New TP

TOMMY PARKER
5716 Sullivan Point Dr.
Powder Springs, Georgia 30127
678-570-9770
parkert3000@yahoo.com
OBJECTIVE
To obtain a position where I can contribute and develop growth to businesses by planning, organizing,
directing, and executing various programs.
WORK EXPERIENCE
Dates Employed Job Title Company
March,20 – Present Fiber Splicing Technician Gannett Fleming
Ability to fusion or mechanical splice SM or MM fiber optic cables, to include terminate various
types of fiber optic connectors (ST,SC, LC). Work with engineers and/or OSP PM’s to perform
fusion splicing as directed. Installation and testing of pressurized and non-pressurized closures
on all types and sizes of cable. Experience and knowledge in fiber acceptance testing, using
Fiber Optic Scope and or a Fiber OTDR.Installation and dressing of fiber optic cables
(vertical/horizontal). Serve as a resource to the internal staff on matters concerning splicing
practices and procedures. Provide red-line splicing diagrams to update network documentation.
Provide management with detailed reports of field splicing activity. Manage multiple projects at
one time. Communicate with Project Manager and Team Leader on workload status in order to
meet designated goals. Maintain company vehicle, and equipment in good working condition.
Maintain a positive attitude and strong work ethic that can provide high productivity with minimal
supervision.Extensive driving and travelling up to 100%.
Nov,3. 2014 – Feb -2015 Technician / Installer Orin Inc.
NC.Market
US Cellular Project Take pre pics. Mount 19’rack with anchor; terminate connector for power RRU,
DUS, Run Ethernet cable for router, Run Fiber with inter duct, GPS Antenna on grounded pole,
polyphaser mounted to inside ground bar on power P side of MGB. GPS cable ran through boot with
silicone ran and laced GPS cables in rack, installed ground cables for GPS, ran power cable for RRU,
run power cable from rectifier to PSU terminated at both ends, installed brady labels and p-tags on
all necessary locations. Complete close out package.
July 26. 2014 Oct,30 - 2014 Central Office Technicain Alta / AFL
Installed, tested and turned up DS1, DS3, OC3, OC3 express, OC12, OC48 access node, Soneplex and
Channel Banks. Used various test equipment T-Bird 107, 307, 310, 2310, fiber optic light source and BNC
tester. Managed workloads for field technicians. Scheduled jobs for site surveys and new installations.
Interfaced with customers on daily basis while installing service on site. Coordinated cut over with
customers and vendors, prior to turn up service of what the Customer ordered. Handled trouble tickets after
hours on various equipment, also DC (power). Troubleshoot and tested electrical and Sonnet based circuits,
tested DS1 circuits using Titan 5500 DCS. Fiber splicing and termination (Fusion Splices).
Feb. 26. 2014 July-2014 Technician / Installer Tengent / TNS
AT&T 1c LTE and UMTS Install, Installing GPS Antenna installation, Take pre pics Installed all
equipment in rack, DUS, SAU, GPS & fiber tray Installed GPS Antenna on grounded pole, polyphaser
mounted to inside ground bar on P side of MGB. GPS cable ran through boot with silicone ran and
laced GPS cables in rack, Ran the SAU Alarm cables up the 19” rack into the ladder rack to the
location of the 66-Blocks Then punched down the 66-Blocks. installed ground cables for
GPS,SAU,DUS, and fiber tray ran power cable from DUS to PDU terminated at both ends ,,installed
brady labels and p-tags on all necessary locations.
Feb. 27, 2013 Dec-2013 Technician/ Installer Parson /N.C
Market
T-Mobile Modernization Project, My duty was install and complete power upgrade and install and removed
parts. Complete 2c cut over with 911 test calls into TDOA war room. Working on GSM or CDMA, Make
sure LMU is online and site is alarms free. DUL (6601) into 19’ rack, terminated alarms cables, labels,
punch down on 66-blocks, terminated -48 volts, Commission / Integrating, call test, 911 call testing, using
Hyper Terminal, OMT and RBS Configurations Tools, Element Manger, FileZilla, Putty, troubleshooting
T1s, running CAT5 cables, DUL, DUW,DUG and Mini Link 210, 310. Up-loading AMS TOOL with
photos, close-out package.
Nov. 26, 2012 Feb-2013 Technician Quanta / TNS
Atlanta, Ga.
As a technician my duty was install DUL (6601) into 19’ rack, terminated alarms cables, labels, punch
down on 66-blocks, terminated -48 volts, Commission / Integrating, call test, 911 call testing, using Hyper
Terminal, OTDR, Fiber tester, Light Source, OMT and RBS Configurations Tools, Element Manger,
FileZilla, Putty, troubleshooting T1s, running CAT5 cables, DUL, DUW,DUG and Mini Link 210, 310.
Up-loading AMS TOOL with photos, close-out package.
July 23, 2012 Nov. 2012 Technician AFL
New York
4G LTE Commissioner / Integrator As a Technician for AFL (contractor) my responsibility,
Installation and integration of DUW30,DUG, and DUL for Ericsson equipment in the 6000 series
LTE cabinets. Running cat5 and cat6 for T1s to Node B and 2G cabinet using RJ-45 connectors.
Perform test calls and data testing all so trouble shooting issue onsite. When down loading
software using RBS Element Manger, FileZilla, Putty, FTP Pro, HyperTerminal, OMT and RBS
Configurations Tool.
May 29, 2012- July 2012 Technician Rightech
Kennesaw
As a contractor my duty’s was to add software DUL and Mini Link SP 210 and 310 using Putty and
HyperTerminal. I also build Ericsson 6102, 6201 RBS and BBS cabinet according to the MOP. Once I took
inventory of material (BOM), I had to follow the MOP procedures to pre-stage the cabinet, Pre-stage
cabinet for shipment.
Jan. 15, 2011- April 4, 2012 Lead Tech MasTec Inc.
Raleigh, NC.
As a Lead tech my duties was to install SIAD in rack, run DC power to PDU and Install
ETMFX-CARD to UMTS Ericsson 3206 cabinet. Writing script for the SIAD
Resetting SIAD Configuration to Factory Defaults
Provide ETTCS technicians information to reset SIAD configuration to factory defaults.
Information to provide the methods used to reset the SIAD, MWR 2941 DC Cisco Router
configuration to factory defaults. Using pro-com plus to telnet in to the router. Ericsson
3206 cabinet, DUL Commissioner / Integrator, also PCO testing with the NOC.
July 1, 2010 – Dec,12 2010 Lead Tech RighTech
Kennesaw GA.
Install HUB’S 110 blocks, 66 blocks, and punch down riser cables. Implement network cable installation,
including, Ethernet, Coaxial, Twisted Pair, Fiber Optic for local area networks. Telephone cable plant riser
system PBX, Electronic and 1A2 Key System, Central Office and Automatic Dialers. Install, test and turn
up DS1, DS3, OC3, OC3 express, OC12, OC48 access node, Soneplex and Channel Banks. Use various
test equipment T-Bird 107, 307, 310, 2310, fiber optic light source and BNC tester. Manage workloads for
field technicians. Handle the inventory control and editing database. Schedule jobs for site surveys and
new installations/repairs. Interface with customers on daily basis while installing service on site.
Coordinate cut over with customers and vendors, prior to turn up service of what the Customer ordered.
Handle trouble tickets after hours on various equipment, also DC (power). Troubleshoot and test electrical
and Sonnet based circuits, test DS1circuits using Titan 5500 DCS.
Oct 15, 2007- June, 1 -2010 Network Management Operations, Tier 11 Venturi
Technology
Alpharetta, GA
Provided operation support for the Customer Service Maintenance & Technical support. Accountable for
following all external trouble resolution and escalations processes and performed proactive LAP
monitoring to ensure forward progress of tickets by Local Access Provider escalations. Provided
communication with the customer and proactively supplied them with up to date progress reports which
included next steps and when they would occur. Took ownership for directing all activities leading to
isolation and resolution fixing the problem. Troubleshoot and maintained Frame Relay, ATM Switching,
DS3, OC12, DS1 and DS0 using different types of systems, TIRKS (Trunks Integrated Record Keeping
System), DSTS (Digital Service Testing System), SARTS (Switch Access Remote Test Systems), BMP
Tickets Systems. Knowledge of LEC Provisioning Processes.
Feb 12, 2007 - Oct 15, 2007 UMTS Nokia Project Manager Mittrix, Inc.
Duluth, GA
As a project manager I am responsible for performing weekly physical inventory and making sure that the
inventory (tracker) corresponds with SAP# (identification) as shipment of material arrives. I then make
sure that information is edited onto the tracker. I am on a conference call daily at 3:00pm with T-Mobile
and other wireless carriers discussing issues and accomplishments. As a project manager my duties are to
make sure that technicians have their building of material (BOM) to accomplish their task. I also make up
building of material (BOM) so technicians can go out and install cabinet sled, tanks, generator for cell sites.
Receive orders from customer that material must be staged for their technician to pick up. Responsible for
the Ethernet Network to the Cell migrations for Ericsson Node B equipment in the 3G Network.
Responsible for Creating/preparing work orders and scripts to be executed in Node B, RNC, MSN,
and SIADs
Feb 6, 2005 – Feb 4, 2007 Network Consultant Hewlett Packard Co.
Alpharetta, GA
Communicated with HP Business Partners to determine need. Recommended Business Partner
Connectivity Solutions. Conducted requirements gathering including source, destinations and protocol.
Developed network design using Visio. Reviewed approvals from IT Network Security to build ACLs list
and Crypto. Built Cisco IOS Access Control list for hardware and software VPN solutions, as well as for
Legacy lease line solutions. Determined types of requests and risks associated with the request. Formatted
and requested ACLs/ VPN solutions to engineers for implementation. Worked with engineers until
requests met clients’ satisfaction. Attended conference calls and meetings. Worked as Team Leader of
Data Center Consolidations, Closures, and Applications Migrations.
Jan 18, 2004- Feb 6, 2005 Installation / Commissioning Alcoa Wireless
Alpharetta, GA
Responsible for terminating power and commissioning, editing database, updating Firmware and
downloading newest Software with the use of LMT work UMR 4.0 software. Integration to RNC and
fault finding on Siemens UMTS Node B 580 equipment, replacing any and all defective Channel
Coding Cards with and without HSDPA, Core Controller, Cat 40, DUAMCO, and DRIC cards.
Troubleshooting T-1 and Alarm links from Siemens UMTS Node B 580 to RNC, RC, and to the Switch
with the use of LMT works UMR 4.0 SW. Responsible for updating IDF and IDT files on Siemens
UMTS Node B 580 to maintain correct inventory in UMTS. Configuring older 2102 and newer 2106
Ericsson cabinets to customer specific configurations. Installing Ericsson 3206 – 2206 to change out
radios and terminating T-1, alarm cables and reconfiguring radios.
May 14, 2002 - Jan 18, 2004 Network Management Operations Global
Technician
Consultants
Norcross, GA
Engineered local network transport migration projects from Media One to AT&T platform, LSO and
Collector rings at DSO, T1, DS3, OC3, and OC12 and OC48 levels. Developed, maintained and updated
project documentation, spreadsheets, network elements, fiber optic ring maps, Visio’s, COLR’s and ATT
databases. Analyzed inventory, tracking electronic circuit via Titan 5500, submitted service orders for
adds, changes, disco, updates, due dates and turn ups. Ensured network operations integrity and
provisioning, managed multi-tasks, and communicated with all levels of management.
May 4, 2000 - May 14, 2002 Lead Technician ARBROS
Communication
Washington DC
As the manager of the Baltimore site, I supervised the installation of circuits and equipment by contractors,
test and turn-up orders from DSO,T1,DS3, OC3, OC3 Express and OC48, Lucent Wave Star OC 192 and
Talon MX (Kestrel) high speed circuits and used wireless 38GHz (P-com), Frame Relay, ATM, TCP/IP.
May 9, 1995 - May 4 2000 Lead Technician AT&T Local
Service
Washington DC
Installed, tested and turned up DS1, DS3, OC3, OC3 express, OC12, OC48 access node, Soneplex and
Channel Banks. Used various test equipment T-Bird 107, 307, 310, 2310, fiber optic light source and BNC
tester. Managed workloads for field technicians. Scheduled jobs for site surveys and new installations.
Taught classes to less experienced technicians. Interfaced with customers on daily basis while installing
service on site. Coordinated cut over with customers and vendors, prior to turn up service of what the
Customer ordered. Handled trouble tickets after hours on various equipment, also DC (power).
Troubleshoot and tested electrical and Sonnet based circuits, tested DS1 circuits using Titan 5500 DCS.
Supervised employees whom completed contracts with Drug Enforcement Administration (DEA) GTE and
Department of Energy.
EDUCATION
Skill 40 WPM Typing
2015 Smart Laptop Introduction Certification Richardson, TX
2015 LTE Commissioning Certification Richardson, TX
2015 OMT IDB T-Mobile Certification Richardson, TX
2014 EAMS 3.10 Training Certification Richardson, TX
2014 EAMS Training Certification Richardson, TX
2012 T-Mobile Multi Standard Certification Richardson, TX
Solution Overview
DUW30, DUG, DUL
2011 HS1 LTE Ericsson Certification Richardson, TX
2010 Commissioner/Integrator
2006 Nokia Installation Certification Mokena, IL
2006 Nokia Training on Mokena, IL
(1900 – 850) Series
2006 Wireless Cable Training on Certification Mokena, IL
L4PDM-RC, L5PDF-RPC, Andrew Institute
A7TDF-PS, SGL5, L5SGRIP
Weatherproofing
1999 Nortel OC3 Express Certification Montreal, Canada
1999 Titan 5500 DCS/Tellabs Certification Chicago, Illinois
1999 Nortel Access Node Certification Raleigh, NC
1998 Sonnet Certification Dayton, NJ
1998 Light Brigade Advanced
Fiber Optic Technologies Professional Dayton, NJ
1998 Disc’s System-Turn Up
and Maintenance/RELTEC Certification Dayton, NJ
1997 Wireless Fiber Installation/
1997 Winstar Certification Leesburg, VA
1997 BNC Interconnect/Trompeter Certification NW, Washington
1980 United State Army 36K Wireman United State
1978 T.C Williams H.S Graduation Alexandria, VA.
1980 United State Army 36K Wireman United State
1978 T.C Williams H.S Graduation Alexandria, VA.

Recomendados

Daniel Steven Brooks Resume por
Daniel Steven Brooks ResumeDaniel Steven Brooks Resume
Daniel Steven Brooks ResumeDaniel Steven Brooks
129 vistas15 diapositivas
Nathaniel weathers resume linkedin por
Nathaniel weathers resume linkedinNathaniel weathers resume linkedin
Nathaniel weathers resume linkedinNathaniel Weathers
389 vistas3 diapositivas
tahir.resume por
tahir.resumetahir.resume
tahir.resumeMuhammad Tahir
193 vistas7 diapositivas
GS_IT_Resume_2015 por
GS_IT_Resume_2015GS_IT_Resume_2015
GS_IT_Resume_2015Gabriel Santiago
201 vistas2 diapositivas
Rizwan Ahmad (f) por
Rizwan Ahmad (f)Rizwan Ahmad (f)
Rizwan Ahmad (f)Rizwan Ahmad
276 vistas5 diapositivas
Stephen kramer resume updated 2 por
Stephen kramer resume updated 2Stephen kramer resume updated 2
Stephen kramer resume updated 2Stephen Kramer
226 vistas3 diapositivas

Más contenido relacionado

La actualidad más candente

Antonio Bocanegra Resume 2015 por
Antonio Bocanegra Resume 2015Antonio Bocanegra Resume 2015
Antonio Bocanegra Resume 2015Antono Bocanegra
273 vistas3 diapositivas
Campbell michael resume mtli 7 por
Campbell michael resume mtli 7Campbell michael resume mtli 7
Campbell michael resume mtli 7Michael Campbell
138 vistas4 diapositivas
Adeel Ahmed- CV por
Adeel Ahmed- CVAdeel Ahmed- CV
Adeel Ahmed- CVADEEL AHMED
287 vistas6 diapositivas
Paul_Coulter_Resume_10_2016 por
Paul_Coulter_Resume_10_2016Paul_Coulter_Resume_10_2016
Paul_Coulter_Resume_10_2016Paul Coulter
197 vistas4 diapositivas
Resume por
ResumeResume
Resumeshashank rai
1K vistas3 diapositivas
KAMALJEET_SINGH_cv_NEW por
KAMALJEET_SINGH_cv_NEWKAMALJEET_SINGH_cv_NEW
KAMALJEET_SINGH_cv_NEWKamaljeet Singh
263 vistas6 diapositivas

La actualidad más candente(20)

Adeel Ahmed- CV por ADEEL AHMED
Adeel Ahmed- CVAdeel Ahmed- CV
Adeel Ahmed- CV
ADEEL AHMED287 vistas
Paul_Coulter_Resume_10_2016 por Paul Coulter
Paul_Coulter_Resume_10_2016Paul_Coulter_Resume_10_2016
Paul_Coulter_Resume_10_2016
Paul Coulter197 vistas
Esrar Alam Transmission Engineer por Esrar Khan
Esrar Alam  Transmission EngineerEsrar Alam  Transmission Engineer
Esrar Alam Transmission Engineer
Esrar Khan366 vistas
Blocker cv 2012-12-15 por efb112763
Blocker cv 2012-12-15Blocker cv 2012-12-15
Blocker cv 2012-12-15
efb112763698 vistas
MAZHAR NEW CV with Huawei,ZTE,LCC KSA 3G por Mazhar Ali
MAZHAR NEW CV with Huawei,ZTE,LCC KSA 3GMAZHAR NEW CV with Huawei,ZTE,LCC KSA 3G
MAZHAR NEW CV with Huawei,ZTE,LCC KSA 3G
Mazhar Ali2.3K vistas
(Tm) 14 May Jwm Pro Intro Resume Cover por JMONDAK
(Tm) 14 May Jwm Pro Intro Resume Cover(Tm) 14 May Jwm Pro Intro Resume Cover
(Tm) 14 May Jwm Pro Intro Resume Cover
JMONDAK529 vistas
ARIEL T. GANAL RESUME por Ariel Ganal
ARIEL T. GANAL RESUMEARIEL T. GANAL RESUME
ARIEL T. GANAL RESUME
Ariel Ganal272 vistas
Cv michael flaviano 2017 - Telecommunication Engineer por Michael Flaviano
Cv michael flaviano 2017 - Telecommunication EngineerCv michael flaviano 2017 - Telecommunication Engineer
Cv michael flaviano 2017 - Telecommunication Engineer
Michael Flaviano291 vistas
Resume December 2012 por efb112763
Resume December 2012Resume December 2012
Resume December 2012
efb112763486 vistas

Destacado

Alfred resume por
Alfred resumeAlfred resume
Alfred resumeAlfred Ryals
169 vistas2 diapositivas
Jj resume (1) por
Jj resume (1)Jj resume (1)
Jj resume (1)Jantzen Jeffrey
90 vistas1 diapositiva
JACQUELINE C EDWARDS resume 2015 nn por
JACQUELINE C EDWARDS resume 2015 nnJACQUELINE C EDWARDS resume 2015 nn
JACQUELINE C EDWARDS resume 2015 nnJacque Edwards
265 vistas3 diapositivas
Resume 2016 por
Resume 2016Resume 2016
Resume 2016Caitlin Baker
86 vistas2 diapositivas
Resume, Meghan Brieck por
Resume, Meghan BrieckResume, Meghan Brieck
Resume, Meghan BrieckMeghan Brieck
198 vistas2 diapositivas
Johnson resume update as of 7 june 2016 por
Johnson resume update as of 7 june 2016Johnson resume update as of 7 june 2016
Johnson resume update as of 7 june 2016Vincent Johnson Sr.
102 vistas7 diapositivas

Similar a New TP

MasterResumeDAVIDCLARK111715 por
MasterResumeDAVIDCLARK111715MasterResumeDAVIDCLARK111715
MasterResumeDAVIDCLARK111715David Clark
140 vistas3 diapositivas
Raywood Mickles-resume por
Raywood Mickles-resumeRaywood Mickles-resume
Raywood Mickles-resumeRay Mickles
224 vistas2 diapositivas
Telecommunications[1][1] por
Telecommunications[1][1]Telecommunications[1][1]
Telecommunications[1][1]John Bernhard
232 vistas5 diapositivas
MAIN RESUME por
MAIN RESUMEMAIN RESUME
MAIN RESUMEBennie Pearson
93 vistas7 diapositivas
JADE SANTOS CV por
JADE SANTOS CVJADE SANTOS CV
JADE SANTOS CVJade Santos ECE
1.6K vistas4 diapositivas
9 27 16 resume por
9 27 16 resume9 27 16 resume
9 27 16 resumekaren malpass
359 vistas4 diapositivas

Similar a New TP(20)

MasterResumeDAVIDCLARK111715 por David Clark
MasterResumeDAVIDCLARK111715MasterResumeDAVIDCLARK111715
MasterResumeDAVIDCLARK111715
David Clark140 vistas
Raywood Mickles-resume por Ray Mickles
Raywood Mickles-resumeRaywood Mickles-resume
Raywood Mickles-resume
Ray Mickles224 vistas
Telecommunications[1][1] por John Bernhard
Telecommunications[1][1]Telecommunications[1][1]
Telecommunications[1][1]
John Bernhard232 vistas
A rosario resume_2013_a por vsanchez1963
A rosario resume_2013_aA rosario resume_2013_a
A rosario resume_2013_a
vsanchez1963651 vistas
Jeff_Pierson_resume_current 12_21_2016 por Jeffery Pierson
Jeff_Pierson_resume_current 12_21_2016Jeff_Pierson_resume_current 12_21_2016
Jeff_Pierson_resume_current 12_21_2016
Jeffery Pierson47 vistas
Resume from Robert Scales por Robert Scales
Resume from Robert ScalesResume from Robert Scales
Resume from Robert Scales
Robert Scales166 vistas
AVISHESH BHARGAVA resume por avisheshb
AVISHESH BHARGAVA resumeAVISHESH BHARGAVA resume
AVISHESH BHARGAVA resume
avisheshb331 vistas
Thai Tran Resume por thai tran
Thai Tran ResumeThai Tran Resume
Thai Tran Resume
thai tran116 vistas
Thai Tran Resume por thai tran
Thai Tran ResumeThai Tran Resume
Thai Tran Resume
thai tran113 vistas
CV E Atienza new 2 - Copy por Edgar Atienza
CV E Atienza new 2 - CopyCV E Atienza new 2 - Copy
CV E Atienza new 2 - Copy
Edgar Atienza281 vistas
Debra Peck.res.2015 por Debra Peck
Debra Peck.res.2015Debra Peck.res.2015
Debra Peck.res.2015
Debra Peck184 vistas

New TP

  • 1. TOMMY PARKER 5716 Sullivan Point Dr. Powder Springs, Georgia 30127 678-570-9770 parkert3000@yahoo.com OBJECTIVE To obtain a position where I can contribute and develop growth to businesses by planning, organizing, directing, and executing various programs. WORK EXPERIENCE Dates Employed Job Title Company March,20 – Present Fiber Splicing Technician Gannett Fleming Ability to fusion or mechanical splice SM or MM fiber optic cables, to include terminate various types of fiber optic connectors (ST,SC, LC). Work with engineers and/or OSP PM’s to perform fusion splicing as directed. Installation and testing of pressurized and non-pressurized closures on all types and sizes of cable. Experience and knowledge in fiber acceptance testing, using Fiber Optic Scope and or a Fiber OTDR.Installation and dressing of fiber optic cables (vertical/horizontal). Serve as a resource to the internal staff on matters concerning splicing practices and procedures. Provide red-line splicing diagrams to update network documentation. Provide management with detailed reports of field splicing activity. Manage multiple projects at one time. Communicate with Project Manager and Team Leader on workload status in order to meet designated goals. Maintain company vehicle, and equipment in good working condition. Maintain a positive attitude and strong work ethic that can provide high productivity with minimal supervision.Extensive driving and travelling up to 100%. Nov,3. 2014 – Feb -2015 Technician / Installer Orin Inc. NC.Market US Cellular Project Take pre pics. Mount 19’rack with anchor; terminate connector for power RRU, DUS, Run Ethernet cable for router, Run Fiber with inter duct, GPS Antenna on grounded pole, polyphaser mounted to inside ground bar on power P side of MGB. GPS cable ran through boot with silicone ran and laced GPS cables in rack, installed ground cables for GPS, ran power cable for RRU, run power cable from rectifier to PSU terminated at both ends, installed brady labels and p-tags on all necessary locations. Complete close out package. July 26. 2014 Oct,30 - 2014 Central Office Technicain Alta / AFL Installed, tested and turned up DS1, DS3, OC3, OC3 express, OC12, OC48 access node, Soneplex and Channel Banks. Used various test equipment T-Bird 107, 307, 310, 2310, fiber optic light source and BNC tester. Managed workloads for field technicians. Scheduled jobs for site surveys and new installations. Interfaced with customers on daily basis while installing service on site. Coordinated cut over with customers and vendors, prior to turn up service of what the Customer ordered. Handled trouble tickets after
  • 2. hours on various equipment, also DC (power). Troubleshoot and tested electrical and Sonnet based circuits, tested DS1 circuits using Titan 5500 DCS. Fiber splicing and termination (Fusion Splices). Feb. 26. 2014 July-2014 Technician / Installer Tengent / TNS AT&T 1c LTE and UMTS Install, Installing GPS Antenna installation, Take pre pics Installed all equipment in rack, DUS, SAU, GPS & fiber tray Installed GPS Antenna on grounded pole, polyphaser mounted to inside ground bar on P side of MGB. GPS cable ran through boot with silicone ran and laced GPS cables in rack, Ran the SAU Alarm cables up the 19” rack into the ladder rack to the location of the 66-Blocks Then punched down the 66-Blocks. installed ground cables for GPS,SAU,DUS, and fiber tray ran power cable from DUS to PDU terminated at both ends ,,installed brady labels and p-tags on all necessary locations. Feb. 27, 2013 Dec-2013 Technician/ Installer Parson /N.C Market T-Mobile Modernization Project, My duty was install and complete power upgrade and install and removed parts. Complete 2c cut over with 911 test calls into TDOA war room. Working on GSM or CDMA, Make sure LMU is online and site is alarms free. DUL (6601) into 19’ rack, terminated alarms cables, labels, punch down on 66-blocks, terminated -48 volts, Commission / Integrating, call test, 911 call testing, using Hyper Terminal, OMT and RBS Configurations Tools, Element Manger, FileZilla, Putty, troubleshooting T1s, running CAT5 cables, DUL, DUW,DUG and Mini Link 210, 310. Up-loading AMS TOOL with photos, close-out package. Nov. 26, 2012 Feb-2013 Technician Quanta / TNS Atlanta, Ga. As a technician my duty was install DUL (6601) into 19’ rack, terminated alarms cables, labels, punch down on 66-blocks, terminated -48 volts, Commission / Integrating, call test, 911 call testing, using Hyper Terminal, OTDR, Fiber tester, Light Source, OMT and RBS Configurations Tools, Element Manger, FileZilla, Putty, troubleshooting T1s, running CAT5 cables, DUL, DUW,DUG and Mini Link 210, 310. Up-loading AMS TOOL with photos, close-out package. July 23, 2012 Nov. 2012 Technician AFL New York 4G LTE Commissioner / Integrator As a Technician for AFL (contractor) my responsibility, Installation and integration of DUW30,DUG, and DUL for Ericsson equipment in the 6000 series LTE cabinets. Running cat5 and cat6 for T1s to Node B and 2G cabinet using RJ-45 connectors. Perform test calls and data testing all so trouble shooting issue onsite. When down loading software using RBS Element Manger, FileZilla, Putty, FTP Pro, HyperTerminal, OMT and RBS Configurations Tool. May 29, 2012- July 2012 Technician Rightech Kennesaw
  • 3. As a contractor my duty’s was to add software DUL and Mini Link SP 210 and 310 using Putty and HyperTerminal. I also build Ericsson 6102, 6201 RBS and BBS cabinet according to the MOP. Once I took inventory of material (BOM), I had to follow the MOP procedures to pre-stage the cabinet, Pre-stage cabinet for shipment. Jan. 15, 2011- April 4, 2012 Lead Tech MasTec Inc. Raleigh, NC. As a Lead tech my duties was to install SIAD in rack, run DC power to PDU and Install ETMFX-CARD to UMTS Ericsson 3206 cabinet. Writing script for the SIAD Resetting SIAD Configuration to Factory Defaults Provide ETTCS technicians information to reset SIAD configuration to factory defaults. Information to provide the methods used to reset the SIAD, MWR 2941 DC Cisco Router configuration to factory defaults. Using pro-com plus to telnet in to the router. Ericsson 3206 cabinet, DUL Commissioner / Integrator, also PCO testing with the NOC. July 1, 2010 – Dec,12 2010 Lead Tech RighTech Kennesaw GA. Install HUB’S 110 blocks, 66 blocks, and punch down riser cables. Implement network cable installation, including, Ethernet, Coaxial, Twisted Pair, Fiber Optic for local area networks. Telephone cable plant riser system PBX, Electronic and 1A2 Key System, Central Office and Automatic Dialers. Install, test and turn up DS1, DS3, OC3, OC3 express, OC12, OC48 access node, Soneplex and Channel Banks. Use various test equipment T-Bird 107, 307, 310, 2310, fiber optic light source and BNC tester. Manage workloads for field technicians. Handle the inventory control and editing database. Schedule jobs for site surveys and new installations/repairs. Interface with customers on daily basis while installing service on site. Coordinate cut over with customers and vendors, prior to turn up service of what the Customer ordered. Handle trouble tickets after hours on various equipment, also DC (power). Troubleshoot and test electrical and Sonnet based circuits, test DS1circuits using Titan 5500 DCS. Oct 15, 2007- June, 1 -2010 Network Management Operations, Tier 11 Venturi Technology Alpharetta, GA Provided operation support for the Customer Service Maintenance & Technical support. Accountable for following all external trouble resolution and escalations processes and performed proactive LAP monitoring to ensure forward progress of tickets by Local Access Provider escalations. Provided communication with the customer and proactively supplied them with up to date progress reports which included next steps and when they would occur. Took ownership for directing all activities leading to isolation and resolution fixing the problem. Troubleshoot and maintained Frame Relay, ATM Switching, DS3, OC12, DS1 and DS0 using different types of systems, TIRKS (Trunks Integrated Record Keeping System), DSTS (Digital Service Testing System), SARTS (Switch Access Remote Test Systems), BMP Tickets Systems. Knowledge of LEC Provisioning Processes. Feb 12, 2007 - Oct 15, 2007 UMTS Nokia Project Manager Mittrix, Inc. Duluth, GA As a project manager I am responsible for performing weekly physical inventory and making sure that the inventory (tracker) corresponds with SAP# (identification) as shipment of material arrives. I then make sure that information is edited onto the tracker. I am on a conference call daily at 3:00pm with T-Mobile and other wireless carriers discussing issues and accomplishments. As a project manager my duties are to
  • 4. make sure that technicians have their building of material (BOM) to accomplish their task. I also make up building of material (BOM) so technicians can go out and install cabinet sled, tanks, generator for cell sites. Receive orders from customer that material must be staged for their technician to pick up. Responsible for the Ethernet Network to the Cell migrations for Ericsson Node B equipment in the 3G Network. Responsible for Creating/preparing work orders and scripts to be executed in Node B, RNC, MSN, and SIADs Feb 6, 2005 – Feb 4, 2007 Network Consultant Hewlett Packard Co. Alpharetta, GA Communicated with HP Business Partners to determine need. Recommended Business Partner Connectivity Solutions. Conducted requirements gathering including source, destinations and protocol. Developed network design using Visio. Reviewed approvals from IT Network Security to build ACLs list and Crypto. Built Cisco IOS Access Control list for hardware and software VPN solutions, as well as for Legacy lease line solutions. Determined types of requests and risks associated with the request. Formatted and requested ACLs/ VPN solutions to engineers for implementation. Worked with engineers until requests met clients’ satisfaction. Attended conference calls and meetings. Worked as Team Leader of Data Center Consolidations, Closures, and Applications Migrations. Jan 18, 2004- Feb 6, 2005 Installation / Commissioning Alcoa Wireless Alpharetta, GA Responsible for terminating power and commissioning, editing database, updating Firmware and downloading newest Software with the use of LMT work UMR 4.0 software. Integration to RNC and fault finding on Siemens UMTS Node B 580 equipment, replacing any and all defective Channel Coding Cards with and without HSDPA, Core Controller, Cat 40, DUAMCO, and DRIC cards. Troubleshooting T-1 and Alarm links from Siemens UMTS Node B 580 to RNC, RC, and to the Switch with the use of LMT works UMR 4.0 SW. Responsible for updating IDF and IDT files on Siemens UMTS Node B 580 to maintain correct inventory in UMTS. Configuring older 2102 and newer 2106 Ericsson cabinets to customer specific configurations. Installing Ericsson 3206 – 2206 to change out radios and terminating T-1, alarm cables and reconfiguring radios. May 14, 2002 - Jan 18, 2004 Network Management Operations Global Technician Consultants Norcross, GA Engineered local network transport migration projects from Media One to AT&T platform, LSO and Collector rings at DSO, T1, DS3, OC3, and OC12 and OC48 levels. Developed, maintained and updated project documentation, spreadsheets, network elements, fiber optic ring maps, Visio’s, COLR’s and ATT databases. Analyzed inventory, tracking electronic circuit via Titan 5500, submitted service orders for adds, changes, disco, updates, due dates and turn ups. Ensured network operations integrity and provisioning, managed multi-tasks, and communicated with all levels of management. May 4, 2000 - May 14, 2002 Lead Technician ARBROS Communication Washington DC As the manager of the Baltimore site, I supervised the installation of circuits and equipment by contractors, test and turn-up orders from DSO,T1,DS3, OC3, OC3 Express and OC48, Lucent Wave Star OC 192 and Talon MX (Kestrel) high speed circuits and used wireless 38GHz (P-com), Frame Relay, ATM, TCP/IP. May 9, 1995 - May 4 2000 Lead Technician AT&T Local Service
  • 5. Washington DC Installed, tested and turned up DS1, DS3, OC3, OC3 express, OC12, OC48 access node, Soneplex and Channel Banks. Used various test equipment T-Bird 107, 307, 310, 2310, fiber optic light source and BNC tester. Managed workloads for field technicians. Scheduled jobs for site surveys and new installations. Taught classes to less experienced technicians. Interfaced with customers on daily basis while installing service on site. Coordinated cut over with customers and vendors, prior to turn up service of what the Customer ordered. Handled trouble tickets after hours on various equipment, also DC (power). Troubleshoot and tested electrical and Sonnet based circuits, tested DS1 circuits using Titan 5500 DCS. Supervised employees whom completed contracts with Drug Enforcement Administration (DEA) GTE and Department of Energy. EDUCATION Skill 40 WPM Typing 2015 Smart Laptop Introduction Certification Richardson, TX 2015 LTE Commissioning Certification Richardson, TX 2015 OMT IDB T-Mobile Certification Richardson, TX 2014 EAMS 3.10 Training Certification Richardson, TX 2014 EAMS Training Certification Richardson, TX 2012 T-Mobile Multi Standard Certification Richardson, TX Solution Overview DUW30, DUG, DUL 2011 HS1 LTE Ericsson Certification Richardson, TX 2010 Commissioner/Integrator 2006 Nokia Installation Certification Mokena, IL 2006 Nokia Training on Mokena, IL (1900 – 850) Series 2006 Wireless Cable Training on Certification Mokena, IL L4PDM-RC, L5PDF-RPC, Andrew Institute A7TDF-PS, SGL5, L5SGRIP Weatherproofing 1999 Nortel OC3 Express Certification Montreal, Canada 1999 Titan 5500 DCS/Tellabs Certification Chicago, Illinois 1999 Nortel Access Node Certification Raleigh, NC 1998 Sonnet Certification Dayton, NJ 1998 Light Brigade Advanced Fiber Optic Technologies Professional Dayton, NJ 1998 Disc’s System-Turn Up and Maintenance/RELTEC Certification Dayton, NJ 1997 Wireless Fiber Installation/ 1997 Winstar Certification Leesburg, VA 1997 BNC Interconnect/Trompeter Certification NW, Washington
  • 6. 1980 United State Army 36K Wireman United State 1978 T.C Williams H.S Graduation Alexandria, VA.
  • 7. 1980 United State Army 36K Wireman United State 1978 T.C Williams H.S Graduation Alexandria, VA.