SlideShare una empresa de Scribd logo
1 de 6
Descargar para leer sin conexión
TAWFIG KHIDIR IBNOUF ADHAM
Form No. QMF 105-15 1 of 4 Rev. 1, Date: Sept. 1, 2012
1. Position : Sr. Project Manager Marital
Status:
Married
Nationality: Sudanese
2. Education Degree-Year,
Major / Minor
: Masters in Project Management (2016 University of
Liverpool, UK). BSc in Civil Engineering (1995 University of
Khartoum)
3. Seminars/Trainings
Attended (Date/Course
or Title/Description)
: 1. EMS Awareness Course
2. QASAS Awareness Course
3. QMS Awareness Course
4. Professional Project Management Program
5. Internal Quality Audit Course for Integrated
Management System
4. Computer Background : Primavera Planning and Scheduling P3.1, MS Office,
AutoCAD 2009, Windows 2007 & XP
5. Language Capabilities
(English, Arabic, Others...)
: Arabic – Mother-tongue and very good in English
6. Summary of Work
Experience
: With more than 21 years of working experience in the
construction industry; involved with different projects
whose scope is with construction, infrastructure projects,
sewerage and storm water line, pumping station, water
pipeline, Bridges, road and earth works, irrigation pipeline
and irrigation reservoirs.
7. CGC Department or Project
Assigned/Worked
7.1 Project Assigned/Worked :
:
:
C019-
Improvement and Upgrading of Intersection of Etihad Road
(E11) With Al Falaj Al Mualla – Um Al Quwain Road (E55)
(Phase 2 – Main Interchange)
Title : Sr. Project Manager
Period
Project Amount
:
:
March 2015 to Present
AED 111,442,410.00
Brief Scope of Work : Construction of 7 bridge viaducts, 2 underpasses and
ramps, Laying and compaction of subgrade, granular and
asphaltic pavement layers for road construction,
Installation of barriers and fencing, Construction of storm
TAWFIG KHIDIR IBNOUF ADHAM
Form No. QMF 105-15 2 of 4 Rev. 1, Date: Sept. 1, 2012
water drainage network and pipe culverts, Installation of
road furniture, inclusive of road signs and road markings
etc., Installation of electrical and road way lighting network
and Supply and execution of miscellaneous items and
operations ancillary to the main works
7.2 Project Assigned/Worked :
:
:
C009-
Presidential Palace - Roads & Infrastructure Package
(Contract No. CCP110)
Title : Sr. Project Manager
Period
Project Amount
:
:
January 2013 to February 2015
AED 112,000,000.00
Brief Scope of Work : Construction of 30 Km storm water network, 16.5 Km
irrigation network, 10 km potable water network, 11 km
firefighting network, 149 km CCTV network, 111 km
Tel/GSM, and 21.5 km Military network . Construction of
rods and associated landscaping works.
7.3 Project Assigned/Worked :
:
:
C004-
Construction of Infra Structure for Mahawi Project
Construction of Purification Network (Contract No. CMW-
272/2009)
Additional Works: Diversion of Existing Sewerage and
Portable Water Network @ ADNOC Proposed Petrol
Station.
Title : Project Manager
Period
Project Amount
:
:
January 2010 to December 2012
AED 75,356,107.00
Brief Scope of Work : Construction of 3 Sewerage Pumping Station, 500 m³ Irrigation
Reservoir, administration building, and chlorination room.
Sewerage Network 45 Km, Dia. 200-700mm, GRP Double
Skinned Manhole Dia.2000mm 15m Deep. Construction of
Potable water, firefighting and Irrigation HDPE Network 37 Km
Including Pumping Main, Air Release, and Washout Chambers.
7.4 Project Assigned/Worked :
:
C003
Al Ain New Dairy Farm Project
Title : Project Manager
TAWFIG KHIDIR IBNOUF ADHAM
Form No. QMF 105-15 3 of 4 Rev. 1, Date: Sept. 1, 2012
Period
Project Amount
:
:
October 2009 to December 2010
AED 98,000,000.00
Brief Scope of Work : Construction of underground durable concrete 1000m3
capacity reservoir with pump room, and associated
electrical instruments. 8 Steel structures, 165-200 m x 32m
each. Grading & Earth Works for sheds areas with sub
grade material CBR 40 % graded to required slope.
Construction of Milking parallel amenities and control
room with two floors similar to existing of size 20m x 15m
with steel roof structure excluding any instrumentations,
special equipment and video cameras.
Duties &
Responsibilities
: 1. Manage projects within budget, time schedules,
statutory requirements and company procedures
ensuring compliance with HSE and QA/QC policies
and customer satisfactions.
2. Represent the company and enhance relationships
in dealings with clients, consultants and regulatory
authorities.
3. Prepare the project execution plan for management
review and approval and manage approved plan to
achieve project deliverables and timeline objectives.
4. Review contract documents and administer all
issues related to the project in conjunction with
senior manager / manager of projects in accordance
with company policies and procedures.
5. Manage resource and expenses to achieve contract
completion within budget and time frame.
6. Liaise with the HSE and/ or Quality Department for
the preparation and publishing of project safety and
quality manuals to ensure company's Health, Safety
& Environment standards are met.
7. Ensure timely payments are received from the
customer in accordance conditions.
8. Identify and ensure skills and training needs of
assigned manpower are aligned to project
requirements and support recruitment activities to
source technical competent personnel for the
project.
9. Participate in the pricing of tenders and technical
documentation for upcoming projects as required.
10. Lead a project team to ensure timeframes and
customer satisfaction are met.
TAWFIG KHIDIR IBNOUF ADHAM
Form No. QMF 105-15 4 of 4 Rev. 1, Date: Sept. 1, 2012
11. Identify and scope any additional works and
technical upgrades not covered in the contract to
enhance the project deliverable, customer
satisfaction and improve company's revenue.
8. Work Experience :
8.1 Name of Employer : Al Muhairy General Contracting
Location : UAE
Title : Project Engineer
Department/Project
Consultant
:
:
Internal Road in Mohammed Bin Zayed City
N/A
Period
Project amount
:
:
March 2007 – October 2009
AED 307 M
Brief Scope of Work : Construction of Internal Roads in Mohammed Bin Zayed
City. Installation of electrical network including 40 Nos of
Electrical substations (38 Ring Main & 2 switching gear).
Construction of 31 Km Sewerage network, 15Km potable
water network and 36 km storm water network including
all associated Manholes and chambers for all networks.
Duties &
Responsibilities
: 1. Assist the project manager in managing the
administration and overall coordination of the
construction contract.
2. Responsible for overall coordination with
governmental agencies, utility agencies and other
contractors.
3. Responsible for obtaining any required permits for
progression of work.
8.2 Name of Employer : Al Muhairy General Contracting
Location : Abu Dhabi, UAE
Title : Section Engineer
Department/Project
Consultant
:
:
New Corniche Road East (Stage 2)
N/A
Period
Project amount
:
:
November 2003 – March 2007
AED 577,843.330
Brief Scope of Work : i. Construction of Bridge, 3Tunnels and 14 Pedestrian
Under passes including all finishing works.
ii. Storm water (300GRP – 3000GRP), Ducts, CCTV, light
poles and Telephone works.
iii. Road works and associated landscaping works,
TAWFIG KHIDIR IBNOUF ADHAM
Form No. QMF 105-15 5 of 4 Rev. 1, Date: Sept. 1, 2012
intersections, parking areas, sidewalks etc...
Duties & Responsibilities
1. Serve as utility engineer for storm water, ducts,
CCTV, light poles and telephone works.
2. Supervise road works and associated landscaping
works, intersections, parking areas, sidewalks, etc.
8.3 Name of Employer : Winner Consultant Engineering
Location : UAE
Title : Civil Engineer
Department/Project
Consultant
:
:
N/A
N/A
Period
Project amount
:
:
September 2000 – November 2003
N/A
Duties & Responsibilities
1. Supervision and coordination of activities of
contractor in the field.
2. Inspect the work to ensure that confirms to
specifications and adherence to schedule of work.
3. Examine blueprints, select materials and inspect
them to ensure conformance with provision of
building code, local ordinance and specifications.
4. Prepare weekly and monthly progress of work.
8.4 Name of Employer : Saco Engineering and Contractor
Location : UAE
Title : Civil Engineer
Department/Project
Consultant
:
:
N/A
N/A
Period
Project amount
:
:
September 1998 – September 2000
N/A
Duties & Responsibilities 1. Supervision of buildings at different stage of
construction.
2. Managing the sites, labors and equipment.
3. Preparation of shop drawings.
4. Analyze accident to avoid repetition of similar in
the future.
8.5 Name of Employer : Al Mazhur General Contracting Co.
Location : UAE
Title : Civil Engineer
Department/Project
Consultant
:
:
N/A
N/A
TAWFIG KHIDIR IBNOUF ADHAM
Form No. QMF 105-15 6 of 4 Rev. 1, Date: Sept. 1, 2012
Period
Project amount
:
:
September 1997 – September 1998
N/A
Duties & Responsibilities 1. Supervision of buildings at different stage of
construction.
2. Participating in the preparation of estimation and
cost analysis for different buildings and planning of
construction stages.
8.6 Name of Employer : Darfur general contracting co, SUDAN
Location : Sudan
Title : Site Engineer
Department/Project : Various projects
Period : From 1995 to September 1997
Duties &
Responsibilities
:  Follow up the projects progress and holding meeting with concerned
parties.
 Preparation of payments.
 Handing over the works.
 Follow up the maintenance works.

Más contenido relacionado

La actualidad más candente

Ibrahim_Abdelkhalig_Curriculum_vitae_(2)
Ibrahim_Abdelkhalig_Curriculum_vitae_(2) Ibrahim_Abdelkhalig_Curriculum_vitae_(2)
Ibrahim_Abdelkhalig_Curriculum_vitae_(2) Ibraim Mohamed
 
Ayman Hussien cv - Copy
Ayman Hussien cv - CopyAyman Hussien cv - Copy
Ayman Hussien cv - Copyayman hussien
 
Mohamed sanoussi cv
Mohamed sanoussi cvMohamed sanoussi cv
Mohamed sanoussi cvBladina.com
 
Minh-RESUME 2015
Minh-RESUME 2015Minh-RESUME 2015
Minh-RESUME 2015Minh TV
 
Ici j sern unit employer brief v2 (1)
Ici j sern unit employer brief v2 (1)Ici j sern unit employer brief v2 (1)
Ici j sern unit employer brief v2 (1)Macy Khor
 
A_Rashad_new_updateCV
A_Rashad_new_updateCVA_Rashad_new_updateCV
A_Rashad_new_updateCVAhmed Mishrif
 
2017 السيره الذاتيه للمهندس محمد حبلص
2017 السيره الذاتيه للمهندس محمد حبلص2017 السيره الذاتيه للمهندس محمد حبلص
2017 السيره الذاتيه للمهندس محمد حبلصMohamed Hablas
 
Curriculum Vitae end to start 19-7-2016
Curriculum Vitae end to start 19-7-2016Curriculum Vitae end to start 19-7-2016
Curriculum Vitae end to start 19-7-2016Ayman Issa
 
Fady samir cv
Fady samir cvFady samir cv
Fady samir cvfady toma
 
CURRICULUM VITAE-SUNIL GOPINATH (2)
CURRICULUM VITAE-SUNIL GOPINATH (2)CURRICULUM VITAE-SUNIL GOPINATH (2)
CURRICULUM VITAE-SUNIL GOPINATH (2)Sunil Gopinath
 
Eng. Sherif kadry C.V.updating April 2016
Eng. Sherif kadry C.V.updating April 2016Eng. Sherif kadry C.V.updating April 2016
Eng. Sherif kadry C.V.updating April 2016sherif kadry
 
GRADUATE QS PORTFOLIO SUBMISSION FOR APPLICATION FOR REGISTRATION
GRADUATE QS PORTFOLIO SUBMISSION FOR APPLICATION FOR REGISTRATIONGRADUATE QS PORTFOLIO SUBMISSION FOR APPLICATION FOR REGISTRATION
GRADUATE QS PORTFOLIO SUBMISSION FOR APPLICATION FOR REGISTRATIONIRAGI MIHIGO Didier
 
Research development
Research developmentResearch development
Research developmentJ-Sern Phua
 

La actualidad más candente (20)

MCV
MCVMCV
MCV
 
2015 CV
2015 CV 2015 CV
2015 CV
 
Ibrahim_Abdelkhalig_Curriculum_vitae_(2)
Ibrahim_Abdelkhalig_Curriculum_vitae_(2) Ibrahim_Abdelkhalig_Curriculum_vitae_(2)
Ibrahim_Abdelkhalig_Curriculum_vitae_(2)
 
Ayman Hussien cv - Copy
Ayman Hussien cv - CopyAyman Hussien cv - Copy
Ayman Hussien cv - Copy
 
RANJI -CV
RANJI -CVRANJI -CV
RANJI -CV
 
Mohamed sanoussi cv
Mohamed sanoussi cvMohamed sanoussi cv
Mohamed sanoussi cv
 
CV OF MVV
CV OF MVVCV OF MVV
CV OF MVV
 
Minh-RESUME 2015
Minh-RESUME 2015Minh-RESUME 2015
Minh-RESUME 2015
 
Ici j sern unit employer brief v2 (1)
Ici j sern unit employer brief v2 (1)Ici j sern unit employer brief v2 (1)
Ici j sern unit employer brief v2 (1)
 
A_Rashad_new_updateCV
A_Rashad_new_updateCVA_Rashad_new_updateCV
A_Rashad_new_updateCV
 
2017 السيره الذاتيه للمهندس محمد حبلص
2017 السيره الذاتيه للمهندس محمد حبلص2017 السيره الذاتيه للمهندس محمد حبلص
2017 السيره الذاتيه للمهندس محمد حبلص
 
Curriculum Vitae end to start 19-7-2016
Curriculum Vitae end to start 19-7-2016Curriculum Vitae end to start 19-7-2016
Curriculum Vitae end to start 19-7-2016
 
Fady samir cv
Fady samir cvFady samir cv
Fady samir cv
 
Resume
ResumeResume
Resume
 
CURRICULUM VITAE-SUNIL GOPINATH (2)
CURRICULUM VITAE-SUNIL GOPINATH (2)CURRICULUM VITAE-SUNIL GOPINATH (2)
CURRICULUM VITAE-SUNIL GOPINATH (2)
 
Eng. Sherif kadry C.V.updating April 2016
Eng. Sherif kadry C.V.updating April 2016Eng. Sherif kadry C.V.updating April 2016
Eng. Sherif kadry C.V.updating April 2016
 
GRADUATE QS PORTFOLIO SUBMISSION FOR APPLICATION FOR REGISTRATION
GRADUATE QS PORTFOLIO SUBMISSION FOR APPLICATION FOR REGISTRATIONGRADUATE QS PORTFOLIO SUBMISSION FOR APPLICATION FOR REGISTRATION
GRADUATE QS PORTFOLIO SUBMISSION FOR APPLICATION FOR REGISTRATION
 
Remi Lumbo_12082016
Remi Lumbo_12082016Remi Lumbo_12082016
Remi Lumbo_12082016
 
Research development
Research developmentResearch development
Research development
 
CV Ahmed Site
CV Ahmed SiteCV Ahmed Site
CV Ahmed Site
 

Destacado

707 12 1201 8
707 12 1201 8707 12 1201 8
707 12 1201 8oabvga
 
707 12 0328 0
707 12 0328 0707 12 0328 0
707 12 0328 0oabvga
 
El dia de la independencia
El dia de la independenciaEl dia de la independencia
El dia de la independenciaabribenedetti
 
Semana de mayo abri y dinaaaaaaa
Semana de mayo abri y dinaaaaaaaSemana de mayo abri y dinaaaaaaa
Semana de mayo abri y dinaaaaaaaabribenedetti
 
2016-04-26_Centrumomgeving richtinggevend kader_laatste versie
2016-04-26_Centrumomgeving richtinggevend kader_laatste versie2016-04-26_Centrumomgeving richtinggevend kader_laatste versie
2016-04-26_Centrumomgeving richtinggevend kader_laatste versieYana Van Tienen
 
OpenNebulaConf 2016 - OpenNebula 5.0 Highlights and Beyond by Ruben S. Monter...
OpenNebulaConf 2016 - OpenNebula 5.0 Highlights and Beyond by Ruben S. Monter...OpenNebulaConf 2016 - OpenNebula 5.0 Highlights and Beyond by Ruben S. Monter...
OpenNebulaConf 2016 - OpenNebula 5.0 Highlights and Beyond by Ruben S. Monter...OpenNebula Project
 
Catálogos trilhos rígidos - Dois Dez Industrial
Catálogos trilhos rígidos - Dois Dez IndustrialCatálogos trilhos rígidos - Dois Dez Industrial
Catálogos trilhos rígidos - Dois Dez IndustrialGabriela Coelho Monteiro
 
Comparación de 1816 y 2016
Comparación de 1816 y 2016 Comparación de 1816 y 2016
Comparación de 1816 y 2016 josefinaconca
 
707 12 1018 6
707 12 1018 6707 12 1018 6
707 12 1018 6oabvga
 

Destacado (20)

Tecnologia
TecnologiaTecnologia
Tecnologia
 
707 12 1201 8
707 12 1201 8707 12 1201 8
707 12 1201 8
 
MDSC iBelieve
MDSC iBelieveMDSC iBelieve
MDSC iBelieve
 
Ty
TyTy
Ty
 
707 12 0328 0
707 12 0328 0707 12 0328 0
707 12 0328 0
 
New Renewables - Wind Energy Briefing
New Renewables  - Wind Energy BriefingNew Renewables  - Wind Energy Briefing
New Renewables - Wind Energy Briefing
 
El dia de la independencia
El dia de la independenciaEl dia de la independencia
El dia de la independencia
 
Semana de mayo abri y dinaaaaaaa
Semana de mayo abri y dinaaaaaaaSemana de mayo abri y dinaaaaaaa
Semana de mayo abri y dinaaaaaaa
 
False Assumptions
False AssumptionsFalse Assumptions
False Assumptions
 
2016-04-26_Centrumomgeving richtinggevend kader_laatste versie
2016-04-26_Centrumomgeving richtinggevend kader_laatste versie2016-04-26_Centrumomgeving richtinggevend kader_laatste versie
2016-04-26_Centrumomgeving richtinggevend kader_laatste versie
 
OpenNebulaConf 2016 - OpenNebula 5.0 Highlights and Beyond by Ruben S. Monter...
OpenNebulaConf 2016 - OpenNebula 5.0 Highlights and Beyond by Ruben S. Monter...OpenNebulaConf 2016 - OpenNebula 5.0 Highlights and Beyond by Ruben S. Monter...
OpenNebulaConf 2016 - OpenNebula 5.0 Highlights and Beyond by Ruben S. Monter...
 
Catálogos trilhos rígidos - Dois Dez Industrial
Catálogos trilhos rígidos - Dois Dez IndustrialCatálogos trilhos rígidos - Dois Dez Industrial
Catálogos trilhos rígidos - Dois Dez Industrial
 
Asset mgt
Asset mgt Asset mgt
Asset mgt
 
Alliance Logo Color Pdf
Alliance Logo Color PdfAlliance Logo Color Pdf
Alliance Logo Color Pdf
 
Heridas
HeridasHeridas
Heridas
 
Dean Edwards CV
Dean Edwards CVDean Edwards CV
Dean Edwards CV
 
Heather Orlando Resume
Heather Orlando ResumeHeather Orlando Resume
Heather Orlando Resume
 
Comparación de 1816 y 2016
Comparación de 1816 y 2016 Comparación de 1816 y 2016
Comparación de 1816 y 2016
 
707 12 1018 6
707 12 1018 6707 12 1018 6
707 12 1018 6
 
Resumo português
Resumo portuguêsResumo português
Resumo português
 

Similar a Tawfig Khidir - CV

Similar a Tawfig Khidir - CV (20)

CV-MEP-Ahmad Majdalawi
CV-MEP-Ahmad MajdalawiCV-MEP-Ahmad Majdalawi
CV-MEP-Ahmad Majdalawi
 
CV-MEP-Ahmad Majdalawi
CV-MEP-Ahmad MajdalawiCV-MEP-Ahmad Majdalawi
CV-MEP-Ahmad Majdalawi
 
CV
CVCV
CV
 
Adly CV111
Adly CV111Adly CV111
Adly CV111
 
Rafeek's CV
Rafeek's CV Rafeek's CV
Rafeek's CV
 
Resume 08--Earl Victor -
Resume 08--Earl Victor -Resume 08--Earl Victor -
Resume 08--Earl Victor -
 
CV RAJASEKA PERIYASAMY
CV RAJASEKA PERIYASAMYCV RAJASEKA PERIYASAMY
CV RAJASEKA PERIYASAMY
 
CV-Osama Amin ..........
CV-Osama Amin  ..........CV-Osama Amin  ..........
CV-Osama Amin ..........
 
Resume_[Sr. Estimator - Sr. QS]
Resume_[Sr. Estimator - Sr. QS]Resume_[Sr. Estimator - Sr. QS]
Resume_[Sr. Estimator - Sr. QS]
 
Updated Resume.DOC
Updated Resume.DOCUpdated Resume.DOC
Updated Resume.DOC
 
Akhtar Mahmood - Construction Site Engineer (1).doc
Akhtar Mahmood - Construction Site Engineer (1).docAkhtar Mahmood - Construction Site Engineer (1).doc
Akhtar Mahmood - Construction Site Engineer (1).doc
 
01. Karim Absawi updated on 22-04-2016
01. Karim Absawi updated on 22-04-201601. Karim Absawi updated on 22-04-2016
01. Karim Absawi updated on 22-04-2016
 
JAMES -CV -
JAMES -CV -JAMES -CV -
JAMES -CV -
 
CV- Project Control Manager PMP
CV- Project Control Manager PMPCV- Project Control Manager PMP
CV- Project Control Manager PMP
 
Engr. Abo ElSoud CV-2017
Engr.  Abo ElSoud CV-2017Engr.  Abo ElSoud CV-2017
Engr. Abo ElSoud CV-2017
 
CIVIL ENGINEER-PROJECT MANAGER
CIVIL ENGINEER-PROJECT MANAGERCIVIL ENGINEER-PROJECT MANAGER
CIVIL ENGINEER-PROJECT MANAGER
 
Engr.riyaz cv 02 11-15-2
Engr.riyaz cv 02 11-15-2Engr.riyaz cv 02 11-15-2
Engr.riyaz cv 02 11-15-2
 
Hafez CV
Hafez CVHafez CV
Hafez CV
 
CV
CVCV
CV
 
Updated C.V of water & sewerage
Updated  C.V of water & sewerageUpdated  C.V of water & sewerage
Updated C.V of water & sewerage
 

Tawfig Khidir - CV

  • 1. TAWFIG KHIDIR IBNOUF ADHAM Form No. QMF 105-15 1 of 4 Rev. 1, Date: Sept. 1, 2012 1. Position : Sr. Project Manager Marital Status: Married Nationality: Sudanese 2. Education Degree-Year, Major / Minor : Masters in Project Management (2016 University of Liverpool, UK). BSc in Civil Engineering (1995 University of Khartoum) 3. Seminars/Trainings Attended (Date/Course or Title/Description) : 1. EMS Awareness Course 2. QASAS Awareness Course 3. QMS Awareness Course 4. Professional Project Management Program 5. Internal Quality Audit Course for Integrated Management System 4. Computer Background : Primavera Planning and Scheduling P3.1, MS Office, AutoCAD 2009, Windows 2007 & XP 5. Language Capabilities (English, Arabic, Others...) : Arabic – Mother-tongue and very good in English 6. Summary of Work Experience : With more than 21 years of working experience in the construction industry; involved with different projects whose scope is with construction, infrastructure projects, sewerage and storm water line, pumping station, water pipeline, Bridges, road and earth works, irrigation pipeline and irrigation reservoirs. 7. CGC Department or Project Assigned/Worked 7.1 Project Assigned/Worked : : : C019- Improvement and Upgrading of Intersection of Etihad Road (E11) With Al Falaj Al Mualla – Um Al Quwain Road (E55) (Phase 2 – Main Interchange) Title : Sr. Project Manager Period Project Amount : : March 2015 to Present AED 111,442,410.00 Brief Scope of Work : Construction of 7 bridge viaducts, 2 underpasses and ramps, Laying and compaction of subgrade, granular and asphaltic pavement layers for road construction, Installation of barriers and fencing, Construction of storm
  • 2. TAWFIG KHIDIR IBNOUF ADHAM Form No. QMF 105-15 2 of 4 Rev. 1, Date: Sept. 1, 2012 water drainage network and pipe culverts, Installation of road furniture, inclusive of road signs and road markings etc., Installation of electrical and road way lighting network and Supply and execution of miscellaneous items and operations ancillary to the main works 7.2 Project Assigned/Worked : : : C009- Presidential Palace - Roads & Infrastructure Package (Contract No. CCP110) Title : Sr. Project Manager Period Project Amount : : January 2013 to February 2015 AED 112,000,000.00 Brief Scope of Work : Construction of 30 Km storm water network, 16.5 Km irrigation network, 10 km potable water network, 11 km firefighting network, 149 km CCTV network, 111 km Tel/GSM, and 21.5 km Military network . Construction of rods and associated landscaping works. 7.3 Project Assigned/Worked : : : C004- Construction of Infra Structure for Mahawi Project Construction of Purification Network (Contract No. CMW- 272/2009) Additional Works: Diversion of Existing Sewerage and Portable Water Network @ ADNOC Proposed Petrol Station. Title : Project Manager Period Project Amount : : January 2010 to December 2012 AED 75,356,107.00 Brief Scope of Work : Construction of 3 Sewerage Pumping Station, 500 m³ Irrigation Reservoir, administration building, and chlorination room. Sewerage Network 45 Km, Dia. 200-700mm, GRP Double Skinned Manhole Dia.2000mm 15m Deep. Construction of Potable water, firefighting and Irrigation HDPE Network 37 Km Including Pumping Main, Air Release, and Washout Chambers. 7.4 Project Assigned/Worked : : C003 Al Ain New Dairy Farm Project Title : Project Manager
  • 3. TAWFIG KHIDIR IBNOUF ADHAM Form No. QMF 105-15 3 of 4 Rev. 1, Date: Sept. 1, 2012 Period Project Amount : : October 2009 to December 2010 AED 98,000,000.00 Brief Scope of Work : Construction of underground durable concrete 1000m3 capacity reservoir with pump room, and associated electrical instruments. 8 Steel structures, 165-200 m x 32m each. Grading & Earth Works for sheds areas with sub grade material CBR 40 % graded to required slope. Construction of Milking parallel amenities and control room with two floors similar to existing of size 20m x 15m with steel roof structure excluding any instrumentations, special equipment and video cameras. Duties & Responsibilities : 1. Manage projects within budget, time schedules, statutory requirements and company procedures ensuring compliance with HSE and QA/QC policies and customer satisfactions. 2. Represent the company and enhance relationships in dealings with clients, consultants and regulatory authorities. 3. Prepare the project execution plan for management review and approval and manage approved plan to achieve project deliverables and timeline objectives. 4. Review contract documents and administer all issues related to the project in conjunction with senior manager / manager of projects in accordance with company policies and procedures. 5. Manage resource and expenses to achieve contract completion within budget and time frame. 6. Liaise with the HSE and/ or Quality Department for the preparation and publishing of project safety and quality manuals to ensure company's Health, Safety & Environment standards are met. 7. Ensure timely payments are received from the customer in accordance conditions. 8. Identify and ensure skills and training needs of assigned manpower are aligned to project requirements and support recruitment activities to source technical competent personnel for the project. 9. Participate in the pricing of tenders and technical documentation for upcoming projects as required. 10. Lead a project team to ensure timeframes and customer satisfaction are met.
  • 4. TAWFIG KHIDIR IBNOUF ADHAM Form No. QMF 105-15 4 of 4 Rev. 1, Date: Sept. 1, 2012 11. Identify and scope any additional works and technical upgrades not covered in the contract to enhance the project deliverable, customer satisfaction and improve company's revenue. 8. Work Experience : 8.1 Name of Employer : Al Muhairy General Contracting Location : UAE Title : Project Engineer Department/Project Consultant : : Internal Road in Mohammed Bin Zayed City N/A Period Project amount : : March 2007 – October 2009 AED 307 M Brief Scope of Work : Construction of Internal Roads in Mohammed Bin Zayed City. Installation of electrical network including 40 Nos of Electrical substations (38 Ring Main & 2 switching gear). Construction of 31 Km Sewerage network, 15Km potable water network and 36 km storm water network including all associated Manholes and chambers for all networks. Duties & Responsibilities : 1. Assist the project manager in managing the administration and overall coordination of the construction contract. 2. Responsible for overall coordination with governmental agencies, utility agencies and other contractors. 3. Responsible for obtaining any required permits for progression of work. 8.2 Name of Employer : Al Muhairy General Contracting Location : Abu Dhabi, UAE Title : Section Engineer Department/Project Consultant : : New Corniche Road East (Stage 2) N/A Period Project amount : : November 2003 – March 2007 AED 577,843.330 Brief Scope of Work : i. Construction of Bridge, 3Tunnels and 14 Pedestrian Under passes including all finishing works. ii. Storm water (300GRP – 3000GRP), Ducts, CCTV, light poles and Telephone works. iii. Road works and associated landscaping works,
  • 5. TAWFIG KHIDIR IBNOUF ADHAM Form No. QMF 105-15 5 of 4 Rev. 1, Date: Sept. 1, 2012 intersections, parking areas, sidewalks etc... Duties & Responsibilities 1. Serve as utility engineer for storm water, ducts, CCTV, light poles and telephone works. 2. Supervise road works and associated landscaping works, intersections, parking areas, sidewalks, etc. 8.3 Name of Employer : Winner Consultant Engineering Location : UAE Title : Civil Engineer Department/Project Consultant : : N/A N/A Period Project amount : : September 2000 – November 2003 N/A Duties & Responsibilities 1. Supervision and coordination of activities of contractor in the field. 2. Inspect the work to ensure that confirms to specifications and adherence to schedule of work. 3. Examine blueprints, select materials and inspect them to ensure conformance with provision of building code, local ordinance and specifications. 4. Prepare weekly and monthly progress of work. 8.4 Name of Employer : Saco Engineering and Contractor Location : UAE Title : Civil Engineer Department/Project Consultant : : N/A N/A Period Project amount : : September 1998 – September 2000 N/A Duties & Responsibilities 1. Supervision of buildings at different stage of construction. 2. Managing the sites, labors and equipment. 3. Preparation of shop drawings. 4. Analyze accident to avoid repetition of similar in the future. 8.5 Name of Employer : Al Mazhur General Contracting Co. Location : UAE Title : Civil Engineer Department/Project Consultant : : N/A N/A
  • 6. TAWFIG KHIDIR IBNOUF ADHAM Form No. QMF 105-15 6 of 4 Rev. 1, Date: Sept. 1, 2012 Period Project amount : : September 1997 – September 1998 N/A Duties & Responsibilities 1. Supervision of buildings at different stage of construction. 2. Participating in the preparation of estimation and cost analysis for different buildings and planning of construction stages. 8.6 Name of Employer : Darfur general contracting co, SUDAN Location : Sudan Title : Site Engineer Department/Project : Various projects Period : From 1995 to September 1997 Duties & Responsibilities :  Follow up the projects progress and holding meeting with concerned parties.  Preparation of payments.  Handing over the works.  Follow up the maintenance works.