Building a Better Toronto Together
Welcome
Bump-outs on Oakwood Ave.
Between St. Clair Ave. & Rogers Rd.
Tuesday, January 12, 2016. Oakwood Village Library & Arts Centre
5 - 6:30 p.m. Public drop-in (view drawings & discuss with staff)
6:30 - 8 p.m. Presentation followed by questions & answers
www.toronto.ca/oakwood-bump-outs
1
Building a Better Toronto Together
Introduction
The City of Toronto is considering the addition of up to seven
"bump-outs" on Oakwood Avenue between St. Clair Avenue
and Rogers Road.
This is a once in generation opportunity to improve this section
of Oakwood Avenue as part of scheduled road resurfacing.
This consultation event and survey is in follow-up to the
request for further public consultation on design options as
discussed at the March 4, 2015 public meeting.
See survey and materials at
toronto.ca/oakwood-bump-outs
Resurface
Bump-outs
Bump-outs
2
Building a Better Toronto Together
Existing Conditions
South of Earlsdale Ave At Conway Ave
NorthboundSouthbound
3
Building a Better Toronto Together
Existing Conditions
Crosswalk south of Earlsdale Avenue Approach to Rogers Road - parking allowed at all times
Crosswalk at Conway Avenue Bus loading at the curb with vehicles passing
4
Building a Better Toronto Together
What is a Bump-out?
Benefits of Bump-outs
• Improves safety for pedestrians,
including children and the elderly:
• Better visibility of pedestrians about
to cross
• Shortens crossing distance
• Reduces right side passing by
motorists
• Discourages vehicle speeding
• Bump-outs with trees and other plants
provide shade and beautify the street
Example of paved bump-out
Example of planted bump-out
Bump-outs, also known as curb extensions or
pedestrian peninsulas, extend the sidewalk and creates
new space for trees, bus shelters and other upgrades.
5
Building a Better Toronto Together
Advantages Bump-outs at Bus Stops
• Space for bus shelters, benches and
waste bins
• Places waiting area further away from
adjacent houses
• Space for customers using wheelchairs
and scooters to get on and off buses
• More attractive surrounding with
landscaping and street furniture
• Allow buses to load passengers from the
traffic lane, which means they are not
delayed waiting to enter into the traffic lane
6
Building a Better Toronto Together
Proposed Locations
These bump-out locations and designs have been selected by
Transportation Services to improve safety at crosswalks, improve
TTC bus stops, and provide new street trees, while still
maintaining ample on-street parking spaces.
• One on the east side, about three doors south of Conway Ave.
crosswalk, which will include a new TTC bus stop (adjacent to
207, 209 & 211 Oakwood Ave.)
• One south of Conway Ave. on the west side of the crosswalk,
extend to include a new TTC bus stop (adjacent to 216-228
{even} on Oakwood Ave.)
• One with plantings north of Conway Ave. on the east side
(231, 233,& 235 Oakwood Ave.)
• Two with plantings south of Earlsdale Ave. on either side of the
crosswalk, including the existing west side TTC bus stop
(adjacent to City park, 300-312 {even} and 295-305 {odd}
Oakwood Ave.)
• One on the south-east side of Oakwood Ave. and Earlsdale
Ave., including the existing east TTC bus stop (adjacent to
315, 317 & 317A Oakwood Ave.)
• One with plantings on the north-east side of Oakwood Ave.
and Earlsdale Ave. (adjacent to 319 & 319A Oakwood Ave.)
7
Building a Better Toronto Together
TTC Stop Consolidation
As part of an ongoing joint City-TTC initiative to
improve the safety of pedestrians on city streets, the
TTC intends to remove the bus stops at Earnscliffe
Road and Glenhurst Road, and replace them with
one set of bus stops at Conway Avenue. This new
location has the advantage of a pedestrian
crosswalk, which will make it safer for people to
cross to and from the bus stops.
This bus stop consolidation is an independent
decision and not part of this bump-out
consultation. See more information in the
Question and Answers page
Bus stop location comments should be directed
to TTC customer service: 416-393-4636 ttc.ca
8
Building a Better Toronto Together
Minor Changes to On-street Parking
If bump-outs are approved, there would be a loss of
about a dozen parking spaces, from the existing
approximately 200 spaces on Oakwood Avenue, in
the area of the new bump-outs. However, a few new
spots will also be created where the existing TTC
bus stops are to be consolidated (see TTC Stop
Consolidation note on previous panel). Bus stops
and crosswalks always prohibit parking on either
side.
The current plan is to maintain the existing "No
Parking" regulations: southbound 7 a.m. to 9 p.m.,
northbound 4 p.m. to 6 p.m.
9
Building a Better Toronto Together
Comparing Road Volumes
Southbound
AM
Peak
PM
Peak
Off-Peak
High
Oakwood Nth of St. Clair 653 611 534
Oakwood Sth of St. Clair 602 530 466
Roncesvalles (2014) 364 351 284
Royal York Rd Nth of Bloor 719 895 811
Caledonia Nth of St. Clair 480 536 425
*Oakwood Nth of Rogers 669 900 504
Northbound
AM
Peak
PM
Peak
Off-Peak
High
Oakwood Nth of St. Clair 508 588 653
Oakwood Sth of St. Clair 416 539 498
Roncesvalles (2014) 278 281 334
Royal York Rd Nth of Bloor 707 752 702
Caledonia W of St. Clair 458 674 467
*Oakwood Nth of Rogers 909 857 545
East-West
AM
Peak
PM
Peak
Off-Peak
High
Rogers W of Oakwood -
Eastbound
448 502 323
Rogers W of Oakwood -
Westbound
458 515 431
*Parking allowed at all times
Comparable Traffic Volumes
on Two Lane Roads
Classification Example
Local Roads
• Provide access to property
• Less than 2,500 vehicles per day
• Low traffic speed
• No bus routes
Stanmills Road
Collector Roads
• Provide access to property and traffic movement
• 2,500 to 8,000 vehicles per day
• Less than 1,500 bus (or streetcar) passenger per day
• Signalized intersections at arterial roads
Elmhurst Drive
Minor Arterial Roads
• Traffic movement is a primary function
• 8,000 to 20,000 vehicles per day
• 1,500 to 5,000 bus passenger per day
• Speed limits 40 to 60 km/hr
• No “Stop” signs; traffic signals at intersections Gerrard Street East
Major Arterial Roads
• Traffic movement is a primary function
• Subject to access controls
• Greater than 20,000 vehicles per day
• Greater than 5,000 bus passengers per day
• Speed limits 50 to 60 km/hr Yonge Street (North of St. Clair)
Toronto Expressway
• Traffic movement is a primary function
• Speed limits 80 to 100 km/hr
• No local transit service
• Pedestrians and cyclists prohibited
• Grade-separated intersections (no traffic signals) F.G. Gardner Expressway
Oakwood Ave.
is a Minor
Arterial Road
10
Building a Better Toronto Together
Minimal Impacts to Overall Traffic Flow
Transportation Services has carried out traffic counts, observations and real-life
bump-out simulations (with parked vehicles in bump-out locations during rush
hour) to confirm that bump-outs would not cause any sustained traffic back-ups.
In short, bump-outs affect traffic much like parked cars next to the travel
lane. Currently there are parked cars on Oakwood Avenue (in the area of the
proposed bump-outs) for 22 hours of the day during weekdays, including during
peak traffic volumes, and are not a significant factor affecting traffic delays.
Examples of mid-block peak
traffic flowing past parked
vehicles occupying lane space
similar to how bump-outs would
0
100
200
300
400
500
600
700
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23
NumberofVehicles
NoParking
0
100
200
300
400
500
600
700
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23
NumberofVehicles
NoParking
Volumes by Hour (at Conway Ave)
Southbound Northbound
11
Building a Better Toronto Together
Minimal Impacts to Overall Traffic Flow
On Oakwood Avenue, delays are mainly experienced at the approach
of Rogers Road and at St. Clair Avenue where drivers wait for the
opportunity to turn at the traffic control signals. The proposed bump-
outs are over 130 metres away from these intersections and should
not change this situation.
Near Rogers Road there is existing on-street parking all day.
Waiting Behind Stopped TTC Buses
With bump-outs at two bus stops in each direction, buses would stop
to serve passengers in the traffic lane - drivers behind a stopped bus
would be required to wait approximately 8 to 20 seconds before
continuing.
No Changes to Crosswalks
Pedestrian crossing counts do not warrant the installation of any new
traffic signals or changes to the locations of crosswalks, noting that
the TTC intends to consolidate stops to near Conway Avenue where
there is an existing crosswalk.
Example of traffic delays on approach of the signalized
intersection at St. Clair Avenue during peak periods.
Bump-outs are not proposed in these approaches.
Pedestrian crossing counts (8 hours)
12
Building a Better Toronto Together
Considerations for Cyclists
The section of Oakwood Avenue immediately
north of St. Clair Avenue (south of Glenhurst
Avenue) is not wide enough to accommodate
bike lanes and still maintain its existing traffic
functions.
Although bike lanes are not included in this
proposal, the traffic lane next to the bump-
outs will be at least 4.1 m wide, which
provides adequate space for cycling next to
vehicles.
In addition, the City's 10 Year Cycling
Network Plan (to be approved in 2016)
includes a continuous bikeway link on
parallel Winona Drive, connecting to
bikeways on Davenport Road and Marlee
Avenue.
13
Building a Better Toronto Together
Planting Area or Decorative Pavers
Where there is opportunity, bump-outs will include street trees.
Beyond the trees, where there is space, bump-outs could also include open planting areas. Such
planting areas can add beauty and greenery to the street. Planting areas in the bump-outs would be
serviced by the City a few times a year, but local residents would need to voluntarily maintain the
plantings on a more day-to-day basis to ensure they are free of litter and looking their best.
Canopy trees options include Maples, Honeylocusts, Basswoods and Elms.
Shrubs could include ornamental grasses, Sedums/Flox, and low flowering shrubs.
Alternatively the design could minimize open soil areas and instead install decorative permeable
brick pavers, which allow stormwater to flow through.
In any case, additional trees could may be planted in some front yards, if requested by property
owners.
Trees within paved areas Open planting areas
14
Building a Better Toronto Together
Three Main Options
Option 1) No Bump-outs
There would be no changes to Oakwood Avenue
roadway, other than resurfacing and sidewalk repairs.
New transit accessibility standards (e.g. for wheelchair
users) may require the City to expand the sidewalk into
some residential front yards next to bus stops.
Pro • Faster construction
• Lower costs for construction & maintenance
• Drivers can pass stopped TTC busses
• Minor increase in on street parking space
(assuming TTC stop consolidation)
Con • TTC buses possibly delayed when merging
into traffic lane
• No improvements to safety for pedestrians
• 0 additional street trees planted on
Oakwood Avenue
• No bus shelters at TTC stops (not enough
available space)
• May need to expand the sidewalk into some
residential front yards next to bus stops
Option 2) Bump-outs
on West Side Only
Only two bump-outs would be installed, both
on the west side (south bound). No change
to the lanes on the east side (north bound).
Pro • Some improvements to safety
for pedestrians, including 2
reduced crossing distance
locations
• Approximately up to 5 additional
street trees could be planted
• Southbound bus stops could
include shelters or other
upgrades
Con • Southbound drivers will on
occasion be required to wait
behind a stopped bus
• May need to expand the
sidewalk into some residential
front yards next to bus stops on
east side
Option 3) Bump-outs
on Both Sides
There would be seven bump-outs installed.
Five bump-outs would include planting
areas.
Pro • Significant improvements to safety for
pedestrians, including 4 reduced
crossing distance locations
• Approximately up to 13 additional street
trees could be planted
• 4 bus stops could include shelters
and/or other upgrades
• Improved TTC bus service (no merging
required)
Con • Drivers will on occasion be required to
wait behind a stopped bus
• Minor reduction in on-street parking
15
Building a Better Toronto Together
Road Resurfacing & Sidewalk Improvements
Whether bump-outs are approved or not, the
following work is planned for 2016:
• Road resurfacing: grinding and repaving the top
100mm of asphalt
• Repair broken/damaged sidewalk/curb to bring it
into state of good repair
• Installation of new tactile walking surface
indicators at intersections and cross-walks
(required for the visually impaired)
16
Building a Better Toronto Together
Next Steps
• Receive feedback tonight and online up to January 17, 2016
• Survey results will feature highly in the Transportation Services recommendations to Etobicoke York
Community Council, where a decision on these bump-outs will be made
• Finalize design and update residents
• Tender the project and hire a contractor
• Two weeks before construction, a Construction Notice will be issued with more details on when work will begin
and stages of construction
Expected Construction Start Date: Summer 2016
Expected Completion Date: Fall 2016
For More Information
Tracy Manolakakis
Manager, Public Consultation Unit
Tel: 416-392-2990 E-mail: tmanola@toronto.ca toronto.ca/oakwood-bump-outs
TTC customer information: 416-393-4636
17

Más contenido relacionado

La actualidad más candente

King-Liberty Pedestrian / Cycling Bridge (Dec. 8 2016 Information Panels)
King-Liberty Pedestrian / Cycling Bridge (Dec. 8 2016 Information Panels)King-Liberty Pedestrian / Cycling Bridge (Dec. 8 2016 Information Panels)
King-Liberty Pedestrian / Cycling Bridge (Dec. 8 2016 Information Panels)Toronto Public Consultation Unit
 
Master plan edit
Master plan editMaster plan edit
Master plan editCuty Cat
 
Presentation for public information centres
Presentation for public information centresPresentation for public information centres
Presentation for public information centresknelischer
 
Bgi visionfor piers7-12
Bgi visionfor piers7-12Bgi visionfor piers7-12
Bgi visionfor piers7-12jpetr0s
 
Hurst Lane Place Workshop- Solihull Metropolitan Borough Council, 23.04.2013
Hurst Lane Place Workshop- Solihull Metropolitan Borough Council, 23.04.2013Hurst Lane Place Workshop- Solihull Metropolitan Borough Council, 23.04.2013
Hurst Lane Place Workshop- Solihull Metropolitan Borough Council, 23.04.2013Design South East
 
Steeles Bridge EA PIC#2 powerpoint 04_01_2017
Steeles Bridge  EA PIC#2 powerpoint 04_01_2017Steeles Bridge  EA PIC#2 powerpoint 04_01_2017
Steeles Bridge EA PIC#2 powerpoint 04_01_2017Paul B. Martin
 
King Street Pilot Public Meeting - Feb 13 2017
King Street Pilot Public Meeting - Feb 13 2017King Street Pilot Public Meeting - Feb 13 2017
King Street Pilot Public Meeting - Feb 13 2017City of Toronto Planning
 
New Street Typologies/New Street Types - Getting more out of the same R.O.W.:...
New Street Typologies/New Street Types - Getting more out of the same R.O.W.:...New Street Typologies/New Street Types - Getting more out of the same R.O.W.:...
New Street Typologies/New Street Types - Getting more out of the same R.O.W.:...Congress for the New Urbanism
 
Remove jcfo booklet
Remove jcfo bookletRemove jcfo booklet
Remove jcfo bookletGardinerEast
 
Remove jcfo boards
Remove jcfo boardsRemove jcfo boards
Remove jcfo boardsGardinerEast
 
Park Lawn Lake Shore Transportation Master Plan Community Workshop 1 Display ...
Park Lawn Lake Shore Transportation Master Plan Community Workshop 1 Display ...Park Lawn Lake Shore Transportation Master Plan Community Workshop 1 Display ...
Park Lawn Lake Shore Transportation Master Plan Community Workshop 1 Display ...Toronto Public Consultation Unit
 
Former Kodak Lands Update - November 19, 2015
Former Kodak Lands Update - November 19, 2015Former Kodak Lands Update - November 19, 2015
Former Kodak Lands Update - November 19, 2015Crosstown TO
 
Potosi Sidewalk Plan
Potosi Sidewalk PlanPotosi Sidewalk Plan
Potosi Sidewalk PlanBrody Johnson
 
Delivering the Rehabilitation of the F.G. Gardiner Expressway
Delivering the Rehabilitation of the F.G. Gardiner ExpresswayDelivering the Rehabilitation of the F.G. Gardiner Expressway
Delivering the Rehabilitation of the F.G. Gardiner ExpresswayToronto Public Consultation Unit
 

La actualidad más candente (20)

King-Liberty Pedestrian / Cycling Bridge (Dec. 8 2016 Information Panels)
King-Liberty Pedestrian / Cycling Bridge (Dec. 8 2016 Information Panels)King-Liberty Pedestrian / Cycling Bridge (Dec. 8 2016 Information Panels)
King-Liberty Pedestrian / Cycling Bridge (Dec. 8 2016 Information Panels)
 
Master plan edit
Master plan editMaster plan edit
Master plan edit
 
Presentation for public information centres
Presentation for public information centresPresentation for public information centres
Presentation for public information centres
 
Bgi visionfor piers7-12
Bgi visionfor piers7-12Bgi visionfor piers7-12
Bgi visionfor piers7-12
 
Hurst Lane Place Workshop- Solihull Metropolitan Borough Council, 23.04.2013
Hurst Lane Place Workshop- Solihull Metropolitan Borough Council, 23.04.2013Hurst Lane Place Workshop- Solihull Metropolitan Borough Council, 23.04.2013
Hurst Lane Place Workshop- Solihull Metropolitan Borough Council, 23.04.2013
 
Steeles Bridge EA PIC#2 powerpoint 04_01_2017
Steeles Bridge  EA PIC#2 powerpoint 04_01_2017Steeles Bridge  EA PIC#2 powerpoint 04_01_2017
Steeles Bridge EA PIC#2 powerpoint 04_01_2017
 
Sectors 2 & 3 Charrette Closing Presentation
Sectors 2 & 3 Charrette Closing PresentationSectors 2 & 3 Charrette Closing Presentation
Sectors 2 & 3 Charrette Closing Presentation
 
Beaufort-Sector1-Charrette-FinalPresentation
Beaufort-Sector1-Charrette-FinalPresentationBeaufort-Sector1-Charrette-FinalPresentation
Beaufort-Sector1-Charrette-FinalPresentation
 
CPA v2
CPA v2CPA v2
CPA v2
 
Steeles Avenue East Bridge Study PIC 1
Steeles Avenue East Bridge Study PIC 1Steeles Avenue East Bridge Study PIC 1
Steeles Avenue East Bridge Study PIC 1
 
King Street Pilot Public Meeting - Feb 13 2017
King Street Pilot Public Meeting - Feb 13 2017King Street Pilot Public Meeting - Feb 13 2017
King Street Pilot Public Meeting - Feb 13 2017
 
New Street Typologies/New Street Types - Getting more out of the same R.O.W.:...
New Street Typologies/New Street Types - Getting more out of the same R.O.W.:...New Street Typologies/New Street Types - Getting more out of the same R.O.W.:...
New Street Typologies/New Street Types - Getting more out of the same R.O.W.:...
 
Remove jcfo booklet
Remove jcfo bookletRemove jcfo booklet
Remove jcfo booklet
 
Remove jcfo boards
Remove jcfo boardsRemove jcfo boards
Remove jcfo boards
 
Park Lawn Lake Shore Transportation Master Plan Community Workshop 1 Display ...
Park Lawn Lake Shore Transportation Master Plan Community Workshop 1 Display ...Park Lawn Lake Shore Transportation Master Plan Community Workshop 1 Display ...
Park Lawn Lake Shore Transportation Master Plan Community Workshop 1 Display ...
 
Former Kodak Lands Update - November 19, 2015
Former Kodak Lands Update - November 19, 2015Former Kodak Lands Update - November 19, 2015
Former Kodak Lands Update - November 19, 2015
 
SmartTrack Public Meeting Presentation
SmartTrack Public Meeting PresentationSmartTrack Public Meeting Presentation
SmartTrack Public Meeting Presentation
 
The Cermak/Blue Island Sustainable Streetscape
The Cermak/Blue Island Sustainable StreetscapeThe Cermak/Blue Island Sustainable Streetscape
The Cermak/Blue Island Sustainable Streetscape
 
Potosi Sidewalk Plan
Potosi Sidewalk PlanPotosi Sidewalk Plan
Potosi Sidewalk Plan
 
Delivering the Rehabilitation of the F.G. Gardiner Expressway
Delivering the Rehabilitation of the F.G. Gardiner ExpresswayDelivering the Rehabilitation of the F.G. Gardiner Expressway
Delivering the Rehabilitation of the F.G. Gardiner Expressway
 

Similar a Building a Better Toronto Together: Proposed Bump-Outs on Oakwood Ave

Aspen Hill MMPA Transportation Section & Appendix May '15
Aspen Hill MMPA Transportation Section & Appendix May '15Aspen Hill MMPA Transportation Section & Appendix May '15
Aspen Hill MMPA Transportation Section & Appendix May '15Aaron Zimmerman, PTP
 
Roundabouts - May14 -PA Township News
Roundabouts - May14 -PA Township NewsRoundabouts - May14 -PA Township News
Roundabouts - May14 -PA Township NewsAndy Duerr
 
REimagining Yonge Street - Public Open House 1 Display Panels [may 25-16]
REimagining Yonge Street - Public Open House 1 Display Panels [may 25-16]REimagining Yonge Street - Public Open House 1 Display Panels [may 25-16]
REimagining Yonge Street - Public Open House 1 Display Panels [may 25-16]knelischer
 
Cedarvale station open house for website final2
Cedarvale station open house for website final2Cedarvale station open house for website final2
Cedarvale station open house for website final2Crosstown TO
 
Leslie safety tour nov 20 2010
Leslie safety tour nov 20 2010Leslie safety tour nov 20 2010
Leslie safety tour nov 20 2010bikingtoronto
 
Leaside station open house
Leaside station open house Leaside station open house
Leaside station open house Crosstown TO
 
Sp3 follow up power point pedestrian safety presentation 09.24.12 final
Sp3 follow up power point pedestrian safety presentation 09.24.12 finalSp3 follow up power point pedestrian safety presentation 09.24.12 final
Sp3 follow up power point pedestrian safety presentation 09.24.12 finalcityofevanston
 
Sp2- pedestrian safety presentation 10.08.12 final
Sp2- pedestrian safety presentation 10.08.12 finalSp2- pedestrian safety presentation 10.08.12 final
Sp2- pedestrian safety presentation 10.08.12 finalcityofevanston
 
Brentcliffe - Victoria Park Construction Liaison Committee Meeting
Brentcliffe - Victoria Park Construction Liaison Committee MeetingBrentcliffe - Victoria Park Construction Liaison Committee Meeting
Brentcliffe - Victoria Park Construction Liaison Committee MeetingCrosstown TO
 
LYNX Blue Line Extension Construction Update
LYNX Blue Line Extension Construction UpdateLYNX Blue Line Extension Construction Update
LYNX Blue Line Extension Construction UpdateLeslie Blaser
 
Laird Station Open House
Laird Station Open HouseLaird Station Open House
Laird Station Open HouseCrosstown TO
 
Streamlining Hoddle Street
Streamlining Hoddle StreetStreamlining Hoddle Street
Streamlining Hoddle StreetJumpingJaq
 
Fulton Market Streetscape Public Meeting 12/10/2014
Fulton Market Streetscape Public Meeting 12/10/2014Fulton Market Streetscape Public Meeting 12/10/2014
Fulton Market Streetscape Public Meeting 12/10/2014West Central Association
 
Ottawa fall construction season 2016
Ottawa fall construction season 2016Ottawa fall construction season 2016
Ottawa fall construction season 2016Devyn Barrie
 
Eastern Works Open House
Eastern Works Open House Eastern Works Open House
Eastern Works Open House Crosstown TO
 
Cedarvale Station Open House - March 2017
Cedarvale Station Open House - March 2017Cedarvale Station Open House - March 2017
Cedarvale Station Open House - March 2017Crosstown TO
 
Fulton Market Task Force presentation #3 12.03.14
Fulton Market Task Force presentation #3 12.03.14Fulton Market Task Force presentation #3 12.03.14
Fulton Market Task Force presentation #3 12.03.14West Central Association
 

Similar a Building a Better Toronto Together: Proposed Bump-Outs on Oakwood Ave (20)

Soho-Phoebe-Stephanie Cycling Connections
Soho-Phoebe-Stephanie Cycling ConnectionsSoho-Phoebe-Stephanie Cycling Connections
Soho-Phoebe-Stephanie Cycling Connections
 
Aspen Hill MMPA Transportation Section & Appendix May '15
Aspen Hill MMPA Transportation Section & Appendix May '15Aspen Hill MMPA Transportation Section & Appendix May '15
Aspen Hill MMPA Transportation Section & Appendix May '15
 
Roundabouts - May14 -PA Township News
Roundabouts - May14 -PA Township NewsRoundabouts - May14 -PA Township News
Roundabouts - May14 -PA Township News
 
REimagining Yonge Street - Public Open House 1 Display Panels [may 25-16]
REimagining Yonge Street - Public Open House 1 Display Panels [may 25-16]REimagining Yonge Street - Public Open House 1 Display Panels [may 25-16]
REimagining Yonge Street - Public Open House 1 Display Panels [may 25-16]
 
Cedarvale station open house for website final2
Cedarvale station open house for website final2Cedarvale station open house for website final2
Cedarvale station open house for website final2
 
Okeechobee Road from Krome Avenue to NW 79 Avenue PD&E Study presentation, Ju...
Okeechobee Road from Krome Avenue to NW 79 Avenue PD&E Study presentation, Ju...Okeechobee Road from Krome Avenue to NW 79 Avenue PD&E Study presentation, Ju...
Okeechobee Road from Krome Avenue to NW 79 Avenue PD&E Study presentation, Ju...
 
Leslie safety tour nov 20 2010
Leslie safety tour nov 20 2010Leslie safety tour nov 20 2010
Leslie safety tour nov 20 2010
 
Leaside station open house
Leaside station open house Leaside station open house
Leaside station open house
 
HIGHWAY.ppt
HIGHWAY.pptHIGHWAY.ppt
HIGHWAY.ppt
 
Sp3 follow up power point pedestrian safety presentation 09.24.12 final
Sp3 follow up power point pedestrian safety presentation 09.24.12 finalSp3 follow up power point pedestrian safety presentation 09.24.12 final
Sp3 follow up power point pedestrian safety presentation 09.24.12 final
 
Sp2- pedestrian safety presentation 10.08.12 final
Sp2- pedestrian safety presentation 10.08.12 finalSp2- pedestrian safety presentation 10.08.12 final
Sp2- pedestrian safety presentation 10.08.12 final
 
Brentcliffe - Victoria Park Construction Liaison Committee Meeting
Brentcliffe - Victoria Park Construction Liaison Committee MeetingBrentcliffe - Victoria Park Construction Liaison Committee Meeting
Brentcliffe - Victoria Park Construction Liaison Committee Meeting
 
LYNX Blue Line Extension Construction Update
LYNX Blue Line Extension Construction UpdateLYNX Blue Line Extension Construction Update
LYNX Blue Line Extension Construction Update
 
Laird Station Open House
Laird Station Open HouseLaird Station Open House
Laird Station Open House
 
Streamlining Hoddle Street
Streamlining Hoddle StreetStreamlining Hoddle Street
Streamlining Hoddle Street
 
Fulton Market Streetscape Public Meeting 12/10/2014
Fulton Market Streetscape Public Meeting 12/10/2014Fulton Market Streetscape Public Meeting 12/10/2014
Fulton Market Streetscape Public Meeting 12/10/2014
 
Ottawa fall construction season 2016
Ottawa fall construction season 2016Ottawa fall construction season 2016
Ottawa fall construction season 2016
 
Eastern Works Open House
Eastern Works Open House Eastern Works Open House
Eastern Works Open House
 
Cedarvale Station Open House - March 2017
Cedarvale Station Open House - March 2017Cedarvale Station Open House - March 2017
Cedarvale Station Open House - March 2017
 
Fulton Market Task Force presentation #3 12.03.14
Fulton Market Task Force presentation #3 12.03.14Fulton Market Task Force presentation #3 12.03.14
Fulton Market Task Force presentation #3 12.03.14
 

Más de Toronto Public Consultation Unit

Waterfront Sanitary Servicing Master Plan Update (Oct. 30 PIE).
Waterfront Sanitary Servicing Master Plan Update (Oct. 30 PIE). Waterfront Sanitary Servicing Master Plan Update (Oct. 30 PIE).
Waterfront Sanitary Servicing Master Plan Update (Oct. 30 PIE). Toronto Public Consultation Unit
 
Six Points Interchange Reconfiguration public event display panels, May 11, 2017
Six Points Interchange Reconfiguration public event display panels, May 11, 2017Six Points Interchange Reconfiguration public event display panels, May 11, 2017
Six Points Interchange Reconfiguration public event display panels, May 11, 2017Toronto Public Consultation Unit
 
College Street Promenade BIA Streetscaping Update Public Meeting Feb 28 final
College Street Promenade BIA Streetscaping Update Public Meeting Feb 28  finalCollege Street Promenade BIA Streetscaping Update Public Meeting Feb 28  final
College Street Promenade BIA Streetscaping Update Public Meeting Feb 28 finalToronto Public Consultation Unit
 
Presentation - Park Lawn Lake Shore Transportation Master Plan Community Work...
Presentation - Park Lawn Lake Shore Transportation Master Plan Community Work...Presentation - Park Lawn Lake Shore Transportation Master Plan Community Work...
Presentation - Park Lawn Lake Shore Transportation Master Plan Community Work...Toronto Public Consultation Unit
 

Más de Toronto Public Consultation Unit (20)

Waterfront Sanitary Servicing Master Plan Update (Oct. 30 PIE).
Waterfront Sanitary Servicing Master Plan Update (Oct. 30 PIE). Waterfront Sanitary Servicing Master Plan Update (Oct. 30 PIE).
Waterfront Sanitary Servicing Master Plan Update (Oct. 30 PIE).
 
Waterfront Transit Reset Phase 2 Display Panels
Waterfront Transit Reset Phase 2 Display PanelsWaterfront Transit Reset Phase 2 Display Panels
Waterfront Transit Reset Phase 2 Display Panels
 
Waterfront Transit Reset Public Meeting Presentation
Waterfront Transit Reset Public Meeting Presentation Waterfront Transit Reset Public Meeting Presentation
Waterfront Transit Reset Public Meeting Presentation
 
Sewer Outfall Project
Sewer Outfall ProjectSewer Outfall Project
Sewer Outfall Project
 
General information
General informationGeneral information
General information
 
Disinfection System
Disinfection SystemDisinfection System
Disinfection System
 
2017 Sediment Basin construction updated information
2017 Sediment Basin construction updated information 2017 Sediment Basin construction updated information
2017 Sediment Basin construction updated information
 
Scarborough Subway TPAP Boards
Scarborough Subway TPAP Boards Scarborough Subway TPAP Boards
Scarborough Subway TPAP Boards
 
2017 05-18 Etobicoke Creek Nort Trail panels final
2017 05-18 Etobicoke Creek Nort Trail panels final2017 05-18 Etobicoke Creek Nort Trail panels final
2017 05-18 Etobicoke Creek Nort Trail panels final
 
King Street Phase 2 Slide Deck
King Street Phase 2 Slide Deck King Street Phase 2 Slide Deck
King Street Phase 2 Slide Deck
 
Scarborough Subway TPAP PIC
Scarborough Subway TPAP PICScarborough Subway TPAP PIC
Scarborough Subway TPAP PIC
 
Six Points Interchange Reconfiguration public event display panels, May 11, 2017
Six Points Interchange Reconfiguration public event display panels, May 11, 2017Six Points Interchange Reconfiguration public event display panels, May 11, 2017
Six Points Interchange Reconfiguration public event display panels, May 11, 2017
 
Downsview Area Long Term Water Servicing
Downsview Area Long Term Water Servicing Downsview Area Long Term Water Servicing
Downsview Area Long Term Water Servicing
 
College Street Promenade BIA Streetscaping Update Public Meeting Feb 28 final
College Street Promenade BIA Streetscaping Update Public Meeting Feb 28  finalCollege Street Promenade BIA Streetscaping Update Public Meeting Feb 28  final
College Street Promenade BIA Streetscaping Update Public Meeting Feb 28 final
 
Swc public consultation_pres_170307_final
Swc public consultation_pres_170307_finalSwc public consultation_pres_170307_final
Swc public consultation_pres_170307_final
 
King Street Pilot Public Meeting
King Street Pilot Public MeetingKing Street Pilot Public Meeting
King Street Pilot Public Meeting
 
Presentation - Park Lawn Lake Shore Transportation Master Plan Community Work...
Presentation - Park Lawn Lake Shore Transportation Master Plan Community Work...Presentation - Park Lawn Lake Shore Transportation Master Plan Community Work...
Presentation - Park Lawn Lake Shore Transportation Master Plan Community Work...
 
Downsview Water Service Improvement Study Boards
Downsview Water Service Improvement Study BoardsDownsview Water Service Improvement Study Boards
Downsview Water Service Improvement Study Boards
 
Downsview Water Service Improvement Study Maps
Downsview Water Service Improvement Study MapsDownsview Water Service Improvement Study Maps
Downsview Water Service Improvement Study Maps
 
Transit Network Plan Update and Financial Strategy
 Transit Network Plan Update and Financial Strategy Transit Network Plan Update and Financial Strategy
Transit Network Plan Update and Financial Strategy
 

Último

Focusing on the rights of women and girls
Focusing on the rights of women and girlsFocusing on the rights of women and girls
Focusing on the rights of women and girlsChristina Parmionova
 
ECOSOC YOUTH FORUM 2024 - Side Events Schedule -16 April.
ECOSOC YOUTH FORUM 2024 - Side Events Schedule -16 April.ECOSOC YOUTH FORUM 2024 - Side Events Schedule -16 April.
ECOSOC YOUTH FORUM 2024 - Side Events Schedule -16 April.Christina Parmionova
 
Build Tomorrow’s India Today By Making Charity For Poor Students
Build Tomorrow’s India Today By Making Charity For Poor StudentsBuild Tomorrow’s India Today By Making Charity For Poor Students
Build Tomorrow’s India Today By Making Charity For Poor StudentsSERUDS INDIA
 
Item # 7 - Demolition & Replacement Structure Processes
Item # 7 - Demolition & Replacement Structure ProcessesItem # 7 - Demolition & Replacement Structure Processes
Item # 7 - Demolition & Replacement Structure Processesahcitycouncil
 
PPT Item # 6 - TBG Partners Landscape Architectural Design Services.pdf
PPT Item # 6 - TBG Partners Landscape Architectural Design Services.pdfPPT Item # 6 - TBG Partners Landscape Architectural Design Services.pdf
PPT Item # 6 - TBG Partners Landscape Architectural Design Services.pdfahcitycouncil
 
ECOSOC YOUTH FORUM 2024 - Side Events Schedule -17 April.
ECOSOC YOUTH FORUM 2024 - Side Events Schedule -17 April.ECOSOC YOUTH FORUM 2024 - Side Events Schedule -17 April.
ECOSOC YOUTH FORUM 2024 - Side Events Schedule -17 April.Christina Parmionova
 
2024: The FAR, Federal Acquisition Regulations - Part 23
2024: The FAR, Federal Acquisition Regulations - Part 232024: The FAR, Federal Acquisition Regulations - Part 23
2024: The FAR, Federal Acquisition Regulations - Part 23JSchaus & Associates
 
NL-FR Partnership - Water management roundtable 20240403.pdf
NL-FR Partnership - Water management roundtable 20240403.pdfNL-FR Partnership - Water management roundtable 20240403.pdf
NL-FR Partnership - Water management roundtable 20240403.pdfBertrand Coppin
 
PPT Item # 7 - Demolition & Replacement Structure Processes
PPT Item # 7 - Demolition & Replacement Structure ProcessesPPT Item # 7 - Demolition & Replacement Structure Processes
PPT Item # 7 - Demolition & Replacement Structure Processesahcitycouncil
 
Youth shaping sustainable and innovative solution - Reinforcing the 2030 agen...
Youth shaping sustainable and innovative solution - Reinforcing the 2030 agen...Youth shaping sustainable and innovative solution - Reinforcing the 2030 agen...
Youth shaping sustainable and innovative solution - Reinforcing the 2030 agen...Christina Parmionova
 
World Health Day theme 2024 is 'My health, my right’.
World Health Day theme 2024 is 'My health, my right’.World Health Day theme 2024 is 'My health, my right’.
World Health Day theme 2024 is 'My health, my right’.Christina Parmionova
 
Canadian Immigration Tracker - Key Slides - February 2024.pdf
Canadian Immigration Tracker - Key Slides - February 2024.pdfCanadian Immigration Tracker - Key Slides - February 2024.pdf
Canadian Immigration Tracker - Key Slides - February 2024.pdfAndrew Griffith
 
Digital Transformation of the Heritage Sector and its Practical Implications
Digital Transformation of the Heritage Sector and its Practical ImplicationsDigital Transformation of the Heritage Sector and its Practical Implications
Digital Transformation of the Heritage Sector and its Practical ImplicationsBeat Estermann
 
2024 ECOSOC YOUTH FORUM -logistical information - United Nations Economic an...
2024 ECOSOC YOUTH FORUM -logistical information -  United Nations Economic an...2024 ECOSOC YOUTH FORUM -logistical information -  United Nations Economic an...
2024 ECOSOC YOUTH FORUM -logistical information - United Nations Economic an...Christina Parmionova
 
World Health Day 2024 - Zero Discrimination, Affordable treatments, Respectfu...
World Health Day 2024 - Zero Discrimination, Affordable treatments, Respectfu...World Health Day 2024 - Zero Discrimination, Affordable treatments, Respectfu...
World Health Day 2024 - Zero Discrimination, Affordable treatments, Respectfu...Christina Parmionova
 
Actions to take at the global, national and local levels to realize the right...
Actions to take at the global, national and local levels to realize the right...Actions to take at the global, national and local levels to realize the right...
Actions to take at the global, national and local levels to realize the right...Christina Parmionova
 
Madison Cat Project - Foster Training: Lesson 1
Madison Cat Project - Foster Training: Lesson 1Madison Cat Project - Foster Training: Lesson 1
Madison Cat Project - Foster Training: Lesson 1KelleyWasmund
 
Phase 8 Hope For Venezuelan Refugees Soup Meal Program-Periods 4-6.
Phase 8 Hope For Venezuelan Refugees Soup Meal Program-Periods 4-6.Phase 8 Hope For Venezuelan Refugees Soup Meal Program-Periods 4-6.
Phase 8 Hope For Venezuelan Refugees Soup Meal Program-Periods 4-6.Cristal Montañéz
 
1- Phase 8 Hope For Venezuelan Refugees Soup Program-Periods 4-6.pdf
1- Phase 8 Hope For Venezuelan Refugees Soup Program-Periods 4-6.pdf1- Phase 8 Hope For Venezuelan Refugees Soup Program-Periods 4-6.pdf
1- Phase 8 Hope For Venezuelan Refugees Soup Program-Periods 4-6.pdfCristal Montañéz
 
Health rights correspond to a checklisk.
Health rights correspond to a checklisk.Health rights correspond to a checklisk.
Health rights correspond to a checklisk.Christina Parmionova
 

Último (20)

Focusing on the rights of women and girls
Focusing on the rights of women and girlsFocusing on the rights of women and girls
Focusing on the rights of women and girls
 
ECOSOC YOUTH FORUM 2024 - Side Events Schedule -16 April.
ECOSOC YOUTH FORUM 2024 - Side Events Schedule -16 April.ECOSOC YOUTH FORUM 2024 - Side Events Schedule -16 April.
ECOSOC YOUTH FORUM 2024 - Side Events Schedule -16 April.
 
Build Tomorrow’s India Today By Making Charity For Poor Students
Build Tomorrow’s India Today By Making Charity For Poor StudentsBuild Tomorrow’s India Today By Making Charity For Poor Students
Build Tomorrow’s India Today By Making Charity For Poor Students
 
Item # 7 - Demolition & Replacement Structure Processes
Item # 7 - Demolition & Replacement Structure ProcessesItem # 7 - Demolition & Replacement Structure Processes
Item # 7 - Demolition & Replacement Structure Processes
 
PPT Item # 6 - TBG Partners Landscape Architectural Design Services.pdf
PPT Item # 6 - TBG Partners Landscape Architectural Design Services.pdfPPT Item # 6 - TBG Partners Landscape Architectural Design Services.pdf
PPT Item # 6 - TBG Partners Landscape Architectural Design Services.pdf
 
ECOSOC YOUTH FORUM 2024 - Side Events Schedule -17 April.
ECOSOC YOUTH FORUM 2024 - Side Events Schedule -17 April.ECOSOC YOUTH FORUM 2024 - Side Events Schedule -17 April.
ECOSOC YOUTH FORUM 2024 - Side Events Schedule -17 April.
 
2024: The FAR, Federal Acquisition Regulations - Part 23
2024: The FAR, Federal Acquisition Regulations - Part 232024: The FAR, Federal Acquisition Regulations - Part 23
2024: The FAR, Federal Acquisition Regulations - Part 23
 
NL-FR Partnership - Water management roundtable 20240403.pdf
NL-FR Partnership - Water management roundtable 20240403.pdfNL-FR Partnership - Water management roundtable 20240403.pdf
NL-FR Partnership - Water management roundtable 20240403.pdf
 
PPT Item # 7 - Demolition & Replacement Structure Processes
PPT Item # 7 - Demolition & Replacement Structure ProcessesPPT Item # 7 - Demolition & Replacement Structure Processes
PPT Item # 7 - Demolition & Replacement Structure Processes
 
Youth shaping sustainable and innovative solution - Reinforcing the 2030 agen...
Youth shaping sustainable and innovative solution - Reinforcing the 2030 agen...Youth shaping sustainable and innovative solution - Reinforcing the 2030 agen...
Youth shaping sustainable and innovative solution - Reinforcing the 2030 agen...
 
World Health Day theme 2024 is 'My health, my right’.
World Health Day theme 2024 is 'My health, my right’.World Health Day theme 2024 is 'My health, my right’.
World Health Day theme 2024 is 'My health, my right’.
 
Canadian Immigration Tracker - Key Slides - February 2024.pdf
Canadian Immigration Tracker - Key Slides - February 2024.pdfCanadian Immigration Tracker - Key Slides - February 2024.pdf
Canadian Immigration Tracker - Key Slides - February 2024.pdf
 
Digital Transformation of the Heritage Sector and its Practical Implications
Digital Transformation of the Heritage Sector and its Practical ImplicationsDigital Transformation of the Heritage Sector and its Practical Implications
Digital Transformation of the Heritage Sector and its Practical Implications
 
2024 ECOSOC YOUTH FORUM -logistical information - United Nations Economic an...
2024 ECOSOC YOUTH FORUM -logistical information -  United Nations Economic an...2024 ECOSOC YOUTH FORUM -logistical information -  United Nations Economic an...
2024 ECOSOC YOUTH FORUM -logistical information - United Nations Economic an...
 
World Health Day 2024 - Zero Discrimination, Affordable treatments, Respectfu...
World Health Day 2024 - Zero Discrimination, Affordable treatments, Respectfu...World Health Day 2024 - Zero Discrimination, Affordable treatments, Respectfu...
World Health Day 2024 - Zero Discrimination, Affordable treatments, Respectfu...
 
Actions to take at the global, national and local levels to realize the right...
Actions to take at the global, national and local levels to realize the right...Actions to take at the global, national and local levels to realize the right...
Actions to take at the global, national and local levels to realize the right...
 
Madison Cat Project - Foster Training: Lesson 1
Madison Cat Project - Foster Training: Lesson 1Madison Cat Project - Foster Training: Lesson 1
Madison Cat Project - Foster Training: Lesson 1
 
Phase 8 Hope For Venezuelan Refugees Soup Meal Program-Periods 4-6.
Phase 8 Hope For Venezuelan Refugees Soup Meal Program-Periods 4-6.Phase 8 Hope For Venezuelan Refugees Soup Meal Program-Periods 4-6.
Phase 8 Hope For Venezuelan Refugees Soup Meal Program-Periods 4-6.
 
1- Phase 8 Hope For Venezuelan Refugees Soup Program-Periods 4-6.pdf
1- Phase 8 Hope For Venezuelan Refugees Soup Program-Periods 4-6.pdf1- Phase 8 Hope For Venezuelan Refugees Soup Program-Periods 4-6.pdf
1- Phase 8 Hope For Venezuelan Refugees Soup Program-Periods 4-6.pdf
 
Health rights correspond to a checklisk.
Health rights correspond to a checklisk.Health rights correspond to a checklisk.
Health rights correspond to a checklisk.
 

Building a Better Toronto Together: Proposed Bump-Outs on Oakwood Ave

  • 1. Building a Better Toronto Together Welcome Bump-outs on Oakwood Ave. Between St. Clair Ave. & Rogers Rd. Tuesday, January 12, 2016. Oakwood Village Library & Arts Centre 5 - 6:30 p.m. Public drop-in (view drawings & discuss with staff) 6:30 - 8 p.m. Presentation followed by questions & answers www.toronto.ca/oakwood-bump-outs 1
  • 2. Building a Better Toronto Together Introduction The City of Toronto is considering the addition of up to seven "bump-outs" on Oakwood Avenue between St. Clair Avenue and Rogers Road. This is a once in generation opportunity to improve this section of Oakwood Avenue as part of scheduled road resurfacing. This consultation event and survey is in follow-up to the request for further public consultation on design options as discussed at the March 4, 2015 public meeting. See survey and materials at toronto.ca/oakwood-bump-outs Resurface Bump-outs Bump-outs 2
  • 3. Building a Better Toronto Together Existing Conditions South of Earlsdale Ave At Conway Ave NorthboundSouthbound 3
  • 4. Building a Better Toronto Together Existing Conditions Crosswalk south of Earlsdale Avenue Approach to Rogers Road - parking allowed at all times Crosswalk at Conway Avenue Bus loading at the curb with vehicles passing 4
  • 5. Building a Better Toronto Together What is a Bump-out? Benefits of Bump-outs • Improves safety for pedestrians, including children and the elderly: • Better visibility of pedestrians about to cross • Shortens crossing distance • Reduces right side passing by motorists • Discourages vehicle speeding • Bump-outs with trees and other plants provide shade and beautify the street Example of paved bump-out Example of planted bump-out Bump-outs, also known as curb extensions or pedestrian peninsulas, extend the sidewalk and creates new space for trees, bus shelters and other upgrades. 5
  • 6. Building a Better Toronto Together Advantages Bump-outs at Bus Stops • Space for bus shelters, benches and waste bins • Places waiting area further away from adjacent houses • Space for customers using wheelchairs and scooters to get on and off buses • More attractive surrounding with landscaping and street furniture • Allow buses to load passengers from the traffic lane, which means they are not delayed waiting to enter into the traffic lane 6
  • 7. Building a Better Toronto Together Proposed Locations These bump-out locations and designs have been selected by Transportation Services to improve safety at crosswalks, improve TTC bus stops, and provide new street trees, while still maintaining ample on-street parking spaces. • One on the east side, about three doors south of Conway Ave. crosswalk, which will include a new TTC bus stop (adjacent to 207, 209 & 211 Oakwood Ave.) • One south of Conway Ave. on the west side of the crosswalk, extend to include a new TTC bus stop (adjacent to 216-228 {even} on Oakwood Ave.) • One with plantings north of Conway Ave. on the east side (231, 233,& 235 Oakwood Ave.) • Two with plantings south of Earlsdale Ave. on either side of the crosswalk, including the existing west side TTC bus stop (adjacent to City park, 300-312 {even} and 295-305 {odd} Oakwood Ave.) • One on the south-east side of Oakwood Ave. and Earlsdale Ave., including the existing east TTC bus stop (adjacent to 315, 317 & 317A Oakwood Ave.) • One with plantings on the north-east side of Oakwood Ave. and Earlsdale Ave. (adjacent to 319 & 319A Oakwood Ave.) 7
  • 8. Building a Better Toronto Together TTC Stop Consolidation As part of an ongoing joint City-TTC initiative to improve the safety of pedestrians on city streets, the TTC intends to remove the bus stops at Earnscliffe Road and Glenhurst Road, and replace them with one set of bus stops at Conway Avenue. This new location has the advantage of a pedestrian crosswalk, which will make it safer for people to cross to and from the bus stops. This bus stop consolidation is an independent decision and not part of this bump-out consultation. See more information in the Question and Answers page Bus stop location comments should be directed to TTC customer service: 416-393-4636 ttc.ca 8
  • 9. Building a Better Toronto Together Minor Changes to On-street Parking If bump-outs are approved, there would be a loss of about a dozen parking spaces, from the existing approximately 200 spaces on Oakwood Avenue, in the area of the new bump-outs. However, a few new spots will also be created where the existing TTC bus stops are to be consolidated (see TTC Stop Consolidation note on previous panel). Bus stops and crosswalks always prohibit parking on either side. The current plan is to maintain the existing "No Parking" regulations: southbound 7 a.m. to 9 p.m., northbound 4 p.m. to 6 p.m. 9
  • 10. Building a Better Toronto Together Comparing Road Volumes Southbound AM Peak PM Peak Off-Peak High Oakwood Nth of St. Clair 653 611 534 Oakwood Sth of St. Clair 602 530 466 Roncesvalles (2014) 364 351 284 Royal York Rd Nth of Bloor 719 895 811 Caledonia Nth of St. Clair 480 536 425 *Oakwood Nth of Rogers 669 900 504 Northbound AM Peak PM Peak Off-Peak High Oakwood Nth of St. Clair 508 588 653 Oakwood Sth of St. Clair 416 539 498 Roncesvalles (2014) 278 281 334 Royal York Rd Nth of Bloor 707 752 702 Caledonia W of St. Clair 458 674 467 *Oakwood Nth of Rogers 909 857 545 East-West AM Peak PM Peak Off-Peak High Rogers W of Oakwood - Eastbound 448 502 323 Rogers W of Oakwood - Westbound 458 515 431 *Parking allowed at all times Comparable Traffic Volumes on Two Lane Roads Classification Example Local Roads • Provide access to property • Less than 2,500 vehicles per day • Low traffic speed • No bus routes Stanmills Road Collector Roads • Provide access to property and traffic movement • 2,500 to 8,000 vehicles per day • Less than 1,500 bus (or streetcar) passenger per day • Signalized intersections at arterial roads Elmhurst Drive Minor Arterial Roads • Traffic movement is a primary function • 8,000 to 20,000 vehicles per day • 1,500 to 5,000 bus passenger per day • Speed limits 40 to 60 km/hr • No “Stop” signs; traffic signals at intersections Gerrard Street East Major Arterial Roads • Traffic movement is a primary function • Subject to access controls • Greater than 20,000 vehicles per day • Greater than 5,000 bus passengers per day • Speed limits 50 to 60 km/hr Yonge Street (North of St. Clair) Toronto Expressway • Traffic movement is a primary function • Speed limits 80 to 100 km/hr • No local transit service • Pedestrians and cyclists prohibited • Grade-separated intersections (no traffic signals) F.G. Gardner Expressway Oakwood Ave. is a Minor Arterial Road 10
  • 11. Building a Better Toronto Together Minimal Impacts to Overall Traffic Flow Transportation Services has carried out traffic counts, observations and real-life bump-out simulations (with parked vehicles in bump-out locations during rush hour) to confirm that bump-outs would not cause any sustained traffic back-ups. In short, bump-outs affect traffic much like parked cars next to the travel lane. Currently there are parked cars on Oakwood Avenue (in the area of the proposed bump-outs) for 22 hours of the day during weekdays, including during peak traffic volumes, and are not a significant factor affecting traffic delays. Examples of mid-block peak traffic flowing past parked vehicles occupying lane space similar to how bump-outs would 0 100 200 300 400 500 600 700 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 NumberofVehicles NoParking 0 100 200 300 400 500 600 700 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 NumberofVehicles NoParking Volumes by Hour (at Conway Ave) Southbound Northbound 11
  • 12. Building a Better Toronto Together Minimal Impacts to Overall Traffic Flow On Oakwood Avenue, delays are mainly experienced at the approach of Rogers Road and at St. Clair Avenue where drivers wait for the opportunity to turn at the traffic control signals. The proposed bump- outs are over 130 metres away from these intersections and should not change this situation. Near Rogers Road there is existing on-street parking all day. Waiting Behind Stopped TTC Buses With bump-outs at two bus stops in each direction, buses would stop to serve passengers in the traffic lane - drivers behind a stopped bus would be required to wait approximately 8 to 20 seconds before continuing. No Changes to Crosswalks Pedestrian crossing counts do not warrant the installation of any new traffic signals or changes to the locations of crosswalks, noting that the TTC intends to consolidate stops to near Conway Avenue where there is an existing crosswalk. Example of traffic delays on approach of the signalized intersection at St. Clair Avenue during peak periods. Bump-outs are not proposed in these approaches. Pedestrian crossing counts (8 hours) 12
  • 13. Building a Better Toronto Together Considerations for Cyclists The section of Oakwood Avenue immediately north of St. Clair Avenue (south of Glenhurst Avenue) is not wide enough to accommodate bike lanes and still maintain its existing traffic functions. Although bike lanes are not included in this proposal, the traffic lane next to the bump- outs will be at least 4.1 m wide, which provides adequate space for cycling next to vehicles. In addition, the City's 10 Year Cycling Network Plan (to be approved in 2016) includes a continuous bikeway link on parallel Winona Drive, connecting to bikeways on Davenport Road and Marlee Avenue. 13
  • 14. Building a Better Toronto Together Planting Area or Decorative Pavers Where there is opportunity, bump-outs will include street trees. Beyond the trees, where there is space, bump-outs could also include open planting areas. Such planting areas can add beauty and greenery to the street. Planting areas in the bump-outs would be serviced by the City a few times a year, but local residents would need to voluntarily maintain the plantings on a more day-to-day basis to ensure they are free of litter and looking their best. Canopy trees options include Maples, Honeylocusts, Basswoods and Elms. Shrubs could include ornamental grasses, Sedums/Flox, and low flowering shrubs. Alternatively the design could minimize open soil areas and instead install decorative permeable brick pavers, which allow stormwater to flow through. In any case, additional trees could may be planted in some front yards, if requested by property owners. Trees within paved areas Open planting areas 14
  • 15. Building a Better Toronto Together Three Main Options Option 1) No Bump-outs There would be no changes to Oakwood Avenue roadway, other than resurfacing and sidewalk repairs. New transit accessibility standards (e.g. for wheelchair users) may require the City to expand the sidewalk into some residential front yards next to bus stops. Pro • Faster construction • Lower costs for construction & maintenance • Drivers can pass stopped TTC busses • Minor increase in on street parking space (assuming TTC stop consolidation) Con • TTC buses possibly delayed when merging into traffic lane • No improvements to safety for pedestrians • 0 additional street trees planted on Oakwood Avenue • No bus shelters at TTC stops (not enough available space) • May need to expand the sidewalk into some residential front yards next to bus stops Option 2) Bump-outs on West Side Only Only two bump-outs would be installed, both on the west side (south bound). No change to the lanes on the east side (north bound). Pro • Some improvements to safety for pedestrians, including 2 reduced crossing distance locations • Approximately up to 5 additional street trees could be planted • Southbound bus stops could include shelters or other upgrades Con • Southbound drivers will on occasion be required to wait behind a stopped bus • May need to expand the sidewalk into some residential front yards next to bus stops on east side Option 3) Bump-outs on Both Sides There would be seven bump-outs installed. Five bump-outs would include planting areas. Pro • Significant improvements to safety for pedestrians, including 4 reduced crossing distance locations • Approximately up to 13 additional street trees could be planted • 4 bus stops could include shelters and/or other upgrades • Improved TTC bus service (no merging required) Con • Drivers will on occasion be required to wait behind a stopped bus • Minor reduction in on-street parking 15
  • 16. Building a Better Toronto Together Road Resurfacing & Sidewalk Improvements Whether bump-outs are approved or not, the following work is planned for 2016: • Road resurfacing: grinding and repaving the top 100mm of asphalt • Repair broken/damaged sidewalk/curb to bring it into state of good repair • Installation of new tactile walking surface indicators at intersections and cross-walks (required for the visually impaired) 16
  • 17. Building a Better Toronto Together Next Steps • Receive feedback tonight and online up to January 17, 2016 • Survey results will feature highly in the Transportation Services recommendations to Etobicoke York Community Council, where a decision on these bump-outs will be made • Finalize design and update residents • Tender the project and hire a contractor • Two weeks before construction, a Construction Notice will be issued with more details on when work will begin and stages of construction Expected Construction Start Date: Summer 2016 Expected Completion Date: Fall 2016 For More Information Tracy Manolakakis Manager, Public Consultation Unit Tel: 416-392-2990 E-mail: tmanola@toronto.ca toronto.ca/oakwood-bump-outs TTC customer information: 416-393-4636 17