1. Curriculum Vitae
CAREER OBJECTIVE
To build a career with leading corporate which will help me to contribute to the organizational
objectives and at the same time explore my core competencies.
Seeking a challenging career in the management level which provides an opportunity to
contribute to the organization and help to improve my skills with dedication and determination.
EDUCATIONAL BACKGROUND
Pursing Master of Civil Engineering from Vivekananda Institute of Management &
Engineering.
Pursing Diploma Civil Engineering from Karnataka State Open University in the year
2012-2014.
Graduation Diploma Civil Engineering from Vivekananda Institute of Management &
Engineering, Kota, Rajasthan 2010.
B.Com from SGVS Virakthmath Arts and Commerce College, Bailhongal, Karnataka in the
year 2006-2009.
II PUC from S.B.Jakati.Govt.Arts.College, Yaragatti, Karnataka in the year 2004-2006.
Diploma in Land & City Survey from Madina Pre University College, Dharwad, Karnataka
in the year 2002-2003.
SSLC from SGVD High School, Chachadi, Karnataka in the year 2001-2002.
SOFTWARE SKILLS
Sound knowledge of Windows XP/7, MS-Office application & Auto cad 2004-2009 etc.
TOTAL EXPERIANCE
10 yrs 3 months exp in Survey with total station (Highway & Bridge)
Instruments Touch
Total Station & Auto Level
1. SOKKIA SET-5F & SET-230 RK
2. PENTAX ATS-102
3. SOKKIA POWERSET 2000etc
4. NIKON DTM-851
5. AUTO LEVELS
2. PROFESSIONAL EXPERIANCE
1) Position Held : Survey Engineer
Contractor : Hyundai Engineering & Construction Co Ltd.
Name of Project : River Chambal Cable Stayed Bridge Project
Duration : Aug 4th
2010 - till date
Client : National Highways Authority of India
Project Cost : 450 crore
Consultant & Engineer : LBG & COVI Engineers Ltd. (JV)
2) Position Held : Jr. Engineer (Survey)
Contractor : Oriental Structural Engineers Pvt Ltd.
Name of Project : Widening of NH-68 in the State of Tamilnadu Construction of
Salem-Ulundurepet section from km 62.250 to km 136.670
Duration : Jun 1
st
2008 – Aug 4
th
2010
Client : National Highways Authority of India
Project Cost : 400 crore
Consultant & Engineer : Neel Construction Link Pvt Ltd & M/s Utility Energetic and
Engineers Pvt Ltd
Independent Consultant : M/s Technical S.P.A.
3) Position Held : Surveyor
Contractor : KMC Construction Ltd
Client : (TNRSP: 01)
Name of work : Up gradation of road from Arcot to Ulundepettai (
Elavanasur), Polur to Chengam, Vriddhachlam to Tiruvarur,
Jayankondam to Ariyalur and bypass roads at Chidambaram,
Sirkhazi, Arani, Polur, Thiruvannamalai, Thirukovilur,
Vridhachalam, Ariyalur and Thiruvarur
Duration : April 2007 - May 2008
Consultant & Engineer : M/s LEA International Ltd. Canada & M/s LEA Associates
South
Asia Pvt Ltd
4) Position Held : Assistant Surveyor
Contractor : KMC Construction Ltd
Name of work : Up gradation of Hungunda to Belgaum, U8-Package of length
40 km under (KSHIP) Karnataka State Highway Improvement
Project.
3. Duration : Aug 2003 - April 2007
Consultant & Engineer : SMEC Pvt Ltd, New Delhi (JV)
DUTIES & RESPONSIBILITY (work experience in Bridge/Highway)
HANGING BRIDGE (CABLE STAY BRIDGE)
Preparing and following up of project: Check the all Instruments like level machine, Total
Station to verify collimation and instrument calibrations time to time for making the
work fast.
Daily monitoring for Deflection, Elevation, Layout & Alignment checking of Pylon &
Deck.
Pylon Co-Ordinate & Level Adjustment, Location marking of Stay cable Anchorage.
Download, edit and process of data using SOKIA software for as built drawing.
Processing and plotting of data using AUTOCAD Establishment of horizontal and vertical
control points for fixed reference using total station and automatic level.
Lay-out and setting out of vertical and horizontal alignment of concrete column, footing,
slabs, elevators, stairs, other concrete structure, mechanical layout and electrical layout.
All types of survey work (Traversing, Topography, CL Fixing, Layout & BM Fixing etc.)
carried out in Bridge Projects.
Handling Of all type of equipment which is being used in survey work.
Preparation of daily construction activities of survey work, with liaison of
chief surveyor/Project manager and construction team members.
Assist the Project Manager in carrying out the field surveys.
Setting out co-ordinates, Data submitting for preparation of as built drawings, layout
checking, co-ordinates traversing & fly level traversing, levels checking, preparation of
Cross sections. TBM fixing from GPS Bench mark.
Maintenance of all document Survey related data.
HIGHWAY
Aligning of centerline with the help of Electronic Total Station using three-dimensional
coordinates.
Preparing and following up of project: Check the all Instruments like level machine,
Total Station to verify collimation and instrument calibrations time to time for making
the work fast.
Responsible of all Bridges marking with total station, coordinates method.
Checking of Cross section & Level layer sheet prepare for BC,DBM,WMM, etc.,
Prepare bed and Leveling for Embankment, Sub grade, GSB, WMM and Bituminous of
the road project.
4. Line Plotting junction marking & prepared drawing.
Responsible for doing of traversing, Topography, CL fixing, TBM fixing from GTS & TBM
List prepare also Traversing list (Control Point). Taking OGL’s of both sides from
proposed center line. Transferring of levels with respect to permanent benchmarks.
Prepare working Drawing of (Culverts, Utility crossing, Junctions, Drains etc) in Auto-
Cad.
Collection of all data of details along the road including L/S, C/S and H.F.L, for design
purpose using total station.
Co-Ordinate with Consultant & Client to get Approval.
Maintenance of all document Survey related data.
PERSONAL DETAILS
Name: Vishwanath Wali
Date of Birth / Age: 31.07.1986 / 27
Nationality: Indian
Passport No: H0247532
Marital Status: Unmarried
Mobile: +91-9414216192 , + 91-9782477434, +91-9799446222
E-mail Id: vishwa.wali2203@gmail.com vishwa.wali85@gmail.com
Address: Kota, Rajasthan - 324 010 (IND)
Language Known: Kannada, Hindi, English, Telugu & Tamil
Current Address Permanent Address
Vishwanath Wali (Survey Engineer) S/o M.B.Wali (Rtd. Teacher)
Hyundai Engineering & Construction Co Ltd #2527 Teacher’s Colony,
Mahantesh Nagar,
River Chambal Cable Stayed Bridge At Po: Yaragatti – 591 129
Project Behind- Tilam Sangh Rawat Bhata Road Taluk: Saudatti, Dist: Belgaum
Kota, Rajasthan -324010(IND) State: Karnataka. (IND)
I hereby declare that above details furnished by me are true to the best of my knowledge.
Date: Vi sh w a n at h Wa l i