This document provides production data for a dyeing section of a factory. It includes daily dyeing production amounts for April broken down by process, as well as monthly finishing production targets and actuals. Overall, dyeing production was 22,974kg on average for April, which was 6.83% higher than the previous month. Finishing production totaled 720,862kg for the month. Machine capacity and production forecasts are also presented to aid in planning.
2. Daily Dyeing Production
Production In 2015
Dyeing Lost Time
Dyeing Plan
Finishing Plan
Buyer Wise Position
Process Wise Contribution
Time Study
Summary
INDEX
DYEING SECTION
Forecast
Daily Finish Production
Alarm
Average Production/Month
3. Daily Dyeing Production (ACTL)
Details ACTL CAL
Total Production 416,976 kg
Average Production 22,974 kg about 6.83% more then last month
0
2000
4000
6000
8000
10000
12000
14000
16000
1-Apr
2-Apr
3-Apr
4-Apr
5-Apr
6-Apr
7-Apr
8-Apr
9-Apr
10-Apr
11-Apr
12-Apr
13-Apr
14-Apr
15-Apr
16-Apr
17-Apr
18-Apr
19-Apr
20-Apr
21-Apr
22-Apr
23-Apr
24-Apr
25-Apr
26-Apr
27-Apr
28-Apr
29-Apr
30-Apr
Daily Dyeing Production (kg)
2 Part Dyeing
Re-Dyeing
Shade cor.
Reprocess
Wash
white
Color
4. Dyeing (CAL)
ACTL CAL
Total Production 272,244 kg
Average Production 9,075 kg about 8.88 % less then last month.
-
2,000
4,000
6,000
8,000
10,000
12,000
14,000
1/Apr
2/Apr
3/Apr
4/Apr
5/Apr
6/Apr
7/Apr
8/Apr
9/Apr
10/Apr
11/Apr
12/Apr
13/Apr
14/Apr
15/Apr
16/Apr
17/Apr
18/Apr
19/Apr
20/Apr
21/Apr
22/Apr
23/Apr
24/Apr
25/Apr
26/Apr
27/Apr
28/Apr
29/Apr
30/Apr
9,359
9,420
8,158
7,485
9,577
7,987
7,724
8,696
9,557
9,200
8,092
8,217
9,241
9,842
7,211
8,200
7,330
8,062
8,584
8,412
9,442
9,952
9,523
9,724
10,094
10,114
10,355
10,203
10,061
12,422