
# street number, city, state
Contact Number
0123456789
Email Address
emailaddress123@gmail.com
63