Planning Principles for Full Fleet Electrification

World Resources Institute (WRI)
World Resources Institute (WRI)environmental think tank
PLANNING PRINCIPLES FOR
FULL FLEET ELECTRIFICATION
WRI Webinar: August 29, 2023
WELCOME
• All attendees are in listen-only mode. Please use the
Q&A feature to ask questions of the presenters and
panelists.
• The recording and slides will be shared with participants
after the webinar.
SPEAKERS
Ian Goldsmith
Research Analyst,
WRI
Moderator
Joseph Womble
Research Analyst I,
WRI
Presenter
WEBINAR AGENDA
• Planning for Full Fleet Electrification: Lessons
Learned (15 minutes)
• Panel Discussion (30 minutes)
• Audience Q&A (10 minutes)
PANEL DISCUSSION
Lori Bird
U.S. Energy Director
and Polsky Chair for
Renewable Energy
World Resources
Institute
Diana Kotler
CEO
Anaheim
Transportation
Network
Brent Taylor
Assistant
Commissioner, Fleet
New York City
Department of Citywide
Administrative Services
Ewan Pritchard
Consultant and
Subject Matter
Expert
Pritchard
Engineering and
Energetics
PLANNING FOR FULL FLEET
ELECTRIFICATION: LESSONS
LEARNED
Presenter: Joseph Womble, WRI
Contributors: Ian Goldsmith, Michelle Levinson, WRI
DISCLAIMER
• This research on key considerations related to full fleet
electrification was funded by the UPS Foundation.
• However, the information contained in this presentation only
expresses the views and opinions of the presenters and does not
necessarily reflect the views and opinions of the UPS Foundation.
RESEARCH ACTIVITIES
• Our research focused on "public purpose"
fleets - operated to serve the public
– Examples: public transit, school buses,
emergency services, municipal public works,
law enforcement vehicles
• Our research consisted of:
– A literature review of more than 15 public
purpose fleet electrification plans
– 17 interviews with experts at the forefront of
fleet electrification (e.g., local governments,
transit agencies, fleet transition consultants)
– A review of other resources related to
fleet electrification
TRENDS IN VEHICLE ELECTRIFICATION
• EV sales are
growing, reaching 10% of
new vehicle sales in June
2023
• Public purpose fleets are
part of this trend
and motivated by:
– Reducing total ownership and
maintenance costs
– Reaching their sustainability
goals
Source: Atlas EV Hub
RESEARCH QUESTIONS
We focused on two major questions:
How does planning for full
fleet electrification differ
from planning for early and
pilot actions?
What energy infrastructure
considerations should fleet
planners take into account
for fully electrifying
public purpose fleets at
depots and yards?
PUBLIC PURPOSE FLEETS IN THE U.S.
U.S. public purpose fleet vehicles include:
– 645,000 vehicles in the federal fleet
– 500,000 vehicles in state fleets
– Approximately 500,000 school buses
– More than 3 million vehicles in municipal and
county fleets
Sources: Federal Highway Administration Highway Statistics Series; https://time.com/6117544/electric-school-
buses/ ; https://database.aceee.org/state/fleets ; https://www.washingtonpost.com/climate-solutions/2021/01/28/biden-federal-fleet-electric/
TIMELINE AND SCALE OF TRANSITIONS
• Fleet transition timelines vary widely
– Some entities seeking to convert their entire
fleet to zero-emissions as early as 2035
• When determining transition timelines,
various factors are critical to consider:
– Anticipated technology availability
– Technology cost curves and anticipated
incentives/grants
– Existing and planned routes
– Siting plans
– Equitable distribution of benefits
– Workforce development
– Level of ambition and political will
• Transition timelines are typically iterative
and undergo periodic review
Source: King County Metro Transit Zero-Emission Bus Fleet Transition Plan
Example Fleet Conversion Timeline
and Purchase Schedule
BARRIERS TO SCALING FLEET ELECTRIFICATION
Lack of capacity
and technical
knowledge
Internal
coordination
Siting
Uncertainty
around
infrastructure
sequencing
Utility
collaboration
Procurement
challenges with
certain vehicles
Equity concerns
Grid upgrades
and concern
about grid
impacts
Maintenance
concerns
Restrictions
around
"futureproofing"
Technology
uncertainties
PLANNING PRINCIPLES
Consider how fleet electrification affects staff roles and
coordination across the organization
Engage with your utility early and often
Be creative with how you site electric vehicle depots and
infrastructure
Determine how you will pay for EVSE maintenance and
replacement costs
Identify pathways for exploring new technologies
COORDINATION AND NEW RESPONSIBILITIES
Consider how fleet electrification affects staff
roles and coordination across the organization
– What new staff roles are needed?
– Are there new organizational structures that might be
needed to facilitate coordination?
– What needs exist today that may multiply as you
further electrify your fleet?
– How can you share relevant data internally and with
partner organizations?
– What ways can you simplify internal coordination
around procurement processes?
– How can you avoid taking on significant additional
responsibilities internally while advancing your goals?
Mayor Michael Bloomberg established
New York's Department of Citywide
Administrative Services, which
oversees and manages fleets for all
other departments.
UTILITY ENGAGEMENT
Engage with your utility early and often
– How can you prepare your utility for anticipated
electrification loads 2, 5, and 10 years out?
– How can you proactively lock in beneficial
charging rates?
– What constraints does your utility face?
– What are your highest priority concerns?
The Port of Oakland asks its
customers to keep it informed of
planned electrification and potential
electrification to help customers avoid
unnecessary upgrade costs.
SITING
Be creative with how you site electric
vehicle depots and infrastructure
– Can you move sites, decentralize or centralize
depots, or share a site with a regional
partner?
– What sites should be prioritized for installation
of charging infrastructure?
– How will charging infrastructure be installed at
non-prioritized sites? What is the timeline for
doing so?
– How much power does a given site have?
How easy would it be to upgrade? How
resilient is it?
MAINTENANCE AND REPLACEMENT COSTS
Determine how you will pay for EVSE
maintenance and replacement costs
– How can you avoid adding maintenance of
chargers to your responsibilities?
– Are there any loopholes in your RFPs that
might lead to excessive EVSE downtime?
– Do networked or non-networked solutions
make more sense for your applications?
NEW AND CHANGING TECHNOLOGIES
Identify pathways for exploring new
technologies, such as vehicle-to-grid
(V2G) and microgrids
– How can you leverage grants or other
funds to explore adoption of these
technologies?
– How can you build strong partnerships with
your utility and other players to allow you
low-risk ways to pilot new technologies?
– What impact does your geography and
climate have on battery range and the need
for other technologies?
Montgomery County, MD partnered
with AlphaStruxure and Carlyle Group
to build a 6.5-megawatt microgrid and
electric bus depot at no upfront cost to
the county.
FLEET ELECTRIFICATION PLANS AND RESOURCES
• Alameda Contra Costa Transit District
• Champaign-Urbana Mass Transit District
• Colorado DOT ZEV Transition Planning Template
• The District of Columbia's Municipal Fleet
• King County Metro Transit
• New York City Department of Citywide Administrative Services
• Philadelphia's Municipal Fleet
Example fleet electrification plans:
OTHER KEY FINDINGS
• Being forward-looking is ideal when conducting funding needs
assessments, workforce analyses, and partnership
assessments.
• Considering customer preferences and needs is critical to
ensuring successful fleet transitions.
• Understanding the policy picture is important for
planning and determining timelines
• Purchasing EVs and installing infrastructure should be as
aligned as possible, but infrastructure sequencing may vary
depending on various factors.
THANK YOU
Please reach out to joseph.womble@wri.org with any questions.
PANEL DISCUSSION
Lori Bird
U.S. Energy Director
and Polsky Chair for
Renewable Energy
Diana Kotler
CEO
Anaheim
Transportation
Network
Brent Taylor
Assistant
Commissioner, Fleet
New York City
Department of Citywide
Administrative Services
Ewan Pritchard
Consultant and
Subject Matter
Expert
Pritchard
Engineering and
Energetics
1 de 23

Recomendados

EV Fast Charging Infrastructure version 4.65 .pdf por
EV Fast Charging Infrastructure version 4.65 .pdfEV Fast Charging Infrastructure version 4.65 .pdf
EV Fast Charging Infrastructure version 4.65 .pdfssuser0eaf3b
7 vistas19 diapositivas
Christine Kehoe, PEV Collaborative por
Christine Kehoe, PEV Collaborative Christine Kehoe, PEV Collaborative
Christine Kehoe, PEV Collaborative Forth
699 vistas22 diapositivas
Tips for Utilities and Regulators on Distribution Planning and Distributed En... por
Tips for Utilities and Regulators on Distribution Planning and Distributed En...Tips for Utilities and Regulators on Distribution Planning and Distributed En...
Tips for Utilities and Regulators on Distribution Planning and Distributed En...Smart Grid Northwest
402 vistas38 diapositivas
Utility Distribution Planning and Distributed Energy Resource Integration: EQ... por
Utility Distribution Planning and Distributed Energy Resource Integration: EQ...Utility Distribution Planning and Distributed Energy Resource Integration: EQ...
Utility Distribution Planning and Distributed Energy Resource Integration: EQ...Smart Grid Northwest
655 vistas38 diapositivas
DEVELOPING AN EV CHARGING STATION: A TECHNICAL AND REGULATORY OVERVIEW por
DEVELOPING AN EV CHARGING STATION: A TECHNICAL AND REGULATORY OVERVIEWDEVELOPING AN EV CHARGING STATION: A TECHNICAL AND REGULATORY OVERVIEW
DEVELOPING AN EV CHARGING STATION: A TECHNICAL AND REGULATORY OVERVIEWDesignTeam8
248 vistas20 diapositivas
Plug In Vehicles and Integration por
Plug In Vehicles and IntegrationPlug In Vehicles and Integration
Plug In Vehicles and IntegrationCALSTART
424 vistas17 diapositivas

Más contenido relacionado

Similar a Planning Principles for Full Fleet Electrification

Aaron Milano, Portland General Electric: Transportation Electrification por
Aaron Milano, Portland General Electric: Transportation Electrification Aaron Milano, Portland General Electric: Transportation Electrification
Aaron Milano, Portland General Electric: Transportation Electrification Forth
1K vistas17 diapositivas
EV INFRASTRUCTURE IMPLEMENTATION CHALLENGES por
EV INFRASTRUCTURE IMPLEMENTATION CHALLENGESEV INFRASTRUCTURE IMPLEMENTATION CHALLENGES
EV INFRASTRUCTURE IMPLEMENTATION CHALLENGESiQHub
116 vistas14 diapositivas
Using Federal Charging Funds Equitably & Effectively by Steve Lommele and Bri... por
Using Federal Charging Funds Equitably & Effectively by Steve Lommele and Bri...Using Federal Charging Funds Equitably & Effectively by Steve Lommele and Bri...
Using Federal Charging Funds Equitably & Effectively by Steve Lommele and Bri...Forth
69 vistas26 diapositivas
Workplace Charging Best Practices (CALSTART) Detroit June 18 2013 por
Workplace Charging Best Practices (CALSTART) Detroit June 18 2013Workplace Charging Best Practices (CALSTART) Detroit June 18 2013
Workplace Charging Best Practices (CALSTART) Detroit June 18 2013CALSTART
977 vistas35 diapositivas
Tonia Buell, Expanding Fast Charging, November 2017 por
Tonia Buell, Expanding Fast Charging, November 2017Tonia Buell, Expanding Fast Charging, November 2017
Tonia Buell, Expanding Fast Charging, November 2017Forth
725 vistas19 diapositivas
The Electric Vehicle Market por
The Electric Vehicle MarketThe Electric Vehicle Market
The Electric Vehicle MarketScottMadden, Inc.
209 vistas14 diapositivas

Similar a Planning Principles for Full Fleet Electrification(20)

Aaron Milano, Portland General Electric: Transportation Electrification por Forth
Aaron Milano, Portland General Electric: Transportation Electrification Aaron Milano, Portland General Electric: Transportation Electrification
Aaron Milano, Portland General Electric: Transportation Electrification
Forth 1K vistas
EV INFRASTRUCTURE IMPLEMENTATION CHALLENGES por iQHub
EV INFRASTRUCTURE IMPLEMENTATION CHALLENGESEV INFRASTRUCTURE IMPLEMENTATION CHALLENGES
EV INFRASTRUCTURE IMPLEMENTATION CHALLENGES
iQHub116 vistas
Using Federal Charging Funds Equitably & Effectively by Steve Lommele and Bri... por Forth
Using Federal Charging Funds Equitably & Effectively by Steve Lommele and Bri...Using Federal Charging Funds Equitably & Effectively by Steve Lommele and Bri...
Using Federal Charging Funds Equitably & Effectively by Steve Lommele and Bri...
Forth 69 vistas
Workplace Charging Best Practices (CALSTART) Detroit June 18 2013 por CALSTART
Workplace Charging Best Practices (CALSTART) Detroit June 18 2013Workplace Charging Best Practices (CALSTART) Detroit June 18 2013
Workplace Charging Best Practices (CALSTART) Detroit June 18 2013
CALSTART977 vistas
Tonia Buell, Expanding Fast Charging, November 2017 por Forth
Tonia Buell, Expanding Fast Charging, November 2017Tonia Buell, Expanding Fast Charging, November 2017
Tonia Buell, Expanding Fast Charging, November 2017
Forth 725 vistas
The Electric Vehicle Market: Utility Infrastructure Deployment por ScottMadden, Inc.
The Electric Vehicle Market: Utility Infrastructure DeploymentThe Electric Vehicle Market: Utility Infrastructure Deployment
The Electric Vehicle Market: Utility Infrastructure Deployment
ScottMadden, Inc.505 vistas
The Electric Vehicle Market: Utility Perspective and Considerations for Utili... por ScottMadden, Inc.
The Electric Vehicle Market: Utility Perspective and Considerations for Utili...The Electric Vehicle Market: Utility Perspective and Considerations for Utili...
The Electric Vehicle Market: Utility Perspective and Considerations for Utili...
ScottMadden, Inc.491 vistas
Managed Charging by Laura McCarty por Forth
Managed Charging by Laura McCartyManaged Charging by Laura McCarty
Managed Charging by Laura McCarty
Forth 75 vistas
State Transportation Electrification Strategies: Best Practices by Amanda P... por Forth
State Transportation Electrification Strategies:  Best Practices  by Amanda P...State Transportation Electrification Strategies:  Best Practices  by Amanda P...
State Transportation Electrification Strategies: Best Practices by Amanda P...
Forth 43 vistas
RV 2014: Urban Circulator Roundtable: Shaping Cities one Challenge at a Time ... por Rail~Volution
RV 2014: Urban Circulator Roundtable: Shaping Cities one Challenge at a Time ...RV 2014: Urban Circulator Roundtable: Shaping Cities one Challenge at a Time ...
RV 2014: Urban Circulator Roundtable: Shaping Cities one Challenge at a Time ...
Rail~Volution665 vistas
WestSmartEV, James Campbell por Forth
WestSmartEV, James CampbellWestSmartEV, James Campbell
WestSmartEV, James Campbell
Forth 323 vistas
Electric Vehicles Readiness and Charging at Multi-Unit Dwellings by Eric Huang por Forth
Electric Vehicles Readiness and Charging at Multi-Unit Dwellings by Eric HuangElectric Vehicles Readiness and Charging at Multi-Unit Dwellings by Eric Huang
Electric Vehicles Readiness and Charging at Multi-Unit Dwellings by Eric Huang
Forth 79 vistas
Alternative Fuels Workshop & Wisconsin Smart Fleet Recognition Program - WCC ... por Wisconsin Clean Cities
Alternative Fuels Workshop & Wisconsin Smart Fleet Recognition Program - WCC ...Alternative Fuels Workshop & Wisconsin Smart Fleet Recognition Program - WCC ...
Alternative Fuels Workshop & Wisconsin Smart Fleet Recognition Program - WCC ...
RV 2015: Sustainable Corridors: Broad and Specific Looks by Robert Hastings por Rail~Volution
RV 2015: Sustainable Corridors: Broad and Specific Looks by Robert HastingsRV 2015: Sustainable Corridors: Broad and Specific Looks by Robert Hastings
RV 2015: Sustainable Corridors: Broad and Specific Looks by Robert Hastings
Rail~Volution3.1K vistas
EEI Strategic Issues Forum - Integration of DER: California and New York por ScottMadden, Inc.
EEI Strategic Issues Forum - Integration of DER: California and New YorkEEI Strategic Issues Forum - Integration of DER: California and New York
EEI Strategic Issues Forum - Integration of DER: California and New York
ScottMadden, Inc.908 vistas
Where to Get Help por Forth
Where to Get HelpWhere to Get Help
Where to Get Help
Forth 24 vistas
Driving Transportation Electrification Forward - The TEINA Study byMary Brazell por Forth
Driving Transportation Electrification Forward - The TEINA Study byMary BrazellDriving Transportation Electrification Forward - The TEINA Study byMary Brazell
Driving Transportation Electrification Forward - The TEINA Study byMary Brazell
Forth 200 vistas
LTC, Jack R. Widmeyer Transportation Research Conference, 11/04/2010 por LTC @ CSUSB
LTC, Jack R. Widmeyer Transportation Research Conference, 11/04/2010LTC, Jack R. Widmeyer Transportation Research Conference, 11/04/2010
LTC, Jack R. Widmeyer Transportation Research Conference, 11/04/2010
LTC @ CSUSB583 vistas

Más de World Resources Institute (WRI)

Forest Data Partnership: The Traceability and Transparency Tipping Point: Tra... por
Forest Data Partnership: The Traceability and Transparency Tipping Point: Tra...Forest Data Partnership: The Traceability and Transparency Tipping Point: Tra...
Forest Data Partnership: The Traceability and Transparency Tipping Point: Tra...World Resources Institute (WRI)
473 vistas21 diapositivas
Maximizing Clean Energy Opportunities in the Inflation Reduction Act: A Roadm... por
Maximizing Clean Energy Opportunities in the Inflation Reduction Act: A Roadm...Maximizing Clean Energy Opportunities in the Inflation Reduction Act: A Roadm...
Maximizing Clean Energy Opportunities in the Inflation Reduction Act: A Roadm...World Resources Institute (WRI)
504 vistas38 diapositivas
How Cities Can Maximize Inflation Reduction Act (IRA) Opportunities As Clean ... por
How Cities Can Maximize Inflation Reduction Act (IRA) Opportunities As Clean ...How Cities Can Maximize Inflation Reduction Act (IRA) Opportunities As Clean ...
How Cities Can Maximize Inflation Reduction Act (IRA) Opportunities As Clean ...World Resources Institute (WRI)
490 vistas49 diapositivas
24/7 Carbon Free Energy Local Governments Pitch Deck por
24/7 Carbon Free Energy Local Governments Pitch Deck24/7 Carbon Free Energy Local Governments Pitch Deck
24/7 Carbon Free Energy Local Governments Pitch DeckWorld Resources Institute (WRI)
61 vistas34 diapositivas
Global Pasture Watch: Mapping & Monitoring Global Grasslands and Livestock por
Global Pasture Watch: Mapping & Monitoring Global Grasslands and LivestockGlobal Pasture Watch: Mapping & Monitoring Global Grasslands and Livestock
Global Pasture Watch: Mapping & Monitoring Global Grasslands and LivestockWorld Resources Institute (WRI)
2.7K vistas75 diapositivas
Carbon Removal at Scale: A Call to Action from the IPCC Report por
Carbon Removal at Scale: A Call to Action from the IPCC ReportCarbon Removal at Scale: A Call to Action from the IPCC Report
Carbon Removal at Scale: A Call to Action from the IPCC ReportWorld Resources Institute (WRI)
1.7K vistas16 diapositivas

Más de World Resources Institute (WRI)(20)

Último

Oral Presentation.pdf por
Oral Presentation.pdfOral Presentation.pdf
Oral Presentation.pdfsalamaalmehrzi14
7 vistas9 diapositivas
Overview of the IPCC Inventory Software for National Greenhouse Gas Inventori... por
Overview of the IPCC Inventory Software for National Greenhouse Gas Inventori...Overview of the IPCC Inventory Software for National Greenhouse Gas Inventori...
Overview of the IPCC Inventory Software for National Greenhouse Gas Inventori...ipcc-media
111 vistas15 diapositivas
Uforest innovation Challenge - Diversity as an Urban Recipe por
Uforest innovation Challenge - Diversity as an Urban RecipeUforest innovation Challenge - Diversity as an Urban Recipe
Uforest innovation Challenge - Diversity as an Urban RecipeEtifor srl
18 vistas71 diapositivas
Where is global warming in relation to the long-term temperature goal? por
Where is global warming in relation to the long-term temperature goal?Where is global warming in relation to the long-term temperature goal?
Where is global warming in relation to the long-term temperature goal?ipcc-media
28 vistas30 diapositivas
Subscribe por
Subscribe Subscribe
Subscribe saadalirao90
8 vistas1 diapositiva
Smart Grids por
Smart GridsSmart Grids
Smart GridsDr. Salem Baidas
15 vistas30 diapositivas

Último(20)

Overview of the IPCC Inventory Software for National Greenhouse Gas Inventori... por ipcc-media
Overview of the IPCC Inventory Software for National Greenhouse Gas Inventori...Overview of the IPCC Inventory Software for National Greenhouse Gas Inventori...
Overview of the IPCC Inventory Software for National Greenhouse Gas Inventori...
ipcc-media111 vistas
Uforest innovation Challenge - Diversity as an Urban Recipe por Etifor srl
Uforest innovation Challenge - Diversity as an Urban RecipeUforest innovation Challenge - Diversity as an Urban Recipe
Uforest innovation Challenge - Diversity as an Urban Recipe
Etifor srl18 vistas
Where is global warming in relation to the long-term temperature goal? por ipcc-media
Where is global warming in relation to the long-term temperature goal?Where is global warming in relation to the long-term temperature goal?
Where is global warming in relation to the long-term temperature goal?
ipcc-media28 vistas
cop28ppt12.pptx por APSARARS
cop28ppt12.pptxcop28ppt12.pptx
cop28ppt12.pptx
APSARARS16 vistas
Insights from AR6 WGIII on energy system mitigation, in AR6 and Towards AR7 por ipcc-media
Insights from AR6 WGIII on energy system mitigation, in AR6 and Towards AR7 Insights from AR6 WGIII on energy system mitigation, in AR6 and Towards AR7
Insights from AR6 WGIII on energy system mitigation, in AR6 and Towards AR7
ipcc-media73 vistas
Transformational Mitigation For Industry Sectors Exposed To International Com... por ipcc-media
Transformational Mitigation For Industry Sectors Exposed To International Com...Transformational Mitigation For Industry Sectors Exposed To International Com...
Transformational Mitigation For Industry Sectors Exposed To International Com...
ipcc-media56 vistas
overview of the causes and effects of drinking water scarcity in the uae.pdf por ajaalfalasi
overview of the causes and effects of drinking water scarcity in the uae.pdfoverview of the causes and effects of drinking water scarcity in the uae.pdf
overview of the causes and effects of drinking water scarcity in the uae.pdf
ajaalfalasi8 vistas
IPCC Working Group II por ipcc-media
IPCC Working Group II IPCC Working Group II
IPCC Working Group II
ipcc-media45 vistas
PROGRAMMES OF ENVIRONMENTAL EDUCATION.pptx por DrHafizKosar
PROGRAMMES OF ENVIRONMENTAL EDUCATION.pptxPROGRAMMES OF ENVIRONMENTAL EDUCATION.pptx
PROGRAMMES OF ENVIRONMENTAL EDUCATION.pptx
DrHafizKosar143 vistas
Physical Science Challenges for AR7 por ipcc-media
Physical Science Challenges for AR7Physical Science Challenges for AR7
Physical Science Challenges for AR7
ipcc-media271 vistas
Exceeding-returning-Intro-v1Dec-final.pptx por ipcc-media
Exceeding-returning-Intro-v1Dec-final.pptxExceeding-returning-Intro-v1Dec-final.pptx
Exceeding-returning-Intro-v1Dec-final.pptx
ipcc-media81 vistas
Uforest Innovation Challenge - UNIFOREST por Etifor srl
Uforest Innovation Challenge - UNIFORESTUforest Innovation Challenge - UNIFOREST
Uforest Innovation Challenge - UNIFOREST
Etifor srl25 vistas
Opportunities for scaling up climate action por ipcc-media
Opportunities for scaling up  climate actionOpportunities for scaling up  climate action
Opportunities for scaling up climate action
ipcc-media54 vistas
IPCC Scholarship Programme por ipcc-media
IPCC Scholarship ProgrammeIPCC Scholarship Programme
IPCC Scholarship Programme
ipcc-media67 vistas
Challenges for WG1 por ipcc-media
Challenges for WG1Challenges for WG1
Challenges for WG1
ipcc-media45 vistas

Planning Principles for Full Fleet Electrification

  • 1. PLANNING PRINCIPLES FOR FULL FLEET ELECTRIFICATION WRI Webinar: August 29, 2023
  • 2. WELCOME • All attendees are in listen-only mode. Please use the Q&A feature to ask questions of the presenters and panelists. • The recording and slides will be shared with participants after the webinar.
  • 3. SPEAKERS Ian Goldsmith Research Analyst, WRI Moderator Joseph Womble Research Analyst I, WRI Presenter
  • 4. WEBINAR AGENDA • Planning for Full Fleet Electrification: Lessons Learned (15 minutes) • Panel Discussion (30 minutes) • Audience Q&A (10 minutes)
  • 5. PANEL DISCUSSION Lori Bird U.S. Energy Director and Polsky Chair for Renewable Energy World Resources Institute Diana Kotler CEO Anaheim Transportation Network Brent Taylor Assistant Commissioner, Fleet New York City Department of Citywide Administrative Services Ewan Pritchard Consultant and Subject Matter Expert Pritchard Engineering and Energetics
  • 6. PLANNING FOR FULL FLEET ELECTRIFICATION: LESSONS LEARNED Presenter: Joseph Womble, WRI Contributors: Ian Goldsmith, Michelle Levinson, WRI
  • 7. DISCLAIMER • This research on key considerations related to full fleet electrification was funded by the UPS Foundation. • However, the information contained in this presentation only expresses the views and opinions of the presenters and does not necessarily reflect the views and opinions of the UPS Foundation.
  • 8. RESEARCH ACTIVITIES • Our research focused on "public purpose" fleets - operated to serve the public – Examples: public transit, school buses, emergency services, municipal public works, law enforcement vehicles • Our research consisted of: – A literature review of more than 15 public purpose fleet electrification plans – 17 interviews with experts at the forefront of fleet electrification (e.g., local governments, transit agencies, fleet transition consultants) – A review of other resources related to fleet electrification
  • 9. TRENDS IN VEHICLE ELECTRIFICATION • EV sales are growing, reaching 10% of new vehicle sales in June 2023 • Public purpose fleets are part of this trend and motivated by: – Reducing total ownership and maintenance costs – Reaching their sustainability goals Source: Atlas EV Hub
  • 10. RESEARCH QUESTIONS We focused on two major questions: How does planning for full fleet electrification differ from planning for early and pilot actions? What energy infrastructure considerations should fleet planners take into account for fully electrifying public purpose fleets at depots and yards?
  • 11. PUBLIC PURPOSE FLEETS IN THE U.S. U.S. public purpose fleet vehicles include: – 645,000 vehicles in the federal fleet – 500,000 vehicles in state fleets – Approximately 500,000 school buses – More than 3 million vehicles in municipal and county fleets Sources: Federal Highway Administration Highway Statistics Series; https://time.com/6117544/electric-school- buses/ ; https://database.aceee.org/state/fleets ; https://www.washingtonpost.com/climate-solutions/2021/01/28/biden-federal-fleet-electric/
  • 12. TIMELINE AND SCALE OF TRANSITIONS • Fleet transition timelines vary widely – Some entities seeking to convert their entire fleet to zero-emissions as early as 2035 • When determining transition timelines, various factors are critical to consider: – Anticipated technology availability – Technology cost curves and anticipated incentives/grants – Existing and planned routes – Siting plans – Equitable distribution of benefits – Workforce development – Level of ambition and political will • Transition timelines are typically iterative and undergo periodic review Source: King County Metro Transit Zero-Emission Bus Fleet Transition Plan Example Fleet Conversion Timeline and Purchase Schedule
  • 13. BARRIERS TO SCALING FLEET ELECTRIFICATION Lack of capacity and technical knowledge Internal coordination Siting Uncertainty around infrastructure sequencing Utility collaboration Procurement challenges with certain vehicles Equity concerns Grid upgrades and concern about grid impacts Maintenance concerns Restrictions around "futureproofing" Technology uncertainties
  • 14. PLANNING PRINCIPLES Consider how fleet electrification affects staff roles and coordination across the organization Engage with your utility early and often Be creative with how you site electric vehicle depots and infrastructure Determine how you will pay for EVSE maintenance and replacement costs Identify pathways for exploring new technologies
  • 15. COORDINATION AND NEW RESPONSIBILITIES Consider how fleet electrification affects staff roles and coordination across the organization – What new staff roles are needed? – Are there new organizational structures that might be needed to facilitate coordination? – What needs exist today that may multiply as you further electrify your fleet? – How can you share relevant data internally and with partner organizations? – What ways can you simplify internal coordination around procurement processes? – How can you avoid taking on significant additional responsibilities internally while advancing your goals? Mayor Michael Bloomberg established New York's Department of Citywide Administrative Services, which oversees and manages fleets for all other departments.
  • 16. UTILITY ENGAGEMENT Engage with your utility early and often – How can you prepare your utility for anticipated electrification loads 2, 5, and 10 years out? – How can you proactively lock in beneficial charging rates? – What constraints does your utility face? – What are your highest priority concerns? The Port of Oakland asks its customers to keep it informed of planned electrification and potential electrification to help customers avoid unnecessary upgrade costs.
  • 17. SITING Be creative with how you site electric vehicle depots and infrastructure – Can you move sites, decentralize or centralize depots, or share a site with a regional partner? – What sites should be prioritized for installation of charging infrastructure? – How will charging infrastructure be installed at non-prioritized sites? What is the timeline for doing so? – How much power does a given site have? How easy would it be to upgrade? How resilient is it?
  • 18. MAINTENANCE AND REPLACEMENT COSTS Determine how you will pay for EVSE maintenance and replacement costs – How can you avoid adding maintenance of chargers to your responsibilities? – Are there any loopholes in your RFPs that might lead to excessive EVSE downtime? – Do networked or non-networked solutions make more sense for your applications?
  • 19. NEW AND CHANGING TECHNOLOGIES Identify pathways for exploring new technologies, such as vehicle-to-grid (V2G) and microgrids – How can you leverage grants or other funds to explore adoption of these technologies? – How can you build strong partnerships with your utility and other players to allow you low-risk ways to pilot new technologies? – What impact does your geography and climate have on battery range and the need for other technologies? Montgomery County, MD partnered with AlphaStruxure and Carlyle Group to build a 6.5-megawatt microgrid and electric bus depot at no upfront cost to the county.
  • 20. FLEET ELECTRIFICATION PLANS AND RESOURCES • Alameda Contra Costa Transit District • Champaign-Urbana Mass Transit District • Colorado DOT ZEV Transition Planning Template • The District of Columbia's Municipal Fleet • King County Metro Transit • New York City Department of Citywide Administrative Services • Philadelphia's Municipal Fleet Example fleet electrification plans:
  • 21. OTHER KEY FINDINGS • Being forward-looking is ideal when conducting funding needs assessments, workforce analyses, and partnership assessments. • Considering customer preferences and needs is critical to ensuring successful fleet transitions. • Understanding the policy picture is important for planning and determining timelines • Purchasing EVs and installing infrastructure should be as aligned as possible, but infrastructure sequencing may vary depending on various factors.
  • 22. THANK YOU Please reach out to joseph.womble@wri.org with any questions.
  • 23. PANEL DISCUSSION Lori Bird U.S. Energy Director and Polsky Chair for Renewable Energy Diana Kotler CEO Anaheim Transportation Network Brent Taylor Assistant Commissioner, Fleet New York City Department of Citywide Administrative Services Ewan Pritchard Consultant and Subject Matter Expert Pritchard Engineering and Energetics