Identify Your Opportunity
© Upsite Technologies, Inc.6/2/2016 2
There are two types of computer rooms
1. Those without IT equipment intake air temperature problems
• Improving AFM enables them to be more efficient
2. Those with IT equipment intake air temperature problems
• Improving AFM solves intake air temperature problems (hot
spots and cold spots) and enables them to be more efficient
• More efficient results in: lower OPEX, deferred CAPEX,
increased cooling capacity
Why Airflow Management
© Upsite Technologies, Inc.6/2/2016 3
Total Load
IT Load
PUE =
Mechanical plant +
cooling fans: 35%
of total load, 73%
of non IT Load
BYPASS AIRFLOW CLARIFIED
© Upsite Technologies, Inc.6/2/2016 4
Definition of Bypass Airflow
Any cooling air that does not pass through IT
equipment before returning to a cooling unit
Bypass flow rate (CFM) = total cooling supply
flow rate (CFM) – total IT equipment flow rate
(CFM)
© Upsite Technologies, Inc.
ΔT Through IT Equipment
UPS load (kW) x avg CFM/kW = Total IT CFM
IT Equipment Required Flow Rate
IT
Equipment
Delta T
(deg F)
15° 20° 25° 30° 35° 40°
Required
flow rate
(CFM/kW)
211 158 126 105 90 79
© Upsite Technologies, Inc.
Bypass Airflow Clarified
Typical existing conditions
© Upsite Technologies, Inc.
Bypass Airflow Clarified
After AFM improvements
© Upsite Technologies, Inc.
Bypass Airflow Clarified
Optimized
© Upsite Technologies, Inc.
Upsite’s 4 R’s of Airflow Management™
 A holistic approach
 An iterative process
 ‘check in’ at the room level
after making any
adjustments
6/2/2016 10
Watch video at:
upsite.com/resources/airflow-management/
© Upsite Technologies, Inc.
Airflow Management Best Practices
Gone Wrong, What We Can Learn
Mark Seymour
Future Facilities 11
This presentation illustrates some of the classic actions in a
data center that can create airflow management issues
The intent is to reveal:
• Why considering airflow is important
• That good practice is just that – it’s not a guarantee
• Engineering simulation is used to illustrate airflow that is
otherwise unseen and enabling proactive operational
management
• Airflow management applies to both the rack/cabinet level
and the room level
Introduction
© Upsite Technologies, Inc.6/2/2016 12
futurefacilities.co
m
Energy efficiency of the
cooling system can be
undermined by
• Negative flow 
o Often through perforated tiles
near the cooling unit
• By-pass
o Can overshoot IT or pass
through unmanaged leakage.
E.g. cable penetrations
• Recirculation 
o Occurs in the rack as well as
the room is important
Common issues
© Upsite Technologies, Inc.6/2/2016 13
CABLE PENETRATIONS & LEAKAGE
© Upsite Technologies, Inc.6/2/2016 14
futurefacilities.co
m
 Unmanaged cable
penetrations
 Typically installed in
raised floor in rear if the
cabinet
 Installing cable
management is an easy
win but care should be
taken to ensure the
cooling is not in use
Leakage Paths
 Watch for leakage paths
• Under the cabinet
• Over the cabinet (through
containment)
• Between cabinets
• End of rows (through
containment)
• Through Cooling Units on
standby
• Similarly in the rack
o Under
o Over
o Between
o Around equipment
o Through IT equipment that is
off
© Upsite Technologies, Inc.6/2/2016 15
futurefacilities.co
m
Cable Penetration Seals
Cable Penetration Management
 Why practice it?
• Stop air leaking out of the
cable penetrations
• Increase the pressure in
the raised floor plenum
• Stop bypass cooling down
the hot return air
• Force more air out of the
perforated tiles and grates
in front of the IT
equipment
© Upsite Technologies, Inc.6/2/2016 16
futurefacilities.co
m
 Hot Aisle / Cold
Aisle
 Mix of Equipment
 Size: 1,066 sq. ft.
 Cooling: 55.6 tons
(196 kW)
 Load: 152 kW
Example Room
© Upsite Technologies, Inc.6/2/2016 17
futurefacilities.co
m
ASHRAE Temperature Compliance
One rack has inlet temperatures above the ASHRAE
Temperature Compliance recommended range
© Upsite Technologies, Inc.6/2/2016 18
Using simulation we can investigate the impact of adding
brush seals to the cable penetrations:
Modeling of Penetration Seals
© Upsite Technologies, Inc.6/2/2016 19
futurefacilities.co
m
Static Pressure
© Upsite Technologies, Inc.6/2/2016 20
futurefacilities.co
m
Perforated Tile Flow
© Upsite Technologies, Inc.6/2/2016 21
futurefacilities.co
m
ASHRAE Temperature Results
Comparison
© Upsite Technologies, Inc.6/2/2016 22
Improving raised floor open area
management reveals need to improve
rack airflow management
futurefacilities.co
m
Why Did the Room Get Worse?
With Brush
Seals
No Seals
Improving rack airflow management with blanking
panels, rail seals, and under rack panels will bring IT
intake air temperatures back into compliance
© Upsite Technologies, Inc.6/2/2016 23
futurefacilities.co
m
 Sealing holes in the floor are still the best practice
 It is critical to apply best practices to sealing the
cabinet at the same time.
 Final engineering simulation image would reveal
optimized cooling with no exhaust air recirculation
6/2/2016 © Upsite Technologies, Inc. 24
futurefacilities.co
m
Equipment Configuration
Consider a cabinet housing
a blade system and 3 1U
servers
• Does it matter how the 2
equipment types are
installed in this cabinet?
• Option 1 – Three 1U
servers placed on top of a
BladeCenter H
3kW Blade
Enclosure
3 x 1U 275W
Servers
15o
C / 59°F Supply Air
© Upsite Technologies, Inc.6/2/2016 25
futurefacilities.co
m
Equipment Configuration
Base Configuration – Option 1
Recirculation
under cabinet
Maximum inlet temperature
o
C (°F)
Blade 27.1 (80.8)
Server1 19.6 (67.3)
Server2 19.7 (67.5)
Server3 18.9 (66.0)
© Upsite Technologies, Inc.6/2/2016 26
futurefacilities.co
m
Equipment Configuration
Option: 1U servers under blade
Maximum inlet temperature
o
C (°F)
Blade 18.1 (64.6)
Server1 19.1 (66.4)
Server2 20.9 (69.6)
Server3 21.8 (71.2)
Recirculation from
1u servers is cooler
Recirculation of this nature can occur
whether or not the data center is
contained. The solution is blocking the
under rack airflow.
© Upsite Technologies, Inc.
6/2/2016 27
AISLE CONTAINMENT
© Upsite Technologies, Inc.6/2/2016 28
futurefacilities.co
m
Consider two rows of equipment with full cold aisle
containment:
Cold Aisle Containment
© Upsite Technologies, Inc.6/2/2016 29
futurefacilities.co
m
Containment Measured
Warmer Air
Supply
No change
Colder Air
Supply
© Upsite Technologies, Inc.6/2/2016 30
futurefacilities.co
m
 Simulation shows what is
happening:
• There is a lack of available
airflow
• Uncontained, the
additional air required
recirculates via the room
over the top of the
cabinets. Consequently it
mixes and so is colder
than the air in the hot aisle
• Contained, the additional
air recirculates directly
from the back of the
cabinets and, without any
mixing, it is hotter.
Simulation Explains All
Uncontained
Contained
© Upsite Technologies, Inc.6/2/2016 31
COOLING UNITS
© Upsite Technologies, Inc.6/2/2016 32
futurefacilities.co
m
 More efficient (up to 30%)
 Easily controlled (0-10V
signal)
 Longer life and reduced
maintenance
 Improved airflow through
the CRAC/CRAH
 Reduced noise
Benefits of EC fans?
© Upsite Technologies, Inc.6/2/2016 33
futurefacilities.co
m
Air Distribution
EC Plug Fans vs Traditional Blowers
Blower
© Upsite Technologies, Inc.6/2/2016 34
Traditional BlowersLowered EC Plug Fans
The different types of fans distribute air in different ways
The Effect on Airflow
© Upsite Technologies, Inc.6/2/2016 35
futurefacilities.co
m
 6,727ft² of floor space
 200+ Cabinets
 800kW Cooling Capacity at
N+2
Test Facility
© Upsite Technologies, Inc.6/2/2016 36
 Airflow distribution patterns look very different.
 How has this affected the available cooling?
Grille Flow
© Upsite Technologies, Inc.6/2/2016 37
0
10
20
30
40
50
60
70
80
90
100
1 2 3 4 5 6 7 8 9 10 11 12 13
PotentialCooling(kW)
Cold Aisle
Cooling Available per Row
© Upsite Technologies, Inc.6/2/2016 38
Reduced cooling capacity puts IT at risk of thermal
shutdown
Immediate Issues
Aisle 4 cooling
reduced 21kW
64 Blades now at
risk
Aisle 5 cooling
reduced 15kW
30 Proliants now at
risk
© Upsite Technologies, Inc.6/2/2016 39
Immediate Issues
© Upsite Technologies, Inc.6/2/2016 40
Upsite's 4 R's of Airflow Optimization provide a guide for
implement changes and achieving the greatest benefits in
your data center.
“Efficiency can’t be purchased,
it has to be managed”
Julian Kudritzki
- The Uptime Institute
 Airflow management is essential for optimizing capacity
and efficiency of the entire data center
 Good practices are often beneficial but should be
undertaken with due diligence
 Airflow is invisible, therefore the hardest thing to manage
in a data center
 Actions for one scenario may be beneficial while in
another counter productive – e.g. total containment in an
over-provisioned scenario compared with an under-
provisioned scenario.
 Engineering simulation can visualize and help guide
airflow management choices
 Apply the 4 R’s Methodology to Airflow Management
Summary & Conclusions
© Upsite Technologies, Inc.6/2/2016 41
 June 8: 5 Myths of Data Center Containment
Presented by Lars Strong, P.E.
 June 15: How IT Decisions Impact Facilities: The
Importance of Mutual Understanding
Presented by Ian Seaton and Lars Strong, P.E.
 June 22: The 4 Delta T’s of Airflow Management
Presented by Lars Strong, P.E.
 Register at upsite.com/airflow-management-awareness-
month
Upcoming Schedule
© Upsite Technologies, Inc.6/2/2016 42
Thank you!
@UpsiteTech
blog.upsite.com
On LinkedIn
Lars Strong, P.E.
Senior Engineer, Upsite
Technologies
lstrong@upsite.com
Follow Upsite for the latest
news and information on
data center AFM.
Mark Seymour
Senior Engineer, Future
Facilities
Mark.Seymour@futurefacilities.com

Más contenido relacionado

La actualidad más candente

Data Center Floor Design - Your Layout Can Save of Kill Your PUE & Cooling Ef...
Data Center Floor Design - Your Layout Can Save of Kill Your PUE & Cooling Ef...Data Center Floor Design - Your Layout Can Save of Kill Your PUE & Cooling Ef...
Data Center Floor Design - Your Layout Can Save of Kill Your PUE & Cooling Ef...Maria Demitras
 
Improvements in Data Center Management
Improvements in Data Center ManagementImprovements in Data Center Management
Improvements in Data Center ManagementScottMadden, Inc.
 
Data Center Cooling, Critical Facility and Infrastructure Optimization
Data Center Cooling, Critical Facility and Infrastructure OptimizationData Center Cooling, Critical Facility and Infrastructure Optimization
Data Center Cooling, Critical Facility and Infrastructure OptimizationGreg Stover
 
Datacenter101
Datacenter101Datacenter101
Datacenter101tarundua
 
Data center design 2
Data center design 2Data center design 2
Data center design 2Aditya Gupta
 
How to Calculate Data Center TCO (SlideShare)
How to Calculate Data Center TCO (SlideShare)How to Calculate Data Center TCO (SlideShare)
How to Calculate Data Center TCO (SlideShare)SP Home Run Inc.
 
Data Center Cooling Design - Datacenter-serverroom
Data Center Cooling Design - Datacenter-serverroomData Center Cooling Design - Datacenter-serverroom
Data Center Cooling Design - Datacenter-serverroommarlisaclark
 
Improved efficiency & reliability for servers using immersion cooling technology
Improved efficiency & reliability for servers using immersion cooling technologyImproved efficiency & reliability for servers using immersion cooling technology
Improved efficiency & reliability for servers using immersion cooling technologyASQ Reliability Division
 
HCIA-Data Center Facility V2.0 Training Material.pdf
HCIA-Data Center Facility V2.0 Training Material.pdfHCIA-Data Center Facility V2.0 Training Material.pdf
HCIA-Data Center Facility V2.0 Training Material.pdfGermanVN
 
Datacenter best practices design and implementation
Datacenter best practices design and implementationDatacenter best practices design and implementation
Datacenter best practices design and implementationAnton An
 
COMMON PROBLEMS AND CHALLENGES IN DATA CENTRES
COMMON PROBLEMS AND CHALLENGES IN DATA CENTRESCOMMON PROBLEMS AND CHALLENGES IN DATA CENTRES
COMMON PROBLEMS AND CHALLENGES IN DATA CENTRESKamran Hassan
 
Data Center Lessons Learned
Data Center Lessons LearnedData Center Lessons Learned
Data Center Lessons LearnedTom Greenbaum
 

La actualidad más candente (20)

Best Practices for Planning your Datacenter
Best Practices for Planning your DatacenterBest Practices for Planning your Datacenter
Best Practices for Planning your Datacenter
 
Data Center Floor Design - Your Layout Can Save of Kill Your PUE & Cooling Ef...
Data Center Floor Design - Your Layout Can Save of Kill Your PUE & Cooling Ef...Data Center Floor Design - Your Layout Can Save of Kill Your PUE & Cooling Ef...
Data Center Floor Design - Your Layout Can Save of Kill Your PUE & Cooling Ef...
 
Modular Data Center Design
Modular Data Center DesignModular Data Center Design
Modular Data Center Design
 
Improvements in Data Center Management
Improvements in Data Center ManagementImprovements in Data Center Management
Improvements in Data Center Management
 
Ashrae thermal guidelines svlg 2015 (1)
Ashrae thermal guidelines  svlg 2015 (1)Ashrae thermal guidelines  svlg 2015 (1)
Ashrae thermal guidelines svlg 2015 (1)
 
Data Center Cooling, Critical Facility and Infrastructure Optimization
Data Center Cooling, Critical Facility and Infrastructure OptimizationData Center Cooling, Critical Facility and Infrastructure Optimization
Data Center Cooling, Critical Facility and Infrastructure Optimization
 
Data center
Data centerData center
Data center
 
Datacenter101
Datacenter101Datacenter101
Datacenter101
 
Data center design 2
Data center design 2Data center design 2
Data center design 2
 
How to Calculate Data Center TCO (SlideShare)
How to Calculate Data Center TCO (SlideShare)How to Calculate Data Center TCO (SlideShare)
How to Calculate Data Center TCO (SlideShare)
 
Data Center Cooling Design - Datacenter-serverroom
Data Center Cooling Design - Datacenter-serverroomData Center Cooling Design - Datacenter-serverroom
Data Center Cooling Design - Datacenter-serverroom
 
Improved efficiency & reliability for servers using immersion cooling technology
Improved efficiency & reliability for servers using immersion cooling technologyImproved efficiency & reliability for servers using immersion cooling technology
Improved efficiency & reliability for servers using immersion cooling technology
 
HCIA-Data Center Facility V2.0 Training Material.pdf
HCIA-Data Center Facility V2.0 Training Material.pdfHCIA-Data Center Facility V2.0 Training Material.pdf
HCIA-Data Center Facility V2.0 Training Material.pdf
 
Data Center Cooling Study on Liquid Cooling
Data Center Cooling Study on Liquid CoolingData Center Cooling Study on Liquid Cooling
Data Center Cooling Study on Liquid Cooling
 
Data Center Site Selection
Data Center Site SelectionData Center Site Selection
Data Center Site Selection
 
Data Center Server Rack Strategies
Data Center Server Rack StrategiesData Center Server Rack Strategies
Data Center Server Rack Strategies
 
Data center
Data centerData center
Data center
 
Datacenter best practices design and implementation
Datacenter best practices design and implementationDatacenter best practices design and implementation
Datacenter best practices design and implementation
 
COMMON PROBLEMS AND CHALLENGES IN DATA CENTRES
COMMON PROBLEMS AND CHALLENGES IN DATA CENTRESCOMMON PROBLEMS AND CHALLENGES IN DATA CENTRES
COMMON PROBLEMS AND CHALLENGES IN DATA CENTRES
 
Data Center Lessons Learned
Data Center Lessons LearnedData Center Lessons Learned
Data Center Lessons Learned
 

Similar a The Science Behind Airflow Management Best Practices

Myths of Data Center Containment:Whats's True and What's Not
Myths of Data Center Containment:Whats's True and What's NotMyths of Data Center Containment:Whats's True and What's Not
Myths of Data Center Containment:Whats's True and What's NotUpsite Technologies
 
How IT Decisions Impact Facilities: The Importance of Mutual Understanding
How IT Decisions Impact Facilities: The Importance of Mutual UnderstandingHow IT Decisions Impact Facilities: The Importance of Mutual Understanding
How IT Decisions Impact Facilities: The Importance of Mutual UnderstandingUpsite Technologies
 
Slides: The Top 3 North America Data Center Trends for Cooling
Slides: The Top 3 North America Data Center Trends for CoolingSlides: The Top 3 North America Data Center Trends for Cooling
Slides: The Top 3 North America Data Center Trends for CoolingGraybar
 
Data center cooling ahmed abdel-salam (2019)
Data center cooling   ahmed abdel-salam (2019)Data center cooling   ahmed abdel-salam (2019)
Data center cooling ahmed abdel-salam (2019)Ahmed Abdel-Salam
 
In the Data Center: Five Keys to Achieving Ultra-Low PUEs
In the Data Center: Five Keys to Achieving Ultra-Low PUEsIn the Data Center: Five Keys to Achieving Ultra-Low PUEs
In the Data Center: Five Keys to Achieving Ultra-Low PUEsVantage Data Centers
 
Afcom air control solution presentation
Afcom air control solution presentation Afcom air control solution presentation
Afcom air control solution presentation stacygriggs
 
IRJET- AC Room Design on HVAC
IRJET- AC Room Design on HVACIRJET- AC Room Design on HVAC
IRJET- AC Room Design on HVACIRJET Journal
 
High Efficiency technologies for Data Centre Air Conditioning
High Efficiency technologies for  Data Centre Air ConditioningHigh Efficiency technologies for  Data Centre Air Conditioning
High Efficiency technologies for Data Centre Air ConditioningCAREL Industries S.p.A
 
TCI Control System Overview
TCI Control System OverviewTCI Control System Overview
TCI Control System OverviewErnieAd
 
Exceeding the Limits of Air Cooling to Unlock Greater Potential in HPC
Exceeding the Limits of Air Cooling to Unlock Greater Potential in HPCExceeding the Limits of Air Cooling to Unlock Greater Potential in HPC
Exceeding the Limits of Air Cooling to Unlock Greater Potential in HPCinside-BigData.com
 
IRJET- Experimental Analysis on Liquid-Cooled Minichannel Heatsink for Pe...
IRJET-  	  Experimental Analysis on Liquid-Cooled Minichannel Heatsink for Pe...IRJET-  	  Experimental Analysis on Liquid-Cooled Minichannel Heatsink for Pe...
IRJET- Experimental Analysis on Liquid-Cooled Minichannel Heatsink for Pe...IRJET Journal
 
Data Center Cooling System Design: Reducing Cooling Costs and Power Consumpti...
Data Center Cooling System Design: Reducing Cooling Costs and Power Consumpti...Data Center Cooling System Design: Reducing Cooling Costs and Power Consumpti...
Data Center Cooling System Design: Reducing Cooling Costs and Power Consumpti...SimScale
 
DC inverter technology in HVAC-R business
DC inverter technology in HVAC-R businessDC inverter technology in HVAC-R business
DC inverter technology in HVAC-R businessCAREL Industries S.p.A
 
OCP liquid direct to chip temperature guideline.pdf
OCP liquid direct to chip temperature guideline.pdfOCP liquid direct to chip temperature guideline.pdf
OCP liquid direct to chip temperature guideline.pdfbui thequan
 
Proactively Managing Your Data Center Infrastructure
Proactively Managing Your Data Center InfrastructureProactively Managing Your Data Center Infrastructure
Proactively Managing Your Data Center Infrastructurekimotte
 
Aircon Saver
Aircon SaverAircon Saver
Aircon Saverselengia
 
Dns Smartcool Telecom
Dns Smartcool TelecomDns Smartcool Telecom
Dns Smartcool Telecomsdas61
 

Similar a The Science Behind Airflow Management Best Practices (20)

Myths of Data Center Containment:Whats's True and What's Not
Myths of Data Center Containment:Whats's True and What's NotMyths of Data Center Containment:Whats's True and What's Not
Myths of Data Center Containment:Whats's True and What's Not
 
How IT Decisions Impact Facilities: The Importance of Mutual Understanding
How IT Decisions Impact Facilities: The Importance of Mutual UnderstandingHow IT Decisions Impact Facilities: The Importance of Mutual Understanding
How IT Decisions Impact Facilities: The Importance of Mutual Understanding
 
Slides: The Top 3 North America Data Center Trends for Cooling
Slides: The Top 3 North America Data Center Trends for CoolingSlides: The Top 3 North America Data Center Trends for Cooling
Slides: The Top 3 North America Data Center Trends for Cooling
 
Data center cooling ahmed abdel-salam (2019)
Data center cooling   ahmed abdel-salam (2019)Data center cooling   ahmed abdel-salam (2019)
Data center cooling ahmed abdel-salam (2019)
 
Eliminating Data Center Hot Spots
Eliminating Data Center Hot SpotsEliminating Data Center Hot Spots
Eliminating Data Center Hot Spots
 
In the Data Center: Five Keys to Achieving Ultra-Low PUEs
In the Data Center: Five Keys to Achieving Ultra-Low PUEsIn the Data Center: Five Keys to Achieving Ultra-Low PUEs
In the Data Center: Five Keys to Achieving Ultra-Low PUEs
 
Eficiencia Data Center
Eficiencia Data CenterEficiencia Data Center
Eficiencia Data Center
 
Afcom air control solution presentation
Afcom air control solution presentation Afcom air control solution presentation
Afcom air control solution presentation
 
IRJET- AC Room Design on HVAC
IRJET- AC Room Design on HVACIRJET- AC Room Design on HVAC
IRJET- AC Room Design on HVAC
 
High Efficiency technologies for Data Centre Air Conditioning
High Efficiency technologies for  Data Centre Air ConditioningHigh Efficiency technologies for  Data Centre Air Conditioning
High Efficiency technologies for Data Centre Air Conditioning
 
TCI Control System Overview
TCI Control System OverviewTCI Control System Overview
TCI Control System Overview
 
Virtualización para la Eficiencia
Virtualización para la EficienciaVirtualización para la Eficiencia
Virtualización para la Eficiencia
 
Exceeding the Limits of Air Cooling to Unlock Greater Potential in HPC
Exceeding the Limits of Air Cooling to Unlock Greater Potential in HPCExceeding the Limits of Air Cooling to Unlock Greater Potential in HPC
Exceeding the Limits of Air Cooling to Unlock Greater Potential in HPC
 
IRJET- Experimental Analysis on Liquid-Cooled Minichannel Heatsink for Pe...
IRJET-  	  Experimental Analysis on Liquid-Cooled Minichannel Heatsink for Pe...IRJET-  	  Experimental Analysis on Liquid-Cooled Minichannel Heatsink for Pe...
IRJET- Experimental Analysis on Liquid-Cooled Minichannel Heatsink for Pe...
 
Data Center Cooling System Design: Reducing Cooling Costs and Power Consumpti...
Data Center Cooling System Design: Reducing Cooling Costs and Power Consumpti...Data Center Cooling System Design: Reducing Cooling Costs and Power Consumpti...
Data Center Cooling System Design: Reducing Cooling Costs and Power Consumpti...
 
DC inverter technology in HVAC-R business
DC inverter technology in HVAC-R businessDC inverter technology in HVAC-R business
DC inverter technology in HVAC-R business
 
OCP liquid direct to chip temperature guideline.pdf
OCP liquid direct to chip temperature guideline.pdfOCP liquid direct to chip temperature guideline.pdf
OCP liquid direct to chip temperature guideline.pdf
 
Proactively Managing Your Data Center Infrastructure
Proactively Managing Your Data Center InfrastructureProactively Managing Your Data Center Infrastructure
Proactively Managing Your Data Center Infrastructure
 
Aircon Saver
Aircon SaverAircon Saver
Aircon Saver
 
Dns Smartcool Telecom
Dns Smartcool TelecomDns Smartcool Telecom
Dns Smartcool Telecom
 

Último

Moving Beyond Passwords: FIDO Paris Seminar.pdf
Moving Beyond Passwords: FIDO Paris Seminar.pdfMoving Beyond Passwords: FIDO Paris Seminar.pdf
Moving Beyond Passwords: FIDO Paris Seminar.pdfLoriGlavin3
 
Developer Data Modeling Mistakes: From Postgres to NoSQL
Developer Data Modeling Mistakes: From Postgres to NoSQLDeveloper Data Modeling Mistakes: From Postgres to NoSQL
Developer Data Modeling Mistakes: From Postgres to NoSQLScyllaDB
 
New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024BookNet Canada
 
Transcript: New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024Transcript: New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024BookNet Canada
 
The Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptx
The Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptxThe Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptx
The Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptxLoriGlavin3
 
How to write a Business Continuity Plan
How to write a Business Continuity PlanHow to write a Business Continuity Plan
How to write a Business Continuity PlanDatabarracks
 
Use of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptx
Use of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptxUse of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptx
Use of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptxLoriGlavin3
 
Nell’iperspazio con Rocket: il Framework Web di Rust!
Nell’iperspazio con Rocket: il Framework Web di Rust!Nell’iperspazio con Rocket: il Framework Web di Rust!
Nell’iperspazio con Rocket: il Framework Web di Rust!Commit University
 
From Family Reminiscence to Scholarly Archive .
From Family Reminiscence to Scholarly Archive .From Family Reminiscence to Scholarly Archive .
From Family Reminiscence to Scholarly Archive .Alan Dix
 
SAP Build Work Zone - Overview L2-L3.pptx
SAP Build Work Zone - Overview L2-L3.pptxSAP Build Work Zone - Overview L2-L3.pptx
SAP Build Work Zone - Overview L2-L3.pptxNavinnSomaal
 
TeamStation AI System Report LATAM IT Salaries 2024
TeamStation AI System Report LATAM IT Salaries 2024TeamStation AI System Report LATAM IT Salaries 2024
TeamStation AI System Report LATAM IT Salaries 2024Lonnie McRorey
 
What's New in Teams Calling, Meetings and Devices March 2024
What's New in Teams Calling, Meetings and Devices March 2024What's New in Teams Calling, Meetings and Devices March 2024
What's New in Teams Calling, Meetings and Devices March 2024Stephanie Beckett
 
"ML in Production",Oleksandr Bagan
"ML in Production",Oleksandr Bagan"ML in Production",Oleksandr Bagan
"ML in Production",Oleksandr BaganFwdays
 
How AI, OpenAI, and ChatGPT impact business and software.
How AI, OpenAI, and ChatGPT impact business and software.How AI, OpenAI, and ChatGPT impact business and software.
How AI, OpenAI, and ChatGPT impact business and software.Curtis Poe
 
unit 4 immunoblotting technique complete.pptx
unit 4 immunoblotting technique complete.pptxunit 4 immunoblotting technique complete.pptx
unit 4 immunoblotting technique complete.pptxBkGupta21
 
Merck Moving Beyond Passwords: FIDO Paris Seminar.pptx
Merck Moving Beyond Passwords: FIDO Paris Seminar.pptxMerck Moving Beyond Passwords: FIDO Paris Seminar.pptx
Merck Moving Beyond Passwords: FIDO Paris Seminar.pptxLoriGlavin3
 
The Role of FIDO in a Cyber Secure Netherlands: FIDO Paris Seminar.pptx
The Role of FIDO in a Cyber Secure Netherlands: FIDO Paris Seminar.pptxThe Role of FIDO in a Cyber Secure Netherlands: FIDO Paris Seminar.pptx
The Role of FIDO in a Cyber Secure Netherlands: FIDO Paris Seminar.pptxLoriGlavin3
 
DevEX - reference for building teams, processes, and platforms
DevEX - reference for building teams, processes, and platformsDevEX - reference for building teams, processes, and platforms
DevEX - reference for building teams, processes, and platformsSergiu Bodiu
 
What is DBT - The Ultimate Data Build Tool.pdf
What is DBT - The Ultimate Data Build Tool.pdfWhat is DBT - The Ultimate Data Build Tool.pdf
What is DBT - The Ultimate Data Build Tool.pdfMounikaPolabathina
 

Último (20)

Moving Beyond Passwords: FIDO Paris Seminar.pdf
Moving Beyond Passwords: FIDO Paris Seminar.pdfMoving Beyond Passwords: FIDO Paris Seminar.pdf
Moving Beyond Passwords: FIDO Paris Seminar.pdf
 
Developer Data Modeling Mistakes: From Postgres to NoSQL
Developer Data Modeling Mistakes: From Postgres to NoSQLDeveloper Data Modeling Mistakes: From Postgres to NoSQL
Developer Data Modeling Mistakes: From Postgres to NoSQL
 
New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
 
Transcript: New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024Transcript: New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024
 
The Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptx
The Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptxThe Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptx
The Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptx
 
How to write a Business Continuity Plan
How to write a Business Continuity PlanHow to write a Business Continuity Plan
How to write a Business Continuity Plan
 
Use of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptx
Use of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptxUse of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptx
Use of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptx
 
Nell’iperspazio con Rocket: il Framework Web di Rust!
Nell’iperspazio con Rocket: il Framework Web di Rust!Nell’iperspazio con Rocket: il Framework Web di Rust!
Nell’iperspazio con Rocket: il Framework Web di Rust!
 
From Family Reminiscence to Scholarly Archive .
From Family Reminiscence to Scholarly Archive .From Family Reminiscence to Scholarly Archive .
From Family Reminiscence to Scholarly Archive .
 
SAP Build Work Zone - Overview L2-L3.pptx
SAP Build Work Zone - Overview L2-L3.pptxSAP Build Work Zone - Overview L2-L3.pptx
SAP Build Work Zone - Overview L2-L3.pptx
 
TeamStation AI System Report LATAM IT Salaries 2024
TeamStation AI System Report LATAM IT Salaries 2024TeamStation AI System Report LATAM IT Salaries 2024
TeamStation AI System Report LATAM IT Salaries 2024
 
What's New in Teams Calling, Meetings and Devices March 2024
What's New in Teams Calling, Meetings and Devices March 2024What's New in Teams Calling, Meetings and Devices March 2024
What's New in Teams Calling, Meetings and Devices March 2024
 
"ML in Production",Oleksandr Bagan
"ML in Production",Oleksandr Bagan"ML in Production",Oleksandr Bagan
"ML in Production",Oleksandr Bagan
 
How AI, OpenAI, and ChatGPT impact business and software.
How AI, OpenAI, and ChatGPT impact business and software.How AI, OpenAI, and ChatGPT impact business and software.
How AI, OpenAI, and ChatGPT impact business and software.
 
unit 4 immunoblotting technique complete.pptx
unit 4 immunoblotting technique complete.pptxunit 4 immunoblotting technique complete.pptx
unit 4 immunoblotting technique complete.pptx
 
Merck Moving Beyond Passwords: FIDO Paris Seminar.pptx
Merck Moving Beyond Passwords: FIDO Paris Seminar.pptxMerck Moving Beyond Passwords: FIDO Paris Seminar.pptx
Merck Moving Beyond Passwords: FIDO Paris Seminar.pptx
 
The Role of FIDO in a Cyber Secure Netherlands: FIDO Paris Seminar.pptx
The Role of FIDO in a Cyber Secure Netherlands: FIDO Paris Seminar.pptxThe Role of FIDO in a Cyber Secure Netherlands: FIDO Paris Seminar.pptx
The Role of FIDO in a Cyber Secure Netherlands: FIDO Paris Seminar.pptx
 
DevEX - reference for building teams, processes, and platforms
DevEX - reference for building teams, processes, and platformsDevEX - reference for building teams, processes, and platforms
DevEX - reference for building teams, processes, and platforms
 
DMCC Future of Trade Web3 - Special Edition
DMCC Future of Trade Web3 - Special EditionDMCC Future of Trade Web3 - Special Edition
DMCC Future of Trade Web3 - Special Edition
 
What is DBT - The Ultimate Data Build Tool.pdf
What is DBT - The Ultimate Data Build Tool.pdfWhat is DBT - The Ultimate Data Build Tool.pdf
What is DBT - The Ultimate Data Build Tool.pdf
 

The Science Behind Airflow Management Best Practices

  • 1. The Science Behind Airflow Management Best Practices Lars Strong, P.E., Upsite Technologies Mark Seymour, Future Facilities Airflow Management Awareness Month June 1, 2016
  • 2. Identify Your Opportunity © Upsite Technologies, Inc.6/2/2016 2 There are two types of computer rooms 1. Those without IT equipment intake air temperature problems • Improving AFM enables them to be more efficient 2. Those with IT equipment intake air temperature problems • Improving AFM solves intake air temperature problems (hot spots and cold spots) and enables them to be more efficient • More efficient results in: lower OPEX, deferred CAPEX, increased cooling capacity
  • 3. Why Airflow Management © Upsite Technologies, Inc.6/2/2016 3 Total Load IT Load PUE = Mechanical plant + cooling fans: 35% of total load, 73% of non IT Load
  • 4. BYPASS AIRFLOW CLARIFIED © Upsite Technologies, Inc.6/2/2016 4
  • 5. Definition of Bypass Airflow Any cooling air that does not pass through IT equipment before returning to a cooling unit Bypass flow rate (CFM) = total cooling supply flow rate (CFM) – total IT equipment flow rate (CFM) © Upsite Technologies, Inc.
  • 6. ΔT Through IT Equipment UPS load (kW) x avg CFM/kW = Total IT CFM IT Equipment Required Flow Rate IT Equipment Delta T (deg F) 15° 20° 25° 30° 35° 40° Required flow rate (CFM/kW) 211 158 126 105 90 79 © Upsite Technologies, Inc.
  • 7. Bypass Airflow Clarified Typical existing conditions © Upsite Technologies, Inc.
  • 8. Bypass Airflow Clarified After AFM improvements © Upsite Technologies, Inc.
  • 9. Bypass Airflow Clarified Optimized © Upsite Technologies, Inc.
  • 10. Upsite’s 4 R’s of Airflow Management™  A holistic approach  An iterative process  ‘check in’ at the room level after making any adjustments 6/2/2016 10 Watch video at: upsite.com/resources/airflow-management/ © Upsite Technologies, Inc.
  • 11. Airflow Management Best Practices Gone Wrong, What We Can Learn Mark Seymour Future Facilities 11
  • 12. This presentation illustrates some of the classic actions in a data center that can create airflow management issues The intent is to reveal: • Why considering airflow is important • That good practice is just that – it’s not a guarantee • Engineering simulation is used to illustrate airflow that is otherwise unseen and enabling proactive operational management • Airflow management applies to both the rack/cabinet level and the room level Introduction © Upsite Technologies, Inc.6/2/2016 12
  • 13. futurefacilities.co m Energy efficiency of the cooling system can be undermined by • Negative flow  o Often through perforated tiles near the cooling unit • By-pass o Can overshoot IT or pass through unmanaged leakage. E.g. cable penetrations • Recirculation  o Occurs in the rack as well as the room is important Common issues © Upsite Technologies, Inc.6/2/2016 13
  • 14. CABLE PENETRATIONS & LEAKAGE © Upsite Technologies, Inc.6/2/2016 14
  • 15. futurefacilities.co m  Unmanaged cable penetrations  Typically installed in raised floor in rear if the cabinet  Installing cable management is an easy win but care should be taken to ensure the cooling is not in use Leakage Paths  Watch for leakage paths • Under the cabinet • Over the cabinet (through containment) • Between cabinets • End of rows (through containment) • Through Cooling Units on standby • Similarly in the rack o Under o Over o Between o Around equipment o Through IT equipment that is off © Upsite Technologies, Inc.6/2/2016 15
  • 16. futurefacilities.co m Cable Penetration Seals Cable Penetration Management  Why practice it? • Stop air leaking out of the cable penetrations • Increase the pressure in the raised floor plenum • Stop bypass cooling down the hot return air • Force more air out of the perforated tiles and grates in front of the IT equipment © Upsite Technologies, Inc.6/2/2016 16
  • 17. futurefacilities.co m  Hot Aisle / Cold Aisle  Mix of Equipment  Size: 1,066 sq. ft.  Cooling: 55.6 tons (196 kW)  Load: 152 kW Example Room © Upsite Technologies, Inc.6/2/2016 17
  • 18. futurefacilities.co m ASHRAE Temperature Compliance One rack has inlet temperatures above the ASHRAE Temperature Compliance recommended range © Upsite Technologies, Inc.6/2/2016 18
  • 19. Using simulation we can investigate the impact of adding brush seals to the cable penetrations: Modeling of Penetration Seals © Upsite Technologies, Inc.6/2/2016 19
  • 20. futurefacilities.co m Static Pressure © Upsite Technologies, Inc.6/2/2016 20
  • 21. futurefacilities.co m Perforated Tile Flow © Upsite Technologies, Inc.6/2/2016 21
  • 22. futurefacilities.co m ASHRAE Temperature Results Comparison © Upsite Technologies, Inc.6/2/2016 22 Improving raised floor open area management reveals need to improve rack airflow management
  • 23. futurefacilities.co m Why Did the Room Get Worse? With Brush Seals No Seals Improving rack airflow management with blanking panels, rail seals, and under rack panels will bring IT intake air temperatures back into compliance © Upsite Technologies, Inc.6/2/2016 23
  • 24. futurefacilities.co m  Sealing holes in the floor are still the best practice  It is critical to apply best practices to sealing the cabinet at the same time.  Final engineering simulation image would reveal optimized cooling with no exhaust air recirculation 6/2/2016 © Upsite Technologies, Inc. 24
  • 25. futurefacilities.co m Equipment Configuration Consider a cabinet housing a blade system and 3 1U servers • Does it matter how the 2 equipment types are installed in this cabinet? • Option 1 – Three 1U servers placed on top of a BladeCenter H 3kW Blade Enclosure 3 x 1U 275W Servers 15o C / 59°F Supply Air © Upsite Technologies, Inc.6/2/2016 25
  • 26. futurefacilities.co m Equipment Configuration Base Configuration – Option 1 Recirculation under cabinet Maximum inlet temperature o C (°F) Blade 27.1 (80.8) Server1 19.6 (67.3) Server2 19.7 (67.5) Server3 18.9 (66.0) © Upsite Technologies, Inc.6/2/2016 26
  • 27. futurefacilities.co m Equipment Configuration Option: 1U servers under blade Maximum inlet temperature o C (°F) Blade 18.1 (64.6) Server1 19.1 (66.4) Server2 20.9 (69.6) Server3 21.8 (71.2) Recirculation from 1u servers is cooler Recirculation of this nature can occur whether or not the data center is contained. The solution is blocking the under rack airflow. © Upsite Technologies, Inc. 6/2/2016 27
  • 28. AISLE CONTAINMENT © Upsite Technologies, Inc.6/2/2016 28
  • 29. futurefacilities.co m Consider two rows of equipment with full cold aisle containment: Cold Aisle Containment © Upsite Technologies, Inc.6/2/2016 29
  • 30. futurefacilities.co m Containment Measured Warmer Air Supply No change Colder Air Supply © Upsite Technologies, Inc.6/2/2016 30
  • 31. futurefacilities.co m  Simulation shows what is happening: • There is a lack of available airflow • Uncontained, the additional air required recirculates via the room over the top of the cabinets. Consequently it mixes and so is colder than the air in the hot aisle • Contained, the additional air recirculates directly from the back of the cabinets and, without any mixing, it is hotter. Simulation Explains All Uncontained Contained © Upsite Technologies, Inc.6/2/2016 31
  • 32. COOLING UNITS © Upsite Technologies, Inc.6/2/2016 32
  • 33. futurefacilities.co m  More efficient (up to 30%)  Easily controlled (0-10V signal)  Longer life and reduced maintenance  Improved airflow through the CRAC/CRAH  Reduced noise Benefits of EC fans? © Upsite Technologies, Inc.6/2/2016 33
  • 34. futurefacilities.co m Air Distribution EC Plug Fans vs Traditional Blowers Blower © Upsite Technologies, Inc.6/2/2016 34
  • 35. Traditional BlowersLowered EC Plug Fans The different types of fans distribute air in different ways The Effect on Airflow © Upsite Technologies, Inc.6/2/2016 35
  • 36. futurefacilities.co m  6,727ft² of floor space  200+ Cabinets  800kW Cooling Capacity at N+2 Test Facility © Upsite Technologies, Inc.6/2/2016 36
  • 37.  Airflow distribution patterns look very different.  How has this affected the available cooling? Grille Flow © Upsite Technologies, Inc.6/2/2016 37
  • 38. 0 10 20 30 40 50 60 70 80 90 100 1 2 3 4 5 6 7 8 9 10 11 12 13 PotentialCooling(kW) Cold Aisle Cooling Available per Row © Upsite Technologies, Inc.6/2/2016 38
  • 39. Reduced cooling capacity puts IT at risk of thermal shutdown Immediate Issues Aisle 4 cooling reduced 21kW 64 Blades now at risk Aisle 5 cooling reduced 15kW 30 Proliants now at risk © Upsite Technologies, Inc.6/2/2016 39
  • 40. Immediate Issues © Upsite Technologies, Inc.6/2/2016 40 Upsite's 4 R's of Airflow Optimization provide a guide for implement changes and achieving the greatest benefits in your data center. “Efficiency can’t be purchased, it has to be managed” Julian Kudritzki - The Uptime Institute
  • 41.  Airflow management is essential for optimizing capacity and efficiency of the entire data center  Good practices are often beneficial but should be undertaken with due diligence  Airflow is invisible, therefore the hardest thing to manage in a data center  Actions for one scenario may be beneficial while in another counter productive – e.g. total containment in an over-provisioned scenario compared with an under- provisioned scenario.  Engineering simulation can visualize and help guide airflow management choices  Apply the 4 R’s Methodology to Airflow Management Summary & Conclusions © Upsite Technologies, Inc.6/2/2016 41
  • 42.  June 8: 5 Myths of Data Center Containment Presented by Lars Strong, P.E.  June 15: How IT Decisions Impact Facilities: The Importance of Mutual Understanding Presented by Ian Seaton and Lars Strong, P.E.  June 22: The 4 Delta T’s of Airflow Management Presented by Lars Strong, P.E.  Register at upsite.com/airflow-management-awareness- month Upcoming Schedule © Upsite Technologies, Inc.6/2/2016 42