 Section 1. Instructions to Tenderers (ITT)
 Section 2. Tender Data Sheet (TDS)
 Section 3. General Conditions of Contract
(GCC)
 Section 4. Particular Conditions of
Contract(PCC)
 Section 5. Tender and Contract Forms
 Section 6. Bill of Quantities
 Section 7. General Specifications
 Section 8. Particular Specifications
 Section 9. Drawings
 1.CRITERIA FOR ELIGIBILITY
EXPERIENCE.
FINANCIAL
CAPACITY.
TAX PAYING
CAPABILITY.
 2.INFORMATIONS
 Information on –
# Tender preparation
# Tender submission
# Tender opening &
evaluation
# Contract of award
PREPERA-
TION
CURRENCY
AND
TENDER
SECURITY
PRICE OF
CONTRACT CONTENTS
OF
SENDER
Tender Opening
& Evaluation
TENDER
OPENING.
PRELIMIN
ARY
EXAMINA
TION.
TENDERE
R’S
CLARIFIC
ATION.
LOWEST
EVALUAT
ED
TENDER
CONTRACT
OF AWARD
CONTRACT
SIGNING
PERFORMANCE
SECURING
RIGHT TO
COMPLAIN
ISSUE OF
NOA
 GENERAL:
 THE PROCURING ENTITY: Executive
Engineer,PWD E/M,Division-V.
 TITLE OF WORK: Construction of 4 Storied
Commercial Building.
 SINGLE LOT.
 OPEN TENDER METHOD.
 Tender Document:
• Attention : Executive Engineer.
• Address : Dhaka PWD Division.
• Telephone : 9348972
• e-mail address: ictt_ce_15@gmail.com
 QUALIFICATION CRITERIA:
 A satisfactory completion of similar works of at
least Tk. 1 crore 20 lacs under single number of
contract.
 Required average annual construction turnover :
Tk. 1 crore over the last 1 year.
 Minimum amount of liquid asset : Tk 80 lacs.
 TENDER PREPERATION:
 Additional Documents-
Professional and Technical Qualification
Financial Resources
Equipment and Physical Facilities
Specific Experience
 Tender Validity Period 80 days.
 Tender Security : Taka 4 lacs.
 TENDER SUBMISSION:
Deadline : 10 am,12th November,2015
 TENDER OPENING:
Address: Office of the Executive Engineer,PWD E/M Division-V,12-
storied Govt. Office Building (11th floor), Segunbagicha, Dhaka.
Time And Date: 10 am,17th November,2015
 CONTRACT AWARD:
Performance Security : 10% of Contract
Price.
General
Time Control
Quality Control
Cost Control
Completion of Contract
Termination and Settlement of Disputes
Disputes and Arbitration
 Procuring Entity: …………….
 Project Manager: …………….
 Site location: ......................
 Job: .............................
Possession of the
Site
20th December,2015
Starting date
5 January,2016
Intended
Completion
Date
5 November,2017
Programme for
the Works
within 7 days
Defects Liability Period 12 months
Proportion of payments be retained
Liquidated Damages 0.07 percent off the
Contract price
Contract value of the works not
completed is 16%
Place for arbitration (Dhaka)
Tender Submission Letter
Tenderer Information
Bank Guarantee for Tender
Security
Tender & Contract Forms
Tender forms
Notification of award
Contract agreement
Performance security
Contract Forms
Outline of the ‘Bill of Quantities’
Main parts of ‘Bill of Quantities’
I. Item No-100: Earth Work
II. Item No-200. RCC Works
III. Item No-300: Reinforcements
IV. Item No-400: Brick soling, CC, DPC
V. Item No-500: Brickwork, Plastering & Floor finish
VI. Item No-600: Door and Window Materials
Item No.:
101
For
Example
Item Description:
Layout & Marking for
earthwork in excavation
in foundation accepted
by the Engineer
Unit:
sqm
Quantity:
310
Features of BOQ
-grouped into sections
-simple and brief
-computed net from the Drawings
-no allowance should be made for bulking,
shrinkage, or waste; quantities should be
rounded up or down
Considerations for BOQ
Earth Work:
RCC Work:
Reinforcements:
Brick soling, CC, DPC :
Brickwork, Plastering & Floor finish:
Door and Window Materials:
 First Class Bricks must be used in both BFS
and 5” Brick Wall
 60 Grade( 400MPa) Deformed Bar from any
Renowned Bangladeshi Manufacturer should
be used.
 Only Bangladeshi paints can be used for
painting works.
 The Mosaic floor finish must consist of Marble
Chips of Indian Origin. Chips from other
countries must not be used. Also, 100% white
cement must be used.
 Mahogany Wood for Door Frame and
Chapalish wood for Door Shutters must be
used.
 Window frames must be made with Aluminum
of S.S. color
 Tinted Glass(Greenish) from renowned
manufacturer should be used.
General Specifications
- Dismantling & Removal of Existing Structures
- Mobilization and Preparation of Site
-Security
-Disposal and Pollution
-Surveys and Setting Out
-Programme and Progress Reports and Return
-Health and Safety
- Quantities should be computed net from the
Drawings
-The actual Drawings, including site plans,
should be attached to this section or annexed in
a separate folder.
Thank you
for your kind attention

Más contenido relacionado

La actualidad más candente

Construction contracts docuements_08092008
Construction contracts docuements_08092008Construction contracts docuements_08092008
Construction contracts docuements_08092008AYM1979
 
Conditions Of Contract
Conditions Of ContractConditions Of Contract
Conditions Of Contractguestdb5e498
 
Stages In Construction
Stages In ConstructionStages In Construction
Stages In ConstructionAB MAKASANA
 
Construction phases
Construction phasesConstruction phases
Construction phasesMeesum Zaidi
 
Types of Tender and their Process
Types of Tender and their ProcessTypes of Tender and their Process
Types of Tender and their Processarpantripathi2
 
Types of tender and their processing.
Types of tender and their processing.Types of tender and their processing.
Types of tender and their processing.Abhishek kumar maurya
 
CONTRACTS AND ITS TYPES
CONTRACTS AND ITS TYPESCONTRACTS AND ITS TYPES
CONTRACTS AND ITS TYPESPundlik Rathod
 
Tendering documentation
Tendering documentationTendering documentation
Tendering documentationnipuna_bopage
 
Pre qualification stages and tender selection
Pre qualification stages and tender selectionPre qualification stages and tender selection
Pre qualification stages and tender selectionanojan kanagarathnam
 
Construction Management & Equipments
Construction Management & EquipmentsConstruction Management & Equipments
Construction Management & EquipmentsGAURAV. H .TANDON
 
Tender and tender document
Tender and tender documentTender and tender document
Tender and tender documentAkshataFarakate
 
Tendering in Construction
Tendering in ConstructionTendering in Construction
Tendering in Constructionshillier38
 
Construction Project management
Construction Project management Construction Project management
Construction Project management Anupama holla
 
Estimating, administrative approval, technical sanction, budget provision
Estimating, administrative approval, technical sanction, budget provisionEstimating, administrative approval, technical sanction, budget provision
Estimating, administrative approval, technical sanction, budget provisionAshwiniChaudhari13
 

La actualidad más candente (20)

Construction contracts docuements_08092008
Construction contracts docuements_08092008Construction contracts docuements_08092008
Construction contracts docuements_08092008
 
Conditions Of Contract
Conditions Of ContractConditions Of Contract
Conditions Of Contract
 
Stages In Construction
Stages In ConstructionStages In Construction
Stages In Construction
 
Construction phases
Construction phasesConstruction phases
Construction phases
 
Types of Tender and their Process
Types of Tender and their ProcessTypes of Tender and their Process
Types of Tender and their Process
 
Types of tender and their processing.
Types of tender and their processing.Types of tender and their processing.
Types of tender and their processing.
 
CONTRACTS AND ITS TYPES
CONTRACTS AND ITS TYPESCONTRACTS AND ITS TYPES
CONTRACTS AND ITS TYPES
 
Tender procedure slide
Tender procedure slideTender procedure slide
Tender procedure slide
 
Tendering documentation
Tendering documentationTendering documentation
Tendering documentation
 
Pre qualification stages and tender selection
Pre qualification stages and tender selectionPre qualification stages and tender selection
Pre qualification stages and tender selection
 
Tender
TenderTender
Tender
 
Module 4 lecture 1
Module  4 lecture 1Module  4 lecture 1
Module 4 lecture 1
 
Construction Management & Equipments
Construction Management & EquipmentsConstruction Management & Equipments
Construction Management & Equipments
 
Analysis of rates
Analysis of ratesAnalysis of rates
Analysis of rates
 
Contracts and-tenders
Contracts and-tendersContracts and-tenders
Contracts and-tenders
 
Tender and tender document
Tender and tender documentTender and tender document
Tender and tender document
 
Tendering in Construction
Tendering in ConstructionTendering in Construction
Tendering in Construction
 
Etendering
EtenderingEtendering
Etendering
 
Construction Project management
Construction Project management Construction Project management
Construction Project management
 
Estimating, administrative approval, technical sanction, budget provision
Estimating, administrative approval, technical sanction, budget provisionEstimating, administrative approval, technical sanction, budget provision
Estimating, administrative approval, technical sanction, budget provision
 

Similar a TENDER DOCUMENT

Tendering Document for the Procurement of Works
Tendering Document for the Procurement of WorksTendering Document for the Procurement of Works
Tendering Document for the Procurement of WorksMohammad Alimuzzaman Bappy
 
contract_management.ppt
contract_management.pptcontract_management.ppt
contract_management.pptssuser32da691
 
Arbitration Dispute Cross Arguments: Asia NGPipeline -Substance of EPC contra...
Arbitration Dispute Cross Arguments: Asia NGPipeline -Substance of EPC contra...Arbitration Dispute Cross Arguments: Asia NGPipeline -Substance of EPC contra...
Arbitration Dispute Cross Arguments: Asia NGPipeline -Substance of EPC contra...César del Riego y Fuentes
 
Measurement Assignment
Measurement AssignmentMeasurement Assignment
Measurement Assignmentashleyyeap
 
Measurement iv
Measurement ivMeasurement iv
Measurement ivtfkc1212
 
Measuring tendering and estimating for CBE
Measuring tendering and estimating for CBEMeasuring tendering and estimating for CBE
Measuring tendering and estimating for CBESahl Buhary
 
Mechanisms to implement wind energy projects “egyptian experience”
Mechanisms to implement wind energy projects “egyptian experience”Mechanisms to implement wind energy projects “egyptian experience”
Mechanisms to implement wind energy projects “egyptian experience”RCREEE
 
Measurement 4:presentation slides
Measurement 4:presentation slidesMeasurement 4:presentation slides
Measurement 4:presentation slides마 이환
 
Pp2 group assignment
Pp2 group assignmentPp2 group assignment
Pp2 group assignmentlohwenjun
 
Tendernotice_1 of Washery for coal washing.pdf
Tendernotice_1 of Washery for coal washing.pdfTendernotice_1 of Washery for coal washing.pdf
Tendernotice_1 of Washery for coal washing.pdfCILPS1
 
Tendernotice_1 (1).pdf
Tendernotice_1 (1).pdfTendernotice_1 (1).pdf
Tendernotice_1 (1).pdfssusera91051
 
Tendernotice_1.pdf
Tendernotice_1.pdfTendernotice_1.pdf
Tendernotice_1.pdfssusera91051
 
CE 444 Contracts and SpecificationsAssignment 7 - Conduct a 95
CE 444 Contracts and SpecificationsAssignment 7 -  Conduct a 95CE 444 Contracts and SpecificationsAssignment 7 -  Conduct a 95
CE 444 Contracts and SpecificationsAssignment 7 - Conduct a 95MaximaSheffield592
 
Draft Bid Evaluation Report-2.docx
Draft Bid Evaluation Report-2.docxDraft Bid Evaluation Report-2.docx
Draft Bid Evaluation Report-2.docxArshadMahmood155695
 

Similar a TENDER DOCUMENT (20)

Tendering Document for the Procurement of Works
Tendering Document for the Procurement of WorksTendering Document for the Procurement of Works
Tendering Document for the Procurement of Works
 
contract_management.ppt
contract_management.pptcontract_management.ppt
contract_management.ppt
 
Bid document reverse tendering
Bid document reverse tenderingBid document reverse tendering
Bid document reverse tendering
 
Arbitration Dispute Cross Arguments: Asia NGPipeline -Substance of EPC contra...
Arbitration Dispute Cross Arguments: Asia NGPipeline -Substance of EPC contra...Arbitration Dispute Cross Arguments: Asia NGPipeline -Substance of EPC contra...
Arbitration Dispute Cross Arguments: Asia NGPipeline -Substance of EPC contra...
 
Measurement Assignment
Measurement AssignmentMeasurement Assignment
Measurement Assignment
 
Cm mitemrate ver270206
Cm mitemrate ver270206Cm mitemrate ver270206
Cm mitemrate ver270206
 
Measurement iv
Measurement ivMeasurement iv
Measurement iv
 
Measuring tendering and estimating for CBE
Measuring tendering and estimating for CBEMeasuring tendering and estimating for CBE
Measuring tendering and estimating for CBE
 
Mechanisms to implement wind energy projects “egyptian experience”
Mechanisms to implement wind energy projects “egyptian experience”Mechanisms to implement wind energy projects “egyptian experience”
Mechanisms to implement wind energy projects “egyptian experience”
 
tendering
 tendering tendering
tendering
 
Ak contract management
Ak contract managementAk contract management
Ak contract management
 
Contract presentation
Contract presentation  Contract presentation
Contract presentation
 
Measurement 4:presentation slides
Measurement 4:presentation slidesMeasurement 4:presentation slides
Measurement 4:presentation slides
 
Fidic Form of Contract.
Fidic Form of Contract.Fidic Form of Contract.
Fidic Form of Contract.
 
Pp2 group assignment
Pp2 group assignmentPp2 group assignment
Pp2 group assignment
 
Tendernotice_1 of Washery for coal washing.pdf
Tendernotice_1 of Washery for coal washing.pdfTendernotice_1 of Washery for coal washing.pdf
Tendernotice_1 of Washery for coal washing.pdf
 
Tendernotice_1 (1).pdf
Tendernotice_1 (1).pdfTendernotice_1 (1).pdf
Tendernotice_1 (1).pdf
 
Tendernotice_1.pdf
Tendernotice_1.pdfTendernotice_1.pdf
Tendernotice_1.pdf
 
CE 444 Contracts and SpecificationsAssignment 7 - Conduct a 95
CE 444 Contracts and SpecificationsAssignment 7 -  Conduct a 95CE 444 Contracts and SpecificationsAssignment 7 -  Conduct a 95
CE 444 Contracts and SpecificationsAssignment 7 - Conduct a 95
 
Draft Bid Evaluation Report-2.docx
Draft Bid Evaluation Report-2.docxDraft Bid Evaluation Report-2.docx
Draft Bid Evaluation Report-2.docx
 

Más de Sumaiya Jabin

Presentation on tribal leadership
Presentation on tribal leadershipPresentation on tribal leadership
Presentation on tribal leadershipSumaiya Jabin
 
Presentation on the happiness advantage
Presentation on the happiness advantagePresentation on the happiness advantage
Presentation on the happiness advantageSumaiya Jabin
 
Presentation on start with why
Presentation on start with whyPresentation on start with why
Presentation on start with whySumaiya Jabin
 
Presentation on dale carnegie how to win friends and influence people
Presentation on dale carnegie how to win friends and influence peoplePresentation on dale carnegie how to win friends and influence people
Presentation on dale carnegie how to win friends and influence peopleSumaiya Jabin
 
Presentation on 360 degree leadership
Presentation on 360 degree leadershipPresentation on 360 degree leadership
Presentation on 360 degree leadershipSumaiya Jabin
 
Damco Bangladesh Exam Questions
Damco Bangladesh Exam QuestionsDamco Bangladesh Exam Questions
Damco Bangladesh Exam QuestionsSumaiya Jabin
 
PROFESSIONAL PRACTICES AND COMMUNICATION
PROFESSIONAL PRACTICES AND COMMUNICATIONPROFESSIONAL PRACTICES AND COMMUNICATION
PROFESSIONAL PRACTICES AND COMMUNICATIONSumaiya Jabin
 
ENVIRONMENTAL RESTORATION
ENVIRONMENTAL RESTORATIONENVIRONMENTAL RESTORATION
ENVIRONMENTAL RESTORATIONSumaiya Jabin
 

Más de Sumaiya Jabin (11)

Presentation on tribal leadership
Presentation on tribal leadershipPresentation on tribal leadership
Presentation on tribal leadership
 
Presentation on the happiness advantage
Presentation on the happiness advantagePresentation on the happiness advantage
Presentation on the happiness advantage
 
Presentation on start with why
Presentation on start with whyPresentation on start with why
Presentation on start with why
 
Presentation on dale carnegie how to win friends and influence people
Presentation on dale carnegie how to win friends and influence peoplePresentation on dale carnegie how to win friends and influence people
Presentation on dale carnegie how to win friends and influence people
 
Presentation on 360 degree leadership
Presentation on 360 degree leadershipPresentation on 360 degree leadership
Presentation on 360 degree leadership
 
Damco Bangladesh Exam Questions
Damco Bangladesh Exam QuestionsDamco Bangladesh Exam Questions
Damco Bangladesh Exam Questions
 
Psf a blessing
Psf a blessingPsf a blessing
Psf a blessing
 
Tannery
TanneryTannery
Tannery
 
PROFESSIONAL PRACTICES AND COMMUNICATION
PROFESSIONAL PRACTICES AND COMMUNICATIONPROFESSIONAL PRACTICES AND COMMUNICATION
PROFESSIONAL PRACTICES AND COMMUNICATION
 
ENVIRONMENTAL RESTORATION
ENVIRONMENTAL RESTORATIONENVIRONMENTAL RESTORATION
ENVIRONMENTAL RESTORATION
 
COARSE EVALUATION
COARSE EVALUATIONCOARSE EVALUATION
COARSE EVALUATION
 

TENDER DOCUMENT

  • 1.
  • 2.  Section 1. Instructions to Tenderers (ITT)  Section 2. Tender Data Sheet (TDS)  Section 3. General Conditions of Contract (GCC)  Section 4. Particular Conditions of Contract(PCC)  Section 5. Tender and Contract Forms  Section 6. Bill of Quantities  Section 7. General Specifications  Section 8. Particular Specifications  Section 9. Drawings
  • 3.
  • 4.
  • 5.  1.CRITERIA FOR ELIGIBILITY EXPERIENCE. FINANCIAL CAPACITY. TAX PAYING CAPABILITY.
  • 6.  2.INFORMATIONS  Information on – # Tender preparation # Tender submission # Tender opening & evaluation # Contract of award
  • 7. PREPERA- TION CURRENCY AND TENDER SECURITY PRICE OF CONTRACT CONTENTS OF SENDER Tender Opening & Evaluation TENDER OPENING. PRELIMIN ARY EXAMINA TION. TENDERE R’S CLARIFIC ATION. LOWEST EVALUAT ED TENDER CONTRACT OF AWARD CONTRACT SIGNING PERFORMANCE SECURING RIGHT TO COMPLAIN ISSUE OF NOA
  • 8.
  • 9.  GENERAL:  THE PROCURING ENTITY: Executive Engineer,PWD E/M,Division-V.  TITLE OF WORK: Construction of 4 Storied Commercial Building.  SINGLE LOT.  OPEN TENDER METHOD.
  • 10.  Tender Document: • Attention : Executive Engineer. • Address : Dhaka PWD Division. • Telephone : 9348972 • e-mail address: ictt_ce_15@gmail.com
  • 11.  QUALIFICATION CRITERIA:  A satisfactory completion of similar works of at least Tk. 1 crore 20 lacs under single number of contract.  Required average annual construction turnover : Tk. 1 crore over the last 1 year.  Minimum amount of liquid asset : Tk 80 lacs.
  • 12.  TENDER PREPERATION:  Additional Documents- Professional and Technical Qualification Financial Resources Equipment and Physical Facilities Specific Experience  Tender Validity Period 80 days.  Tender Security : Taka 4 lacs.
  • 13.  TENDER SUBMISSION: Deadline : 10 am,12th November,2015  TENDER OPENING: Address: Office of the Executive Engineer,PWD E/M Division-V,12- storied Govt. Office Building (11th floor), Segunbagicha, Dhaka. Time And Date: 10 am,17th November,2015  CONTRACT AWARD: Performance Security : 10% of Contract Price.
  • 14.
  • 15. General Time Control Quality Control Cost Control Completion of Contract Termination and Settlement of Disputes Disputes and Arbitration
  • 16.
  • 17.  Procuring Entity: …………….  Project Manager: …………….  Site location: ......................  Job: .............................
  • 18. Possession of the Site 20th December,2015 Starting date 5 January,2016 Intended Completion Date 5 November,2017 Programme for the Works within 7 days
  • 19. Defects Liability Period 12 months Proportion of payments be retained Liquidated Damages 0.07 percent off the Contract price Contract value of the works not completed is 16% Place for arbitration (Dhaka)
  • 20.
  • 21. Tender Submission Letter Tenderer Information Bank Guarantee for Tender Security Tender & Contract Forms Tender forms
  • 22. Notification of award Contract agreement Performance security Contract Forms
  • 23.
  • 24. Outline of the ‘Bill of Quantities’ Main parts of ‘Bill of Quantities’ I. Item No-100: Earth Work II. Item No-200. RCC Works III. Item No-300: Reinforcements IV. Item No-400: Brick soling, CC, DPC V. Item No-500: Brickwork, Plastering & Floor finish VI. Item No-600: Door and Window Materials
  • 25. Item No.: 101 For Example Item Description: Layout & Marking for earthwork in excavation in foundation accepted by the Engineer Unit: sqm Quantity: 310
  • 26. Features of BOQ -grouped into sections -simple and brief -computed net from the Drawings -no allowance should be made for bulking, shrinkage, or waste; quantities should be rounded up or down
  • 27. Considerations for BOQ Earth Work: RCC Work: Reinforcements: Brick soling, CC, DPC : Brickwork, Plastering & Floor finish: Door and Window Materials:
  • 28.  First Class Bricks must be used in both BFS and 5” Brick Wall  60 Grade( 400MPa) Deformed Bar from any Renowned Bangladeshi Manufacturer should be used.  Only Bangladeshi paints can be used for painting works.  The Mosaic floor finish must consist of Marble Chips of Indian Origin. Chips from other countries must not be used. Also, 100% white cement must be used.
  • 29.  Mahogany Wood for Door Frame and Chapalish wood for Door Shutters must be used.  Window frames must be made with Aluminum of S.S. color  Tinted Glass(Greenish) from renowned manufacturer should be used.
  • 30.
  • 31. General Specifications - Dismantling & Removal of Existing Structures - Mobilization and Preparation of Site -Security -Disposal and Pollution -Surveys and Setting Out -Programme and Progress Reports and Return -Health and Safety
  • 32.
  • 33.
  • 34.
  • 35.
  • 36. - Quantities should be computed net from the Drawings -The actual Drawings, including site plans, should be attached to this section or annexed in a separate folder.
  • 37. Thank you for your kind attention