SlideShare una empresa de Scribd logo
1 de 21
Descargar para leer sin conexión
Trivandrum Capital Region

Impact of Knowledge and High-
    Technology Industries

       January 29, 2009

            Ajay Prasad
    Trivandrum Development Front
Trivandrum Capital Region - Snapshot
                        Trivandrum
                             • Capital of Kerala State
Political Status
                             • Tier II
City Status                  • Largest city in Kerala
                             • >1 million (Core City Area)
Population                   • >1.5 million (Agglomeration)

                             • 300 Sq.Km. (Agglomeration)
Area                         • 2200 Sq. Km. (District)

                             IT/ITES, Tourism, Services, Textiles,
Major Industries             Aerospace, Electronics, Small and
                             Medium-scale manufacturing

                             • Per Capita Income – Rs 102,000
Economic Demographics        • 30% of population in SEC A &B

                             • Air (International and Domestic)
Connectivity                 • Rail and Road
                             • 4% CAGR
Urban Growth Rate
                             • >90%
Literacy Rate
IT & High-technology Industries @ Tvm - Snapshot

 Total Number of Employees             Approx. 25,000
 Indirect Employment                      > 50,000
 Total Number of Companies                   150
 Total IT Exports                      Rs 2500 Crores
 Share of Kerala's Total                   > 70%
 Share of India's Total                  Approx. 1%

 Built-up Space in Technopark           4 million Sq.ft
 Space in Development                   3 Million Sq,ft
 Proposed Space                       > 15 Million Sq.ft.

                                Infosys, TCS, UST Global, IBS,
                                NEST, Toonz, Tata Elxsi, E&Y,
 Major Companies
                                RR Donnelly, Allianz, RMESI,
                                RWDI, InApp, Mckinsey
Why is Trivandrum best suited to be the IT hub of
Kerala?
                                                       World Class Facilities
             Strategic Location                       Technopark, Technocity,
                                                      KINFRA industrial parks



                                                           Excellent Air, Rail and Road
  World Class R&D Hubs
                                                                   Connectivity
                                                            International Deepwater
 VSSC, CDAC, RRL, IIST, IISER
                                                                       Port
                                        Trivandrum
                                    Digital Capital
                                                             Abundant International
Excellent Human Resources
                                                               Data Connectivity
     Top-class Educational
         Institutions                                          FALCON landing station




         Low Cost and High Quality
                                                       Natural Beauty and
        of Living; World-class Social
                                                       Tourist Attractions
          and Urban Infrastructure
Upcoming Projects – Technopark Phase II & III
Technopark Phase II

   – Total area of 86 acres; notified as SEZ
   – 50 acres handed over to Infosys and 36 acres to UST Global
   – Infosys has commenced work on its campus
       • Phase I to be operational in May 2009
       • Eventual capacity of 12,000 IT professionals by 2012
   – UST Global is set to commence work in a few weeks with a final
     plan for 2.5 million sq.ft.

Technopark Phase III

   – Total area of 88 acres; notified as SEZ
   – Technopark to develop 2.1 million sq.ft. By 2013
   – Private developer to build campus on a 42-acre parcel
      • Selection process in progress
   – Total of over 35,000 direct employment opportunities by 2015
Upcoming Projects – Technocity
• Technocity is to be developed on a total extent of 450 acres
• It will be an Integrated Development encompassing not just IT/business
  space but also residential, commercial, retail, hospitality, medical and
  educational facilities
    – In short, it will be a brand new “Techno” City!
• Dedicated power supply, water supply and sewerage facilities have to be
  developed
• The project is being jointly developed by Technopark and Kerala State IT
  Infrastructure Limited (KSITIL)
• Technocity will have over 15 million sq.ft. of IT space when complete in
  2018
   – It will generate 100,000 to 150,000 direct jobs by 2018

• Leading international developer Forest City Enterprises has expressed
  interest in developing a Knowledge City within the project
Upcoming Projects – Imagery




    UST Global Phase I                Infosys Phase I
     Phase III Campus     Technocity Campus (Artist's Impression)
Upcoming Projects – Others
Biotechnology Park

• KSIDC is developing a Biotechnology Park/Medicity on a 250 acre
  plot about 1 Km North of Technocity
• It will provide space for biotechnology, medical research, medical
  manufacturing, pharmaceutical and medical care firms
Telecom City

• SIDCO and ITI, Bangalore together are developing a dedicated 4
  million Sq.ft. facility for manufacturing telecommunications
  equipment at Kazhakkoottam

KINFRA Film and Video Park

• It is already India's first SEZ for Animation and Gaming
• Massive expansion planned to meet strong demand from industry
Railway Line




               Courtesy: The Hindu
IT Corridor Infrastructure

• Trivandrum is endowed with a natural alignment of seaport, airport,
  rail hubs, IT & knowledge industry clusters and social infrastructure
  between Chackai and Thonnakkal on the NH-47
• Immediate steps need to be taken to develop it into a formalised IT
  Corridor
• Areas along the IT Corridor needed to be zoned for mixed-
  development, to permit commercial, residential and institutional
  development along its length
• An increased FAR needs to be provided to encourage growth
• The road needs to be widened to 6 lanes with 2 service lanes
  immediately
   – By 2014, the road may need to be widened to 8 lanes
• Electricity, water and sewerage facilities need to be developed in
  anticipation of growth
• Mass Transit arrangements need to be put in place along the Corridor
   – Initially BRTS can be implemented followed by a higher-capacity
       system like a mono-rail.
Electronics Hardware Sector
• Trivandrum has a strong presence in the sector since the early days of
  KELTRON
• Trivandrum posses unique advantages to emerge as a hub of electronics
  hardware and semiconductor manufacturing
   – Strong R&D presence with institutions like CDAC and NIIST
   – Firms like NEST & Tata Elxsi are already active in the field
   – Skilled talent pool – engineers and technicians
   – Low labour cost
   – Strong logistics – Port & Airport
• Key industries may be:
   – Hardware assembly
   – Semiconductor fabrication, assembly and testing
   – Non-conventional energy
   – Telecommunications
   – Aerospace and Defence electronics
• KINFRA is planning a Electronics Hub on 1000 Acres near Pothencode
Biotechnology and Medical Sector
• Trivandrum has several distinct advantages in developing into a
  center of the biotechnology industry
    – Extensive biological diversity in the vicinity
    – Existing instiutions like RGCB, TGBRI, SCIMST and so on
    – Large pool of skilled and experienced talent
    – Well developed medical sector
    – Association with related sectors like material sciences, computing
      and electronics
• The proposed Biotechnology Park by KSIDC could be the spring
  board for development in this sector
• With its unbeatable combination of world-class hospitals and tourist
  attractions, Trivandrum could also be a global hub for medical-value
  travel and medical outsourcing.
Material Sciences Sector
• Trivandrum is home to leading institutions in the physical sciences like
  the NIIST and IISER
    – It is poised to be the home of a world-class Molecular Sciences
        Center for which the State Government will soon allote land
• Material sciences like molecular biology and nanotechnology will be
  the biggest growth sectors in a few years from now
• Nanotechnology could be the next big thing after IT and could be a
  trillion dollar industry in 10 years
• Trivandrum can provide a R&D base for the new industries and later
  become a manufacturing hub
• Material sciences could be made part of the proposed Electronics Hub
  by KINFRA
Employment Generated till 2018*
                                                                           (* Projections beyond 10 years may not be accurate)
                       250000

                                      Technopark Phases                  Employee Strength
                                      I, II and III
                                      Technocity & Others
                       200000
                                      Total
 Number of Employees




                       150000




                       100000




                       50000




                           0
                                2007-08 2008-09 2009-10 2010-11 2011-12 2012-13 2013-14 2014-15 2015-16 2016-17 2017-18

                                              Year
Sources: NASSCOM, Mckinsey, AT Kearney, PwC and Technopark studies
Additional Population Growth due to Knowledge
                          Sector till 2018
                          500000

                                                                             Population Growth due to Knowledge Sector
                                               Technopark Phases I,
                                               II and III
                                               Technocity & Others
                          400000
                                               Total
  Additional Population




                          300000




                          200000




                          100000




                              0
                                   2006-07 2007-08 2008-09 2009-10 2010-11 2011-12 2012-13 2013-14 2014-15 2015-16 2016-17 2017-18

                                                                            Year

Sources: NASSCOM, Mckinsey, AT Kearney, PwC and Technopark studies
Housing Demand Generated till 2020
               120000

                                Technopark Phases                  Demand for Residential Units
                                I, II and III
                                Technocity & Others
                                Total
               90000
No. of Units




               60000




               30000




                    0
                        2006-07 2007-08 2008-09 2009-10 2010-11 2011-12 2012-13 2013-14 2014-15 2015-16 2016-17 2017-18

                                                               Years
Sources: NASSCOM, Mckinsey, AT Kearney, PwC and Technopark studies
Power Demand Generated till 2018
          1800


          1600
                           Total Power                          Additional Power Demand
                           Demand (MVA)
          1400            (Includes only Office and Residential Demand)


          1200


          1000
    MVA




           800


           600


           400


           200


            0
                 2006-07 2007-08 2008-09 2009-10 2010-11 2011-12 2012-13 2013-14 2014-15 2015-16 2016-17 2017-18

                                                          Years
Sources: NASSCOM, Mckinsey, AT Kearney, PwC and Technopark studies
Water Demand & Sewage Generation till 2018

       80
                     Total Water                 Additional Water and Sewage Demand
                     Demand (MLD)
       70
                     Total Sewage
                     Created (MLD)
                     (Includes only Office and Residential Demand)
       60


       50
 MLD




       40


       30


       20


       10


        0
            2006-07 2007-08 2008-09 2009-10 2010-11 2011-12 2012-13 2013-14 2014-15 2015-16 2016-17 2017-18

                                                         Years
Sources: NASSCOM, Mckinsey, AT Kearney, PwC and Technopark studies
Zones of Development


   Residential Zone

   Commercial/Industrial
   Zone
Conclusion

• The Trivandrum Capital Region to be formally created to cater to
  the expansion needs of the Trivandrum Metropolitan Area
• A centralised authority to plan and co-ordinate development of
  the TCR
    – TRIDA could be expanded for this role
• The development zones discussed here to be brought within the
  purview of the Master Plan
    – The IT/Industrial areas will witness the most development
      going forward
• The IT Corridor to be formalised immediately
    – Infrastructure and planning incentives like extra FAR to be
      provided
    – A special development agency to be created for this
• All future infrastructure expansion to keep at least 2020 demand
  levels in mind
Thank You

      For further information, Contact:

    Trivandrum Development Front
                 W :- www.tribiz.in
                E:- contact@tribiz.in

Please contact us for an editable version of this presentation

Más contenido relacionado

La actualidad más candente

Energy Efficiency Case Studies(India and Abroad)
Energy Efficiency Case Studies(India and Abroad)Energy Efficiency Case Studies(India and Abroad)
Energy Efficiency Case Studies(India and Abroad)Sahil Kaundal
 
Kochi city study(intro, history, demography, infrastructure, economy, tourism)
Kochi  city study(intro, history, demography, infrastructure, economy, tourism)Kochi  city study(intro, history, demography, infrastructure, economy, tourism)
Kochi city study(intro, history, demography, infrastructure, economy, tourism)Arun Chandra Babu
 
15 minute city - par Carlos Moreno
15 minute city - par Carlos Moreno15 minute city - par Carlos Moreno
15 minute city - par Carlos MorenoCarlos Moreno
 
Difference between plotted development and flatted development
Difference between plotted development and  flatted developmentDifference between plotted development and  flatted development
Difference between plotted development and flatted developmentJIT KUMAR GUPTA
 
buildings rated by GRIHA and LEED, sustainable buildings around the wold, gre...
buildings rated by GRIHA and LEED, sustainable buildings around the wold, gre...buildings rated by GRIHA and LEED, sustainable buildings around the wold, gre...
buildings rated by GRIHA and LEED, sustainable buildings around the wold, gre...DhvaniR2
 
Charles correa
Charles correaCharles correa
Charles correaKrithika P
 
Evolution of Chennai & Bangalore over time
Evolution of Chennai & Bangalore over timeEvolution of Chennai & Bangalore over time
Evolution of Chennai & Bangalore over timeAbby Varghese
 
Jaunapur slum resettlement scheme by Ar.Anil Laul
Jaunapur slum resettlement scheme by Ar.Anil LaulJaunapur slum resettlement scheme by Ar.Anil Laul
Jaunapur slum resettlement scheme by Ar.Anil LaulAakriti Rawat
 
Goverdhan eco village
Goverdhan eco villageGoverdhan eco village
Goverdhan eco villageSumama Smm
 
A case study of intelligent buildings
A case study of intelligent buildingsA case study of intelligent buildings
A case study of intelligent buildingsRajat Nainwal
 
FIRE NORMS AND INDIAN HABITAT CENTRE CASE STUDY
FIRE NORMS AND INDIAN HABITAT CENTRE CASE STUDYFIRE NORMS AND INDIAN HABITAT CENTRE CASE STUDY
FIRE NORMS AND INDIAN HABITAT CENTRE CASE STUDYNamrata Jindal
 
case study sustainibility indian office highrise
case study sustainibility indian office highrisecase study sustainibility indian office highrise
case study sustainibility indian office highriseAnurag Biswas
 
Commercial Projects in Kharadi Pune by World Trade Center (WTC Pune)
Commercial Projects in Kharadi Pune by World Trade Center (WTC Pune)Commercial Projects in Kharadi Pune by World Trade Center (WTC Pune)
Commercial Projects in Kharadi Pune by World Trade Center (WTC Pune)Panchshil
 

La actualidad más candente (20)

Energy Efficiency Case Studies(India and Abroad)
Energy Efficiency Case Studies(India and Abroad)Energy Efficiency Case Studies(India and Abroad)
Energy Efficiency Case Studies(India and Abroad)
 
Kochi city study(intro, history, demography, infrastructure, economy, tourism)
Kochi  city study(intro, history, demography, infrastructure, economy, tourism)Kochi  city study(intro, history, demography, infrastructure, economy, tourism)
Kochi city study(intro, history, demography, infrastructure, economy, tourism)
 
15 minute city - par Carlos Moreno
15 minute city - par Carlos Moreno15 minute city - par Carlos Moreno
15 minute city - par Carlos Moreno
 
Difference between plotted development and flatted development
Difference between plotted development and  flatted developmentDifference between plotted development and  flatted development
Difference between plotted development and flatted development
 
buildings rated by GRIHA and LEED, sustainable buildings around the wold, gre...
buildings rated by GRIHA and LEED, sustainable buildings around the wold, gre...buildings rated by GRIHA and LEED, sustainable buildings around the wold, gre...
buildings rated by GRIHA and LEED, sustainable buildings around the wold, gre...
 
Compact City
Compact CityCompact City
Compact City
 
Bdd chawl CASE STUDY
Bdd chawl CASE STUDYBdd chawl CASE STUDY
Bdd chawl CASE STUDY
 
cannaught place
cannaught place cannaught place
cannaught place
 
Charles correa
Charles correaCharles correa
Charles correa
 
Evolution of Chennai & Bangalore over time
Evolution of Chennai & Bangalore over timeEvolution of Chennai & Bangalore over time
Evolution of Chennai & Bangalore over time
 
Jaunapur slum resettlement scheme by Ar.Anil Laul
Jaunapur slum resettlement scheme by Ar.Anil LaulJaunapur slum resettlement scheme by Ar.Anil Laul
Jaunapur slum resettlement scheme by Ar.Anil Laul
 
It parks
It parksIt parks
It parks
 
urban design
urban design urban design
urban design
 
high rise case study
high rise case studyhigh rise case study
high rise case study
 
URBAN LANDSCAPE
URBAN LANDSCAPEURBAN LANDSCAPE
URBAN LANDSCAPE
 
Goverdhan eco village
Goverdhan eco villageGoverdhan eco village
Goverdhan eco village
 
A case study of intelligent buildings
A case study of intelligent buildingsA case study of intelligent buildings
A case study of intelligent buildings
 
FIRE NORMS AND INDIAN HABITAT CENTRE CASE STUDY
FIRE NORMS AND INDIAN HABITAT CENTRE CASE STUDYFIRE NORMS AND INDIAN HABITAT CENTRE CASE STUDY
FIRE NORMS AND INDIAN HABITAT CENTRE CASE STUDY
 
case study sustainibility indian office highrise
case study sustainibility indian office highrisecase study sustainibility indian office highrise
case study sustainibility indian office highrise
 
Commercial Projects in Kharadi Pune by World Trade Center (WTC Pune)
Commercial Projects in Kharadi Pune by World Trade Center (WTC Pune)Commercial Projects in Kharadi Pune by World Trade Center (WTC Pune)
Commercial Projects in Kharadi Pune by World Trade Center (WTC Pune)
 

Similar a Trivandrum Capital Region Knowledge Industries

Knowledge City, Trivandrum
Knowledge City, TrivandrumKnowledge City, Trivandrum
Knowledge City, TrivandrumAjay Prasad
 
ITC and Electronics Fact Sheet
ITC and Electronics Fact SheetITC and Electronics Fact Sheet
ITC and Electronics Fact SheetUniversité Laval
 
A Strategy to Develop IT/ITES Infrastructure in Kerala
A Strategy to Develop IT/ITES Infrastructure in KeralaA Strategy to Develop IT/ITES Infrastructure in Kerala
A Strategy to Develop IT/ITES Infrastructure in KeralaAjay Prasad
 
Vietnam - A promising destination investment | Chapter 2: Da Nang
Vietnam - A promising destination investment | Chapter 2: Da NangVietnam - A promising destination investment | Chapter 2: Da Nang
Vietnam - A promising destination investment | Chapter 2: Da NangAsia Legal
 
MEGA TEXTILE PARK PPT .pptx
MEGA TEXTILE PARK PPT .pptxMEGA TEXTILE PARK PPT .pptx
MEGA TEXTILE PARK PPT .pptxjeyamohan4
 
TII_Thierry_LESTABLE_CN4R_v5.pdf
TII_Thierry_LESTABLE_CN4R_v5.pdfTII_Thierry_LESTABLE_CN4R_v5.pdf
TII_Thierry_LESTABLE_CN4R_v5.pdfThierry Lestable
 
IoT_Industrial_Brochure V2
IoT_Industrial_Brochure V2IoT_Industrial_Brochure V2
IoT_Industrial_Brochure V2Rubana Shifat
 
Information Technology
Information TechnologyInformation Technology
Information TechnologyViraj Kansara
 
Iti dr. heba saleh
Iti dr. heba salehIti dr. heba saleh
Iti dr. heba salehEITESANGO
 
Indian Infrastructure In 2030
Indian Infrastructure In 2030Indian Infrastructure In 2030
Indian Infrastructure In 2030Utkarsha Singh
 
Itcn Asia 2009 Fact Sheet
Itcn Asia 2009 Fact SheetItcn Asia 2009 Fact Sheet
Itcn Asia 2009 Fact SheetITCN Asia
 
Itcn asia 2009_fact_sheet
Itcn asia 2009_fact_sheetItcn asia 2009_fact_sheet
Itcn asia 2009_fact_sheetITCN Asia
 
Prof DP Sharma in Vancouver Canada for international keynote speech
Prof DP Sharma in Vancouver Canada for international keynote speechProf DP Sharma in Vancouver Canada for international keynote speech
Prof DP Sharma in Vancouver Canada for international keynote speechdhatura
 
Vancouver Canada Keynote Speech
Vancouver Canada Keynote SpeechVancouver Canada Keynote Speech
Vancouver Canada Keynote Speechdhatura
 
Vancouver keynote speech
Vancouver keynote speechVancouver keynote speech
Vancouver keynote speechdhatura
 
IoT - Technical Regulatory Aspects and Key Challenges
IoT - Technical Regulatory Aspects and Key Challenges IoT - Technical Regulatory Aspects and Key Challenges
IoT - Technical Regulatory Aspects and Key Challenges Dr. Mazlan Abbas
 

Similar a Trivandrum Capital Region Knowledge Industries (20)

Knowledge City, Trivandrum
Knowledge City, TrivandrumKnowledge City, Trivandrum
Knowledge City, Trivandrum
 
ITC and Electronics Fact Sheet
ITC and Electronics Fact SheetITC and Electronics Fact Sheet
ITC and Electronics Fact Sheet
 
A Strategy to Develop IT/ITES Infrastructure in Kerala
A Strategy to Develop IT/ITES Infrastructure in KeralaA Strategy to Develop IT/ITES Infrastructure in Kerala
A Strategy to Develop IT/ITES Infrastructure in Kerala
 
Vietnam - A promising destination investment | Chapter 2: Da Nang
Vietnam - A promising destination investment | Chapter 2: Da NangVietnam - A promising destination investment | Chapter 2: Da Nang
Vietnam - A promising destination investment | Chapter 2: Da Nang
 
MEGA TEXTILE PARK PPT .pptx
MEGA TEXTILE PARK PPT .pptxMEGA TEXTILE PARK PPT .pptx
MEGA TEXTILE PARK PPT .pptx
 
BIDHANNAGAR COLLEGE
BIDHANNAGAR COLLEGEBIDHANNAGAR COLLEGE
BIDHANNAGAR COLLEGE
 
TII_Thierry_LESTABLE_CN4R_v5.pdf
TII_Thierry_LESTABLE_CN4R_v5.pdfTII_Thierry_LESTABLE_CN4R_v5.pdf
TII_Thierry_LESTABLE_CN4R_v5.pdf
 
Ictmarch2009
Ictmarch2009Ictmarch2009
Ictmarch2009
 
Advantage Mihan
Advantage MihanAdvantage Mihan
Advantage Mihan
 
IoT_Industrial_Brochure V2
IoT_Industrial_Brochure V2IoT_Industrial_Brochure V2
IoT_Industrial_Brochure V2
 
Information Technology
Information TechnologyInformation Technology
Information Technology
 
Iti dr. heba saleh
Iti dr. heba salehIti dr. heba saleh
Iti dr. heba saleh
 
Indian Infrastructure In 2030
Indian Infrastructure In 2030Indian Infrastructure In 2030
Indian Infrastructure In 2030
 
Itcn Asia 2009 Fact Sheet
Itcn Asia 2009 Fact SheetItcn Asia 2009 Fact Sheet
Itcn Asia 2009 Fact Sheet
 
Itcn asia 2009_fact_sheet
Itcn asia 2009_fact_sheetItcn asia 2009_fact_sheet
Itcn asia 2009_fact_sheet
 
Jordan ICT Sector Presentation - Oct 2014
Jordan ICT Sector Presentation - Oct 2014Jordan ICT Sector Presentation - Oct 2014
Jordan ICT Sector Presentation - Oct 2014
 
Prof DP Sharma in Vancouver Canada for international keynote speech
Prof DP Sharma in Vancouver Canada for international keynote speechProf DP Sharma in Vancouver Canada for international keynote speech
Prof DP Sharma in Vancouver Canada for international keynote speech
 
Vancouver Canada Keynote Speech
Vancouver Canada Keynote SpeechVancouver Canada Keynote Speech
Vancouver Canada Keynote Speech
 
Vancouver keynote speech
Vancouver keynote speechVancouver keynote speech
Vancouver keynote speech
 
IoT - Technical Regulatory Aspects and Key Challenges
IoT - Technical Regulatory Aspects and Key Challenges IoT - Technical Regulatory Aspects and Key Challenges
IoT - Technical Regulatory Aspects and Key Challenges
 

Más de Ajay Prasad

Letter to MoEF for Environmental Clearance of the Vizhinjam Project
Letter to MoEF for Environmental Clearance of the Vizhinjam ProjectLetter to MoEF for Environmental Clearance of the Vizhinjam Project
Letter to MoEF for Environmental Clearance of the Vizhinjam ProjectAjay Prasad
 
Trivandrum Master Plan Inputs - Final
Trivandrum Master Plan Inputs - FinalTrivandrum Master Plan Inputs - Final
Trivandrum Master Plan Inputs - FinalAjay Prasad
 
Trivandrum master plan draft comments 060213
Trivandrum master plan draft comments 060213Trivandrum master plan draft comments 060213
Trivandrum master plan draft comments 060213Ajay Prasad
 
Vizhinjam way forward Sep 7 2012 abbridged
Vizhinjam way forward Sep 7 2012 abbridgedVizhinjam way forward Sep 7 2012 abbridged
Vizhinjam way forward Sep 7 2012 abbridgedAjay Prasad
 
Vizhinjam way forward sep 7 2012
Vizhinjam way forward sep 7 2012Vizhinjam way forward sep 7 2012
Vizhinjam way forward sep 7 2012Ajay Prasad
 
Cruise tourism in trivandrum
Cruise tourism in trivandrumCruise tourism in trivandrum
Cruise tourism in trivandrumAjay Prasad
 
NH-47 Six laning
NH-47 Six laningNH-47 Six laning
NH-47 Six laningAjay Prasad
 
Cruise Tourism in Trivandrum
Cruise Tourism in TrivandrumCruise Tourism in Trivandrum
Cruise Tourism in TrivandrumAjay Prasad
 
Trivandrum Monorail Preliminary Study
Trivandrum Monorail Preliminary StudyTrivandrum Monorail Preliminary Study
Trivandrum Monorail Preliminary StudyAjay Prasad
 
Mm Technocity June 17 2009 V 2
Mm Technocity June 17 2009 V 2Mm Technocity June 17 2009 V 2
Mm Technocity June 17 2009 V 2Ajay Prasad
 
Manorama Protest Jun 22
Manorama Protest Jun 22Manorama Protest Jun 22
Manorama Protest Jun 22Ajay Prasad
 
Trivandrum Development Jun 13 2009
Trivandrum Development Jun 13 2009Trivandrum Development Jun 13 2009
Trivandrum Development Jun 13 2009Ajay Prasad
 
Trivandrum It Corridor
Trivandrum It CorridorTrivandrum It Corridor
Trivandrum It CorridorAjay Prasad
 

Más de Ajay Prasad (13)

Letter to MoEF for Environmental Clearance of the Vizhinjam Project
Letter to MoEF for Environmental Clearance of the Vizhinjam ProjectLetter to MoEF for Environmental Clearance of the Vizhinjam Project
Letter to MoEF for Environmental Clearance of the Vizhinjam Project
 
Trivandrum Master Plan Inputs - Final
Trivandrum Master Plan Inputs - FinalTrivandrum Master Plan Inputs - Final
Trivandrum Master Plan Inputs - Final
 
Trivandrum master plan draft comments 060213
Trivandrum master plan draft comments 060213Trivandrum master plan draft comments 060213
Trivandrum master plan draft comments 060213
 
Vizhinjam way forward Sep 7 2012 abbridged
Vizhinjam way forward Sep 7 2012 abbridgedVizhinjam way forward Sep 7 2012 abbridged
Vizhinjam way forward Sep 7 2012 abbridged
 
Vizhinjam way forward sep 7 2012
Vizhinjam way forward sep 7 2012Vizhinjam way forward sep 7 2012
Vizhinjam way forward sep 7 2012
 
Cruise tourism in trivandrum
Cruise tourism in trivandrumCruise tourism in trivandrum
Cruise tourism in trivandrum
 
NH-47 Six laning
NH-47 Six laningNH-47 Six laning
NH-47 Six laning
 
Cruise Tourism in Trivandrum
Cruise Tourism in TrivandrumCruise Tourism in Trivandrum
Cruise Tourism in Trivandrum
 
Trivandrum Monorail Preliminary Study
Trivandrum Monorail Preliminary StudyTrivandrum Monorail Preliminary Study
Trivandrum Monorail Preliminary Study
 
Mm Technocity June 17 2009 V 2
Mm Technocity June 17 2009 V 2Mm Technocity June 17 2009 V 2
Mm Technocity June 17 2009 V 2
 
Manorama Protest Jun 22
Manorama Protest Jun 22Manorama Protest Jun 22
Manorama Protest Jun 22
 
Trivandrum Development Jun 13 2009
Trivandrum Development Jun 13 2009Trivandrum Development Jun 13 2009
Trivandrum Development Jun 13 2009
 
Trivandrum It Corridor
Trivandrum It CorridorTrivandrum It Corridor
Trivandrum It Corridor
 

Último

Purva Park Hill Kanakapura Road Bangalore.pdf
Purva Park Hill  Kanakapura Road Bangalore.pdfPurva Park Hill  Kanakapura Road Bangalore.pdf
Purva Park Hill Kanakapura Road Bangalore.pdfashiyadav24
 
Sankla East World Hadapsar Pune Brochure.pdf
Sankla East World Hadapsar Pune Brochure.pdfSankla East World Hadapsar Pune Brochure.pdf
Sankla East World Hadapsar Pune Brochure.pdfabbu831446
 
Experion Elements Sector 45 Noida E-Brochure
Experion Elements Sector 45 Noida E-BrochureExperion Elements Sector 45 Noida E-Brochure
Experion Elements Sector 45 Noida E-BrochureRealEstate Info
 
LCAR RE Practice - The Pearson Vue State Exam
LCAR RE Practice - The Pearson Vue State ExamLCAR RE Practice - The Pearson Vue State Exam
LCAR RE Practice - The Pearson Vue State ExamTom Blefko
 
LCAR Unit 21 - Closing the Real Estate Transaction - 14th Edition Revised
LCAR Unit 21 - Closing the Real Estate Transaction - 14th Edition RevisedLCAR Unit 21 - Closing the Real Estate Transaction - 14th Edition Revised
LCAR Unit 21 - Closing the Real Estate Transaction - 14th Edition RevisedTom Blefko
 
The Shore16 Floor Plans By MSR Communities
The  Shore16 Floor Plans By MSR CommunitiesThe  Shore16 Floor Plans By MSR Communities
The Shore16 Floor Plans By MSR CommunitiesKranthi Shaik
 
Honer Richmont Hyderabad E brochure - A Life With A View
Honer Richmont Hyderabad E brochure - A Life With A ViewHoner Richmont Hyderabad E brochure - A Life With A View
Honer Richmont Hyderabad E brochure - A Life With A ViewAhanundefined
 
Assetz Melodies Of Life off Hosa Road Bangalore.pdf
Assetz Melodies Of Life off Hosa Road Bangalore.pdfAssetz Melodies Of Life off Hosa Road Bangalore.pdf
Assetz Melodies Of Life off Hosa Road Bangalore.pdfashiyadav24
 
Raymond Ten X Era Viviana Mall Thane Brochure.pdf
Raymond Ten X Era Viviana Mall Thane Brochure.pdfRaymond Ten X Era Viviana Mall Thane Brochure.pdf
Raymond Ten X Era Viviana Mall Thane Brochure.pdfPrachiRudram
 
What is Affordable Housing? Bristol Civic Society April 2024
What is Affordable Housing? Bristol Civic Society April 2024What is Affordable Housing? Bristol Civic Society April 2024
What is Affordable Housing? Bristol Civic Society April 2024Paul Smith
 
It’s Time to Fight Back Against the Media Narrative Regarding Real Estate Com...
It’s Time to Fight Back Against the Media Narrative Regarding Real Estate Com...It’s Time to Fight Back Against the Media Narrative Regarding Real Estate Com...
It’s Time to Fight Back Against the Media Narrative Regarding Real Estate Com...Tom Blefko
 
Dubai Real Estate vs Other Global Markets-a-Comparative-Analysis
Dubai Real Estate vs Other Global Markets-a-Comparative-AnalysisDubai Real Estate vs Other Global Markets-a-Comparative-Analysis
Dubai Real Estate vs Other Global Markets-a-Comparative-AnalysisHomeStation1
 
Sobha Oakshire Devanhalli Bangalore.pdf.pdf
Sobha Oakshire Devanhalli Bangalore.pdf.pdfSobha Oakshire Devanhalli Bangalore.pdf.pdf
Sobha Oakshire Devanhalli Bangalore.pdf.pdfkratirudram
 
Saheel ITREND Futura At Baner Annexe Pune - PDF.pdf
Saheel ITREND Futura At Baner Annexe Pune - PDF.pdfSaheel ITREND Futura At Baner Annexe Pune - PDF.pdf
Saheel ITREND Futura At Baner Annexe Pune - PDF.pdfmonikasharma630
 
Volition Meetup 2024 03 Mortgages & Interest Rates – Is The Worst Behind Us_ ...
Volition Meetup 2024 03 Mortgages & Interest Rates – Is The Worst Behind Us_ ...Volition Meetup 2024 03 Mortgages & Interest Rates – Is The Worst Behind Us_ ...
Volition Meetup 2024 03 Mortgages & Interest Rates – Is The Worst Behind Us_ ...Volition Properties
 
SVN Live 4.15.24 Weekly Property Broadcast
SVN Live 4.15.24 Weekly Property BroadcastSVN Live 4.15.24 Weekly Property Broadcast
SVN Live 4.15.24 Weekly Property BroadcastSVN International Corp.
 
K Raheja Amaltis Sion Mumbai Brochure.pdf
K Raheja Amaltis Sion Mumbai  Brochure.pdfK Raheja Amaltis Sion Mumbai  Brochure.pdf
K Raheja Amaltis Sion Mumbai Brochure.pdfBabyrudram
 
Listing Turkey - Resim Modern Catalog Istanbul
Listing Turkey - Resim Modern Catalog IstanbulListing Turkey - Resim Modern Catalog Istanbul
Listing Turkey - Resim Modern Catalog IstanbulListing Turkey
 
Lancaster Market Expenses and Company Worksheet
Lancaster Market Expenses and Company WorksheetLancaster Market Expenses and Company Worksheet
Lancaster Market Expenses and Company WorksheetTom Blefko
 
LCAR Unit 20 - Appraising Real Estate - 14th Edition Revised
LCAR Unit 20 - Appraising Real Estate - 14th Edition RevisedLCAR Unit 20 - Appraising Real Estate - 14th Edition Revised
LCAR Unit 20 - Appraising Real Estate - 14th Edition RevisedTom Blefko
 

Último (20)

Purva Park Hill Kanakapura Road Bangalore.pdf
Purva Park Hill  Kanakapura Road Bangalore.pdfPurva Park Hill  Kanakapura Road Bangalore.pdf
Purva Park Hill Kanakapura Road Bangalore.pdf
 
Sankla East World Hadapsar Pune Brochure.pdf
Sankla East World Hadapsar Pune Brochure.pdfSankla East World Hadapsar Pune Brochure.pdf
Sankla East World Hadapsar Pune Brochure.pdf
 
Experion Elements Sector 45 Noida E-Brochure
Experion Elements Sector 45 Noida E-BrochureExperion Elements Sector 45 Noida E-Brochure
Experion Elements Sector 45 Noida E-Brochure
 
LCAR RE Practice - The Pearson Vue State Exam
LCAR RE Practice - The Pearson Vue State ExamLCAR RE Practice - The Pearson Vue State Exam
LCAR RE Practice - The Pearson Vue State Exam
 
LCAR Unit 21 - Closing the Real Estate Transaction - 14th Edition Revised
LCAR Unit 21 - Closing the Real Estate Transaction - 14th Edition RevisedLCAR Unit 21 - Closing the Real Estate Transaction - 14th Edition Revised
LCAR Unit 21 - Closing the Real Estate Transaction - 14th Edition Revised
 
The Shore16 Floor Plans By MSR Communities
The  Shore16 Floor Plans By MSR CommunitiesThe  Shore16 Floor Plans By MSR Communities
The Shore16 Floor Plans By MSR Communities
 
Honer Richmont Hyderabad E brochure - A Life With A View
Honer Richmont Hyderabad E brochure - A Life With A ViewHoner Richmont Hyderabad E brochure - A Life With A View
Honer Richmont Hyderabad E brochure - A Life With A View
 
Assetz Melodies Of Life off Hosa Road Bangalore.pdf
Assetz Melodies Of Life off Hosa Road Bangalore.pdfAssetz Melodies Of Life off Hosa Road Bangalore.pdf
Assetz Melodies Of Life off Hosa Road Bangalore.pdf
 
Raymond Ten X Era Viviana Mall Thane Brochure.pdf
Raymond Ten X Era Viviana Mall Thane Brochure.pdfRaymond Ten X Era Viviana Mall Thane Brochure.pdf
Raymond Ten X Era Viviana Mall Thane Brochure.pdf
 
What is Affordable Housing? Bristol Civic Society April 2024
What is Affordable Housing? Bristol Civic Society April 2024What is Affordable Housing? Bristol Civic Society April 2024
What is Affordable Housing? Bristol Civic Society April 2024
 
It’s Time to Fight Back Against the Media Narrative Regarding Real Estate Com...
It’s Time to Fight Back Against the Media Narrative Regarding Real Estate Com...It’s Time to Fight Back Against the Media Narrative Regarding Real Estate Com...
It’s Time to Fight Back Against the Media Narrative Regarding Real Estate Com...
 
Dubai Real Estate vs Other Global Markets-a-Comparative-Analysis
Dubai Real Estate vs Other Global Markets-a-Comparative-AnalysisDubai Real Estate vs Other Global Markets-a-Comparative-Analysis
Dubai Real Estate vs Other Global Markets-a-Comparative-Analysis
 
Sobha Oakshire Devanhalli Bangalore.pdf.pdf
Sobha Oakshire Devanhalli Bangalore.pdf.pdfSobha Oakshire Devanhalli Bangalore.pdf.pdf
Sobha Oakshire Devanhalli Bangalore.pdf.pdf
 
Saheel ITREND Futura At Baner Annexe Pune - PDF.pdf
Saheel ITREND Futura At Baner Annexe Pune - PDF.pdfSaheel ITREND Futura At Baner Annexe Pune - PDF.pdf
Saheel ITREND Futura At Baner Annexe Pune - PDF.pdf
 
Volition Meetup 2024 03 Mortgages & Interest Rates – Is The Worst Behind Us_ ...
Volition Meetup 2024 03 Mortgages & Interest Rates – Is The Worst Behind Us_ ...Volition Meetup 2024 03 Mortgages & Interest Rates – Is The Worst Behind Us_ ...
Volition Meetup 2024 03 Mortgages & Interest Rates – Is The Worst Behind Us_ ...
 
SVN Live 4.15.24 Weekly Property Broadcast
SVN Live 4.15.24 Weekly Property BroadcastSVN Live 4.15.24 Weekly Property Broadcast
SVN Live 4.15.24 Weekly Property Broadcast
 
K Raheja Amaltis Sion Mumbai Brochure.pdf
K Raheja Amaltis Sion Mumbai  Brochure.pdfK Raheja Amaltis Sion Mumbai  Brochure.pdf
K Raheja Amaltis Sion Mumbai Brochure.pdf
 
Listing Turkey - Resim Modern Catalog Istanbul
Listing Turkey - Resim Modern Catalog IstanbulListing Turkey - Resim Modern Catalog Istanbul
Listing Turkey - Resim Modern Catalog Istanbul
 
Lancaster Market Expenses and Company Worksheet
Lancaster Market Expenses and Company WorksheetLancaster Market Expenses and Company Worksheet
Lancaster Market Expenses and Company Worksheet
 
LCAR Unit 20 - Appraising Real Estate - 14th Edition Revised
LCAR Unit 20 - Appraising Real Estate - 14th Edition RevisedLCAR Unit 20 - Appraising Real Estate - 14th Edition Revised
LCAR Unit 20 - Appraising Real Estate - 14th Edition Revised
 

Trivandrum Capital Region Knowledge Industries

  • 1. Trivandrum Capital Region Impact of Knowledge and High- Technology Industries January 29, 2009 Ajay Prasad Trivandrum Development Front
  • 2. Trivandrum Capital Region - Snapshot Trivandrum • Capital of Kerala State Political Status • Tier II City Status • Largest city in Kerala • >1 million (Core City Area) Population • >1.5 million (Agglomeration) • 300 Sq.Km. (Agglomeration) Area • 2200 Sq. Km. (District) IT/ITES, Tourism, Services, Textiles, Major Industries Aerospace, Electronics, Small and Medium-scale manufacturing • Per Capita Income – Rs 102,000 Economic Demographics • 30% of population in SEC A &B • Air (International and Domestic) Connectivity • Rail and Road • 4% CAGR Urban Growth Rate • >90% Literacy Rate
  • 3. IT & High-technology Industries @ Tvm - Snapshot Total Number of Employees Approx. 25,000 Indirect Employment > 50,000 Total Number of Companies 150 Total IT Exports Rs 2500 Crores Share of Kerala's Total > 70% Share of India's Total Approx. 1% Built-up Space in Technopark 4 million Sq.ft Space in Development 3 Million Sq,ft Proposed Space > 15 Million Sq.ft. Infosys, TCS, UST Global, IBS, NEST, Toonz, Tata Elxsi, E&Y, Major Companies RR Donnelly, Allianz, RMESI, RWDI, InApp, Mckinsey
  • 4. Why is Trivandrum best suited to be the IT hub of Kerala? World Class Facilities Strategic Location Technopark, Technocity, KINFRA industrial parks Excellent Air, Rail and Road World Class R&D Hubs Connectivity International Deepwater VSSC, CDAC, RRL, IIST, IISER Port Trivandrum Digital Capital Abundant International Excellent Human Resources Data Connectivity Top-class Educational Institutions FALCON landing station Low Cost and High Quality Natural Beauty and of Living; World-class Social Tourist Attractions and Urban Infrastructure
  • 5. Upcoming Projects – Technopark Phase II & III Technopark Phase II – Total area of 86 acres; notified as SEZ – 50 acres handed over to Infosys and 36 acres to UST Global – Infosys has commenced work on its campus • Phase I to be operational in May 2009 • Eventual capacity of 12,000 IT professionals by 2012 – UST Global is set to commence work in a few weeks with a final plan for 2.5 million sq.ft. Technopark Phase III – Total area of 88 acres; notified as SEZ – Technopark to develop 2.1 million sq.ft. By 2013 – Private developer to build campus on a 42-acre parcel • Selection process in progress – Total of over 35,000 direct employment opportunities by 2015
  • 6. Upcoming Projects – Technocity • Technocity is to be developed on a total extent of 450 acres • It will be an Integrated Development encompassing not just IT/business space but also residential, commercial, retail, hospitality, medical and educational facilities – In short, it will be a brand new “Techno” City! • Dedicated power supply, water supply and sewerage facilities have to be developed • The project is being jointly developed by Technopark and Kerala State IT Infrastructure Limited (KSITIL) • Technocity will have over 15 million sq.ft. of IT space when complete in 2018 – It will generate 100,000 to 150,000 direct jobs by 2018 • Leading international developer Forest City Enterprises has expressed interest in developing a Knowledge City within the project
  • 7. Upcoming Projects – Imagery UST Global Phase I Infosys Phase I Phase III Campus Technocity Campus (Artist's Impression)
  • 8. Upcoming Projects – Others Biotechnology Park • KSIDC is developing a Biotechnology Park/Medicity on a 250 acre plot about 1 Km North of Technocity • It will provide space for biotechnology, medical research, medical manufacturing, pharmaceutical and medical care firms Telecom City • SIDCO and ITI, Bangalore together are developing a dedicated 4 million Sq.ft. facility for manufacturing telecommunications equipment at Kazhakkoottam KINFRA Film and Video Park • It is already India's first SEZ for Animation and Gaming • Massive expansion planned to meet strong demand from industry
  • 9. Railway Line Courtesy: The Hindu
  • 10. IT Corridor Infrastructure • Trivandrum is endowed with a natural alignment of seaport, airport, rail hubs, IT & knowledge industry clusters and social infrastructure between Chackai and Thonnakkal on the NH-47 • Immediate steps need to be taken to develop it into a formalised IT Corridor • Areas along the IT Corridor needed to be zoned for mixed- development, to permit commercial, residential and institutional development along its length • An increased FAR needs to be provided to encourage growth • The road needs to be widened to 6 lanes with 2 service lanes immediately – By 2014, the road may need to be widened to 8 lanes • Electricity, water and sewerage facilities need to be developed in anticipation of growth • Mass Transit arrangements need to be put in place along the Corridor – Initially BRTS can be implemented followed by a higher-capacity system like a mono-rail.
  • 11. Electronics Hardware Sector • Trivandrum has a strong presence in the sector since the early days of KELTRON • Trivandrum posses unique advantages to emerge as a hub of electronics hardware and semiconductor manufacturing – Strong R&D presence with institutions like CDAC and NIIST – Firms like NEST & Tata Elxsi are already active in the field – Skilled talent pool – engineers and technicians – Low labour cost – Strong logistics – Port & Airport • Key industries may be: – Hardware assembly – Semiconductor fabrication, assembly and testing – Non-conventional energy – Telecommunications – Aerospace and Defence electronics • KINFRA is planning a Electronics Hub on 1000 Acres near Pothencode
  • 12. Biotechnology and Medical Sector • Trivandrum has several distinct advantages in developing into a center of the biotechnology industry – Extensive biological diversity in the vicinity – Existing instiutions like RGCB, TGBRI, SCIMST and so on – Large pool of skilled and experienced talent – Well developed medical sector – Association with related sectors like material sciences, computing and electronics • The proposed Biotechnology Park by KSIDC could be the spring board for development in this sector • With its unbeatable combination of world-class hospitals and tourist attractions, Trivandrum could also be a global hub for medical-value travel and medical outsourcing.
  • 13. Material Sciences Sector • Trivandrum is home to leading institutions in the physical sciences like the NIIST and IISER – It is poised to be the home of a world-class Molecular Sciences Center for which the State Government will soon allote land • Material sciences like molecular biology and nanotechnology will be the biggest growth sectors in a few years from now • Nanotechnology could be the next big thing after IT and could be a trillion dollar industry in 10 years • Trivandrum can provide a R&D base for the new industries and later become a manufacturing hub • Material sciences could be made part of the proposed Electronics Hub by KINFRA
  • 14. Employment Generated till 2018* (* Projections beyond 10 years may not be accurate) 250000 Technopark Phases Employee Strength I, II and III Technocity & Others 200000 Total Number of Employees 150000 100000 50000 0 2007-08 2008-09 2009-10 2010-11 2011-12 2012-13 2013-14 2014-15 2015-16 2016-17 2017-18 Year Sources: NASSCOM, Mckinsey, AT Kearney, PwC and Technopark studies
  • 15. Additional Population Growth due to Knowledge Sector till 2018 500000 Population Growth due to Knowledge Sector Technopark Phases I, II and III Technocity & Others 400000 Total Additional Population 300000 200000 100000 0 2006-07 2007-08 2008-09 2009-10 2010-11 2011-12 2012-13 2013-14 2014-15 2015-16 2016-17 2017-18 Year Sources: NASSCOM, Mckinsey, AT Kearney, PwC and Technopark studies
  • 16. Housing Demand Generated till 2020 120000 Technopark Phases Demand for Residential Units I, II and III Technocity & Others Total 90000 No. of Units 60000 30000 0 2006-07 2007-08 2008-09 2009-10 2010-11 2011-12 2012-13 2013-14 2014-15 2015-16 2016-17 2017-18 Years Sources: NASSCOM, Mckinsey, AT Kearney, PwC and Technopark studies
  • 17. Power Demand Generated till 2018 1800 1600 Total Power Additional Power Demand Demand (MVA) 1400 (Includes only Office and Residential Demand) 1200 1000 MVA 800 600 400 200 0 2006-07 2007-08 2008-09 2009-10 2010-11 2011-12 2012-13 2013-14 2014-15 2015-16 2016-17 2017-18 Years Sources: NASSCOM, Mckinsey, AT Kearney, PwC and Technopark studies
  • 18. Water Demand & Sewage Generation till 2018 80 Total Water Additional Water and Sewage Demand Demand (MLD) 70 Total Sewage Created (MLD) (Includes only Office and Residential Demand) 60 50 MLD 40 30 20 10 0 2006-07 2007-08 2008-09 2009-10 2010-11 2011-12 2012-13 2013-14 2014-15 2015-16 2016-17 2017-18 Years Sources: NASSCOM, Mckinsey, AT Kearney, PwC and Technopark studies
  • 19. Zones of Development Residential Zone Commercial/Industrial Zone
  • 20. Conclusion • The Trivandrum Capital Region to be formally created to cater to the expansion needs of the Trivandrum Metropolitan Area • A centralised authority to plan and co-ordinate development of the TCR – TRIDA could be expanded for this role • The development zones discussed here to be brought within the purview of the Master Plan – The IT/Industrial areas will witness the most development going forward • The IT Corridor to be formalised immediately – Infrastructure and planning incentives like extra FAR to be provided – A special development agency to be created for this • All future infrastructure expansion to keep at least 2020 demand levels in mind
  • 21. Thank You For further information, Contact: Trivandrum Development Front W :- www.tribiz.in E:- contact@tribiz.in Please contact us for an editable version of this presentation