PRODUCING
AND
EXPLORING
YEAR END CONFERENCE CALL
FEBRUARY 20, 2013




                           1
FORWARD LOOKING STATEMENTS
Certain information included in this presentation, including any information as to the Company’s strategy, projects, exploration programs, joint venture ownership
positions, plans, future financial or operating performance and other statements that express management’s expectations or estimates of future performance,
constitute “forward-looking statements”. The words “believe”, “expect”, “will”, “intend”, ”anticipate”, “project”, ”plan”, “estimate”, “on track” and similar expressions
identify forward looking statements. Such forward-looking statements are necessarily based upon a number of estimates, assumptions, opinions and analysis made
by management in light of its experience that, while considered reasonable, may turn out to be incorrect and involve known and unknown risks, uncertainties and
other factors, in each case that may cause the actual financial results, performance or achievements of the Company to be materially different from the Company’s
estimated future results, performance or achievements expressed or implied by those forward-looking statements. Such forward-looking statements are not
guarantees of future performance. These assumptions, risks, uncertainties and other factors include, but are not limited to: assumptions regarding general business
and economic conditions; conditions in financial markets and the future financial performance of the company; the impact of global liquidity and credit availability on
the timing of cash flows and the values of assets and liabilities based on projected future cash flows; the supply and demand for, deliveries of, and the level and
volatility of the worldwide price of gold or certain other commodities (such as silver, fuel and electricity); fluctuations in currency markets, including changes in U.S.
dollar and CFA Franc interest rates; risks arising from holding derivative instruments; adverse changes in our credit rating; level of indebtedness and liquidity; ability
to successfully complete announced transactions and integrate acquired assets; legislative, political or economic developments in the jurisdictions in which the
Company carries on business; operating or technical difficulties in connection with mining or development activities; employee relations; availability and costs
associated with mining inputs and labour; the speculative nature of exploration and development, including the risks of obtaining necessary licenses and permits and
diminishing quantities or grades of reserves; changes in costs and estimates associated with our projects; the accuracy of our reserve estimates (including with
respect to size, grade and recoverability) and the geological, operational and price assumptions on which these are based; contests over title to properties,
particularly title to undeveloped properties; the risks involved in the exploration, development and mining business, as well as other risks and uncertainties which are
more fully described in the Company's prospectus dated November 11, 2010 and in other Company filings with securities and regulatory authorities which are
available at www.sedar.com. Accordingly, readers should not place undue reliance on such forward looking statements. Teranga expressly disclaims any intention or
obligation to update or revise any forward looking statements, whether as a result of new information, future events or otherwise, except in accordance with
applicable securities laws.

This presentation is dated as of February 20, 2013. All references to the Company include its subsidiaries unless the context requires otherwise.

This presentation contains references to Teranga using the words “we”, “us”, “our” and similar words and the reader is referred to using the words “you”, “your” and
similar words.




                                                                                                                                                                             2
FINANCIAL RESULTS SUMMARY
Profit (Loss)
  • Q4 2012                                                                   $48.8M
  • 2012                                                                      $79.9M
  • 2011                                                                      ($16.0M)

Cash Balance
 • 2012 (1)                                                                   $45.0M
 • 2011 (2)                                                                   $24.6M

Hedge Balance
 • Jan. 29, 2013                                                              38,105 oz.
 • 2012                                                                       59,789 oz.
 • 2011                                                                       174,500 oz.

Revenue
 • 2012                                                                       $350.5M
 • 2011                                                                       $236.9M




(1)   As at December 31, 2012. Includes cash and cash equivalents and $5.3M in bullion receivables.
(2)   As at December 31, 2011. Includes cash and cash equivalents and $17.0M in bullion receivables.
                                                                                                       3
OPERATIONAL RESULTS SUMMARY
Production
  • Q4 2012                                                    71,804 oz.
  • 2012                                                       214,310 oz.
  • 2011 (1)                                                   131,461 oz.

Cash Costs
 • 2012                                                        $627/oz.
 • 2011 (1)                                                    $782/oz.

Production Costs
  • 2012                                                       $850/oz.
  • 2011 (1)                                                   $1,031/oz.

Capital Expenditure (2)
 • 2012                                                        $52.9M
 • 2011                                                        $62.1M

Capitalized Reserve Development Expenditure
 • 2012                                 $30.4M
 • 2011                                 $14.4M



(1)   For the twelve months ending December 31, 2011
(2)   Excluding capitalized reserve development expenditure.
                                                                             4
2013 OUTLOOK
Production Guidance
  • 190,000 - 210,000oz. at cash costs of $650 - $700/oz.

 •   Material mined 24% higher than in 2012

 •   Ore milled 37% higher than in 2012

Costs
 • Gross costs increasing $30M or 20%

 •   Unit costs per tonne to decrease




                                                            5
FISCAL
Tax Assessments
  • Senegal tax authority has levied $36M in tax assessments
     against the Company

  •   Reviewed with our legal counsel and concluded to have no
      merit

Contribution Tax
 • New Senegalese law was passed to impose a 5%
     “contribution” on the sale of products from mines and quarries

  •   Stability provision in place for Sabodala

  •   Working with the Senegalese authorities in order to find a
      mutually agreeable solution




                                                                      6
EXPANSION, RESERVES AND
EXPLORATION & DEVELOPMENT
Mill Expansion Completed in 2012
  • Continuing our mill optimization work

  •   Capacity - 3.5Mtpa of 100% hard ore and 6Mtpa of 100%
      oxide ore

  •   Processing ~95% hard ore in 2013

  •   Expect design capacity by end of Q2

Mill Production
  • Objective is to produce a base of 200,000oz. from the mine
      license alone

  •   Phase 1 Vision: Increase production to 250,000 – 350,000oz.
        •   Gora will be additive to our mine license production for
            an annual total of ~250,000oz.




                                                                       7
MOST ADVANCED SATELLITE
DEPOSIT - GORA
Economics
 • Capital cost est. $45M - $50M
 •   Est. total cash cost to average $675 - $700/oz.
 •   NPV (5%) at $1500/oz. of $105 million
 •   IRR 69%

Open Pit
 • 26km from mill
 •   Technical Study and ESIA complete – initiating
     permitting Q1’13
 •   Proven & Probable reserves of 285,000oz. at
                                                       Source – Typical section of Gora looking South West, 2012.
     4.2gpt.
 •   Estimated 4 year mine life
 •   Stripping ratio of 19:1
 •   Estimating production to start in 2014




                                                                                                                    8
RESERVES & RESOURCES(1,2)
•      Reserves remain similar to that of 2011 net of production

•      Focused on growing our reserves and are confident that we will
       add reserves on the ML

•      M&I resources increased 34% to 2.9Moz.

                              Proven                             Probable            Proven and Probable
 Deposit           Tonne                                Tonne                        Tonne
                               Grade          Au                  Grade       Au             Grade      Au
                     s                                    s                            s
                    (Mt)       (g/t)         (Moz)      (Mt)       (g/t)     (Moz)   (Mt)    (g/t)   (Moz)
 Sabodala           6.55        1.5          0.315      11.07      1.24      0.443   17.62   1.34    0.758
 Sutuba               -          -             -        0.37       1.40      0.017   0.37    1.40    0.017
 Niakafiri          0.23       1.69          0.013      7.58       1.12      0.274   7.81    1.14    0.287
 Gora               0.57       4.07          0.074      1.53       4.27      0.21     2.1    4.22    0.284
 Stockpiles         7.32       1.02          0.24         -         -          -     7.32    1.02    0.24
 Total             14.67       1.36          0.642      20.56      1.43      0.944   35.23   1.40    1.586

                                                                                         Measured and
                              Measured                           Indicated
                                                                                           Indicated
 Deposit                                                 Tonne      Grad             Tonne   Grad
                    Tonnes       Grade             Au                         Au                      Au
                                                           s         e                 s      e
                      (Mt)           (g/t)     (Moz)      (Mt)       (g/t)   (Moz)    (Mt)   (g/t)   (Moz)
 Sabodala            28.06           1.24      1.12      31.47      0.96      0.97   59.53   1.09    2.09
 Sutuba                   -            -           -      0.50      1.27      0.02   0.50    1.27    0.02
 Niakafiri           0.30            1.74      0.02      10.50      1.10      0.37   10.70   1.12    0.39
 Gora                0.49            5.27      0.08       1.84      4.93      0.29   2.32    5.00    0.37
 Total               28.85           1.32      1.22      44.31      1.16      1.65   73.05   1.22    2.87


(1)   Please see page 15 for Competent Persons Statement relating to this reserves estimate.
(2)   Based on assays received as of August 2012.
                                                                                                             9
POTENTIAL TO EXPAND THE ML
GOLD MINERALIZATION INVENTORY
                    •   Potential to expand gold inventory on ML with the
            33km2       objective of increasing mine life to the year 2020/25

                                     SABODALA PIT –
                                  MAIN FLAT EXTENSION /
                                    LOWER FLAT ZONE


                                        SAMBAYA HILL



                                             SUTUBA



                                         DINKOKHONO


                              NIAKAFIRI / NIAKAFIRI WEST /
                                      SOUKHOTO

                                                                                10
EXPLORATION - ML
•   Drill program for the Sabodala pit to be completed in Q1’13

•   Targeting new pit design for mid-year

•   Conduct an underground analysis in the second half of the
    year

•   Drilling in 2012 extended the Masato mineralized limits
    defining approximately 700,000oz. of Inferred Resource

•   Expect to begin drilling at Niakafiri by mid-year




                                                                  11
EXPLORATION – RLP
  •      Currently have 10(1) exploration permits ~1,200 km2 of land
         surrounding our 33 km2 ML

  •      2012 - Over 100,000m drilled, 25 anomalies, $20M

  •      Highlights from the 2012 drilling program;
           • Discovery of a new prospect at Tourokhoto-Marougou
           • Identification of significant mineralization at Saiensoutou

  •      2013 budget - $10-15M
           • Focus is on five priority targets
           • Other targets will be followed up in 2014

  •      Committing a minimum budget of $20M for exploration
         programs on the ML and RLP




(1)   The Company’s 11th exploration permit, Sabodala North West, was not renewed by the Government in June
      2012. The Company has since appealed this decision and is awaiting a response from the Government
                                                                                                              12
PROPERTIES IN VARYING STAGES
OF ASSESSMENT WITHIN RLP
                      1,200km2     NINYENKO /
                                    SORETO


                                   DIABOUGOU


                                  SAIENSOUTOU


                                  TOUROKHOTO
                                  (Main and Marougou)
  35km from Mill



                                 GOUMBOU GAMBA


                   GORA
                                                        13
FOCUS IS ON CONTINUED GROWTH
Focused on Growing Reserves
 •   To secure a reserve life to year 2020/25
 •   Growth through exploration
 •   Growth through regional opportunities (JV’s, acquisitions)

Focused on Growing Production
 •   Phase 1:   250,000 – 350,000oz. annual production by
                leveraging existing mill and land package
 •   Phase 2:   400,000 – 500,000oz. annual production, will
                require another mill expansion

Focused on Building Financial Strength
 •   Eliminating hedge book
 •   Expanding cash margins
 •   Increasing cash balance
 •   Use free cash flow to self-fund growth strategy
 •   Focusing on the ounces that provide the best returns
 •   Increase earning and cash flow per share (minimize dilution)



                                                                    14
COMPETENT PERSONS STATEMENT
The technical information contained in this Report relating to the mineral reserve estimates within the Sabodala, Sutuba, Niakafiri and Gora deposits and the Stockpiles, is
based on information compiled by Julia Martin, P.Eng., MAusIMM (CP), a full time employee with AMC Mining Consultants (Canada) Ltd., is independent of Teranga, is a
“qualified person” as defined in NI 43-101 and a “competent person” as defined in the 2004 Edition of the “Australasian Code for Reporting of Exploration Results, Mineral
Resources and Ore Reserves”. Ms. Martin has sufficient experience relevant to the style of mineralization and type of deposit under consideration and to the activity she
is undertaking to qualify as a Competent Person as defined in the 2004 Edition of the “Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore
Reserves”. Ms Martin has reviewed and accepts responsibility for the reserve estimates disclosed above. Ms Martin has consented to the inclusion in the report of the
matters based on her information in the form and context in which it appears in this Report.

The technical information contained in this Report relating to the mineral resources is based on information compiled by Ms. Patti Nakai-Lajoie, who is a Member of the
Association of Professional Geoscientists of Ontario. Ms. Patti Nakai-Lajoie is full time employee of Teranga and is not “independent” within the meaning of National
Instrument 43-101. Ms. Patti Nakai-Lajoie has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the
activity which she is undertaking to qualify as a Competent Person as defined in the 2004 Edition of the “Australasian Code for Reporting of Exploration Results, Mineral
Resources and Ore Reserves”. Ms. Patti Nakai-Lajoie is a “Qualified Person” under National Instrument 43-101 Standards of Disclosure for Mineral Projects.and she
consents to the inclusion in the report of the matters based on her information in the form and context in which it appears in this Report.

The technical information contained in this Report relating to exploration results is based on information compiled by Mr. Martin Pawlitschek, who is a Member of the
Australian Institute of Geoscientists. Mr. Pawlitschek is a consultant of Teranga and is not “independent” within the meaning of National Instrument 43-101. Mr.
Pawlitschek has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to
qualify as a Competent Person as defined in the 2004 Edition of the “Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves”. Mr.
Pawlitschek is a “Qualified Person” in accordance with NI 43-101 and he consents to the inclusion in the report of the matters based on his information in the form and
context in which it appears in this Report.




                                                                                                                                                                                15

More Related Content

What's hot

Q4 2008 Mktg Presentation Feb2009
Q4 2008 Mktg Presentation Feb2009Q4 2008 Mktg Presentation Feb2009
Q4 2008 Mktg Presentation Feb2009aemdemo
 
AEM Corporate Update Presentation
AEM Corporate Update PresentationAEM Corporate Update Presentation
AEM Corporate Update PresentationAgnico Eagle Mines
 
Q2 2012 results presentation conf call
Q2 2012 results presentation conf callQ2 2012 results presentation conf call
Q2 2012 results presentation conf callAgnico Eagle Mines
 
newmont mining Diggers_RClark
newmont mining Diggers_RClarknewmont mining Diggers_RClark
newmont mining Diggers_RClarkfinance37
 
Impact Silver Corporate Presentation
Impact Silver Corporate PresentationImpact Silver Corporate Presentation
Impact Silver Corporate PresentationAdnet Communications
 
Impact Silver Corporate Presentation
Impact Silver Corporate PresentationImpact Silver Corporate Presentation
Impact Silver Corporate PresentationAdnet Communications
 
Impact Silver Corporate Presentation
Impact Silver Corporate Presentation Impact Silver Corporate Presentation
Impact Silver Corporate Presentation Adnet Communications
 
occidental petroleum 2006 Annual Report
occidental petroleum 2006 Annual Reportoccidental petroleum 2006 Annual Report
occidental petroleum 2006 Annual Reportfinance13
 
Claude Resources Inc. April 2015 Corporate Presentation
Claude Resources Inc. April 2015 Corporate Presentation Claude Resources Inc. April 2015 Corporate Presentation
Claude Resources Inc. April 2015 Corporate Presentation Claude Resources Inc.
 
Claude Resources Inc. 2010 Annual Report
 Claude Resources Inc. 2010 Annual Report Claude Resources Inc. 2010 Annual Report
Claude Resources Inc. 2010 Annual ReportClaude Resources Inc.
 
National Bank Financial London Gold Conference Corporate Presentation
National Bank Financial London Gold Conference Corporate PresentationNational Bank Financial London Gold Conference Corporate Presentation
National Bank Financial London Gold Conference Corporate PresentationDetourGold
 
newmont mining oct_30_Q32008EarningsReleasePresentationFinal
newmont mining oct_30_Q32008EarningsReleasePresentationFinalnewmont mining oct_30_Q32008EarningsReleasePresentationFinal
newmont mining oct_30_Q32008EarningsReleasePresentationFinalfinance37
 
Bmo presentation draft 2013 03 28
Bmo presentation draft 2013 03 28Bmo presentation draft 2013 03 28
Bmo presentation draft 2013 03 28primero_mining
 
occidental petroleum 2007 Annual Report
occidental petroleum 2007 Annual Reportoccidental petroleum 2007 Annual Report
occidental petroleum 2007 Annual Reportfinance13
 

What's hot (19)

Q4 2008 Mktg Presentation Feb2009
Q4 2008 Mktg Presentation Feb2009Q4 2008 Mktg Presentation Feb2009
Q4 2008 Mktg Presentation Feb2009
 
AEM Corporate Update Presentation
AEM Corporate Update PresentationAEM Corporate Update Presentation
AEM Corporate Update Presentation
 
Q2 2012 results presentation conf call
Q2 2012 results presentation conf callQ2 2012 results presentation conf call
Q2 2012 results presentation conf call
 
newmont mining Diggers_RClark
newmont mining Diggers_RClarknewmont mining Diggers_RClark
newmont mining Diggers_RClark
 
Impact Silver Corporate Presentation
Impact Silver Corporate PresentationImpact Silver Corporate Presentation
Impact Silver Corporate Presentation
 
Impact Silver Corporate Presentation
Impact Silver Corporate PresentationImpact Silver Corporate Presentation
Impact Silver Corporate Presentation
 
Corporate Presentation
Corporate PresentationCorporate Presentation
Corporate Presentation
 
Impact Silver Corporate Presentation
Impact Silver Corporate Presentation Impact Silver Corporate Presentation
Impact Silver Corporate Presentation
 
Stifel report
Stifel reportStifel report
Stifel report
 
occidental petroleum 2006 Annual Report
occidental petroleum 2006 Annual Reportoccidental petroleum 2006 Annual Report
occidental petroleum 2006 Annual Report
 
Claude Resources Inc. April 2015 Corporate Presentation
Claude Resources Inc. April 2015 Corporate Presentation Claude Resources Inc. April 2015 Corporate Presentation
Claude Resources Inc. April 2015 Corporate Presentation
 
Claude Resources Inc. 2010 Annual Report
 Claude Resources Inc. 2010 Annual Report Claude Resources Inc. 2010 Annual Report
Claude Resources Inc. 2010 Annual Report
 
National Bank Financial London Gold Conference Corporate Presentation
National Bank Financial London Gold Conference Corporate PresentationNational Bank Financial London Gold Conference Corporate Presentation
National Bank Financial London Gold Conference Corporate Presentation
 
newmont mining oct_30_Q32008EarningsReleasePresentationFinal
newmont mining oct_30_Q32008EarningsReleasePresentationFinalnewmont mining oct_30_Q32008EarningsReleasePresentationFinal
newmont mining oct_30_Q32008EarningsReleasePresentationFinal
 
Bmo presentation draft 2013 03 28
Bmo presentation draft 2013 03 28Bmo presentation draft 2013 03 28
Bmo presentation draft 2013 03 28
 
occidental petroleum 2007 Annual Report
occidental petroleum 2007 Annual Reportoccidental petroleum 2007 Annual Report
occidental petroleum 2007 Annual Report
 
Corporate Presentation - May 24, 2017
Corporate Presentation - May 24, 2017Corporate Presentation - May 24, 2017
Corporate Presentation - May 24, 2017
 
4.18.12 european gold forum final
4.18.12 european gold forum final4.18.12 european gold forum final
4.18.12 european gold forum final
 
Barclays Presentation
Barclays PresentationBarclays Presentation
Barclays Presentation
 

Viewers also liked

Final teranga-investor-presentation-july20111
Final teranga-investor-presentation-july20111Final teranga-investor-presentation-july20111
Final teranga-investor-presentation-july20111Teranga Gold
 
Final teranga-investor-presentation-august-2011-081620111
Final teranga-investor-presentation-august-2011-081620111Final teranga-investor-presentation-august-2011-081620111
Final teranga-investor-presentation-august-2011-081620111Teranga Gold
 
Teranga Gold Q2 2013 Presentation
Teranga Gold Q2 2013 Presentation Teranga Gold Q2 2013 Presentation
Teranga Gold Q2 2013 Presentation Teranga Gold
 
October 2012 final
October 2012 finalOctober 2012 final
October 2012 finalTeranga Gold
 
Producing and Exploring: October 2012
Producing and Exploring: October 2012Producing and Exploring: October 2012
Producing and Exploring: October 2012Teranga Gold
 
Teranga Gold AGM Presentation
Teranga Gold AGM Presentation Teranga Gold AGM Presentation
Teranga Gold AGM Presentation Teranga Gold
 
Investor Presentation December 2014
Investor Presentation December 2014Investor Presentation December 2014
Investor Presentation December 2014Teranga Gold
 
07 30-15-q2-results-presentation-final3
07 30-15-q2-results-presentation-final307 30-15-q2-results-presentation-final3
07 30-15-q2-results-presentation-final3Teranga Gold
 
Q1 conference call 29042013 final
Q1 conference call  29042013 finalQ1 conference call  29042013 final
Q1 conference call 29042013 finalTeranga Gold
 
Indaba conf feb2013 final
Indaba conf feb2013 finalIndaba conf feb2013 final
Indaba conf feb2013 finalTeranga Gold
 
Teranga november presentation 11 11 11 final
Teranga november presentation 11 11 11 finalTeranga november presentation 11 11 11 final
Teranga november presentation 11 11 11 finalTeranga Gold
 
Teranga q4 year end webcast fina lv2 website
Teranga q4 year end webcast fina lv2 websiteTeranga q4 year end webcast fina lv2 website
Teranga q4 year end webcast fina lv2 websiteTeranga Gold
 
03 26-15 - stonegate marketing in tx and ny final
03 26-15 - stonegate marketing in tx and ny final03 26-15 - stonegate marketing in tx and ny final
03 26-15 - stonegate marketing in tx and ny finalTeranga Gold
 
Denver Gold Forum Presentation
Denver Gold Forum PresentationDenver Gold Forum Presentation
Denver Gold Forum PresentationTeranga Gold
 
European Gold Forum 2014
European Gold Forum 2014European Gold Forum 2014
European Gold Forum 2014Teranga Gold
 
Producing & Exploring: ASX Q4 & 2013 Results Conference Call
Producing & Exploring: ASX Q4 & 2013 Results Conference CallProducing & Exploring: ASX Q4 & 2013 Results Conference Call
Producing & Exploring: ASX Q4 & 2013 Results Conference CallTeranga Gold
 
BMO Global Metals & Mining Conference
BMO Global Metals & Mining ConferenceBMO Global Metals & Mining Conference
BMO Global Metals & Mining ConferenceTeranga Gold
 
Producing and Exploring: November 2012
Producing and Exploring: November 2012Producing and Exploring: November 2012
Producing and Exploring: November 2012Teranga Gold
 
07 30-15 q2 results presentation final3
07 30-15 q2 results presentation final307 30-15 q2 results presentation final3
07 30-15 q2 results presentation final3Teranga Gold
 
Teranga Gold Q2 2014 Results
Teranga Gold Q2 2014 ResultsTeranga Gold Q2 2014 Results
Teranga Gold Q2 2014 ResultsTeranga Gold
 

Viewers also liked (20)

Final teranga-investor-presentation-july20111
Final teranga-investor-presentation-july20111Final teranga-investor-presentation-july20111
Final teranga-investor-presentation-july20111
 
Final teranga-investor-presentation-august-2011-081620111
Final teranga-investor-presentation-august-2011-081620111Final teranga-investor-presentation-august-2011-081620111
Final teranga-investor-presentation-august-2011-081620111
 
Teranga Gold Q2 2013 Presentation
Teranga Gold Q2 2013 Presentation Teranga Gold Q2 2013 Presentation
Teranga Gold Q2 2013 Presentation
 
October 2012 final
October 2012 finalOctober 2012 final
October 2012 final
 
Producing and Exploring: October 2012
Producing and Exploring: October 2012Producing and Exploring: October 2012
Producing and Exploring: October 2012
 
Teranga Gold AGM Presentation
Teranga Gold AGM Presentation Teranga Gold AGM Presentation
Teranga Gold AGM Presentation
 
Investor Presentation December 2014
Investor Presentation December 2014Investor Presentation December 2014
Investor Presentation December 2014
 
07 30-15-q2-results-presentation-final3
07 30-15-q2-results-presentation-final307 30-15-q2-results-presentation-final3
07 30-15-q2-results-presentation-final3
 
Q1 conference call 29042013 final
Q1 conference call  29042013 finalQ1 conference call  29042013 final
Q1 conference call 29042013 final
 
Indaba conf feb2013 final
Indaba conf feb2013 finalIndaba conf feb2013 final
Indaba conf feb2013 final
 
Teranga november presentation 11 11 11 final
Teranga november presentation 11 11 11 finalTeranga november presentation 11 11 11 final
Teranga november presentation 11 11 11 final
 
Teranga q4 year end webcast fina lv2 website
Teranga q4 year end webcast fina lv2 websiteTeranga q4 year end webcast fina lv2 website
Teranga q4 year end webcast fina lv2 website
 
03 26-15 - stonegate marketing in tx and ny final
03 26-15 - stonegate marketing in tx and ny final03 26-15 - stonegate marketing in tx and ny final
03 26-15 - stonegate marketing in tx and ny final
 
Denver Gold Forum Presentation
Denver Gold Forum PresentationDenver Gold Forum Presentation
Denver Gold Forum Presentation
 
European Gold Forum 2014
European Gold Forum 2014European Gold Forum 2014
European Gold Forum 2014
 
Producing & Exploring: ASX Q4 & 2013 Results Conference Call
Producing & Exploring: ASX Q4 & 2013 Results Conference CallProducing & Exploring: ASX Q4 & 2013 Results Conference Call
Producing & Exploring: ASX Q4 & 2013 Results Conference Call
 
BMO Global Metals & Mining Conference
BMO Global Metals & Mining ConferenceBMO Global Metals & Mining Conference
BMO Global Metals & Mining Conference
 
Producing and Exploring: November 2012
Producing and Exploring: November 2012Producing and Exploring: November 2012
Producing and Exploring: November 2012
 
07 30-15 q2 results presentation final3
07 30-15 q2 results presentation final307 30-15 q2 results presentation final3
07 30-15 q2 results presentation final3
 
Teranga Gold Q2 2014 Results
Teranga Gold Q2 2014 ResultsTeranga Gold Q2 2014 Results
Teranga Gold Q2 2014 Results
 

Similar to Conference call ye 2012 final

Q2 2012 webcast final
Q2 2012 webcast finalQ2 2012 webcast final
Q2 2012 webcast finalTeranga Gold
 
European gold forum april 2013
European gold forum april 2013European gold forum april 2013
European gold forum april 2013Teranga Gold
 
First Quarter 2012 Conference Call & Webcast
First Quarter 2012 Conference Call & WebcastFirst Quarter 2012 Conference Call & Webcast
First Quarter 2012 Conference Call & WebcastTeranga Gold
 
SilverCrest Mines | Corporate Presentation | September 2012
SilverCrest Mines | Corporate Presentation | September 2012SilverCrest Mines | Corporate Presentation | September 2012
SilverCrest Mines | Corporate Presentation | September 2012Silvercrestmines
 
Orvana Corporate Presentation
Orvana Corporate PresentationOrvana Corporate Presentation
Orvana Corporate PresentationCompany Spotlight
 
AEM Q4 & Full Year 2011 Results
AEM Q4 & Full Year 2011 ResultsAEM Q4 & Full Year 2011 Results
AEM Q4 & Full Year 2011 ResultsAgnico Eagle Mines
 
Frontline Q4 2012 results presentation
Frontline Q4 2012 results presentationFrontline Q4 2012 results presentation
Frontline Q4 2012 results presentationTradeWindsnews
 
Wesdome 2009 Annual Report
Wesdome 2009 Annual ReportWesdome 2009 Annual Report
Wesdome 2009 Annual Reportdonovan_pollitt
 
Cabo presentation feb282011ppt(f)
Cabo presentation feb282011ppt(f)Cabo presentation feb282011ppt(f)
Cabo presentation feb282011ppt(f)Company Spotlight
 
Q1 2012 Quarterly Report
Q1 2012 Quarterly ReportQ1 2012 Quarterly Report
Q1 2012 Quarterly Reportprimero_mining
 
Bmo conf final feb 2013
Bmo conf final feb 2013Bmo conf final feb 2013
Bmo conf final feb 2013Teranga Gold
 
Teranga agm webcast final
Teranga agm webcast finalTeranga agm webcast final
Teranga agm webcast finalTeranga Gold
 
Dahlman Rose Global Metals Mining and Materials Conference
Dahlman Rose Global Metals Mining and Materials ConferenceDahlman Rose Global Metals Mining and Materials Conference
Dahlman Rose Global Metals Mining and Materials ConferenceNewmont Mining Corporation
 
Primero q2 results presentation final
Primero q2 results presentation finalPrimero q2 results presentation final
Primero q2 results presentation finalprimero_mining
 

Similar to Conference call ye 2012 final (20)

Presentation
PresentationPresentation
Presentation
 
Presentation
PresentationPresentation
Presentation
 
Presentation
PresentationPresentation
Presentation
 
Q2 2012 webcast final
Q2 2012 webcast finalQ2 2012 webcast final
Q2 2012 webcast final
 
European gold forum april 2013
European gold forum april 2013European gold forum april 2013
European gold forum april 2013
 
First Quarter 2012 Conference Call & Webcast
First Quarter 2012 Conference Call & WebcastFirst Quarter 2012 Conference Call & Webcast
First Quarter 2012 Conference Call & Webcast
 
SilverCrest Mines | Corporate Presentation | September 2012
SilverCrest Mines | Corporate Presentation | September 2012SilverCrest Mines | Corporate Presentation | September 2012
SilverCrest Mines | Corporate Presentation | September 2012
 
Orvana Corporate Presentation
Orvana Corporate PresentationOrvana Corporate Presentation
Orvana Corporate Presentation
 
AEM Q4 & Full Year 2011 Results
AEM Q4 & Full Year 2011 ResultsAEM Q4 & Full Year 2011 Results
AEM Q4 & Full Year 2011 Results
 
Frontline Q4 2012 results presentation
Frontline Q4 2012 results presentationFrontline Q4 2012 results presentation
Frontline Q4 2012 results presentation
 
Wesdome 2009 Annual Report
Wesdome 2009 Annual ReportWesdome 2009 Annual Report
Wesdome 2009 Annual Report
 
Cabo presentation feb282011ppt(f)
Cabo presentation feb282011ppt(f)Cabo presentation feb282011ppt(f)
Cabo presentation feb282011ppt(f)
 
Q1 2012 Quarterly Report
Q1 2012 Quarterly ReportQ1 2012 Quarterly Report
Q1 2012 Quarterly Report
 
Bmo conf final feb 2013
Bmo conf final feb 2013Bmo conf final feb 2013
Bmo conf final feb 2013
 
Orvana2013 agm presentation
Orvana2013 agm presentationOrvana2013 agm presentation
Orvana2013 agm presentation
 
Presentation
PresentationPresentation
Presentation
 
Presentation
PresentationPresentation
Presentation
 
Teranga agm webcast final
Teranga agm webcast finalTeranga agm webcast final
Teranga agm webcast final
 
Dahlman Rose Global Metals Mining and Materials Conference
Dahlman Rose Global Metals Mining and Materials ConferenceDahlman Rose Global Metals Mining and Materials Conference
Dahlman Rose Global Metals Mining and Materials Conference
 
Primero q2 results presentation final
Primero q2 results presentation finalPrimero q2 results presentation final
Primero q2 results presentation final
 

More from Teranga Gold

2018 aug-7-8 - teranga presentation - vancouver marketing
2018 aug-7-8 - teranga presentation - vancouver marketing2018 aug-7-8 - teranga presentation - vancouver marketing
2018 aug-7-8 - teranga presentation - vancouver marketingTeranga Gold
 
Tgz q2 2018 results webcast
Tgz q2 2018 results webcastTgz q2 2018 results webcast
Tgz q2 2018 results webcastTeranga Gold
 
18 06 05 06 121 ny presentation 1x1
18 06 05 06 121 ny presentation 1x118 06 05 06 121 ny presentation 1x1
18 06 05 06 121 ny presentation 1x1Teranga Gold
 
121 singapore teranga presentation - 1x1
121 singapore   teranga presentation - 1x1121 singapore   teranga presentation - 1x1
121 singapore teranga presentation - 1x1Teranga Gold
 
121 london teranga presentation - 1x1
121 london   teranga presentation - 1x1121 london   teranga presentation - 1x1
121 london teranga presentation - 1x1Teranga Gold
 
Teranga gold agm 2018
Teranga gold   agm 2018Teranga gold   agm 2018
Teranga gold agm 2018Teranga Gold
 
Tgz q1 2018 results webcast
Tgz q1 2018 results webcastTgz q1 2018 results webcast
Tgz q1 2018 results webcastTeranga Gold
 
2018 march swiss mining lunch presentation-final
2018 march swiss mining lunch presentation-final2018 march swiss mining lunch presentation-final
2018 march swiss mining lunch presentation-finalTeranga Gold
 
2018 pdac presentation
2018 pdac presentation2018 pdac presentation
2018 pdac presentationTeranga Gold
 
Teranga gold 1x1 presentation bmo 2018
Teranga gold 1x1 presentation   bmo 2018Teranga gold 1x1 presentation   bmo 2018
Teranga gold 1x1 presentation bmo 2018Teranga Gold
 
2018 february slides 1x1-final
2018 february slides 1x1-final2018 february slides 1x1-final
2018 february slides 1x1-finalTeranga Gold
 
2018 january 1x1 investor presentation vancouver-final
2018 january 1x1 investor presentation vancouver-final2018 january 1x1 investor presentation vancouver-final
2018 january 1x1 investor presentation vancouver-finalTeranga Gold
 
Website slides november 26, 2017 - final
Website slides   november 26, 2017 - finalWebsite slides   november 26, 2017 - final
Website slides november 26, 2017 - finalTeranga Gold
 
Tgz q3 2017 results webcast final
Tgz q3 2017 results webcast   finalTgz q3 2017 results webcast   final
Tgz q3 2017 results webcast finalTeranga Gold
 
2017 beaver creek final
2017 beaver creek final2017 beaver creek final
2017 beaver creek finalTeranga Gold
 
Sprott Natural Resource Symposium
Sprott Natural Resource SymposiumSprott Natural Resource Symposium
Sprott Natural Resource SymposiumTeranga Gold
 
Sprott Natural Resource Symposium
Sprott Natural Resource Symposium Sprott Natural Resource Symposium
Sprott Natural Resource Symposium Teranga Gold
 
European Gold Forum
European Gold Forum European Gold Forum
European Gold Forum Teranga Gold
 

More from Teranga Gold (20)

2018 aug-7-8 - teranga presentation - vancouver marketing
2018 aug-7-8 - teranga presentation - vancouver marketing2018 aug-7-8 - teranga presentation - vancouver marketing
2018 aug-7-8 - teranga presentation - vancouver marketing
 
Tgz q2 2018 results webcast
Tgz q2 2018 results webcastTgz q2 2018 results webcast
Tgz q2 2018 results webcast
 
18 06 05 06 121 ny presentation 1x1
18 06 05 06 121 ny presentation 1x118 06 05 06 121 ny presentation 1x1
18 06 05 06 121 ny presentation 1x1
 
121 singapore teranga presentation - 1x1
121 singapore   teranga presentation - 1x1121 singapore   teranga presentation - 1x1
121 singapore teranga presentation - 1x1
 
121 london teranga presentation - 1x1
121 london   teranga presentation - 1x1121 london   teranga presentation - 1x1
121 london teranga presentation - 1x1
 
Teranga gold agm 2018
Teranga gold   agm 2018Teranga gold   agm 2018
Teranga gold agm 2018
 
Tgz q1 2018 results webcast
Tgz q1 2018 results webcastTgz q1 2018 results webcast
Tgz q1 2018 results webcast
 
2018 march swiss mining lunch presentation-final
2018 march swiss mining lunch presentation-final2018 march swiss mining lunch presentation-final
2018 march swiss mining lunch presentation-final
 
2018 pdac presentation
2018 pdac presentation2018 pdac presentation
2018 pdac presentation
 
Teranga gold 1x1 presentation bmo 2018
Teranga gold 1x1 presentation   bmo 2018Teranga gold 1x1 presentation   bmo 2018
Teranga gold 1x1 presentation bmo 2018
 
2018 february slides 1x1-final
2018 february slides 1x1-final2018 february slides 1x1-final
2018 february slides 1x1-final
 
2018 january 1x1 investor presentation vancouver-final
2018 january 1x1 investor presentation vancouver-final2018 january 1x1 investor presentation vancouver-final
2018 january 1x1 investor presentation vancouver-final
 
Website slides november 26, 2017 - final
Website slides   november 26, 2017 - finalWebsite slides   november 26, 2017 - final
Website slides november 26, 2017 - final
 
Tgz q3 2017 results webcast final
Tgz q3 2017 results webcast   finalTgz q3 2017 results webcast   final
Tgz q3 2017 results webcast final
 
2017 dgf final2
2017 dgf final22017 dgf final2
2017 dgf final2
 
2017 beaver creek final
2017 beaver creek final2017 beaver creek final
2017 beaver creek final
 
2017 Q2 Results
2017 Q2 Results2017 Q2 Results
2017 Q2 Results
 
Sprott Natural Resource Symposium
Sprott Natural Resource SymposiumSprott Natural Resource Symposium
Sprott Natural Resource Symposium
 
Sprott Natural Resource Symposium
Sprott Natural Resource Symposium Sprott Natural Resource Symposium
Sprott Natural Resource Symposium
 
European Gold Forum
European Gold Forum European Gold Forum
European Gold Forum
 

Conference call ye 2012 final

  • 2. FORWARD LOOKING STATEMENTS Certain information included in this presentation, including any information as to the Company’s strategy, projects, exploration programs, joint venture ownership positions, plans, future financial or operating performance and other statements that express management’s expectations or estimates of future performance, constitute “forward-looking statements”. The words “believe”, “expect”, “will”, “intend”, ”anticipate”, “project”, ”plan”, “estimate”, “on track” and similar expressions identify forward looking statements. Such forward-looking statements are necessarily based upon a number of estimates, assumptions, opinions and analysis made by management in light of its experience that, while considered reasonable, may turn out to be incorrect and involve known and unknown risks, uncertainties and other factors, in each case that may cause the actual financial results, performance or achievements of the Company to be materially different from the Company’s estimated future results, performance or achievements expressed or implied by those forward-looking statements. Such forward-looking statements are not guarantees of future performance. These assumptions, risks, uncertainties and other factors include, but are not limited to: assumptions regarding general business and economic conditions; conditions in financial markets and the future financial performance of the company; the impact of global liquidity and credit availability on the timing of cash flows and the values of assets and liabilities based on projected future cash flows; the supply and demand for, deliveries of, and the level and volatility of the worldwide price of gold or certain other commodities (such as silver, fuel and electricity); fluctuations in currency markets, including changes in U.S. dollar and CFA Franc interest rates; risks arising from holding derivative instruments; adverse changes in our credit rating; level of indebtedness and liquidity; ability to successfully complete announced transactions and integrate acquired assets; legislative, political or economic developments in the jurisdictions in which the Company carries on business; operating or technical difficulties in connection with mining or development activities; employee relations; availability and costs associated with mining inputs and labour; the speculative nature of exploration and development, including the risks of obtaining necessary licenses and permits and diminishing quantities or grades of reserves; changes in costs and estimates associated with our projects; the accuracy of our reserve estimates (including with respect to size, grade and recoverability) and the geological, operational and price assumptions on which these are based; contests over title to properties, particularly title to undeveloped properties; the risks involved in the exploration, development and mining business, as well as other risks and uncertainties which are more fully described in the Company's prospectus dated November 11, 2010 and in other Company filings with securities and regulatory authorities which are available at www.sedar.com. Accordingly, readers should not place undue reliance on such forward looking statements. Teranga expressly disclaims any intention or obligation to update or revise any forward looking statements, whether as a result of new information, future events or otherwise, except in accordance with applicable securities laws. This presentation is dated as of February 20, 2013. All references to the Company include its subsidiaries unless the context requires otherwise. This presentation contains references to Teranga using the words “we”, “us”, “our” and similar words and the reader is referred to using the words “you”, “your” and similar words. 2
  • 3. FINANCIAL RESULTS SUMMARY Profit (Loss) • Q4 2012 $48.8M • 2012 $79.9M • 2011 ($16.0M) Cash Balance • 2012 (1) $45.0M • 2011 (2) $24.6M Hedge Balance • Jan. 29, 2013 38,105 oz. • 2012 59,789 oz. • 2011 174,500 oz. Revenue • 2012 $350.5M • 2011 $236.9M (1) As at December 31, 2012. Includes cash and cash equivalents and $5.3M in bullion receivables. (2) As at December 31, 2011. Includes cash and cash equivalents and $17.0M in bullion receivables. 3
  • 4. OPERATIONAL RESULTS SUMMARY Production • Q4 2012 71,804 oz. • 2012 214,310 oz. • 2011 (1) 131,461 oz. Cash Costs • 2012 $627/oz. • 2011 (1) $782/oz. Production Costs • 2012 $850/oz. • 2011 (1) $1,031/oz. Capital Expenditure (2) • 2012 $52.9M • 2011 $62.1M Capitalized Reserve Development Expenditure • 2012 $30.4M • 2011 $14.4M (1) For the twelve months ending December 31, 2011 (2) Excluding capitalized reserve development expenditure. 4
  • 5. 2013 OUTLOOK Production Guidance • 190,000 - 210,000oz. at cash costs of $650 - $700/oz. • Material mined 24% higher than in 2012 • Ore milled 37% higher than in 2012 Costs • Gross costs increasing $30M or 20% • Unit costs per tonne to decrease 5
  • 6. FISCAL Tax Assessments • Senegal tax authority has levied $36M in tax assessments against the Company • Reviewed with our legal counsel and concluded to have no merit Contribution Tax • New Senegalese law was passed to impose a 5% “contribution” on the sale of products from mines and quarries • Stability provision in place for Sabodala • Working with the Senegalese authorities in order to find a mutually agreeable solution 6
  • 7. EXPANSION, RESERVES AND EXPLORATION & DEVELOPMENT Mill Expansion Completed in 2012 • Continuing our mill optimization work • Capacity - 3.5Mtpa of 100% hard ore and 6Mtpa of 100% oxide ore • Processing ~95% hard ore in 2013 • Expect design capacity by end of Q2 Mill Production • Objective is to produce a base of 200,000oz. from the mine license alone • Phase 1 Vision: Increase production to 250,000 – 350,000oz. • Gora will be additive to our mine license production for an annual total of ~250,000oz. 7
  • 8. MOST ADVANCED SATELLITE DEPOSIT - GORA Economics • Capital cost est. $45M - $50M • Est. total cash cost to average $675 - $700/oz. • NPV (5%) at $1500/oz. of $105 million • IRR 69% Open Pit • 26km from mill • Technical Study and ESIA complete – initiating permitting Q1’13 • Proven & Probable reserves of 285,000oz. at Source – Typical section of Gora looking South West, 2012. 4.2gpt. • Estimated 4 year mine life • Stripping ratio of 19:1 • Estimating production to start in 2014 8
  • 9. RESERVES & RESOURCES(1,2) • Reserves remain similar to that of 2011 net of production • Focused on growing our reserves and are confident that we will add reserves on the ML • M&I resources increased 34% to 2.9Moz. Proven Probable Proven and Probable Deposit Tonne Tonne Tonne Grade Au Grade Au Grade Au s s s (Mt) (g/t) (Moz) (Mt) (g/t) (Moz) (Mt) (g/t) (Moz) Sabodala 6.55 1.5 0.315 11.07 1.24 0.443 17.62 1.34 0.758 Sutuba - - - 0.37 1.40 0.017 0.37 1.40 0.017 Niakafiri 0.23 1.69 0.013 7.58 1.12 0.274 7.81 1.14 0.287 Gora 0.57 4.07 0.074 1.53 4.27 0.21 2.1 4.22 0.284 Stockpiles 7.32 1.02 0.24 - - - 7.32 1.02 0.24 Total 14.67 1.36 0.642 20.56 1.43 0.944 35.23 1.40 1.586 Measured and Measured Indicated Indicated Deposit Tonne Grad Tonne Grad Tonnes Grade Au Au Au s e s e (Mt) (g/t) (Moz) (Mt) (g/t) (Moz) (Mt) (g/t) (Moz) Sabodala 28.06 1.24 1.12 31.47 0.96 0.97 59.53 1.09 2.09 Sutuba - - - 0.50 1.27 0.02 0.50 1.27 0.02 Niakafiri 0.30 1.74 0.02 10.50 1.10 0.37 10.70 1.12 0.39 Gora 0.49 5.27 0.08 1.84 4.93 0.29 2.32 5.00 0.37 Total 28.85 1.32 1.22 44.31 1.16 1.65 73.05 1.22 2.87 (1) Please see page 15 for Competent Persons Statement relating to this reserves estimate. (2) Based on assays received as of August 2012. 9
  • 10. POTENTIAL TO EXPAND THE ML GOLD MINERALIZATION INVENTORY • Potential to expand gold inventory on ML with the 33km2 objective of increasing mine life to the year 2020/25 SABODALA PIT – MAIN FLAT EXTENSION / LOWER FLAT ZONE SAMBAYA HILL SUTUBA DINKOKHONO NIAKAFIRI / NIAKAFIRI WEST / SOUKHOTO 10
  • 11. EXPLORATION - ML • Drill program for the Sabodala pit to be completed in Q1’13 • Targeting new pit design for mid-year • Conduct an underground analysis in the second half of the year • Drilling in 2012 extended the Masato mineralized limits defining approximately 700,000oz. of Inferred Resource • Expect to begin drilling at Niakafiri by mid-year 11
  • 12. EXPLORATION – RLP • Currently have 10(1) exploration permits ~1,200 km2 of land surrounding our 33 km2 ML • 2012 - Over 100,000m drilled, 25 anomalies, $20M • Highlights from the 2012 drilling program; • Discovery of a new prospect at Tourokhoto-Marougou • Identification of significant mineralization at Saiensoutou • 2013 budget - $10-15M • Focus is on five priority targets • Other targets will be followed up in 2014 • Committing a minimum budget of $20M for exploration programs on the ML and RLP (1) The Company’s 11th exploration permit, Sabodala North West, was not renewed by the Government in June 2012. The Company has since appealed this decision and is awaiting a response from the Government 12
  • 13. PROPERTIES IN VARYING STAGES OF ASSESSMENT WITHIN RLP 1,200km2 NINYENKO / SORETO DIABOUGOU SAIENSOUTOU TOUROKHOTO (Main and Marougou) 35km from Mill GOUMBOU GAMBA GORA 13
  • 14. FOCUS IS ON CONTINUED GROWTH Focused on Growing Reserves • To secure a reserve life to year 2020/25 • Growth through exploration • Growth through regional opportunities (JV’s, acquisitions) Focused on Growing Production • Phase 1: 250,000 – 350,000oz. annual production by leveraging existing mill and land package • Phase 2: 400,000 – 500,000oz. annual production, will require another mill expansion Focused on Building Financial Strength • Eliminating hedge book • Expanding cash margins • Increasing cash balance • Use free cash flow to self-fund growth strategy • Focusing on the ounces that provide the best returns • Increase earning and cash flow per share (minimize dilution) 14
  • 15. COMPETENT PERSONS STATEMENT The technical information contained in this Report relating to the mineral reserve estimates within the Sabodala, Sutuba, Niakafiri and Gora deposits and the Stockpiles, is based on information compiled by Julia Martin, P.Eng., MAusIMM (CP), a full time employee with AMC Mining Consultants (Canada) Ltd., is independent of Teranga, is a “qualified person” as defined in NI 43-101 and a “competent person” as defined in the 2004 Edition of the “Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves”. Ms. Martin has sufficient experience relevant to the style of mineralization and type of deposit under consideration and to the activity she is undertaking to qualify as a Competent Person as defined in the 2004 Edition of the “Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves”. Ms Martin has reviewed and accepts responsibility for the reserve estimates disclosed above. Ms Martin has consented to the inclusion in the report of the matters based on her information in the form and context in which it appears in this Report. The technical information contained in this Report relating to the mineral resources is based on information compiled by Ms. Patti Nakai-Lajoie, who is a Member of the Association of Professional Geoscientists of Ontario. Ms. Patti Nakai-Lajoie is full time employee of Teranga and is not “independent” within the meaning of National Instrument 43-101. Ms. Patti Nakai-Lajoie has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which she is undertaking to qualify as a Competent Person as defined in the 2004 Edition of the “Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves”. Ms. Patti Nakai-Lajoie is a “Qualified Person” under National Instrument 43-101 Standards of Disclosure for Mineral Projects.and she consents to the inclusion in the report of the matters based on her information in the form and context in which it appears in this Report. The technical information contained in this Report relating to exploration results is based on information compiled by Mr. Martin Pawlitschek, who is a Member of the Australian Institute of Geoscientists. Mr. Pawlitschek is a consultant of Teranga and is not “independent” within the meaning of National Instrument 43-101. Mr. Pawlitschek has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2004 Edition of the “Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves”. Mr. Pawlitschek is a “Qualified Person” in accordance with NI 43-101 and he consents to the inclusion in the report of the matters based on his information in the form and context in which it appears in this Report. 15