Publicidad

Sunk Costs are retrievable upon future divestment of the project. .pdf

27 de Mar de 2023
Sunk Costs are retrievable upon future divestment of the project. .pdf
Próximo SlideShare
Supose there are 12 signals, each with a max frequency of 3kHz. All .pdfSupose there are 12 signals, each with a max frequency of 3kHz. All .pdf
Cargando en ... 3
1 de 1
Publicidad

Más contenido relacionado

Más de akilastationarrymdu(20)

Publicidad

Sunk Costs are retrievable upon future divestment of the project. .pdf

  1. Sunk Costs are retrievable upon future divestment of the project. A.True b.False Solution Money already spent and permanently lost. Sunk costs are past opportunity costs that are partially (as salvage, if any) or totally irretrievable and, therefore, should be considered irrelevant to future decision making. This term is from the oil industry where the decision to abandon or operate an oil well is made on the basis of its expected cash flows and not on how much money was spent in drilling it. Also called embedded cost, prior year cost, stranded cost, or sunk capital. Hence the statement is False.
Publicidad