SmartTrack: Eglinton Avenue West
Corridor Feasibility Review
Coordinated Transit Consultation Program
Public Information Centre
June 13-25, 2015
Transportation Planning Section | City Planning Division
Overview of Presentation
1. Coordination of rapid transit studies
2. Relief Line Project Assessment
3. Scarborough Subway Extension Project
Assessment
4. GO RER/SmartTrack Background
5. SmartTrack: Eglinton Avenue West Corridor
Feasibility Review
2
Why are we here?
• We are seeking your opinions and comments on the work
currently underway.
• What we hear will be used to inform our work going forward.
• Sharing your thoughts is very important in order for the needs of
the community to be reflected in the final review.
• The best results will come by more people participating in and
contributing to the conversation. We need your input.
3
How is Network Transit Planning
Coordinated?• Metrolinx, the City and TTC are all working together
• Four major transit initiatives are interrelated
• Other projects planned or under construction:
• Major projects are all interrelated and have a significant
impact on the overall transit network
– Connections between future projects and connections with existing lines
will form the foundation of an improved network
• We are currently in the process of undertaking the integrated
assessment of these projects through detailed ridership
modelling
– Work on each project will inform the other analysis 4
­ GO Regional Express Rail (RER)
­ SmartTrack concept
­ Scarborough Subway Extension
­ Relief Line
­ Finch West LRT
­ Sheppard East LRT
­ Toronto-York Spadina Subway Extension
­ Eglinton Crosstown LRT
Public Engagement for Transit Planning
Initiatives
5
Updated Transportation Model
An updated transportation model will help us understand how
each project is related.
Key features of the GTAModel V4.0 model system include:
•Covers the entire GTHA using 2011 TTS for the base data
•The model explicitly represents individuals and households
•The model considers how a person’s trips fit together instead of considering each
trip in individually
•Trips are modelled for entire 24-hour week-day time period (using five time
periods)
•The transit assignment model considers crowding on the system and fares of
different paths
Critical timelines for modelling work:
June 2015 – Draft results of transportation modelling
– Report on employment land use modelling
July 2015 – Report on transportation modelling results
6
Timing
7
Current • Public consultation in June, 2015 on all projects
Mid/late
Summer
• Further analysis and assessment of options for each
project
• Public consultation on project recommendations in
September, 2015
Fall • Report to Council October/November, 2015 on results
and public consultations and recommendations for next
steps on each project
Future
Work
• Issue Notice of Commencement for Final Project Review
in 2016
Relief Line
Project Assessment
8
Relief Line Study Area
9
Evaluation Results of Potential Station
Locations • 45 potential station
locations were
identified and
evaluated
‒ In Downtown
‒ Connection to the
Danforth Subway
‒ Key activity areas,
east and west of
the Don River
• Preliminary
evaluation has
identified those
that best achieve
objectives for the
project and the
communities
10
Consultation
Relief Line
Consultations are focused on:
1. Draft evaluation results for
potential station options
2. Potential corridors and their
stations
Corridor A
Broadview to
Queen/Richmond
Corridor B
Pape to
Queen/Richmond
Corridor C
Broadview to
King/Wellington
Corridor D
Pape to
King/Wellington
• Four potential corridors have
been identified for further,
more detailed consideration
• These corridors have the
highest potential to address
the results of the station
evaluation, the full range of
project objectives and city-
building criteria
• The potential corridors and
their stations will be further
evaluated to identify a
preferred corridor
11
Scarborough Subway
Extension Project
Assessment
12
Note - All station location and alignment
options being considered are located within
the study area. Residents across Scarborough
and the entire City of Toronto will benefit from
transit and transportation network
improvements created by the Scarborough
Subway Extension
Study Area
Scarborough Subway
Extension
13
Scarborough Subway Extension Current Work
• Nine potential
corridors have been
assessed
– Preliminary evaluation
has identified three best
performing
• Consultation to-date:
– Two public meetings
– Stakeholder Advisory
Group
– Interactive workshop
– Online consultation
14
Consultation
Scarborough Subway Extension
Looking for public feedback on:
• Existing conditions
• Short listed corridors
• Preliminary evaluation of
corridors
• Potential alignments and
station locations
15
GO Regional Express
Rail
/ SmartTrack
16
GO Regional Express Rail (RER)
Over the next ten years, Metrolinx will introduce RER including 15-
minute, two-way, all-day transit service on most of the seven GO
lines (and significant service improvements on the other lines).
Across the system, this will mean:
• Electrification of several corridors that will
reduce travel times by up to 20% and
reduce operating costs
• Four times the number of train trips outside
of rush hour and on weekends
• Twice the number of trips during rush hour
• Benefits for all 19 existing GO stations in
Toronto and the potential for new stations
• Infrastructure requirements of 150
kilometres of new, dedicated GO track
and dozens of new tunnels and bridges
17
GO RER and SmartTrack
• SmartTrack builds on RER and the existing GO network
– Proposes enhanced service on three existing corridors –
Stouffville, Lakeshore East, Kitchener
– Proposes a heavy rail corridor connecting Mount Dennis to the
Mississauga Airport Corporate Centre
• SmartTrack concept features
– Service frequency of 15 minutes or better
– All stop service in both directions
– TTC fare option
– Additional stations along the three existing GO corridors
– Electrified trains
• City Council has directed staff to further evaluate the
SmartTrack concept and report back
– This includes the Eglinton West Feasibility Review
18
19
The SmartTrack concept
builds on RER
SmartTrack Train Technology
20
Zurich S-Bahn
Source: http://www.stadlerrail.com/media/uploads/factsheets/KISS_DOSBBRE0810e.pdf
Diesel Locomotive Hauled Train Electric Multiple Unit Train
Electric Multiple Unit trains
accelerate faster and can be
split into smaller train sets
depending on demand.
SmartTrack will use the same trains as GO Transit.
Objectives
21
• In February, 2015, City Council
directed staff to review the
feasibility of SmartTrack
options between Mt. Dennis
Station and the Mississauga
Airport Corporate Centre
• The first step is a high-level
feasibility review of various
options to connect Mount
Dennis station to the
Mississauga Airport Corporate
Centre.
Feasibility Review
• This feasibility review is only to determine if it is
possible to extend heavy rail to the Mississauga
Airport Corporate Centre
• Feasible solutions will require more thorough study
and comprehensive engagement with the
community and local councillors
• City Council will give direction to staff on next steps
in the fall
22
Potential Corridors and Conceptual
Alignments
23
Three corridor options will be tested for feasibility: 
1. A continuous heavy rail spur connection from the Kitchener GO
corridor connection by way of Eglinton Avenue West
2. A separate heavy rail corridor along Eglinton Avenue West with a
transfer at Mt Dennis
3. A continuous heavy rail spur connection diverging from the existing GO
corridor somewhere in the vicinity of Highway 27 into the airport and
south to the Mississauga Airport Corporate Centre
The approved Environmental Assessment for the western
portion of the Eglinton Crosstown LRT will be taken as the base
reference case against which other options are evaluated.
The LRT plan included potential future access to Pearson
Airport.
Potential Corridors and Conceptual
Alignments
24
1. A continuous heavy rail spur connection from the Kitchener GO
corridor connection by way of Eglinton Avenue West
Potential Corridors and Conceptual
Alignments
25
2. A separate heavy rail corridor along Eglinton Avenue West with a
transfer at Mt Dennis
Potential Corridors and Conceptual
Alignments
26
3. A continuous heavy rail spur connection diverging from the existing GO
corridor somewhere in the vicinity of Highway 27 into the airport and
south to the Mississauga Airport Corporate Centre
Potential Corridors: Continuous Connection -
Eglinton
27
Potential Corridors: Continuous Connection -
Eglinton
28
Potential Corridors: Continuous Connection -
Eglinton
29
Potential Corridors: Continuous Connection -
Airport
30
Potential Corridors: Continuous Connection -
Airport
31
Potential Corridors: Continuous Connection -
Airport
32
Potential Corridors: Separate Service - Eglinton
33
Base Reference Case – Eglinton LRT
34
Approach to Analysis
The feasibility of each alignment will be evaluated
from the following perspectives:
– Technical (i.e. design and engineering)
– Service concept (i.e. ability to integrate with other transit
services)
– Financial
– Regulatory and legislative
– Land use
35
Feasibility Questions
Technical Analysis:
•How could the alignments be constructed?
•Could they connect to other existing and planned transit lines?
•What would the operational constraints be?
Service Concept Analysis:
•What additional infrastructure would be required for SmartTrack to
operate on the alignments?
•What would be the implication for other services (GO, VIA, UP Express) if
additional infrastructure is not added?
Financial Analysis:
•What are the estimated costs for constructing, maintaining and
operating each of the alignments?
36
Feasibility Questions
Regulatory and Legislative:
•What regulatory requirements would apply to the development and
operation of the corridor?
•What federal and provincial approvals would be required to construct
the alignments?
Land-use Analysis:
•Would the alignments be compatible with surrounding land uses?
•What is the development potential around potential stations?
•What impacts could there be on sensitive features?
•Is heavy rail appropriate for serving the anticipated ridership
considering the surrounding land uses?
37
Communications & Outreach
The City and TTC are committed to engaging the public in
a way that is transparent, collaborative, inclusive and
authentic. The City Planning Division is leading the
consultations.
•Communications activities:
– Website
– Social media
•Consultation and feedback:
– Outreach to key community and stakeholder groups as
appropriate
– Consultation with City of Mississauga
– Traditional public meetings in the review area and across
Toronto
– Online consultation 38
Timing
Eglinton West Corridor
39
Current • Identify conceptual alignments
• Develop broad screening criteria
• Public Consultation in June, 2015
Mid/late
Summer
• Evaluate feasibility of conceptual alignments
• Rank draft short list of feasible conceptual alignments
• Consultation with City of Mississauga
• Public Consultation in September, 2015
Fall • Report to Council on feasible conceptual alignments
with recommended option at the same time as
reporting on SmartTrack/RER – November, 2015
Future Work
(if required)
• Final project review (Transit Project Assessment
Process) in 2016
Questions
40

Más contenido relacionado

La actualidad más candente

Scarborough Subway Extension SAG Meeting - February 8, 2016
Scarborough Subway Extension SAG Meeting - February 8, 2016Scarborough Subway Extension SAG Meeting - February 8, 2016
Scarborough Subway Extension SAG Meeting - February 8, 2016Toronto Public Consultation Unit
 
Scarborough Subway Extension - Public Meeting Presentation - January/February...
Scarborough Subway Extension - Public Meeting Presentation - January/February...Scarborough Subway Extension - Public Meeting Presentation - January/February...
Scarborough Subway Extension - Public Meeting Presentation - January/February...Toronto Public Consultation Unit
 
Scarborough Subway Extension - Phase 1 Consultation Report
Scarborough Subway Extension - Phase 1 Consultation ReportScarborough Subway Extension - Phase 1 Consultation Report
Scarborough Subway Extension - Phase 1 Consultation ReportToronto Public Consultation Unit
 
Scarborough Subway Extension - June 2015 Public Consultation Report
Scarborough Subway Extension - June 2015 Public Consultation ReportScarborough Subway Extension - June 2015 Public Consultation Report
Scarborough Subway Extension - June 2015 Public Consultation ReportToronto Public Consultation Unit
 
Scarborough Subway Extension Project Assessment - Draft Terms of Reference
Scarborough Subway Extension Project Assessment - Draft Terms of ReferenceScarborough Subway Extension Project Assessment - Draft Terms of Reference
Scarborough Subway Extension Project Assessment - Draft Terms of ReferenceToronto Public Consultation Unit
 
Fairfax County Countywide Transit Network Study: Board of Supervisors Transpo...
Fairfax County Countywide Transit Network Study: Board of Supervisors Transpo...Fairfax County Countywide Transit Network Study: Board of Supervisors Transpo...
Fairfax County Countywide Transit Network Study: Board of Supervisors Transpo...Fairfax County
 

La actualidad más candente (20)

June Relief Line Update
June Relief Line UpdateJune Relief Line Update
June Relief Line Update
 
2015 06-15 relief line presentation
2015 06-15 relief line presentation2015 06-15 relief line presentation
2015 06-15 relief line presentation
 
15-03 Relief Line Public Meeting Presentation
15-03 Relief Line Public Meeting Presentation15-03 Relief Line Public Meeting Presentation
15-03 Relief Line Public Meeting Presentation
 
Evaluation process and criteria june 2 2015 final
Evaluation process and criteria june 2 2015 finalEvaluation process and criteria june 2 2015 final
Evaluation process and criteria june 2 2015 final
 
February Transit Update Presentation
February Transit Update PresentationFebruary Transit Update Presentation
February Transit Update Presentation
 
Scarborough Subway Extension SAG Meeting - February 8, 2016
Scarborough Subway Extension SAG Meeting - February 8, 2016Scarborough Subway Extension SAG Meeting - February 8, 2016
Scarborough Subway Extension SAG Meeting - February 8, 2016
 
Draft Relief Line Corridor Evaluation
Draft Relief Line Corridor EvaluationDraft Relief Line Corridor Evaluation
Draft Relief Line Corridor Evaluation
 
Relief Line Project Assessment Phase 1A Consultation Presentation
Relief Line Project Assessment Phase 1A Consultation PresentationRelief Line Project Assessment Phase 1A Consultation Presentation
Relief Line Project Assessment Phase 1A Consultation Presentation
 
Scarborough Subway Extension - Public Meeting Presentation - January/February...
Scarborough Subway Extension - Public Meeting Presentation - January/February...Scarborough Subway Extension - Public Meeting Presentation - January/February...
Scarborough Subway Extension - Public Meeting Presentation - January/February...
 
SMART Plan DTPW Corridor Estimates
SMART Plan DTPW Corridor EstimatesSMART Plan DTPW Corridor Estimates
SMART Plan DTPW Corridor Estimates
 
Scarborough Subway Extension - Phase 1 Consultation Report
Scarborough Subway Extension - Phase 1 Consultation ReportScarborough Subway Extension - Phase 1 Consultation Report
Scarborough Subway Extension - Phase 1 Consultation Report
 
First-Last Mile Presentation
First-Last Mile PresentationFirst-Last Mile Presentation
First-Last Mile Presentation
 
Scarborough Subway Extension - June 2015 Public Consultation Report
Scarborough Subway Extension - June 2015 Public Consultation ReportScarborough Subway Extension - June 2015 Public Consultation Report
Scarborough Subway Extension - June 2015 Public Consultation Report
 
Relief Line Phase 3 Consultation Report
Relief Line Phase 3 Consultation ReportRelief Line Phase 3 Consultation Report
Relief Line Phase 3 Consultation Report
 
Scarborough Subway Extension Project Assessment - Draft Terms of Reference
Scarborough Subway Extension Project Assessment - Draft Terms of ReferenceScarborough Subway Extension Project Assessment - Draft Terms of Reference
Scarborough Subway Extension Project Assessment - Draft Terms of Reference
 
Chapel Hill Transit North-South BRT Project
Chapel Hill Transit North-South BRT ProjectChapel Hill Transit North-South BRT Project
Chapel Hill Transit North-South BRT Project
 
GoTriangle Update on DOLRT Project
GoTriangle Update on DOLRT ProjectGoTriangle Update on DOLRT Project
GoTriangle Update on DOLRT Project
 
Update from Regional Transportation Alliance
Update from Regional Transportation AllianceUpdate from Regional Transportation Alliance
Update from Regional Transportation Alliance
 
Fairfax County Countywide Transit Network Study: Board of Supervisors Transpo...
Fairfax County Countywide Transit Network Study: Board of Supervisors Transpo...Fairfax County Countywide Transit Network Study: Board of Supervisors Transpo...
Fairfax County Countywide Transit Network Study: Board of Supervisors Transpo...
 
DTPW's Rapid Transit Corridors Conceptual Financial Plan Proposal
DTPW's Rapid Transit Corridors Conceptual Financial Plan ProposalDTPW's Rapid Transit Corridors Conceptual Financial Plan Proposal
DTPW's Rapid Transit Corridors Conceptual Financial Plan Proposal
 

Similar a SmartTrack Presentation - June, 2015

I-66 Corridor Improvements Outside the Beltway
I-66 Corridor Improvements Outside the BeltwayI-66 Corridor Improvements Outside the Beltway
I-66 Corridor Improvements Outside the BeltwayFairfax County
 
Board of Supervisors Transportation Committee: Proposed High Quality Transit ...
Board of Supervisors Transportation Committee: Proposed High Quality Transit ...Board of Supervisors Transportation Committee: Proposed High Quality Transit ...
Board of Supervisors Transportation Committee: Proposed High Quality Transit ...Fairfax County
 
Sprawled City; Lesson 7.pptx
Sprawled City; Lesson 7.pptxSprawled City; Lesson 7.pptx
Sprawled City; Lesson 7.pptxssuserc1ed5e
 
Mohinder Singh - Gestión Institucional del Sistema de Transporte de Singapur
Mohinder Singh - Gestión Institucional del Sistema de Transporte de SingapurMohinder Singh - Gestión Institucional del Sistema de Transporte de Singapur
Mohinder Singh - Gestión Institucional del Sistema de Transporte de SingapurFagner Glinski
 
Transport appraisal – evolution development and current challenges
Transport appraisal – evolution development and current challengesTransport appraisal – evolution development and current challenges
Transport appraisal – evolution development and current challengesInstitute for Transport Studies (ITS)
 
Scarborough Subway Extension Stakeholder Advisory Group Meeting 1
Scarborough Subway Extension Stakeholder Advisory Group Meeting 1Scarborough Subway Extension Stakeholder Advisory Group Meeting 1
Scarborough Subway Extension Stakeholder Advisory Group Meeting 1Toronto Public Consultation Unit
 
First – Last Mile_MBPJ_2015
First – Last Mile_MBPJ_2015First – Last Mile_MBPJ_2015
First – Last Mile_MBPJ_2015Norma Nun
 
Doing more with less - LBI
Doing more with less - LBIDoing more with less - LBI
Doing more with less - LBIChristian Bode
 
London's Crossrail Scheme - its evolution, governance, financing and challenges
London's Crossrail Scheme  - its evolution, governance, financing and challengesLondon's Crossrail Scheme  - its evolution, governance, financing and challenges
London's Crossrail Scheme - its evolution, governance, financing and challengesInstitute for Transport Studies (ITS)
 
The Development of Public Transportation Strategic Plan for Metro Cebu Volume...
The Development of Public Transportation Strategic Plan for Metro Cebu Volume...The Development of Public Transportation Strategic Plan for Metro Cebu Volume...
The Development of Public Transportation Strategic Plan for Metro Cebu Volume...Emmanuel Mongaya
 
CMAX Cleveland Avenue BRT Public Meeting - October 14, 2014
CMAX Cleveland Avenue BRT Public Meeting - October 14, 2014CMAX Cleveland Avenue BRT Public Meeting - October 14, 2014
CMAX Cleveland Avenue BRT Public Meeting - October 14, 2014COTA BUS
 

Similar a SmartTrack Presentation - June, 2015 (20)

Scarborough Subway Extension - Phase 2 Presentation
Scarborough Subway Extension - Phase 2 PresentationScarborough Subway Extension - Phase 2 Presentation
Scarborough Subway Extension - Phase 2 Presentation
 
SmartTrack Presentation- Toronto Transit Network Planning
SmartTrack Presentation- Toronto Transit Network PlanningSmartTrack Presentation- Toronto Transit Network Planning
SmartTrack Presentation- Toronto Transit Network Planning
 
Coordinated Transit Planning in Toronto
Coordinated Transit Planning in TorontoCoordinated Transit Planning in Toronto
Coordinated Transit Planning in Toronto
 
2016-06-06 Scarborough Subway Extension SAG
2016-06-06 Scarborough Subway Extension SAG2016-06-06 Scarborough Subway Extension SAG
2016-06-06 Scarborough Subway Extension SAG
 
Scarborough Transit Town Hall - April 23, 2016
Scarborough Transit Town Hall - April 23, 2016Scarborough Transit Town Hall - April 23, 2016
Scarborough Transit Town Hall - April 23, 2016
 
I-66 Corridor Improvements Outside the Beltway
I-66 Corridor Improvements Outside the BeltwayI-66 Corridor Improvements Outside the Beltway
I-66 Corridor Improvements Outside the Beltway
 
SmartTrack Public Meeting Presentation
SmartTrack Public Meeting PresentationSmartTrack Public Meeting Presentation
SmartTrack Public Meeting Presentation
 
Board of Supervisors Transportation Committee: Proposed High Quality Transit ...
Board of Supervisors Transportation Committee: Proposed High Quality Transit ...Board of Supervisors Transportation Committee: Proposed High Quality Transit ...
Board of Supervisors Transportation Committee: Proposed High Quality Transit ...
 
Waterfront Transit Reset Public Meeting Presentation
Waterfront Transit Reset Public Meeting Presentation Waterfront Transit Reset Public Meeting Presentation
Waterfront Transit Reset Public Meeting Presentation
 
Transport Thursday Niel van Oort
Transport Thursday Niel van OortTransport Thursday Niel van Oort
Transport Thursday Niel van Oort
 
Sprawled City; Lesson 7.pptx
Sprawled City; Lesson 7.pptxSprawled City; Lesson 7.pptx
Sprawled City; Lesson 7.pptx
 
Mohinder Singh - Gestión Institucional del Sistema de Transporte de Singapur
Mohinder Singh - Gestión Institucional del Sistema de Transporte de SingapurMohinder Singh - Gestión Institucional del Sistema de Transporte de Singapur
Mohinder Singh - Gestión Institucional del Sistema de Transporte de Singapur
 
Transport appraisal – evolution development and current challenges
Transport appraisal – evolution development and current challengesTransport appraisal – evolution development and current challenges
Transport appraisal – evolution development and current challenges
 
Scarborough Subway Extension Stakeholder Advisory Group Meeting 1
Scarborough Subway Extension Stakeholder Advisory Group Meeting 1Scarborough Subway Extension Stakeholder Advisory Group Meeting 1
Scarborough Subway Extension Stakeholder Advisory Group Meeting 1
 
First – Last Mile_MBPJ_2015
First – Last Mile_MBPJ_2015First – Last Mile_MBPJ_2015
First – Last Mile_MBPJ_2015
 
Doing more with less - LBI
Doing more with less - LBIDoing more with less - LBI
Doing more with less - LBI
 
monorail system implication in Sri Lanka
monorail system implication in Sri Lankamonorail system implication in Sri Lanka
monorail system implication in Sri Lanka
 
London's Crossrail Scheme - its evolution, governance, financing and challenges
London's Crossrail Scheme  - its evolution, governance, financing and challengesLondon's Crossrail Scheme  - its evolution, governance, financing and challenges
London's Crossrail Scheme - its evolution, governance, financing and challenges
 
The Development of Public Transportation Strategic Plan for Metro Cebu Volume...
The Development of Public Transportation Strategic Plan for Metro Cebu Volume...The Development of Public Transportation Strategic Plan for Metro Cebu Volume...
The Development of Public Transportation Strategic Plan for Metro Cebu Volume...
 
CMAX Cleveland Avenue BRT Public Meeting - October 14, 2014
CMAX Cleveland Avenue BRT Public Meeting - October 14, 2014CMAX Cleveland Avenue BRT Public Meeting - October 14, 2014
CMAX Cleveland Avenue BRT Public Meeting - October 14, 2014
 

Más de Toronto Public Consultation Unit

Waterfront Sanitary Servicing Master Plan Update (Oct. 30 PIE).
Waterfront Sanitary Servicing Master Plan Update (Oct. 30 PIE). Waterfront Sanitary Servicing Master Plan Update (Oct. 30 PIE).
Waterfront Sanitary Servicing Master Plan Update (Oct. 30 PIE). Toronto Public Consultation Unit
 
King-Liberty Pedestrian / Cycling Bridge Project Update - Slides
King-Liberty Pedestrian / Cycling Bridge Project Update - Slides King-Liberty Pedestrian / Cycling Bridge Project Update - Slides
King-Liberty Pedestrian / Cycling Bridge Project Update - Slides Toronto Public Consultation Unit
 
Six Points Interchange Reconfiguration public event display panels, May 11, 2017
Six Points Interchange Reconfiguration public event display panels, May 11, 2017Six Points Interchange Reconfiguration public event display panels, May 11, 2017
Six Points Interchange Reconfiguration public event display panels, May 11, 2017Toronto Public Consultation Unit
 
College Street Promenade BIA Streetscaping Update Public Meeting Feb 28 final
College Street Promenade BIA Streetscaping Update Public Meeting Feb 28  finalCollege Street Promenade BIA Streetscaping Update Public Meeting Feb 28  final
College Street Promenade BIA Streetscaping Update Public Meeting Feb 28 finalToronto Public Consultation Unit
 
King-Liberty Pedestrian / Cycling Bridge (Dec. 8 2016 Information Panels)
King-Liberty Pedestrian / Cycling Bridge (Dec. 8 2016 Information Panels)King-Liberty Pedestrian / Cycling Bridge (Dec. 8 2016 Information Panels)
King-Liberty Pedestrian / Cycling Bridge (Dec. 8 2016 Information Panels)Toronto Public Consultation Unit
 
Presentation - Park Lawn Lake Shore Transportation Master Plan Community Work...
Presentation - Park Lawn Lake Shore Transportation Master Plan Community Work...Presentation - Park Lawn Lake Shore Transportation Master Plan Community Work...
Presentation - Park Lawn Lake Shore Transportation Master Plan Community Work...Toronto Public Consultation Unit
 
Park Lawn Lake Shore Transportation Master Plan Community Workshop 1 Display ...
Park Lawn Lake Shore Transportation Master Plan Community Workshop 1 Display ...Park Lawn Lake Shore Transportation Master Plan Community Workshop 1 Display ...
Park Lawn Lake Shore Transportation Master Plan Community Workshop 1 Display ...Toronto Public Consultation Unit
 

Más de Toronto Public Consultation Unit (20)

Waterfront Sanitary Servicing Master Plan Update (Oct. 30 PIE).
Waterfront Sanitary Servicing Master Plan Update (Oct. 30 PIE). Waterfront Sanitary Servicing Master Plan Update (Oct. 30 PIE).
Waterfront Sanitary Servicing Master Plan Update (Oct. 30 PIE).
 
Waterfront Transit Reset Phase 2 Display Panels
Waterfront Transit Reset Phase 2 Display PanelsWaterfront Transit Reset Phase 2 Display Panels
Waterfront Transit Reset Phase 2 Display Panels
 
King-Liberty Pedestrian / Cycling Bridge Project Update - Slides
King-Liberty Pedestrian / Cycling Bridge Project Update - Slides King-Liberty Pedestrian / Cycling Bridge Project Update - Slides
King-Liberty Pedestrian / Cycling Bridge Project Update - Slides
 
Sewer Outfall Project
Sewer Outfall ProjectSewer Outfall Project
Sewer Outfall Project
 
General information
General informationGeneral information
General information
 
Disinfection System
Disinfection SystemDisinfection System
Disinfection System
 
2017 Sediment Basin construction updated information
2017 Sediment Basin construction updated information 2017 Sediment Basin construction updated information
2017 Sediment Basin construction updated information
 
Scarborough Subway TPAP Boards
Scarborough Subway TPAP Boards Scarborough Subway TPAP Boards
Scarborough Subway TPAP Boards
 
2017 05-18 Etobicoke Creek Nort Trail panels final
2017 05-18 Etobicoke Creek Nort Trail panels final2017 05-18 Etobicoke Creek Nort Trail panels final
2017 05-18 Etobicoke Creek Nort Trail panels final
 
King Street Phase 2 Slide Deck
King Street Phase 2 Slide Deck King Street Phase 2 Slide Deck
King Street Phase 2 Slide Deck
 
Scarborough Subway TPAP PIC
Scarborough Subway TPAP PICScarborough Subway TPAP PIC
Scarborough Subway TPAP PIC
 
Six Points Interchange Reconfiguration public event display panels, May 11, 2017
Six Points Interchange Reconfiguration public event display panels, May 11, 2017Six Points Interchange Reconfiguration public event display panels, May 11, 2017
Six Points Interchange Reconfiguration public event display panels, May 11, 2017
 
Downsview Area Long Term Water Servicing
Downsview Area Long Term Water Servicing Downsview Area Long Term Water Servicing
Downsview Area Long Term Water Servicing
 
FG Gardiner New Simcoe Ramp - display boards
FG Gardiner   New Simcoe Ramp - display boardsFG Gardiner   New Simcoe Ramp - display boards
FG Gardiner New Simcoe Ramp - display boards
 
College Street Promenade BIA Streetscaping Update Public Meeting Feb 28 final
College Street Promenade BIA Streetscaping Update Public Meeting Feb 28  finalCollege Street Promenade BIA Streetscaping Update Public Meeting Feb 28  final
College Street Promenade BIA Streetscaping Update Public Meeting Feb 28 final
 
Swc public consultation_pres_170307_final
Swc public consultation_pres_170307_finalSwc public consultation_pres_170307_final
Swc public consultation_pres_170307_final
 
King Street Pilot Public Meeting
King Street Pilot Public MeetingKing Street Pilot Public Meeting
King Street Pilot Public Meeting
 
King-Liberty Pedestrian / Cycling Bridge (Dec. 8 2016 Information Panels)
King-Liberty Pedestrian / Cycling Bridge (Dec. 8 2016 Information Panels)King-Liberty Pedestrian / Cycling Bridge (Dec. 8 2016 Information Panels)
King-Liberty Pedestrian / Cycling Bridge (Dec. 8 2016 Information Panels)
 
Presentation - Park Lawn Lake Shore Transportation Master Plan Community Work...
Presentation - Park Lawn Lake Shore Transportation Master Plan Community Work...Presentation - Park Lawn Lake Shore Transportation Master Plan Community Work...
Presentation - Park Lawn Lake Shore Transportation Master Plan Community Work...
 
Park Lawn Lake Shore Transportation Master Plan Community Workshop 1 Display ...
Park Lawn Lake Shore Transportation Master Plan Community Workshop 1 Display ...Park Lawn Lake Shore Transportation Master Plan Community Workshop 1 Display ...
Park Lawn Lake Shore Transportation Master Plan Community Workshop 1 Display ...
 

Último

Item # 1a --- March 25, 2024 CCM Minutes
Item # 1a --- March 25, 2024 CCM MinutesItem # 1a --- March 25, 2024 CCM Minutes
Item # 1a --- March 25, 2024 CCM Minutesahcitycouncil
 
Focusing on the rights of women and girls
Focusing on the rights of women and girlsFocusing on the rights of women and girls
Focusing on the rights of women and girlsChristina Parmionova
 
April 7th - World Health Day 2024 - My Health. My Right.
April 7th - World Health Day 2024 - My Health. My Right.April 7th - World Health Day 2024 - My Health. My Right.
April 7th - World Health Day 2024 - My Health. My Right.Christina Parmionova
 
GOVERNMENT OF NCT OF DELHI DIRECTORATE OF EDUCATION
GOVERNMENT OF NCT OF DELHI DIRECTORATE OF EDUCATIONGOVERNMENT OF NCT OF DELHI DIRECTORATE OF EDUCATION
GOVERNMENT OF NCT OF DELHI DIRECTORATE OF EDUCATIONShivamShukla147857
 
Digital Transformation of the Heritage Sector and its Practical Implications
Digital Transformation of the Heritage Sector and its Practical ImplicationsDigital Transformation of the Heritage Sector and its Practical Implications
Digital Transformation of the Heritage Sector and its Practical ImplicationsBeat Estermann
 
Madison Cat Project - Foster Training: Lesson 1
Madison Cat Project - Foster Training: Lesson 1Madison Cat Project - Foster Training: Lesson 1
Madison Cat Project - Foster Training: Lesson 1KelleyWasmund
 
PPT Item # 4&5 - 415 & 423 Evans Ave. Replat.pdf
PPT Item # 4&5 - 415 & 423 Evans Ave. Replat.pdfPPT Item # 4&5 - 415 & 423 Evans Ave. Replat.pdf
PPT Item # 4&5 - 415 & 423 Evans Ave. Replat.pdfahcitycouncil
 
In War and conflict, health workers, facilities and supplies are off limits.
In War and conflict, health workers, facilities and supplies are off limits.In War and conflict, health workers, facilities and supplies are off limits.
In War and conflict, health workers, facilities and supplies are off limits.Christina Parmionova
 
Health rights correspond to a checklisk.
Health rights correspond to a checklisk.Health rights correspond to a checklisk.
Health rights correspond to a checklisk.Christina Parmionova
 
PPT Item # 6 - TBG Partners Landscape Architectural Design Services.pdf
PPT Item # 6 - TBG Partners Landscape Architectural Design Services.pdfPPT Item # 6 - TBG Partners Landscape Architectural Design Services.pdf
PPT Item # 6 - TBG Partners Landscape Architectural Design Services.pdfahcitycouncil
 
World Health Day theme 2024 is 'My health, my right’.
World Health Day theme 2024 is 'My health, my right’.World Health Day theme 2024 is 'My health, my right’.
World Health Day theme 2024 is 'My health, my right’.Christina Parmionova
 
2024 ECOSOC YOUTH FORUM -logistical information - United Nations Economic an...
2024 ECOSOC YOUTH FORUM -logistical information -  United Nations Economic an...2024 ECOSOC YOUTH FORUM -logistical information -  United Nations Economic an...
2024 ECOSOC YOUTH FORUM -logistical information - United Nations Economic an...Christina Parmionova
 
Item # 7 - Demolition & Replacement Structure Processes
Item # 7 - Demolition & Replacement Structure ProcessesItem # 7 - Demolition & Replacement Structure Processes
Item # 7 - Demolition & Replacement Structure Processesahcitycouncil
 
ISEIDP in Chikkaballapura, Karnataka, India
ISEIDP in Chikkaballapura, Karnataka, IndiaISEIDP in Chikkaballapura, Karnataka, India
ISEIDP in Chikkaballapura, Karnataka, IndiaTrinity Care Foundation
 
Madison Cat Project Foster Training - Lesson 1
Madison Cat Project Foster Training - Lesson 1Madison Cat Project Foster Training - Lesson 1
Madison Cat Project Foster Training - Lesson 1KelleyWasmund
 
PPT Item # 2 -- Announcements Powerpoint
PPT Item # 2 -- Announcements PowerpointPPT Item # 2 -- Announcements Powerpoint
PPT Item # 2 -- Announcements Powerpointahcitycouncil
 
2024: The FAR, Federal Acquisition Regulations - Part 24
2024: The FAR, Federal Acquisition Regulations - Part 242024: The FAR, Federal Acquisition Regulations - Part 24
2024: The FAR, Federal Acquisition Regulations - Part 24JSchaus & Associates
 
Item # 6 - TBG Partners Landscape Architectural Design Services
Item # 6 - TBG Partners Landscape Architectural Design ServicesItem # 6 - TBG Partners Landscape Architectural Design Services
Item # 6 - TBG Partners Landscape Architectural Design Servicesahcitycouncil
 
ECOSOC YOUTH FORUM 2024 - Side Events Schedule -17 April.
ECOSOC YOUTH FORUM 2024 - Side Events Schedule -17 April.ECOSOC YOUTH FORUM 2024 - Side Events Schedule -17 April.
ECOSOC YOUTH FORUM 2024 - Side Events Schedule -17 April.Christina Parmionova
 
2023 Barangay Officials pre assumption PPT.pptx
2023 Barangay Officials pre assumption PPT.pptx2023 Barangay Officials pre assumption PPT.pptx
2023 Barangay Officials pre assumption PPT.pptxMariaFionaDuranMerqu
 

Último (20)

Item # 1a --- March 25, 2024 CCM Minutes
Item # 1a --- March 25, 2024 CCM MinutesItem # 1a --- March 25, 2024 CCM Minutes
Item # 1a --- March 25, 2024 CCM Minutes
 
Focusing on the rights of women and girls
Focusing on the rights of women and girlsFocusing on the rights of women and girls
Focusing on the rights of women and girls
 
April 7th - World Health Day 2024 - My Health. My Right.
April 7th - World Health Day 2024 - My Health. My Right.April 7th - World Health Day 2024 - My Health. My Right.
April 7th - World Health Day 2024 - My Health. My Right.
 
GOVERNMENT OF NCT OF DELHI DIRECTORATE OF EDUCATION
GOVERNMENT OF NCT OF DELHI DIRECTORATE OF EDUCATIONGOVERNMENT OF NCT OF DELHI DIRECTORATE OF EDUCATION
GOVERNMENT OF NCT OF DELHI DIRECTORATE OF EDUCATION
 
Digital Transformation of the Heritage Sector and its Practical Implications
Digital Transformation of the Heritage Sector and its Practical ImplicationsDigital Transformation of the Heritage Sector and its Practical Implications
Digital Transformation of the Heritage Sector and its Practical Implications
 
Madison Cat Project - Foster Training: Lesson 1
Madison Cat Project - Foster Training: Lesson 1Madison Cat Project - Foster Training: Lesson 1
Madison Cat Project - Foster Training: Lesson 1
 
PPT Item # 4&5 - 415 & 423 Evans Ave. Replat.pdf
PPT Item # 4&5 - 415 & 423 Evans Ave. Replat.pdfPPT Item # 4&5 - 415 & 423 Evans Ave. Replat.pdf
PPT Item # 4&5 - 415 & 423 Evans Ave. Replat.pdf
 
In War and conflict, health workers, facilities and supplies are off limits.
In War and conflict, health workers, facilities and supplies are off limits.In War and conflict, health workers, facilities and supplies are off limits.
In War and conflict, health workers, facilities and supplies are off limits.
 
Health rights correspond to a checklisk.
Health rights correspond to a checklisk.Health rights correspond to a checklisk.
Health rights correspond to a checklisk.
 
PPT Item # 6 - TBG Partners Landscape Architectural Design Services.pdf
PPT Item # 6 - TBG Partners Landscape Architectural Design Services.pdfPPT Item # 6 - TBG Partners Landscape Architectural Design Services.pdf
PPT Item # 6 - TBG Partners Landscape Architectural Design Services.pdf
 
World Health Day theme 2024 is 'My health, my right’.
World Health Day theme 2024 is 'My health, my right’.World Health Day theme 2024 is 'My health, my right’.
World Health Day theme 2024 is 'My health, my right’.
 
2024 ECOSOC YOUTH FORUM -logistical information - United Nations Economic an...
2024 ECOSOC YOUTH FORUM -logistical information -  United Nations Economic an...2024 ECOSOC YOUTH FORUM -logistical information -  United Nations Economic an...
2024 ECOSOC YOUTH FORUM -logistical information - United Nations Economic an...
 
Item # 7 - Demolition & Replacement Structure Processes
Item # 7 - Demolition & Replacement Structure ProcessesItem # 7 - Demolition & Replacement Structure Processes
Item # 7 - Demolition & Replacement Structure Processes
 
ISEIDP in Chikkaballapura, Karnataka, India
ISEIDP in Chikkaballapura, Karnataka, IndiaISEIDP in Chikkaballapura, Karnataka, India
ISEIDP in Chikkaballapura, Karnataka, India
 
Madison Cat Project Foster Training - Lesson 1
Madison Cat Project Foster Training - Lesson 1Madison Cat Project Foster Training - Lesson 1
Madison Cat Project Foster Training - Lesson 1
 
PPT Item # 2 -- Announcements Powerpoint
PPT Item # 2 -- Announcements PowerpointPPT Item # 2 -- Announcements Powerpoint
PPT Item # 2 -- Announcements Powerpoint
 
2024: The FAR, Federal Acquisition Regulations - Part 24
2024: The FAR, Federal Acquisition Regulations - Part 242024: The FAR, Federal Acquisition Regulations - Part 24
2024: The FAR, Federal Acquisition Regulations - Part 24
 
Item # 6 - TBG Partners Landscape Architectural Design Services
Item # 6 - TBG Partners Landscape Architectural Design ServicesItem # 6 - TBG Partners Landscape Architectural Design Services
Item # 6 - TBG Partners Landscape Architectural Design Services
 
ECOSOC YOUTH FORUM 2024 - Side Events Schedule -17 April.
ECOSOC YOUTH FORUM 2024 - Side Events Schedule -17 April.ECOSOC YOUTH FORUM 2024 - Side Events Schedule -17 April.
ECOSOC YOUTH FORUM 2024 - Side Events Schedule -17 April.
 
2023 Barangay Officials pre assumption PPT.pptx
2023 Barangay Officials pre assumption PPT.pptx2023 Barangay Officials pre assumption PPT.pptx
2023 Barangay Officials pre assumption PPT.pptx
 

SmartTrack Presentation - June, 2015

  • 1. SmartTrack: Eglinton Avenue West Corridor Feasibility Review Coordinated Transit Consultation Program Public Information Centre June 13-25, 2015 Transportation Planning Section | City Planning Division
  • 2. Overview of Presentation 1. Coordination of rapid transit studies 2. Relief Line Project Assessment 3. Scarborough Subway Extension Project Assessment 4. GO RER/SmartTrack Background 5. SmartTrack: Eglinton Avenue West Corridor Feasibility Review 2
  • 3. Why are we here? • We are seeking your opinions and comments on the work currently underway. • What we hear will be used to inform our work going forward. • Sharing your thoughts is very important in order for the needs of the community to be reflected in the final review. • The best results will come by more people participating in and contributing to the conversation. We need your input. 3
  • 4. How is Network Transit Planning Coordinated?• Metrolinx, the City and TTC are all working together • Four major transit initiatives are interrelated • Other projects planned or under construction: • Major projects are all interrelated and have a significant impact on the overall transit network – Connections between future projects and connections with existing lines will form the foundation of an improved network • We are currently in the process of undertaking the integrated assessment of these projects through detailed ridership modelling – Work on each project will inform the other analysis 4 ­ GO Regional Express Rail (RER) ­ SmartTrack concept ­ Scarborough Subway Extension ­ Relief Line ­ Finch West LRT ­ Sheppard East LRT ­ Toronto-York Spadina Subway Extension ­ Eglinton Crosstown LRT
  • 5. Public Engagement for Transit Planning Initiatives 5
  • 6. Updated Transportation Model An updated transportation model will help us understand how each project is related. Key features of the GTAModel V4.0 model system include: •Covers the entire GTHA using 2011 TTS for the base data •The model explicitly represents individuals and households •The model considers how a person’s trips fit together instead of considering each trip in individually •Trips are modelled for entire 24-hour week-day time period (using five time periods) •The transit assignment model considers crowding on the system and fares of different paths Critical timelines for modelling work: June 2015 – Draft results of transportation modelling – Report on employment land use modelling July 2015 – Report on transportation modelling results 6
  • 7. Timing 7 Current • Public consultation in June, 2015 on all projects Mid/late Summer • Further analysis and assessment of options for each project • Public consultation on project recommendations in September, 2015 Fall • Report to Council October/November, 2015 on results and public consultations and recommendations for next steps on each project Future Work • Issue Notice of Commencement for Final Project Review in 2016
  • 10. Evaluation Results of Potential Station Locations • 45 potential station locations were identified and evaluated ‒ In Downtown ‒ Connection to the Danforth Subway ‒ Key activity areas, east and west of the Don River • Preliminary evaluation has identified those that best achieve objectives for the project and the communities 10
  • 11. Consultation Relief Line Consultations are focused on: 1. Draft evaluation results for potential station options 2. Potential corridors and their stations Corridor A Broadview to Queen/Richmond Corridor B Pape to Queen/Richmond Corridor C Broadview to King/Wellington Corridor D Pape to King/Wellington • Four potential corridors have been identified for further, more detailed consideration • These corridors have the highest potential to address the results of the station evaluation, the full range of project objectives and city- building criteria • The potential corridors and their stations will be further evaluated to identify a preferred corridor 11
  • 13. Note - All station location and alignment options being considered are located within the study area. Residents across Scarborough and the entire City of Toronto will benefit from transit and transportation network improvements created by the Scarborough Subway Extension Study Area Scarborough Subway Extension 13
  • 14. Scarborough Subway Extension Current Work • Nine potential corridors have been assessed – Preliminary evaluation has identified three best performing • Consultation to-date: – Two public meetings – Stakeholder Advisory Group – Interactive workshop – Online consultation 14
  • 15. Consultation Scarborough Subway Extension Looking for public feedback on: • Existing conditions • Short listed corridors • Preliminary evaluation of corridors • Potential alignments and station locations 15
  • 16. GO Regional Express Rail / SmartTrack 16
  • 17. GO Regional Express Rail (RER) Over the next ten years, Metrolinx will introduce RER including 15- minute, two-way, all-day transit service on most of the seven GO lines (and significant service improvements on the other lines). Across the system, this will mean: • Electrification of several corridors that will reduce travel times by up to 20% and reduce operating costs • Four times the number of train trips outside of rush hour and on weekends • Twice the number of trips during rush hour • Benefits for all 19 existing GO stations in Toronto and the potential for new stations • Infrastructure requirements of 150 kilometres of new, dedicated GO track and dozens of new tunnels and bridges 17
  • 18. GO RER and SmartTrack • SmartTrack builds on RER and the existing GO network – Proposes enhanced service on three existing corridors – Stouffville, Lakeshore East, Kitchener – Proposes a heavy rail corridor connecting Mount Dennis to the Mississauga Airport Corporate Centre • SmartTrack concept features – Service frequency of 15 minutes or better – All stop service in both directions – TTC fare option – Additional stations along the three existing GO corridors – Electrified trains • City Council has directed staff to further evaluate the SmartTrack concept and report back – This includes the Eglinton West Feasibility Review 18
  • 20. SmartTrack Train Technology 20 Zurich S-Bahn Source: http://www.stadlerrail.com/media/uploads/factsheets/KISS_DOSBBRE0810e.pdf Diesel Locomotive Hauled Train Electric Multiple Unit Train Electric Multiple Unit trains accelerate faster and can be split into smaller train sets depending on demand. SmartTrack will use the same trains as GO Transit.
  • 21. Objectives 21 • In February, 2015, City Council directed staff to review the feasibility of SmartTrack options between Mt. Dennis Station and the Mississauga Airport Corporate Centre • The first step is a high-level feasibility review of various options to connect Mount Dennis station to the Mississauga Airport Corporate Centre.
  • 22. Feasibility Review • This feasibility review is only to determine if it is possible to extend heavy rail to the Mississauga Airport Corporate Centre • Feasible solutions will require more thorough study and comprehensive engagement with the community and local councillors • City Council will give direction to staff on next steps in the fall 22
  • 23. Potential Corridors and Conceptual Alignments 23 Three corridor options will be tested for feasibility:  1. A continuous heavy rail spur connection from the Kitchener GO corridor connection by way of Eglinton Avenue West 2. A separate heavy rail corridor along Eglinton Avenue West with a transfer at Mt Dennis 3. A continuous heavy rail spur connection diverging from the existing GO corridor somewhere in the vicinity of Highway 27 into the airport and south to the Mississauga Airport Corporate Centre The approved Environmental Assessment for the western portion of the Eglinton Crosstown LRT will be taken as the base reference case against which other options are evaluated. The LRT plan included potential future access to Pearson Airport.
  • 24. Potential Corridors and Conceptual Alignments 24 1. A continuous heavy rail spur connection from the Kitchener GO corridor connection by way of Eglinton Avenue West
  • 25. Potential Corridors and Conceptual Alignments 25 2. A separate heavy rail corridor along Eglinton Avenue West with a transfer at Mt Dennis
  • 26. Potential Corridors and Conceptual Alignments 26 3. A continuous heavy rail spur connection diverging from the existing GO corridor somewhere in the vicinity of Highway 27 into the airport and south to the Mississauga Airport Corporate Centre
  • 27. Potential Corridors: Continuous Connection - Eglinton 27
  • 28. Potential Corridors: Continuous Connection - Eglinton 28
  • 29. Potential Corridors: Continuous Connection - Eglinton 29
  • 30. Potential Corridors: Continuous Connection - Airport 30
  • 31. Potential Corridors: Continuous Connection - Airport 31
  • 32. Potential Corridors: Continuous Connection - Airport 32
  • 33. Potential Corridors: Separate Service - Eglinton 33
  • 34. Base Reference Case – Eglinton LRT 34
  • 35. Approach to Analysis The feasibility of each alignment will be evaluated from the following perspectives: – Technical (i.e. design and engineering) – Service concept (i.e. ability to integrate with other transit services) – Financial – Regulatory and legislative – Land use 35
  • 36. Feasibility Questions Technical Analysis: •How could the alignments be constructed? •Could they connect to other existing and planned transit lines? •What would the operational constraints be? Service Concept Analysis: •What additional infrastructure would be required for SmartTrack to operate on the alignments? •What would be the implication for other services (GO, VIA, UP Express) if additional infrastructure is not added? Financial Analysis: •What are the estimated costs for constructing, maintaining and operating each of the alignments? 36
  • 37. Feasibility Questions Regulatory and Legislative: •What regulatory requirements would apply to the development and operation of the corridor? •What federal and provincial approvals would be required to construct the alignments? Land-use Analysis: •Would the alignments be compatible with surrounding land uses? •What is the development potential around potential stations? •What impacts could there be on sensitive features? •Is heavy rail appropriate for serving the anticipated ridership considering the surrounding land uses? 37
  • 38. Communications & Outreach The City and TTC are committed to engaging the public in a way that is transparent, collaborative, inclusive and authentic. The City Planning Division is leading the consultations. •Communications activities: – Website – Social media •Consultation and feedback: – Outreach to key community and stakeholder groups as appropriate – Consultation with City of Mississauga – Traditional public meetings in the review area and across Toronto – Online consultation 38
  • 39. Timing Eglinton West Corridor 39 Current • Identify conceptual alignments • Develop broad screening criteria • Public Consultation in June, 2015 Mid/late Summer • Evaluate feasibility of conceptual alignments • Rank draft short list of feasible conceptual alignments • Consultation with City of Mississauga • Public Consultation in September, 2015 Fall • Report to Council on feasible conceptual alignments with recommended option at the same time as reporting on SmartTrack/RER – November, 2015 Future Work (if required) • Final project review (Transit Project Assessment Process) in 2016

Notas del editor

  1. SmartTrack proposes to leverage the Province's commitment to improving regional rail to meet the City's interests in moving residents, reducing gridlock and advancing city building opportunities. SmartTrack builds upon the Province’s RER initiative and proposes a 53 kilometre line utilizing two GO rail corridors and a heavy rail corridor along Eglinton Avenue West to the Mississauga Airport Corporate Centre. The map on the slide shows how SmartTrack overlays with the existing GO network and the TTC. With connections to Mississauga and Markham, SmartTrack is a regional line that proposes 22 station stops, of which 13 are new. 9 GO stations including Union Station form part of the line. There are also 5 interchange points with the TTC included in the plan, and seamless fare and service integration with the TTC network is proposed. The Stouffville/Lakeshore East GO Corridor- shown as line 1 on the map, and the Kitchener GO Corridor – shown as line 2 on the map, form part of the existing GO rail network. The province already has plans for implementing RER on these two corridors as described earlier in this presentation. The Eglinton West Corridor- shown as line 3 on the map, is not part of the GO transit network and heavy rail does not currently operate on the corridor. The proposal for SmartTrack has suggested the project be delivered within 7 years. The work plan described later in this report focuses specifically on the initial planning, review and approval phases of the project that will take place over 2015 and potentially 2016. The SmartTrack plan requires approval from both City Council and the Province, as the line would be delivered and operated on provincially owned GO Transit rail corridors.