JIT
Just in Time Production
1
Arunnima B S
July 2013
Contents
 JIT – Intro
 Origin of JIT
 JIT Concepts
 Kanban
 Benefits & Limitations
 Trends
2
Just-in-time Production
JIT
Right
items
Right
quantity
Right
quality
Right
place
Right
time
3
 A Japanese management philosophy,
applied in manufacturing which involves
production of the right items of the right
quantity and quality, at the right place and
right time.
 A philosophy of manufacturing based on
planned elimination of all waste and on
continuous improvement of productivity.
 A special manufacturing methodology that
seeks to make all production processes more
efficient .
Origin of JIT
 Initiated by Taiichi Ohno of Toyota shortly after World
War II
 Idea taken from American Supermarket operations
o Customers pulled items from shelf to their shopping carts
o Shelves became empty as customers pulled items
o Empty space signaled refilling of items in the shelf
o When item quantities became low, it signaled to order more from suppliers
 Applied the same logic to manufacturing
o Parts were pulled through the plant as per usage
o Machines were kept closer to reduce movement
o Usage of parts were determined by production rates
4
Two important concepts…
“Waste” & “Pull System”
 WASTE
Waste is ‘anything other than the minimum amount of equipment,
materials, parts, space, and worker’s time, which are absolutely
essential to add value to the product.’
— Shoichiro Toyoda, Former Chairman, Toyota
Anything that does not add value can be considered as a waste
5
 Waste arising
 from overproducing
 from waiting time
 from transport
 from unnecessary stock on hand
 from producing defective goods
 from the underutilization of talent
Two important concepts…
 Push System & Pull System
 Push System
o Pre defined quantity of materials are pushed to the assembly line
o Production initiated based on demand forecast
o Used in traditional manufacturing process
 Pull System
o Materials are pulled as and when required for the manufacturing process
o Production initiated based on customer order
o Used in JIT process
6
“Waste” & “Pull System”
Crux of JIT
 Reduce inventory , Expose problems
 Deliberately create some disturbances to uncover
problem areas
 Solve problems , eliminate waste and increase efficiency
 Continuous improvement
7
8
Less material, labor, indirect costs & better quality
Less
Inventory
Less Material
waste
Fewer
rework
High quality
finished goods
Less Indirect
costs
Lot size
reductions
Scrap/qualit
y control
JIT
production
Smoother
output rates
Heightened awareness of
problems and causes
Faster
feedback
Reduced buffer
inventories
Deliberate
withdrawal of
buffer inventories
Ideas for
cutting lot
sizes
Ideas for
improving
JIT delivery
Ideas for
controlling
defects
JIT Logic and beneficial effects on
manufacturing systems
Building blocks
9
Product
Design
Process
Design
Personnel
Elements
Manufactur-
ing Planning
Eliminate disruptions
Make the system flexible
Reduce setup
and lead times
Eliminate waste
Minimize inventories
A
balanced
rapid flow
Ultimate Goal
Supporting Goals
Building Blocks
Characteristics of JIT
 Lower inventory levels
 Small Lot Size
 Reducing travel distance [Cellular Manufacturing]
 Eliminate waste & defects
 High quality levels
 Standardization
 Continuous improvement
 Applicable primarily for repetitive operations
10
Kanban as Control Tool
 Kanban is most widely used JIT technique
 Kanban – Japanese word – meaning signal or card
 A signal or a card indicating the quantity to be
pulled or the quantity to be produced by a process
 No production or movement of material between
processes without Kanban
 Results
 Prevents overproduction and excess transport
 Exposes problems, reduces inventory and eliminates waste from
the system
11
Implementations
Toyota
 As part of continuous improvements in Toyota, employees were encouraged
to provide improvement suggestions
 An average of 10 improvement suggestions per employee per year
 Over 99% of suggestions were improved
Harley Davidson
 Inventory levels decreased by 75%
 Increased productivity
 Process problems could no longer be hidden by costly inventory that helped
meet the shipment dates. The inefficiencies in processes could be easily
identified and solved
12
Dell Intel Motorola
General Electric AT&T Xerox
Benefits
 Company
 More efficient production process - Higher productivity
 Eliminating waste, lower inventory levels, lesser defects, lesser space - Enhanced
profitability
 Makes the process flexible by making the environment function by matching actual
demand
 Greater visibility to problems , can plan better
 Employees
 Constant flow of work
 No idle time, no unnecessary stress for employees as work is predictable
 Customers
 Higher quality products at lower prices
13
Limitations /Challenges
 Requires co-operation from employees
 Special training and reorganization of policies and
procedures
 Involves high setup costs
 Assumes that sources of supply are reliable and
dependable at all times, which may not be the
case
 Suppliers may resist to deliver as per JIT requirements
14
Trends
15
JIT in Construction
JIT in Financial Services
16
When is the best time to have an inventory
part ready for production?
Just in time.
When is the best time to have an item ready
for the next step in production?
Just in time.
When is the best time to have a product
ready for delivery to a customer?
Just in time.
Why do manufacturers build inventory of both
finished goods and raw materials?
Just in case!
17
References
 http://www.toyota-
global.com/company/vision_philosophy/toyota_production_system/just-in-
time.html
 http://www.tutorialspoint.com/management_concepts/just_in_time_manufac
turing.htm
 http://www.mindtools.com/pages/article/newSTR_78.htm
 JIT MANUFACTURING: WORKING TO DELIVER QUALITY AT THE RIGHT TIME, ALL
OF THE TIME, By Bryan Sparks, School of Technology , Eastern Illinois University
 Application of Just-In-Time Principles to Financial Services, By Olga Manou,
University of the Aegean
18

More Related Content

What's hot (20)

Lean manufacturing
Lean manufacturingLean manufacturing
Lean manufacturing
 
Presentation on Just in Time
Presentation on Just in TimePresentation on Just in Time
Presentation on Just in Time
 
JIT- JUST IN TIME PPT
JIT- JUST IN TIME PPTJIT- JUST IN TIME PPT
JIT- JUST IN TIME PPT
 
Theory of constraints
Theory of constraintsTheory of constraints
Theory of constraints
 
Lean production System - TPS
Lean production System - TPSLean production System - TPS
Lean production System - TPS
 
Just in time (JIT).
Just in time (JIT).Just in time (JIT).
Just in time (JIT).
 
Just In Time - JIT
Just In Time - JITJust In Time - JIT
Just In Time - JIT
 
Lean presentation ppt
Lean presentation pptLean presentation ppt
Lean presentation ppt
 
Lean Manufacturing PowerPoint Presentation Sample
Lean Manufacturing PowerPoint Presentation SampleLean Manufacturing PowerPoint Presentation Sample
Lean Manufacturing PowerPoint Presentation Sample
 
Lean Manufacturing
Lean ManufacturingLean Manufacturing
Lean Manufacturing
 
JIT case study of Toyota
JIT case study of ToyotaJIT case study of Toyota
JIT case study of Toyota
 
Lean manufacturing basics
Lean manufacturing basicsLean manufacturing basics
Lean manufacturing basics
 
Lean manufacturing
Lean manufacturing Lean manufacturing
Lean manufacturing
 
Just in time
Just in timeJust in time
Just in time
 
Lean manufacturing ppt
Lean manufacturing pptLean manufacturing ppt
Lean manufacturing ppt
 
Lean Manufacturing - An Overview
Lean Manufacturing - An OverviewLean Manufacturing - An Overview
Lean Manufacturing - An Overview
 
Just in time (jit) and lean production
Just in time (jit) and lean productionJust in time (jit) and lean production
Just in time (jit) and lean production
 
JIT inventory
JIT inventoryJIT inventory
JIT inventory
 
Toyota production system
Toyota production systemToyota production system
Toyota production system
 
Lean Manufacturing Training
Lean Manufacturing TrainingLean Manufacturing Training
Lean Manufacturing Training
 

Viewers also liked (7)

Ppp8 Glassy State And Glass Transition Temperature
Ppp8 Glassy State And Glass Transition TemperaturePpp8 Glassy State And Glass Transition Temperature
Ppp8 Glassy State And Glass Transition Temperature
 
Production Process of T-Shirt
Production Process of T-ShirtProduction Process of T-Shirt
Production Process of T-Shirt
 
Mrp, mrp 2 n bpr
Mrp, mrp 2 n bprMrp, mrp 2 n bpr
Mrp, mrp 2 n bpr
 
MRP, MRP2 and ERP system in supply chain
MRP, MRP2 and ERP system in supply chainMRP, MRP2 and ERP system in supply chain
MRP, MRP2 and ERP system in supply chain
 
Master scheduling
Master schedulingMaster scheduling
Master scheduling
 
Just In Time (JIT) Systems
Just In Time (JIT) SystemsJust In Time (JIT) Systems
Just In Time (JIT) Systems
 
Master production schedule
Master production scheduleMaster production schedule
Master production schedule
 

Similar to Just In Time Production (JIT)

Lean manufacturing presentation in pharmaceuticals industry
Lean manufacturing presentation in pharmaceuticals industryLean manufacturing presentation in pharmaceuticals industry
Lean manufacturing presentation in pharmaceuticals industrypraaditya2020
 
Just In Time
Just In TimeJust In Time
Just In Timedvyvjy
 
Lean production and jit
Lean production and jitLean production and jit
Lean production and jitKusum Parmar
 
Lean - PPT (Lean manufacturing and six sigma)
Lean - PPT (Lean manufacturing and six sigma)Lean - PPT (Lean manufacturing and six sigma)
Lean - PPT (Lean manufacturing and six sigma)Blankdevil
 
Session 8
Session 8Session 8
Session 8thangv
 
Session 8_OM
Session 8_OMSession 8_OM
Session 8_OMthangv
 
Lean_Manufacturing___Just-in-Time.ppt
Lean_Manufacturing___Just-in-Time.pptLean_Manufacturing___Just-in-Time.ppt
Lean_Manufacturing___Just-in-Time.pptrahul368457
 
The Practice of `Just-in-Time' Production Model in Toyota Automobile Company ...
The Practice of `Just-in-Time' Production Model in Toyota Automobile Company ...The Practice of `Just-in-Time' Production Model in Toyota Automobile Company ...
The Practice of `Just-in-Time' Production Model in Toyota Automobile Company ...Md.Nazrul Islam
 
15 lean mfg toyota production system (1)
15 lean mfg toyota production system (1)15 lean mfg toyota production system (1)
15 lean mfg toyota production system (1)Ashima Kandari
 
37020766 jit-and-lean-manufacturing-by-sashi-prabhu
37020766 jit-and-lean-manufacturing-by-sashi-prabhu37020766 jit-and-lean-manufacturing-by-sashi-prabhu
37020766 jit-and-lean-manufacturing-by-sashi-prabhusashi prabhu
 
37020766 jit-and-lean-manufacturing-by-sashi-prabhu
37020766 jit-and-lean-manufacturing-by-sashi-prabhu37020766 jit-and-lean-manufacturing-by-sashi-prabhu
37020766 jit-and-lean-manufacturing-by-sashi-prabhusashi prabhu
 

Similar to Just In Time Production (JIT) (20)

LEAN MANUFACTURING USES
LEAN MANUFACTURING USESLEAN MANUFACTURING USES
LEAN MANUFACTURING USES
 
Just in Time (JIT)
Just in Time (JIT)Just in Time (JIT)
Just in Time (JIT)
 
Chapter.1 just in time
Chapter.1 just in timeChapter.1 just in time
Chapter.1 just in time
 
Lean manufacturing presentation in pharmaceuticals industry
Lean manufacturing presentation in pharmaceuticals industryLean manufacturing presentation in pharmaceuticals industry
Lean manufacturing presentation in pharmaceuticals industry
 
Just In Time
Just In TimeJust In Time
Just In Time
 
Lean production and jit
Lean production and jitLean production and jit
Lean production and jit
 
Lean - PPT (Lean manufacturing and six sigma)
Lean - PPT (Lean manufacturing and six sigma)Lean - PPT (Lean manufacturing and six sigma)
Lean - PPT (Lean manufacturing and six sigma)
 
Jit And Lean
Jit And LeanJit And Lean
Jit And Lean
 
Session 8
Session 8Session 8
Session 8
 
Session 8_OM
Session 8_OMSession 8_OM
Session 8_OM
 
Just in time
Just in timeJust in time
Just in time
 
Lean_Manufacturing___Just-in-Time.ppt
Lean_Manufacturing___Just-in-Time.pptLean_Manufacturing___Just-in-Time.ppt
Lean_Manufacturing___Just-in-Time.ppt
 
The Practice of `Just-in-Time' Production Model in Toyota Automobile Company ...
The Practice of `Just-in-Time' Production Model in Toyota Automobile Company ...The Practice of `Just-in-Time' Production Model in Toyota Automobile Company ...
The Practice of `Just-in-Time' Production Model in Toyota Automobile Company ...
 
15 lean mfg toyota production system (1)
15 lean mfg toyota production system (1)15 lean mfg toyota production system (1)
15 lean mfg toyota production system (1)
 
37020766 jit-and-lean-manufacturing-by-sashi-prabhu
37020766 jit-and-lean-manufacturing-by-sashi-prabhu37020766 jit-and-lean-manufacturing-by-sashi-prabhu
37020766 jit-and-lean-manufacturing-by-sashi-prabhu
 
37020766 jit-and-lean-manufacturing-by-sashi-prabhu
37020766 jit-and-lean-manufacturing-by-sashi-prabhu37020766 jit-and-lean-manufacturing-by-sashi-prabhu
37020766 jit-and-lean-manufacturing-by-sashi-prabhu
 
just in time
just in timejust in time
just in time
 
Production methods
Production methodsProduction methods
Production methods
 
Lean manufacturing
Lean manufacturingLean manufacturing
Lean manufacturing
 
Just-In-Time
Just-In-TimeJust-In-Time
Just-In-Time
 

Recently uploaded

internship thesis pakistan aeronautical complex kamra
internship thesis pakistan aeronautical complex kamrainternship thesis pakistan aeronautical complex kamra
internship thesis pakistan aeronautical complex kamraAllTops
 
Persuasive and Communication is the art of negotiation.
Persuasive and Communication is the art of negotiation.Persuasive and Communication is the art of negotiation.
Persuasive and Communication is the art of negotiation.aruny7087
 
W.H.Bender Quote 62 - Always strive to be a Hospitality Service professional
W.H.Bender Quote 62 - Always strive to be a Hospitality Service professionalW.H.Bender Quote 62 - Always strive to be a Hospitality Service professional
W.H.Bender Quote 62 - Always strive to be a Hospitality Service professionalWilliam (Bill) H. Bender, FCSI
 
International Ocean Transportation p.pdf
International Ocean Transportation p.pdfInternational Ocean Transportation p.pdf
International Ocean Transportation p.pdfAlejandromexEspino
 
Information Technology Project Management, Revised 7th edition test bank.docx
Information Technology Project Management, Revised 7th edition test bank.docxInformation Technology Project Management, Revised 7th edition test bank.docx
Information Technology Project Management, Revised 7th edition test bank.docxssuserf63bd7
 
Marketing Management 16th edition by Philip Kotler test bank.docx
Marketing Management 16th edition by Philip Kotler test bank.docxMarketing Management 16th edition by Philip Kotler test bank.docx
Marketing Management 16th edition by Philip Kotler test bank.docxssuserf63bd7
 
Siliguri Escorts Service Girl ^ 9332606886, WhatsApp Anytime Siliguri
Siliguri Escorts Service Girl ^ 9332606886, WhatsApp Anytime SiliguriSiliguri Escorts Service Girl ^ 9332606886, WhatsApp Anytime Siliguri
Siliguri Escorts Service Girl ^ 9332606886, WhatsApp Anytime Siligurimeghakumariji156
 
The Psychology Of Motivation - Richard Brown
The Psychology Of Motivation - Richard BrownThe Psychology Of Motivation - Richard Brown
The Psychology Of Motivation - Richard BrownSandaliGurusinghe2
 
digital Human resource management presentation.pdf
digital Human resource management presentation.pdfdigital Human resource management presentation.pdf
digital Human resource management presentation.pdfArtiSrivastava23
 
Gautam Buddh Nagar Call Girls 🥰 8617370543 Service Offer VIP Hot Model
Gautam Buddh Nagar Call Girls 🥰 8617370543 Service Offer VIP Hot ModelGautam Buddh Nagar Call Girls 🥰 8617370543 Service Offer VIP Hot Model
Gautam Buddh Nagar Call Girls 🥰 8617370543 Service Offer VIP Hot ModelNitya salvi
 
How Software Developers Destroy Business Value.pptx
How Software Developers Destroy Business Value.pptxHow Software Developers Destroy Business Value.pptx
How Software Developers Destroy Business Value.pptxAaron Stannard
 
Safety T fire missions army field Artillery
Safety T fire missions army field ArtillerySafety T fire missions army field Artillery
Safety T fire missions army field ArtilleryKennethSwanberg
 
Beyond the Codes_Repositioning towards sustainable development
Beyond the Codes_Repositioning towards sustainable developmentBeyond the Codes_Repositioning towards sustainable development
Beyond the Codes_Repositioning towards sustainable developmentNimot Muili
 

Recently uploaded (14)

internship thesis pakistan aeronautical complex kamra
internship thesis pakistan aeronautical complex kamrainternship thesis pakistan aeronautical complex kamra
internship thesis pakistan aeronautical complex kamra
 
Abortion pills in Jeddah |• +966572737505 ] GET CYTOTEC
Abortion pills in Jeddah |• +966572737505 ] GET CYTOTECAbortion pills in Jeddah |• +966572737505 ] GET CYTOTEC
Abortion pills in Jeddah |• +966572737505 ] GET CYTOTEC
 
Persuasive and Communication is the art of negotiation.
Persuasive and Communication is the art of negotiation.Persuasive and Communication is the art of negotiation.
Persuasive and Communication is the art of negotiation.
 
W.H.Bender Quote 62 - Always strive to be a Hospitality Service professional
W.H.Bender Quote 62 - Always strive to be a Hospitality Service professionalW.H.Bender Quote 62 - Always strive to be a Hospitality Service professional
W.H.Bender Quote 62 - Always strive to be a Hospitality Service professional
 
International Ocean Transportation p.pdf
International Ocean Transportation p.pdfInternational Ocean Transportation p.pdf
International Ocean Transportation p.pdf
 
Information Technology Project Management, Revised 7th edition test bank.docx
Information Technology Project Management, Revised 7th edition test bank.docxInformation Technology Project Management, Revised 7th edition test bank.docx
Information Technology Project Management, Revised 7th edition test bank.docx
 
Marketing Management 16th edition by Philip Kotler test bank.docx
Marketing Management 16th edition by Philip Kotler test bank.docxMarketing Management 16th edition by Philip Kotler test bank.docx
Marketing Management 16th edition by Philip Kotler test bank.docx
 
Siliguri Escorts Service Girl ^ 9332606886, WhatsApp Anytime Siliguri
Siliguri Escorts Service Girl ^ 9332606886, WhatsApp Anytime SiliguriSiliguri Escorts Service Girl ^ 9332606886, WhatsApp Anytime Siliguri
Siliguri Escorts Service Girl ^ 9332606886, WhatsApp Anytime Siliguri
 
The Psychology Of Motivation - Richard Brown
The Psychology Of Motivation - Richard BrownThe Psychology Of Motivation - Richard Brown
The Psychology Of Motivation - Richard Brown
 
digital Human resource management presentation.pdf
digital Human resource management presentation.pdfdigital Human resource management presentation.pdf
digital Human resource management presentation.pdf
 
Gautam Buddh Nagar Call Girls 🥰 8617370543 Service Offer VIP Hot Model
Gautam Buddh Nagar Call Girls 🥰 8617370543 Service Offer VIP Hot ModelGautam Buddh Nagar Call Girls 🥰 8617370543 Service Offer VIP Hot Model
Gautam Buddh Nagar Call Girls 🥰 8617370543 Service Offer VIP Hot Model
 
How Software Developers Destroy Business Value.pptx
How Software Developers Destroy Business Value.pptxHow Software Developers Destroy Business Value.pptx
How Software Developers Destroy Business Value.pptx
 
Safety T fire missions army field Artillery
Safety T fire missions army field ArtillerySafety T fire missions army field Artillery
Safety T fire missions army field Artillery
 
Beyond the Codes_Repositioning towards sustainable development
Beyond the Codes_Repositioning towards sustainable developmentBeyond the Codes_Repositioning towards sustainable development
Beyond the Codes_Repositioning towards sustainable development
 

Just In Time Production (JIT)

  • 1. JIT Just in Time Production 1 Arunnima B S July 2013
  • 2. Contents  JIT – Intro  Origin of JIT  JIT Concepts  Kanban  Benefits & Limitations  Trends 2
  • 3. Just-in-time Production JIT Right items Right quantity Right quality Right place Right time 3  A Japanese management philosophy, applied in manufacturing which involves production of the right items of the right quantity and quality, at the right place and right time.  A philosophy of manufacturing based on planned elimination of all waste and on continuous improvement of productivity.  A special manufacturing methodology that seeks to make all production processes more efficient .
  • 4. Origin of JIT  Initiated by Taiichi Ohno of Toyota shortly after World War II  Idea taken from American Supermarket operations o Customers pulled items from shelf to their shopping carts o Shelves became empty as customers pulled items o Empty space signaled refilling of items in the shelf o When item quantities became low, it signaled to order more from suppliers  Applied the same logic to manufacturing o Parts were pulled through the plant as per usage o Machines were kept closer to reduce movement o Usage of parts were determined by production rates 4
  • 5. Two important concepts… “Waste” & “Pull System”  WASTE Waste is ‘anything other than the minimum amount of equipment, materials, parts, space, and worker’s time, which are absolutely essential to add value to the product.’ — Shoichiro Toyoda, Former Chairman, Toyota Anything that does not add value can be considered as a waste 5  Waste arising  from overproducing  from waiting time  from transport  from unnecessary stock on hand  from producing defective goods  from the underutilization of talent
  • 6. Two important concepts…  Push System & Pull System  Push System o Pre defined quantity of materials are pushed to the assembly line o Production initiated based on demand forecast o Used in traditional manufacturing process  Pull System o Materials are pulled as and when required for the manufacturing process o Production initiated based on customer order o Used in JIT process 6 “Waste” & “Pull System”
  • 7. Crux of JIT  Reduce inventory , Expose problems  Deliberately create some disturbances to uncover problem areas  Solve problems , eliminate waste and increase efficiency  Continuous improvement 7
  • 8. 8 Less material, labor, indirect costs & better quality Less Inventory Less Material waste Fewer rework High quality finished goods Less Indirect costs Lot size reductions Scrap/qualit y control JIT production Smoother output rates Heightened awareness of problems and causes Faster feedback Reduced buffer inventories Deliberate withdrawal of buffer inventories Ideas for cutting lot sizes Ideas for improving JIT delivery Ideas for controlling defects JIT Logic and beneficial effects on manufacturing systems
  • 9. Building blocks 9 Product Design Process Design Personnel Elements Manufactur- ing Planning Eliminate disruptions Make the system flexible Reduce setup and lead times Eliminate waste Minimize inventories A balanced rapid flow Ultimate Goal Supporting Goals Building Blocks
  • 10. Characteristics of JIT  Lower inventory levels  Small Lot Size  Reducing travel distance [Cellular Manufacturing]  Eliminate waste & defects  High quality levels  Standardization  Continuous improvement  Applicable primarily for repetitive operations 10
  • 11. Kanban as Control Tool  Kanban is most widely used JIT technique  Kanban – Japanese word – meaning signal or card  A signal or a card indicating the quantity to be pulled or the quantity to be produced by a process  No production or movement of material between processes without Kanban  Results  Prevents overproduction and excess transport  Exposes problems, reduces inventory and eliminates waste from the system 11
  • 12. Implementations Toyota  As part of continuous improvements in Toyota, employees were encouraged to provide improvement suggestions  An average of 10 improvement suggestions per employee per year  Over 99% of suggestions were improved Harley Davidson  Inventory levels decreased by 75%  Increased productivity  Process problems could no longer be hidden by costly inventory that helped meet the shipment dates. The inefficiencies in processes could be easily identified and solved 12 Dell Intel Motorola General Electric AT&T Xerox
  • 13. Benefits  Company  More efficient production process - Higher productivity  Eliminating waste, lower inventory levels, lesser defects, lesser space - Enhanced profitability  Makes the process flexible by making the environment function by matching actual demand  Greater visibility to problems , can plan better  Employees  Constant flow of work  No idle time, no unnecessary stress for employees as work is predictable  Customers  Higher quality products at lower prices 13
  • 14. Limitations /Challenges  Requires co-operation from employees  Special training and reorganization of policies and procedures  Involves high setup costs  Assumes that sources of supply are reliable and dependable at all times, which may not be the case  Suppliers may resist to deliver as per JIT requirements 14
  • 15. Trends 15 JIT in Construction JIT in Financial Services
  • 16. 16 When is the best time to have an inventory part ready for production? Just in time. When is the best time to have an item ready for the next step in production? Just in time. When is the best time to have a product ready for delivery to a customer? Just in time. Why do manufacturers build inventory of both finished goods and raw materials? Just in case!
  • 17. 17
  • 18. References  http://www.toyota- global.com/company/vision_philosophy/toyota_production_system/just-in- time.html  http://www.tutorialspoint.com/management_concepts/just_in_time_manufac turing.htm  http://www.mindtools.com/pages/article/newSTR_78.htm  JIT MANUFACTURING: WORKING TO DELIVER QUALITY AT THE RIGHT TIME, ALL OF THE TIME, By Bryan Sparks, School of Technology , Eastern Illinois University  Application of Just-In-Time Principles to Financial Services, By Olga Manou, University of the Aegean 18

Editor's Notes

  1. 27th July 2013
  2. As implemented in the Toyota Production System, a kanban is a card that is attached to a storage and transport container.  It identifies the part number and container capacity, along with other information, and is used to provide an easily understood, visual signal that a specific activity is required. In Toyota’s dual-card kanban system, there are two main types of kanban: 1. Production Kanban: signals the need to produce more parts 2. Withdrawal Kanban (also called a "move" or a "conveyance” kanban): signals the need to withdraw parts from one work center and deliver them to the next work center.
  3. JIT Health Information Systems – Personalized content delivery without search