Lean Management
Lean in Manufacturing
Agenda
Background
Boeing’s Lean Journey: Case Study
Summary
Background
• Production philosophy
• Product manufacturing innovations
• Embracing Lean
• Goals of Lean manufacturing
• Paradigm shift
• Elimination of waste
Boeing’s Lean Journey
4
History and Background
• Commercial airplanes division (1996)
• Deliver more value to customer
Lean Principles Embraced
• Identify the value stream
• Make value flow
• Pull value through from the customer
• Remove waste
• Pursue perfection
Lean Principles Embraced
• Lean manufacturing assessment
• Employee participation
• Accelerated Improvement Workshops (AIWs)
o Individual work areas improvements
Waste Elimination Focus Areas
• Complexity
• Labor
• Overproduction
• Space
• Energy
• Defects
• Materials
• Idle materials
• Time
• Transportation
• Unsafe acts
Summary
Lean in manufacturing
Background
© Simplilearn Solutions
Boeing’s Lean implementation journey
Knowledge Check
Knowledge
Check
A.
B.
C.
D.
1
Which department of Boeing started Lean implementation?
Factory shopfloor
Engines department
Commercial airplanes division
Waste and recycle department
Knowledge
Check
The correct answer is
A.
B.
C.
D.
1
Boeing started Lean implementation in the commercial airplanes division in the year 1996.
C
Which department of Boeing started Lean implementation?
Factory shopfloor
Engines department
Commercial airplanes division
Waste and recycle department

Más contenido relacionado

Similar a Lesson 4 - Lean in Manufacturing

Goodyear's Guide To Lean Product Development - Dozuki Workshop Series
Goodyear's Guide To Lean Product Development - Dozuki Workshop SeriesGoodyear's Guide To Lean Product Development - Dozuki Workshop Series
Goodyear's Guide To Lean Product Development - Dozuki Workshop SeriesDozuki Software
 
Remanufacturing lecture Bologna
Remanufacturing lecture BolognaRemanufacturing lecture Bologna
Remanufacturing lecture BolognaMarcel Bovy
 
2014_12_10_increase_effectiveness_of_auto_inbound_supply_chain
2014_12_10_increase_effectiveness_of_auto_inbound_supply_chain2014_12_10_increase_effectiveness_of_auto_inbound_supply_chain
2014_12_10_increase_effectiveness_of_auto_inbound_supply_chainHari Sivaprakasam
 
Industrial Fasteners/ Valmont
Industrial Fasteners/ ValmontIndustrial Fasteners/ Valmont
Industrial Fasteners/ Valmontprhea1st
 
Innovation day 2012 8. ann van mele - verhaert - 'drastically increase your...
Innovation day 2012   8. ann van mele - verhaert - 'drastically increase your...Innovation day 2012   8. ann van mele - verhaert - 'drastically increase your...
Innovation day 2012 8. ann van mele - verhaert - 'drastically increase your...Verhaert Masters in Innovation
 
SMED - Quick Change Over
SMED - Quick Change OverSMED - Quick Change Over
SMED - Quick Change OverOskar Olofsson
 
lean manufacturing
 lean manufacturing lean manufacturing
lean manufacturingTonny Danny
 
HVAC SENIOR PRODUCT ENGINEER
HVAC SENIOR PRODUCT ENGINEERHVAC SENIOR PRODUCT ENGINEER
HVAC SENIOR PRODUCT ENGINEERmalazab
 
Chap004-Product and Service Design.pdf
Chap004-Product and Service Design.pdfChap004-Product and Service Design.pdf
Chap004-Product and Service Design.pdfKhatVillados
 
Lesson 1 - Introduction of LEAN
Lesson 1 - Introduction of LEANLesson 1 - Introduction of LEAN
Lesson 1 - Introduction of LEANTunAnhTrnh9
 
Ops 571 ops571 ops 571 best tutorials guide uopstudy.com
Ops 571 ops571 ops 571 best tutorials guide  uopstudy.comOps 571 ops571 ops 571 best tutorials guide  uopstudy.com
Ops 571 ops571 ops 571 best tutorials guide uopstudy.comULLPTT
 
Ops 571 ops571 ops 571 education for service uopstudy.com
Ops 571 ops571 ops 571 education for service   uopstudy.comOps 571 ops571 ops 571 education for service   uopstudy.com
Ops 571 ops571 ops 571 education for service uopstudy.comULLPTT
 
Ops 571 ops571 ops 571 effective communication uopstudy.com
Ops 571 ops571 ops 571 effective communication   uopstudy.comOps 571 ops571 ops 571 effective communication   uopstudy.com
Ops 571 ops571 ops 571 effective communication uopstudy.comULLPTT
 
Ops 571 ops571 ops 571 forecasting and strategic planning -uopstudy.com
Ops 571 ops571 ops 571 forecasting and strategic planning -uopstudy.comOps 571 ops571 ops 571 forecasting and strategic planning -uopstudy.com
Ops 571 ops571 ops 571 forecasting and strategic planning -uopstudy.comULLPTT
 
Digital Transformation to enhance productivity and improve profitability
Digital Transformation to enhance productivity and improve profitabilityDigital Transformation to enhance productivity and improve profitability
Digital Transformation to enhance productivity and improve profitabilityHuiGuanGan
 

Similar a Lesson 4 - Lean in Manufacturing (20)

Goodyear's Guide To Lean Product Development - Dozuki Workshop Series
Goodyear's Guide To Lean Product Development - Dozuki Workshop SeriesGoodyear's Guide To Lean Product Development - Dozuki Workshop Series
Goodyear's Guide To Lean Product Development - Dozuki Workshop Series
 
Remanufacturing lecture Bologna
Remanufacturing lecture BolognaRemanufacturing lecture Bologna
Remanufacturing lecture Bologna
 
2014_12_10_increase_effectiveness_of_auto_inbound_supply_chain
2014_12_10_increase_effectiveness_of_auto_inbound_supply_chain2014_12_10_increase_effectiveness_of_auto_inbound_supply_chain
2014_12_10_increase_effectiveness_of_auto_inbound_supply_chain
 
Industrial Fasteners/ Valmont
Industrial Fasteners/ ValmontIndustrial Fasteners/ Valmont
Industrial Fasteners/ Valmont
 
Wcm & am
Wcm & amWcm & am
Wcm & am
 
Innovation day 2012 8. ann van mele - verhaert - 'drastically increase your...
Innovation day 2012   8. ann van mele - verhaert - 'drastically increase your...Innovation day 2012   8. ann van mele - verhaert - 'drastically increase your...
Innovation day 2012 8. ann van mele - verhaert - 'drastically increase your...
 
Lean manufacturing
Lean manufacturingLean manufacturing
Lean manufacturing
 
BASICS OF LEAN MANUFACTURING
BASICS OF LEAN MANUFACTURINGBASICS OF LEAN MANUFACTURING
BASICS OF LEAN MANUFACTURING
 
SMED - Quick Change Over
SMED - Quick Change OverSMED - Quick Change Over
SMED - Quick Change Over
 
lean manufacturing
 lean manufacturing lean manufacturing
lean manufacturing
 
HVAC SENIOR PRODUCT ENGINEER
HVAC SENIOR PRODUCT ENGINEERHVAC SENIOR PRODUCT ENGINEER
HVAC SENIOR PRODUCT ENGINEER
 
Chap004-Product and Service Design.pdf
Chap004-Product and Service Design.pdfChap004-Product and Service Design.pdf
Chap004-Product and Service Design.pdf
 
Lesson 1 - Introduction of LEAN
Lesson 1 - Introduction of LEANLesson 1 - Introduction of LEAN
Lesson 1 - Introduction of LEAN
 
Ops 571 ops571 ops 571 best tutorials guide uopstudy.com
Ops 571 ops571 ops 571 best tutorials guide  uopstudy.comOps 571 ops571 ops 571 best tutorials guide  uopstudy.com
Ops 571 ops571 ops 571 best tutorials guide uopstudy.com
 
Ops 571 ops571 ops 571 education for service uopstudy.com
Ops 571 ops571 ops 571 education for service   uopstudy.comOps 571 ops571 ops 571 education for service   uopstudy.com
Ops 571 ops571 ops 571 education for service uopstudy.com
 
Ops 571 ops571 ops 571 effective communication uopstudy.com
Ops 571 ops571 ops 571 effective communication   uopstudy.comOps 571 ops571 ops 571 effective communication   uopstudy.com
Ops 571 ops571 ops 571 effective communication uopstudy.com
 
Ops 571 ops571 ops 571 forecasting and strategic planning -uopstudy.com
Ops 571 ops571 ops 571 forecasting and strategic planning -uopstudy.comOps 571 ops571 ops 571 forecasting and strategic planning -uopstudy.com
Ops 571 ops571 ops 571 forecasting and strategic planning -uopstudy.com
 
BOEING
BOEINGBOEING
BOEING
 
LanningJeffreyresumerev
LanningJeffreyresumerevLanningJeffreyresumerev
LanningJeffreyresumerev
 
Digital Transformation to enhance productivity and improve profitability
Digital Transformation to enhance productivity and improve profitabilityDigital Transformation to enhance productivity and improve profitability
Digital Transformation to enhance productivity and improve profitability
 

Más de TunAnhTrnh9

Lesson 2 - Types of Waste
Lesson 2 - Types of WasteLesson 2 - Types of Waste
Lesson 2 - Types of WasteTunAnhTrnh9
 
Lesson 6 - Lean in Office
Lesson 6 - Lean in OfficeLesson 6 - Lean in Office
Lesson 6 - Lean in OfficeTunAnhTrnh9
 
Lesson 7 - Lean Metrics
Lesson 7 - Lean MetricsLesson 7 - Lean Metrics
Lesson 7 - Lean MetricsTunAnhTrnh9
 
Lesson 10 - Value stream mapping
Lesson 10 - Value stream mappingLesson 10 - Value stream mapping
Lesson 10 - Value stream mappingTunAnhTrnh9
 
Lesson 8 - Other Methodologies That Complement Lean
Lesson 8 - Other Methodologies That Complement LeanLesson 8 - Other Methodologies That Complement Lean
Lesson 8 - Other Methodologies That Complement LeanTunAnhTrnh9
 
Lesson 5 - Lean in Service
Lesson 5 - Lean in ServiceLesson 5 - Lean in Service
Lesson 5 - Lean in ServiceTunAnhTrnh9
 
Lesson 9 - Lean Maturity Matrix
Lesson 9 - Lean Maturity MatrixLesson 9 - Lean Maturity Matrix
Lesson 9 - Lean Maturity MatrixTunAnhTrnh9
 
Lesson 3 - Tools
Lesson 3 - ToolsLesson 3 - Tools
Lesson 3 - ToolsTunAnhTrnh9
 

Más de TunAnhTrnh9 (8)

Lesson 2 - Types of Waste
Lesson 2 - Types of WasteLesson 2 - Types of Waste
Lesson 2 - Types of Waste
 
Lesson 6 - Lean in Office
Lesson 6 - Lean in OfficeLesson 6 - Lean in Office
Lesson 6 - Lean in Office
 
Lesson 7 - Lean Metrics
Lesson 7 - Lean MetricsLesson 7 - Lean Metrics
Lesson 7 - Lean Metrics
 
Lesson 10 - Value stream mapping
Lesson 10 - Value stream mappingLesson 10 - Value stream mapping
Lesson 10 - Value stream mapping
 
Lesson 8 - Other Methodologies That Complement Lean
Lesson 8 - Other Methodologies That Complement LeanLesson 8 - Other Methodologies That Complement Lean
Lesson 8 - Other Methodologies That Complement Lean
 
Lesson 5 - Lean in Service
Lesson 5 - Lean in ServiceLesson 5 - Lean in Service
Lesson 5 - Lean in Service
 
Lesson 9 - Lean Maturity Matrix
Lesson 9 - Lean Maturity MatrixLesson 9 - Lean Maturity Matrix
Lesson 9 - Lean Maturity Matrix
 
Lesson 3 - Tools
Lesson 3 - ToolsLesson 3 - Tools
Lesson 3 - Tools
 

Último

Cost estimation approach: FP to COCOMO scenario based question
Cost estimation approach: FP to COCOMO scenario based questionCost estimation approach: FP to COCOMO scenario based question
Cost estimation approach: FP to COCOMO scenario based questionSneha Padhiar
 
Main Memory Management in Operating System
Main Memory Management in Operating SystemMain Memory Management in Operating System
Main Memory Management in Operating SystemRashmi Bhat
 
KCD Costa Rica 2024 - Nephio para parvulitos
KCD Costa Rica 2024 - Nephio para parvulitosKCD Costa Rica 2024 - Nephio para parvulitos
KCD Costa Rica 2024 - Nephio para parvulitosVictor Morales
 
Levelling - Rise and fall - Height of instrument method
Levelling - Rise and fall - Height of instrument methodLevelling - Rise and fall - Height of instrument method
Levelling - Rise and fall - Height of instrument methodManicka Mamallan Andavar
 
Prach: A Feature-Rich Platform Empowering the Autism Community
Prach: A Feature-Rich Platform Empowering the Autism CommunityPrach: A Feature-Rich Platform Empowering the Autism Community
Prach: A Feature-Rich Platform Empowering the Autism Communityprachaibot
 
11. Properties of Liquid Fuels in Energy Engineering.pdf
11. Properties of Liquid Fuels in Energy Engineering.pdf11. Properties of Liquid Fuels in Energy Engineering.pdf
11. Properties of Liquid Fuels in Energy Engineering.pdfHafizMudaserAhmad
 
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor CatchersTechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catcherssdickerson1
 
Module-1-(Building Acoustics) Noise Control (Unit-3). pdf
Module-1-(Building Acoustics) Noise Control (Unit-3). pdfModule-1-(Building Acoustics) Noise Control (Unit-3). pdf
Module-1-(Building Acoustics) Noise Control (Unit-3). pdfManish Kumar
 
Research Methodology for Engineering pdf
Research Methodology for Engineering pdfResearch Methodology for Engineering pdf
Research Methodology for Engineering pdfCaalaaAbdulkerim
 
Mine Environment II Lab_MI10448MI__________.pptx
Mine Environment II Lab_MI10448MI__________.pptxMine Environment II Lab_MI10448MI__________.pptx
Mine Environment II Lab_MI10448MI__________.pptxRomil Mishra
 
Earthing details of Electrical Substation
Earthing details of Electrical SubstationEarthing details of Electrical Substation
Earthing details of Electrical Substationstephanwindworld
 
『澳洲文凭』买麦考瑞大学毕业证书成绩单办理澳洲Macquarie文凭学位证书
『澳洲文凭』买麦考瑞大学毕业证书成绩单办理澳洲Macquarie文凭学位证书『澳洲文凭』买麦考瑞大学毕业证书成绩单办理澳洲Macquarie文凭学位证书
『澳洲文凭』买麦考瑞大学毕业证书成绩单办理澳洲Macquarie文凭学位证书rnrncn29
 
Virtual memory management in Operating System
Virtual memory management in Operating SystemVirtual memory management in Operating System
Virtual memory management in Operating SystemRashmi Bhat
 
Ch10-Global Supply Chain - Cadena de Suministro.pdf
Ch10-Global Supply Chain - Cadena de Suministro.pdfCh10-Global Supply Chain - Cadena de Suministro.pdf
Ch10-Global Supply Chain - Cadena de Suministro.pdfChristianCDAM
 
CME 397 - SURFACE ENGINEERING - UNIT 1 FULL NOTES
CME 397 - SURFACE ENGINEERING - UNIT 1 FULL NOTESCME 397 - SURFACE ENGINEERING - UNIT 1 FULL NOTES
CME 397 - SURFACE ENGINEERING - UNIT 1 FULL NOTESkarthi keyan
 
CS 3251 Programming in c all unit notes pdf
CS 3251 Programming in c all unit notes pdfCS 3251 Programming in c all unit notes pdf
CS 3251 Programming in c all unit notes pdfBalamuruganV28
 
Input Output Management in Operating System
Input Output Management in Operating SystemInput Output Management in Operating System
Input Output Management in Operating SystemRashmi Bhat
 
Energy Awareness training ppt for manufacturing process.pptx
Energy Awareness training ppt for manufacturing process.pptxEnergy Awareness training ppt for manufacturing process.pptx
Energy Awareness training ppt for manufacturing process.pptxsiddharthjain2303
 
signals in triangulation .. ...Surveying
signals in triangulation .. ...Surveyingsignals in triangulation .. ...Surveying
signals in triangulation .. ...Surveyingsapna80328
 
Robotics Group 10 (Control Schemes) cse.pdf
Robotics Group 10  (Control Schemes) cse.pdfRobotics Group 10  (Control Schemes) cse.pdf
Robotics Group 10 (Control Schemes) cse.pdfsahilsajad201
 

Último (20)

Cost estimation approach: FP to COCOMO scenario based question
Cost estimation approach: FP to COCOMO scenario based questionCost estimation approach: FP to COCOMO scenario based question
Cost estimation approach: FP to COCOMO scenario based question
 
Main Memory Management in Operating System
Main Memory Management in Operating SystemMain Memory Management in Operating System
Main Memory Management in Operating System
 
KCD Costa Rica 2024 - Nephio para parvulitos
KCD Costa Rica 2024 - Nephio para parvulitosKCD Costa Rica 2024 - Nephio para parvulitos
KCD Costa Rica 2024 - Nephio para parvulitos
 
Levelling - Rise and fall - Height of instrument method
Levelling - Rise and fall - Height of instrument methodLevelling - Rise and fall - Height of instrument method
Levelling - Rise and fall - Height of instrument method
 
Prach: A Feature-Rich Platform Empowering the Autism Community
Prach: A Feature-Rich Platform Empowering the Autism CommunityPrach: A Feature-Rich Platform Empowering the Autism Community
Prach: A Feature-Rich Platform Empowering the Autism Community
 
11. Properties of Liquid Fuels in Energy Engineering.pdf
11. Properties of Liquid Fuels in Energy Engineering.pdf11. Properties of Liquid Fuels in Energy Engineering.pdf
11. Properties of Liquid Fuels in Energy Engineering.pdf
 
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor CatchersTechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
 
Module-1-(Building Acoustics) Noise Control (Unit-3). pdf
Module-1-(Building Acoustics) Noise Control (Unit-3). pdfModule-1-(Building Acoustics) Noise Control (Unit-3). pdf
Module-1-(Building Acoustics) Noise Control (Unit-3). pdf
 
Research Methodology for Engineering pdf
Research Methodology for Engineering pdfResearch Methodology for Engineering pdf
Research Methodology for Engineering pdf
 
Mine Environment II Lab_MI10448MI__________.pptx
Mine Environment II Lab_MI10448MI__________.pptxMine Environment II Lab_MI10448MI__________.pptx
Mine Environment II Lab_MI10448MI__________.pptx
 
Earthing details of Electrical Substation
Earthing details of Electrical SubstationEarthing details of Electrical Substation
Earthing details of Electrical Substation
 
『澳洲文凭』买麦考瑞大学毕业证书成绩单办理澳洲Macquarie文凭学位证书
『澳洲文凭』买麦考瑞大学毕业证书成绩单办理澳洲Macquarie文凭学位证书『澳洲文凭』买麦考瑞大学毕业证书成绩单办理澳洲Macquarie文凭学位证书
『澳洲文凭』买麦考瑞大学毕业证书成绩单办理澳洲Macquarie文凭学位证书
 
Virtual memory management in Operating System
Virtual memory management in Operating SystemVirtual memory management in Operating System
Virtual memory management in Operating System
 
Ch10-Global Supply Chain - Cadena de Suministro.pdf
Ch10-Global Supply Chain - Cadena de Suministro.pdfCh10-Global Supply Chain - Cadena de Suministro.pdf
Ch10-Global Supply Chain - Cadena de Suministro.pdf
 
CME 397 - SURFACE ENGINEERING - UNIT 1 FULL NOTES
CME 397 - SURFACE ENGINEERING - UNIT 1 FULL NOTESCME 397 - SURFACE ENGINEERING - UNIT 1 FULL NOTES
CME 397 - SURFACE ENGINEERING - UNIT 1 FULL NOTES
 
CS 3251 Programming in c all unit notes pdf
CS 3251 Programming in c all unit notes pdfCS 3251 Programming in c all unit notes pdf
CS 3251 Programming in c all unit notes pdf
 
Input Output Management in Operating System
Input Output Management in Operating SystemInput Output Management in Operating System
Input Output Management in Operating System
 
Energy Awareness training ppt for manufacturing process.pptx
Energy Awareness training ppt for manufacturing process.pptxEnergy Awareness training ppt for manufacturing process.pptx
Energy Awareness training ppt for manufacturing process.pptx
 
signals in triangulation .. ...Surveying
signals in triangulation .. ...Surveyingsignals in triangulation .. ...Surveying
signals in triangulation .. ...Surveying
 
Robotics Group 10 (Control Schemes) cse.pdf
Robotics Group 10  (Control Schemes) cse.pdfRobotics Group 10  (Control Schemes) cse.pdf
Robotics Group 10 (Control Schemes) cse.pdf
 

Lesson 4 - Lean in Manufacturing