Personal Information
Organización/Lugar de trabajo
Perak, Malaysia Malaysia
Ocupación
Mechanical Engineer at Tenaga Nasional Berhad
Sector
Logistics / Supply Chain
Acerca de
An adaptable mechanical engineer with 6 years of experience in supercritical power plant projects. Currently assigned as owner project team member at Manjung 5 and previously at Manjung 4 project; each having 1,000MW of generation capacity. Responsibility involves the 2X1,000MW steam turbines (ALSTOM & MHPS) and its auxiliaries, condenser, feed water system, condensate system, condensate polishing plant, main and secondary cooling water system, closed cooling water system, and electro-chlorination plant.
- Presentaciones
- Documentos
- Infografías
FUNDAMENTAL OF VALVE DESIGN
MOHAMMAD ATIF ALI
•
Hace 8 años
Feedwater heater control: Level
Shari Worthington
•
Hace 12 años
Design of pressure vessel
Chandresh Suthar
•
Hace 7 años
Control valves for thermal power plants
SHIVAJI CHOUDHURY
•
Hace 12 años
Qc piping guide
MOHAMMAD ATIF ALI
•
Hace 5 años
Pipe Support Field Inspection, Installation & Maintenance
Piping Technology & Products, Inc.
•
Hace 12 años
Inspection manual for piping
Khiem Vo Duy
•
Hace 6 años
Types, Operations and Maintenance of Air Compressor Plants
Nejat Öztezcan
•
Hace 6 años
Pre commissioning steam turbines load trial
Nagesh H
•
Hace 10 años
We will become a leader in flow control within oil & gas and mining - Metso
Metso Group
•
Hace 9 años