3. Situation
• CSU Cleaning lady
• Cost saving VS quality
• Costs at the moment
Floor No. Square Costs m2/year Total
meters
Concrete coating 1390,53 0,95 € 1.321
Parquet 2468,23 0,95 € 2.345
total 3858,76 € 3.666
4. Desired situation
• Be innovative by using robots
• Keeping in mind the quality level
- VSR quality system
- Dagelijks kontrole systeem (DKS), Daily Control system
5. Market
Domestic robots
- Fast growing
- A lot of offers
- Price reduction
Industrial robots
- Slow growing market
- Not a lot of offers
- High investment
6. Toekomst
- Robot gespecialiseerd in kantoorruimte
- Combinatie tussen industrieel en huishoudelijk
- Flexibel en snel