5. Integration of diagrams and Database
SQL
• Diagramsoftware: Progman MagiCAD System Designer
Tero Järvinen - Design Your Buildings
6. Under development: MEP PLM -System
PLM = Product Lifecycle Management
FLM = Facility Lifecycle Management
Schematic design Detailed Design Construction FM
Spaces / Design
Equipment Network
Modeling
Equipment approval
Browser based MEP PLM software
Tero Järvinen - Design Your Buildings
Requirements
BAS info
BIM in FM
Supervision
Diagrams
Service areas
Simulations
SQL
IFC
Performance
Metrix
Network
Balancing
AsBuilt info
FLM
7. Bim to FM, roadmap
Construction organisation FM organization
Concept design Detail design Construction Facility
Management
Spaces / Zones
Bim from designers
FM demands for
Confirmation of
as-built -
information
design BIMinFM
FM execution plan Monitoring
Exchange plan to
FM information
handover
Organisation of
handover and teaching
FM coordinator organises demands and follow that they are fulfilled
Tero Järvinen - Design Your Buildings
8. Granlund Designer Concept
Tero Järvinen - Design Your Buildings
MEP
Site
BIM2FM
GRANLUND DESIGNER
Ultimate PLM solution for
MEP Facility Lifecycle Management
Designer
Contractor
Project Management
Property owner
9. • 2D graphics, IFC space import
• MEP Targets and/or Requirements connected
to spacetypes through libraries
• Connections to Architectural requirements
databases (webservices)
• External simulation software (Riuska, IES…)
• Graphical comparisions of different simulation
cases
• Cost estimations based in square meters and
MEP system selections (including service areas)
Tero Järvinen - Design Your Buildings
Designer
Contractor
Project Management
Property owner
Granlund Designer Concept
MEP
Site
BIM2FM
10. • Comparison between requirements and
simulation results (theme charts)
• Device database connected to diagrams
• Device libraries for rapid database creation
• MEP network model import (IFC)
• Comparision of design values to requirements
and simulations
• Creation of combied model, visualizations
(external software)
Tero Järvinen - Design Your Buildings
Designer
Contractor
Project Management
Property owner
Granlund Designer Concept
MEP
Site
BIM2FM
11. • MEP network model version comparisations
(tool for change orders)
• Design information queries from database
• Equipment approval process
- Contractor propose devices according the
designer information
- Designer/Project Management accept /
reject proposals
- Approval process situation can be
followed
• After approval, contractor imports all device
information needed for FM (pdf’s etc.)
Tero Järvinen - Design Your Buildings
Designer
Contractor
Project Management
Property owner
Granlund Designer Concept
MEP
Site
BIM2FM
12. • Previous phases ensures that BIM information
is available for FM usage – a starting point of
FLM (Facility Lifecycle Management)
• Requirements can be compared to design and
contractor values
• Service Areas and MEP networks/equipments
are connected to spaces
• Device approval process information is stored
in design database – usage in FM software
through webservices etc.
• Connections to Building Automation System ->
BIM based Building Monitoring
Tero Järvinen - Design Your Buildings
Designer
Contractor
Project Management
Property owner
Granlund Designer Concept
MEP
Site
BIM2FM
13. Dataflow between softwares
Software
A
Software
B, Granlund
Tero Järvinen - Design Your Buildings
Internal
usage,
calculations
Internal
usage,
calculations
Usage of extracted
Information
Return of
calculation
results, partial
information
extraction
Return of
calculation
results, partial
information
extraction
Usage of extracted
Information
Webservice or Granlund service bus,
Client API Webservice
14. Dataflow between softwares, example
MEP service areas Comfort
Granlund Designer
creates targets
Requirements
Software A Software C
IFC update with Requirements (Pset)
Tero Järvinen - Design Your Buildings
simulations
IFC update with MEP Zones (IfcZone)
Native Architect IFC
Only spaces (and space
boundaries) are readed
Riuska makes
energy and comfort
simulations
Granlund Designer
creates zones
IFC update with simulation results tied to spaces (Propertyset)
Analyze with
Granlund Designer
Arch IFC Arch Spaces
Software B Software B Software D
Software B
WebService
Granlund Service Bus
15. Dataflow between softwares
Software
”Spaces”
WebService used
in information
exchange between
softwares
Tero Järvinen - Design Your Buildings
Software
”Equipments”
Software
”Schedule”
Software
”Energy”
Software
”N”
Software
”Requirements”
Information export (.IFC) storage:
Propertyset in IfcSpace
Only results will be stored
16. GD principles
Tero Järvinen - Design Your Buildings
Equipment list
Granlund Designer MEP
System Diagrams
Database of Combined
Information
2015-17
Equipment revision
management
Equipment approval
IFC Service area Charts Creation of Requirements
Linked to IFC-space types
IFC information to Database
17. GD principles
BIM2FM, 3D-view (external software required)
Tero Järvinen - Design Your Buildings
Bim software
Granlund Designer
BIM2FM: Intelligent 2D IFC-spaceview
Above information also linked
To IFC-spaces
Daily updated Information
is not in Graphical BIM software
but in shared databases
18. Tero Järvinen - Design Your Buildings
Origin: DPR Construction inc.
19. BIM based designing
Requirements • Creating requirements
Schematic • Alternative solutions
Design • Modelling chosen alternative
Construction • Building according the Models
Commissioning • Utilization of Models
Maintenance • BIM in FM
Target consumption
Indoor air quality
Spatial Provisions
Energy Efficiency
Network Modelling
Network calculations
Combied Models
Information content
Device Validation
Information content
Service Area Charts
Device Database
Tero Järvinen - Design Your Buildings
20. Requirements management
T5
Requirements
Schematic
Design
Construction
Commissioning
Maintenance
T6
1. Targets for spacetypes
2. Building Model
3. Linking requirements
to spaces
7. Chosen calculation to basis
of CAD-system calculations
5. Energy and
Comfort simulation
IFC
4. Service Area
Zones
6. Comparisation of
alternative solutions
SQL
Software:
Roomex
Riuska
Solibri
MagiCAD Room
Tero Järvinen - Design Your Buildings
Look also: Creating requirements in early stage of project
21. BIM in Design Development -phase
Requirements
Schematic
Design
Construction
Commissioning
Maintenance
Design Developments –phase specifys investment costs,
energy consumption and indoor air quality levels
Alterantive
solutions
Diagrams and
equipment
databases
Spatial provisions
and service area
zones
Sustainability
Energy- and comfort
simulatations
Life Cycle
Lighting
Simulations
Technical
Visualizations
CFD-simulations 3D-mockups
SQL
IFC
Tero Järvinen - Design Your Buildings
22. BIM in Detail Design -phase
Requirements
Schematic
Design
Construction
Commissioning
Maintenance
Detail Design is made according the Design Develompment
Combied Models Modelling of Model Auditing
MEP-networks
BIM based
Provision of Voids
Equipment
database
Route Designing
SQL
IFC Common BIM
Requirements
Information export
from models
Tero Järvinen - Design Your Buildings
23. BIM in Construction -phase
Requirements
Schematic
Design
Construction
Commissioning
Maintenance
Installations are mabe according the Detailed Design
Model
Combied Models Information export
from models
IFC
SQL
Revisionhandling
of Models,
Documents and
Equipment data
Model based assembly
inspection
Equipment
Validation
Tero Järvinen - Design Your Buildings
24. BIM in Commissioning
Requirements
Schematic
Design
Construction
Commissioning
Maintenance
Information of BIM is used in Commissioning
Information export
from models
As-Bildt Model
Target values of energy
consumption for
SQL Facility Management
IFC
Assembly
Inspections
Tero Järvinen - Design Your Buildings
25. BIM in Facility Management
Requirements
Schematic
Design
Construction
Commissioning
Maintenance
BIM is helping Facility Management
Use of Models in
Facility Management
Monitoring of Energy
Efficiency
BIM Management
Process during
building life cycle
Tero Järvinen - Design Your Buildings
26. Spacetypes and Requirements
Requirements
Concept
Detail
Construction
Commissioning
Maintenance
SQL
For having MEP design strated, you need requirements for Indoor
Quality, equipment
• With colloboration of customer, maximum temperatures etc. has to be
decided
• With these requirements MEP designer makes comfort and energy
simulations for fullfilling the requirements. End result is a target value
for each space, which MEP designer has to fulfill. (for example:
Requirement: max. 26oC -> simulation -> target value 1.2kW cooling
Tero Järvinen - Design Your Buildings
Software
used:
Roomex
Riuska
27. Linking requirements to spaces
Architectural model and requirements is linked together with ”Roomex”
• After that every space knows it’s requirements according to indoor
quality
Tero Järvinen - Design Your Buildings
Requirements
Construction
Commissioning
Maintenance
IFC
Concept
Detail
Software:
Roomex
SQL
28. Service area charts
Spaces with requirements are loinked to service area charts
(for example Air handling unit service areas)
• Linking is made using ifcSpaces, so ifcZones are created to IFC file
• 2D Visualization for example with Solibri etc.
Tero Järvinen - Design Your Buildings
Requirements
Construction
Commissioning
Maintenance
IFC
Concept
Detail
Software:
Roomex
Solibri
SQL
29. Energy and Comfort simulations
Dynamic simulation of energy and comfort is made with requirements,
building model and service area charts simulation.
• Every space is simulated
• Alternative simulations and comparisations for different envelopes,
windows etc. -> beginning of LCC calculations
Tero Järvinen - Design Your Buildings
Requirements
Construction
Commissioning
Maintenance
IFC
Concept
Detail
Software:
Riuska
SQL
30. Optimisation of Energy usage
With parametric energysimulation in Riuska, you can get 200-2000 (or
more) simulation results of building energy consumption.
Results are viewed in userfriendly cloud service for decission making
purposes – real time search for optimate solution in one meeting with
people having knowledge about expences and reality of limitations
Tero Järvinen - Design Your Buildings
Requirements
Concept
Detail
Construction
Commissioning
Maintenance
Software:
Riuska
Granlund
Optimisation
SQL
31. Building Performance
Tero Järvinen - Design Your Buildings
Manager METRIX
BAS system
Manager Metrix
• Connected to BAS system and offering ”one value of building Performance”
• Offering interface for Facility management persons, who are not capable to
use BAS system
• Offering interface for Building Management to analyze building performance
daily basis
Requirements
Concept
Detail
Construction
Commissioning
Maintenance
SQL
32. Building Performance
Tero Järvinen - Design Your Buildings
Manager Building Info
BAS system
Manager
Building Info
• Information pops up on a large lobby screen or on your computer screen
alongside newsletters providing information on your building's energy
consumption, energy class and maintenance performance.
Requirements
Concept
Detail
Construction
Commissioning
Maintenance
SQL
33. Requirements management in phase of Design Brief
Tero Järvinen - Design Your Buildings
Requirements
Concept
Detail
Construction
Commissioning
Maintenance
Software:
- Cost estimation
- Riuska /
energysimulation
- IFC-space objects
IFC
34. Different views to BIM
Performance
Quantities, schedule
Drawings, memos, schedule
Visualization models
Tero Järvinen - Design Your Buildings
36. Equipment approval
Tero Järvinen - Design Your Buildings
Designed
Calculated
values
Reference
manufacturer
Pump
2 dm3/s ,
35kPa
Wilo
Offered
Manufacturer
approval
Grundfos
Approval
Manufacturer
approved
Grundfos
Offered
Values
Pump
2,2 dm3/s ,
38kPa
Approval
Values
approved
Pump
2,2 dm3/s ,
38kPa
As-built
Information
in Granlund
Designer
Values
Pump
2,2 dm3/s ,
38kPa
Grundfos
FM material
to Granlund
Designer
PDF Upload
Linked to
equipment
Manuals,
service
areas,
Step 1 Step 2
Granlund Designer ”Site” > BIM2FM
Step 3
37. Construction Project Data Management – MEP
Architectural
design
• Design
• Modeling
• Publishing
22.3.2013 MJo
Structural
design
• Design
• Modeling
• Publishing
STRCT
Management of interoperable construction data
Construction project
data storage
Design
management
• Space program
• End-user data
• Requirements
• Space data status
• Time schedules
Construction
management
• Procurement
• Production
• Resources
• Costs
• Time schedules
ARCH
MEP
design
• Design
• Modeling
• Publishing
MEP
MEP
information services
• System data
• Building parts
• Inspections
• As-built data
input
MEP
Granlund Designer
Facilities
management
• O&M manual
• Energy monitoring
• Repairs
• Budgeting
FM
Granlund Manager
• Documents
• BIM 2D/3D views
• BIM data
Management of real estate
data
Real estate
data storage
• Documents
• BIM 2D/3D views
• BIM data
Contruction project
As-built data
Renovation project
Input data
Tero Järvinen - Design Your Buildings