Intend to build a career with leading corporate of hi-tech environment which help me to explore
and utilize my technical and managerial skill to the best of my abilities to perform any given task.
B-Tech in Electrical Engineering from Konark Institute of Science and Technology affiliated from
BPUT University, Bhubaneswar having an aggregate of 7.25 CGPA in the academic year 2009.
7 Year of core experience in the field of power sector, primarily in sub-critical coal fired thermal
power plant.
Toshiba Jsw Power System pvt Ltd:- Working as Assistant Manager in department of
Commissioning .Involve in commissioning activity of TG area.
Current project:- NTPC (Kudgi) 3*800MW.
Duration:-August 2016-till date.
Lanco Infratech Limited: - Working as Senior engineer in department of Commissioning and
Maintenance. Currently involved in commissioning activity of BTG package of Moserbaer project
2*600MW supplied by HTC Sub critical coal based thermal power plant.
Project: - Udupi power corporation ltd(2*600MW), Anpara power (2*600MW), Amarkanthak
power(2*660MW).
Current project:- MBPIL (2*600MW)
Duration:-June 2010 – july 2016.
Role: - Engineer.
Responsibility:-Testing, Commissioning and Maintenance of HT & LT Switchgear,Generator,
Generator Transformer (3*250MVA), Distribution Transformer, HT & LT Drives, Switchyard 400kV.
AMRIT KUMARPATTANAIK
LIG-134, BRITCOLONY,BHUBANESWAR-751012
MOB-9583336861, 7619686733
EMAIL: - amritpattanaik87@gmail.com
Passport no - L3221527
OBJECTIVE
PROFESSIONAL QUALIFICATION
WORK EXPERIENCE
PREVIOUS ORGANIZATION
PRESENT ORGANIZATION
ROLES IN TESTING AND COMMISSIONING
HT & LT Switchgear (0.415kV-11kV)
 Testing of equipment and relay setting.
 Checking of internal wiring and healthiness of equipment (i.e. CT, PT, Relay, Breaker etc).
 Checking of equipment as per diagram.
 Testing and commissioning of ELDB and MLDB.
HT & LT Drives (0.37kW-11000kW)
 Testing of motor (i.e. Megger, Resistance, Differential etc.)
 Inspection of HT Drive and verifying its technical specification.
 Relay setting as per motor requirement.
 Preparation of commissioning checklist and protocol.
 Coordinating with erection team for quality work and raising of pending points of HT Drives.
Transformer(Generator Tansformer 250MVA*3,UT31MVA)
 Testing of transformer(i.e. Tan-delta ,Stability, Differential etc.)
 Checking of interpanel wiring of CMB and Main panel.
 Testing and commissioning of fans.
DistributionTransformer
 Testing of transformer(i.e.Stability,Differential etc.)
 Checking interpanel wiring of MB.
 Relay setting as per transformer requirement.
Generator
 Scheme checking.
 CT wiring of generator protection.
 Testing of Generator and Rotor.
 SCC & OCC test while rolling of turbine in 3000 rpm.
AVR
 Testing of AVR.
 Checking of the wiring and connection of external cable & feedback cable.
 Operating of AVR in Manual & Auto Mode.
 Worked in both ABB and TOSHIBA make.
Switchyard(400kV)
 Testing of equipment of switchyard(SF6 Breaker,Isolator etc).
 Loop checking and interpanel wiring checking of relay panel and equipment of switchyard.
 Relay testing (i.e. I/O signal).
RESPONSIBILITIES
ABT(Auto Bus Transfer)
 Checking of inter panel wiring of ABT panel.
 Checking and termination of cable in switchgear and ABT as per requirement.
 Relay setting as per requirement.
DC System
 Testing and commissioning of 220 v battery charger and bank.
 Testing and commissioning of 48v battery charger and bank.
 Troubleshooting of DC System.
 Commissioning of DC Motor and its panel.
DG System
 Cheching of AMF panel.
 Testing & Commissioning of DG set.
 Checking interlocks between DG AMF panel and EMCC.
Documents
 Modification of control drawing as per site requirement.
 Study & Reviewing of Control & protection schemes control/ Logic diagram for various
electrical equipment.
ROLES IN MAINTENANCE
 Maintenance and Troubleshooting of HT/LT Switchgear, transformer.
 Checking of Motor protection along with their periodic maintenance.
 Maintenance of Battery Charger with battery bank & DC drives.
 Maintenance and Troubleshooting of HT/LT Drives.
 10 Week training on “Power Plant Familiarization” at NPTI, Neyvelli.
 1 Week training on “Electrical Protection System” conducted by ABB.
 3 days Standard course on UNITROl-5000 SES product operation and maintenance at
ABB, Bangalore.
 Undergone 60 days Industrial Training at Hindustan Copper Limited, moubhandar, Jharkhand.
 Undergone 30 days training in Transmission and Distribution in OPTCL, Bhubaneswar.
v
 AUTO CAD
 C/C++
 MS Office/Outlook
COMPUTER SKILLS
TRAINING AND CERTIFICATION
FATHER NAME: - ANIL KUMAR PATTANAIK
MOTHER NAME: - ANGURBALA PATTANAIK
DATE OF BIRTH: - 31/03/1987
GENDER:- MALE
LANGUAGE: - ENGLISH, HINDI, ODIYA
I hereby declare that the information furnished above is true to the best of my knowledge.
AMRIT KUMAR PATTANAIK
PERSONAL DETAILS
DECLARATION

More Related Content

What's hot

Amit Kumar_CV_100_MW
Amit Kumar_CV_100_MWAmit Kumar_CV_100_MW
Amit Kumar_CV_100_MW
Amit Kumar
 
Stalin_resumedoc1
Stalin_resumedoc1Stalin_resumedoc1
Stalin_resumedoc1
stalin B
 

What's hot (20)

Amit Kumar_CV_100_MW
Amit Kumar_CV_100_MWAmit Kumar_CV_100_MW
Amit Kumar_CV_100_MW
 
Akram CV- Updated
Akram CV- UpdatedAkram CV- Updated
Akram CV- Updated
 
Maximum power point tracking converter
Maximum power point tracking converterMaximum power point tracking converter
Maximum power point tracking converter
 
The way to off grid power
The way to off grid powerThe way to off grid power
The way to off grid power
 
Enhanced energy output from a pv system under partial shaded conditions using...
Enhanced energy output from a pv system under partial shaded conditions using...Enhanced energy output from a pv system under partial shaded conditions using...
Enhanced energy output from a pv system under partial shaded conditions using...
 
Maximum power point tracking of pv arrays under partial shading condition usi...
Maximum power point tracking of pv arrays under partial shading condition usi...Maximum power point tracking of pv arrays under partial shading condition usi...
Maximum power point tracking of pv arrays under partial shading condition usi...
 
Maximumpowerpoint trackingtechniquesforphotovoltaic
Maximumpowerpoint trackingtechniquesforphotovoltaicMaximumpowerpoint trackingtechniquesforphotovoltaic
Maximumpowerpoint trackingtechniquesforphotovoltaic
 
FINAL Poster
FINAL PosterFINAL Poster
FINAL Poster
 
Pv power system based mppt z source inverter to supply bldc motor
Pv power system based mppt z source inverter to supply bldc motorPv power system based mppt z source inverter to supply bldc motor
Pv power system based mppt z source inverter to supply bldc motor
 
Subhash_sharma_NMDC
Subhash_sharma_NMDCSubhash_sharma_NMDC
Subhash_sharma_NMDC
 
Saran Resume
Saran ResumeSaran Resume
Saran Resume
 
rashgggg
rashggggrashgggg
rashgggg
 
Mppt vs pwm charge controller - which one to take?
Mppt vs pwm charge controller -  which one to take?Mppt vs pwm charge controller -  which one to take?
Mppt vs pwm charge controller - which one to take?
 
Dc-Dc boost converter topologies & MPPT techniques for grid connected PV system
Dc-Dc boost converter topologies & MPPT techniques for grid connected PV systemDc-Dc boost converter topologies & MPPT techniques for grid connected PV system
Dc-Dc boost converter topologies & MPPT techniques for grid connected PV system
 
[Codientu.org] design of a charge controller circuit
[Codientu.org] design of a charge controller circuit[Codientu.org] design of a charge controller circuit
[Codientu.org] design of a charge controller circuit
 
Stalin_resumedoc1
Stalin_resumedoc1Stalin_resumedoc1
Stalin_resumedoc1
 
Photovoltaic Generator with Battery Storage
Photovoltaic Generator with Battery StoragePhotovoltaic Generator with Battery Storage
Photovoltaic Generator with Battery Storage
 
IRJET- Simulation of Solar PV and DG based Hybrid Micro Grid
IRJET-  	  Simulation of Solar PV and DG based Hybrid Micro GridIRJET-  	  Simulation of Solar PV and DG based Hybrid Micro Grid
IRJET- Simulation of Solar PV and DG based Hybrid Micro Grid
 
Resume
ResumeResume
Resume
 
A high efficiency non isolated buck-boost converter based on zeta converter
A high efficiency non isolated buck-boost converter based on zeta converterA high efficiency non isolated buck-boost converter based on zeta converter
A high efficiency non isolated buck-boost converter based on zeta converter
 

Viewers also liked

Princip vo geologijata
Princip vo geologijataPrincip vo geologijata
Princip vo geologijata
Darko Sw-Haor
 
Cis336 week 5 i lab 5
Cis336 week 5 i lab 5Cis336 week 5 i lab 5
Cis336 week 5 i lab 5
jackiechaner
 
P4 CL Slides
P4 CL SlidesP4 CL Slides
P4 CL Slides
xnpsp5
 

Viewers also liked (16)

Surendran_CVupdated
Surendran_CVupdatedSurendran_CVupdated
Surendran_CVupdated
 
Electrical Machinery Sectore Report - January 2017
Electrical Machinery Sectore Report - January 2017Electrical Machinery Sectore Report - January 2017
Electrical Machinery Sectore Report - January 2017
 
Kumar RESUME
Kumar RESUMEKumar RESUME
Kumar RESUME
 
Resume - Electrical Engineer (MEP) 9+ Years Exp
Resume - Electrical Engineer (MEP) 9+ Years ExpResume - Electrical Engineer (MEP) 9+ Years Exp
Resume - Electrical Engineer (MEP) 9+ Years Exp
 
Princip vo geologijata
Princip vo geologijataPrincip vo geologijata
Princip vo geologijata
 
Ca
Ca Ca
Ca
 
Ratios
RatiosRatios
Ratios
 
Basic of tianium
Basic of tianiumBasic of tianium
Basic of tianium
 
Cis336 week 5 i lab 5
Cis336 week 5 i lab 5Cis336 week 5 i lab 5
Cis336 week 5 i lab 5
 
Etapa II e suas Brincadeiras
Etapa II e suas BrincadeirasEtapa II e suas Brincadeiras
Etapa II e suas Brincadeiras
 
Website 14 15
Website 14 15Website 14 15
Website 14 15
 
P4 CL Slides
P4 CL SlidesP4 CL Slides
P4 CL Slides
 
מדד ההמבורגר מרץ 2014
מדד ההמבורגר מרץ 2014מדד ההמבורגר מרץ 2014
מדד ההמבורגר מרץ 2014
 
Deontología profesional
Deontología profesionalDeontología profesional
Deontología profesional
 
Both 2016 shanghai development of innovative ultra high temperature coatings ...
Both 2016 shanghai development of innovative ultra high temperature coatings ...Both 2016 shanghai development of innovative ultra high temperature coatings ...
Both 2016 shanghai development of innovative ultra high temperature coatings ...
 
Introducing ASP.NET vNext – The Future of .NET on the Server | FalafelCON 2014
Introducing ASP.NET vNext – The Future of .NET on the Server | FalafelCON 2014Introducing ASP.NET vNext – The Future of .NET on the Server | FalafelCON 2014
Introducing ASP.NET vNext – The Future of .NET on the Server | FalafelCON 2014
 

Similar to Amrit kumar pattanaik resume

CV, Electrical Engr -
CV, Electrical Engr -CV, Electrical Engr -
CV, Electrical Engr -
Mehboob Ahmad
 
Chandru_-_Testing_&_Commissioning_Engineer (1)
Chandru_-_Testing_&_Commissioning_Engineer (1)Chandru_-_Testing_&_Commissioning_Engineer (1)
Chandru_-_Testing_&_Commissioning_Engineer (1)
BALA CHANDRU
 
Graduate Electrical Engineer having 6.6 Years exprience in renewable energy &...
Graduate Electrical Engineer having 6.6 Years exprience in renewable energy &...Graduate Electrical Engineer having 6.6 Years exprience in renewable energy &...
Graduate Electrical Engineer having 6.6 Years exprience in renewable energy &...
Upendra Kumar Yadav
 
ARITRA_GHOSH_Resume_Updtd
ARITRA_GHOSH_Resume_UpdtdARITRA_GHOSH_Resume_Updtd
ARITRA_GHOSH_Resume_Updtd
Aritra Ghosh
 

Similar to Amrit kumar pattanaik resume (20)

venkatCV
venkatCVvenkatCV
venkatCV
 
Resume (1)
Resume (1)Resume (1)
Resume (1)
 
CV, Electrical Engr -
CV, Electrical Engr -CV, Electrical Engr -
CV, Electrical Engr -
 
Chandru_-_Testing_&_Commissioning_Engineer (1)
Chandru_-_Testing_&_Commissioning_Engineer (1)Chandru_-_Testing_&_Commissioning_Engineer (1)
Chandru_-_Testing_&_Commissioning_Engineer (1)
 
Graduate Electrical Engineer having 6.6 Years exprience in renewable energy &...
Graduate Electrical Engineer having 6.6 Years exprience in renewable energy &...Graduate Electrical Engineer having 6.6 Years exprience in renewable energy &...
Graduate Electrical Engineer having 6.6 Years exprience in renewable energy &...
 
utsav cv
utsav cvutsav cv
utsav cv
 
viren.cv
viren.cvviren.cv
viren.cv
 
Janardhan resume
Janardhan resumeJanardhan resume
Janardhan resume
 
CV, Electrical Engr
CV, Electrical EngrCV, Electrical Engr
CV, Electrical Engr
 
ARITRA_GHOSH_Resume_Updtd
ARITRA_GHOSH_Resume_UpdtdARITRA_GHOSH_Resume_Updtd
ARITRA_GHOSH_Resume_Updtd
 
Engr kashif cv
Engr kashif cvEngr kashif cv
Engr kashif cv
 
Resume (1)
Resume (1)Resume (1)
Resume (1)
 
Janardhan (Power Electronics resume)
Janardhan (Power Electronics resume)Janardhan (Power Electronics resume)
Janardhan (Power Electronics resume)
 
Sharma Resume
Sharma ResumeSharma Resume
Sharma Resume
 
Sharma Resume
Sharma ResumeSharma Resume
Sharma Resume
 
resume
resumeresume
resume
 
Afroz cv
Afroz cvAfroz cv
Afroz cv
 
Cv
CvCv
Cv
 
CV_Susovan
CV_SusovanCV_Susovan
CV_Susovan
 
CV_ susovan
CV_ susovanCV_ susovan
CV_ susovan
 

Amrit kumar pattanaik resume

  • 1. Intend to build a career with leading corporate of hi-tech environment which help me to explore and utilize my technical and managerial skill to the best of my abilities to perform any given task. B-Tech in Electrical Engineering from Konark Institute of Science and Technology affiliated from BPUT University, Bhubaneswar having an aggregate of 7.25 CGPA in the academic year 2009. 7 Year of core experience in the field of power sector, primarily in sub-critical coal fired thermal power plant. Toshiba Jsw Power System pvt Ltd:- Working as Assistant Manager in department of Commissioning .Involve in commissioning activity of TG area. Current project:- NTPC (Kudgi) 3*800MW. Duration:-August 2016-till date. Lanco Infratech Limited: - Working as Senior engineer in department of Commissioning and Maintenance. Currently involved in commissioning activity of BTG package of Moserbaer project 2*600MW supplied by HTC Sub critical coal based thermal power plant. Project: - Udupi power corporation ltd(2*600MW), Anpara power (2*600MW), Amarkanthak power(2*660MW). Current project:- MBPIL (2*600MW) Duration:-June 2010 – july 2016. Role: - Engineer. Responsibility:-Testing, Commissioning and Maintenance of HT & LT Switchgear,Generator, Generator Transformer (3*250MVA), Distribution Transformer, HT & LT Drives, Switchyard 400kV. AMRIT KUMARPATTANAIK LIG-134, BRITCOLONY,BHUBANESWAR-751012 MOB-9583336861, 7619686733 EMAIL: - amritpattanaik87@gmail.com Passport no - L3221527 OBJECTIVE PROFESSIONAL QUALIFICATION WORK EXPERIENCE PREVIOUS ORGANIZATION PRESENT ORGANIZATION
  • 2. ROLES IN TESTING AND COMMISSIONING HT & LT Switchgear (0.415kV-11kV)  Testing of equipment and relay setting.  Checking of internal wiring and healthiness of equipment (i.e. CT, PT, Relay, Breaker etc).  Checking of equipment as per diagram.  Testing and commissioning of ELDB and MLDB. HT & LT Drives (0.37kW-11000kW)  Testing of motor (i.e. Megger, Resistance, Differential etc.)  Inspection of HT Drive and verifying its technical specification.  Relay setting as per motor requirement.  Preparation of commissioning checklist and protocol.  Coordinating with erection team for quality work and raising of pending points of HT Drives. Transformer(Generator Tansformer 250MVA*3,UT31MVA)  Testing of transformer(i.e. Tan-delta ,Stability, Differential etc.)  Checking of interpanel wiring of CMB and Main panel.  Testing and commissioning of fans. DistributionTransformer  Testing of transformer(i.e.Stability,Differential etc.)  Checking interpanel wiring of MB.  Relay setting as per transformer requirement. Generator  Scheme checking.  CT wiring of generator protection.  Testing of Generator and Rotor.  SCC & OCC test while rolling of turbine in 3000 rpm. AVR  Testing of AVR.  Checking of the wiring and connection of external cable & feedback cable.  Operating of AVR in Manual & Auto Mode.  Worked in both ABB and TOSHIBA make. Switchyard(400kV)  Testing of equipment of switchyard(SF6 Breaker,Isolator etc).  Loop checking and interpanel wiring checking of relay panel and equipment of switchyard.  Relay testing (i.e. I/O signal). RESPONSIBILITIES
  • 3. ABT(Auto Bus Transfer)  Checking of inter panel wiring of ABT panel.  Checking and termination of cable in switchgear and ABT as per requirement.  Relay setting as per requirement. DC System  Testing and commissioning of 220 v battery charger and bank.  Testing and commissioning of 48v battery charger and bank.  Troubleshooting of DC System.  Commissioning of DC Motor and its panel. DG System  Cheching of AMF panel.  Testing & Commissioning of DG set.  Checking interlocks between DG AMF panel and EMCC. Documents  Modification of control drawing as per site requirement.  Study & Reviewing of Control & protection schemes control/ Logic diagram for various electrical equipment. ROLES IN MAINTENANCE  Maintenance and Troubleshooting of HT/LT Switchgear, transformer.  Checking of Motor protection along with their periodic maintenance.  Maintenance of Battery Charger with battery bank & DC drives.  Maintenance and Troubleshooting of HT/LT Drives.  10 Week training on “Power Plant Familiarization” at NPTI, Neyvelli.  1 Week training on “Electrical Protection System” conducted by ABB.  3 days Standard course on UNITROl-5000 SES product operation and maintenance at ABB, Bangalore.  Undergone 60 days Industrial Training at Hindustan Copper Limited, moubhandar, Jharkhand.  Undergone 30 days training in Transmission and Distribution in OPTCL, Bhubaneswar. v  AUTO CAD  C/C++  MS Office/Outlook COMPUTER SKILLS TRAINING AND CERTIFICATION
  • 4. FATHER NAME: - ANIL KUMAR PATTANAIK MOTHER NAME: - ANGURBALA PATTANAIK DATE OF BIRTH: - 31/03/1987 GENDER:- MALE LANGUAGE: - ENGLISH, HINDI, ODIYA I hereby declare that the information furnished above is true to the best of my knowledge. AMRIT KUMAR PATTANAIK PERSONAL DETAILS DECLARATION