Se ha denunciado esta presentación.
Se está descargando tu SlideShare. ×

CV - Yuri Crispim (inglês)

Anuncio
Anuncio
Anuncio
Anuncio
Anuncio
Anuncio
Anuncio
Anuncio
Anuncio
Anuncio
Anuncio
Anuncio
Cargando en…3
×

Eche un vistazo a continuación

1 de 2 Anuncio
Anuncio

Más Contenido Relacionado

A los espectadores también les gustó (20)

Anuncio

Similares a CV - Yuri Crispim (inglês) (20)

CV - Yuri Crispim (inglês)

  1. 1. Yuri Ivonei Crispim Camaçari - BA - Brazil yuricrispim@hotmail.com SINGLE TEL: (+55) 71 99285-0004 19/08/1988 OBJECTIVE: MP&L / ENGINEERING / QUALITY ACADEMIC BACKGROUND B.S. – Industrial Engineer – UniJorge – 2016 B.S. – Financial Managment – UNIP – to conclude: 2018 MAJOR ACCOMPLISHMENTS Saving R$ 1.500.00,00 in process improvements projects in 2014. Finalizing APQP for two entire projects (B515 and B562) with all targets on time. Restructured a MP&L department, defining processes, hiring new people and training them. The efficience of the team improve 70%. Choosed as a MMDP Candidate (Middle Management Development Program), and making a Project in Germany plant, with this results below: Reduce Raw Material Stock Levels – from 72%/NPV to 34%/NPV (~ € 1.500.000,00) Reducing Spare Parts Inventory - € 2.400.000,00 in spare parts inventory reduction 5S Improvement – from 19 to 82 points (Max. Score is 100) Improve Logistics – Create a Kanban system on production line PROFESSIONAL BACKGROUND SODECIA DA BAHIA – since Oct/2009 Auto parts multinational company Planning Coordinator * Responsible for calculate the productive capacity, defining the necessary shifts and the manpower to produce the costumer demand; * Responsible for maintain the stock levels inside the defined forecast by the senior managment; * Participate in the forecast creation process, collaborating with the sales and purchasing estimates and with the productivity in the analyzed period; * Responsible for control the phase-in and phase-out process; * Responsible for Production Programming and Control; * Responsible for the costumer orders analysis; * Responsible for the suppliers orders (components, steel); * Responsible for analyse cyclic inventories; * Responsible for MRP Process; * Responsible for MP&L staff restructuring; * Responsible for define the logistics processes; * Lead a tem with eight people; Process Engineer * Responsible for process documentation according Quality Manual and ISO/TS 16949 standarts; * Responsible for to coordinate the APQP activities – coordinating all departments to accomplish with the projects phases within the time limit; * Responsible for create and review all IMDS; * Responsible for map the process and creathe the bill of material in system; * Responsible for manage the OEE and part of the team that implement OEE system on time; * Responsible for improvement projects in the unit, Kaizes or Investments Proposals, with the objective of reduce costs and improve competitiveness; * Lead a team with three people; Quality Auxiliary * Responsible for control the process audit and manage the non conformities found searching the improvement of the process; * Answer the costumer non conformities using the specific quality tools; * Responsible for manage the suppliers non conformities; * Responsible for review all quality documents on the process; * Part of the team responsible for Internal Quality Audits;
  2. 2. * Responsible for MSA and analyse the SCP; LANGUAGES AND COMPUTER SKILLS * English – Fluent; * Portuguese – Fluent (native); * Spanish – Advanced; * Italian – Basic; * German – Basic; * Proficient user of MS Office (including MS Project); * Proficient user of AutoCad; CERTIFICATION AND LICENSES * Green Belt Training - Interface; * MMOG Training - SETEC; * ISO 16949 Internal Auditor – SETEC; * VDA 6.3 Training - SETEC; * Quality Tools Training (SCP, MSA, PPAP and APQP) - SETEC; INTERNATIONAL TRIPS * Participation on MMPD (Middle Managment Development Program), thats include: * Porto (Portugal) – 5 weeks (Jun/2016) – Leadership and Managment Skills Training; * Oelsnitz (Germany) – 3 Months (Sep. To Dec. – 2016) – Developing a manufacturing Project, resulting in: Raw Materials Stock Level Reduction in 38%; Spare Partes Inventory Reduction in 60%. 5S score improvment from 19 to 82 (Max. 100); Implementing a Kanban System in weld cells. * Total availability to home moving (national or international)

×