TABLE OF CONTENTS
Overview of Wärtsilä’s LNG solutions
Liquefaction plants
Terminals
Summary
© Wärtsilä NOT YET CLASSIFIED
BEFORE: CONVENTIONAL LNG VALUE CHAIN
5.8.2016 Fredrik Bonäs/ Kenneth Engblom3
© Wärtsilä NOT YET CLASSIFIED
AFTER: CONVENTIONAL + SMALL-SCALE VALUE CHAIN
5.8.2016 Fredrik Bonäs/ Kenneth Engblom4
© Wärtsilä NOT YET CLASSIFIED 5.8.2016 Fredrik Bonäs/ Kenneth Engblom5
WÄRTSILÄ LNG SOLUTIONS
ONSHOREOFFSHORELIFECYCLE
Small LNG liquefaction plants Mini LNG liquefaction plants Small/Medium LNG terminals LNG satellite & bunkering
terminals
LNG storage & regasification
barge
LNG regasification BOG reliquefaction Cargo Handling System
Gas and LNG Carriers
Fuel gas handling system Ship and Cargo Tank design
Lifecycle services Start–up support Product and technical support Spares
© Wärtsilä NOT YET CLASSIFIED
Wärtsilä offers products and services for modern, flexible and sustainable
power generation and LNG infrastructure.
WÄRTSILÄ SERVICES
EPC Spares
Maintenance
Operation
Project
Development and
Financial Services
5.8.2016 Fredrik Bonäs/ Kenneth Engblom6
© Wärtsilä NOT YET CLASSIFIED
SHORTENING PROJECT DEVELOPMENT
AND EPC LEAD TIME
5.8.2016 Fredrik Bonäs/ Kenneth Engblom7
YOU HAVE AN IDEA!
Wärtsilä route
• Design, Engineering, Cost Evaluations,
Constructability reviews and Safety studies
• Project execution and commissioning
• Asset management and maintenance agreements
Conventional route
• Choose an engineering company
• Conceptual design, Feasibility studies and FEED
• Evaluate potential contractors
• Bidding process, supplier selection and delivery
contract(s)
• Manage construction of LNG terminal and power
plant
• Arrange for operation maintenance and training
Your shorter & quicker route to
commercial operations!
(10-20 months)
Long process to FID, more time spent
on administration, legal consultations
and contractual setup...
(20-30 months)
© Wärtsilä NOT YET CLASSIFIED 5.8.2016 Fredrik Bonäs/ Kenneth Engblom8
TABLE OF CONTENTS
Overview of Wärtsilä’s LNG solutions
Liquefaction plants
Terminals
Summary
© Wärtsilä NOT YET CLASSIFIED 5.8.2016 Fredrik Bonäs/ Kenneth Engblom9
MINI/SMALL SCALE LIQUEFACTION PLANTS
INPUT OUTPUTPLANT
Gas sources
• Pipeline gas
• Biogas
• Landfill gas
• Associated gas
• Coal seam gas
• Tight gas
• Shale gas
2,000 – 300,000 TPA
(3,400 – 510,000 GPD)
Gas pre-treatment
Liquefaction
• Mixed Refrigerant: 2,000 -
30,000 TPA
(3,400 – 51,000 GPD)
• Reversed Brayton: 20,000 –
300,000 TPA
(34,000 – 510,000 GPD)
Storage tanks
Jetty & Marine facilities
Export systems
LNG transport
• Carriers
• Tanker trucks
• Containers
• Rail cars
Peak shaving
gas send-out
Ship bunkering
TPA = Tonnes Per Year
GPD = Gallons Per Day
© Wärtsilä NOT YET CLASSIFIED
Bergen, Norway
“Twice the capacity,
half the footprint!”
Kollsnes II
Customer Gasnor
Type Small scale liquefaction plant
Tank net volume 4,000 m3
Capacity 230 TPD / 84,000 TPA
Size of
liquefaction unit
12 m x 38 m
Gas source Pipeline gas. Inlet pressure
typically 70 bar.
Details Extension to Kollsnes I.
Includes two truck loading
stations and existing loading
jetty for small LNG carriers.
Scope
of supply
Complete plant, incl.
• Gas pre-treatment
• Cooling system (Seawater)
• Double Reversed Brayton
liquefaction process
• Storage tank
• Electrical and control
systems
• Civil works
Delivery method EPCIC
Delivered 2007
5.8.2016 Fredrik Bonäs/ Kenneth Engblom10
© Wärtsilä NOT YET CLASSIFIED
Oslo, Norway
“135 Oslo region buses will be
able to run on biogas which
means 10,000 tonnes
emission reduction per year.”
EGE Biogas
Customer Cambi AS
Type Mini liquefaction plant
Tank net volume 180 m3
Capacity 11 TPD / 4,000 TPA
Size of
liquefaction unit
8 m x 14 m
Gas source Biogas from 50,000 TPA of
food waste
Details Fuel production for 135 buses
in the city of Oslo
Scope
of supply
Complete plant, incl.
• Gas pre-treatment
• Cooling system (Ambient
air)
• MR liquefaction process
• Storage tank
• Electrical and control
systems
• Service agreement
Excl. Civil works and
installation
Delivery method EPC
Delivered 2013
5.8.2016 Fredrik Bonäs/ Kenneth Engblom11
© Wärtsilä NOT YET CLASSIFIED 5.8.2016 Fredrik Bonäs/ Kenneth Engblom12
TABLE OF CONTENTS
Overview of Wärtsilä’s LNG solutions
Liquefaction plants
Terminals
Summary
© Wärtsilä NOT YET CLASSIFIED
SMALL/MID SCALE TERMINALS
INPUT OUTPUTTERMINAL
LNG transport
• Carriers
• Tanker trucks
• Containers
• Rail cars
Tank capacity
100 – 160,000 m3
(26,400 – 42 Million gallons)
Jetty & Marine facilities
Unloading systems
Storage tanks
Boil-off gas handling
Re-gasification
• Up to 1,000 TPH
(1,000 MMSCFD)
Export systems
LNG transport
• Carriers
• Tanker trucks
• Containers
• Rail cars
Gas send-out
Ship bunkering
TPH = Tonnes Per Hour
MMSCFD = Million Standard Cubic Feet per Day
5.8.2016 Fredrik Bonäs/ Kenneth Engblom13
© Wärtsilä NOT YET CLASSIFIED
Tornio, Finland
“Providing the only source of
gas for industries in Northern
Finland.”
Tornio Manga LNG
Customer Manga LNG Oy
Type Small/Mid scale terminal
Tank net volume 50,000 m3
Send out Max 40 tonnes per hour at 6.0
barg
Scope of supply • Civil works and
infrastructure
• Full containment storage
tank
• Regasification & gas
metering
• BOG system
• Electrical and control
system
• Unloading system
• Bunkering and Truck
loading
Delivery method EPC Turnkey
Delivered 2018
5.8.2016 Fredrik Bonäs/ Kenneth Engblom14
© Wärtsilä NOT YET CLASSIFIED
San Pedro de Macoris, Dominican Republic
“Power Plant and LNG supply
system combined at the same
site.”
Los Origenes
Customer César Iglesias
Type Combined Power Plant and
LNG tank yard
Tank net volume 500 m3
Details LNG delivered by 3 trucks /
day, 40 m3 each.
Scope of supply • Complete Wärtsilä 34 dual-
fuel power plant including
civil works
• Integration of customer’s
LNG tank yard
Delivery method EPC
Delivered 2011
5.8.2016 Fredrik Bonäs/ Kenneth Engblom15
© Wärtsilä NOT YET CLASSIFIED 5.8.2016 Fredrik Bonäs/ Kenneth Engblom16
TABLE OF CONTENTS
Overview of Wärtsilä’s LNG solutions
Liquefaction plants
Terminals
Summary
© Wärtsilä NOT YET CLASSIFIED
COMMITMENT TO CUSTOMER SATISFACTION
• At Wärtsilä we know that every customer has unique expectations and
priorities. We serve all of them with the same level of quality and excellence.
• Projects are tailored to customer needs based on a set of pre-defined scopes
and proven designs, that will provide a valuable asset with the highest
possible quality at an affordable cost.
5.8.2016 Fredrik Bonäs/ Kenneth Engblom17
© Wärtsilä NOT YET CLASSIFIED
SUPPORT FOR THE WHOLE LIFE CYCLE
24 h
Technical Support
Wärtsilä Services’ global network
Widest range of offering and expertise
Wärtsilä Services provides full service throughout the product
lifecycle for both Marine and Energy solutions customers,
and is constantly developing its network worldwide.
 70 countries, 200 locations, 11,000 service professionals
5.8.2016 Fredrik Bonäs/ Kenneth Engblom18
© Wärtsilä NOT YET CLASSIFIED
COMPLETE SOLUTIONS THAT BRING VALUE TO CUSTOMERS
Project
Development &
Financing
Technology EPC Operations &
Maintenance
LNG Terminal or Liquefaction Plant
Gas / Dual-Fuel Power Plant
5.8.2016 Fredrik Bonäs/ Kenneth Engblom19
1 de 19

Recomendados

Fuel Flexibility - The Next Challenge for the Power Generation Industry por
Fuel Flexibility - The Next Challenge for the Power Generation IndustryFuel Flexibility - The Next Challenge for the Power Generation Industry
Fuel Flexibility - The Next Challenge for the Power Generation IndustryWärtsilä Marine Solutions
31.8K vistas21 diapositivas
LNG Fuel Marine Adoption por
LNG Fuel Marine AdoptionLNG Fuel Marine Adoption
LNG Fuel Marine AdoptionWärtsilä Marine Solutions
31.2K vistas11 diapositivas
Supporting an lng fuelled marine industry future across the entire gas value ... por
Supporting an lng fuelled marine industry future across the entire gas value ...Supporting an lng fuelled marine industry future across the entire gas value ...
Supporting an lng fuelled marine industry future across the entire gas value ...Wärtsilä Marine Solutions
2.7K vistas22 diapositivas
Determining the Viability of a Small Scale LNG Project por
Determining the Viability of a Small Scale LNG ProjectDetermining the Viability of a Small Scale LNG Project
Determining the Viability of a Small Scale LNG ProjectSampo Suvisaari
452 vistas18 diapositivas
LNG as fuel for shipping - dynamics & growth por
LNG as fuel for shipping - dynamics & growthLNG as fuel for shipping - dynamics & growth
LNG as fuel for shipping - dynamics & growthFrank Harteveld
27.7K vistas16 diapositivas
Wärtsilä Mobile LNG - Your Shorter Route to Gas por
Wärtsilä Mobile LNG - Your Shorter Route to GasWärtsilä Mobile LNG - Your Shorter Route to Gas
Wärtsilä Mobile LNG - Your Shorter Route to GasWärtsilä Marine Solutions
9.8K vistas16 diapositivas

Más contenido relacionado

La actualidad más candente

Small and medium scale LNG for power generation por
Small and medium scale LNG for power generationSmall and medium scale LNG for power generation
Small and medium scale LNG for power generationSmart Power Generation
11.7K vistas42 diapositivas
Seca seminar 2013 rolls royce - stein ruben larsen por
Seca seminar 2013   rolls royce - stein ruben larsenSeca seminar 2013   rolls royce - stein ruben larsen
Seca seminar 2013 rolls royce - stein ruben larsenShortsea Promotion Centre Norway
2.1K vistas18 diapositivas
Seagas LNG Bunkering Viking Grace por
Seagas LNG Bunkering Viking GraceSeagas LNG Bunkering Viking Grace
Seagas LNG Bunkering Viking GraceJohn Hatley PE
3.6K vistas27 diapositivas
Wärtsilä: Ensuring sustainable electricity supply in Myanmar por
Wärtsilä: Ensuring sustainable electricity supply in Myanmar Wärtsilä: Ensuring sustainable electricity supply in Myanmar
Wärtsilä: Ensuring sustainable electricity supply in Myanmar Wärtsilä Marine Solutions
3.2K vistas34 diapositivas
LNG Marine Fuel Adoption, How Soon, Which Routes, and Vessel Types por
LNG Marine Fuel Adoption, How Soon, Which Routes, and Vessel TypesLNG Marine Fuel Adoption, How Soon, Which Routes, and Vessel Types
LNG Marine Fuel Adoption, How Soon, Which Routes, and Vessel TypesJohn Hatley PE
485 vistas11 diapositivas
Wärtsilä HY: the first integrated hybrid power module in the marine industry! por
Wärtsilä HY: the first integrated hybrid power module in the marine industry!Wärtsilä HY: the first integrated hybrid power module in the marine industry!
Wärtsilä HY: the first integrated hybrid power module in the marine industry!Nicola Spiga
3.5K vistas14 diapositivas

La actualidad más candente(20)

Seagas LNG Bunkering Viking Grace por John Hatley PE
Seagas LNG Bunkering Viking GraceSeagas LNG Bunkering Viking Grace
Seagas LNG Bunkering Viking Grace
John Hatley PE3.6K vistas
LNG Marine Fuel Adoption, How Soon, Which Routes, and Vessel Types por John Hatley PE
LNG Marine Fuel Adoption, How Soon, Which Routes, and Vessel TypesLNG Marine Fuel Adoption, How Soon, Which Routes, and Vessel Types
LNG Marine Fuel Adoption, How Soon, Which Routes, and Vessel Types
John Hatley PE485 vistas
Wärtsilä HY: the first integrated hybrid power module in the marine industry! por Nicola Spiga
Wärtsilä HY: the first integrated hybrid power module in the marine industry!Wärtsilä HY: the first integrated hybrid power module in the marine industry!
Wärtsilä HY: the first integrated hybrid power module in the marine industry!
Nicola Spiga3.5K vistas
Fuel gas quality control for gas mode operations por Reetta Kaila
Fuel gas quality control for gas mode operationsFuel gas quality control for gas mode operations
Fuel gas quality control for gas mode operations
Reetta Kaila33.2K vistas
Asia Days 2013 - Market opportunities for small LNG distribution por Innovation Norway
Asia Days 2013 - Market opportunities for small LNG distributionAsia Days 2013 - Market opportunities for small LNG distribution
Asia Days 2013 - Market opportunities for small LNG distribution
Innovation Norway3.9K vistas
Wison Offshore & Marine - FLNG solution Mar 2015 por Hisham Yusof
Wison Offshore & Marine - FLNG solution Mar 2015Wison Offshore & Marine - FLNG solution Mar 2015
Wison Offshore & Marine - FLNG solution Mar 2015
Hisham Yusof2K vistas
Poyry - How can small-scale LNG help grow the European gas market? - Point of... por Pöyry
Poyry - How can small-scale LNG help grow the European gas market? - Point of...Poyry - How can small-scale LNG help grow the European gas market? - Point of...
Poyry - How can small-scale LNG help grow the European gas market? - Point of...
Pöyry1.3K vistas
LNG fuelled container feeder ship por Nitin Sharma
LNG fuelled container feeder shipLNG fuelled container feeder ship
LNG fuelled container feeder ship
Nitin Sharma2.4K vistas
Marketing of Small Scale LNG serving Remote Users por Darshit Paun
Marketing of Small Scale LNG serving Remote UsersMarketing of Small Scale LNG serving Remote Users
Marketing of Small Scale LNG serving Remote Users
Darshit Paun1.1K vistas
Lng bunkering china status report January 2016 por Dan-Hermann Thue
Lng bunkering china status report January 2016Lng bunkering china status report January 2016
Lng bunkering china status report January 2016
Dan-Hermann Thue3.6K vistas
Opportunities for Shipping LNG to the Caribbean por John Hatley PE
Opportunities for Shipping LNG to the CaribbeanOpportunities for Shipping LNG to the Caribbean
Opportunities for Shipping LNG to the Caribbean
John Hatley PE1.6K vistas
Gas entec ppt for_gis 2016_distribution por Brandon Shin
Gas entec ppt for_gis 2016_distributionGas entec ppt for_gis 2016_distribution
Gas entec ppt for_gis 2016_distribution
Brandon Shin13.1K vistas
Outlook on LNG Bunkering Facilities in China Inland Waterways and Ports por Dan-Hermann Thue
Outlook on LNG Bunkering Facilities in China Inland Waterways and PortsOutlook on LNG Bunkering Facilities in China Inland Waterways and Ports
Outlook on LNG Bunkering Facilities in China Inland Waterways and Ports
Dan-Hermann Thue4.2K vistas

Similar a Wärtsilä LNG Solutions

Felton LNG Tour Presentation (PG&E) por
Felton LNG Tour Presentation (PG&E)Felton LNG Tour Presentation (PG&E)
Felton LNG Tour Presentation (PG&E)Robert Singleton
1.6K vistas43 diapositivas
Natural gas and bio methane as fuel for transport h. aouad por
Natural gas and bio methane as fuel for transport   h. aouadNatural gas and bio methane as fuel for transport   h. aouad
Natural gas and bio methane as fuel for transport h. aouadEuropean Commission
1.2K vistas22 diapositivas
Lng creating new_opportunities_for_industrial_actors_and_consumers por
Lng creating new_opportunities_for_industrial_actors_and_consumersLng creating new_opportunities_for_industrial_actors_and_consumers
Lng creating new_opportunities_for_industrial_actors_and_consumersPrizztech
662 vistas17 diapositivas
Opportunities on lng_gasum por
Opportunities on lng_gasumOpportunities on lng_gasum
Opportunities on lng_gasumPrizztech
753 vistas23 diapositivas
Basic technology & solutions of LNG por
Basic technology & solutions of LNGBasic technology & solutions of LNG
Basic technology & solutions of LNGAbu Bakar Siddiqui
459 vistas23 diapositivas
Conceptual design study Kriegers Flak 090618 redused por
Conceptual design study Kriegers Flak 090618 redusedConceptual design study Kriegers Flak 090618 redused
Conceptual design study Kriegers Flak 090618 redusedThomas Stalin
1.3K vistas42 diapositivas

Similar a Wärtsilä LNG Solutions(20)

Felton LNG Tour Presentation (PG&E) por Robert Singleton
Felton LNG Tour Presentation (PG&E)Felton LNG Tour Presentation (PG&E)
Felton LNG Tour Presentation (PG&E)
Robert Singleton1.6K vistas
Natural gas and bio methane as fuel for transport h. aouad por European Commission
Natural gas and bio methane as fuel for transport   h. aouadNatural gas and bio methane as fuel for transport   h. aouad
Natural gas and bio methane as fuel for transport h. aouad
European Commission1.2K vistas
Lng creating new_opportunities_for_industrial_actors_and_consumers por Prizztech
Lng creating new_opportunities_for_industrial_actors_and_consumersLng creating new_opportunities_for_industrial_actors_and_consumers
Lng creating new_opportunities_for_industrial_actors_and_consumers
Prizztech662 vistas
Opportunities on lng_gasum por Prizztech
Opportunities on lng_gasumOpportunities on lng_gasum
Opportunities on lng_gasum
Prizztech753 vistas
Conceptual design study Kriegers Flak 090618 redused por Thomas Stalin
Conceptual design study Kriegers Flak 090618 redusedConceptual design study Kriegers Flak 090618 redused
Conceptual design study Kriegers Flak 090618 redused
Thomas Stalin1.3K vistas
Northern Lights: A European CO2 transport and storage project por Global CCS Institute
Northern Lights: A European CO2 transport and storage project Northern Lights: A European CO2 transport and storage project
Northern Lights: A European CO2 transport and storage project
Global CCS Institute4.5K vistas
Webinar: From compressor to reservoir – Flow assurance and control philosophy... por Global CCS Institute
Webinar: From compressor to reservoir – Flow assurance and control philosophy...Webinar: From compressor to reservoir – Flow assurance and control philosophy...
Webinar: From compressor to reservoir – Flow assurance and control philosophy...
Global CCS Institute1.8K vistas
Oivin inversen's presentation slides from the 2010 World National Oil Compani... por oilandgas
Oivin inversen's presentation slides from the 2010 World National Oil Compani...Oivin inversen's presentation slides from the 2010 World National Oil Compani...
Oivin inversen's presentation slides from the 2010 World National Oil Compani...
oilandgas744 vistas
Innovation landscape All Energy 2017 por BVG Associates
Innovation landscape All Energy 2017Innovation landscape All Energy 2017
Innovation landscape All Energy 2017
BVG Associates215 vistas
Central gas equipment for industrial gases (2011 edition in english) uk619 10... por PRITAM JADHAV
Central gas equipment for industrial gases (2011 edition in english) uk619 10...Central gas equipment for industrial gases (2011 edition in english) uk619 10...
Central gas equipment for industrial gases (2011 edition in english) uk619 10...
PRITAM JADHAV1.6K vistas
Pioner-projektledelse på Samsø-færgens nye anlæg - Lars Sall, Kosan Crisplant por Mediehuset Ingeniøren Live
Pioner-projektledelse på Samsø-færgens nye anlæg - Lars Sall, Kosan CrisplantPioner-projektledelse på Samsø-færgens nye anlæg - Lars Sall, Kosan Crisplant
Pioner-projektledelse på Samsø-færgens nye anlæg - Lars Sall, Kosan Crisplant
20151208 Hydrocarbon training Cyprus - Stakeholders session por Jarno Dakhorst
20151208 Hydrocarbon training Cyprus - Stakeholders session20151208 Hydrocarbon training Cyprus - Stakeholders session
20151208 Hydrocarbon training Cyprus - Stakeholders session
Jarno Dakhorst142 vistas
The Trajectories of Large Scale Landfills and their International Counterparts por Circular Economy Asia
The Trajectories of Large Scale Landfills and their International CounterpartsThe Trajectories of Large Scale Landfills and their International Counterparts
The Trajectories of Large Scale Landfills and their International Counterparts

Último

Design and analysis of a new undergraduate Computer Engineering degree – a me... por
Design and analysis of a new undergraduate Computer Engineering degree – a me...Design and analysis of a new undergraduate Computer Engineering degree – a me...
Design and analysis of a new undergraduate Computer Engineering degree – a me...WaelBadawy6
56 vistas4 diapositivas
_MAKRIADI-FOTEINI_diploma thesis.pptx por
_MAKRIADI-FOTEINI_diploma thesis.pptx_MAKRIADI-FOTEINI_diploma thesis.pptx
_MAKRIADI-FOTEINI_diploma thesis.pptxfotinimakriadi
7 vistas32 diapositivas
IWISS Catalog 2022 por
IWISS Catalog 2022IWISS Catalog 2022
IWISS Catalog 2022Iwiss Tools Co.,Ltd
26 vistas66 diapositivas
Object Oriented Programming with JAVA por
Object Oriented Programming with JAVAObject Oriented Programming with JAVA
Object Oriented Programming with JAVADemian Antony D'Mello
107 vistas28 diapositivas
STUDY OF SMART MATERIALS USED IN CONSTRUCTION-1.pptx por
STUDY OF SMART MATERIALS USED IN CONSTRUCTION-1.pptxSTUDY OF SMART MATERIALS USED IN CONSTRUCTION-1.pptx
STUDY OF SMART MATERIALS USED IN CONSTRUCTION-1.pptxAnnieRachelJohn
33 vistas34 diapositivas
DevOps to DevSecOps: Enhancing Software Security Throughout The Development L... por
DevOps to DevSecOps: Enhancing Software Security Throughout The Development L...DevOps to DevSecOps: Enhancing Software Security Throughout The Development L...
DevOps to DevSecOps: Enhancing Software Security Throughout The Development L...Anowar Hossain
12 vistas34 diapositivas

Último(20)

Design and analysis of a new undergraduate Computer Engineering degree – a me... por WaelBadawy6
Design and analysis of a new undergraduate Computer Engineering degree – a me...Design and analysis of a new undergraduate Computer Engineering degree – a me...
Design and analysis of a new undergraduate Computer Engineering degree – a me...
WaelBadawy656 vistas
_MAKRIADI-FOTEINI_diploma thesis.pptx por fotinimakriadi
_MAKRIADI-FOTEINI_diploma thesis.pptx_MAKRIADI-FOTEINI_diploma thesis.pptx
_MAKRIADI-FOTEINI_diploma thesis.pptx
fotinimakriadi7 vistas
STUDY OF SMART MATERIALS USED IN CONSTRUCTION-1.pptx por AnnieRachelJohn
STUDY OF SMART MATERIALS USED IN CONSTRUCTION-1.pptxSTUDY OF SMART MATERIALS USED IN CONSTRUCTION-1.pptx
STUDY OF SMART MATERIALS USED IN CONSTRUCTION-1.pptx
AnnieRachelJohn33 vistas
DevOps to DevSecOps: Enhancing Software Security Throughout The Development L... por Anowar Hossain
DevOps to DevSecOps: Enhancing Software Security Throughout The Development L...DevOps to DevSecOps: Enhancing Software Security Throughout The Development L...
DevOps to DevSecOps: Enhancing Software Security Throughout The Development L...
Anowar Hossain12 vistas
Update 42 models(Diode/General ) in SPICE PARK(DEC2023) por Tsuyoshi Horigome
Update 42 models(Diode/General ) in SPICE PARK(DEC2023)Update 42 models(Diode/General ) in SPICE PARK(DEC2023)
Update 42 models(Diode/General ) in SPICE PARK(DEC2023)
Tsuyoshi Horigome23 vistas
How I learned to stop worrying and love the dark silicon apocalypse.pdf por Tomasz Kowalczewski
How I learned to stop worrying and love the dark silicon apocalypse.pdfHow I learned to stop worrying and love the dark silicon apocalypse.pdf
How I learned to stop worrying and love the dark silicon apocalypse.pdf
Multi-objective distributed generation integration in radial distribution sy... por IJECEIAES
Multi-objective distributed generation integration in radial  distribution sy...Multi-objective distributed generation integration in radial  distribution sy...
Multi-objective distributed generation integration in radial distribution sy...
IJECEIAES15 vistas
Machine Element II Course outline.pdf por odatadese1
Machine Element II Course outline.pdfMachine Element II Course outline.pdf
Machine Element II Course outline.pdf
odatadese18 vistas
Performance of Back-to-Back Mechanically Stabilized Earth Walls Supporting th... por ahmedmesaiaoun
Performance of Back-to-Back Mechanically Stabilized Earth Walls Supporting th...Performance of Back-to-Back Mechanically Stabilized Earth Walls Supporting th...
Performance of Back-to-Back Mechanically Stabilized Earth Walls Supporting th...
ahmedmesaiaoun12 vistas
MSA Website Slideshow (16).pdf por msaucla
MSA Website Slideshow (16).pdfMSA Website Slideshow (16).pdf
MSA Website Slideshow (16).pdf
msaucla58 vistas
Thermal aware task assignment for multicore processors using genetic algorithm por IJECEIAES
Thermal aware task assignment for multicore processors using genetic algorithm Thermal aware task assignment for multicore processors using genetic algorithm
Thermal aware task assignment for multicore processors using genetic algorithm
IJECEIAES31 vistas

Wärtsilä LNG Solutions

  • 1. © Wärtsilä NOT YET CLASSIFIED WÄRTSILÄ LNG SOLUTIONS LNG18 April 2016 Fredrik Bonäs fi.linkedin.com/in/fredrikbonas #WartsilaKnowsGas #GasBassador 5.8.2016 Fredrik Bonäs/ Kenneth Engblom1
  • 2. © Wärtsilä NOT YET CLASSIFIED 5.8.2016 Fredrik Bonäs/ Kenneth Engblom2 TABLE OF CONTENTS Overview of Wärtsilä’s LNG solutions Liquefaction plants Terminals Summary
  • 3. © Wärtsilä NOT YET CLASSIFIED BEFORE: CONVENTIONAL LNG VALUE CHAIN 5.8.2016 Fredrik Bonäs/ Kenneth Engblom3
  • 4. © Wärtsilä NOT YET CLASSIFIED AFTER: CONVENTIONAL + SMALL-SCALE VALUE CHAIN 5.8.2016 Fredrik Bonäs/ Kenneth Engblom4
  • 5. © Wärtsilä NOT YET CLASSIFIED 5.8.2016 Fredrik Bonäs/ Kenneth Engblom5 WÄRTSILÄ LNG SOLUTIONS ONSHOREOFFSHORELIFECYCLE Small LNG liquefaction plants Mini LNG liquefaction plants Small/Medium LNG terminals LNG satellite & bunkering terminals LNG storage & regasification barge LNG regasification BOG reliquefaction Cargo Handling System Gas and LNG Carriers Fuel gas handling system Ship and Cargo Tank design Lifecycle services Start–up support Product and technical support Spares
  • 6. © Wärtsilä NOT YET CLASSIFIED Wärtsilä offers products and services for modern, flexible and sustainable power generation and LNG infrastructure. WÄRTSILÄ SERVICES EPC Spares Maintenance Operation Project Development and Financial Services 5.8.2016 Fredrik Bonäs/ Kenneth Engblom6
  • 7. © Wärtsilä NOT YET CLASSIFIED SHORTENING PROJECT DEVELOPMENT AND EPC LEAD TIME 5.8.2016 Fredrik Bonäs/ Kenneth Engblom7 YOU HAVE AN IDEA! Wärtsilä route • Design, Engineering, Cost Evaluations, Constructability reviews and Safety studies • Project execution and commissioning • Asset management and maintenance agreements Conventional route • Choose an engineering company • Conceptual design, Feasibility studies and FEED • Evaluate potential contractors • Bidding process, supplier selection and delivery contract(s) • Manage construction of LNG terminal and power plant • Arrange for operation maintenance and training Your shorter & quicker route to commercial operations! (10-20 months) Long process to FID, more time spent on administration, legal consultations and contractual setup... (20-30 months)
  • 8. © Wärtsilä NOT YET CLASSIFIED 5.8.2016 Fredrik Bonäs/ Kenneth Engblom8 TABLE OF CONTENTS Overview of Wärtsilä’s LNG solutions Liquefaction plants Terminals Summary
  • 9. © Wärtsilä NOT YET CLASSIFIED 5.8.2016 Fredrik Bonäs/ Kenneth Engblom9 MINI/SMALL SCALE LIQUEFACTION PLANTS INPUT OUTPUTPLANT Gas sources • Pipeline gas • Biogas • Landfill gas • Associated gas • Coal seam gas • Tight gas • Shale gas 2,000 – 300,000 TPA (3,400 – 510,000 GPD) Gas pre-treatment Liquefaction • Mixed Refrigerant: 2,000 - 30,000 TPA (3,400 – 51,000 GPD) • Reversed Brayton: 20,000 – 300,000 TPA (34,000 – 510,000 GPD) Storage tanks Jetty & Marine facilities Export systems LNG transport • Carriers • Tanker trucks • Containers • Rail cars Peak shaving gas send-out Ship bunkering TPA = Tonnes Per Year GPD = Gallons Per Day
  • 10. © Wärtsilä NOT YET CLASSIFIED Bergen, Norway “Twice the capacity, half the footprint!” Kollsnes II Customer Gasnor Type Small scale liquefaction plant Tank net volume 4,000 m3 Capacity 230 TPD / 84,000 TPA Size of liquefaction unit 12 m x 38 m Gas source Pipeline gas. Inlet pressure typically 70 bar. Details Extension to Kollsnes I. Includes two truck loading stations and existing loading jetty for small LNG carriers. Scope of supply Complete plant, incl. • Gas pre-treatment • Cooling system (Seawater) • Double Reversed Brayton liquefaction process • Storage tank • Electrical and control systems • Civil works Delivery method EPCIC Delivered 2007 5.8.2016 Fredrik Bonäs/ Kenneth Engblom10
  • 11. © Wärtsilä NOT YET CLASSIFIED Oslo, Norway “135 Oslo region buses will be able to run on biogas which means 10,000 tonnes emission reduction per year.” EGE Biogas Customer Cambi AS Type Mini liquefaction plant Tank net volume 180 m3 Capacity 11 TPD / 4,000 TPA Size of liquefaction unit 8 m x 14 m Gas source Biogas from 50,000 TPA of food waste Details Fuel production for 135 buses in the city of Oslo Scope of supply Complete plant, incl. • Gas pre-treatment • Cooling system (Ambient air) • MR liquefaction process • Storage tank • Electrical and control systems • Service agreement Excl. Civil works and installation Delivery method EPC Delivered 2013 5.8.2016 Fredrik Bonäs/ Kenneth Engblom11
  • 12. © Wärtsilä NOT YET CLASSIFIED 5.8.2016 Fredrik Bonäs/ Kenneth Engblom12 TABLE OF CONTENTS Overview of Wärtsilä’s LNG solutions Liquefaction plants Terminals Summary
  • 13. © Wärtsilä NOT YET CLASSIFIED SMALL/MID SCALE TERMINALS INPUT OUTPUTTERMINAL LNG transport • Carriers • Tanker trucks • Containers • Rail cars Tank capacity 100 – 160,000 m3 (26,400 – 42 Million gallons) Jetty & Marine facilities Unloading systems Storage tanks Boil-off gas handling Re-gasification • Up to 1,000 TPH (1,000 MMSCFD) Export systems LNG transport • Carriers • Tanker trucks • Containers • Rail cars Gas send-out Ship bunkering TPH = Tonnes Per Hour MMSCFD = Million Standard Cubic Feet per Day 5.8.2016 Fredrik Bonäs/ Kenneth Engblom13
  • 14. © Wärtsilä NOT YET CLASSIFIED Tornio, Finland “Providing the only source of gas for industries in Northern Finland.” Tornio Manga LNG Customer Manga LNG Oy Type Small/Mid scale terminal Tank net volume 50,000 m3 Send out Max 40 tonnes per hour at 6.0 barg Scope of supply • Civil works and infrastructure • Full containment storage tank • Regasification & gas metering • BOG system • Electrical and control system • Unloading system • Bunkering and Truck loading Delivery method EPC Turnkey Delivered 2018 5.8.2016 Fredrik Bonäs/ Kenneth Engblom14
  • 15. © Wärtsilä NOT YET CLASSIFIED San Pedro de Macoris, Dominican Republic “Power Plant and LNG supply system combined at the same site.” Los Origenes Customer César Iglesias Type Combined Power Plant and LNG tank yard Tank net volume 500 m3 Details LNG delivered by 3 trucks / day, 40 m3 each. Scope of supply • Complete Wärtsilä 34 dual- fuel power plant including civil works • Integration of customer’s LNG tank yard Delivery method EPC Delivered 2011 5.8.2016 Fredrik Bonäs/ Kenneth Engblom15
  • 16. © Wärtsilä NOT YET CLASSIFIED 5.8.2016 Fredrik Bonäs/ Kenneth Engblom16 TABLE OF CONTENTS Overview of Wärtsilä’s LNG solutions Liquefaction plants Terminals Summary
  • 17. © Wärtsilä NOT YET CLASSIFIED COMMITMENT TO CUSTOMER SATISFACTION • At Wärtsilä we know that every customer has unique expectations and priorities. We serve all of them with the same level of quality and excellence. • Projects are tailored to customer needs based on a set of pre-defined scopes and proven designs, that will provide a valuable asset with the highest possible quality at an affordable cost. 5.8.2016 Fredrik Bonäs/ Kenneth Engblom17
  • 18. © Wärtsilä NOT YET CLASSIFIED SUPPORT FOR THE WHOLE LIFE CYCLE 24 h Technical Support Wärtsilä Services’ global network Widest range of offering and expertise Wärtsilä Services provides full service throughout the product lifecycle for both Marine and Energy solutions customers, and is constantly developing its network worldwide.  70 countries, 200 locations, 11,000 service professionals 5.8.2016 Fredrik Bonäs/ Kenneth Engblom18
  • 19. © Wärtsilä NOT YET CLASSIFIED COMPLETE SOLUTIONS THAT BRING VALUE TO CUSTOMERS Project Development & Financing Technology EPC Operations & Maintenance LNG Terminal or Liquefaction Plant Gas / Dual-Fuel Power Plant 5.8.2016 Fredrik Bonäs/ Kenneth Engblom19