IBBR Process to Evaluate Potential Energy
Consumption Reduction Measures
 Identify the need (what do we want/need to do and why)
• Will the end result:
• Improve operational efficiency?
• Improve operational reliability?
• Reduce operational cost?
• Improve lab/workspace environment?
 Identify impact on labs and occupants (+/-)
• Workmen in the labs/workspaces
• Temperature/humidity conditions
• Effect of final result of the project
 Safety concerns
 Funding sources and incentives
 Payback on investment
2
HVAC
50–70%
Lighting
20%
Other
10%
Lab energy consumption
Copyright © 2015 Optimum Energy LLC. All Rights Reserved. Proprietary & Confidential
Strategy to Implement Projects
 Frame basic scope of work
 Identify all stake holders
 Engage stake holders in project planning and scheduling(flesh out final scope
of work)
 Identify funding mechanism(s)
 Procure services
 Communicate the plan to contractors/installers
 Monitor, Evaluate and Revise the plan as the situation requires.
 Provide what you promise, communicate what you can’t
 Follow up on and clear outstanding issues
 Obtain stake holder buy in on job completion (make adjustments if
necessary)
4
Copyright © 2015 Optimum Energy LLC. All Rights Reserved. Proprietary & Confidential
Discussion of Three Energy Projects at IBBR
5
Building 2 Chiller Optimization
Lab Ventilation Savings
Lab and Office lighting retrofit
© Optimum Energy
Copyright © 2015 Optimum Energy LLC. All Rights Reserved. Proprietary & Confidential
Optimum Energy
Scalable, Data-Driven Optimization for Cooling and Heating Systems
2015
IBBR Building 2 Chiller Plant Optimization
Copyright © 2015 Optimum Energy LLC. All Rights Reserved. Proprietary & Confidential
OptiCx Plant Overview
7
• Total Capacity:
900 Tons
• 2 Chillers
• 2 Towers
• 2 Primary
Pumps
• 2 Secondary
Pumps
• 2 Condenser
Pumps
8
Operational Modules
Real-time Dynamic Commissioning
OptiCx Platform
Pumps
&Valves
Chillers Tower
Fans
VFD’
s
VFD’s
OptimumLOOP TM
OptiCx Platform: Chilled Water System Optimization
• Up to 50% efficiency improvement
• Delivers superior occupant comfort while
optimizing system performance
• Substantially reduces CO2, water, and energy
• Fights performance drift
OptimumLOOP
• Configurable optimization software for
centrifugal chilled water plants
• Patented relational control algorithms
• Automatically and continuously optimizes plant
performance in real time
• Dynamically adapts to yield the lowest energy
draw while meeting availability requirements
Building Automation System
Copyright © 2015 Optimum Energy LLC. All Rights Reserved. Proprietary & Confidential
Estimated IBBR Chiller Plant Efficiency - 2012
Annual average kW per ton
Notes:
1. Input includes: chillers, tower fans condenser pumps and chilled water
2. ESA is the Engineering Site Analysis that took place prior to optimization
9
Estimated Efficiency from the ESA of the Current Plant = 0.882 kW/ton
Estimated Efficiency from the ESA of the Current Plant Optimized = 0.647 kW/ton
.882
Current
.647
Projected
27% Efficiency Improvement
Copyright © 2015 Optimum Energy LLC. All Rights Reserved. Proprietary & Confidential
2015 Results: Optimized vs Baseline kW/Ton
10
Copyright © 2015 Optimum Energy LLC. All Rights Reserved. Proprietary & Confidential
Environmental Impact
(based on 181,000kwh/yr saved)
11
Greenhouse gas
emissions from
CO2 emissions from
Greenhouse gas
emissions from
Copyright © 2015 Optimum Energy LLC. All Rights Reserved. Proprietary & Confidential
12
LAB VENTILATION SAVINGS
SIEMENS
Copyright © 2015 Optimum Energy LLC. All Rights Reserved. Proprietary & Confidential
Lab Room 101 Lab Room 102 Classroom 103
Supply Air Duct
General Exhaust Duct
IMS
Advisor
data
center
Sensor Suite
BMS
Copyright © 2015 Optimum Energy LLC. All Rights Reserved. Proprietary & Confidential
Impact of Dynamic Control on Dilution Rates
• 1.5 L spill of acetone in 200 sq ft lab room, 1 sq. m spill
• After vaporized, dynamic system hits TLV in 20 vs. 60 min
• After 2 hours dynamic control has dropped level to 2.6 PPM
– After 2 hours, 6 ACH system is at 302 PPM or 116 times higher!
0.0
1000.0
2000.0
3000.0
4000.0
5000.0
6000.0
0 4 8 12 16 20 24 28 32 36 40 44 48 52 56 60 64 68 72 76 80 84 88 92
PPM
Concentration
Time in Minutes
Spill Dilution Conc. vs Time with 2 ACH Min & 15 ACH Purge
6 ACH Baseline Threshold in PPM Dynamic: 5 Min. Dynamic: 10 Min. Dynamic: 15 Min.
Dynamic control approach is always less than 6 ACH baseline
15 min. detection
time still better than
6 ACH baseline!
Lower initial
ACH helps!
Copyright © 2015 Optimum Energy LLC. All Rights Reserved. Proprietary & Confidential
Optinet System Overview – Example DCV Event
CO2 spike detected in
room 2229 on 5/30/15
Optinet System began commanding
ACH increase at 300ppm CO2
differential to supply air. Peak
level detected drove up ACH by
approximately 7
Correlating flow increase
as commanded by the
Optinet System
Copyright © 2015 Optimum Energy LLC. All Rights Reserved. Proprietary & Confidential
Environmental Impact
(based on 213,778kwh/yr saved)
16
Greenhouse gas
emissions from
CO2 emissions from
Greenhouse gas
emissions from
Copyright © 2015 Optimum Energy LLC. All Rights Reserved. Proprietary & Confidential
Lighting Retrofit
17
INSTITUTE FOR BIOSCIENCE AND BIOTECHNOLOGY RESEARCH
Copyright © 2015 Optimum Energy LLC. All Rights Reserved. Proprietary & Confidential
Lighting Retrofit Objective
18
The objective of the this project is to
optimize fixture spacing in lab spaces to
provide an average illuminance on the
desktop/bench top of 50 foot candles and
10-20 foot candles on non-working
surfaces. In so doing we intended to
reduce total lighting consumption by 50%.
Copyright © 2015 Optimum Energy LLC. All Rights Reserved. Proprietary & Confidential
Lighting Retrofit Overview
19
IBBR Building 1
Number
of
Fixtures
Existing
kW per
Space
Annual
KWh per
Space
Number
of
Fixtures/
Lamps/
Doors
kW per
Space
Peak kW
Savings
Annual
kWh
Savings
Annual
Natural
Gas Use
per
Space
(therms)
Total
Incentive
Amount
1,086 58.241 584,587 590 27.153 31.910 319,917 -2,061 $16,200
IBBR Building 2
Number
of
Fixtures
Existing
kW per
Space
Annual
KWh per
Space
Number
of
Fixtures
to
Replace
kW per
Space
Peak kW
Savings
Annual
kWh
Savings
Annual
Natural
Gas Use
per
Space
(therms)
Total
Incentive
Amount
2,037 94.988 906,086 1,279 47.677 52.314 510,567 -3,319 $35,125
Copyright © 2015 Optimum Energy LLC. All Rights Reserved. Proprietary & Confidential
Environmental Impact
(based on 830,484kwh/yr saved)
20
Greenhouse gas
emissions from
CO2 emissions from
Greenhouse gas
emissions from

Más contenido relacionado

Similar a ibbr_energy_conservation_measure_slides_only.pptx

Jonathan woolley talk
Jonathan woolley talkJonathan woolley talk
Jonathan woolley talkPhucPhamThanh
 
NASSCOM Design and Engineering Summit 2016: Session VI: Disruptor Byte
NASSCOM Design and Engineering Summit 2016: Session VI:  Disruptor ByteNASSCOM Design and Engineering Summit 2016: Session VI:  Disruptor Byte
NASSCOM Design and Engineering Summit 2016: Session VI: Disruptor BytePriya Chawla
 
Aurora hpc energy efficiency
Aurora hpc energy efficiencyAurora hpc energy efficiency
Aurora hpc energy efficiencyEurotech Aurora
 
Smart energy efficiency for industrial consumer systems
Smart energy efficiency for industrial consumer systemsSmart energy efficiency for industrial consumer systems
Smart energy efficiency for industrial consumer systemsGeorges Seil, PhD
 
Smart energy efficiency for industrial consumer systems
Smart energy efficiency for industrial consumer systemsSmart energy efficiency for industrial consumer systems
Smart energy efficiency for industrial consumer systemsGeorges Seil, PhD
 
Mitsubishi 2011 price
Mitsubishi 2011 priceMitsubishi 2011 price
Mitsubishi 2011 pricedokundot
 
Optimising Efficiency & Capacity Sep 04 Rev 0
Optimising Efficiency & Capacity Sep 04 Rev 0Optimising Efficiency & Capacity Sep 04 Rev 0
Optimising Efficiency & Capacity Sep 04 Rev 0Raja Ratnam
 
Alter nrg presentation to springtec nov 2010
Alter nrg presentation to springtec nov 2010Alter nrg presentation to springtec nov 2010
Alter nrg presentation to springtec nov 2010Atef Gresat
 
An introduction to EECO2-Energy Efficiency Consultancy Limited
An introduction to EECO2-Energy Efficiency Consultancy LimitedAn introduction to EECO2-Energy Efficiency Consultancy Limited
An introduction to EECO2-Energy Efficiency Consultancy LimitedEECO2
 
EECO2 GMP critical HVAC energy cost reduction
EECO2 GMP critical HVAC energy cost reductionEECO2 GMP critical HVAC energy cost reduction
EECO2 GMP critical HVAC energy cost reductionKeith Beattie
 
Environmental Sustainability - Green IT
Environmental Sustainability - Green ITEnvironmental Sustainability - Green IT
Environmental Sustainability - Green ITHKAIM
 
Cheetah presentation
Cheetah presentationCheetah presentation
Cheetah presentationashwina c
 
Presentation Holland RET (16-9)
Presentation Holland RET (16-9)Presentation Holland RET (16-9)
Presentation Holland RET (16-9)Max Fossen
 
EcoCooling IT Sales Manual
EcoCooling IT Sales ManualEcoCooling IT Sales Manual
EcoCooling IT Sales ManualAlan Beresford
 

Similar a ibbr_energy_conservation_measure_slides_only.pptx (20)

Polymer APC
Polymer APCPolymer APC
Polymer APC
 
Luke Marshall - One Number to Prioritise Work?
Luke Marshall - One Number to Prioritise Work?Luke Marshall - One Number to Prioritise Work?
Luke Marshall - One Number to Prioritise Work?
 
Jonathan woolley talk
Jonathan woolley talkJonathan woolley talk
Jonathan woolley talk
 
NASSCOM Design and Engineering Summit 2016: Session VI: Disruptor Byte
NASSCOM Design and Engineering Summit 2016: Session VI:  Disruptor ByteNASSCOM Design and Engineering Summit 2016: Session VI:  Disruptor Byte
NASSCOM Design and Engineering Summit 2016: Session VI: Disruptor Byte
 
Ilc Power Point
Ilc Power PointIlc Power Point
Ilc Power Point
 
Aurora hpc energy efficiency
Aurora hpc energy efficiencyAurora hpc energy efficiency
Aurora hpc energy efficiency
 
ECO Energy - Average Energy Consumption
ECO Energy - Average Energy ConsumptionECO Energy - Average Energy Consumption
ECO Energy - Average Energy Consumption
 
Smart energy efficiency for industrial consumer systems
Smart energy efficiency for industrial consumer systemsSmart energy efficiency for industrial consumer systems
Smart energy efficiency for industrial consumer systems
 
Smart energy efficiency for industrial consumer systems
Smart energy efficiency for industrial consumer systemsSmart energy efficiency for industrial consumer systems
Smart energy efficiency for industrial consumer systems
 
Re con
Re conRe con
Re con
 
Mitsubishi 2011 price
Mitsubishi 2011 priceMitsubishi 2011 price
Mitsubishi 2011 price
 
Optimising Efficiency & Capacity Sep 04 Rev 0
Optimising Efficiency & Capacity Sep 04 Rev 0Optimising Efficiency & Capacity Sep 04 Rev 0
Optimising Efficiency & Capacity Sep 04 Rev 0
 
Alter nrg presentation to springtec nov 2010
Alter nrg presentation to springtec nov 2010Alter nrg presentation to springtec nov 2010
Alter nrg presentation to springtec nov 2010
 
An introduction to EECO2-Energy Efficiency Consultancy Limited
An introduction to EECO2-Energy Efficiency Consultancy LimitedAn introduction to EECO2-Energy Efficiency Consultancy Limited
An introduction to EECO2-Energy Efficiency Consultancy Limited
 
EECO2 GMP critical HVAC energy cost reduction
EECO2 GMP critical HVAC energy cost reductionEECO2 GMP critical HVAC energy cost reduction
EECO2 GMP critical HVAC energy cost reduction
 
Environmental Sustainability - Green IT
Environmental Sustainability - Green ITEnvironmental Sustainability - Green IT
Environmental Sustainability - Green IT
 
Cheetah presentation
Cheetah presentationCheetah presentation
Cheetah presentation
 
IKIO One Pager
 IKIO One Pager IKIO One Pager
IKIO One Pager
 
Presentation Holland RET (16-9)
Presentation Holland RET (16-9)Presentation Holland RET (16-9)
Presentation Holland RET (16-9)
 
EcoCooling IT Sales Manual
EcoCooling IT Sales ManualEcoCooling IT Sales Manual
EcoCooling IT Sales Manual
 

Último

multiple access in wireless communication
multiple access in wireless communicationmultiple access in wireless communication
multiple access in wireless communicationpanditadesh123
 
Stork Webinar | APM Transformational planning, Tool Selection & Performance T...
Stork Webinar | APM Transformational planning, Tool Selection & Performance T...Stork Webinar | APM Transformational planning, Tool Selection & Performance T...
Stork Webinar | APM Transformational planning, Tool Selection & Performance T...Stork
 
Levelling - Rise and fall - Height of instrument method
Levelling - Rise and fall - Height of instrument methodLevelling - Rise and fall - Height of instrument method
Levelling - Rise and fall - Height of instrument methodManicka Mamallan Andavar
 
Paper Tube : Shigeru Ban projects and Case Study of Cardboard Cathedral .pdf
Paper Tube : Shigeru Ban projects and Case Study of Cardboard Cathedral .pdfPaper Tube : Shigeru Ban projects and Case Study of Cardboard Cathedral .pdf
Paper Tube : Shigeru Ban projects and Case Study of Cardboard Cathedral .pdfNainaShrivastava14
 
Computer Graphics Introduction, Open GL, Line and Circle drawing algorithm
Computer Graphics Introduction, Open GL, Line and Circle drawing algorithmComputer Graphics Introduction, Open GL, Line and Circle drawing algorithm
Computer Graphics Introduction, Open GL, Line and Circle drawing algorithmDeepika Walanjkar
 
List of Accredited Concrete Batching Plant.pdf
List of Accredited Concrete Batching Plant.pdfList of Accredited Concrete Batching Plant.pdf
List of Accredited Concrete Batching Plant.pdfisabel213075
 
Prach: A Feature-Rich Platform Empowering the Autism Community
Prach: A Feature-Rich Platform Empowering the Autism CommunityPrach: A Feature-Rich Platform Empowering the Autism Community
Prach: A Feature-Rich Platform Empowering the Autism Communityprachaibot
 
Robotics Group 10 (Control Schemes) cse.pdf
Robotics Group 10  (Control Schemes) cse.pdfRobotics Group 10  (Control Schemes) cse.pdf
Robotics Group 10 (Control Schemes) cse.pdfsahilsajad201
 
『澳洲文凭』买麦考瑞大学毕业证书成绩单办理澳洲Macquarie文凭学位证书
『澳洲文凭』买麦考瑞大学毕业证书成绩单办理澳洲Macquarie文凭学位证书『澳洲文凭』买麦考瑞大学毕业证书成绩单办理澳洲Macquarie文凭学位证书
『澳洲文凭』买麦考瑞大学毕业证书成绩单办理澳洲Macquarie文凭学位证书rnrncn29
 
Mine Environment II Lab_MI10448MI__________.pptx
Mine Environment II Lab_MI10448MI__________.pptxMine Environment II Lab_MI10448MI__________.pptx
Mine Environment II Lab_MI10448MI__________.pptxRomil Mishra
 
CS 3251 Programming in c all unit notes pdf
CS 3251 Programming in c all unit notes pdfCS 3251 Programming in c all unit notes pdf
CS 3251 Programming in c all unit notes pdfBalamuruganV28
 
2022 AWS DNA Hackathon 장애 대응 솔루션 jarvis.
2022 AWS DNA Hackathon 장애 대응 솔루션 jarvis.2022 AWS DNA Hackathon 장애 대응 솔루션 jarvis.
2022 AWS DNA Hackathon 장애 대응 솔루션 jarvis.elesangwon
 
Cost estimation approach: FP to COCOMO scenario based question
Cost estimation approach: FP to COCOMO scenario based questionCost estimation approach: FP to COCOMO scenario based question
Cost estimation approach: FP to COCOMO scenario based questionSneha Padhiar
 
KCD Costa Rica 2024 - Nephio para parvulitos
KCD Costa Rica 2024 - Nephio para parvulitosKCD Costa Rica 2024 - Nephio para parvulitos
KCD Costa Rica 2024 - Nephio para parvulitosVictor Morales
 
Immutable Image-Based Operating Systems - EW2024.pdf
Immutable Image-Based Operating Systems - EW2024.pdfImmutable Image-Based Operating Systems - EW2024.pdf
Immutable Image-Based Operating Systems - EW2024.pdfDrew Moseley
 
System Simulation and Modelling with types and Event Scheduling
System Simulation and Modelling with types and Event SchedulingSystem Simulation and Modelling with types and Event Scheduling
System Simulation and Modelling with types and Event SchedulingBootNeck1
 
Gravity concentration_MI20612MI_________
Gravity concentration_MI20612MI_________Gravity concentration_MI20612MI_________
Gravity concentration_MI20612MI_________Romil Mishra
 
THE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTION
THE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTIONTHE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTION
THE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTIONjhunlian
 
Novel 3D-Printed Soft Linear and Bending Actuators
Novel 3D-Printed Soft Linear and Bending ActuatorsNovel 3D-Printed Soft Linear and Bending Actuators
Novel 3D-Printed Soft Linear and Bending ActuatorsResearcher Researcher
 
Turn leadership mistakes into a better future.pptx
Turn leadership mistakes into a better future.pptxTurn leadership mistakes into a better future.pptx
Turn leadership mistakes into a better future.pptxStephen Sitton
 

Último (20)

multiple access in wireless communication
multiple access in wireless communicationmultiple access in wireless communication
multiple access in wireless communication
 
Stork Webinar | APM Transformational planning, Tool Selection & Performance T...
Stork Webinar | APM Transformational planning, Tool Selection & Performance T...Stork Webinar | APM Transformational planning, Tool Selection & Performance T...
Stork Webinar | APM Transformational planning, Tool Selection & Performance T...
 
Levelling - Rise and fall - Height of instrument method
Levelling - Rise and fall - Height of instrument methodLevelling - Rise and fall - Height of instrument method
Levelling - Rise and fall - Height of instrument method
 
Paper Tube : Shigeru Ban projects and Case Study of Cardboard Cathedral .pdf
Paper Tube : Shigeru Ban projects and Case Study of Cardboard Cathedral .pdfPaper Tube : Shigeru Ban projects and Case Study of Cardboard Cathedral .pdf
Paper Tube : Shigeru Ban projects and Case Study of Cardboard Cathedral .pdf
 
Computer Graphics Introduction, Open GL, Line and Circle drawing algorithm
Computer Graphics Introduction, Open GL, Line and Circle drawing algorithmComputer Graphics Introduction, Open GL, Line and Circle drawing algorithm
Computer Graphics Introduction, Open GL, Line and Circle drawing algorithm
 
List of Accredited Concrete Batching Plant.pdf
List of Accredited Concrete Batching Plant.pdfList of Accredited Concrete Batching Plant.pdf
List of Accredited Concrete Batching Plant.pdf
 
Prach: A Feature-Rich Platform Empowering the Autism Community
Prach: A Feature-Rich Platform Empowering the Autism CommunityPrach: A Feature-Rich Platform Empowering the Autism Community
Prach: A Feature-Rich Platform Empowering the Autism Community
 
Robotics Group 10 (Control Schemes) cse.pdf
Robotics Group 10  (Control Schemes) cse.pdfRobotics Group 10  (Control Schemes) cse.pdf
Robotics Group 10 (Control Schemes) cse.pdf
 
『澳洲文凭』买麦考瑞大学毕业证书成绩单办理澳洲Macquarie文凭学位证书
『澳洲文凭』买麦考瑞大学毕业证书成绩单办理澳洲Macquarie文凭学位证书『澳洲文凭』买麦考瑞大学毕业证书成绩单办理澳洲Macquarie文凭学位证书
『澳洲文凭』买麦考瑞大学毕业证书成绩单办理澳洲Macquarie文凭学位证书
 
Mine Environment II Lab_MI10448MI__________.pptx
Mine Environment II Lab_MI10448MI__________.pptxMine Environment II Lab_MI10448MI__________.pptx
Mine Environment II Lab_MI10448MI__________.pptx
 
CS 3251 Programming in c all unit notes pdf
CS 3251 Programming in c all unit notes pdfCS 3251 Programming in c all unit notes pdf
CS 3251 Programming in c all unit notes pdf
 
2022 AWS DNA Hackathon 장애 대응 솔루션 jarvis.
2022 AWS DNA Hackathon 장애 대응 솔루션 jarvis.2022 AWS DNA Hackathon 장애 대응 솔루션 jarvis.
2022 AWS DNA Hackathon 장애 대응 솔루션 jarvis.
 
Cost estimation approach: FP to COCOMO scenario based question
Cost estimation approach: FP to COCOMO scenario based questionCost estimation approach: FP to COCOMO scenario based question
Cost estimation approach: FP to COCOMO scenario based question
 
KCD Costa Rica 2024 - Nephio para parvulitos
KCD Costa Rica 2024 - Nephio para parvulitosKCD Costa Rica 2024 - Nephio para parvulitos
KCD Costa Rica 2024 - Nephio para parvulitos
 
Immutable Image-Based Operating Systems - EW2024.pdf
Immutable Image-Based Operating Systems - EW2024.pdfImmutable Image-Based Operating Systems - EW2024.pdf
Immutable Image-Based Operating Systems - EW2024.pdf
 
System Simulation and Modelling with types and Event Scheduling
System Simulation and Modelling with types and Event SchedulingSystem Simulation and Modelling with types and Event Scheduling
System Simulation and Modelling with types and Event Scheduling
 
Gravity concentration_MI20612MI_________
Gravity concentration_MI20612MI_________Gravity concentration_MI20612MI_________
Gravity concentration_MI20612MI_________
 
THE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTION
THE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTIONTHE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTION
THE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTION
 
Novel 3D-Printed Soft Linear and Bending Actuators
Novel 3D-Printed Soft Linear and Bending ActuatorsNovel 3D-Printed Soft Linear and Bending Actuators
Novel 3D-Printed Soft Linear and Bending Actuators
 
Turn leadership mistakes into a better future.pptx
Turn leadership mistakes into a better future.pptxTurn leadership mistakes into a better future.pptx
Turn leadership mistakes into a better future.pptx
 

ibbr_energy_conservation_measure_slides_only.pptx

  • 1. Copyright © 2015 Optimum Energy LLC. All Rights Reserved. Proprietary & Confidential Incorporating Energy Conservation Strategies into University Research Lab Facilities 1 INSTITUTE FOR BIOSCIENCE AND BIOTECHNOLOGY RESEARCH
  • 2. Copyright © 2015 Optimum Energy LLC. All Rights Reserved. Proprietary & Confidential IBBR Process to Evaluate Potential Energy Consumption Reduction Measures  Identify the need (what do we want/need to do and why) • Will the end result: • Improve operational efficiency? • Improve operational reliability? • Reduce operational cost? • Improve lab/workspace environment?  Identify impact on labs and occupants (+/-) • Workmen in the labs/workspaces • Temperature/humidity conditions • Effect of final result of the project  Safety concerns  Funding sources and incentives  Payback on investment 2
  • 4. Copyright © 2015 Optimum Energy LLC. All Rights Reserved. Proprietary & Confidential Strategy to Implement Projects  Frame basic scope of work  Identify all stake holders  Engage stake holders in project planning and scheduling(flesh out final scope of work)  Identify funding mechanism(s)  Procure services  Communicate the plan to contractors/installers  Monitor, Evaluate and Revise the plan as the situation requires.  Provide what you promise, communicate what you can’t  Follow up on and clear outstanding issues  Obtain stake holder buy in on job completion (make adjustments if necessary) 4
  • 5. Copyright © 2015 Optimum Energy LLC. All Rights Reserved. Proprietary & Confidential Discussion of Three Energy Projects at IBBR 5 Building 2 Chiller Optimization Lab Ventilation Savings Lab and Office lighting retrofit
  • 6. © Optimum Energy Copyright © 2015 Optimum Energy LLC. All Rights Reserved. Proprietary & Confidential Optimum Energy Scalable, Data-Driven Optimization for Cooling and Heating Systems 2015 IBBR Building 2 Chiller Plant Optimization
  • 7. Copyright © 2015 Optimum Energy LLC. All Rights Reserved. Proprietary & Confidential OptiCx Plant Overview 7 • Total Capacity: 900 Tons • 2 Chillers • 2 Towers • 2 Primary Pumps • 2 Secondary Pumps • 2 Condenser Pumps
  • 8. 8 Operational Modules Real-time Dynamic Commissioning OptiCx Platform Pumps &Valves Chillers Tower Fans VFD’ s VFD’s OptimumLOOP TM OptiCx Platform: Chilled Water System Optimization • Up to 50% efficiency improvement • Delivers superior occupant comfort while optimizing system performance • Substantially reduces CO2, water, and energy • Fights performance drift OptimumLOOP • Configurable optimization software for centrifugal chilled water plants • Patented relational control algorithms • Automatically and continuously optimizes plant performance in real time • Dynamically adapts to yield the lowest energy draw while meeting availability requirements Building Automation System
  • 9. Copyright © 2015 Optimum Energy LLC. All Rights Reserved. Proprietary & Confidential Estimated IBBR Chiller Plant Efficiency - 2012 Annual average kW per ton Notes: 1. Input includes: chillers, tower fans condenser pumps and chilled water 2. ESA is the Engineering Site Analysis that took place prior to optimization 9 Estimated Efficiency from the ESA of the Current Plant = 0.882 kW/ton Estimated Efficiency from the ESA of the Current Plant Optimized = 0.647 kW/ton .882 Current .647 Projected 27% Efficiency Improvement
  • 10. Copyright © 2015 Optimum Energy LLC. All Rights Reserved. Proprietary & Confidential 2015 Results: Optimized vs Baseline kW/Ton 10
  • 11. Copyright © 2015 Optimum Energy LLC. All Rights Reserved. Proprietary & Confidential Environmental Impact (based on 181,000kwh/yr saved) 11 Greenhouse gas emissions from CO2 emissions from Greenhouse gas emissions from
  • 12. Copyright © 2015 Optimum Energy LLC. All Rights Reserved. Proprietary & Confidential 12 LAB VENTILATION SAVINGS SIEMENS
  • 13. Copyright © 2015 Optimum Energy LLC. All Rights Reserved. Proprietary & Confidential Lab Room 101 Lab Room 102 Classroom 103 Supply Air Duct General Exhaust Duct IMS Advisor data center Sensor Suite BMS
  • 14. Copyright © 2015 Optimum Energy LLC. All Rights Reserved. Proprietary & Confidential Impact of Dynamic Control on Dilution Rates • 1.5 L spill of acetone in 200 sq ft lab room, 1 sq. m spill • After vaporized, dynamic system hits TLV in 20 vs. 60 min • After 2 hours dynamic control has dropped level to 2.6 PPM – After 2 hours, 6 ACH system is at 302 PPM or 116 times higher! 0.0 1000.0 2000.0 3000.0 4000.0 5000.0 6000.0 0 4 8 12 16 20 24 28 32 36 40 44 48 52 56 60 64 68 72 76 80 84 88 92 PPM Concentration Time in Minutes Spill Dilution Conc. vs Time with 2 ACH Min & 15 ACH Purge 6 ACH Baseline Threshold in PPM Dynamic: 5 Min. Dynamic: 10 Min. Dynamic: 15 Min. Dynamic control approach is always less than 6 ACH baseline 15 min. detection time still better than 6 ACH baseline! Lower initial ACH helps!
  • 15. Copyright © 2015 Optimum Energy LLC. All Rights Reserved. Proprietary & Confidential Optinet System Overview – Example DCV Event CO2 spike detected in room 2229 on 5/30/15 Optinet System began commanding ACH increase at 300ppm CO2 differential to supply air. Peak level detected drove up ACH by approximately 7 Correlating flow increase as commanded by the Optinet System
  • 16. Copyright © 2015 Optimum Energy LLC. All Rights Reserved. Proprietary & Confidential Environmental Impact (based on 213,778kwh/yr saved) 16 Greenhouse gas emissions from CO2 emissions from Greenhouse gas emissions from
  • 17. Copyright © 2015 Optimum Energy LLC. All Rights Reserved. Proprietary & Confidential Lighting Retrofit 17 INSTITUTE FOR BIOSCIENCE AND BIOTECHNOLOGY RESEARCH
  • 18. Copyright © 2015 Optimum Energy LLC. All Rights Reserved. Proprietary & Confidential Lighting Retrofit Objective 18 The objective of the this project is to optimize fixture spacing in lab spaces to provide an average illuminance on the desktop/bench top of 50 foot candles and 10-20 foot candles on non-working surfaces. In so doing we intended to reduce total lighting consumption by 50%.
  • 19. Copyright © 2015 Optimum Energy LLC. All Rights Reserved. Proprietary & Confidential Lighting Retrofit Overview 19 IBBR Building 1 Number of Fixtures Existing kW per Space Annual KWh per Space Number of Fixtures/ Lamps/ Doors kW per Space Peak kW Savings Annual kWh Savings Annual Natural Gas Use per Space (therms) Total Incentive Amount 1,086 58.241 584,587 590 27.153 31.910 319,917 -2,061 $16,200 IBBR Building 2 Number of Fixtures Existing kW per Space Annual KWh per Space Number of Fixtures to Replace kW per Space Peak kW Savings Annual kWh Savings Annual Natural Gas Use per Space (therms) Total Incentive Amount 2,037 94.988 906,086 1,279 47.677 52.314 510,567 -3,319 $35,125
  • 20. Copyright © 2015 Optimum Energy LLC. All Rights Reserved. Proprietary & Confidential Environmental Impact (based on 830,484kwh/yr saved) 20 Greenhouse gas emissions from CO2 emissions from Greenhouse gas emissions from