SAFETY IN ERECTION OF
STRUCTURAL STEELWORK
AKASH TILOKANI
121420006
College Of Engineering , Pune
Forerunners in technical education
References
• IS 7205: 1974 – Code of Safety for Erection of
Structural Steel Work
• SP 70: 2001 – Handbook on Construction
Safety Practices
College Of Engineering , Pune
Forerunners in technical education
Aspects: Clause 9.1 (SP:70-2001) and
Clause 2.1 (IS:7205-1974)
College Of Engineering , Pune
Forerunners in technical education
Scheme
College Of Engineering , Pune
Forerunners in technical education
General Provisions
• Contained in IS 7205-1974, Clause 5 and its sub
clauses
• Before a man is engaged in some work, he should
be given thorough medical check up.
• The erection gang should have adequate supply of
bolts, washers, rivets, pins, etc., of correct size.
• When fitter, riveters, etc., can work from a
planked floor or a planked area, the work can be
done safely and more expeditiously. When this is
not feasible scaffolding or floats should be used.
College Of Engineering , Pune
Forerunners in technical education
Continued…
• When the men can work safely from the steel structure
itself, this is preferable to hanging platforms or
scaffolds, as it eliminates additional operations, which
in turn, reduces the hazard of an accident.
• The men should be taught to clean their shoes of mud,
grease, oil, snow, ice or other slippery material before
climbing ladder or going on steel or a planked floor, so
that they will not slip or drag slippery material for other
to slip on.
• Men should avoid carrying tools or other material when
using a ladder, they should use a hand rope to raise and
lower such material.
College Of Engineering , Pune
Forerunners in technical education
Continued…
• When a number of trusses or deep girders are
loaded in one car or a truck, all but one being
lifted should be tied back unless they have
been tied or braced to prevent their falling over
and endangering men while unloading.
• If a piece is laterally unstable when picked at
its center, use of a balance beam is advisable ,
unless a pair of bridled slings can be placed far
enough for them to be safe lifting points.
College Of Engineering , Pune
Forerunners in technical education
Erection Equipments
• Contained in respective clauses of SP:70-2001 and IS:7205-1974.
1. Cranes
• No crane should be used unless a competent person has inspected
and tested it and furnished a certificate specifying the maximum
working load.
• Access to and egress from the operator’s stand should be safe from
any position of the crane.
• Cranes should not be used to pull out fixed objects with a slanting
pull, drag objects or move vehicles.
• Before being put into use for the first time, jib cranes with variable
radius should undergo tests of stability and all movements.
• Jib cranes should not be operated in the proximity to the electric
power lines.
College Of Engineering , Pune
Forerunners in technical education
Continued …1
2. Hoists
• Hoists must be enclosed at ground level by substantial enclosures
and gates at least by 2 m high and the enclosures should be extended
to accommodate the engine or motor.
• Gates of the same height of 2 m must be provided at all landing
stages.
• The complete hoist way throughout its height shall preferably be
enclosed with a wire mesh in order to contain the accidentally
dislodged material from the hoist platform.
• There must be only one operating position for the hoist and the
driver must be trained in the job and able to see the platform
throughout the travel.
• Every hoist must be fitted with an automatic device which will
support the platform in the event of any failure of the ropes or gear.
• Every hoist must be checked or inspected once in the week.
College Of Engineering , Pune
Forerunners in technical education
Continued…2
3. Wire ropes
• Wire ropes should be visually inspected daily or
at the start of shifts – Idea of thorough inspection.
• One rope lay: Refers to the axial wire rope length
for one wire rope strand to completely wrap
around the wire rope assembly.
• Wires should be stocked for the machines which
are in continuous service.
• Signs of rope deterioration and guidelines of
replacement are as follows
College Of Engineering , Pune
Forerunners in technical education
Continued…3
Signs of deterioration Causes of Replacement
Reduction of rope diameter
(a) Loss of core support
(b) Corrosion
(c) Worn out wires
For Rope Dia Reduction more than
Up to 80 mm 4 mm
95 mm to 130 mm 8 mm
145 mm to 190 mm 12 mm
Broken outside wires (a) 12 randomly distributed broken wires in
ORL
(b) 4 broken wires in one strand in ORL
Wear of individual wires Wear of 1/3rd of the original diameter of
outside individual wires
Corroded, broken, cracked, bent or
worn at end
Any of these conditions indicate replacement
Severe crushing, cutting and
unstranding
When such faults result in distortion of rope
structure
College Of Engineering , Pune
Forerunners in technical education
Columns
• Contained in SP:70-2001, Clause 9.3 and its sub
clauses.
• Get the first four columns of a bay facing
diagonally opposite to one another grouted soon
after bracing of the steelwork and its aligning and
plumbing the portion of steel structure.
• For levelling, aligning and plumbing of columns,
screed bars or level pads shall be provided.
College Of Engineering , Pune
Forerunners in technical education
Continued…
• Stabilize the erected anchored columns by
fastening temporary wire guys till four column
square is completely braced, levelled and
plumbed.
• Filled in pits must be either manually rammed or
rolled over by a heavy roller and sleepers should
be laid over the area.
• Safety nets shall be provided within two stories or
10 m below the height of the work which is
performed.
College Of Engineering , Pune
Forerunners in technical education
Riveting Operations
• Contained in IS 7205:1974, Clause 5.26 and its Sub
clauses
• Rivets covered with slippery materials should not be used
in fabrication work. Care shall be taken while handling
rivets so that they do not fall, strike or cause injury to
men and material below.
• Rivet heating equipment should be as near as possible to
the place of work. A pail of water should always be ready
for quenching the fire, if it develops.
• Rivets, bolts and the like should be kept in the boxes at
working area to prevent falling down on men or
equipments.
College Of Engineering , Pune
Forerunners in technical education
Slinging Operations
• While using multi legged slings each sling or leg should be
loaded evenly and the slings should be of sufficient length
to avoid a wide angle between legs.
• Only properly tested and marked lifting tackle of adequate
strength should be used.
• Allowances should be made for the weight of tackles.
• Load shall be free from any obstructions before it is lifted.
Hands should be taken away from the sling and the slinging
person should stand clear of the load4
• Crane hook should be centrally placed over the load to
prevent the slipping and swinging of the load when it is
raised.
College Of Engineering , Pune
Forerunners in technical education
Erection of Bridge Girders
• Contained in IS:7205-1974, Clause 6.1 and its sub clauses
• Careful inspection of machinery required for the purpose
and check for its capacity is needed.
• Care to protect the edges of members getting marked or
distorted, in the event of use of chains for lashing.
• Temporary bracings shall be provided to care of temporary
stresses from erection equipments or other loads.
• Provisions for lateral forces and wind loads as per the local
conditions.
College Of Engineering , Pune
Forerunners in technical education
Continued...
• Joints shall normally be made by filling not less than
50% of the holes with service bolts and barrel drifts
in the ratio 4:1. The service bolts are to be fully
tightened up as soon as the joint is assembled.
• In the event of emergency arising, such as the
structure in danger of being carried away by floods
before the riveting can be completed, the joints shall
be made secure by filling 40% of the holes with
cylindrical drifts and an equal number with service
bolts fully tightened up.
College Of Engineering , Pune
Forerunners in technical education
Occupational Safety and Health
Administration Provisions
• Safety for erection of structural steel is contained
in code 1926 and sub part R of OSHA.
• Provisions are related to;
1. Site layout, site specific erection plan and
construction sequence
2. Hoisting and Rigging
3. Structural steel stability requirements
4. Falling object protection
5. Fall Protection
College Of Engineering , Pune
Forerunners in technical education
College Of Engineering , Pune
Forerunners in technical education
College Of Engineering , Pune
Forerunners in technical education
College Of Engineering , Pune
Forerunners in technical education
College Of Engineering , Pune
Forerunners in technical education
College Of Engineering , Pune
Forerunners in technical education
College Of Engineering , Pune
Forerunners in technical education
College Of Engineering , Pune
Forerunners in technical education

More Related Content

What's hot

bar bending safety precautions.pdf
bar bending safety precautions.pdfbar bending safety precautions.pdf
bar bending safety precautions.pdfconstruction
 
Lifting plan
Lifting planLifting plan
Lifting plantnsv22
 
12 construction safety
12 construction safety12 construction safety
12 construction safetyazak80
 
Tower crane safety
Tower crane safetyTower crane safety
Tower crane safetyShiva Kaveri
 
Cause of accident and prevention in construction industry
Cause of accident and prevention in construction industryCause of accident and prevention in construction industry
Cause of accident and prevention in construction industryYASMINE HASLAN
 
Construction safety pocket guide osha3252
Construction safety pocket guide osha3252Construction safety pocket guide osha3252
Construction safety pocket guide osha3252zul husni
 
HSE construction environment management plan
HSE construction environment management planHSE construction environment management plan
HSE construction environment management planDwarika Bhushan Sharma
 
Safety precautions during demolition
Safety precautions during demolitionSafety precautions during demolition
Safety precautions during demolitionManthan Vaghasiya
 
Erection of scaffolding
Erection of scaffoldingErection of scaffolding
Erection of scaffoldingSAKET AGRAWAL
 
The Many Hazards Of Manual Cut and Bend Of Rebars
The Many Hazards Of Manual Cut and Bend Of RebarsThe Many Hazards Of Manual Cut and Bend Of Rebars
The Many Hazards Of Manual Cut and Bend Of RebarsTiscon Readybuild
 
313440656 crane-lifting-calculation-sheet
313440656 crane-lifting-calculation-sheet313440656 crane-lifting-calculation-sheet
313440656 crane-lifting-calculation-sheetPhạm Thành
 
3. safety guidelines for construction workers
3. safety guidelines for construction workers 3. safety guidelines for construction workers
3. safety guidelines for construction workers Content Mutual
 
Basic Scaffolding Awareness
Basic Scaffolding AwarenessBasic Scaffolding Awareness
Basic Scaffolding Awarenessedale07
 
Health and Safety in Construction PPT
Health and Safety in Construction  PPTHealth and Safety in Construction  PPT
Health and Safety in Construction PPTLuke D'Arcy
 

What's hot (20)

bar bending safety precautions.pdf
bar bending safety precautions.pdfbar bending safety precautions.pdf
bar bending safety precautions.pdf
 
Lifting plan
Lifting planLifting plan
Lifting plan
 
Rigging and lifting
Rigging and liftingRigging and lifting
Rigging and lifting
 
12 construction safety
12 construction safety12 construction safety
12 construction safety
 
HEIGHT WORK SAFETY REPORT
HEIGHT WORK SAFETY REPORTHEIGHT WORK SAFETY REPORT
HEIGHT WORK SAFETY REPORT
 
Tower crane safety
Tower crane safetyTower crane safety
Tower crane safety
 
Cause of accident and prevention in construction industry
Cause of accident and prevention in construction industryCause of accident and prevention in construction industry
Cause of accident and prevention in construction industry
 
Lifting & Rigging by NEIS
Lifting & Rigging by NEISLifting & Rigging by NEIS
Lifting & Rigging by NEIS
 
Crane Operation - Lifting
Crane Operation -  LiftingCrane Operation -  Lifting
Crane Operation - Lifting
 
Construction safety pocket guide osha3252
Construction safety pocket guide osha3252Construction safety pocket guide osha3252
Construction safety pocket guide osha3252
 
HSE construction environment management plan
HSE construction environment management planHSE construction environment management plan
HSE construction environment management plan
 
Safety precautions during demolition
Safety precautions during demolitionSafety precautions during demolition
Safety precautions during demolition
 
Erection of scaffolding
Erection of scaffoldingErection of scaffolding
Erection of scaffolding
 
The Many Hazards Of Manual Cut and Bend Of Rebars
The Many Hazards Of Manual Cut and Bend Of RebarsThe Many Hazards Of Manual Cut and Bend Of Rebars
The Many Hazards Of Manual Cut and Bend Of Rebars
 
Health and Safety Presentation FINAL
Health and Safety Presentation FINALHealth and Safety Presentation FINAL
Health and Safety Presentation FINAL
 
Lifting Operation Safety ppt.pptx
Lifting Operation Safety ppt.pptxLifting Operation Safety ppt.pptx
Lifting Operation Safety ppt.pptx
 
313440656 crane-lifting-calculation-sheet
313440656 crane-lifting-calculation-sheet313440656 crane-lifting-calculation-sheet
313440656 crane-lifting-calculation-sheet
 
3. safety guidelines for construction workers
3. safety guidelines for construction workers 3. safety guidelines for construction workers
3. safety guidelines for construction workers
 
Basic Scaffolding Awareness
Basic Scaffolding AwarenessBasic Scaffolding Awareness
Basic Scaffolding Awareness
 
Health and Safety in Construction PPT
Health and Safety in Construction  PPTHealth and Safety in Construction  PPT
Health and Safety in Construction PPT
 

Viewers also liked

Erection of steel Structure
Erection of steel StructureErection of steel Structure
Erection of steel StructureGaurang Kakadiya
 
Subpart R - Steel Erection
Subpart R -  Steel ErectionSubpart R -  Steel Erection
Subpart R - Steel ErectionFFSafety
 
Some common defects in steel structural erection at site
Some common defects in steel structural erection at site Some common defects in steel structural erection at site
Some common defects in steel structural erection at site PRABIR DATTA
 
Equipments for erection and compaction
Equipments for erection and compactionEquipments for erection and compaction
Equipments for erection and compactionPrasanthi Nelloor
 
Presentation on steel, fabrication & erection Munger Ganga Bridge
Presentation on steel, fabrication & erection  Munger Ganga BridgePresentation on steel, fabrication & erection  Munger Ganga Bridge
Presentation on steel, fabrication & erection Munger Ganga BridgeAshish Kumar Yadav
 
Lifting Sling Safety
Lifting Sling SafetyLifting Sling Safety
Lifting Sling SafetyHvacmach
 
Crane Safety Training Presentation
Crane Safety Training PresentationCrane Safety Training Presentation
Crane Safety Training PresentationFAIZ FAREED
 
Job Safety Analysis
Job Safety AnalysisJob Safety Analysis
Job Safety AnalysisPraxiom
 
NEW CROSBY PRODUCTS
NEW CROSBY PRODUCTSNEW CROSBY PRODUCTS
NEW CROSBY PRODUCTSAndre Visser
 
Deterioration Modelling of Structural Members Subjected to Cyclic Loading Usi...
Deterioration Modelling of Structural Members Subjected to Cyclic Loading Usi...Deterioration Modelling of Structural Members Subjected to Cyclic Loading Usi...
Deterioration Modelling of Structural Members Subjected to Cyclic Loading Usi...openseesdays
 
Job safety Analysis
Job safety Analysis Job safety Analysis
Job safety Analysis Deepu Rajan
 
Cases in Delays - Indian Contract Act, 1872
Cases in Delays - Indian Contract Act, 1872Cases in Delays - Indian Contract Act, 1872
Cases in Delays - Indian Contract Act, 1872Karthik Madhavan
 
Construction joints
Construction jointsConstruction joints
Construction jointsDaniia Roxio
 
Summer internship in Jaypee Group
Summer internship in Jaypee GroupSummer internship in Jaypee Group
Summer internship in Jaypee GroupAbhimanyu Saraswat
 

Viewers also liked (20)

Erection of steel Structure
Erection of steel StructureErection of steel Structure
Erection of steel Structure
 
Subpart R - Steel Erection
Subpart R -  Steel ErectionSubpart R -  Steel Erection
Subpart R - Steel Erection
 
Pages from MPR
Pages from MPRPages from MPR
Pages from MPR
 
Some common defects in steel structural erection at site
Some common defects in steel structural erection at site Some common defects in steel structural erection at site
Some common defects in steel structural erection at site
 
Equipments for erection and compaction
Equipments for erection and compactionEquipments for erection and compaction
Equipments for erection and compaction
 
Presentation on steel, fabrication & erection Munger Ganga Bridge
Presentation on steel, fabrication & erection  Munger Ganga BridgePresentation on steel, fabrication & erection  Munger Ganga Bridge
Presentation on steel, fabrication & erection Munger Ganga Bridge
 
Operating practices
Operating practicesOperating practices
Operating practices
 
Lifting Sling Safety
Lifting Sling SafetyLifting Sling Safety
Lifting Sling Safety
 
Crane Safety Training Presentation
Crane Safety Training PresentationCrane Safety Training Presentation
Crane Safety Training Presentation
 
Job Hazard Analysis
Job Hazard AnalysisJob Hazard Analysis
Job Hazard Analysis
 
Job Safety Analysis
Job Safety AnalysisJob Safety Analysis
Job Safety Analysis
 
Steel truss ppt
Steel truss pptSteel truss ppt
Steel truss ppt
 
NEW CROSBY PRODUCTS
NEW CROSBY PRODUCTSNEW CROSBY PRODUCTS
NEW CROSBY PRODUCTS
 
Deterioration Modelling of Structural Members Subjected to Cyclic Loading Usi...
Deterioration Modelling of Structural Members Subjected to Cyclic Loading Usi...Deterioration Modelling of Structural Members Subjected to Cyclic Loading Usi...
Deterioration Modelling of Structural Members Subjected to Cyclic Loading Usi...
 
Safe_Erections_Web
Safe_Erections_WebSafe_Erections_Web
Safe_Erections_Web
 
Job safety Analysis
Job safety Analysis Job safety Analysis
Job safety Analysis
 
Cases in Delays - Indian Contract Act, 1872
Cases in Delays - Indian Contract Act, 1872Cases in Delays - Indian Contract Act, 1872
Cases in Delays - Indian Contract Act, 1872
 
Construction joints
Construction jointsConstruction joints
Construction joints
 
Keselamatankerja
KeselamatankerjaKeselamatankerja
Keselamatankerja
 
Summer internship in Jaypee Group
Summer internship in Jaypee GroupSummer internship in Jaypee Group
Summer internship in Jaypee Group
 

Similar to Safety in Erection of Steel Structures

Hoisting and Rigging Safety
Hoisting and Rigging SafetyHoisting and Rigging Safety
Hoisting and Rigging SafetyNickHawkins19
 
Crawler crane introduction
Crawler crane   introductionCrawler crane   introduction
Crawler crane introductionBhushan Goyal
 
الروافع البرجيه واخطارها والتعامل معها. ومكوناتها
الروافع البرجيه واخطارها والتعامل معها. ومكوناتهاالروافع البرجيه واخطارها والتعامل معها. ومكوناتها
الروافع البرجيه واخطارها والتعامل معها. ومكوناتهاOsamaAbdelbaset2
 
UNIT 3 Part B - Safety in Special Construction Operations.pdf
UNIT 3 Part B - Safety in Special Construction Operations.pdfUNIT 3 Part B - Safety in Special Construction Operations.pdf
UNIT 3 Part B - Safety in Special Construction Operations.pdfPinakRay1
 
Mobile crane safety rules
Mobile crane safety rulesMobile crane safety rules
Mobile crane safety rulesytcrane
 
Scaffolding safety procedures and its types
Scaffolding safety procedures and its typesScaffolding safety procedures and its types
Scaffolding safety procedures and its typesabhisheksharma12001
 
Module 3.pptx
Module 3.pptxModule 3.pptx
Module 3.pptxShijo25
 
PMT80 Foundation Design & Installation & Commissioning & Safety.pdf
PMT80 Foundation Design & Installation & Commissioning & Safety.pdfPMT80 Foundation Design & Installation & Commissioning & Safety.pdf
PMT80 Foundation Design & Installation & Commissioning & Safety.pdfssuseref23d3
 
Safety engineering module 6 shskwn ejekdndhek
Safety engineering module 6 shskwn ejekdndhekSafety engineering module 6 shskwn ejekdndhek
Safety engineering module 6 shskwn ejekdndhekRoseGaming1
 
SCAFFOLDING Safety Training
SCAFFOLDING Safety TrainingSCAFFOLDING Safety Training
SCAFFOLDING Safety TrainingWilliam York
 
PRESENTATION BY HANS HAMMAN-DROP RAISE
PRESENTATION BY HANS HAMMAN-DROP RAISEPRESENTATION BY HANS HAMMAN-DROP RAISE
PRESENTATION BY HANS HAMMAN-DROP RAISEHANS HAMMAN
 

Similar to Safety in Erection of Steel Structures (20)

safety while prestressed concrete
safety while prestressed concretesafety while prestressed concrete
safety while prestressed concrete
 
UTA_AST-Rigging.pptx
UTA_AST-Rigging.pptxUTA_AST-Rigging.pptx
UTA_AST-Rigging.pptx
 
Hoisting and Rigging Safety
Hoisting and Rigging SafetyHoisting and Rigging Safety
Hoisting and Rigging Safety
 
Safety.pptx
Safety.pptxSafety.pptx
Safety.pptx
 
safe lift EMERSON EDUARDO RODRIGUES
safe lift EMERSON EDUARDO RODRIGUESsafe lift EMERSON EDUARDO RODRIGUES
safe lift EMERSON EDUARDO RODRIGUES
 
Crawler crane introduction
Crawler crane   introductionCrawler crane   introduction
Crawler crane introduction
 
Rigger safety .pdf
Rigger safety                        .pdfRigger safety                        .pdf
Rigger safety .pdf
 
Rigging Course .pdf
Rigging Course                       .pdfRigging Course                       .pdf
Rigging Course .pdf
 
الروافع البرجيه واخطارها والتعامل معها. ومكوناتها
الروافع البرجيه واخطارها والتعامل معها. ومكوناتهاالروافع البرجيه واخطارها والتعامل معها. ومكوناتها
الروافع البرجيه واخطارها والتعامل معها. ومكوناتها
 
Scaffold Safety (2).ppt
Scaffold Safety (2).pptScaffold Safety (2).ppt
Scaffold Safety (2).ppt
 
Overhead Crane Operators by
Overhead  Crane Operators byOverhead  Crane Operators by
Overhead Crane Operators by
 
UNIT 3 Part B - Safety in Special Construction Operations.pdf
UNIT 3 Part B - Safety in Special Construction Operations.pdfUNIT 3 Part B - Safety in Special Construction Operations.pdf
UNIT 3 Part B - Safety in Special Construction Operations.pdf
 
Lifting tools
Lifting toolsLifting tools
Lifting tools
 
Mobile crane safety rules
Mobile crane safety rulesMobile crane safety rules
Mobile crane safety rules
 
Scaffolding safety procedures and its types
Scaffolding safety procedures and its typesScaffolding safety procedures and its types
Scaffolding safety procedures and its types
 
Module 3.pptx
Module 3.pptxModule 3.pptx
Module 3.pptx
 
PMT80 Foundation Design & Installation & Commissioning & Safety.pdf
PMT80 Foundation Design & Installation & Commissioning & Safety.pdfPMT80 Foundation Design & Installation & Commissioning & Safety.pdf
PMT80 Foundation Design & Installation & Commissioning & Safety.pdf
 
Safety engineering module 6 shskwn ejekdndhek
Safety engineering module 6 shskwn ejekdndhekSafety engineering module 6 shskwn ejekdndhek
Safety engineering module 6 shskwn ejekdndhek
 
SCAFFOLDING Safety Training
SCAFFOLDING Safety TrainingSCAFFOLDING Safety Training
SCAFFOLDING Safety Training
 
PRESENTATION BY HANS HAMMAN-DROP RAISE
PRESENTATION BY HANS HAMMAN-DROP RAISEPRESENTATION BY HANS HAMMAN-DROP RAISE
PRESENTATION BY HANS HAMMAN-DROP RAISE
 

More from Akash Tilokani

Glass Reinforced Plastic Waste
Glass Reinforced Plastic WasteGlass Reinforced Plastic Waste
Glass Reinforced Plastic WasteAkash Tilokani
 
Reactive Powder Concrete
Reactive Powder ConcreteReactive Powder Concrete
Reactive Powder ConcreteAkash Tilokani
 
Pile Foundations and Diaphragm Walls
Pile Foundations and Diaphragm WallsPile Foundations and Diaphragm Walls
Pile Foundations and Diaphragm WallsAkash Tilokani
 
Workers’ compensation in construction
Workers’ compensation in constructionWorkers’ compensation in construction
Workers’ compensation in constructionAkash Tilokani
 

More from Akash Tilokani (7)

Design of slabs 1
Design of slabs 1Design of slabs 1
Design of slabs 1
 
Glass Reinforced Plastic Waste
Glass Reinforced Plastic WasteGlass Reinforced Plastic Waste
Glass Reinforced Plastic Waste
 
Reactive Powder Concrete
Reactive Powder ConcreteReactive Powder Concrete
Reactive Powder Concrete
 
Pile Foundations and Diaphragm Walls
Pile Foundations and Diaphragm WallsPile Foundations and Diaphragm Walls
Pile Foundations and Diaphragm Walls
 
Compensation (HRM)
Compensation (HRM)Compensation (HRM)
Compensation (HRM)
 
Workers’ compensation in construction
Workers’ compensation in constructionWorkers’ compensation in construction
Workers’ compensation in construction
 
FDI in Infrastructure
FDI in InfrastructureFDI in Infrastructure
FDI in Infrastructure
 

Recently uploaded

KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlysanyuktamishra911
 
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank  Design by Working Stress - IS Method.pdfIntze Overhead Water Tank  Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank Design by Working Stress - IS Method.pdfSuman Jyoti
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...roncy bisnoi
 
Unit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdfUnit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdfRagavanV2
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . pptDineshKumar4165
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdfankushspencer015
 
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...ranjana rawat
 
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptxBSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptxfenichawla
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756dollysharma2066
 
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingrknatarajan
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdfKamal Acharya
 
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELLPVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELLManishPatel169454
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VDineshKumar4165
 
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...SUHANI PANDEY
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performancesivaprakash250
 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college projectTonystark477637
 

Recently uploaded (20)

KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghly
 
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
 
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank  Design by Working Stress - IS Method.pdfIntze Overhead Water Tank  Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
 
Unit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdfUnit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdf
 
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
 
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . ppt
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdf
 
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
 
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptxBSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
 
NFPA 5000 2024 standard .
NFPA 5000 2024 standard                                  .NFPA 5000 2024 standard                                  .
NFPA 5000 2024 standard .
 
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdf
 
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELLPVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - V
 
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performance
 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college project
 

Safety in Erection of Steel Structures

  • 1. SAFETY IN ERECTION OF STRUCTURAL STEELWORK AKASH TILOKANI 121420006 College Of Engineering , Pune Forerunners in technical education
  • 2. References • IS 7205: 1974 – Code of Safety for Erection of Structural Steel Work • SP 70: 2001 – Handbook on Construction Safety Practices College Of Engineering , Pune Forerunners in technical education
  • 3. Aspects: Clause 9.1 (SP:70-2001) and Clause 2.1 (IS:7205-1974) College Of Engineering , Pune Forerunners in technical education
  • 4. Scheme College Of Engineering , Pune Forerunners in technical education
  • 5. General Provisions • Contained in IS 7205-1974, Clause 5 and its sub clauses • Before a man is engaged in some work, he should be given thorough medical check up. • The erection gang should have adequate supply of bolts, washers, rivets, pins, etc., of correct size. • When fitter, riveters, etc., can work from a planked floor or a planked area, the work can be done safely and more expeditiously. When this is not feasible scaffolding or floats should be used. College Of Engineering , Pune Forerunners in technical education
  • 6. Continued… • When the men can work safely from the steel structure itself, this is preferable to hanging platforms or scaffolds, as it eliminates additional operations, which in turn, reduces the hazard of an accident. • The men should be taught to clean their shoes of mud, grease, oil, snow, ice or other slippery material before climbing ladder or going on steel or a planked floor, so that they will not slip or drag slippery material for other to slip on. • Men should avoid carrying tools or other material when using a ladder, they should use a hand rope to raise and lower such material. College Of Engineering , Pune Forerunners in technical education
  • 7. Continued… • When a number of trusses or deep girders are loaded in one car or a truck, all but one being lifted should be tied back unless they have been tied or braced to prevent their falling over and endangering men while unloading. • If a piece is laterally unstable when picked at its center, use of a balance beam is advisable , unless a pair of bridled slings can be placed far enough for them to be safe lifting points. College Of Engineering , Pune Forerunners in technical education
  • 8. Erection Equipments • Contained in respective clauses of SP:70-2001 and IS:7205-1974. 1. Cranes • No crane should be used unless a competent person has inspected and tested it and furnished a certificate specifying the maximum working load. • Access to and egress from the operator’s stand should be safe from any position of the crane. • Cranes should not be used to pull out fixed objects with a slanting pull, drag objects or move vehicles. • Before being put into use for the first time, jib cranes with variable radius should undergo tests of stability and all movements. • Jib cranes should not be operated in the proximity to the electric power lines. College Of Engineering , Pune Forerunners in technical education
  • 9. Continued …1 2. Hoists • Hoists must be enclosed at ground level by substantial enclosures and gates at least by 2 m high and the enclosures should be extended to accommodate the engine or motor. • Gates of the same height of 2 m must be provided at all landing stages. • The complete hoist way throughout its height shall preferably be enclosed with a wire mesh in order to contain the accidentally dislodged material from the hoist platform. • There must be only one operating position for the hoist and the driver must be trained in the job and able to see the platform throughout the travel. • Every hoist must be fitted with an automatic device which will support the platform in the event of any failure of the ropes or gear. • Every hoist must be checked or inspected once in the week. College Of Engineering , Pune Forerunners in technical education
  • 10. Continued…2 3. Wire ropes • Wire ropes should be visually inspected daily or at the start of shifts – Idea of thorough inspection. • One rope lay: Refers to the axial wire rope length for one wire rope strand to completely wrap around the wire rope assembly. • Wires should be stocked for the machines which are in continuous service. • Signs of rope deterioration and guidelines of replacement are as follows College Of Engineering , Pune Forerunners in technical education
  • 11. Continued…3 Signs of deterioration Causes of Replacement Reduction of rope diameter (a) Loss of core support (b) Corrosion (c) Worn out wires For Rope Dia Reduction more than Up to 80 mm 4 mm 95 mm to 130 mm 8 mm 145 mm to 190 mm 12 mm Broken outside wires (a) 12 randomly distributed broken wires in ORL (b) 4 broken wires in one strand in ORL Wear of individual wires Wear of 1/3rd of the original diameter of outside individual wires Corroded, broken, cracked, bent or worn at end Any of these conditions indicate replacement Severe crushing, cutting and unstranding When such faults result in distortion of rope structure College Of Engineering , Pune Forerunners in technical education
  • 12. Columns • Contained in SP:70-2001, Clause 9.3 and its sub clauses. • Get the first four columns of a bay facing diagonally opposite to one another grouted soon after bracing of the steelwork and its aligning and plumbing the portion of steel structure. • For levelling, aligning and plumbing of columns, screed bars or level pads shall be provided. College Of Engineering , Pune Forerunners in technical education
  • 13. Continued… • Stabilize the erected anchored columns by fastening temporary wire guys till four column square is completely braced, levelled and plumbed. • Filled in pits must be either manually rammed or rolled over by a heavy roller and sleepers should be laid over the area. • Safety nets shall be provided within two stories or 10 m below the height of the work which is performed. College Of Engineering , Pune Forerunners in technical education
  • 14. Riveting Operations • Contained in IS 7205:1974, Clause 5.26 and its Sub clauses • Rivets covered with slippery materials should not be used in fabrication work. Care shall be taken while handling rivets so that they do not fall, strike or cause injury to men and material below. • Rivet heating equipment should be as near as possible to the place of work. A pail of water should always be ready for quenching the fire, if it develops. • Rivets, bolts and the like should be kept in the boxes at working area to prevent falling down on men or equipments. College Of Engineering , Pune Forerunners in technical education
  • 15. Slinging Operations • While using multi legged slings each sling or leg should be loaded evenly and the slings should be of sufficient length to avoid a wide angle between legs. • Only properly tested and marked lifting tackle of adequate strength should be used. • Allowances should be made for the weight of tackles. • Load shall be free from any obstructions before it is lifted. Hands should be taken away from the sling and the slinging person should stand clear of the load4 • Crane hook should be centrally placed over the load to prevent the slipping and swinging of the load when it is raised. College Of Engineering , Pune Forerunners in technical education
  • 16. Erection of Bridge Girders • Contained in IS:7205-1974, Clause 6.1 and its sub clauses • Careful inspection of machinery required for the purpose and check for its capacity is needed. • Care to protect the edges of members getting marked or distorted, in the event of use of chains for lashing. • Temporary bracings shall be provided to care of temporary stresses from erection equipments or other loads. • Provisions for lateral forces and wind loads as per the local conditions. College Of Engineering , Pune Forerunners in technical education
  • 17. Continued... • Joints shall normally be made by filling not less than 50% of the holes with service bolts and barrel drifts in the ratio 4:1. The service bolts are to be fully tightened up as soon as the joint is assembled. • In the event of emergency arising, such as the structure in danger of being carried away by floods before the riveting can be completed, the joints shall be made secure by filling 40% of the holes with cylindrical drifts and an equal number with service bolts fully tightened up. College Of Engineering , Pune Forerunners in technical education
  • 18. Occupational Safety and Health Administration Provisions • Safety for erection of structural steel is contained in code 1926 and sub part R of OSHA. • Provisions are related to; 1. Site layout, site specific erection plan and construction sequence 2. Hoisting and Rigging 3. Structural steel stability requirements 4. Falling object protection 5. Fall Protection College Of Engineering , Pune Forerunners in technical education
  • 19. College Of Engineering , Pune Forerunners in technical education
  • 20. College Of Engineering , Pune Forerunners in technical education
  • 21. College Of Engineering , Pune Forerunners in technical education
  • 22. College Of Engineering , Pune Forerunners in technical education
  • 23. College Of Engineering , Pune Forerunners in technical education
  • 24. College Of Engineering , Pune Forerunners in technical education
  • 25. College Of Engineering , Pune Forerunners in technical education