The document discusses India's growing nuclear power program and L&T's role in supporting it. It notes that India plans to significantly increase nuclear capacity and is developing indigenous pressurized heavy water reactor (PHWR) and fast breeder reactor (FBR) technologies. L&T has capabilities across the entire nuclear value chain, including engineering, equipment manufacturing, construction, and automation. It has been a supplier to India's nuclear program since the 1960s and is looking to participate more globally, such as in the ITER fusion reactor project in France.
1. 3rd Annual UKTI Civil Nuclear Export Showcase 2014
L&T’s Contribution : Indian
Nuclear Industry
Mr. Philippe TOLLINI
Head of business Development - Europe
January 27, 2014
1 of 38
2. Power Scenario in India
New Installations - 12th Five Year
Plan (2012 – 2017)
Planned
Achieved
Installed capacity in GW
156.4
88.4
72.3
39.8
28.1
10.8
4.8
Thermal Hydro Nuclear Renew.
26.1
25.1
Thermal
1
Hydro
5.3 0
Nuclear
Total
Total Installed Capacity – 229 GW
2.3% peak supply deficit (~ 3 GW)
Source – CEA Report, Oct’13
2 of 38
3. Indian Nuclear Power Program –
Trend and Plan
0.18
275000
15%
0.16
0.14
17% 250000
0.12
200000
9%
0.1
0.08
0.04
600
950
1.8%
2750
100000
63000
3%
4780
150000
104000
6%
0.06
0.02
300000
50000
20000
0
0
1980
1990
2000
2010
% of total electricty
Source – DAE site
2020
2030
2040
2050
MW Capacity
3 of 38
5. Nuclear industry in Indian : Moving forward
Present
Proposed
Source: Nuclear Power Corporation of India (Ltd)
On January 2014, Prime minister of India, Manmohan
Singh, laid foundation stone of country's largest nuclear power
plant (4 units of 700 MWs each) in Haryana, north of India
5 of 38
11. Larsen & Toubro
Founded
1938
Number of Emp.
54,000+
Sales ($ Bn)
7.4
11.7
12.8 14.0
9.8
8.5
5.0
Market Cap
USD 13.8 Bn
06-07 07-08 08-09 09-10 10-11 11-12 12-13
Share holders
Others
14%
Employees
12%
Gov. & Pvt.
Financial
Institutions
31%
Major Shareholders
LIC of India (16%)
Employee Welfare Foundation (12%)
FIIs
18%
General
Public, 25%
Unit Trust of India (8%)
AAA Rating with Stable outlook
from CRISIL & AAA from ICRA of 38
11
12. Independent Verticals & Subsidiaries
Infrastructure
Hydrocarbon
Heavy Engineering
Power
Metal & Material
Handling
Machinery &
Industrial Products
Electrical &
Automation
Buildings & Factories
Heavy Civil Infra
Power T&D
Others
Transportation
Major Subsidiaries
• Shipbuilding
• Shipbuilding
Water & Ren. Energy
• IES
• Infra. Dev. Pvt. Ltd. • L&T Finance
• Sp. Steels & Heavy • Hyd. Metro
Forgings
• Realty
• L&T Infotech
12 of 38
22. Global Participation – a New Frontier
To
Switzerland
To USA
Overpack
Casks
To USA
Canisters
Casks
Casks
22 of 38
23. Participation in ITER fusion reactor - France
Cryostat
Top Lid
29 m
Upper
Cyl.
Lower
Cyl.
Base
Section
Installation at site
Cadarache in France
Ø 29.4 m
23 of 38
24. ITER Cryostat - Site Workshop
60 % work completed; Expected readiness by Aug’14
As of January 12, 2014
24 of 38
25. L& T Facilities
Integrated Manufacturing Complex at Hazira
Heavy Engineering
Heavy Steel Forgings
Ship Building
E&C - Hydrocarbon
Turbine JV
Boiler JV
HP Piping
Casting
ESP Howden
25 of 38
26. Latest investment for nuclear power industry
L&T Special Steels & Heavy Forgings
India’s largest integrated facility for heavy forgings – 300 MT ingot, 120 MT forgings
26 of 38
27. L&T Special Steels & Heavy Forgings
Steel Melting with 100 T EAF
India’s Biggest Open Die Hydraulic Press
(9.000 T) and 150MT Manipulator
27 of 38
28. Summary
is moving forward on its large nuclear program
Will continue to develop in-house PHWR & FBR Rx
is partner to India’s Nuclear Power Growth Story
has proven Capabilities covering entire Value Chain
is a global supplier of Critical Equipment & Services
28 of 38
29. L&T looks forward to participate in a bigger way in this truly
international effort for the betterment of Mankind