Date Sample project only for presentation
job number
=
+
ZB
P.
P.
2
1
Responsible for project
Processed by
Tested by
Revision
ZBognar
REV1
Sample End Customer
Zoltan Bognar 11/25/2016
8
0 1 2 3 4 5 6 7 8 9
Title page / cover sheet
Z.B.
Z.B.
Project description Sample project only for presentation
+381 (61) 6091871
Number of pages
Commission
21000
2/20/2012
Edit date
2016/11/01
Created on
Sample Customer
Zoltan Bognar
Job number
24
Sample End Customer
Make
ZB_F26_001
zbognar
Part feature
FK
Path
P8
Manufacturer (company)
Project name Presentation project
Responsible for project
Phone.
Type
ZBognar
Company / customer
11/25/2016
Place of installation
by (short name)
Commission Sample
Novi Sad
Z.B.
Z.B.
1
Date Sample project only for presentation
job number
=
+
ZB
P.
P.
6
2
Responsible for project
Processed by
Tested by
Revision
ZBognar
REV1
Sample End Customer
Zoltan Bognar 11/25/2016
8
0 1 2 3 4 5 6 7 8 9
Table of contents
Z.B.
Edited by
Column X: An automatically generated page was edited
supplementary page field
Table of contents
DatePage description
F06_001
XPage
=ZB/1 BOJANATitle page / cover sheet 11/24/2016
=ZB/2 BOJANATable of contents 11/25/2016
=ZB/6 BOJANAP&ID Shematic 11/24/2016
=ZB/8 BOJANARevision overview 11/24/2016
=ZB+ROKOT/101 BOJANAPower supply 400VAC 11/25/2016
=ZB+ROKOT/102 BOJANACommand voltage 24VDC 11/25/2016
=ZB+ROKOT/103 BOJANAEmergecy Stop 11/25/2016
=ZB+ROKOT/105 BOJANAPump 3 demineralized water 4kW 11/25/2016
=ZB+ROKOT/106 BOJANAPump 1-2 storage tank 5.5kW 11/25/2016
=ZB+ROKOT/107 BOJANALevel detection 11/25/2016
=ZB+ROKOT/115 BOJANAPLC ET-200S Overview 11/24/2016
=ZB+ROKOT/116 BOJANABus coupler IM-151 power supply 11/25/2016
=ZB+ROKOT/117 BOJANAPLC Power supply card 11/25/2016
=ZB+ROKOT/121 BOJANADigital inputs I2.0-2.7 11/24/2016
=ZB+ROKOT/122 BOJANADigital inputs I3.0-3.7 11/25/2016
=ZB+ROKOT/131 BOJANADigital outputs Q1.0-1.7 11/24/2016
=ZB+ROKOT/141 BOJANAAnalog inputs IW264-IW270 11/25/2016
=ZB+ROKOT/151 BOJANAAnalog output QW260-262 11/25/2016
=ZB+ROKOT/161 BOJANADigital card 115A3/A4 overview 11/24/2016
=ZB+ROKOT/162 BOJANADigital card 115A11 overview 11/24/2016
=ZB+ROKOT/163 BOJANAAnalog card 115A16 overview 11/24/2016
=ZB+ROKOT/164 BOJANAAnalog card 115A21 overview 11/24/2016
=ZB+REPORT/201 BOJANATerminal-strip overview : =ZB+ROKOT-101X1 - =ZB+ROKOT-107X1 11/25/2016
=ZB+REPORT/202 BOJANACable overview : =ZB+ROKOT-101W1 - =ZB+ROKOT-141W3 11/25/2016
X
X
2
Date Sample project only for presentation
job number
=
+
ZB
P.
P.
8
6
Responsible for project
Processed by
Tested by
Revision
ZBognar
REV1
Sample End Customer
Zoltan Bognar 11/25/2016
8
0 1 2 3 4 5 6 7 8 9
P&ID Shematic
Z.B.
6
Date Sample project only for presentation
job number
=
+
ZB
P.
P.
+ROKOT/101
8
Responsible for project
Processed by
Tested by
Revision
ZBognar
REV1
Sample End Customer
Zoltan Bognar 11/25/2016
8
0 1 2 3 4 5 6 7 8 9
Revision overview
Z.B.
DateRevision comment Revision description creator
Revision overview
Page name
F17_001
Revision name Reason for revision change
REV1 Sample project zbognar 11.24.2016.
+/8
Date Sample project only for presentation
job number
=
+
ZB
ROKOT
P.
P.
102
101
Responsible for project
Processed by
Tested by
Revision
ZBognar
REV1
Sample End Customer
Zoltan Bognar 11/25/2016
164
0 1 2 3 4 5 6 7 8 9
Power supply 400VAC
Z.B.
Service
socket
Heating of
Cabinet
Lighting of
cabinet
Main Power Supply cable
Spare
1 2PE
-101XU1
Schrack
IUKNE250
x1
x2
-101E1
30W
-101HG1
Schrack
IUK08565
1
2
1
2
-101F1
B10A
-101X2 1 3
1
2
-101F2
B6A
4
1
2
-101F3
B6A
5
1
2
PE
-101H1
2
=SUPPLY
-101X1 1 2 5
1
2
3
4
5
6
-FE1
C32A
L1
T1
L2
T2
L3
T3
-101Q1
0-1
-101W1
PP 00 - Y
50 m
5x6
BK BK GNYE
3 4
BR BL
101L1 / 102.0
101L3 / 102.0
101L2 / 102.0
101N / 102.0
PE PEPE
L1
PE
N
PE
L2
L3
L1 L2 L3 N PE
101
Date Sample project only for presentation
job number
=
+
ZB
ROKOT
P.
P.
103
102
Responsible for project
Processed by
Tested by
Revision
ZBognar
REV1
Sample End Customer
Zoltan Bognar 11/25/2016
164
0 1 2 3 4 5 6 7 8 9
Command voltage 24VDC
Z.B.
BUScoupler
powersupply
Powercard
powersupply
Doorequipment
Leveldetection
Internal
2 3 4 5
7 8 9 10
L
+
N
-
-102G1
24VDC/10A
1
2
-102F1
B6A
-101X2 6
1
2
-102F2
T2.5A
1
2
-102F3
T2.5A
1
2
-102F5
T4A
-102X1 6
-102X1 1
1
2
-102F4
T2.5A
101-1116.1
101-11116.1
101-2117.1101-12117.1
101-13105.5
101-4105.5
101-14103.0
101-5105.4
101L1/101.9
101N/101.9
101L2/101.9
101L3/101.9
101L1 / 105.0
101L2 / 105.0
101L3 / 105.0
101-7 / 103.0
101-3107.0
101-16107.0
24 0
102
Date Sample project only for presentation
job number
=
+
ZB
ROKOT
P.
P.
105
103
Responsible for project
Processed by
Tested by
Revision
ZBognar
REV1
Sample End Customer
Zoltan Bognar 11/25/2016
164
0 1 2 3 4 5 6 7 8 9
Emergecy Stop
Z.B.
Emergency Stop
24VDC
0VDC
1
2
-103S1
Total Stop
A1
A2
-103K1
24VDC
12 11
14
/105.4
22 21
24
/106.5
32 31
34
/106.8
42 41
44
/122.6
A1
A2
-103K2
24VDC
12
11
14
22
21
24
101-7/102.4
101-14/102.2 101-14 / 106.5
103
Date Sample project only for presentation
job number
=
+
ZB
ROKOT
P.
P.
106
105
Responsible for project
Processed by
Tested by
Revision
ZBognar
REV1
Sample End Customer
Zoltan Bognar 11/25/2016
164
0 1 2 3 4 5 6 7 8 9
Pump 3
demineralized water 4kW
Z.B.
0M
X
A
1 - Manual
0 - Off
2 - Automatic
-105S1
X1,2/5,6
3,4/7.8
Automatic
Manual
24VDC
24VDC
1
2
3
4
5
6
-105Q1
7.0-10.0
I>I> I>
13
14
21
22
/122.6
-105U1
Danfoss
FC-202 L1
91
L2
92
L3
93
PE
95
12
24VDC
29
Din
18
Din
01
R1-com
02
R1-NO
04
R2-com
05
R2-NO
50
+10V
33
Din
54
AIN1
55
AGNDP7
U
96
V
97
W
98
PE
99
U V W
PE
-105M1
4.0kW
Pumpa
demi vode
3~
M
Θ
+FLD
-105W1
PP 00 - Y
30 m
4x2.5
BK BL BR GNYE
x1
x2
-105H1
RD
Pump Fault
x1
x2
-105H2
GR
In operation
2
1
-105S1
1-0-2
4
3
6
5
8
7
11
14
-131K2
/131.1
PLC
Start/Stop
x2x1
-105V1
12
11
14
-103K1
/103.1
Total Stop
PE
3x0,75
30 m
LIYCY
-105W3
-105X1 1
-105X1 2
12
11
14
-107K3
/107.6
Min. Level
Demineralized water
-105X2 1 2 3 4
WHBN
WHBN
101L1/102.2
101L2/102.2
101L3/102.2
101L1 / 106.0
101L2 / 106.0
101L3 / 106.0
101-4/102.3
105-1/122.6
105-2/122.5
101-13/102.2
101-4 / 121.0
105-4 / 122.2
105-3 / 122.3
101-5/102.3 101-5 / 121.0
105-5 / 151.2
105-6 / 151.1
101-13 / 121.0
PE
105
Date Sample project only for presentation
job number
=
+
ZB
ROKOT
P.
P.
107
106
Responsible for project
Processed by
Tested by
Revision
ZBognar
REV1
Sample End Customer
Zoltan Bognar 11/25/2016
164
0 1 2 3 4 5 6 7 8 9
Pump 1-2
storage tank 5.5kW
Z.B.
Pump 1
storage tank
Pump 2
storage tank
0VDC
Start / Stop
Pump 1
storage tank
Start / Stop
Pump 1
storage tank
1
2
3
4
5
6
-106Q1
9.0-12.0
I>I> I>
13
14
21
22
/121.6
1
2
3
4
5
6
-106Q2
9.0-12.0
I>I> I>
13
14
21
22
/122.1
1
2
-106K1
/106.6
3
4
5
6
1
2
-106K2
/106.8
3
4
5
6
U V W
PE
-106M1
5.5kW 3~
M
U V W
PE
-106M2
5.5kW 3~
M
-106X1 1 2 3 4 -106X2 1 2 3 4
+FLD
-106W1
PP 00 - Y
5 m
4x2.5
GNYEBK BL BR -106W2
PP 00 - Y
5 m
4x2.5
GNYEBK BL BR
A1
A2
-106K1
24VDC
3
4
-106S1
Start
1
2
-106S2
Stop
53
54
-106K1
/106.6
22
21
24
-103K1
/103.1
Emergency Stop
A1
A2
-106K2
24VDC
3
4
-106S3
Start
1
2
-106S4
Stop
53
54
-106K2
/106.8
32
31
34
-103K1
/103.1
Emergency Stop
12
11
14
-131K1
/131.1
PLC Start
12
11
14
-131K3
/131.5
PLC Start
12
11
14
-107K2
/107.4
Dry runn
protection
22
21
24
-107K2
/107.4
Dry runn
protection
101L1/105.2
101L2/105.2
101L3/105.2
101-14/103.3 101-14 / 131.0
121-1
121.3
121-2
121.3
121-3
121.7
121-4
121.8
PE PE
106
Date Sample project only for presentation
job number
=
+
ZB
ROKOT
P.
P.
115
107
Responsible for project
Processed by
Tested by
Revision
ZBognar
REV1
Sample End Customer
Zoltan Bognar 11/25/2016
164
0 1 2 3 4 5 6 7 8 9
Level detection
Z.B.
Max. Level
storage tank
Min. Level
storage tank
Min. Level
Demineralized water
reservoir
0VDC
24VDC
-107U1
RCM-401-3
1 2
-107U2
RCM-401-3
1 2
A1
A2
-107K2
24VDC
12 11
14
/106.5
22 21
24
/106.8
32 31
34
/121.1
42
41
44
+FLD
-107X1 1 2 4 5
-107W1
LIYCY
15 m
3x0.75
WH BN -107W2
LIYCY
15 m
3x0.75
WH BN
A1
A2
-107K3
24VDC
12 11
14
/105.3
22 21
24
/122.7
3 3
3 6
GR GR
-107U3
E&H
FTL20
1 3 2
87 9
BNWH-105W4
LIYCY
15 m
4x0.75
GR
101-3/102.2
101-16/102.2
107-1
121.1
107
Date Sample project only for presentation
job number
=
+
ZB
ROKOT
P.
P.
116
115
Responsible for project
Processed by
Tested by
Revision
ZBognar
REV1
Sample End Customer
Zoltan Bognar 11/25/2016
164
0 1 2 3 4 5 6 7 8 9
PLC ET-200S Overview
Z.B.
6ES7 151-
1AA04-0AB0
1L+ 2L+ 1M 2M
SIEMENS
ET 200S
PROFIBUS-DP
DC24V
SF
BF
ON
IM 151-1
Standard
DP
ADDRESS
OFF ON
A
AUX1
2 6
3 7
A
4
A
8
4 8
A
SF
PM-E
DC24V
6ES7 138
4CA01-0AA0
PWR
8DI
DC24V
6ES7 131
4BF00-0AA0
1
2
3
4
5
6
7
8
11 5
62
3 7
4 8
A
4
A
8
A
3
A
7
8DI
DC24V
6ES7 131
4BF00-0AA0
1
2
3
4
5
6
7
8
11 5
62
3 7
4 8
A
4
A
8
A
3
A
7
4DO
DC24V/0,5A
6ES7 132
4BD01-0AA0
1
2
5
6
11 5
62
3 7
4 8
A
4
A
8
A
3
A
7
4AI
I 2wire ST
6ES7 134
4GD00-0AB0
SF
11 5
62
3 7
4 8
A
4
A
8
A
3
A
7
SF
2AO
I ST
6ES7 135
4GB01-0AB0
11 5
62
3 7
4 8
A
4
A
8
A
3
A
7
Rack2
Slot1
/116.2
-115A1
Rack2
Slot2
/117.0
-115A2
Rack2
Slot3
/121.0
/161.0
-115A3
Rack2
Slot4
/122.0
/161.5
-115A4
Rack2
Slot5
/131.0
/162.0
-115A11
Rack2
Slot6
/141.0
/163.0
-115A16
Rack2
Slot7
/151.0
/164.0
-115A21
115
Date Sample project only for presentation
job number
=
+
ZB
ROKOT
P.
P.
117
116
Responsible for project
Processed by
Tested by
Revision
ZBognar
REV1
Sample End Customer
Zoltan Bognar 11/25/2016
164
0 1 2 3 4 5 6 7 8 9
Bus coupler IM-151 power supply
Z.B.
PROFIBUS DP TYPE 6ES7 151-1AA04-0AB0 PART 1 OF 1 SIEMENS
0VDC
24VDC
24VDC Power supply 0VDC Power supply
-115A1
/115.0
RackX
SlotY
X1
DP
DP
1
1L+
1L+
2
2L+
2L+
3
1M
1M
4
2M
2M
+RONZU-116W2
UNITRONIC BUS-L2/FIP
2x0,64
GR
101-1/102.1
101-11/102.1
+RONZU-116-DP/
116
Date Sample project only for presentation
job number
=
+
ZB
ROKOT
P.
P.
121
117
Responsible for project
Processed by
Tested by
Revision
ZBognar
REV1
Sample End Customer
Zoltan Bognar 11/25/2016
164
0 1 2 3 4 5 6 7 8 9
PLC Power supply card
Z.B.
POWER MODUL TYPE: 6ES7 138-4CA01-0AA0 + TM-P15S(C,N)23-A1 SIEMENS
0VDC
24VDC
24VDC Power supply 0VDC PE
-115A2
/115.2
RackX
SlotY
2
2/DC24V
2/DC24V
3
3/M
3/M
A4
A4/AUX1
6
6/DC24V
6/DC24V
7
7/M
7/M
A8
A8/AUX1
101-2/102.2
101-12/102.2
PE
117
Date Sample project only for presentation
job number
=
+
ZB
ROKOT
P.
P.
122
121
Responsible for project
Processed by
Tested by
Revision
ZBognar
REV1
Sample End Customer
Zoltan Bognar 11/25/2016
164
0 1 2 3 4 5 6 7 8 9
Digital inputs I2.0-2.7
Z.B.
INPUT BYTE:
Max. Level
storage tank
X
Min. Level
storage tank
TYPE: 6ES7 131-4BF00-0AA0 + TM-E15S(C,N)26-A1 PART 1 OF 1 SIEMENS
Pump 1
storage tank
Manual
Pump 1
storage tank
Automatic
Pump 1
storage tank
Run
Pump 1
storage tank
Fault
Pump 2
storage tank
Manual
Pump 2
storage tank
Automatic
0M
X
A
1 - Ručno
0 - Stop
2 - Automatski
-121S1
X2,2/1,1
2,5/1,4
0M
X
A
1 - Ručno
0 - Stop
2 - Automatski
-121S2
X2,2/1,1
2,5/1,4
0VDC
24VDC
24VDC
-115A3
/115.2
Rack2
Slot3
1
I2.0
/161.1
1
2
I2.2
/161.1
2
3
I2.4
/161.1
3
4
I2.6
/161.1
4
A4
A4/AUX1
/161.1
A3
A3/AUX1
/161.1
5
I2.1
/161.1
5
6
I2.3
/161.1
6
7
I2.5
/161.1
7
8
I2.7
/161.1
8
A8
A8/AUX1
/161.1
A7
A7/AUX1
/161.1
L2
T2
-121S1
1-0-2
L2
T5
L1
T1
L1
T4
L2
T2
-121S2
1-0-2
L2
T5
L1
T1
L1
T4
21
22
-106Q1
/106.1
43
44
-106K1
/106.6
x2
x1
-121H1
GR
x2
x1
-121H2
RD
32
31
34
-107K2
/107.4
121-1
106.5
121-3
106.8
101-5/105.8
101-4/105.8 101-4 / 122.0
121-2
106.6
121-4
106.9
101-13/105.8 101-13 / 122.0
107-1
107.2
121
Date Sample project only for presentation
job number
=
+
ZB
ROKOT
P.
P.
131
122
Responsible for project
Processed by
Tested by
Revision
ZBognar
REV1
Sample End Customer
Zoltan Bognar 11/25/2016
164
0 1 2 3 4 5 6 7 8 9
Digital inputs I3.0-3.7
Z.B.
INPUT BYTE: X TYPE: 6ES7 131-4BF00-0AA0 + TM-E15S(C,N)26-A1
Emergency
Stop
Min. Level
Demineralized water
reservoir
PART 1 OF 1 SIEMENS
Pump 2
storage tank
Fault
Pump 2
storage tank
Run
Pump 3
storage tank
Manual
Pump 3
storage tank
Automatic
Pump 3
storage tank
Run
Pump 3
storage tank
Fault
0VDC
24VDC
-115A4
/115.2
Rack2
Slot4
1
I3.0
/161.6
1
2
I3.2
/161.6
2
3
I3.4
/161.6
3
4
I3.6
/161.6
4
A4
A4/AUX1
/161.6
A3
A3/AUX1
/161.6
5
I3.1
/161.6
5
6
I3.3
/161.6
6
7
I3.5
/161.6
7
8
I3.7
/161.6
8
A8
A8/AUX1
/161.6
A7
A7/AUX1
/161.6
43
44
-106K2
/106.8
21
22
-106Q2
/106.3 42
41
44
-103K1
/103.1
Emergency Stop
x2
x1
-122H2
RD
x2
x1
-122H1
GR 22
21
24
-107K3
/107.6
Min. Level
Demineralized
water
-105X1 4
-105X1 3
21
22
-105Q1
/105.1
105-2
105.5
105-1
105.5
101-4/121.9
105-4
105.8
105-3
105.8
101-13/121.9
122
Date Sample project only for presentation
job number
=
+
ZB
ROKOT
P.
P.
141
131
Responsible for project
Processed by
Tested by
Revision
ZBognar
REV1
Sample End Customer
Zoltan Bognar 11/25/2016
164
0 1 2 3 4 5 6 7 8 9
Digital outputs Q1.0-1.7
Z.B.
OUTPUT BYTE: X TYPE: 6ES7 132-4BD01-0AA0 + TM-E15S(C,N)26-A1
Spare
PART 1 OF 1 SIEMENS
Pump 1
storage tank
Start / Stop
Pumpa 2
storage tank
Start / Stop
Pumpa 3
Demineralized
water reservoir
Start / Stop
0VDC
-115A11
/115.3
Rack2
Slot5
Q1.0
/162.1
1
1
Q1.2
/162.1
2
2
3/M
/162.1
3
3/M
3
4/M
/162.1
4
4/M
4
A4/AUX1
/162.1
A4
A3/AUX1
/162.1
A3
Q1.1
/162.1
5
5
Q1.3
/162.1
6
6
7/M
/162.1
7
7/M
7
8/M
/162.1
8
8/M
8
A8/AUX1
/162.1
A8
A7/AUX1
/162.1
A7
A1
A2
-131K2
12
11
14
11 14 /105.6
A1
A2
-131K1
12 11
14
/106.6
A1
A2
-131K3
12 11
14
/106.9
101-14/106.9
131
Date Sample project only for presentation
job number
=
+
ZB
ROKOT
P.
P.
151
141
Responsible for project
Processed by
Tested by
Revision
ZBognar
REV1
Sample End Customer
Zoltan Bognar 11/25/2016
164
0 1 2 3 4 5 6 7 8 9
Analog inputs IW264-IW270
Z.B.
INPUT CHANNEL: X/X+2/X+4/X+6 TYPE: 6ES7 134-4GD00-0AB0 + TM-E15S(C,N)26-A1 PART 1 OF 1 SIEMENS
Condensate level
storage tank
Temperature
storage tank
Pump discharge
pressure
storage tank
SpareSupply
24VDC
Supply
24VDC
Supply
24VDC
Supply
24VDC
T
4-20
P
4-20 4-20
P
+FLD
-141W1
LIYCY
15 m
2x0.75
BR
-115A16
/115.3
Rack2
Slot6
1
1/IW264
/163.1
1
2
2/IW264
/163.1
2
3
3/IW268
/163.1
3
4
4/IW268
/163.1
4
A4
A4/AUX1
/163.1
SH
A3
A3/AUX1
/163.1
SH
5
5/IW266
/163.1
5
6
6/IW266
/163.1
6
7
7/IW270
/163.1
7
8
8/IW270
/163.1
8
A8
A8/AUX1
/163.1
SH
A7
A7/AUX1
/163.1
SH
BE -141W2
LIYCY
15 m
2x0.75
BR BE
1
+
2
-
-141U2
PT100 / 4-20mA
Transmiter temperature
-141U1
DSIII
Hidrostatički
transmiter nivoa
1
+
2
-
1
+
2
-
-141U3
0-10bar
Transmiter
pritiska
BRBE-141W3
LIYCY
5 m
2x0.75
141
Date Sample project only for presentation
job number
=
+
ZB
ROKOT
P.
P.
161
151
Responsible for project
Processed by
Tested by
Revision
ZBognar
REV1
Sample End Customer
Zoltan Bognar 11/25/2016
164
0 1 2 3 4 5 6 7 8 9
Analog output QW260-262
Z.B.
OUTPUT CHANNEL :
Pumpa 3 Reference
Demineralized
water
X - X+2 TYPE: 6ES7 135-4GB01-0AB0 + TM-E15S(C,N)26-A1
RESERVE
PART 1 OF 1 SIEMENS
-115A21
/115.3
Rack2
Slot7
1/QW260
/164.1
1
1
3/MANA
/164.1
3
3/MANA
3
A4/AUX1
/164.1
A4
A3/AUX1
/164.1
A3
5/QW262
/164.1
5
5
7/MANA
/164.1
7
7/MANA
7
A8/AUX1
/164.1
A8
A7/AUX1
/164.1
A7
105-6
105.8
105-5
105.8
151
Date Sample project only for presentation
job number
=
+
ZB
ROKOT
P.
P.
162
161
Responsible for project
Processed by
Tested by
Revision
ZBognar
REV1
Sample End Customer
Zoltan Bognar 11/25/2016
164
0 1 2 3 4 5 6 7 8 9
Digital card 115A3/A4 overview
Z.B.
SIEMENS
8DI DC24V
6ES7 131-4BF00-0AA0
TM-E15S(C,N)26-A1
SIEMENS
8DI DC24V
6ES7 131-4BF00-0AA0
TM-E15S(C,N)26-A1
SIEMENS
8DI DC24V
6ES7 131-4BF00-0AA0
TM-E15S(C,N)26-A1
SIEMENS
8DI DC24V
6ES7 131-4BF00-0AA0
TM-E15S(C,N)26-A1
Rack2
Slot3
/115.2
-115A3
Maksimalni nivo zbirni rezervoar=ViO-107K1:2/121.1
1
I2.0
Minimalni nivo zbirni rezervoar=ViO-107K2:2/121.1
2
I2.2
Pump 1 storage tank Manual-121S1:T2/121.2
3
I2.4
Pump 1 storage tank Automatic-121S1:T5/121.3
4
I2.6
A4/AUX1/121.3
A4
A4/AUX1
A3/AUX1/121.4
A3
A3/AUX1
Pump 1 storage tank Run-106K1:44/121.5
5
I2.1
Pump 1 storage tank Fault-106Q1:22/121.6
6
I2.3
Pump 2 storage tank Manual-121S2:T2/121.6
7
I2.5
Pump 2 storage tank Automatic-121S2:T5/121.7
8
I2.7
A8/AUX1/121.8
A8
A8/AUX1
A7/AUX1/121.8
A7
A7/AUX1
Rack2
Slot4
/115.2
-115A4
Pump 2 storage tank Run-106K2:44/122.1
1
I3.0
Pump 2 storage tank Fault-106Q2:22/122.1
2
I3.2
Pump 3 storage tank Manual-105S1:5/122.2
3
I3.4
Pump 3 storage tank Automatic-105S1:7/122.3
4
I3.6
A4/AUX1/122.3
A4
A4/AUX1
A3/AUX1/122.4
A3
A3/AUX1
Pump 3 storage tank RunI3.1/122.5
5
I3.1
Pump 3 storage tank FaultI3.3/122.6
6
I3.3
Emergency Stop-103K1:44/122.6
7
I3.5
Min. Level Demineralized water reservoir-107K3:24/122.7
8
I3.7
A8/AUX1/122.8
A8
A8/AUX1
A7/AUX1/122.8
A7
A7/AUX1
161
Date Sample project only for presentation
job number
=
+
ZB
ROKOT
P.
P.
163
162
Responsible for project
Processed by
Tested by
Revision
ZBognar
REV1
Sample End Customer
Zoltan Bognar 11/25/2016
164
0 1 2 3 4 5 6 7 8 9
Digital card 115A11 overview
Z.B.
SIEMENS
4DO DC24V/0,5A
Standard
6ES7 132-4BD01-0AA0
TM-E15S(C,N)26-A1
Rack2
Slot5
/115.3
-115A11
Pump 1 storage tank Start / Stop-131K1:A1/131.1
1
Q1.0
Pumpa 3 Demineralized water reservoir Start / Stop-131K2:A1/131.1
2
Q1.2
3/M/131.2
3
3/M
3/M
4/M/131.3
4
4/M
4/M
A4/AUX1/131.3
A4
A4/AUX1
A3/AUX1/131.4
A3
A3/AUX1
Pumpa 2 storage tank Start / Stop-131K3:A1/131.5
5
Q1.1
SpareQ1.3/131.6
6
Q1.3
7/M/131.6
7
7/M
7/M
8/M/131.7
8
8/M
8/M
A8/AUX1/131.8
A8
A8/AUX1
A7/AUX1/131.8
A7
A7/AUX1
162
Date Sample project only for presentation
job number
=
+
ZB
ROKOT
P.
P.
164
163
Responsible for project
Processed by
Tested by
Revision
ZBognar
REV1
Sample End Customer
Zoltan Bognar 11/25/2016
164
0 1 2 3 4 5 6 7 8 9
Analog card 115A16 overview
Z.B.
SIEMENS
4AI I 2wire
Standard
6ES7 134-4GD00-0AB0
TM-E15S(C,N)26-A1
mA
mA
mA
mA
Rack2
Slot6
/115.3
-115A16
Supply 24VDC1/IW264/141.1
1
1/IW264
Condensate level storage tank2/IW264/141.1
2
2/IW264
Supply 24VDC3/IW268/141.2
3
3/IW268
Temperature storage tank4/IW268/141.3
4
4/IW268
SHA4/AUX1/141.3
A4
A4/AUX1
SHA3/AUX1/141.4
A3
A3/AUX1
Supply 24VDC5/IW266/141.5
5
5/IW266
Pump discharge pressure storage tank6/IW266/141.6
6
6/IW266
Supply 24VDC7/IW270/141.6
7
7/IW270
Spare8/IW270/141.7
8
8/IW270
SHA8/AUX1/141.8
A8
A8/AUX1
SHA7/AUX1/141.8
A7
A7/AUX1
163
Date Sample project only for presentation
job number
=
+
ZB
ROKOT
P.
P.
+REPORT/201
164
Responsible for project
Processed by
Tested by
Revision
ZBognar
REV1
Sample End Customer
Zoltan Bognar 11/25/2016
164
0 1 2 3 4 5 6 7 8 9
Analog card 115A21 overview
Z.B.
SIEMENS
2AO I
Standard
6ES7 135-4GB01-0AB0
TM-E15S(C,N)26-A1
Rack2
Slot7
/115.3
-115A21
Pumpa 3 Reference Demineralized water1/QW260/151.1
1
1/QW260
2
3/MANA/151.2
3
3/MANA
3/MANA
4
A4/AUX1/151.3
A4
A4/AUX1
A3/AUX1/151.4
A3
A3/AUX1
RESERVE5/QW262/151.5
5
5/QW262
6
7/MANA/151.6
7
7/MANA
7/MANA
8
A8/AUX1/151.8
A8
A8/AUX1
A7/AUX1/151.8
A7
A7/AUX1
+ROKOT/164
Date Sample project only for presentation
job number
=
+
ZB
REPORT
P.
P.
202
201
Responsible for project
Processed by
Tested by
Revision
ZBognar
REV1
Sample End Customer
Zoltan Bognar 11/25/2016
202
0 1 2 3 4 5 6 7 8 9
Terminal-strip overview : =ZB+ROKOT-101X1 - =ZB+ROKOT-107X1
Z.B.
terminal strip Terminal strip definition text
F14_001
Terminals
Graphical page
of terminal diagrams
Terminal-strip overview
first last Total PE Total N
Total
number
+ROKOT-101X1 1 5 1 1 5
+ROKOT-101X2 1 6 0 6 6
+ROKOT-102X1 1 10 0 0 10
+ROKOT-105X1 1 4 0 0 4
+ROKOT-105X2 1 4 0 0 4
+ROKOT-106X1 1 4 1 0 4
+ROKOT-106X2 1 4 1 0 4
+ROKOT-107X1 1 9 0 0 9
Main power strip
Neutral
Control voltage 24VDC
Pump 3 command strip
Pump 3 motor strip
Pump 1 motor strip
Pump 2 motor strip
Level detection
201
Date Sample project only for presentation
job number
=
+
ZB
REPORT
P.
P.
202
Responsible for project
Processed by
Tested by
Revision
ZBognar
REV1
Sample End Customer
Zoltan Bognar 11/25/2016
202
0 1 2 3 4 5 6 7 8 9
Cable overview : =ZB+ROKOT-101W1 - =ZB+ROKOT-141W3
Z.B.
F10_001
Cross-section
[mm]
Cable name
Graphical page
of cable diagramSource (from)
Cable overview
Conductors
used
Target (to) Length [m]all conductors function textcable type
Main Power Supply cable5 6+ROKOT-101W1 50PP 00 - Y=SUPPLY+ROKOT-FE1+ROKOT-101X1 5
N
PE
Pump 3 power cable4 2.5+ROKOT-105W1 30PP 00 - Y+FLD-105M1+ROKOT-105X2 4
2 0,75+ROKOT-105W3 30LIYCY+FLD-105M1+ROKOT-105U1 3
Min. Level Demineralized water reservoir3 0.75+ROKOT-105W4 15LIYCY+FLD-107U3+ROKOT-107X1 4
Pump 1 power cable4 2.5+ROKOT-106W1 5PP 00 - Y+FLD-106M1+ROKOT-106X1 4
Pump 2 power cable4 2.5+ROKOT-106W2 5PP 00 - Y+FLD-106M2+ROKOT-106X2 4
Max. Level storage tank3 0.75+ROKOT-107W1 15LIYCY+FLD-107U1+ROKOT-107X1 3
Min. Level storage tank3 0.75+ROKOT-107W2 15LIYCY+FLD-107U2+ROKOT-107X1 3
Condensate level in storage tank2 0.75+ROKOT-141W1 15LIYCY+FLD-141U1+ROKOT-115A16 2
Temperature of storage tank2 0.75+ROKOT-141W2 15LIYCY+FLD-141U2+ROKOT-115A16 2
Pump discharge Pressure storage tank0 0.75+ROKOT-141W3 5LIYCY 2
Pump 3 PTC cable