OBRA:
PROPIETARIO: MUNICIPALIDAD PROVINCIAL DE ANGARAES
RECURSOS PROPIOS PROVIAS DESCENTRALIZADO
MODALIDAD DE EJECUCIÓN: CONTRATA
EJECUTA: CONSORCIO UNÑEZ
SUPERVISOR DE OBRA ING. GUERRA A. GUERRA CORONEL
RESIDENTE: ING. GUIDO ROGER HUAYLLAS COSME
METRADO VALOR S/. % METRADO VALOR S/. % METRADO VALOR S/.
%
METRADO VALOR S/.
%
METRADO VALOR S/.
%
METRADO VALOR S/.
%
METRADO VALOR S/. % VALOR S/.
01.00.00
01.01.00 UND 1,00 6.274,96 6.274,96 1,00 6.274,96 100,00% - 0,00 0,00% 0,00 0,00% 0,00 0,00% 0,00 0,00% 0,00 0,00% 1,00 6.274,96 100,00% 6.274,96
01.02.00 GLB 1,00 5.000,00 5.000,00 0,00 0,00% 0,75 3.750,00 75,00% 0,15 750,00 15,00% 0,00 0,00% 0,10 500,00 10,00% 0,00 0,00% 1,00 5.000,00 100,00% 5.000,00
01.03.00 UND 1,00 464,81 464,81 1,00 464,81 100,00% - 0,00 0,00% 0,00 0,00% 0,00 0,00% 0,00 0,00% 0,00 0,00% 1,00 464,81 100,00% 464,81
01.04.00 KM 10,92 568,38 6.206,71 0,00 0,00% 9,28 5.274,57 84,98% 0,00 0,00% 0,00 0,00% 1,64 932,14 15,02% 0,00 0,00% 10,92 6.206,71 100,00% 6.206,71
01.05.00 M3 31,91 28,44 907,52 0,00 0,00 0,00% 31,91 907,52 100,00% 0,00 0,00% 0,00 0,00% 0,00 0,00% 0,00 0,00% 31,91 907,52 100,00% 907,52
02.00.00
02.01.00
02.01.01 M3 13.949,55 4,02 56.077,19 0,00 0,00% 11.770,55 47.317,61 84,38% - 0,00 0,00% 0,00 0,00% 2.179,00 8.759,58 15,62% 0,00 0,00% 13.949,55 56.077,19 100,00% 56.077,19
02.02.00
02.02.01 M3 1.484,00 18,75 27.825,00 0,00 0,00% 1.318,09 24.714,19 88,82% 165,91 3.110,81 11,18% 0,00 0,00% 0,00 0,00% - 0,00 0,00% 1.484,00 27.825,00 100,00% 27.825,00
02.02.02 M3 1.060,00 4,20 4.452,00 0,00 0,00% 941,49 3.954,26 88,82% 118,51 497,74 11,18% 0,00 0,00% 0,00 0,00% - 0,00 0,00% 1.060,00 4.452,00 100,00% 4.452,00
02.03.00
02.03.01 M3 790,19 26,39 20.853,11 0,00 0,00% 698,45 18.432,10 88,39% 91,74 2.421,02 11,61% 0,00 0,00% 0,00 0,00% - 0,00 0,00% 790,19 20.853,11 100,00% 20.853,11
02.03.02 M3 564,42 4,48 2.528,60 0,00 0,00% 498,89 2.235,03 88,39% 65,53 293,57 11,61% 0,00 0,00% 0,00 0,00% - 0,00 0,00% 564,42 2.528,60 100,00% 2.528,60
02.04.00
02.04.01 M3 2.936,22 5,16 15.150,90 0,00 0,00% 2.638,59 13.615,12 89,86% 297,63 1.535,77 10,14% 0,00 0,00% 0,00 0,00% - 0,00 0,00% 2.936,22 15.150,89 100,00% 15.150,89
02.04.02 M2 43.697,96 1,22 53.311,51 0,00 0,00% 39.305,16 47.952,30 89,95% - 0,00 0,00% 0,00 0,00% 2.354,36 2.872,32 5,39% 2.038,44 2.486,90 4,66% 43.697,96 53.311,52 100,00% 53.311,52
02.05.00
02.05.01 M3 9.478,02 4,57 43.314,55 0,00 0,00% 8.046,31 36.771,64 84,89% - 0,00 0,00% 0,00 0,00% 0,00 0,00% 1.431,71 6.542,91 15,11% 9.478,02 43.314,55 100,00% 43.314,55
03.00.00
03.01.00 M3 8.369,73 10,26 85.873,43 0,00 0,00% 1.693,94 17.379,82 20,24% 0,00 0,00% 6.357,45 65.227,44 75,96% 318,34 3.266,17 3,80% 0,00 0,00% 8.369,73 85.873,43 100,00% 85.873,43
03.02.00 M3 8.369,73 3,53 29.545,15 0,00 0,00% 1.275,45 4.502,34 15,24% 0,00 0,00% 4.975,31 17.562,84 59,44% 2.118,97 7.479,96 25,32% 0,00 0,00% 8.369,73 29.545,15 100,00% 29.545,15
03.03.00 M3 8.369,73 2,26 18.915,59 0,00 0,00% 0,00 0,00% 0,00 0,00% 5.631,99 12.728,30 67,29% 2.737,74 6.187,29 32,71% 0,00 0,00% 8.369,73 18.915,59 100,00% 18.915,59
03.04.00 M3 8.369,73 4,78 40.007,31 0,00 0,00% 0,00 0,00% 0,00 0,00% 5.598,51 26.760,88 66,89% 2.771,22 13.246,43 33,11% 0,00 0,00% 8.369,73 40.007,31 100,00% 40.007,31
03.05.00 M2 42.921,69 1,82 78.117,48 0,00 0,00% 0,00 0,00% 0,00 0,00% 28.208,13 51.338,80 65,72% 14.713,56 26.778,68 34,28% 0,00 0,00% 42.921,69 78.117,48 100,00% 78.117,48
04.00.00
04.01.00 KM 21,85 755,46 16.506,80 0,00 0,00% 0,00 0,00% 0,00 0,00% 12,01 9.073,07 54,97% 9,84 7.433,73 45,03% 0,00 0,00% 21,85 16.506,80 100,00% 16.506,80
05.00.00
05.01.00
05.01.01
05.01.01.01 M2 553,28 1,46 807,79 0,00 0,00% 553,28 807,79 100,00% 0,00 0,00% 0,00 0,00% 0,00 0,00% 0,00 0,00% 553,28 807,79 100,00% 807,79
05.01.01.02 M2 553,28 2,13 1.178,49 0,00 0,00% 553,28 1.178,49 100,00% 0,00 0,00% 0,00 0,00% 0,00 0,00% 0,00 0,00% 553,28 1.178,49 100,00% 1.178,49
05.01.02
05.01.02.01 M3 1.833,94 2,62 4.804,92 0,00 0,00% 1.833,94 4.804,92 100,00% 0,00 0,00% 0,00 0,00% 0,00 0,00% 0,00 0,00% 1.833,94 4.804,92 100,00% 4.804,92
05.01.02.02 M3 239,90 21,65 5.193,84 0,00 0,00% 239,90 5.193,84 100,00% 0,00 0,00% 0,00 0,00% 0,00 0,00% 0,00 0,00% 239,90 5.193,84 100,00% 5.193,84
05.01.02.03 M3 1.833,94 4,43 8.124,35 0,00 0,00% 1.833,94 8.124,35 100,00% 0,00 0,00% 0,00 0,00% 0,00 0,00% 0,00 0,00% 1.833,94 8.124,35 100,00% 8.124,35
05.01.02.04 M3 34,86 156,13 5.442,69 0,00 0,00% 34,86 5.442,69 100,00% 0,00 0,00% 0,00 0,00% 0,00 0,00% 0,00 0,00% 34,86 5.442,69 100,00% 5.442,69
05.01.03
05.01.03.01 M3 123,17 374,33 46.106,23 0,00 0,00% 30,55 11.435,78 24,80% 92,25 34.531,94 74,90% 0,00 0,00% 0,37 138,50 0,30% 0,00 0,00% 123,17 46.106,23 100,00% 46.106,23
05.01.03.02 M2 71,37 32,96 2.352,36 0,00 0,00% 17,70 583,39 24,80% 51,27 1.689,86 71,84% 0,00 0,00% 2,40 79,10 3,36% 0,00 0,00% 71,37 2.352,36 100,00% 2.352,36
05.01.03.03 M3 17,68 286,36 5.062,84 0,00 0,00% 0,00 0,00% 5,31 1.520,57 30,03% 0,00 0,00% 12,37 3.542,27 69,97% 0,00 0,00% 17,68 5.062,84 100,00% 5.062,84
05.01.04
05.01.04.01 M3 100,18 449,20 45.000,86 0,00 0,00% 25,15 11.297,38 25,10% 70,34 31.596,73 70,21% 0,00 0,00% 4,69 2.106,75 4,68% 0,00 0,00% 100,18 45.000,86 100,00% 45.000,86
05.01.04.02 M2 500,92 32,96 16.510,32 0,00 0,00% 125,75 4.144,72 25,10% 352,24 11.609,83 70,32% 0,00 0,00% 22,93 755,77 4,58% 0,00 0,00% 500,92 16.510,32 100,00% 16.510,32
05.01.04.03 M3 2.874,39 6,37 18.309,86 0,00 0,00% 1.407,01 8.962,65 48,95% 1.324,52 8.437,19 46,08% 0,00 0,00% 142,86 910,02 4,97% 0,00 0,00% 2.874,39 18.309,86 100,00% 18.309,86
TRANSPORTE DE MATERIALES DE LASTRADO DM=2.56KM
AFIRMADO BASE GRANULAR (E=15CM)
ACERO DE REFUERZO FY=4200 KG/CM2
TRAZO Y REPLANTEO
CONFORMACION DE TERRAPLENES CON MATERIAL PROPIO
PERFILADO Y COMPACTACION DE LA SUB RASANTE EN ZONAS DE CORTE
EXTRACCION Y APILAMIENTO CON MAQUINARIA EN CANTERA
ZARANDEO
CARGUIO CON MAQUINARIA DE MATERIAL DE LASTRADO
PAVIMENTOS
CORTE EN ROCA FIJA
CORTE EN ROCA FIJA (PÉRFORACION Y DISPARO)
LIMPIEZA DE PLANTAFORMA Y DESQUINCHE DE TALUD EN ROCA FIJA
CONFORMACION DE TERRAPLENES O RELLENOS
CORTE DE MATERIAL SUELTO
CORTE EN MATERIAL SUELTO CON MAQUINARIA (INC. PEINADO DE TALUD)
CORTE EN ROCA SUELTA (PÉRFORACION Y DISPARO)
LIMPIEZA DE PLANTAFORMA Y DESQUINCHE DE TALUD EN ROCA SUELTA
CORTE EN ROCA SUELTA
LIQUIDACION DE OBRA
VALORIZACION Nº 3 TOTAL ACUMULADO
PRESUPUESTO EJECUTADO
PRESUP.
VALORIZACION Nº 2
P.UNIT.
VALORIZACION Nº1
CONTROL
CAMPAMENTO PROVISIONALES DE LA OBRA DE 8M X 10M
MOVILIZACION Y DESMOVILIZACION
ELIMINACION DE MATERIAL EXCEDENTE (CARGUIO) DM=0.85KM
ELIMINACION DE MATERIAL EXCEDENTE
VALORIZACION Nº 5
CARTEL DE IDENTIFICACION DE OBRA 3.60 m X 7.20 m.
TRAZO Y REPLANTEO DURANTE LA EJECUCION
DEMOLICION DE ALCANTARILLAS EXISTENTES
MOVIMIENTO DE TIERRAS
EXCAVACION PARA ESTRUCTURAS (MANUAL)
RELLENO CON MATERIAL PROPIO
CONCRETO F´C=210KG/CM2 (LOSA TAPA)
VALORIZACION Nº 4 VALORIZACION Nº 6
CUNETAS
CONFORMACION DE CUNETAS
RELLENO CON MATERIAL GRANULAR
LIMPIEZA DE TERRENO MANUAL
ALCANTARILLAS L=4.20M (28 UND)
OBRAS DE ARTE
TRABAJOS PRELIMINARES
ELIMINACION DE MATERIAL EXCEDENTE D MAX=30M
OBRAS DE CONCRETO SIMPLE
CONCRETO CICLOPIO FC=175KG/CM2+30%PM-ESTRIBOS Y ALETAS
ENCONFRADO Y DESENCOFRADO DE ESTRIBOS Y ALERO
EMBOQUILLADO DE PIEDRA CON MORTERO
OBRAS DE CONCRETO ARMADO
ITEM DESCRIPCIÓN
PRESUPUESTO OFERTADO
UND METRADO
ENCOFRADO Y DESENCOFRADO
OBRAS PRELIMINARES
TRABAJOS PRELIMINARES
“MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD DEL CAMINO VECINAL TRAMO: SANTA ELENA – PITIMPATA – PATAPATA – LLUMCHI, DISTRITO DE LIRCAY, PROVINCIA DE ANGARAES - HUANCAVELICA”
OBRA:
PROPIETARIO: MUNICIPALIDAD PROVINCIAL DE ANGARAES
RECURSOS PROPIOS PROVIAS DESCENTRALIZADO
MODALIDAD DE EJECUCIÓN: CONTRATA
EJECUTA: CONSORCIO UNÑEZ
SUPERVISOR DE OBRA ING. GUERRA A. GUERRA CORONEL
RESIDENTE: ING. GUIDO ROGER HUAYLLAS COSME
METRADO VALOR S/. % METRADO VALOR S/. % METRADO VALOR S/.
%
METRADO VALOR S/.
%
METRADO VALOR S/.
%
METRADO VALOR S/.
%
METRADO VALOR S/. % VALOR S/.
LIQUIDACION DE OBRA
VALORIZACION Nº 3 TOTAL ACUMULADO
PRESUPUESTO EJECUTADO
PRESUP.
VALORIZACION Nº 2
P.UNIT.
VALORIZACION Nº1
CONTROL
VALORIZACION Nº 5
VALORIZACION Nº 4 VALORIZACION Nº 6
ITEM DESCRIPCIÓN
PRESUPUESTO OFERTADO
UND METRADO
OBRAS PRELIMINARES
“MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD DEL CAMINO VECINAL TRAMO: SANTA ELENA – PITIMPATA – PATAPATA – LLUMCHI, DISTRITO DE LIRCAY, PROVINCIA DE ANGARAES - HUANCAVELICA”
05.01.05
05.01.05.01 M 123,20 461,25 56.826,00 0,00 0,00% 123,20 56.826,00 100,00% 0,00 0,00% 0,00 0,00% 0,00 0,00% 0,00 0,00% 123,20 56.826,00 100,00% 56.826,00
05.01.06
05.01.06.01 M2 500,92 11,66 5.840,73 0,00 0,00% 0,00 0,00% 450,67 5.254,81 89,97% 0,00 0,00% 50,25 585,92 10,03% 0,00 0,00% 500,92 5.840,73 100,00% 5.840,73
05.01.06.02 M2 174,29 284,89 49.653,48 0,00 0,00% 0,00 0,00% 110,84 31.577,21 63,60% 0,00 0,00% 63,45 18.076,27 36,40% 0,00 0,00% 174,29 49.653,48 100,00% 49.653,48
05.01.07
05.01.07.01 M2 500,92 25,11 12.578,10 0,00 0,00% 0,00 0,00% 0,00 0,00% 0,00 0,00% 500,92 12.578,10 100,00% 0,00 0,00% 500,92 12.578,10 100,00% 12.578,10
05.02.00
05.02.01
05.02.01.01 M2 111,72 1,46 163,11 0,00 0,00% 0,00 0,00% 0,00 0,00% 0,00 0,00% 0,00 0,00% 111,72 163,11 100,00% 111,72 163,11 100,00% 163,11
05.02.01.02 M2 111,72 18,09 2.021,01 0,00 0,00% 0,00 0,00% 0,00 0,00% 0,00 0,00% 0,00 0,00% 111,72 2.021,01 100,00% 111,72 2.021,01 100,00% 2.021,01
05.02.02
05.02.02.01 M3 45,66 2,62 119,63 0,00 0,00% 0,00 0,00% 0,00 0,00% 0,00 0,00% 0,00 0,00% 45,66 119,63 100,00% 45,66 119,63 100,00% 119,63
05.02.02.02 M3 2,84 21,65 61,49 0,00 0,00% 0,00 0,00% 0,00 0,00% 0,00 0,00% 0,00 0,00% 2,84 61,49 100,00% 2,84 61,49 100,00% 61,49
05.02.02.03 M3 57,07 4,43 252,82 0,00 0,00% 0,00 0,00% 0,00 0,00% 0,00 0,00% 0,00 0,00% 57,07 252,82 100,00% 57,07 252,82 100,00% 252,82
05.02.03
05.02.03.01 M2 51,64 29,69 1.533,19 0,00 0,00% 0,00 0,00% 0,00 0,00% 0,00 0,00% 0,00 0,00% 51,64 1.533,19 100,00% 51,64 1.533,19 100,00% 1.533,19
05.02.03.02 M3 10,09 286,36 2.889,37 0,00 0,00% 0,00 0,00% 0,00 0,00% 0,00 0,00% 0,00 0,00% 10,09 2.889,37 100,00% 10,09 2.889,37 100,00% 2.889,37
05.02.03.03 M3 26,56 431,28 11.454,80 0,00 0,00% 0,00 0,00% 0,00 0,00% 0,00 0,00% 0,00 0,00% 26,56 11.454,80 100,00% 26,56 11.454,80 100,00% 11.454,80
05.02.03.04 M2 75,03 32,96 2.472,99 0,00 0,00% 0,00 0,00% 0,00 0,00% 0,00 0,00% 0,00 0,00% 75,03 2.472,99 100,00% 75,03 2.472,99 100,00% 2.472,99
05.02.04
05.02.04.01 M2 35,88 20,77 745,23 0,00 0,00% 0,00 0,00% 0,00 0,00% 0,00 0,00% 0,00 0,00% 35,88 745,23 100,00% 35,88 745,23 100,00% 745,23
06.00.00
06.01.00 UND 2,00 400,00 800,00 0,00 0,00% 2,00 800,00 100,00% 0,00 0,00% 0,00 0,00% 0,00 0,00% 0,00 0,00% 2,00 800,00 100,00% 800,00
06.02.00 UND 28,00 25,80 722,40 0,00 0,00% 0,00 0,00% 0,00 0,00% 0,00 0,00% 0,00 0,00% 28,00 722,40 100,00% 28,00 722,40 100,00% 722,40
06.03.00 UND 44,00 80,00 3.520,00 0,00 0,00% 0,00 0,00% 0,00 0,00% 0,00 0,00% 0,00 0,00% 44,00 3.520,00 100,00% 44,00 3.520,00 100,00% 3.520,00
07.00.00
07.01.00 GLB 1,00 1.000,00 1.000,00 0,00 0,00% 1,00 1.000,00 100,00% 0,00 0,00% 0,00 0,00% 0,00 0,00% 0,00 0,00% 1,00 1.000,00 100,00% 1.000,00
07.02.00 GLB 1,00 2.597,50 2.597,50 0,00 0,00% 1,00 2.597,50 100,00% 0,00 0,00% 0,00 0,00% 0,00 0,00% 0,00 0,00% 1,00 2.597,50 100,00% 2.597,50
08.00.00
08.01.00 GLB 1,00 14.000,00 14.000,00 0,00 0,00% 0,00 0,00% 0,00 0,00% 0,00 0,00% 0,00 0,00% 1,00 14.000,00 100,00% 1,00 14.000,00 100,00% 14.000,00
09.00.00
09.01.00 UND 14,00 153,98 2.155,72 0,00 0,00% 0,00 0,00% 0,00 0,00% 0,00 0,00% 14,00 2.155,72 100,00% 0,00 0,00% 14,00 2.155,72 100,00% 2.155,72
09.02.00 UND 5,00 645,48 3.227,40 0,00 0,00% 0,00 0,00% 0,00 0,00% 0,00 0,00% 5,00 3.227,40 100,00% 0,00 0,00% 5,00 3.227,40 100,00% 3.227,40
09.03.00 UND 37,00 418,76 15.494,12 0,00 0,00% 0,00 0,00% 0,00 0,00% 0,00 0,00% 37,00 15.494,12 100,00% 0,00 0,00% 37,00 15.494,12 100,00% 15.494,12
10.00.00
10.01.00 M2 1.925,00 6,17 11.877,25 0,00 0,00% 1.606,25 9.910,56 83,44% 0,00 0,00% 0,00 0,00% 0,00 0,00% 318,75 1.966,69 16,56% 1.925,00 11.877,25 100,00% 11.877,25
10.02.00 M2 400,00 2,98 1.192,00 0,00 0,00% 175,00 521,50 43,75% 0,00 0,00% 0,00 0,00% 0,00 0,00% 225,00 670,50 56,25% 400,00 1.192,00 100,00% 1.192,00
10.03.00 M2 1.925,00 2,20 4.235,00 0,00 0,00% - 0,00 0,00% 0,00 0,00% 0,00 0,00% 0,00 0,00% 1.925,00 4.235,00 100,00% 1.925,00 4.235,00 100,00% 4.235,00
11.00.00
11.01.00 GLB 1,00 4.876,04 4.876,04 0,00 0,00% 0,00 0,00% 0,00 0,00% 0,00 0,00% 0,00 0,00 0,00% 1,00 4.876,04 100,00% 1,00 4.876,04 100,00% 4.876,04
A 882.536,55 6.739,77 360.438,06 134.827,05 182.691,33 137.106,24 60.734,08 882.536,53 882.536,55 100,00% 882.536,55
B 36.272,24 277,00 14.814,00 5.541,39 7.508,61 5.635,07 2.496,17 36.272,24 36.272,24 36.272,24
C 22.945,95 175,23 9.371,39 3.505,50 4.749,97 3.564,76 1.579,09 22.945,94 22.945,95 22.945,95
D=(A+B+C) 941.754,74 7.192,00 384.623,45 143.873,94 194.949,91 146.306,07 64.809,34 941.754,71 941.754,74 941.754,74
E=(Dx0.18) 169.515,85 1.294,56 69.232,22 25.897,31 35.090,98 26.335,09 11.665,68 169.515,84 169.515,85 169.515,85
F=(D+E) 1.111.270,59 8.486,56 453.855,67 169.771,25 230.040,89 172.641,16 76.475,02 1.111.270,55 1.111.270,59 1.111.270,59
100,00% 0,76% 40,84% 15,28% 20,70% 15,54% 6,88% 1,0000 100,00% 100,00%
FLETE TERRESTRE
FLETE DE EXPLOSIVOS Y CUSTODIA POLICIAL
TRAMITES Y PERMISOS
DISEÑO DE MEZCLA DE CONCRETO
ROTURA DE TESTIGOS DE CONCRETO
ENSAYOS DE DENSIDAD DE CAMPO
FLETE DE MATERIALES
TRABAJOS PRELIMINARES
ENCOFRADO Y DESENCOFRADO
REVOQUES Y ENLUCIDOS
SOLADO DE CONCRETO 1:10 E=10CM
EMBOQUILLADO DE PIEDRA CON MORTERO
CONCRETO F´C=175 KG/CM+30%PM INCL. FROTACHADO
EXCAVACION PARA ESTRUCTURAS (MANUAL)
TARRAJEO EXTERIORES C/MORTERO 1;5 X 1,5CM
ALIVIADERO Y EMBOQUILLADO DE PIEDRA MORTERO 1:4,C:H
PINTURA
PINTURA EN ALCANTARILLAS
TUBERIA DE METAL CORRUGADO
TUBERIA DE METAL CORRUGADO D=48¨, E=2.5MM
MOVIMIENTO DE TIERRAS
BADENES L=6.45M (02UND)
REVOQUES Y ENLUCIDOS
CAPACITACION AL PERSONAL
OPERACIÓN Y MANTENIMIENTO DE LA INFRAESTRUCTURA
EQUIPAMIENTO Y SEÑALIZACION VIAL
ELIMINACION DE MATERIAL EXCEDENTE D MAX=30M
OBRAS DE CONCRETO SIMPLE
IGV ( 18% )
TOTAL PRESUPUESTO OFERTADO
RELLENO CON MATERIAL PROPIO
TRATAMIENTO DE CAMPAMENTO
POSTES KILOMETRICOS DE 20X15X100
SEÑALIZACION INFORMATIVA
SEÑALIZACION PREVENTIVA
TARRAJEO CON IMPERMEABILIZANTE, MEZCLA 1:1, E1,5
CONTROL DE CALIDAD
MONITOREO ARQUEOLOGICO Y PMA
REVEGETACION DE CANTERAS
MITIGACION AMBIENTAL
ACONDICIONAMIENTO DE BOTADEROS
LIMPIEZA DE TERRENO MANUAL
TRAZO Y REPLANTEO PRELIMINAR
PORCENTAJE DE AVANCE FISICO (%)
COSTO DIRECTO:
GASTOS GENERALES ( 4.109999%)
UTILIDAD ( 10% )
SUB TOTAL

More Related Content

Similar to CALCULO DE LIQUIDACION DE OBRA POR CONTRATA.pdf

Costo referencial de posecion y operacion
Costo referencial de posecion y operacionCosto referencial de posecion y operacion
Costo referencial de posecion y operacionDeyvis Ubaldo
 
De assignment-finalized-28112017 4
De assignment-finalized-28112017 4De assignment-finalized-28112017 4
De assignment-finalized-28112017 4Arthur Wilson
 
The travertine at portico unit price list effective as of january 2017
The travertine at portico unit price list effective as of january 2017The travertine at portico unit price list effective as of january 2017
The travertine at portico unit price list effective as of january 2017Jhoi Jimenez
 
Renewable energy transmission [CSTP 2009]
Renewable energy transmission [CSTP 2009]Renewable energy transmission [CSTP 2009]
Renewable energy transmission [CSTP 2009]Smithers Apex
 
Seville Housing Market Summer 2010
Seville Housing Market Summer 2010Seville Housing Market Summer 2010
Seville Housing Market Summer 2010Ken Schmidt
 
Seville market summer 2010
Seville market summer 2010Seville market summer 2010
Seville market summer 2010Ken Schmidt
 
2000 BMW Z3 - M Roadster - Z3 - M Coupe Electrical Troubleshooting Manual.pdf
2000 BMW Z3 - M Roadster - Z3 - M Coupe Electrical Troubleshooting Manual.pdf2000 BMW Z3 - M Roadster - Z3 - M Coupe Electrical Troubleshooting Manual.pdf
2000 BMW Z3 - M Roadster - Z3 - M Coupe Electrical Troubleshooting Manual.pdfjuliovicencio5
 
01 cronograma valorizado
01 cronograma valorizado01 cronograma valorizado
01 cronograma valorizadoJIMMY PANDURO
 

Similar to CALCULO DE LIQUIDACION DE OBRA POR CONTRATA.pdf (19)

Practica 6
Practica 6Practica 6
Practica 6
 
valores fgts
valores fgtsvalores fgts
valores fgts
 
Costo referencial de posecion y operacion
Costo referencial de posecion y operacionCosto referencial de posecion y operacion
Costo referencial de posecion y operacion
 
De assignment-finalized-28112017 4
De assignment-finalized-28112017 4De assignment-finalized-28112017 4
De assignment-finalized-28112017 4
 
Cronograma valorizado saldo cutervo
Cronograma valorizado saldo cutervoCronograma valorizado saldo cutervo
Cronograma valorizado saldo cutervo
 
Pass Thru Pay
Pass Thru PayPass Thru Pay
Pass Thru Pay
 
Estructuras METRADO
Estructuras METRADOEstructuras METRADO
Estructuras METRADO
 
The travertine at portico unit price list effective as of january 2017
The travertine at portico unit price list effective as of january 2017The travertine at portico unit price list effective as of january 2017
The travertine at portico unit price list effective as of january 2017
 
Renewable energy transmission [CSTP 2009]
Renewable energy transmission [CSTP 2009]Renewable energy transmission [CSTP 2009]
Renewable energy transmission [CSTP 2009]
 
Seville Housing Market Summer 2010
Seville Housing Market Summer 2010Seville Housing Market Summer 2010
Seville Housing Market Summer 2010
 
Seville market summer 2010
Seville market summer 2010Seville market summer 2010
Seville market summer 2010
 
Z distribution
Z distribution Z distribution
Z distribution
 
2000 BMW Z3 - M Roadster - Z3 - M Coupe Electrical Troubleshooting Manual.pdf
2000 BMW Z3 - M Roadster - Z3 - M Coupe Electrical Troubleshooting Manual.pdf2000 BMW Z3 - M Roadster - Z3 - M Coupe Electrical Troubleshooting Manual.pdf
2000 BMW Z3 - M Roadster - Z3 - M Coupe Electrical Troubleshooting Manual.pdf
 
INGRESOS DE LA POLICIA NACIONAL DEL PERU
INGRESOS DE LA POLICIA NACIONAL DEL PERUINGRESOS DE LA POLICIA NACIONAL DEL PERU
INGRESOS DE LA POLICIA NACIONAL DEL PERU
 
Informe final riegos i
Informe final riegos iInforme final riegos i
Informe final riegos i
 
Equipo
EquipoEquipo
Equipo
 
01 cronograma valorizado
01 cronograma valorizado01 cronograma valorizado
01 cronograma valorizado
 
P33TotalNal.pdf
P33TotalNal.pdfP33TotalNal.pdf
P33TotalNal.pdf
 
P33TotalNal.pdf
P33TotalNal.pdfP33TotalNal.pdf
P33TotalNal.pdf
 

Recently uploaded

ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfKamal Acharya
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Bookingdharasingh5698
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...ranjana rawat
 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduitsrknatarajan
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingrakeshbaidya232001
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Dr.Costas Sachpazis
 
Glass Ceramics: Processing and Properties
Glass Ceramics: Processing and PropertiesGlass Ceramics: Processing and Properties
Glass Ceramics: Processing and PropertiesPrabhanshu Chaturvedi
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordAsst.prof M.Gokilavani
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
Online banking management system project.pdf
Online banking management system project.pdfOnline banking management system project.pdf
Online banking management system project.pdfKamal Acharya
 
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingrknatarajan
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxupamatechverse
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)simmis5
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINESIVASHANKAR N
 
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptxBSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptxfenichawla
 
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...ranjana rawat
 

Recently uploaded (20)

ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
 
Roadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and RoutesRoadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and Routes
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduits
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writing
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
 
Glass Ceramics: Processing and Properties
Glass Ceramics: Processing and PropertiesGlass Ceramics: Processing and Properties
Glass Ceramics: Processing and Properties
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
 
Online banking management system project.pdf
Online banking management system project.pdfOnline banking management system project.pdf
Online banking management system project.pdf
 
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptx
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)
 
Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
 
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptxBSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
 
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
 

CALCULO DE LIQUIDACION DE OBRA POR CONTRATA.pdf

  • 1. OBRA: PROPIETARIO: MUNICIPALIDAD PROVINCIAL DE ANGARAES RECURSOS PROPIOS PROVIAS DESCENTRALIZADO MODALIDAD DE EJECUCIÓN: CONTRATA EJECUTA: CONSORCIO UNÑEZ SUPERVISOR DE OBRA ING. GUERRA A. GUERRA CORONEL RESIDENTE: ING. GUIDO ROGER HUAYLLAS COSME METRADO VALOR S/. % METRADO VALOR S/. % METRADO VALOR S/. % METRADO VALOR S/. % METRADO VALOR S/. % METRADO VALOR S/. % METRADO VALOR S/. % VALOR S/. 01.00.00 01.01.00 UND 1,00 6.274,96 6.274,96 1,00 6.274,96 100,00% - 0,00 0,00% 0,00 0,00% 0,00 0,00% 0,00 0,00% 0,00 0,00% 1,00 6.274,96 100,00% 6.274,96 01.02.00 GLB 1,00 5.000,00 5.000,00 0,00 0,00% 0,75 3.750,00 75,00% 0,15 750,00 15,00% 0,00 0,00% 0,10 500,00 10,00% 0,00 0,00% 1,00 5.000,00 100,00% 5.000,00 01.03.00 UND 1,00 464,81 464,81 1,00 464,81 100,00% - 0,00 0,00% 0,00 0,00% 0,00 0,00% 0,00 0,00% 0,00 0,00% 1,00 464,81 100,00% 464,81 01.04.00 KM 10,92 568,38 6.206,71 0,00 0,00% 9,28 5.274,57 84,98% 0,00 0,00% 0,00 0,00% 1,64 932,14 15,02% 0,00 0,00% 10,92 6.206,71 100,00% 6.206,71 01.05.00 M3 31,91 28,44 907,52 0,00 0,00 0,00% 31,91 907,52 100,00% 0,00 0,00% 0,00 0,00% 0,00 0,00% 0,00 0,00% 31,91 907,52 100,00% 907,52 02.00.00 02.01.00 02.01.01 M3 13.949,55 4,02 56.077,19 0,00 0,00% 11.770,55 47.317,61 84,38% - 0,00 0,00% 0,00 0,00% 2.179,00 8.759,58 15,62% 0,00 0,00% 13.949,55 56.077,19 100,00% 56.077,19 02.02.00 02.02.01 M3 1.484,00 18,75 27.825,00 0,00 0,00% 1.318,09 24.714,19 88,82% 165,91 3.110,81 11,18% 0,00 0,00% 0,00 0,00% - 0,00 0,00% 1.484,00 27.825,00 100,00% 27.825,00 02.02.02 M3 1.060,00 4,20 4.452,00 0,00 0,00% 941,49 3.954,26 88,82% 118,51 497,74 11,18% 0,00 0,00% 0,00 0,00% - 0,00 0,00% 1.060,00 4.452,00 100,00% 4.452,00 02.03.00 02.03.01 M3 790,19 26,39 20.853,11 0,00 0,00% 698,45 18.432,10 88,39% 91,74 2.421,02 11,61% 0,00 0,00% 0,00 0,00% - 0,00 0,00% 790,19 20.853,11 100,00% 20.853,11 02.03.02 M3 564,42 4,48 2.528,60 0,00 0,00% 498,89 2.235,03 88,39% 65,53 293,57 11,61% 0,00 0,00% 0,00 0,00% - 0,00 0,00% 564,42 2.528,60 100,00% 2.528,60 02.04.00 02.04.01 M3 2.936,22 5,16 15.150,90 0,00 0,00% 2.638,59 13.615,12 89,86% 297,63 1.535,77 10,14% 0,00 0,00% 0,00 0,00% - 0,00 0,00% 2.936,22 15.150,89 100,00% 15.150,89 02.04.02 M2 43.697,96 1,22 53.311,51 0,00 0,00% 39.305,16 47.952,30 89,95% - 0,00 0,00% 0,00 0,00% 2.354,36 2.872,32 5,39% 2.038,44 2.486,90 4,66% 43.697,96 53.311,52 100,00% 53.311,52 02.05.00 02.05.01 M3 9.478,02 4,57 43.314,55 0,00 0,00% 8.046,31 36.771,64 84,89% - 0,00 0,00% 0,00 0,00% 0,00 0,00% 1.431,71 6.542,91 15,11% 9.478,02 43.314,55 100,00% 43.314,55 03.00.00 03.01.00 M3 8.369,73 10,26 85.873,43 0,00 0,00% 1.693,94 17.379,82 20,24% 0,00 0,00% 6.357,45 65.227,44 75,96% 318,34 3.266,17 3,80% 0,00 0,00% 8.369,73 85.873,43 100,00% 85.873,43 03.02.00 M3 8.369,73 3,53 29.545,15 0,00 0,00% 1.275,45 4.502,34 15,24% 0,00 0,00% 4.975,31 17.562,84 59,44% 2.118,97 7.479,96 25,32% 0,00 0,00% 8.369,73 29.545,15 100,00% 29.545,15 03.03.00 M3 8.369,73 2,26 18.915,59 0,00 0,00% 0,00 0,00% 0,00 0,00% 5.631,99 12.728,30 67,29% 2.737,74 6.187,29 32,71% 0,00 0,00% 8.369,73 18.915,59 100,00% 18.915,59 03.04.00 M3 8.369,73 4,78 40.007,31 0,00 0,00% 0,00 0,00% 0,00 0,00% 5.598,51 26.760,88 66,89% 2.771,22 13.246,43 33,11% 0,00 0,00% 8.369,73 40.007,31 100,00% 40.007,31 03.05.00 M2 42.921,69 1,82 78.117,48 0,00 0,00% 0,00 0,00% 0,00 0,00% 28.208,13 51.338,80 65,72% 14.713,56 26.778,68 34,28% 0,00 0,00% 42.921,69 78.117,48 100,00% 78.117,48 04.00.00 04.01.00 KM 21,85 755,46 16.506,80 0,00 0,00% 0,00 0,00% 0,00 0,00% 12,01 9.073,07 54,97% 9,84 7.433,73 45,03% 0,00 0,00% 21,85 16.506,80 100,00% 16.506,80 05.00.00 05.01.00 05.01.01 05.01.01.01 M2 553,28 1,46 807,79 0,00 0,00% 553,28 807,79 100,00% 0,00 0,00% 0,00 0,00% 0,00 0,00% 0,00 0,00% 553,28 807,79 100,00% 807,79 05.01.01.02 M2 553,28 2,13 1.178,49 0,00 0,00% 553,28 1.178,49 100,00% 0,00 0,00% 0,00 0,00% 0,00 0,00% 0,00 0,00% 553,28 1.178,49 100,00% 1.178,49 05.01.02 05.01.02.01 M3 1.833,94 2,62 4.804,92 0,00 0,00% 1.833,94 4.804,92 100,00% 0,00 0,00% 0,00 0,00% 0,00 0,00% 0,00 0,00% 1.833,94 4.804,92 100,00% 4.804,92 05.01.02.02 M3 239,90 21,65 5.193,84 0,00 0,00% 239,90 5.193,84 100,00% 0,00 0,00% 0,00 0,00% 0,00 0,00% 0,00 0,00% 239,90 5.193,84 100,00% 5.193,84 05.01.02.03 M3 1.833,94 4,43 8.124,35 0,00 0,00% 1.833,94 8.124,35 100,00% 0,00 0,00% 0,00 0,00% 0,00 0,00% 0,00 0,00% 1.833,94 8.124,35 100,00% 8.124,35 05.01.02.04 M3 34,86 156,13 5.442,69 0,00 0,00% 34,86 5.442,69 100,00% 0,00 0,00% 0,00 0,00% 0,00 0,00% 0,00 0,00% 34,86 5.442,69 100,00% 5.442,69 05.01.03 05.01.03.01 M3 123,17 374,33 46.106,23 0,00 0,00% 30,55 11.435,78 24,80% 92,25 34.531,94 74,90% 0,00 0,00% 0,37 138,50 0,30% 0,00 0,00% 123,17 46.106,23 100,00% 46.106,23 05.01.03.02 M2 71,37 32,96 2.352,36 0,00 0,00% 17,70 583,39 24,80% 51,27 1.689,86 71,84% 0,00 0,00% 2,40 79,10 3,36% 0,00 0,00% 71,37 2.352,36 100,00% 2.352,36 05.01.03.03 M3 17,68 286,36 5.062,84 0,00 0,00% 0,00 0,00% 5,31 1.520,57 30,03% 0,00 0,00% 12,37 3.542,27 69,97% 0,00 0,00% 17,68 5.062,84 100,00% 5.062,84 05.01.04 05.01.04.01 M3 100,18 449,20 45.000,86 0,00 0,00% 25,15 11.297,38 25,10% 70,34 31.596,73 70,21% 0,00 0,00% 4,69 2.106,75 4,68% 0,00 0,00% 100,18 45.000,86 100,00% 45.000,86 05.01.04.02 M2 500,92 32,96 16.510,32 0,00 0,00% 125,75 4.144,72 25,10% 352,24 11.609,83 70,32% 0,00 0,00% 22,93 755,77 4,58% 0,00 0,00% 500,92 16.510,32 100,00% 16.510,32 05.01.04.03 M3 2.874,39 6,37 18.309,86 0,00 0,00% 1.407,01 8.962,65 48,95% 1.324,52 8.437,19 46,08% 0,00 0,00% 142,86 910,02 4,97% 0,00 0,00% 2.874,39 18.309,86 100,00% 18.309,86 TRANSPORTE DE MATERIALES DE LASTRADO DM=2.56KM AFIRMADO BASE GRANULAR (E=15CM) ACERO DE REFUERZO FY=4200 KG/CM2 TRAZO Y REPLANTEO CONFORMACION DE TERRAPLENES CON MATERIAL PROPIO PERFILADO Y COMPACTACION DE LA SUB RASANTE EN ZONAS DE CORTE EXTRACCION Y APILAMIENTO CON MAQUINARIA EN CANTERA ZARANDEO CARGUIO CON MAQUINARIA DE MATERIAL DE LASTRADO PAVIMENTOS CORTE EN ROCA FIJA CORTE EN ROCA FIJA (PÉRFORACION Y DISPARO) LIMPIEZA DE PLANTAFORMA Y DESQUINCHE DE TALUD EN ROCA FIJA CONFORMACION DE TERRAPLENES O RELLENOS CORTE DE MATERIAL SUELTO CORTE EN MATERIAL SUELTO CON MAQUINARIA (INC. PEINADO DE TALUD) CORTE EN ROCA SUELTA (PÉRFORACION Y DISPARO) LIMPIEZA DE PLANTAFORMA Y DESQUINCHE DE TALUD EN ROCA SUELTA CORTE EN ROCA SUELTA LIQUIDACION DE OBRA VALORIZACION Nº 3 TOTAL ACUMULADO PRESUPUESTO EJECUTADO PRESUP. VALORIZACION Nº 2 P.UNIT. VALORIZACION Nº1 CONTROL CAMPAMENTO PROVISIONALES DE LA OBRA DE 8M X 10M MOVILIZACION Y DESMOVILIZACION ELIMINACION DE MATERIAL EXCEDENTE (CARGUIO) DM=0.85KM ELIMINACION DE MATERIAL EXCEDENTE VALORIZACION Nº 5 CARTEL DE IDENTIFICACION DE OBRA 3.60 m X 7.20 m. TRAZO Y REPLANTEO DURANTE LA EJECUCION DEMOLICION DE ALCANTARILLAS EXISTENTES MOVIMIENTO DE TIERRAS EXCAVACION PARA ESTRUCTURAS (MANUAL) RELLENO CON MATERIAL PROPIO CONCRETO F´C=210KG/CM2 (LOSA TAPA) VALORIZACION Nº 4 VALORIZACION Nº 6 CUNETAS CONFORMACION DE CUNETAS RELLENO CON MATERIAL GRANULAR LIMPIEZA DE TERRENO MANUAL ALCANTARILLAS L=4.20M (28 UND) OBRAS DE ARTE TRABAJOS PRELIMINARES ELIMINACION DE MATERIAL EXCEDENTE D MAX=30M OBRAS DE CONCRETO SIMPLE CONCRETO CICLOPIO FC=175KG/CM2+30%PM-ESTRIBOS Y ALETAS ENCONFRADO Y DESENCOFRADO DE ESTRIBOS Y ALERO EMBOQUILLADO DE PIEDRA CON MORTERO OBRAS DE CONCRETO ARMADO ITEM DESCRIPCIÓN PRESUPUESTO OFERTADO UND METRADO ENCOFRADO Y DESENCOFRADO OBRAS PRELIMINARES TRABAJOS PRELIMINARES “MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD DEL CAMINO VECINAL TRAMO: SANTA ELENA – PITIMPATA – PATAPATA – LLUMCHI, DISTRITO DE LIRCAY, PROVINCIA DE ANGARAES - HUANCAVELICA”
  • 2. OBRA: PROPIETARIO: MUNICIPALIDAD PROVINCIAL DE ANGARAES RECURSOS PROPIOS PROVIAS DESCENTRALIZADO MODALIDAD DE EJECUCIÓN: CONTRATA EJECUTA: CONSORCIO UNÑEZ SUPERVISOR DE OBRA ING. GUERRA A. GUERRA CORONEL RESIDENTE: ING. GUIDO ROGER HUAYLLAS COSME METRADO VALOR S/. % METRADO VALOR S/. % METRADO VALOR S/. % METRADO VALOR S/. % METRADO VALOR S/. % METRADO VALOR S/. % METRADO VALOR S/. % VALOR S/. LIQUIDACION DE OBRA VALORIZACION Nº 3 TOTAL ACUMULADO PRESUPUESTO EJECUTADO PRESUP. VALORIZACION Nº 2 P.UNIT. VALORIZACION Nº1 CONTROL VALORIZACION Nº 5 VALORIZACION Nº 4 VALORIZACION Nº 6 ITEM DESCRIPCIÓN PRESUPUESTO OFERTADO UND METRADO OBRAS PRELIMINARES “MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD DEL CAMINO VECINAL TRAMO: SANTA ELENA – PITIMPATA – PATAPATA – LLUMCHI, DISTRITO DE LIRCAY, PROVINCIA DE ANGARAES - HUANCAVELICA” 05.01.05 05.01.05.01 M 123,20 461,25 56.826,00 0,00 0,00% 123,20 56.826,00 100,00% 0,00 0,00% 0,00 0,00% 0,00 0,00% 0,00 0,00% 123,20 56.826,00 100,00% 56.826,00 05.01.06 05.01.06.01 M2 500,92 11,66 5.840,73 0,00 0,00% 0,00 0,00% 450,67 5.254,81 89,97% 0,00 0,00% 50,25 585,92 10,03% 0,00 0,00% 500,92 5.840,73 100,00% 5.840,73 05.01.06.02 M2 174,29 284,89 49.653,48 0,00 0,00% 0,00 0,00% 110,84 31.577,21 63,60% 0,00 0,00% 63,45 18.076,27 36,40% 0,00 0,00% 174,29 49.653,48 100,00% 49.653,48 05.01.07 05.01.07.01 M2 500,92 25,11 12.578,10 0,00 0,00% 0,00 0,00% 0,00 0,00% 0,00 0,00% 500,92 12.578,10 100,00% 0,00 0,00% 500,92 12.578,10 100,00% 12.578,10 05.02.00 05.02.01 05.02.01.01 M2 111,72 1,46 163,11 0,00 0,00% 0,00 0,00% 0,00 0,00% 0,00 0,00% 0,00 0,00% 111,72 163,11 100,00% 111,72 163,11 100,00% 163,11 05.02.01.02 M2 111,72 18,09 2.021,01 0,00 0,00% 0,00 0,00% 0,00 0,00% 0,00 0,00% 0,00 0,00% 111,72 2.021,01 100,00% 111,72 2.021,01 100,00% 2.021,01 05.02.02 05.02.02.01 M3 45,66 2,62 119,63 0,00 0,00% 0,00 0,00% 0,00 0,00% 0,00 0,00% 0,00 0,00% 45,66 119,63 100,00% 45,66 119,63 100,00% 119,63 05.02.02.02 M3 2,84 21,65 61,49 0,00 0,00% 0,00 0,00% 0,00 0,00% 0,00 0,00% 0,00 0,00% 2,84 61,49 100,00% 2,84 61,49 100,00% 61,49 05.02.02.03 M3 57,07 4,43 252,82 0,00 0,00% 0,00 0,00% 0,00 0,00% 0,00 0,00% 0,00 0,00% 57,07 252,82 100,00% 57,07 252,82 100,00% 252,82 05.02.03 05.02.03.01 M2 51,64 29,69 1.533,19 0,00 0,00% 0,00 0,00% 0,00 0,00% 0,00 0,00% 0,00 0,00% 51,64 1.533,19 100,00% 51,64 1.533,19 100,00% 1.533,19 05.02.03.02 M3 10,09 286,36 2.889,37 0,00 0,00% 0,00 0,00% 0,00 0,00% 0,00 0,00% 0,00 0,00% 10,09 2.889,37 100,00% 10,09 2.889,37 100,00% 2.889,37 05.02.03.03 M3 26,56 431,28 11.454,80 0,00 0,00% 0,00 0,00% 0,00 0,00% 0,00 0,00% 0,00 0,00% 26,56 11.454,80 100,00% 26,56 11.454,80 100,00% 11.454,80 05.02.03.04 M2 75,03 32,96 2.472,99 0,00 0,00% 0,00 0,00% 0,00 0,00% 0,00 0,00% 0,00 0,00% 75,03 2.472,99 100,00% 75,03 2.472,99 100,00% 2.472,99 05.02.04 05.02.04.01 M2 35,88 20,77 745,23 0,00 0,00% 0,00 0,00% 0,00 0,00% 0,00 0,00% 0,00 0,00% 35,88 745,23 100,00% 35,88 745,23 100,00% 745,23 06.00.00 06.01.00 UND 2,00 400,00 800,00 0,00 0,00% 2,00 800,00 100,00% 0,00 0,00% 0,00 0,00% 0,00 0,00% 0,00 0,00% 2,00 800,00 100,00% 800,00 06.02.00 UND 28,00 25,80 722,40 0,00 0,00% 0,00 0,00% 0,00 0,00% 0,00 0,00% 0,00 0,00% 28,00 722,40 100,00% 28,00 722,40 100,00% 722,40 06.03.00 UND 44,00 80,00 3.520,00 0,00 0,00% 0,00 0,00% 0,00 0,00% 0,00 0,00% 0,00 0,00% 44,00 3.520,00 100,00% 44,00 3.520,00 100,00% 3.520,00 07.00.00 07.01.00 GLB 1,00 1.000,00 1.000,00 0,00 0,00% 1,00 1.000,00 100,00% 0,00 0,00% 0,00 0,00% 0,00 0,00% 0,00 0,00% 1,00 1.000,00 100,00% 1.000,00 07.02.00 GLB 1,00 2.597,50 2.597,50 0,00 0,00% 1,00 2.597,50 100,00% 0,00 0,00% 0,00 0,00% 0,00 0,00% 0,00 0,00% 1,00 2.597,50 100,00% 2.597,50 08.00.00 08.01.00 GLB 1,00 14.000,00 14.000,00 0,00 0,00% 0,00 0,00% 0,00 0,00% 0,00 0,00% 0,00 0,00% 1,00 14.000,00 100,00% 1,00 14.000,00 100,00% 14.000,00 09.00.00 09.01.00 UND 14,00 153,98 2.155,72 0,00 0,00% 0,00 0,00% 0,00 0,00% 0,00 0,00% 14,00 2.155,72 100,00% 0,00 0,00% 14,00 2.155,72 100,00% 2.155,72 09.02.00 UND 5,00 645,48 3.227,40 0,00 0,00% 0,00 0,00% 0,00 0,00% 0,00 0,00% 5,00 3.227,40 100,00% 0,00 0,00% 5,00 3.227,40 100,00% 3.227,40 09.03.00 UND 37,00 418,76 15.494,12 0,00 0,00% 0,00 0,00% 0,00 0,00% 0,00 0,00% 37,00 15.494,12 100,00% 0,00 0,00% 37,00 15.494,12 100,00% 15.494,12 10.00.00 10.01.00 M2 1.925,00 6,17 11.877,25 0,00 0,00% 1.606,25 9.910,56 83,44% 0,00 0,00% 0,00 0,00% 0,00 0,00% 318,75 1.966,69 16,56% 1.925,00 11.877,25 100,00% 11.877,25 10.02.00 M2 400,00 2,98 1.192,00 0,00 0,00% 175,00 521,50 43,75% 0,00 0,00% 0,00 0,00% 0,00 0,00% 225,00 670,50 56,25% 400,00 1.192,00 100,00% 1.192,00 10.03.00 M2 1.925,00 2,20 4.235,00 0,00 0,00% - 0,00 0,00% 0,00 0,00% 0,00 0,00% 0,00 0,00% 1.925,00 4.235,00 100,00% 1.925,00 4.235,00 100,00% 4.235,00 11.00.00 11.01.00 GLB 1,00 4.876,04 4.876,04 0,00 0,00% 0,00 0,00% 0,00 0,00% 0,00 0,00% 0,00 0,00 0,00% 1,00 4.876,04 100,00% 1,00 4.876,04 100,00% 4.876,04 A 882.536,55 6.739,77 360.438,06 134.827,05 182.691,33 137.106,24 60.734,08 882.536,53 882.536,55 100,00% 882.536,55 B 36.272,24 277,00 14.814,00 5.541,39 7.508,61 5.635,07 2.496,17 36.272,24 36.272,24 36.272,24 C 22.945,95 175,23 9.371,39 3.505,50 4.749,97 3.564,76 1.579,09 22.945,94 22.945,95 22.945,95 D=(A+B+C) 941.754,74 7.192,00 384.623,45 143.873,94 194.949,91 146.306,07 64.809,34 941.754,71 941.754,74 941.754,74 E=(Dx0.18) 169.515,85 1.294,56 69.232,22 25.897,31 35.090,98 26.335,09 11.665,68 169.515,84 169.515,85 169.515,85 F=(D+E) 1.111.270,59 8.486,56 453.855,67 169.771,25 230.040,89 172.641,16 76.475,02 1.111.270,55 1.111.270,59 1.111.270,59 100,00% 0,76% 40,84% 15,28% 20,70% 15,54% 6,88% 1,0000 100,00% 100,00% FLETE TERRESTRE FLETE DE EXPLOSIVOS Y CUSTODIA POLICIAL TRAMITES Y PERMISOS DISEÑO DE MEZCLA DE CONCRETO ROTURA DE TESTIGOS DE CONCRETO ENSAYOS DE DENSIDAD DE CAMPO FLETE DE MATERIALES TRABAJOS PRELIMINARES ENCOFRADO Y DESENCOFRADO REVOQUES Y ENLUCIDOS SOLADO DE CONCRETO 1:10 E=10CM EMBOQUILLADO DE PIEDRA CON MORTERO CONCRETO F´C=175 KG/CM+30%PM INCL. FROTACHADO EXCAVACION PARA ESTRUCTURAS (MANUAL) TARRAJEO EXTERIORES C/MORTERO 1;5 X 1,5CM ALIVIADERO Y EMBOQUILLADO DE PIEDRA MORTERO 1:4,C:H PINTURA PINTURA EN ALCANTARILLAS TUBERIA DE METAL CORRUGADO TUBERIA DE METAL CORRUGADO D=48¨, E=2.5MM MOVIMIENTO DE TIERRAS BADENES L=6.45M (02UND) REVOQUES Y ENLUCIDOS CAPACITACION AL PERSONAL OPERACIÓN Y MANTENIMIENTO DE LA INFRAESTRUCTURA EQUIPAMIENTO Y SEÑALIZACION VIAL ELIMINACION DE MATERIAL EXCEDENTE D MAX=30M OBRAS DE CONCRETO SIMPLE IGV ( 18% ) TOTAL PRESUPUESTO OFERTADO RELLENO CON MATERIAL PROPIO TRATAMIENTO DE CAMPAMENTO POSTES KILOMETRICOS DE 20X15X100 SEÑALIZACION INFORMATIVA SEÑALIZACION PREVENTIVA TARRAJEO CON IMPERMEABILIZANTE, MEZCLA 1:1, E1,5 CONTROL DE CALIDAD MONITOREO ARQUEOLOGICO Y PMA REVEGETACION DE CANTERAS MITIGACION AMBIENTAL ACONDICIONAMIENTO DE BOTADEROS LIMPIEZA DE TERRENO MANUAL TRAZO Y REPLANTEO PRELIMINAR PORCENTAJE DE AVANCE FISICO (%) COSTO DIRECTO: GASTOS GENERALES ( 4.109999%) UTILIDAD ( 10% ) SUB TOTAL