SlideShare una empresa de Scribd logo
1 de 34
Technical Writing in
Energy and Resources
Risks and Opportunities

Dr Robert Illes
Technical Communication UK
Bristol, September 2013
Imagine being in a place where we can say…
We are a leading professional services provider to the
energy, resource and complex process industries.
Our services cover the full spectrum both in size and
lifecycle – from the creation of new assets to services that
sustain and enhance operating assets.

Technical Communication is central and implicit in all
aspects of company activity…
Engineering Projects in
Energy and Resources


Waterfall project management



Subject matter / discipline experts own and do their own writing



Quality of writing is extremely variable



Focus of attention is usually the engineering, the schedule,
pesky changes or pacifying a customer who is equally under
pressure to deliver…
Engineering Projects:
The Undiscovered Country
The most important deliverables are:

Written Reports
Strategies
Decision Papers
Guidelines
Plans
Standards
Specifications

Philosophies
Design Basis
Method Statements
Procedures
Scopes of Work
Technical Studies

Opportunities at the outset…
Engineering Projects:
The Undiscovered Country
Choose your sector:
Power
Renewables
Coal, Gas
Carbon capture

Nuclear

Hydrocarbons
Deep water,
Subsea, On-shore
Oil, Gas
Processing, LNG,
Gas-to-liquid
Pipelines

Mining
Base metals, iron,
aluminium
Exotic metals,
lithium
Chemicals,
phosphates
Processing,
Beneficiation

Infrastructure
Transportation on
and off-shore
Pioneer camps,
Operations, Admin
Water

Environmental
impact

Niche consultancy:
Economic/Macroeconomic Analyses
Geotechnical
Carbon Consulting
Sulphur Technology

Opportunities at the outset…
Engineering Projects:
The Undiscovered Country
Choose your discipline:
Assurance and Governance Infrastructure
Business Organisation
Insurances
Capital Cost Estimating

Investment Opportunities

Commissioning
Communications (ICT)
Construction
Detailed Engineering
Design
Geology
Health, Safety and Security

Legal
Manufacturing
Market Analyses
Operations Management /
Mobilisation
Operating Cost Estimating
Permitting

Human Resources

Process Engineering

Product Laboratory Testing
Procurement and Supply
Chain Management
Quality and Integrity
Management
Regional / Local Content
Risk Management
Schedule and Planning
Stakeholder Analyses
Strategy
Sustainable Development /
Environment
Testing and Inspection

Opportunities at the outset…
This Study
Two-Way Risks and Opportunities
Risks
Technical Writer

Engineering Project

(Dedicated Technical
Communications)

(Company, Client,
Stakeholders)
Opportunities

1. What are the risks that a technical writer poses to an engineering
project?
2. What are the opportunities that a technical writer presents to an
engineering project?
3. What are the risks that an engineering project poses to a technical
writer?
4. What are the opportunities that an engineering project presents to a
technical writer?
Method – Data Gathering


One-to-one exploratory conversations with a selection of participants



Participant prompt sheet given a day in advance



Brainstorming and recording of ideas as they arise
Method – Data Analysis


Compilation of anecdotes



Emergence of categories



Saturation of data – you hear similar things with each new
participant



Occasional occurrence of a real gem/oddity that throws your entire
thinking…
Study Participants



Nine discipline specialists across the spectrum, at all levels from
graduate to director
“Home crowd” in that they are people I have worked with, get on
with and who agreed to spend a little time helping with this study
Name
Dionne
Matthew
Kate
Ceren
Frank
David
Sanjay
Jose
Scott
Dr Robert Illes

Role
Risk and Economics Manager
Senior Climate Change Consultant
Graduate Engineer
Graduate PSCM Specialist
Mega-projects Director
Engineering Manager
Process Engineer
Construction Manager
Regional Economics Director
Senior Technical Writer
Methodological Underpinning
Methodological Underpinning
Methodological Underpinning


Risk Management: risks and opportunities treated together
Covello and Allen (1988), Hillson (2002)



Small scale qualitative study, a limited number of participants
Glaser and Strauss (1967), Lincoln and Guba (1985)



Context of projects I have worked on: “battery limits”



All the assumptions and “noise” I bring to the study…

What’s in it for stakeholders?
Consequences for projects

What’s in it for us?
Enhancement of our practice

New and enhanced knowledge about
how technical writing can affect a
project

Avoiding probable pitfalls

How to mitigate probable risks

Enhanced kudos, some new
knowledge out there
Emerging Categories


Financial: aspects such as cash flow and budget



Expertise: is it appropriate, how it will affect the work generated



Project Efficiency: schedule, need for training, communication



Reputation: how it can be damaged or enhanced
1. Risks to the Project
Risks
Financial
Expertise

1. FOR THE PROJECT (from the technical writer to the project)
Elements
How to Mitigate?
Cost – additional drain on budget, perception
Hire on a needs basis, draw on demonstrated
that tech comm is a cost centre
knowledge that it is a profit centre
Lack of relevant depth of knowledge in
Interview and hire the right person with:1)
relevant disciplines
engineering background 2) English skills 3)
common sense
Insufficient understanding of the scope, wasted Establishing positive and effective communication
time in reworking non fit for purpose work
channels, patience for all parties
Communication…
Differing points of view or focus on what is
important
Unknown skillset at point of hire leading to
either underuse of writer or highly divergent
results

Project Efficiency

Reputation

Interviewing, communication
Communication. Allow writer to engage
clients/stakeholders

Lack of engaging all stakeholders. Is the writer
adequately focused on the reader?
Need for training (both the writer and SMEs)
Technical writer ownership – potential
bottleneck if writer has to review every
document
Conflicts of interest – exposure to highly
confidential data
Company X perceived as expensive due to
lavish use of “non-essential” personnel in
expensive locations

Small initial pain for larger gains
Train others in the ways of the writer; let writer
focus on those big, important documents like
executive summaries
Learn the principle of Chinese walls
Hire a writer on a “needs basis” or make tech
comm a profit generating centre
2. Opportunities for the Project
Opportunities
Financial
Expertise

2. FOR THE PROJECT (from the technical writer to the project)
Elements
Increased profits – save money in the long run as project is demonstrably on time, on
budget, producing quality work
Realisation of what we can use a writer for: scopes of work, feasibility reports, execution
reports, end of project reports
Writer can revitalise a study with a fresh approach; organise data in innovative ways

Project
Efficiency

Writers focus on the reader, not their line manager or some piece of engineering
Making all documents standardised, fit for purpose, up-to-date, consistent and useable
across all disciplines
Can help project be on time, on budget, reduce burden of SMEs; so long as engaged
EARLY
New approaches streamline project practices, are reusable, driving schedule; generally
improve the quality of project work

Reputation

A writer is a natural interface between SME disciplines and with clients
Leverage good writing quality as an integral part of why the company should get the work
Mitigate communication breakdowns over documents being rejected at the outset
3. Risks to the Writer
Risks
Financial

Expertise

Project
Efficiency
Reputation

3. FOR THE TECHNICAL WRITER (from the project to the technical writer)
Elements
How to Mitigate?
Sporadic work if hired on a “needs basis” – Run a couple of projects concurrently
usually busy at beginning and end of a
project with a lull in the middle. Field not
Need for the best in security
seen as desirable due to very short
contracts
Risk to one‟s safety in certain
environments if known to be a party to
sensitive data
Frustration in being given an unclear
scope.
Out of depth. Is a journalism specialist
qualified to “own” a mining feasibility
report?
Whether one will develop good working
relationships with SMEs
Producing not fit for purpose work
Being too good and having too much work

Communication…
Choose a role concordant with your
knowledge. SMEs still “own” the reports,
writer is more sideways integrated
Communication and persona
Project must ensure skillset is appropriate,
writer should apply for relevant roles
Argument for a dedicated centre/department
4. Opportunities for the Writer
Opportunities
Financial

Expertise

Project
Efficiency
Reputation

4. FOR THE TECHNICAL WRITER (from the project to the technical writer)
Elements
A lot of “last minute opportunities”
Potentially high earnings if sustained over concurrent projects
Learning a lot of new knowledge, new management styles, consolidating and enhancing
one‟s practice
Chance to micro-niche, become a micro-expert
Develop long lasting great synergistic working relationships
Networking and being able to use skills on other projects
Become known and revered as a centre of technical communication excellence

Good reputation = good flow of steady work
Emerging Gems


Is a writer always focused on the reader? Despite our axiom “write
for the reader”



How safe is a writer? Especially in view of BP Algeria incident and
others
Summing Up
Weighing In
Cost of Dedicated
Technical
Communication
Resource

Inspired by:
http://www.writingassist.com

Cost of Ignoring
Technical
Communication
Profit Centre and Value: Evidence Snapshot
Houlihan, D. (2009). Technical Communications as a Profit Center. Boston, Ma., The Aberdeen
Group.
On analysing data from 165 companies, leading US business researchers The Aberdeen Group found
that when leveraged effectively, technical communication stands to contribute as much as a 42%
increase in customer satisfaction and an associated 45% increase in product revenue.
Aberdeen‟s data clearly indicates that Best-in-Class performers have found the means to leverage
technical communications to influence customers‟ experiences with a marked impact on business
profitability, and that whilst all too often regarded as a cost centre, technical communications and
documentation are actually key profit generators.
Redish, J. (2003). Adding Value as a Professional Technical Communicator. Technical
Communication, 50(4), pp. 505-518.
With reference to case studies in the literature, Redish found that there are numerous ways in which
technical communicators “add value” which go over and above numerical measures. Thus, numbers
do not tell the whole story and “process is critical”.
Al Blackwell, C. (1995). A Good Installation Guide Increases User Satisfaction and Reduces
Support Costs. Technical Communication, 42(1), pp. 56-60.
Seminal case study at SABRE Travel Information Network showing that good documentation reduced
support calls by 80% and resulted in 94% customer satisfaction.
Conclusions


Identified risks have counterparts as opportunities and vice versa –
there is always this two-way relationship



Identified risks are usually able to be mitigated or outweighed by
potential later benefits



Risks are usually relevant to the scene and thus culturally disposed
(e.g. engineers worried about non-specialists messing up their work)



Writers stand a better chance of their discipline standing as a
discipline if it is a profit centre i.e. develop a body of evidence that
engaging good technical resources enhances the quality of project
work and brings it in on time and on budget
Remember the Opportunities…
Written Reports
Strategies
Decision Papers
Guidelines
Plans
Standards
Specifications

Philosophies
Design Basis
Method Statements
Procedures
Scopes of Work
Technical Studies

Assurance and Governance
Business Organisation

Infrastructure
Insurances

Capital Cost Estimating

Investment Opportunities

Commissioning
Communications (ICT)
Construction
Detailed Engineering Design
Geology
Health, Safety and Security

Legal
Manufacturing
Market Analyses
Operations Management /
Mobilisation
Operating Cost Estimating
Permitting

Human Resources

Process Engineering

Product Laboratory Testing
Procurement and Supply Chain
Management
Quality and Integrity
Management
Regional / Local Content
Risk Management
Schedule and Planning
Stakeholder Analyses
Strategy
Sustainable Development /
Environment
Testing and Inspection
Dedicated Technical Communication Development – Why?

A case for our on-going engagement in
Energy and Resources projects
Key Benefits of Using Technical Writers


Reader focus…



Optimise project efficiency



Drive schedules



Drive profits and add value
Reader Focus
Technical writers focus on the reader
at all times
Good writing encourages the reader to
carry on reading
Do engineers understand the
design/product the best?
Specialists may be good within their field
and to their peers, but are they experts at
communicating outside to nonspecialists?
Optimise Project
Efficiency
It‟s about more than good writing skills:
•

Problem-definers, problem-solvers

•

Management of the writing process

•

A resource to find other resources

•

Getting the message across clearly

•

Appropriate detachment
Drive Schedules
Technical writers like to write and edit,
specialists generally do not
Precise about concepts and terminology

Mitigate tortuous language BEFORE it
reaches the client

Significantly reduce the
backdraft/review cycle
“Let each act according to their
best destiny”
Drive Profits, Add Value


Add value to the business in multiple
ways



Enhance all aspects of current
operations



Reduce unnecessary support



Save money in the long run



Be more than an engineering
consultancy
References
Al Blackwell, C. (1995). A Good Installation Guide Increases User Satisfaction and Reduces Support Costs Technical Communication, 42(1), 56-60.
Carr, W. and Kemmis, S. (1986). Becoming Critical. London, Falmer.
Covello, V. T. and Allen, F. H. (1988). Seven Cardinal Rules of Risk Communication. Washington, DC, U.S. Environmental Protection Agency. OPA87-020.
Davis, R. M. (1975). Technical Writing: Its Importance in the Engineering Profession and Its Place in Engineering Curricula - A Survey of the
Experience and Opinions of Prominent Engineers. Education Resources Information Center, Technical Report No. 75-5.
Del Caño, A. and de la Cruz, M. (2002). Integrated Methodology for Project Risk Management. J. Constr. Eng. Manage., 128(6), 473–485.
ENVSEC, 2002. Transforming Risks into Co-operation: Central Asia Ferghana – Osh – Khudjand Area. Background Paper.
Glaser, B. G. and Strauss, A. L. (1967). The Discovery of Grounded Theory. New York, Aldine de Gruyter.
Goldman Sachs, 2008. 190 projects to change the world, Global Investment Research, April 25.
Hardisty, P.E. (2009). Environmental and Economic Sustainability, NY, NY, CRC Press.
Hillson, D. (2002). Extending the risk process to manage opportunities International Journal of Project Management 20, 235-240.
Houlihan, D. (2009). Technical Communications as a Profit Center. Boston, MA., The Aberdeen Group.
ISO (2009). ISO 31000:2009 Risk Management: Principles and Guidelines. Geneva, ISO.
Lewin, K. (1952) „Group Decisions and Social Change‟ in G. E. Swanson, T. M. Newcomb and F. E. Hartley (eds.) Readings in Social Psychology, New
York, Holt.
Lincoln, Y. S. and Guba, E. (1985). Naturalistic Inquiry. California, SAGE.
Narayanan, M. (2010). Importance of Technical Writing in Engineering Education. American Geophysical Union, Fall Meeting 2010.
Redish, J. (1995). Adding Value as a Professional Technical Communicator Technical Communication, 42, (1), pp. 26-39.
Samuels, J. (2013). How out-of-date documentation can cost you your brand and your company. http://www.writingassist.com/resources/articles/out-ofdate-documentation/
WorleyParsons. (2012a). About Economics™. Retrieved 7 May 2013:
http://www.worleyparsons.com/AboutUs/Economics/Pages/AboutEconomics.aspx
WorleyParsons. (2012b). Sustainable Decisions. Retrieved 7 May 2013:
http://www.worleyparsons.com/AboutUs/Economics/Pages/SustainableDecisions.aspx
Your Energetic and Resourceful
Technical Author

Dr Robert Illes
BSc (Hons) PGCE PhD MISTC
Senior Technical Author
robert.illes@opal-flame.com

September 2013
© Opal Flame Consultancy
www.opal-flame.com
All rights reserved

Más contenido relacionado

Similar a TCUK 2013 - Technical writing in Energy and Resources: Risks and opportunities

Technical Writing Annemarie Hamlin, Chris Rubio, Michele DeSilva.docx
Technical Writing Annemarie Hamlin, Chris Rubio, Michele DeSilva.docxTechnical Writing Annemarie Hamlin, Chris Rubio, Michele DeSilva.docx
Technical Writing Annemarie Hamlin, Chris Rubio, Michele DeSilva.docxjacqueliner9
 
BE Final Year Project and Seminar Sem VI.pptx
BE Final Year Project and Seminar Sem VI.pptxBE Final Year Project and Seminar Sem VI.pptx
BE Final Year Project and Seminar Sem VI.pptxssuser65a2e8
 
Project-Manager.ppt
Project-Manager.pptProject-Manager.ppt
Project-Manager.pptTecnicoItca
 
Project Introduction09 Kieran Lenihan
Project Introduction09  Kieran LenihanProject Introduction09  Kieran Lenihan
Project Introduction09 Kieran Lenihanklenihan
 
Project Management online sample (1) (1).pptx
Project Management online sample (1) (1).pptxProject Management online sample (1) (1).pptx
Project Management online sample (1) (1).pptxStanleyChabata1
 
EBUS614- PROJECT AND PORTFOLIO MANAGEMENT IN ORGANISATIONS .docx
EBUS614- PROJECT AND PORTFOLIO MANAGEMENT IN ORGANISATIONS    .docxEBUS614- PROJECT AND PORTFOLIO MANAGEMENT IN ORGANISATIONS    .docx
EBUS614- PROJECT AND PORTFOLIO MANAGEMENT IN ORGANISATIONS .docxmadlynplamondon
 
Technical Writing Annemarie Hamlin, Chris Rubio, Michele DeSilva.docx
Technical Writing Annemarie Hamlin, Chris Rubio, Michele DeSilva.docxTechnical Writing Annemarie Hamlin, Chris Rubio, Michele DeSilva.docx
Technical Writing Annemarie Hamlin, Chris Rubio, Michele DeSilva.docxSANSKAR20
 
Communication management
Communication management Communication management
Communication management ammara2010
 
E Learning Authoring The Shifting Landscape T1 S3 P1
E Learning Authoring   The Shifting Landscape   T1 S3 P1E Learning Authoring   The Shifting Landscape   T1 S3 P1
E Learning Authoring The Shifting Landscape T1 S3 P1David Wilson
 
Technical Report Lagos (2nd run)
Technical Report Lagos (2nd run)Technical Report Lagos (2nd run)
Technical Report Lagos (2nd run)Ifeoma Onyemachi
 
Technical Report Writing, Lagos (2nd run)
Technical Report Writing, Lagos (2nd run)Technical Report Writing, Lagos (2nd run)
Technical Report Writing, Lagos (2nd run)Ifeoma Onyemachi
 
Technical Report Writing, Lagos (2nd run)
Technical Report Writing, Lagos (2nd run)Technical Report Writing, Lagos (2nd run)
Technical Report Writing, Lagos (2nd run)Ifeoma Onyemachi
 
PetroSync - Technical Report Writing and Presentation Skills for Oil & Gas En...
PetroSync - Technical Report Writing and Presentation Skills for Oil & Gas En...PetroSync - Technical Report Writing and Presentation Skills for Oil & Gas En...
PetroSync - Technical Report Writing and Presentation Skills for Oil & Gas En...PetroSync
 
JD - SE Pr. Electrical_Engineer_231102.docx
JD - SE Pr. Electrical_Engineer_231102.docxJD - SE Pr. Electrical_Engineer_231102.docx
JD - SE Pr. Electrical_Engineer_231102.docxRAMIREDDY49
 
Technical Report Writing, Lagos
Technical Report Writing, LagosTechnical Report Writing, Lagos
Technical Report Writing, LagosIfeoma Onyemachi
 
Technical Report Writing, Lagos
Technical Report Writing, LagosTechnical Report Writing, Lagos
Technical Report Writing, LagosIfeoma Onyemachi
 
Steven James Pannett Dissertation
Steven James Pannett  Dissertation Steven James Pannett  Dissertation
Steven James Pannett Dissertation Steven Pannett
 
Registered professional titles presentation
Registered professional titles presentationRegistered professional titles presentation
Registered professional titles presentationRoseanne O'Leary
 

Similar a TCUK 2013 - Technical writing in Energy and Resources: Risks and opportunities (20)

Technical Writing Annemarie Hamlin, Chris Rubio, Michele DeSilva.docx
Technical Writing Annemarie Hamlin, Chris Rubio, Michele DeSilva.docxTechnical Writing Annemarie Hamlin, Chris Rubio, Michele DeSilva.docx
Technical Writing Annemarie Hamlin, Chris Rubio, Michele DeSilva.docx
 
BE Final Year Project and Seminar Sem VI.pptx
BE Final Year Project and Seminar Sem VI.pptxBE Final Year Project and Seminar Sem VI.pptx
BE Final Year Project and Seminar Sem VI.pptx
 
Project-Manager.ppt
Project-Manager.pptProject-Manager.ppt
Project-Manager.ppt
 
Project Introduction09 Kieran Lenihan
Project Introduction09  Kieran LenihanProject Introduction09  Kieran Lenihan
Project Introduction09 Kieran Lenihan
 
Project Management online sample (1) (1).pptx
Project Management online sample (1) (1).pptxProject Management online sample (1) (1).pptx
Project Management online sample (1) (1).pptx
 
EBUS614- PROJECT AND PORTFOLIO MANAGEMENT IN ORGANISATIONS .docx
EBUS614- PROJECT AND PORTFOLIO MANAGEMENT IN ORGANISATIONS    .docxEBUS614- PROJECT AND PORTFOLIO MANAGEMENT IN ORGANISATIONS    .docx
EBUS614- PROJECT AND PORTFOLIO MANAGEMENT IN ORGANISATIONS .docx
 
Technical Writing Annemarie Hamlin, Chris Rubio, Michele DeSilva.docx
Technical Writing Annemarie Hamlin, Chris Rubio, Michele DeSilva.docxTechnical Writing Annemarie Hamlin, Chris Rubio, Michele DeSilva.docx
Technical Writing Annemarie Hamlin, Chris Rubio, Michele DeSilva.docx
 
Communication management
Communication management Communication management
Communication management
 
E Learning Authoring The Shifting Landscape T1 S3 P1
E Learning Authoring   The Shifting Landscape   T1 S3 P1E Learning Authoring   The Shifting Landscape   T1 S3 P1
E Learning Authoring The Shifting Landscape T1 S3 P1
 
Technical Report Lagos (2nd run)
Technical Report Lagos (2nd run)Technical Report Lagos (2nd run)
Technical Report Lagos (2nd run)
 
Technical Report Writing, Lagos (2nd run)
Technical Report Writing, Lagos (2nd run)Technical Report Writing, Lagos (2nd run)
Technical Report Writing, Lagos (2nd run)
 
Technical Report Writing, Lagos (2nd run)
Technical Report Writing, Lagos (2nd run)Technical Report Writing, Lagos (2nd run)
Technical Report Writing, Lagos (2nd run)
 
Cs244 w10ch1
Cs244 w10ch1Cs244 w10ch1
Cs244 w10ch1
 
1530 track2 reid
1530 track2 reid1530 track2 reid
1530 track2 reid
 
PetroSync - Technical Report Writing and Presentation Skills for Oil & Gas En...
PetroSync - Technical Report Writing and Presentation Skills for Oil & Gas En...PetroSync - Technical Report Writing and Presentation Skills for Oil & Gas En...
PetroSync - Technical Report Writing and Presentation Skills for Oil & Gas En...
 
JD - SE Pr. Electrical_Engineer_231102.docx
JD - SE Pr. Electrical_Engineer_231102.docxJD - SE Pr. Electrical_Engineer_231102.docx
JD - SE Pr. Electrical_Engineer_231102.docx
 
Technical Report Writing, Lagos
Technical Report Writing, LagosTechnical Report Writing, Lagos
Technical Report Writing, Lagos
 
Technical Report Writing, Lagos
Technical Report Writing, LagosTechnical Report Writing, Lagos
Technical Report Writing, Lagos
 
Steven James Pannett Dissertation
Steven James Pannett  Dissertation Steven James Pannett  Dissertation
Steven James Pannett Dissertation
 
Registered professional titles presentation
Registered professional titles presentationRegistered professional titles presentation
Registered professional titles presentation
 

Más de TCUK Conference

TCUK 2013 - Managing as a freelance technical communicator
TCUK 2013 - Managing as a freelance technical communicatorTCUK 2013 - Managing as a freelance technical communicator
TCUK 2013 - Managing as a freelance technical communicatorTCUK Conference
 
TCUK 2013 - Don't manage: lead
TCUK 2013 - Don't manage: leadTCUK 2013 - Don't manage: lead
TCUK 2013 - Don't manage: leadTCUK Conference
 
TCUK 2013 - Digital accessibility: Strategy, content and delivery
TCUK 2013 - Digital accessibility: Strategy, content and deliveryTCUK 2013 - Digital accessibility: Strategy, content and delivery
TCUK 2013 - Digital accessibility: Strategy, content and deliveryTCUK Conference
 
TCUK 2013 - Using technology to simplify export documentation
TCUK 2013 - Using technology to simplify export documentationTCUK 2013 - Using technology to simplify export documentation
TCUK 2013 - Using technology to simplify export documentationTCUK Conference
 
TCUK 2013 - Adrian Morse - The challenges of remote management
TCUK 2013 - Adrian Morse - The challenges of remote managementTCUK 2013 - Adrian Morse - The challenges of remote management
TCUK 2013 - Adrian Morse - The challenges of remote managementTCUK Conference
 
TCUK 2013 - Andrew Peck - When culture meets content
TCUK 2013 - Andrew Peck - When culture meets contentTCUK 2013 - Andrew Peck - When culture meets content
TCUK 2013 - Andrew Peck - When culture meets contentTCUK Conference
 
TCUK 2013 - Matthew Ellison - Time saving tools and techniques for capturing ...
TCUK 2013 - Matthew Ellison - Time saving tools and techniques for capturing ...TCUK 2013 - Matthew Ellison - Time saving tools and techniques for capturing ...
TCUK 2013 - Matthew Ellison - Time saving tools and techniques for capturing ...TCUK Conference
 
TCUK 2013 - Roll-Royce - Common Technical Data
TCUK 2013 - Roll-Royce - Common Technical DataTCUK 2013 - Roll-Royce - Common Technical Data
TCUK 2013 - Roll-Royce - Common Technical DataTCUK Conference
 
TCUK 2013 - Mike Unwalla - Patterns in language for POS disambiguation in a s...
TCUK 2013 - Mike Unwalla - Patterns in language for POS disambiguation in a s...TCUK 2013 - Mike Unwalla - Patterns in language for POS disambiguation in a s...
TCUK 2013 - Mike Unwalla - Patterns in language for POS disambiguation in a s...TCUK Conference
 
TCUK 2013 - Martin Block - Creating narrated videos for user assistance
TCUK 2013 - Martin Block - Creating narrated videos for user assistanceTCUK 2013 - Martin Block - Creating narrated videos for user assistance
TCUK 2013 - Martin Block - Creating narrated videos for user assistanceTCUK Conference
 
TCUK 2013 - Fiona Parker - Building a team to support proposal production
TCUK 2013 - Fiona Parker - Building a team to support proposal productionTCUK 2013 - Fiona Parker - Building a team to support proposal production
TCUK 2013 - Fiona Parker - Building a team to support proposal productionTCUK Conference
 
TCUK 2012, Rob Scott Norton, Beyond the Comfort Zone: Today, You Will Not Be ...
TCUK 2012, Rob Scott Norton, Beyond the Comfort Zone: Today, You Will Not Be ...TCUK 2012, Rob Scott Norton, Beyond the Comfort Zone: Today, You Will Not Be ...
TCUK 2012, Rob Scott Norton, Beyond the Comfort Zone: Today, You Will Not Be ...TCUK Conference
 
TCUK 2012, Nolwenn Kerzreho, Metadata: Why Should Technical Communicators Care?
TCUK 2012, Nolwenn Kerzreho, Metadata: Why Should Technical Communicators Care?TCUK 2012, Nolwenn Kerzreho, Metadata: Why Should Technical Communicators Care?
TCUK 2012, Nolwenn Kerzreho, Metadata: Why Should Technical Communicators Care?TCUK Conference
 
TCUK 2012, Alison Peck, CPD - Why Bother?
TCUK 2012, Alison Peck, CPD - Why Bother?TCUK 2012, Alison Peck, CPD - Why Bother?
TCUK 2012, Alison Peck, CPD - Why Bother?TCUK Conference
 
TCUK 2012, Tony Self, DITA Style Guide
TCUK 2012, Tony Self, DITA Style GuideTCUK 2012, Tony Self, DITA Style Guide
TCUK 2012, Tony Self, DITA Style GuideTCUK Conference
 
TCUK 2012, Leah Guren, Golden Rules Redux
TCUK 2012, Leah Guren, Golden Rules ReduxTCUK 2012, Leah Guren, Golden Rules Redux
TCUK 2012, Leah Guren, Golden Rules ReduxTCUK Conference
 
TCUK 2012, Ian Ampleford and Peter Jones, Why would we want to talk to customers
TCUK 2012, Ian Ampleford and Peter Jones, Why would we want to talk to customersTCUK 2012, Ian Ampleford and Peter Jones, Why would we want to talk to customers
TCUK 2012, Ian Ampleford and Peter Jones, Why would we want to talk to customersTCUK Conference
 
TCUK 2012, Bryan Lade, How to sell yourself as a Technical Author
TCUK 2012, Bryan Lade, How to sell yourself as a Technical AuthorTCUK 2012, Bryan Lade, How to sell yourself as a Technical Author
TCUK 2012, Bryan Lade, How to sell yourself as a Technical AuthorTCUK Conference
 
TCUK 2012, Leah Guren, A Fish Tale
TCUK 2012, Leah Guren, A Fish TaleTCUK 2012, Leah Guren, A Fish Tale
TCUK 2012, Leah Guren, A Fish TaleTCUK Conference
 

Más de TCUK Conference (19)

TCUK 2013 - Managing as a freelance technical communicator
TCUK 2013 - Managing as a freelance technical communicatorTCUK 2013 - Managing as a freelance technical communicator
TCUK 2013 - Managing as a freelance technical communicator
 
TCUK 2013 - Don't manage: lead
TCUK 2013 - Don't manage: leadTCUK 2013 - Don't manage: lead
TCUK 2013 - Don't manage: lead
 
TCUK 2013 - Digital accessibility: Strategy, content and delivery
TCUK 2013 - Digital accessibility: Strategy, content and deliveryTCUK 2013 - Digital accessibility: Strategy, content and delivery
TCUK 2013 - Digital accessibility: Strategy, content and delivery
 
TCUK 2013 - Using technology to simplify export documentation
TCUK 2013 - Using technology to simplify export documentationTCUK 2013 - Using technology to simplify export documentation
TCUK 2013 - Using technology to simplify export documentation
 
TCUK 2013 - Adrian Morse - The challenges of remote management
TCUK 2013 - Adrian Morse - The challenges of remote managementTCUK 2013 - Adrian Morse - The challenges of remote management
TCUK 2013 - Adrian Morse - The challenges of remote management
 
TCUK 2013 - Andrew Peck - When culture meets content
TCUK 2013 - Andrew Peck - When culture meets contentTCUK 2013 - Andrew Peck - When culture meets content
TCUK 2013 - Andrew Peck - When culture meets content
 
TCUK 2013 - Matthew Ellison - Time saving tools and techniques for capturing ...
TCUK 2013 - Matthew Ellison - Time saving tools and techniques for capturing ...TCUK 2013 - Matthew Ellison - Time saving tools and techniques for capturing ...
TCUK 2013 - Matthew Ellison - Time saving tools and techniques for capturing ...
 
TCUK 2013 - Roll-Royce - Common Technical Data
TCUK 2013 - Roll-Royce - Common Technical DataTCUK 2013 - Roll-Royce - Common Technical Data
TCUK 2013 - Roll-Royce - Common Technical Data
 
TCUK 2013 - Mike Unwalla - Patterns in language for POS disambiguation in a s...
TCUK 2013 - Mike Unwalla - Patterns in language for POS disambiguation in a s...TCUK 2013 - Mike Unwalla - Patterns in language for POS disambiguation in a s...
TCUK 2013 - Mike Unwalla - Patterns in language for POS disambiguation in a s...
 
TCUK 2013 - Martin Block - Creating narrated videos for user assistance
TCUK 2013 - Martin Block - Creating narrated videos for user assistanceTCUK 2013 - Martin Block - Creating narrated videos for user assistance
TCUK 2013 - Martin Block - Creating narrated videos for user assistance
 
TCUK 2013 - Fiona Parker - Building a team to support proposal production
TCUK 2013 - Fiona Parker - Building a team to support proposal productionTCUK 2013 - Fiona Parker - Building a team to support proposal production
TCUK 2013 - Fiona Parker - Building a team to support proposal production
 
TCUK 2012, Rob Scott Norton, Beyond the Comfort Zone: Today, You Will Not Be ...
TCUK 2012, Rob Scott Norton, Beyond the Comfort Zone: Today, You Will Not Be ...TCUK 2012, Rob Scott Norton, Beyond the Comfort Zone: Today, You Will Not Be ...
TCUK 2012, Rob Scott Norton, Beyond the Comfort Zone: Today, You Will Not Be ...
 
TCUK 2012, Nolwenn Kerzreho, Metadata: Why Should Technical Communicators Care?
TCUK 2012, Nolwenn Kerzreho, Metadata: Why Should Technical Communicators Care?TCUK 2012, Nolwenn Kerzreho, Metadata: Why Should Technical Communicators Care?
TCUK 2012, Nolwenn Kerzreho, Metadata: Why Should Technical Communicators Care?
 
TCUK 2012, Alison Peck, CPD - Why Bother?
TCUK 2012, Alison Peck, CPD - Why Bother?TCUK 2012, Alison Peck, CPD - Why Bother?
TCUK 2012, Alison Peck, CPD - Why Bother?
 
TCUK 2012, Tony Self, DITA Style Guide
TCUK 2012, Tony Self, DITA Style GuideTCUK 2012, Tony Self, DITA Style Guide
TCUK 2012, Tony Self, DITA Style Guide
 
TCUK 2012, Leah Guren, Golden Rules Redux
TCUK 2012, Leah Guren, Golden Rules ReduxTCUK 2012, Leah Guren, Golden Rules Redux
TCUK 2012, Leah Guren, Golden Rules Redux
 
TCUK 2012, Ian Ampleford and Peter Jones, Why would we want to talk to customers
TCUK 2012, Ian Ampleford and Peter Jones, Why would we want to talk to customersTCUK 2012, Ian Ampleford and Peter Jones, Why would we want to talk to customers
TCUK 2012, Ian Ampleford and Peter Jones, Why would we want to talk to customers
 
TCUK 2012, Bryan Lade, How to sell yourself as a Technical Author
TCUK 2012, Bryan Lade, How to sell yourself as a Technical AuthorTCUK 2012, Bryan Lade, How to sell yourself as a Technical Author
TCUK 2012, Bryan Lade, How to sell yourself as a Technical Author
 
TCUK 2012, Leah Guren, A Fish Tale
TCUK 2012, Leah Guren, A Fish TaleTCUK 2012, Leah Guren, A Fish Tale
TCUK 2012, Leah Guren, A Fish Tale
 

Último

Global Scenario On Sustainable and Resilient Coconut Industry by Dr. Jelfina...
Global Scenario On Sustainable  and Resilient Coconut Industry by Dr. Jelfina...Global Scenario On Sustainable  and Resilient Coconut Industry by Dr. Jelfina...
Global Scenario On Sustainable and Resilient Coconut Industry by Dr. Jelfina...ictsugar
 
Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.Anamaria Contreras
 
Marketplace and Quality Assurance Presentation - Vincent Chirchir
Marketplace and Quality Assurance Presentation - Vincent ChirchirMarketplace and Quality Assurance Presentation - Vincent Chirchir
Marketplace and Quality Assurance Presentation - Vincent Chirchirictsugar
 
IoT Insurance Observatory: summary 2024
IoT Insurance Observatory:  summary 2024IoT Insurance Observatory:  summary 2024
IoT Insurance Observatory: summary 2024Matteo Carbone
 
Kenya’s Coconut Value Chain by Gatsby Africa
Kenya’s Coconut Value Chain by Gatsby AfricaKenya’s Coconut Value Chain by Gatsby Africa
Kenya’s Coconut Value Chain by Gatsby Africaictsugar
 
MAHA Global and IPR: Do Actions Speak Louder Than Words?
MAHA Global and IPR: Do Actions Speak Louder Than Words?MAHA Global and IPR: Do Actions Speak Louder Than Words?
MAHA Global and IPR: Do Actions Speak Louder Than Words?Olivia Kresic
 
FULL ENJOY Call girls in Paharganj Delhi | 8377087607
FULL ENJOY Call girls in Paharganj Delhi | 8377087607FULL ENJOY Call girls in Paharganj Delhi | 8377087607
FULL ENJOY Call girls in Paharganj Delhi | 8377087607dollysharma2066
 
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCRashishs7044
 
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City GurgaonCall Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaoncallgirls2057
 
Investment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy CheruiyotInvestment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy Cheruiyotictsugar
 
India Consumer 2024 Redacted Sample Report
India Consumer 2024 Redacted Sample ReportIndia Consumer 2024 Redacted Sample Report
India Consumer 2024 Redacted Sample ReportMintel Group
 
8447779800, Low rate Call girls in Rohini Delhi NCR
8447779800, Low rate Call girls in Rohini Delhi NCR8447779800, Low rate Call girls in Rohini Delhi NCR
8447779800, Low rate Call girls in Rohini Delhi NCRashishs7044
 
Ms Motilal Padampat Sugar Mills vs. State of Uttar Pradesh & Ors. - A Milesto...
Ms Motilal Padampat Sugar Mills vs. State of Uttar Pradesh & Ors. - A Milesto...Ms Motilal Padampat Sugar Mills vs. State of Uttar Pradesh & Ors. - A Milesto...
Ms Motilal Padampat Sugar Mills vs. State of Uttar Pradesh & Ors. - A Milesto...ShrutiBose4
 
Buy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail AccountsBuy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail AccountsBuy Verified Accounts
 
Case study on tata clothing brand zudio in detail
Case study on tata clothing brand zudio in detailCase study on tata clothing brand zudio in detail
Case study on tata clothing brand zudio in detailAriel592675
 
Intro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdfIntro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdfpollardmorgan
 
Islamabad Escorts | Call 03070433345 | Escort Service in Islamabad
Islamabad Escorts | Call 03070433345 | Escort Service in IslamabadIslamabad Escorts | Call 03070433345 | Escort Service in Islamabad
Islamabad Escorts | Call 03070433345 | Escort Service in IslamabadAyesha Khan
 

Último (20)

Japan IT Week 2024 Brochure by 47Billion (English)
Japan IT Week 2024 Brochure by 47Billion (English)Japan IT Week 2024 Brochure by 47Billion (English)
Japan IT Week 2024 Brochure by 47Billion (English)
 
Global Scenario On Sustainable and Resilient Coconut Industry by Dr. Jelfina...
Global Scenario On Sustainable  and Resilient Coconut Industry by Dr. Jelfina...Global Scenario On Sustainable  and Resilient Coconut Industry by Dr. Jelfina...
Global Scenario On Sustainable and Resilient Coconut Industry by Dr. Jelfina...
 
Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.
 
Marketplace and Quality Assurance Presentation - Vincent Chirchir
Marketplace and Quality Assurance Presentation - Vincent ChirchirMarketplace and Quality Assurance Presentation - Vincent Chirchir
Marketplace and Quality Assurance Presentation - Vincent Chirchir
 
IoT Insurance Observatory: summary 2024
IoT Insurance Observatory:  summary 2024IoT Insurance Observatory:  summary 2024
IoT Insurance Observatory: summary 2024
 
Kenya’s Coconut Value Chain by Gatsby Africa
Kenya’s Coconut Value Chain by Gatsby AfricaKenya’s Coconut Value Chain by Gatsby Africa
Kenya’s Coconut Value Chain by Gatsby Africa
 
MAHA Global and IPR: Do Actions Speak Louder Than Words?
MAHA Global and IPR: Do Actions Speak Louder Than Words?MAHA Global and IPR: Do Actions Speak Louder Than Words?
MAHA Global and IPR: Do Actions Speak Louder Than Words?
 
FULL ENJOY Call girls in Paharganj Delhi | 8377087607
FULL ENJOY Call girls in Paharganj Delhi | 8377087607FULL ENJOY Call girls in Paharganj Delhi | 8377087607
FULL ENJOY Call girls in Paharganj Delhi | 8377087607
 
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
 
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City GurgaonCall Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaon
 
No-1 Call Girls In Goa 93193 VIP 73153 Escort service In North Goa Panaji, Ca...
No-1 Call Girls In Goa 93193 VIP 73153 Escort service In North Goa Panaji, Ca...No-1 Call Girls In Goa 93193 VIP 73153 Escort service In North Goa Panaji, Ca...
No-1 Call Girls In Goa 93193 VIP 73153 Escort service In North Goa Panaji, Ca...
 
Corporate Profile 47Billion Information Technology
Corporate Profile 47Billion Information TechnologyCorporate Profile 47Billion Information Technology
Corporate Profile 47Billion Information Technology
 
Investment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy CheruiyotInvestment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy Cheruiyot
 
India Consumer 2024 Redacted Sample Report
India Consumer 2024 Redacted Sample ReportIndia Consumer 2024 Redacted Sample Report
India Consumer 2024 Redacted Sample Report
 
8447779800, Low rate Call girls in Rohini Delhi NCR
8447779800, Low rate Call girls in Rohini Delhi NCR8447779800, Low rate Call girls in Rohini Delhi NCR
8447779800, Low rate Call girls in Rohini Delhi NCR
 
Ms Motilal Padampat Sugar Mills vs. State of Uttar Pradesh & Ors. - A Milesto...
Ms Motilal Padampat Sugar Mills vs. State of Uttar Pradesh & Ors. - A Milesto...Ms Motilal Padampat Sugar Mills vs. State of Uttar Pradesh & Ors. - A Milesto...
Ms Motilal Padampat Sugar Mills vs. State of Uttar Pradesh & Ors. - A Milesto...
 
Buy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail AccountsBuy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail Accounts
 
Case study on tata clothing brand zudio in detail
Case study on tata clothing brand zudio in detailCase study on tata clothing brand zudio in detail
Case study on tata clothing brand zudio in detail
 
Intro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdfIntro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdf
 
Islamabad Escorts | Call 03070433345 | Escort Service in Islamabad
Islamabad Escorts | Call 03070433345 | Escort Service in IslamabadIslamabad Escorts | Call 03070433345 | Escort Service in Islamabad
Islamabad Escorts | Call 03070433345 | Escort Service in Islamabad
 

TCUK 2013 - Technical writing in Energy and Resources: Risks and opportunities

  • 1. Technical Writing in Energy and Resources Risks and Opportunities Dr Robert Illes Technical Communication UK Bristol, September 2013
  • 2. Imagine being in a place where we can say…
  • 3. We are a leading professional services provider to the energy, resource and complex process industries. Our services cover the full spectrum both in size and lifecycle – from the creation of new assets to services that sustain and enhance operating assets. Technical Communication is central and implicit in all aspects of company activity…
  • 4. Engineering Projects in Energy and Resources  Waterfall project management  Subject matter / discipline experts own and do their own writing  Quality of writing is extremely variable  Focus of attention is usually the engineering, the schedule, pesky changes or pacifying a customer who is equally under pressure to deliver…
  • 5. Engineering Projects: The Undiscovered Country The most important deliverables are: Written Reports Strategies Decision Papers Guidelines Plans Standards Specifications Philosophies Design Basis Method Statements Procedures Scopes of Work Technical Studies Opportunities at the outset…
  • 6. Engineering Projects: The Undiscovered Country Choose your sector: Power Renewables Coal, Gas Carbon capture Nuclear Hydrocarbons Deep water, Subsea, On-shore Oil, Gas Processing, LNG, Gas-to-liquid Pipelines Mining Base metals, iron, aluminium Exotic metals, lithium Chemicals, phosphates Processing, Beneficiation Infrastructure Transportation on and off-shore Pioneer camps, Operations, Admin Water Environmental impact Niche consultancy: Economic/Macroeconomic Analyses Geotechnical Carbon Consulting Sulphur Technology Opportunities at the outset…
  • 7. Engineering Projects: The Undiscovered Country Choose your discipline: Assurance and Governance Infrastructure Business Organisation Insurances Capital Cost Estimating Investment Opportunities Commissioning Communications (ICT) Construction Detailed Engineering Design Geology Health, Safety and Security Legal Manufacturing Market Analyses Operations Management / Mobilisation Operating Cost Estimating Permitting Human Resources Process Engineering Product Laboratory Testing Procurement and Supply Chain Management Quality and Integrity Management Regional / Local Content Risk Management Schedule and Planning Stakeholder Analyses Strategy Sustainable Development / Environment Testing and Inspection Opportunities at the outset…
  • 9. Two-Way Risks and Opportunities Risks Technical Writer Engineering Project (Dedicated Technical Communications) (Company, Client, Stakeholders) Opportunities 1. What are the risks that a technical writer poses to an engineering project? 2. What are the opportunities that a technical writer presents to an engineering project? 3. What are the risks that an engineering project poses to a technical writer? 4. What are the opportunities that an engineering project presents to a technical writer?
  • 10. Method – Data Gathering  One-to-one exploratory conversations with a selection of participants  Participant prompt sheet given a day in advance  Brainstorming and recording of ideas as they arise
  • 11. Method – Data Analysis  Compilation of anecdotes  Emergence of categories  Saturation of data – you hear similar things with each new participant  Occasional occurrence of a real gem/oddity that throws your entire thinking…
  • 12. Study Participants   Nine discipline specialists across the spectrum, at all levels from graduate to director “Home crowd” in that they are people I have worked with, get on with and who agreed to spend a little time helping with this study Name Dionne Matthew Kate Ceren Frank David Sanjay Jose Scott Dr Robert Illes Role Risk and Economics Manager Senior Climate Change Consultant Graduate Engineer Graduate PSCM Specialist Mega-projects Director Engineering Manager Process Engineer Construction Manager Regional Economics Director Senior Technical Writer
  • 15. Methodological Underpinning  Risk Management: risks and opportunities treated together Covello and Allen (1988), Hillson (2002)  Small scale qualitative study, a limited number of participants Glaser and Strauss (1967), Lincoln and Guba (1985)  Context of projects I have worked on: “battery limits”  All the assumptions and “noise” I bring to the study… What’s in it for stakeholders? Consequences for projects What’s in it for us? Enhancement of our practice New and enhanced knowledge about how technical writing can affect a project Avoiding probable pitfalls How to mitigate probable risks Enhanced kudos, some new knowledge out there
  • 16. Emerging Categories  Financial: aspects such as cash flow and budget  Expertise: is it appropriate, how it will affect the work generated  Project Efficiency: schedule, need for training, communication  Reputation: how it can be damaged or enhanced
  • 17. 1. Risks to the Project Risks Financial Expertise 1. FOR THE PROJECT (from the technical writer to the project) Elements How to Mitigate? Cost – additional drain on budget, perception Hire on a needs basis, draw on demonstrated that tech comm is a cost centre knowledge that it is a profit centre Lack of relevant depth of knowledge in Interview and hire the right person with:1) relevant disciplines engineering background 2) English skills 3) common sense Insufficient understanding of the scope, wasted Establishing positive and effective communication time in reworking non fit for purpose work channels, patience for all parties Communication… Differing points of view or focus on what is important Unknown skillset at point of hire leading to either underuse of writer or highly divergent results Project Efficiency Reputation Interviewing, communication Communication. Allow writer to engage clients/stakeholders Lack of engaging all stakeholders. Is the writer adequately focused on the reader? Need for training (both the writer and SMEs) Technical writer ownership – potential bottleneck if writer has to review every document Conflicts of interest – exposure to highly confidential data Company X perceived as expensive due to lavish use of “non-essential” personnel in expensive locations Small initial pain for larger gains Train others in the ways of the writer; let writer focus on those big, important documents like executive summaries Learn the principle of Chinese walls Hire a writer on a “needs basis” or make tech comm a profit generating centre
  • 18. 2. Opportunities for the Project Opportunities Financial Expertise 2. FOR THE PROJECT (from the technical writer to the project) Elements Increased profits – save money in the long run as project is demonstrably on time, on budget, producing quality work Realisation of what we can use a writer for: scopes of work, feasibility reports, execution reports, end of project reports Writer can revitalise a study with a fresh approach; organise data in innovative ways Project Efficiency Writers focus on the reader, not their line manager or some piece of engineering Making all documents standardised, fit for purpose, up-to-date, consistent and useable across all disciplines Can help project be on time, on budget, reduce burden of SMEs; so long as engaged EARLY New approaches streamline project practices, are reusable, driving schedule; generally improve the quality of project work Reputation A writer is a natural interface between SME disciplines and with clients Leverage good writing quality as an integral part of why the company should get the work Mitigate communication breakdowns over documents being rejected at the outset
  • 19. 3. Risks to the Writer Risks Financial Expertise Project Efficiency Reputation 3. FOR THE TECHNICAL WRITER (from the project to the technical writer) Elements How to Mitigate? Sporadic work if hired on a “needs basis” – Run a couple of projects concurrently usually busy at beginning and end of a project with a lull in the middle. Field not Need for the best in security seen as desirable due to very short contracts Risk to one‟s safety in certain environments if known to be a party to sensitive data Frustration in being given an unclear scope. Out of depth. Is a journalism specialist qualified to “own” a mining feasibility report? Whether one will develop good working relationships with SMEs Producing not fit for purpose work Being too good and having too much work Communication… Choose a role concordant with your knowledge. SMEs still “own” the reports, writer is more sideways integrated Communication and persona Project must ensure skillset is appropriate, writer should apply for relevant roles Argument for a dedicated centre/department
  • 20. 4. Opportunities for the Writer Opportunities Financial Expertise Project Efficiency Reputation 4. FOR THE TECHNICAL WRITER (from the project to the technical writer) Elements A lot of “last minute opportunities” Potentially high earnings if sustained over concurrent projects Learning a lot of new knowledge, new management styles, consolidating and enhancing one‟s practice Chance to micro-niche, become a micro-expert Develop long lasting great synergistic working relationships Networking and being able to use skills on other projects Become known and revered as a centre of technical communication excellence Good reputation = good flow of steady work
  • 21. Emerging Gems  Is a writer always focused on the reader? Despite our axiom “write for the reader”  How safe is a writer? Especially in view of BP Algeria incident and others
  • 23. Weighing In Cost of Dedicated Technical Communication Resource Inspired by: http://www.writingassist.com Cost of Ignoring Technical Communication
  • 24. Profit Centre and Value: Evidence Snapshot Houlihan, D. (2009). Technical Communications as a Profit Center. Boston, Ma., The Aberdeen Group. On analysing data from 165 companies, leading US business researchers The Aberdeen Group found that when leveraged effectively, technical communication stands to contribute as much as a 42% increase in customer satisfaction and an associated 45% increase in product revenue. Aberdeen‟s data clearly indicates that Best-in-Class performers have found the means to leverage technical communications to influence customers‟ experiences with a marked impact on business profitability, and that whilst all too often regarded as a cost centre, technical communications and documentation are actually key profit generators. Redish, J. (2003). Adding Value as a Professional Technical Communicator. Technical Communication, 50(4), pp. 505-518. With reference to case studies in the literature, Redish found that there are numerous ways in which technical communicators “add value” which go over and above numerical measures. Thus, numbers do not tell the whole story and “process is critical”. Al Blackwell, C. (1995). A Good Installation Guide Increases User Satisfaction and Reduces Support Costs. Technical Communication, 42(1), pp. 56-60. Seminal case study at SABRE Travel Information Network showing that good documentation reduced support calls by 80% and resulted in 94% customer satisfaction.
  • 25. Conclusions  Identified risks have counterparts as opportunities and vice versa – there is always this two-way relationship  Identified risks are usually able to be mitigated or outweighed by potential later benefits  Risks are usually relevant to the scene and thus culturally disposed (e.g. engineers worried about non-specialists messing up their work)  Writers stand a better chance of their discipline standing as a discipline if it is a profit centre i.e. develop a body of evidence that engaging good technical resources enhances the quality of project work and brings it in on time and on budget
  • 26. Remember the Opportunities… Written Reports Strategies Decision Papers Guidelines Plans Standards Specifications Philosophies Design Basis Method Statements Procedures Scopes of Work Technical Studies Assurance and Governance Business Organisation Infrastructure Insurances Capital Cost Estimating Investment Opportunities Commissioning Communications (ICT) Construction Detailed Engineering Design Geology Health, Safety and Security Legal Manufacturing Market Analyses Operations Management / Mobilisation Operating Cost Estimating Permitting Human Resources Process Engineering Product Laboratory Testing Procurement and Supply Chain Management Quality and Integrity Management Regional / Local Content Risk Management Schedule and Planning Stakeholder Analyses Strategy Sustainable Development / Environment Testing and Inspection
  • 27. Dedicated Technical Communication Development – Why? A case for our on-going engagement in Energy and Resources projects
  • 28. Key Benefits of Using Technical Writers  Reader focus…  Optimise project efficiency  Drive schedules  Drive profits and add value
  • 29. Reader Focus Technical writers focus on the reader at all times Good writing encourages the reader to carry on reading Do engineers understand the design/product the best? Specialists may be good within their field and to their peers, but are they experts at communicating outside to nonspecialists?
  • 30. Optimise Project Efficiency It‟s about more than good writing skills: • Problem-definers, problem-solvers • Management of the writing process • A resource to find other resources • Getting the message across clearly • Appropriate detachment
  • 31. Drive Schedules Technical writers like to write and edit, specialists generally do not Precise about concepts and terminology Mitigate tortuous language BEFORE it reaches the client Significantly reduce the backdraft/review cycle “Let each act according to their best destiny”
  • 32. Drive Profits, Add Value  Add value to the business in multiple ways  Enhance all aspects of current operations  Reduce unnecessary support  Save money in the long run  Be more than an engineering consultancy
  • 33. References Al Blackwell, C. (1995). A Good Installation Guide Increases User Satisfaction and Reduces Support Costs Technical Communication, 42(1), 56-60. Carr, W. and Kemmis, S. (1986). Becoming Critical. London, Falmer. Covello, V. T. and Allen, F. H. (1988). Seven Cardinal Rules of Risk Communication. Washington, DC, U.S. Environmental Protection Agency. OPA87-020. Davis, R. M. (1975). Technical Writing: Its Importance in the Engineering Profession and Its Place in Engineering Curricula - A Survey of the Experience and Opinions of Prominent Engineers. Education Resources Information Center, Technical Report No. 75-5. Del Caño, A. and de la Cruz, M. (2002). Integrated Methodology for Project Risk Management. J. Constr. Eng. Manage., 128(6), 473–485. ENVSEC, 2002. Transforming Risks into Co-operation: Central Asia Ferghana – Osh – Khudjand Area. Background Paper. Glaser, B. G. and Strauss, A. L. (1967). The Discovery of Grounded Theory. New York, Aldine de Gruyter. Goldman Sachs, 2008. 190 projects to change the world, Global Investment Research, April 25. Hardisty, P.E. (2009). Environmental and Economic Sustainability, NY, NY, CRC Press. Hillson, D. (2002). Extending the risk process to manage opportunities International Journal of Project Management 20, 235-240. Houlihan, D. (2009). Technical Communications as a Profit Center. Boston, MA., The Aberdeen Group. ISO (2009). ISO 31000:2009 Risk Management: Principles and Guidelines. Geneva, ISO. Lewin, K. (1952) „Group Decisions and Social Change‟ in G. E. Swanson, T. M. Newcomb and F. E. Hartley (eds.) Readings in Social Psychology, New York, Holt. Lincoln, Y. S. and Guba, E. (1985). Naturalistic Inquiry. California, SAGE. Narayanan, M. (2010). Importance of Technical Writing in Engineering Education. American Geophysical Union, Fall Meeting 2010. Redish, J. (1995). Adding Value as a Professional Technical Communicator Technical Communication, 42, (1), pp. 26-39. Samuels, J. (2013). How out-of-date documentation can cost you your brand and your company. http://www.writingassist.com/resources/articles/out-ofdate-documentation/ WorleyParsons. (2012a). About Economics™. Retrieved 7 May 2013: http://www.worleyparsons.com/AboutUs/Economics/Pages/AboutEconomics.aspx WorleyParsons. (2012b). Sustainable Decisions. Retrieved 7 May 2013: http://www.worleyparsons.com/AboutUs/Economics/Pages/SustainableDecisions.aspx
  • 34. Your Energetic and Resourceful Technical Author Dr Robert Illes BSc (Hons) PGCE PhD MISTC Senior Technical Author robert.illes@opal-flame.com September 2013 © Opal Flame Consultancy www.opal-flame.com All rights reserved

Notas del editor

  1. “Added Value” is sometimes implicit and evidence is present throughout all the slides in this presentation of how a dedicated technical communication centre enhances the business.