REDEVELOPMENT OF MARKET AREAS
AT JAMSHEDPUR
Urban Development & Housing Department,
Government of Jharkhand
Jamshedpur a planned Industrial Town offers quality physical and social infrastructure for its residents
and visitors;
As a part of infrastructure creation, ten public markets were created between 1930 & 1990 across to
the town;
Markets along with Land were vested with Govt. under BLR Act
However with growth of population, development of unauthorized encroachments, deterioration of the
conditions of the shop, the infrastructure and hygienic condition of these markets has been under
severe strain;
The rapid urban growth has outpaced the capacity creation and there is an urgent need of augmenting
basic amenities/ infrastructure facilities like parking, fire safety, and access to emergency vehicles etc;
It is in keeping this in mind, Urban Development Department, Government of Jharkhand decided to
redevelop these markets on a Public Private Partnership (PPP) model and has taken out tender for
appointment of consultant for preparation of Feasibility Report and Detailed Project Report for 10
market
Background
Detailed Prefeasibility Report was prepared by in discussion with JUIDCO, JNAC. TATA Steel and other stakeholders for
all the ten market;
FR covered the market scenario and suggested possible components that maybe developed in addition to the
redevelopment of the existing markets. In discussions, the final components were approved
JUIDCO decided that in the First Phase, Draft DPR would be prepared only for Sakchi, Bistupur, Baridih and Golmuri.
The same was prepared and presented to JNAC/Tata Steel and other stakeholders and also submitted to JUIDCO.
The Draft DPR was thereafter presented to Committee of JUIDCO with Pr Secretary and Technical Sanction was
accorded in March 2018. Brief details of the Project are as follows:
Project Background
Market Land Area No of Existing Shops Current FAR
Utilization (% of
allowable)
FAR Proposed (in
the DPR) (% of
allowable)
Sakchi 17.20 2592 10.0% 88.0%
Bistupur 12.78 983 10.0% 89.7%
Golmuri 4.10 315 10.5% 100%
Baridih 2.92 213 8.1% 75.7%
A detailed presentation was made to Secretary UD & HD on 12.12.2018. He suggested the following:
Focus should be more on redevelopment of the existing shop keepers and their social benefits.
Explore the possibility whether some area can be allocated for housing for all and hospital in Sakchi
market
Bistupur being the city centre of Jamshedpur, ITUAL may explore the possibility of an iconic tower
modeled on the Shanghai Tower , may be explored, with all the facilities, amenities in one tower viz;
shops for re-habilitation of existing shop keepers, high end retail, multiplex, high end hotel, space for
townhall, commercial/ office space, urban haat, basement and multi level car parking etc. The
Chairman was of the view that focus should be to create more and more open and green space and
development of plaza/ public gathering space.
The project should clearly come out with the benefits it is accruing to the existing shop keepers, social,
economic & infrastructure benefits and benefits it accrues to the citizens.
He further instructed representatives of ITUAL to make necessary changes and submit a revised concept
plan (based on conceptual planning with indicative views).
The same was submitted to JUIDCO and DMA
Project Background
Overall Redevelopment of the urban centre which is highly unplanned and exposed to
several risks including Fire/ Stampede etc. The area also suffers from poor hygiene and
environmental degradation.
Provision of organised shops for all current occupants of the Market Area
Improvement of the current level of utilization of land which is very low and
unsustainable
Provision of adequate infrastructure such as Road, Water, Drainage, Sewerage, Solid
Waste, Power, etc.
Provision of housing for EWS/LIG and Medical Facilities through a quality Hospital
Provision of commensurate commercial and retail facilities which will cross subsidize the
development of the above and shall also provide livelihood options
Overall Objectives
Sakchi Market
Destination
Distance
(in km)
Jamshedpur Railway Station 7.5
Bistupur 3.5
Tata Steel 0.5
Civil Court 2.0
Tata Hospital 2.5
Sakchi Bus Stand 0.1
Introduction
Sakchi shopping centre is the largest market area in Jamshedpur. Total land area of the
market is to the tune of 17.2 acres (740520 sq. ft) with 2082 Shops as confirmed by TATA
Sakchi is considered to be the major retail hub in the city and is primarily famous for
wholesale trade and commerce.
. The market area is well mixed of various types of shops with predominant presence of
appeal & garments, wholesale grocery & stationery shops.
EXISTING IMAGES OF SAKCHI MARKET
S
No Particulars
Area
(Sq ft)
No of
Shops
1 BLOCK –I 12000 15
2 BLOCK- II 7000 10
3 BLOCK- III 9520 53
4 BLOCK- IV 2730 21
5 BLOCK- V 1680 14
6 BLOCK- VI 2200 22
7 BLOCK- VII 1560 13
8 BLOCK- VIII 7288 48
9 BLOCK- IX 4740 11
10 BLOCK- X 9216 93
11 CITY MARKET 29016 120
12
TANK AREA – “ T-
SECTION”
18526
114
13
F- SECTION “DALDA
LINE”
5488
49
14 TG – SECTION 1215 9
15 TD – SECTION 405 3
16
G-SECTION PUCCA
ROOF
1620
45
17
I-SECTION Pucca
roof shop
6720
82
S
No Particulars
Area
(Sq ft)
No of
Shops
18 COMMON ROOF FRUIT 1610 13
19 COMMON ROOF FISH 1974 73
20 COMMON ROOF MUTTON 384 19
21 COMMON ROOF VEG ST 12768 266
22 COMMON ROOF POTATO 5988 109
23 “ I “ SECTION TINSHED 5120 64
24 “ E “ SECTION TINSHED 540 16
25 “ G “ SECTION TINSHED 252 7
26 “ H “ SECTION TINSHED 216 7
27
H Section tinshed roof
shop
252
6
28 E SECTION PUCCA SHOP 360 10
29 PARTY BUILT STALL A-Sec 2390 24
30 PARTY BUILT STALL B-SEC 6519 55
31
PARTY BUILT STALL C Sec
MANIHARY LINE
2368
37
32
PARTY BUILT STALL C
Section
2304
29
33
PARTY BUILT STALL D-SEC
3653.2
5 17
34 PARTY BUILT STALL H1-SEC 5355 34
S
No Particulars
Area (Sq
ft)
No of
Shops
35 PARTY BUILT STALL H2- 2512 24
36
PARTY BUILT STALL J & J1-
S
5222
74
37 PARTY BUILT STALL J2-S 2928 22
38 PARTY BUILT STALL J3-S 3279 27
39 PARTY BUILT STALL I1-S 1674 17
40 PARTY BUILT STALL K-S 4010.75 52
41 PARTY BUILT STALL L-S 6632 61
42 PARTY BUILT STALL P1-S 1308 18
43 PARTY BUILT STALL P2-S 2504 8
44 PARTY BUILT STALL O-S 3648 45
45 PARTY BUILT STALL O1- 1506 49
46 Sanjay, EADYMADE,KH 7204 144
Daily Toll basis 2049
Open haat (Total of
approx 195 shops of 8' x
6')
9360
195
COMMON ROOF
VEGETABLE STALL (68
nos of stall of 8' x 6')
3264
68
Shalini market (approx
280 nos of shop of 6' x 6')
10080
280
Total Area in Sq ft 238109 2592
Existing Shops
Sakchi Market - layout
Tin Shed Market
Total No of Shops: 896
Approx BUA: 75,000 sq. ft
Dilapidated C ondition
Anytime can collapse.
Needs immediate attention
Mostly Temporary
Sheds/ Semi Pacca
No of Shops: 1698
Approx BUA: 163000
sq. ft
No Civic Infrastructure
and dilapidated
Sakchi Market
Master Plan & Design
PROPOSED MASTER PLAN
Basement + Vegetable Market (MDO) + Multi Level Car Parking
Basement + Market (MDO) + Hotel
Basement + Market (MDO) + Office Space
Basement + Market (MDO) + Retail
Development Plan as per DDPR
Redevelopment planned with state of the art infrastructure
Attempts were made to provide all existing shopkeepers shops
near to their existing place
A 200 Bed Hospital which shall provide quality medical facilities
to all sections of citizens of Jamshedpur;
288 Dwelling Units proposed for EWS/LIG category for the
economically weaker section of people;
Provision of adequate infrastructure facilities;
Balance area to be used to provide commensurate commercial and
retail facilities which will also provide significant livelihood
opportunities;
MLCP to connect directly to shopping complex and commercial
centre.
Proposed Development Plan for Redevelopment with changes
• Total BUA will be approx 1.5
lac sq. ft
• Basement and Surface
Parking: 200 cars
• Ground Coverage: 0.79
acres
Master Plan for Redevelopment
• 200 bed hospital
•Total BUA will be approx 2.15 lac
sq. ft
• Basement and Surface Parking:
225 cars
• Ground Coverage: 0.71 acres
Master Plan for Redevelopment
• 288 dwelling unit planned
•Total BUA will be approx 0.9 lac sq. ft
1 2
3 4
6
5
7
8
Master Plan for Redevelopment
• Modern Shopping Complex
• G+5 structure
• Retail, Food Court, Entertainment/
Multiplex etc
• TBUA: 3.2 lac sq. ft approx
• Connected with MLCP
• Existing shops on Ground Floor
• MLCP
• G+5 structure
• Connected with Modern Shopping
Complex
• TBUA: 2.7 lac sq. ft approx
• approx 700 PCU
• Existing shops on Ground Floor
• Modern Shopping Complex with
Commercial
• G+5 structure
• TBUA: 2.6 lac sq. ft approx
• Connected with MLCP
• Existing shops on Ground Floor
•Commercial Centre
•0.9 lac sq. ft
•Existing Shops/
Retail (1.85 lac sq. ft)
Master Plan for Redevelopment
ARCHITECT IMPRESSION – Land scaping works
Key Features
Every current occupant to be provided with an organised shop along with full
required infrastructure, adequate hygiene safety and security;
The entire area which is currently exposed to significant risks from fire, stampede etc
shall now be developed as a safe, organised and quality urban centre;
10 Mtr Wide Road all along the periphery of the Site
Sakchi Market
Rehabilitation Plan
Re-Habilitation Land for Sakchi Market – AAM Bagan
Total area of Land : 6.153 Acre
Land available for Temporary
Rehabilitation : 3.8 Acre
The identified site is free from
encroachment.
JUSCO- supplied water & power is
available up to site boundary.
The site is flat terrain in nature
The existing Mazhar & Durga
Temple area within the site will be
untouched from development.
Site has been visited alongwith
JNAC Officials
Photographs of Re- Habilitation Site-Sakchi Market
Ambagan – Rehab Site
Block N
Block W
Block E
Block S
1
2
2
2
3
3
3
4
1. Shops from Block N will move to
Ambagan [chosen as Rehab Site]
CONSTRUCTION ACTIVITY FOR BLOCK E, W &
S
3. Shifted Shops of Block E, W & S will
move back to their respective Plots.
4. Shops from Rehab Site will move back to
Block N.
2. Shops from Block E,W & S will move to
New Block N.
CONSTRUCTION ACTIVITY FOR BLOCK N
Initial Movement
Return Movement
Re-Habilitation Plan of Sakchi Market
In view of site limitation, a sequential
rehabilitation plan has been proposed
Existing Sakchi Market- Northern Part
Conceptual Re- habilitation Plan-Sakchi Market
 Internal Road width : 3 M wide
 Main approach road : 6 M
 Proposed outer peripheral road for
expansion : 7 M wide
 Space for loading /unloading
 Dedicated Parking for Two wheeler/cycle
- 250 Nos
BISTUPUR MARKET
Bistupur Market
Land Area: 12.5 acres
No of Existing Shops: 983; (1.62 lac sq. ft)
Mostly temporary sheds; in dilapidated conditions
No basic amenities/ infrastructure facilities like parking, fire safety, unhygienic conditions, illegal tapping
of utility services etc
Re-development planned to provide:
Improved Market infrastructure with rights of existing tenants protected
Livable environment for small and marginal shop owners/ vegetable sellers
Quick emergency response with fire and other safety infrastructure
Proper sewerage and solid waste disposal
Bistupur Market
SUMMARY SHEET
# TYPE OF SHOP NO. OF SHOPS AREA (sq.ft.)
18PUCCA ROOF FISH STALL 22 865.62
19LINE NO-18 12 2807.00
20LINE NO-17 4 680.00
21LINE NO-16 13 2336.00
22LINE NO-15 25 11798.00
23LINE NO-14 4 1380.50
24LINE NO-13 8 1518.00
25LINE NO-12 10 7254.00
26LINE NO-11 8 1496.00
27LINE NO-10 22 8039.61
28LINE NO-9 6 1122.00
29LINE NO-8 24 8034.02
30LINE NO-7 5 3924.50
31LINE NO-6 6 4800.00
32LINE NO-5 19 2420.22
33LINE NO-4 31 11594.00
34LINE NO-3 20 3740.00
35LINE NO-2 17 1700.00
36LINE NO-1 60 30362.27
TOTAL 983 162232.66
SUMMARY SHEET
# TYPE OF SHOP
NO. OF
SHOPS
AREA (sq.ft.)
1GODOWNS & MILLS 24 13137.34
2PARTY BUILT STALL 52 3748.13
3COMPANY BUILT KIOSK 20 1142.17
4FRUIT STALL 50 2205.00
5TIN SHED STALL-OTS 49 5716.50
6TIN SHED STALL-NKTS 6 600.00
7TIN SHED STALL - H SECTION 208 9984.33
8TIN SHED STALL - G&G1 SECTION 39 3524.50
9TIN SHED STALL - F SECTION 14 832.00
10TIN SHED STALL - E&E1 SECTION 38 2795.73
11TIN SHED STALL - D1 SECTION 14 1263.72
12TIN SHED STALL - C1 SECTION 15 896.00
13TIN SHED STALL - B1 SECTION 11 500.00
14TIN SHED STALL - B SECTION 43 4144.50
15TIN SHED STALL - A1 SECTION 52 3340.00
16TIN SHED STALL - A SECTION 16 1596.00
17PUCCA ROOF MUTTON STALL 16 935.00
Current Picture of Bistupur Market
Phase II
Main Market:
Total BUA: 12.81 lac sq. ft
G+9 Structure
SB+G+9
SB+G+4: Retail; 4-5th :Multiplex & food court,
6-9th floor: Hotel & Office
Open Air Parking: 428 Nos
Development Plan as per DDPR
Phase I:
G+2 market to accommodate existing shops
except shops on the arterial roads
978 shops
Total BUA area: 2.18 lacs sq .ft
3rd, 4th & 5th Floor Floor: Car Parking of 2.18
lacs sq. ft
Total Parking: 624 (208 x3) Nos
Phase II
Multi Storey Parking (BUA): 5.66 lac sq. ft
G+5 structure,
Total Parking: 1680 (280 x6) Nos
3rd , 4th & 5th floor connected with Phase I
market
• Development of Organized Integrated City Bazaar with Modern
Infrastructure Facility for the existing Retailer
• Multi Storey Parking Facility
• Balance land to be utilized for Development of Retail,
Entertainment, Commercial and Hotel.
• Employment opportunity
• Economic Growth
• City Branding
All the above to be developed as One Mega Centre under a
Common Roof. One of its kind in India
Proposed Redevelopment Plan
Proposed Development Plan
Ground Floor: City Bazaar
1st to 5th Floor: Multi Storey
Parking
G+30 Tower
Basement, Ground and Upto 5th Floor: Retail,
Commercial, Emtertainment
6th to 30th: Hotel
City Bazaar
• The City Market will have:
• Wide Circulation (4.5 mtr and 3.78 mtr)
• State of the Art Infrastructure, Air Circulation etc 3 side open)
• Product wise Zoning: Vegetable, Fruits, Non Veg, Grocery, Hosiery etc
• One stop mega shopping destination
• Integrated with Retail, Commercial, Hospitality, & Entertainment Centre
City Bazaar
Perspective View
Ground Floor: City Bazaar (1.43
lac sq. ft)
1st to 5th Floor: Multi Storey
Parking (4.79 lac sq. ft; 1600
pcu);
On street parking: 375 pcu
Ground Floor to Fifth Floor: High
End retail, Commercial and
Entertainment Zone (7.18 lac sq.
ft)
5th Floor onward to 30th Floor: Hotel,
with entire terrace of 4.5 acres at 5th
Floor (7.62 lac sq. ft)
Can be utilized for
Urban Haat: 2.82
acres
TOTAL BUA: 21.03 LAC SQ.FT
INCL PARKING
Perspective View
REHABILITATION PLAN - BISTUPUR
Proposed Rehabilitation Plan
Site I:
Total Area: 122900 sq. ft
Type A: 7x10; No of Shops: 715
Site III:
Total Area: 22920 sq. ft
Type A: 7x10; No of Shops: 53
Type B: 7x5; No of Shops: 153
Total A & B: 206 shop
Total Requirement: 922 Shops
Shops Provided: 1155
Site I: 122900
sq ft
Site II: 26040
sq. ft
Total No of Shops to be Rehabilitated: 922
Shops not to be rehabilitated (on the Road Side:
61)
Site III: 22920
sq. ft
Site II:
Total Area: 26040 sq. ft
Type A: 7x10; No of Shops: 53
Type B: 7x5; No of Shops: 181
Total A & B: 234 shops
Site 1: Within the boundary of the Existing Market
Site 2 & 3: On the adjacent Road (North Road) of the
existing market
Legends
Entrance Road 20 ft wide
Internal Road 12ft, 10ft wide
No of Toilets 20 nos
Water Supply Provision made
Drainage Provision made
Parking Provision made
Utility Provision made
The Design is modular and
shops of all size can be
accommodated
Rehab Sites: Perspective Plan
Golmuri Market
Introduction
Golmuri Market
Golmuri shopping centre is community based local market
area in Jamshedpur.
It is located within residential colonies and accessible
through Golmuri Road.
The area is located close proximity to the premise of Tata
Tinplate and Incab industries.
Total No of Shops
TYPE OF SHOP No
AREA
(sq.ft.)
PARTY BUILT KIOSK 32 1280
PARTY BUILT STALLS 159 37555
COMPANY BUILT KIOSK 5 236
TIN SHED 49 5014
MUTTON STALL 4 416
FISH STALL 1 934
LINE.NO-02 61 6330
LINE.NO-01 4 3982
TOTAL 315 55748
Present development at Site on Google Map
Existing Pictures of Golmuri Market
Golmuri Market
Rehabilitation Plan
Golmuri Market – Need for Rehabilitation
.
• Tata Steel Suggested Circus
Maidan – to be utilised for
Rehabilitation of the Existing
Market
• Circus Maidan is adjacent to
the existing market
• Total No of Shops: 315
• No of Shops to be
rehabilitated: 236
• Balance Shops will not be
rehabilitated as the same is in
the set back area.
• The Design is modular and
shops of all size can be
accommodated
Google Image of Main Market and Rehab Site
MASTER PLAN FOR TEMPORARY REHABILITATION
Total No of Shops
Shops not being Rehabilitated
No of Shops being
rehabilitated
TYPE OF SHOP No
AREA
(sq.ft.)
No Area
No of
Shops
Area in Sq.
ft
PARTY BUILT KIOSK 32 1280 0 0 32 1280
PARTY BUILT STALLS 159 37555 18 4252 141 33304
COMPANY BUILT KIOSK 5 236 0 0 5 236
TIN SHED 49 5014 9 921 40 4093
MUTTON STALL 4 416 0 4 416
FISH STALL 1 934 0 1 934
LINE.NO-02 61 6330 48 4981 13 1349
LINE.NO-01 4 3982 4 3982 0 0
TOTAL 315 55748 79 14135 236 41612
As against requirement of 236 shops for rehabilitation, provision made for 288.
Total BUA required to be rehabilitated is 41612, provision is made for 45284 sq. ft
Type A: Size:11x22; Units: 117
Type B: Size: 11x11; Units: 110
Type C: Size: 7x8.6; Units: 61
The Design is modular and shops of all size can be accommodated
Legends
Entrance Road 20 ft wide
Internal Road 15ft, 10ft wide
No of Toilets 14 nos
Water Supply Provision made
Drainage Provision made
Parking Provision for 2 & 4 wheeler
MASTER PLAN FOR TEMPORARY REHABILITATION
3D-View of Rehabilitation Site
Golmuri Market : MASTER PLAN &
DESIGN
• Total plot area = 178596 square ft.
• Total permissible ground coverage = 89298 square ft.
• Total F.A.R. = 3
• BUA Proposed: 574939 sq. ft
• Total proposed ground coverage = 76796 sq ft.
• Proposed construction can be = 2B+G+7
• Existing Shops to be accomodated on the ground floor
• Total no. of 4 wheeler parking = 678 cars.
Master Plan & Design
Master Plan & Design
Road Frontage
Road Frontage
Road Frontage
Road Frontage
Master Plan & Design
PERSPECTIVE VIEW
PERSPECTIVE VIEW
Baridih Market
Introduction
Introduction
The proposed market is spread over 2.98 acres of land comprising of 1 major land
parcel and 2 fragment plots
The market area is well mixed of various types of shops with predominant presence of
grocery, garments & medicine items
Market Images
Baridih Market
Rehabilitation Plan
Existing Status of –Baridih Market
Existing Status of -Baridih Market
S. No. Name Plot Area (Sqmt)
1 Baridih-A 9547.02
2 Baridih-B 708.02
3 Baridih-C 1020.1
Area under proposed road 548.4
Total 11823.54
Total area (Acre) 2.92
Baridih-A
Baridih-B
Baridih-C
Baridih Market
TATA data
No. of Shops Total Area
Company Built 138 24507
Party Built 75 6532
213 31039
• Total no of Existing Shops : 213 nos
• Total Existing Built up area : 2884 sqmt
Rehabilitation site for -Baridih Market
Total area of land available for Re habilitation of
Existing Shops : 2.34 acre
The site surrounded by 5 m wide road all along
periphery
The Main approach road is from Kadani road
which is 7 M (ROW)
The site is free from all encroachment & Big
trees
Land mark of the site : Baridhi Post office
located western corner of the site.
the rehabilitation site is flat terrain in nature
the Site is located around 500 m from the
existing site.
the site was finalised after joint physical survey
with TATA officers & IIDC officers.
Baridhi Post
Office
Proposed Site for
Rehabilitation
Bairidih Rehabilitation site Photograph
Area Statement :
 Total area of land : 2.34 Sqmt ( 9467 Sqmt)
 Total no of Shops proposed : 213 Nos
 Total proposed Built up area of shops : 3448.467 sqmt
 Proposed green /open space area : 1135.65 sqmt
 Car parking area : 572.62 sqmt
 No of proposed car parking : 110 Nos
 Utility area : 735.93 sqmt
Baridih Conceptual Re habilitation Plan Market
Rehabilitation Plan
Baridh Market : MASTER PLAN &
DESIGN
PROPOSED MASTER PLAN
Proposed Floor area
Area (Sqmt) Total No parking No of Shops
Floors
Basement-1 5901.8 130
Basement-2 5901.8 130
Ground Floor 5901.8 162
1st Floor 4477.5 162
2nd Floor 4477.5 162
3rd Floor 4477.5 162
4th Floor 4477.5 162
5th Floor 4477.5 162
Surface Parking 66
40092.9 326 972
Architect Impression of Baridih Market
Planning Concept : The Courtyard Cluster
• The vegetable and meat markets have been clustered together in the left wing of site.
• The concept is derived from the idea of community living where the central space of any
development is predominantly a pedestrian and public space.
• Central courtyard is thus the focal point of design where all other activities have been
clustered around them.
• Vehicular movement has been restricted to peripheral roads whereas all the internal
roads are pedestrian only.
• MDO has been mainly accommodated majorly on ground and first floor
• Courtyards and semi-open corridors ensure light and ventilation in the built spaces.
• It creates a premium commercial space while at the same time integrating the common
public needs into its design and layout.
• The site can be accessed by all four major corridors bounding it.
Sakchi
Development of the temporary rehabilitation site and temporary relocation of the identified existing tenants as per rehabilitation plan
detailed out in the approved DPR.
Development of market complex for the existing shop keepers. After construction completion, handing over 100% of the existing built
up area to Government of Jharkhand free of cost towards rehabilitation of the existing tenants/ others (The Authority Allocation)
The guideline for Authority Allocation will be clearly defined in the bid document.
The Authority shall be entitled to transfer or dispose of its Allocation in the manner as it deem fit to it.
Development of 200 bed Multi Speciality Hospital
Development of 288 EWS Dwelling Units
Development of requisite infrastructure for the MDO
Bistupur
Development of the temporary rehabilitation site and temporary relocation of the identified existing tenants as per rehabilitation plan
detailed out in the approved DPR.
Development of market complex for the existing shop keepers. After construction completion, handing over 100% of the existing built
up area to Government of Jharkhand free of cost towards rehabilitation of the existing tenants/ others (The Authority Allocation)
Development of Urban Haat (in 2 acres land)
Development of requisite infrastructure for the MDO
Minimum Development Obligation of the Developer
Golmuri and Baridih
Development of the temporary rehabilitation site and temporary relocation of the identified existing tenants as per
rehabilitation plan detailed out in the approved DPR.
Development of market complex for the existing shop keepers. After construction completion, handing over 100% of the
existing built up area to Government of Jharkhand free of cost towards rehabilitation of the existing tenants/ others (The
Authority Allocation)
Development Guidelines
The selected developer to follow the Jharkhand Government Building Bye Laws
Parking lot to be provided in each market place in line with the Building Bye Laws
Minimum Development Obligation of the Developer
Suggested Structure – Free Hold
Private Player quoting highest auction price subject to minimum reserve price will be provided the free hold rights on the land
Reserve Price: Circle rate of the land less the cost of construction of MDO and proportionate land area involved in construction of MDO.
The Selected Developer to undertake the Minimum Development Obligation.
Development of the temporary rehabilitation site and temporary relocation of the identified existing tenants as per rehabilitation plan detailed out
in the approved DPR.
After construction completion, handing over ...... sqft (to be detailed out in the bid document) area in each market complex to Government of
Jharkhand free of cost towards rehabilitation of the existing tenants/ others (The Authority Allocation).
The Authority allocation will be clearly defined in the bid document.
The Authority shall be entitled to transfer or dispose of its Allocation in the manner as it deem fit to it.
Development of the balance area (Developers Area)
Developer to have right over its share of space – can sell/ lease/ license the shops to end users.
Till construction, Developer will only have the License Rights and Free hold rights will be effective only upon transfer of MDO to Government.
Approval of the Cabinet will be required for bypassing the Revenue Department Notification and for new
structure
Lease Hold Model
GoJ to give development right to selected bidder for period of 99 years
The Bidding parameter can be Upfront lease premium or a mix of Upfront lease premium or Revenue Sharing (Gujarat Model) or a mix of Upfront and Revenue
Sharing
The Selected Developer to undertake the Minimum Development Obligation.
Development of the temporary rehabilitation site and temporary relocation of the identified existing tenants as per rehabilitation plan detailed out
in the approved DPR.
After construction completion, handing over ...... sqft (to be detailed out in the bid document) area in each market complex to Government of
Jharkhand free of cost towards rehabilitation of the existing tenants/ others (The Authority Allocation).
The Authority allocation will be clearly defined in the bid document.
The Authority shall be entitled to transfer or dispose of its Allocation in the manner as it deem fit to it.
Development of the balance area (Developers Area)
Developer to have right over its share of space – can lease/ license the shops to end users.
Ownership of land remains with GoJ.
Alternate Structure – Lease Hold
Approval of the Cabinet will be required for bypassing the Revenue Department Notification, sub leasing of
land and for new structure
Suggested Structure – Free Hold
Project Implementation Stage:
Stage I: The Authority shall provide permissive possession of the site to enable the Developer to carry out survey & Testing to
finalize the Development Plan. The Developer to take all approvals as maybe required.
Stage II: Development of Rehabilitation Site: The Developer will be given the possession of the rehabilitation site as identified in
discussion with Tata Steel & JNAC for development of the Rehabilitation Site in line with the approved DPR.
Stage III (Development of MDO and Commercial Complex): Upon handing over of the MDO to the Authority, the Authority shall
enter into a Free Hold Agreement with the Developer thereby providing the free hold rights to the developer for balance area
Payments:
20% of the Bidding Price before signing of the Agreement with the Developer
Balance 80% prior to transfer of free hold/ lease hold rights to the Developer (Phase wise)
All the costs towards payment of tax dues, other dues including utility charges
Project Development Expenses incurred by JUIDCO
The project involves substantial amount of investment and involves varied components such as
hotels, office space, retail shop etc. These requires specialised understanding for development and
marketing. In view of the same, the selected agency while continuing to be responsible towards the
Authority, shall need to take into suitable agreements allowing specialised agencies and investors to
come in and implement the project and also share the risks. In the current structure, where sub-
leasing is not allowed, the selected agency will be required to make all investment and operate the
same till the lease period, which may be a challenge in lease model.
The project because of its investment requires funding by way of debt & equity. A free hold structure
would be more attractive to the banker as this will allow the mortgage of the land and structure both.
The free hold right will provide indefinite ownership with the private player and does not require state
consent to transfer ownership. It has been seen that after the expiry of long term lease, the State in
most of the cases finds it difficult to get the property vacated from the lessee. On books the property
remains with Government but with encroachments forever
Benefit of Free Hold over Lease Hold
Thank You

More Related Content

What's hot

“SMART CITY: A CASE STUDY OF VADODARA
“SMART CITY: A CASE STUDY OF VADODARA“SMART CITY: A CASE STUDY OF VADODARA
“SMART CITY: A CASE STUDY OF VADODARA
Yash Shah
 

What's hot (20)

Group Housing Bye Laws
Group Housing Bye LawsGroup Housing Bye Laws
Group Housing Bye Laws
 
Textile park thesis
Textile park thesisTextile park thesis
Textile park thesis
 
Review of Ananya Roy’s “Why India cannot plan its cities: informality, insurg...
Review of Ananya Roy’s “Why India cannot plan its cities: informality, insurg...Review of Ananya Roy’s “Why India cannot plan its cities: informality, insurg...
Review of Ananya Roy’s “Why India cannot plan its cities: informality, insurg...
 
Thesis Report on Integrated Industrial Park
Thesis Report on Integrated Industrial ParkThesis Report on Integrated Industrial Park
Thesis Report on Integrated Industrial Park
 
Town Planning Pimpri Chinchwad Municipal Corporation
Town Planning Pimpri Chinchwad Municipal Corporation Town Planning Pimpri Chinchwad Municipal Corporation
Town Planning Pimpri Chinchwad Municipal Corporation
 
“SMART CITY: A CASE STUDY OF VADODARA
“SMART CITY: A CASE STUDY OF VADODARA“SMART CITY: A CASE STUDY OF VADODARA
“SMART CITY: A CASE STUDY OF VADODARA
 
GIFT City
GIFT CityGIFT City
GIFT City
 
Land Pooling Models in India.pptx
Land Pooling Models in India.pptxLand Pooling Models in India.pptx
Land Pooling Models in India.pptx
 
Masdar City
Masdar CityMasdar City
Masdar City
 
Bhubaneswar- Urban Planning
Bhubaneswar- Urban PlanningBhubaneswar- Urban Planning
Bhubaneswar- Urban Planning
 
Regional plan
Regional plan Regional plan
Regional plan
 
ppp final dpr_02.12.15
ppp final dpr_02.12.15ppp final dpr_02.12.15
ppp final dpr_02.12.15
 
Architectural thesis synopsis
Architectural thesis synopsisArchitectural thesis synopsis
Architectural thesis synopsis
 
Why Pune?
Why Pune?Why Pune?
Why Pune?
 
20 Urban Renewal Projects
20 Urban Renewal Projects20 Urban Renewal Projects
20 Urban Renewal Projects
 
Solid waste management of warangal city
Solid waste management of warangal citySolid waste management of warangal city
Solid waste management of warangal city
 
Vertical cities presentation
Vertical cities presentationVertical cities presentation
Vertical cities presentation
 
Griha
GrihaGriha
Griha
 
GRIHA RATING SYSTEM
GRIHA RATING SYSTEMGRIHA RATING SYSTEM
GRIHA RATING SYSTEM
 
Nature and Psychological Comfort: Biophilic Architecture
Nature and Psychological Comfort: Biophilic ArchitectureNature and Psychological Comfort: Biophilic Architecture
Nature and Psychological Comfort: Biophilic Architecture
 

Similar to Jamshedpur Market.pdf

dokumen.tips_khalifa-port-industrial-zone-abu-dhabi-ports-company-abu-dhabi-e...
dokumen.tips_khalifa-port-industrial-zone-abu-dhabi-ports-company-abu-dhabi-e...dokumen.tips_khalifa-port-industrial-zone-abu-dhabi-ports-company-abu-dhabi-e...
dokumen.tips_khalifa-port-industrial-zone-abu-dhabi-ports-company-abu-dhabi-e...
MuthanaJallad
 
Skygate infopack
Skygate infopackSkygate infopack
Skygate infopack
Ignou Mba
 
Development control regulations kochi report
Development control regulations kochi reportDevelopment control regulations kochi report
Development control regulations kochi report
Geeva Chandana
 
#MP2013 Presentation of the Minister of the Federal Capital Territory Adminis...
#MP2013 Presentation of the Minister of the Federal Capital Territory Adminis...#MP2013 Presentation of the Minister of the Federal Capital Territory Adminis...
#MP2013 Presentation of the Minister of the Federal Capital Territory Adminis...
FMINigeria
 
Noble-Portfolio-S-new
Noble-Portfolio-S-newNoble-Portfolio-S-new
Noble-Portfolio-S-new
Noble George
 

Similar to Jamshedpur Market.pdf (20)

Cornubia Presentation: Investment and Development Opportunities
Cornubia Presentation: Investment and Development OpportunitiesCornubia Presentation: Investment and Development Opportunities
Cornubia Presentation: Investment and Development Opportunities
 
case study of World Trade Park, jaipur, rajasthan & Logix City Centre Noida.
case study of World Trade Park, jaipur, rajasthan & Logix City Centre Noida.case study of World Trade Park, jaipur, rajasthan & Logix City Centre Noida.
case study of World Trade Park, jaipur, rajasthan & Logix City Centre Noida.
 
DMIC Summit – Developing Hub for Investors
DMIC Summit – Developing Hub for Investors DMIC Summit – Developing Hub for Investors
DMIC Summit – Developing Hub for Investors
 
DMIC Summit – Developing Hub for Investors - Overview & Approach - Part - 1
DMIC Summit – Developing Hub for Investors - Overview & Approach - Part - 1DMIC Summit – Developing Hub for Investors - Overview & Approach - Part - 1
DMIC Summit – Developing Hub for Investors - Overview & Approach - Part - 1
 
QAAP
QAAPQAAP
QAAP
 
Monthly progress report , Resettlement ,Rehabilitation , Livelihood and Rest...
Monthly progress report , Resettlement  ,Rehabilitation , Livelihood and Rest...Monthly progress report , Resettlement  ,Rehabilitation , Livelihood and Rest...
Monthly progress report , Resettlement ,Rehabilitation , Livelihood and Rest...
 
Current and future Mega Projects in Jubail and Ras Al-Khair Industrial Cities
Current and future Mega Projects in Jubail and Ras Al-Khair Industrial CitiesCurrent and future Mega Projects in Jubail and Ras Al-Khair Industrial Cities
Current and future Mega Projects in Jubail and Ras Al-Khair Industrial Cities
 
dokumen.tips_khalifa-port-industrial-zone-abu-dhabi-ports-company-abu-dhabi-e...
dokumen.tips_khalifa-port-industrial-zone-abu-dhabi-ports-company-abu-dhabi-e...dokumen.tips_khalifa-port-industrial-zone-abu-dhabi-ports-company-abu-dhabi-e...
dokumen.tips_khalifa-port-industrial-zone-abu-dhabi-ports-company-abu-dhabi-e...
 
Dholera SIR
Dholera SIRDholera SIR
Dholera SIR
 
Dholera SIR Opportunity
Dholera SIR OpportunityDholera SIR Opportunity
Dholera SIR Opportunity
 
Skygate infopack
Skygate infopackSkygate infopack
Skygate infopack
 
cv
cvcv
cv
 
Dholera Smart City and SIR Prospects
Dholera Smart City and SIR ProspectsDholera Smart City and SIR Prospects
Dholera Smart City and SIR Prospects
 
Development control regulations kochi report
Development control regulations kochi reportDevelopment control regulations kochi report
Development control regulations kochi report
 
Odisha industrial policy 2007 for finance, subsidy & project related suppor...
Odisha industrial policy 2007   for finance, subsidy & project related suppor...Odisha industrial policy 2007   for finance, subsidy & project related suppor...
Odisha industrial policy 2007 for finance, subsidy & project related suppor...
 
Federal Capital Territory Administration
Federal  Capital Territory AdministrationFederal  Capital Territory Administration
Federal Capital Territory Administration
 
THE 2013 MINISTERIAL PLATFORM MID-TERM REPORT OF PRESIDENT GOODLUCK JONATHAN...
THE 2013 MINISTERIAL PLATFORM  MID-TERM REPORT OF PRESIDENT GOODLUCK JONATHAN...THE 2013 MINISTERIAL PLATFORM  MID-TERM REPORT OF PRESIDENT GOODLUCK JONATHAN...
THE 2013 MINISTERIAL PLATFORM MID-TERM REPORT OF PRESIDENT GOODLUCK JONATHAN...
 
#MP2013 Presentation of the Minister of the Federal Capital Territory Adminis...
#MP2013 Presentation of the Minister of the Federal Capital Territory Adminis...#MP2013 Presentation of the Minister of the Federal Capital Territory Adminis...
#MP2013 Presentation of the Minister of the Federal Capital Territory Adminis...
 
Noble-Portfolio-S-new
Noble-Portfolio-S-newNoble-Portfolio-S-new
Noble-Portfolio-S-new
 
MIHAN SPECIAL ECONOMIC ZONE
MIHAN SPECIAL ECONOMIC ZONEMIHAN SPECIAL ECONOMIC ZONE
MIHAN SPECIAL ECONOMIC ZONE
 

Recently uploaded

Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
amitlee9823
 
Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...
Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...
Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...
Anamikakaur10
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
dollysharma2066
 

Recently uploaded (20)

It will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayIt will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 May
 
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
 
Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...
Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...
Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...
 
Marel Q1 2024 Investor Presentation from May 8, 2024
Marel Q1 2024 Investor Presentation from May 8, 2024Marel Q1 2024 Investor Presentation from May 8, 2024
Marel Q1 2024 Investor Presentation from May 8, 2024
 
Falcon Invoice Discounting: The best investment platform in india for investors
Falcon Invoice Discounting: The best investment platform in india for investorsFalcon Invoice Discounting: The best investment platform in india for investors
Falcon Invoice Discounting: The best investment platform in india for investors
 
Phases of Negotiation .pptx
 Phases of Negotiation .pptx Phases of Negotiation .pptx
Phases of Negotiation .pptx
 
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesMysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
 
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60% in 6 Months
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60%  in 6 MonthsSEO Case Study: How I Increased SEO Traffic & Ranking by 50-60%  in 6 Months
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60% in 6 Months
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
 
JAYNAGAR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
JAYNAGAR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRLJAYNAGAR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
JAYNAGAR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
 
Call Girls Zirakpur👧 Book Now📱7837612180 📞👉Call Girl Service In Zirakpur No A...
Call Girls Zirakpur👧 Book Now📱7837612180 📞👉Call Girl Service In Zirakpur No A...Call Girls Zirakpur👧 Book Now📱7837612180 📞👉Call Girl Service In Zirakpur No A...
Call Girls Zirakpur👧 Book Now📱7837612180 📞👉Call Girl Service In Zirakpur No A...
 
Malegaon Call Girls Service ☎ ️82500–77686 ☎️ Enjoy 24/7 Escort Service
Malegaon Call Girls Service ☎ ️82500–77686 ☎️ Enjoy 24/7 Escort ServiceMalegaon Call Girls Service ☎ ️82500–77686 ☎️ Enjoy 24/7 Escort Service
Malegaon Call Girls Service ☎ ️82500–77686 ☎️ Enjoy 24/7 Escort Service
 
Organizational Transformation Lead with Culture
Organizational Transformation Lead with CultureOrganizational Transformation Lead with Culture
Organizational Transformation Lead with Culture
 
How to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League CityHow to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League City
 
Value Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsValue Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and pains
 
BAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
BAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRLBAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
BAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
 
Falcon Invoice Discounting: Empowering Your Business Growth
Falcon Invoice Discounting: Empowering Your Business GrowthFalcon Invoice Discounting: Empowering Your Business Growth
Falcon Invoice Discounting: Empowering Your Business Growth
 
(Anamika) VIP Call Girls Napur Call Now 8617697112 Napur Escorts 24x7
(Anamika) VIP Call Girls Napur Call Now 8617697112 Napur Escorts 24x7(Anamika) VIP Call Girls Napur Call Now 8617697112 Napur Escorts 24x7
(Anamika) VIP Call Girls Napur Call Now 8617697112 Napur Escorts 24x7
 
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdfDr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
 
Katrina Personal Brand Project and portfolio 1
Katrina Personal Brand Project and portfolio 1Katrina Personal Brand Project and portfolio 1
Katrina Personal Brand Project and portfolio 1
 

Jamshedpur Market.pdf

  • 1. REDEVELOPMENT OF MARKET AREAS AT JAMSHEDPUR Urban Development & Housing Department, Government of Jharkhand
  • 2. Jamshedpur a planned Industrial Town offers quality physical and social infrastructure for its residents and visitors; As a part of infrastructure creation, ten public markets were created between 1930 & 1990 across to the town; Markets along with Land were vested with Govt. under BLR Act However with growth of population, development of unauthorized encroachments, deterioration of the conditions of the shop, the infrastructure and hygienic condition of these markets has been under severe strain; The rapid urban growth has outpaced the capacity creation and there is an urgent need of augmenting basic amenities/ infrastructure facilities like parking, fire safety, and access to emergency vehicles etc; It is in keeping this in mind, Urban Development Department, Government of Jharkhand decided to redevelop these markets on a Public Private Partnership (PPP) model and has taken out tender for appointment of consultant for preparation of Feasibility Report and Detailed Project Report for 10 market Background
  • 3. Detailed Prefeasibility Report was prepared by in discussion with JUIDCO, JNAC. TATA Steel and other stakeholders for all the ten market; FR covered the market scenario and suggested possible components that maybe developed in addition to the redevelopment of the existing markets. In discussions, the final components were approved JUIDCO decided that in the First Phase, Draft DPR would be prepared only for Sakchi, Bistupur, Baridih and Golmuri. The same was prepared and presented to JNAC/Tata Steel and other stakeholders and also submitted to JUIDCO. The Draft DPR was thereafter presented to Committee of JUIDCO with Pr Secretary and Technical Sanction was accorded in March 2018. Brief details of the Project are as follows: Project Background Market Land Area No of Existing Shops Current FAR Utilization (% of allowable) FAR Proposed (in the DPR) (% of allowable) Sakchi 17.20 2592 10.0% 88.0% Bistupur 12.78 983 10.0% 89.7% Golmuri 4.10 315 10.5% 100% Baridih 2.92 213 8.1% 75.7%
  • 4. A detailed presentation was made to Secretary UD & HD on 12.12.2018. He suggested the following: Focus should be more on redevelopment of the existing shop keepers and their social benefits. Explore the possibility whether some area can be allocated for housing for all and hospital in Sakchi market Bistupur being the city centre of Jamshedpur, ITUAL may explore the possibility of an iconic tower modeled on the Shanghai Tower , may be explored, with all the facilities, amenities in one tower viz; shops for re-habilitation of existing shop keepers, high end retail, multiplex, high end hotel, space for townhall, commercial/ office space, urban haat, basement and multi level car parking etc. The Chairman was of the view that focus should be to create more and more open and green space and development of plaza/ public gathering space. The project should clearly come out with the benefits it is accruing to the existing shop keepers, social, economic & infrastructure benefits and benefits it accrues to the citizens. He further instructed representatives of ITUAL to make necessary changes and submit a revised concept plan (based on conceptual planning with indicative views). The same was submitted to JUIDCO and DMA Project Background
  • 5. Overall Redevelopment of the urban centre which is highly unplanned and exposed to several risks including Fire/ Stampede etc. The area also suffers from poor hygiene and environmental degradation. Provision of organised shops for all current occupants of the Market Area Improvement of the current level of utilization of land which is very low and unsustainable Provision of adequate infrastructure such as Road, Water, Drainage, Sewerage, Solid Waste, Power, etc. Provision of housing for EWS/LIG and Medical Facilities through a quality Hospital Provision of commensurate commercial and retail facilities which will cross subsidize the development of the above and shall also provide livelihood options Overall Objectives
  • 7. Destination Distance (in km) Jamshedpur Railway Station 7.5 Bistupur 3.5 Tata Steel 0.5 Civil Court 2.0 Tata Hospital 2.5 Sakchi Bus Stand 0.1 Introduction Sakchi shopping centre is the largest market area in Jamshedpur. Total land area of the market is to the tune of 17.2 acres (740520 sq. ft) with 2082 Shops as confirmed by TATA Sakchi is considered to be the major retail hub in the city and is primarily famous for wholesale trade and commerce. . The market area is well mixed of various types of shops with predominant presence of appeal & garments, wholesale grocery & stationery shops.
  • 8. EXISTING IMAGES OF SAKCHI MARKET
  • 9. S No Particulars Area (Sq ft) No of Shops 1 BLOCK –I 12000 15 2 BLOCK- II 7000 10 3 BLOCK- III 9520 53 4 BLOCK- IV 2730 21 5 BLOCK- V 1680 14 6 BLOCK- VI 2200 22 7 BLOCK- VII 1560 13 8 BLOCK- VIII 7288 48 9 BLOCK- IX 4740 11 10 BLOCK- X 9216 93 11 CITY MARKET 29016 120 12 TANK AREA – “ T- SECTION” 18526 114 13 F- SECTION “DALDA LINE” 5488 49 14 TG – SECTION 1215 9 15 TD – SECTION 405 3 16 G-SECTION PUCCA ROOF 1620 45 17 I-SECTION Pucca roof shop 6720 82 S No Particulars Area (Sq ft) No of Shops 18 COMMON ROOF FRUIT 1610 13 19 COMMON ROOF FISH 1974 73 20 COMMON ROOF MUTTON 384 19 21 COMMON ROOF VEG ST 12768 266 22 COMMON ROOF POTATO 5988 109 23 “ I “ SECTION TINSHED 5120 64 24 “ E “ SECTION TINSHED 540 16 25 “ G “ SECTION TINSHED 252 7 26 “ H “ SECTION TINSHED 216 7 27 H Section tinshed roof shop 252 6 28 E SECTION PUCCA SHOP 360 10 29 PARTY BUILT STALL A-Sec 2390 24 30 PARTY BUILT STALL B-SEC 6519 55 31 PARTY BUILT STALL C Sec MANIHARY LINE 2368 37 32 PARTY BUILT STALL C Section 2304 29 33 PARTY BUILT STALL D-SEC 3653.2 5 17 34 PARTY BUILT STALL H1-SEC 5355 34 S No Particulars Area (Sq ft) No of Shops 35 PARTY BUILT STALL H2- 2512 24 36 PARTY BUILT STALL J & J1- S 5222 74 37 PARTY BUILT STALL J2-S 2928 22 38 PARTY BUILT STALL J3-S 3279 27 39 PARTY BUILT STALL I1-S 1674 17 40 PARTY BUILT STALL K-S 4010.75 52 41 PARTY BUILT STALL L-S 6632 61 42 PARTY BUILT STALL P1-S 1308 18 43 PARTY BUILT STALL P2-S 2504 8 44 PARTY BUILT STALL O-S 3648 45 45 PARTY BUILT STALL O1- 1506 49 46 Sanjay, EADYMADE,KH 7204 144 Daily Toll basis 2049 Open haat (Total of approx 195 shops of 8' x 6') 9360 195 COMMON ROOF VEGETABLE STALL (68 nos of stall of 8' x 6') 3264 68 Shalini market (approx 280 nos of shop of 6' x 6') 10080 280 Total Area in Sq ft 238109 2592 Existing Shops
  • 10. Sakchi Market - layout Tin Shed Market Total No of Shops: 896 Approx BUA: 75,000 sq. ft Dilapidated C ondition Anytime can collapse. Needs immediate attention Mostly Temporary Sheds/ Semi Pacca No of Shops: 1698 Approx BUA: 163000 sq. ft No Civic Infrastructure and dilapidated
  • 12. PROPOSED MASTER PLAN Basement + Vegetable Market (MDO) + Multi Level Car Parking Basement + Market (MDO) + Hotel Basement + Market (MDO) + Office Space Basement + Market (MDO) + Retail Development Plan as per DDPR
  • 13. Redevelopment planned with state of the art infrastructure Attempts were made to provide all existing shopkeepers shops near to their existing place A 200 Bed Hospital which shall provide quality medical facilities to all sections of citizens of Jamshedpur; 288 Dwelling Units proposed for EWS/LIG category for the economically weaker section of people; Provision of adequate infrastructure facilities; Balance area to be used to provide commensurate commercial and retail facilities which will also provide significant livelihood opportunities; MLCP to connect directly to shopping complex and commercial centre. Proposed Development Plan for Redevelopment with changes
  • 14. • Total BUA will be approx 1.5 lac sq. ft • Basement and Surface Parking: 200 cars • Ground Coverage: 0.79 acres Master Plan for Redevelopment
  • 15. • 200 bed hospital •Total BUA will be approx 2.15 lac sq. ft • Basement and Surface Parking: 225 cars • Ground Coverage: 0.71 acres Master Plan for Redevelopment
  • 16. • 288 dwelling unit planned •Total BUA will be approx 0.9 lac sq. ft 1 2 3 4 6 5 7 8 Master Plan for Redevelopment
  • 17. • Modern Shopping Complex • G+5 structure • Retail, Food Court, Entertainment/ Multiplex etc • TBUA: 3.2 lac sq. ft approx • Connected with MLCP • Existing shops on Ground Floor • MLCP • G+5 structure • Connected with Modern Shopping Complex • TBUA: 2.7 lac sq. ft approx • approx 700 PCU • Existing shops on Ground Floor • Modern Shopping Complex with Commercial • G+5 structure • TBUA: 2.6 lac sq. ft approx • Connected with MLCP • Existing shops on Ground Floor •Commercial Centre •0.9 lac sq. ft •Existing Shops/ Retail (1.85 lac sq. ft) Master Plan for Redevelopment
  • 18. ARCHITECT IMPRESSION – Land scaping works
  • 19. Key Features Every current occupant to be provided with an organised shop along with full required infrastructure, adequate hygiene safety and security; The entire area which is currently exposed to significant risks from fire, stampede etc shall now be developed as a safe, organised and quality urban centre; 10 Mtr Wide Road all along the periphery of the Site
  • 21. Re-Habilitation Land for Sakchi Market – AAM Bagan Total area of Land : 6.153 Acre Land available for Temporary Rehabilitation : 3.8 Acre The identified site is free from encroachment. JUSCO- supplied water & power is available up to site boundary. The site is flat terrain in nature The existing Mazhar & Durga Temple area within the site will be untouched from development. Site has been visited alongwith JNAC Officials
  • 22. Photographs of Re- Habilitation Site-Sakchi Market
  • 23. Ambagan – Rehab Site Block N Block W Block E Block S 1 2 2 2 3 3 3 4 1. Shops from Block N will move to Ambagan [chosen as Rehab Site] CONSTRUCTION ACTIVITY FOR BLOCK E, W & S 3. Shifted Shops of Block E, W & S will move back to their respective Plots. 4. Shops from Rehab Site will move back to Block N. 2. Shops from Block E,W & S will move to New Block N. CONSTRUCTION ACTIVITY FOR BLOCK N Initial Movement Return Movement Re-Habilitation Plan of Sakchi Market In view of site limitation, a sequential rehabilitation plan has been proposed
  • 24. Existing Sakchi Market- Northern Part
  • 25. Conceptual Re- habilitation Plan-Sakchi Market  Internal Road width : 3 M wide  Main approach road : 6 M  Proposed outer peripheral road for expansion : 7 M wide  Space for loading /unloading  Dedicated Parking for Two wheeler/cycle - 250 Nos
  • 27. Bistupur Market Land Area: 12.5 acres No of Existing Shops: 983; (1.62 lac sq. ft) Mostly temporary sheds; in dilapidated conditions No basic amenities/ infrastructure facilities like parking, fire safety, unhygienic conditions, illegal tapping of utility services etc Re-development planned to provide: Improved Market infrastructure with rights of existing tenants protected Livable environment for small and marginal shop owners/ vegetable sellers Quick emergency response with fire and other safety infrastructure Proper sewerage and solid waste disposal
  • 28. Bistupur Market SUMMARY SHEET # TYPE OF SHOP NO. OF SHOPS AREA (sq.ft.) 18PUCCA ROOF FISH STALL 22 865.62 19LINE NO-18 12 2807.00 20LINE NO-17 4 680.00 21LINE NO-16 13 2336.00 22LINE NO-15 25 11798.00 23LINE NO-14 4 1380.50 24LINE NO-13 8 1518.00 25LINE NO-12 10 7254.00 26LINE NO-11 8 1496.00 27LINE NO-10 22 8039.61 28LINE NO-9 6 1122.00 29LINE NO-8 24 8034.02 30LINE NO-7 5 3924.50 31LINE NO-6 6 4800.00 32LINE NO-5 19 2420.22 33LINE NO-4 31 11594.00 34LINE NO-3 20 3740.00 35LINE NO-2 17 1700.00 36LINE NO-1 60 30362.27 TOTAL 983 162232.66 SUMMARY SHEET # TYPE OF SHOP NO. OF SHOPS AREA (sq.ft.) 1GODOWNS & MILLS 24 13137.34 2PARTY BUILT STALL 52 3748.13 3COMPANY BUILT KIOSK 20 1142.17 4FRUIT STALL 50 2205.00 5TIN SHED STALL-OTS 49 5716.50 6TIN SHED STALL-NKTS 6 600.00 7TIN SHED STALL - H SECTION 208 9984.33 8TIN SHED STALL - G&G1 SECTION 39 3524.50 9TIN SHED STALL - F SECTION 14 832.00 10TIN SHED STALL - E&E1 SECTION 38 2795.73 11TIN SHED STALL - D1 SECTION 14 1263.72 12TIN SHED STALL - C1 SECTION 15 896.00 13TIN SHED STALL - B1 SECTION 11 500.00 14TIN SHED STALL - B SECTION 43 4144.50 15TIN SHED STALL - A1 SECTION 52 3340.00 16TIN SHED STALL - A SECTION 16 1596.00 17PUCCA ROOF MUTTON STALL 16 935.00
  • 29. Current Picture of Bistupur Market
  • 30. Phase II Main Market: Total BUA: 12.81 lac sq. ft G+9 Structure SB+G+9 SB+G+4: Retail; 4-5th :Multiplex & food court, 6-9th floor: Hotel & Office Open Air Parking: 428 Nos Development Plan as per DDPR Phase I: G+2 market to accommodate existing shops except shops on the arterial roads 978 shops Total BUA area: 2.18 lacs sq .ft 3rd, 4th & 5th Floor Floor: Car Parking of 2.18 lacs sq. ft Total Parking: 624 (208 x3) Nos Phase II Multi Storey Parking (BUA): 5.66 lac sq. ft G+5 structure, Total Parking: 1680 (280 x6) Nos 3rd , 4th & 5th floor connected with Phase I market
  • 31. • Development of Organized Integrated City Bazaar with Modern Infrastructure Facility for the existing Retailer • Multi Storey Parking Facility • Balance land to be utilized for Development of Retail, Entertainment, Commercial and Hotel. • Employment opportunity • Economic Growth • City Branding All the above to be developed as One Mega Centre under a Common Roof. One of its kind in India Proposed Redevelopment Plan
  • 32. Proposed Development Plan Ground Floor: City Bazaar 1st to 5th Floor: Multi Storey Parking G+30 Tower Basement, Ground and Upto 5th Floor: Retail, Commercial, Emtertainment 6th to 30th: Hotel
  • 33. City Bazaar • The City Market will have: • Wide Circulation (4.5 mtr and 3.78 mtr) • State of the Art Infrastructure, Air Circulation etc 3 side open) • Product wise Zoning: Vegetable, Fruits, Non Veg, Grocery, Hosiery etc • One stop mega shopping destination • Integrated with Retail, Commercial, Hospitality, & Entertainment Centre
  • 35. Perspective View Ground Floor: City Bazaar (1.43 lac sq. ft) 1st to 5th Floor: Multi Storey Parking (4.79 lac sq. ft; 1600 pcu); On street parking: 375 pcu Ground Floor to Fifth Floor: High End retail, Commercial and Entertainment Zone (7.18 lac sq. ft) 5th Floor onward to 30th Floor: Hotel, with entire terrace of 4.5 acres at 5th Floor (7.62 lac sq. ft) Can be utilized for Urban Haat: 2.82 acres TOTAL BUA: 21.03 LAC SQ.FT INCL PARKING
  • 38. Proposed Rehabilitation Plan Site I: Total Area: 122900 sq. ft Type A: 7x10; No of Shops: 715 Site III: Total Area: 22920 sq. ft Type A: 7x10; No of Shops: 53 Type B: 7x5; No of Shops: 153 Total A & B: 206 shop Total Requirement: 922 Shops Shops Provided: 1155 Site I: 122900 sq ft Site II: 26040 sq. ft Total No of Shops to be Rehabilitated: 922 Shops not to be rehabilitated (on the Road Side: 61) Site III: 22920 sq. ft Site II: Total Area: 26040 sq. ft Type A: 7x10; No of Shops: 53 Type B: 7x5; No of Shops: 181 Total A & B: 234 shops Site 1: Within the boundary of the Existing Market Site 2 & 3: On the adjacent Road (North Road) of the existing market
  • 39. Legends Entrance Road 20 ft wide Internal Road 12ft, 10ft wide No of Toilets 20 nos Water Supply Provision made Drainage Provision made Parking Provision made Utility Provision made The Design is modular and shops of all size can be accommodated Rehab Sites: Perspective Plan
  • 41. Golmuri Market Golmuri shopping centre is community based local market area in Jamshedpur. It is located within residential colonies and accessible through Golmuri Road. The area is located close proximity to the premise of Tata Tinplate and Incab industries. Total No of Shops TYPE OF SHOP No AREA (sq.ft.) PARTY BUILT KIOSK 32 1280 PARTY BUILT STALLS 159 37555 COMPANY BUILT KIOSK 5 236 TIN SHED 49 5014 MUTTON STALL 4 416 FISH STALL 1 934 LINE.NO-02 61 6330 LINE.NO-01 4 3982 TOTAL 315 55748
  • 42. Present development at Site on Google Map
  • 43. Existing Pictures of Golmuri Market
  • 45. Golmuri Market – Need for Rehabilitation . • Tata Steel Suggested Circus Maidan – to be utilised for Rehabilitation of the Existing Market • Circus Maidan is adjacent to the existing market • Total No of Shops: 315 • No of Shops to be rehabilitated: 236 • Balance Shops will not be rehabilitated as the same is in the set back area. • The Design is modular and shops of all size can be accommodated
  • 46. Google Image of Main Market and Rehab Site
  • 47. MASTER PLAN FOR TEMPORARY REHABILITATION Total No of Shops Shops not being Rehabilitated No of Shops being rehabilitated TYPE OF SHOP No AREA (sq.ft.) No Area No of Shops Area in Sq. ft PARTY BUILT KIOSK 32 1280 0 0 32 1280 PARTY BUILT STALLS 159 37555 18 4252 141 33304 COMPANY BUILT KIOSK 5 236 0 0 5 236 TIN SHED 49 5014 9 921 40 4093 MUTTON STALL 4 416 0 4 416 FISH STALL 1 934 0 1 934 LINE.NO-02 61 6330 48 4981 13 1349 LINE.NO-01 4 3982 4 3982 0 0 TOTAL 315 55748 79 14135 236 41612 As against requirement of 236 shops for rehabilitation, provision made for 288. Total BUA required to be rehabilitated is 41612, provision is made for 45284 sq. ft Type A: Size:11x22; Units: 117 Type B: Size: 11x11; Units: 110 Type C: Size: 7x8.6; Units: 61 The Design is modular and shops of all size can be accommodated Legends Entrance Road 20 ft wide Internal Road 15ft, 10ft wide No of Toilets 14 nos Water Supply Provision made Drainage Provision made Parking Provision for 2 & 4 wheeler
  • 48. MASTER PLAN FOR TEMPORARY REHABILITATION
  • 50. Golmuri Market : MASTER PLAN & DESIGN
  • 51. • Total plot area = 178596 square ft. • Total permissible ground coverage = 89298 square ft. • Total F.A.R. = 3 • BUA Proposed: 574939 sq. ft • Total proposed ground coverage = 76796 sq ft. • Proposed construction can be = 2B+G+7 • Existing Shops to be accomodated on the ground floor • Total no. of 4 wheeler parking = 678 cars. Master Plan & Design
  • 52. Master Plan & Design Road Frontage Road Frontage Road Frontage Road Frontage
  • 53. Master Plan & Design
  • 57. Introduction The proposed market is spread over 2.98 acres of land comprising of 1 major land parcel and 2 fragment plots The market area is well mixed of various types of shops with predominant presence of grocery, garments & medicine items
  • 60. Existing Status of –Baridih Market
  • 61. Existing Status of -Baridih Market S. No. Name Plot Area (Sqmt) 1 Baridih-A 9547.02 2 Baridih-B 708.02 3 Baridih-C 1020.1 Area under proposed road 548.4 Total 11823.54 Total area (Acre) 2.92 Baridih-A Baridih-B Baridih-C Baridih Market TATA data No. of Shops Total Area Company Built 138 24507 Party Built 75 6532 213 31039 • Total no of Existing Shops : 213 nos • Total Existing Built up area : 2884 sqmt
  • 62. Rehabilitation site for -Baridih Market Total area of land available for Re habilitation of Existing Shops : 2.34 acre The site surrounded by 5 m wide road all along periphery The Main approach road is from Kadani road which is 7 M (ROW) The site is free from all encroachment & Big trees Land mark of the site : Baridhi Post office located western corner of the site. the rehabilitation site is flat terrain in nature the Site is located around 500 m from the existing site. the site was finalised after joint physical survey with TATA officers & IIDC officers. Baridhi Post Office Proposed Site for Rehabilitation
  • 64. Area Statement :  Total area of land : 2.34 Sqmt ( 9467 Sqmt)  Total no of Shops proposed : 213 Nos  Total proposed Built up area of shops : 3448.467 sqmt  Proposed green /open space area : 1135.65 sqmt  Car parking area : 572.62 sqmt  No of proposed car parking : 110 Nos  Utility area : 735.93 sqmt Baridih Conceptual Re habilitation Plan Market Rehabilitation Plan
  • 65. Baridh Market : MASTER PLAN & DESIGN
  • 66. PROPOSED MASTER PLAN Proposed Floor area Area (Sqmt) Total No parking No of Shops Floors Basement-1 5901.8 130 Basement-2 5901.8 130 Ground Floor 5901.8 162 1st Floor 4477.5 162 2nd Floor 4477.5 162 3rd Floor 4477.5 162 4th Floor 4477.5 162 5th Floor 4477.5 162 Surface Parking 66 40092.9 326 972
  • 67. Architect Impression of Baridih Market
  • 68. Planning Concept : The Courtyard Cluster • The vegetable and meat markets have been clustered together in the left wing of site. • The concept is derived from the idea of community living where the central space of any development is predominantly a pedestrian and public space. • Central courtyard is thus the focal point of design where all other activities have been clustered around them. • Vehicular movement has been restricted to peripheral roads whereas all the internal roads are pedestrian only. • MDO has been mainly accommodated majorly on ground and first floor • Courtyards and semi-open corridors ensure light and ventilation in the built spaces. • It creates a premium commercial space while at the same time integrating the common public needs into its design and layout. • The site can be accessed by all four major corridors bounding it.
  • 69. Sakchi Development of the temporary rehabilitation site and temporary relocation of the identified existing tenants as per rehabilitation plan detailed out in the approved DPR. Development of market complex for the existing shop keepers. After construction completion, handing over 100% of the existing built up area to Government of Jharkhand free of cost towards rehabilitation of the existing tenants/ others (The Authority Allocation) The guideline for Authority Allocation will be clearly defined in the bid document. The Authority shall be entitled to transfer or dispose of its Allocation in the manner as it deem fit to it. Development of 200 bed Multi Speciality Hospital Development of 288 EWS Dwelling Units Development of requisite infrastructure for the MDO Bistupur Development of the temporary rehabilitation site and temporary relocation of the identified existing tenants as per rehabilitation plan detailed out in the approved DPR. Development of market complex for the existing shop keepers. After construction completion, handing over 100% of the existing built up area to Government of Jharkhand free of cost towards rehabilitation of the existing tenants/ others (The Authority Allocation) Development of Urban Haat (in 2 acres land) Development of requisite infrastructure for the MDO Minimum Development Obligation of the Developer
  • 70. Golmuri and Baridih Development of the temporary rehabilitation site and temporary relocation of the identified existing tenants as per rehabilitation plan detailed out in the approved DPR. Development of market complex for the existing shop keepers. After construction completion, handing over 100% of the existing built up area to Government of Jharkhand free of cost towards rehabilitation of the existing tenants/ others (The Authority Allocation) Development Guidelines The selected developer to follow the Jharkhand Government Building Bye Laws Parking lot to be provided in each market place in line with the Building Bye Laws Minimum Development Obligation of the Developer
  • 71. Suggested Structure – Free Hold Private Player quoting highest auction price subject to minimum reserve price will be provided the free hold rights on the land Reserve Price: Circle rate of the land less the cost of construction of MDO and proportionate land area involved in construction of MDO. The Selected Developer to undertake the Minimum Development Obligation. Development of the temporary rehabilitation site and temporary relocation of the identified existing tenants as per rehabilitation plan detailed out in the approved DPR. After construction completion, handing over ...... sqft (to be detailed out in the bid document) area in each market complex to Government of Jharkhand free of cost towards rehabilitation of the existing tenants/ others (The Authority Allocation). The Authority allocation will be clearly defined in the bid document. The Authority shall be entitled to transfer or dispose of its Allocation in the manner as it deem fit to it. Development of the balance area (Developers Area) Developer to have right over its share of space – can sell/ lease/ license the shops to end users. Till construction, Developer will only have the License Rights and Free hold rights will be effective only upon transfer of MDO to Government. Approval of the Cabinet will be required for bypassing the Revenue Department Notification and for new structure
  • 72. Lease Hold Model GoJ to give development right to selected bidder for period of 99 years The Bidding parameter can be Upfront lease premium or a mix of Upfront lease premium or Revenue Sharing (Gujarat Model) or a mix of Upfront and Revenue Sharing The Selected Developer to undertake the Minimum Development Obligation. Development of the temporary rehabilitation site and temporary relocation of the identified existing tenants as per rehabilitation plan detailed out in the approved DPR. After construction completion, handing over ...... sqft (to be detailed out in the bid document) area in each market complex to Government of Jharkhand free of cost towards rehabilitation of the existing tenants/ others (The Authority Allocation). The Authority allocation will be clearly defined in the bid document. The Authority shall be entitled to transfer or dispose of its Allocation in the manner as it deem fit to it. Development of the balance area (Developers Area) Developer to have right over its share of space – can lease/ license the shops to end users. Ownership of land remains with GoJ. Alternate Structure – Lease Hold Approval of the Cabinet will be required for bypassing the Revenue Department Notification, sub leasing of land and for new structure
  • 73. Suggested Structure – Free Hold Project Implementation Stage: Stage I: The Authority shall provide permissive possession of the site to enable the Developer to carry out survey & Testing to finalize the Development Plan. The Developer to take all approvals as maybe required. Stage II: Development of Rehabilitation Site: The Developer will be given the possession of the rehabilitation site as identified in discussion with Tata Steel & JNAC for development of the Rehabilitation Site in line with the approved DPR. Stage III (Development of MDO and Commercial Complex): Upon handing over of the MDO to the Authority, the Authority shall enter into a Free Hold Agreement with the Developer thereby providing the free hold rights to the developer for balance area Payments: 20% of the Bidding Price before signing of the Agreement with the Developer Balance 80% prior to transfer of free hold/ lease hold rights to the Developer (Phase wise) All the costs towards payment of tax dues, other dues including utility charges Project Development Expenses incurred by JUIDCO
  • 74. The project involves substantial amount of investment and involves varied components such as hotels, office space, retail shop etc. These requires specialised understanding for development and marketing. In view of the same, the selected agency while continuing to be responsible towards the Authority, shall need to take into suitable agreements allowing specialised agencies and investors to come in and implement the project and also share the risks. In the current structure, where sub- leasing is not allowed, the selected agency will be required to make all investment and operate the same till the lease period, which may be a challenge in lease model. The project because of its investment requires funding by way of debt & equity. A free hold structure would be more attractive to the banker as this will allow the mortgage of the land and structure both. The free hold right will provide indefinite ownership with the private player and does not require state consent to transfer ownership. It has been seen that after the expiry of long term lease, the State in most of the cases finds it difficult to get the property vacated from the lessee. On books the property remains with Government but with encroachments forever Benefit of Free Hold over Lease Hold