BOX
PUSHING
TECHNIQUE
CONVENTIONAL METHOD
Demerits
• Increased time for execution
• Interruption in traffic
• Cost factor was high
Open cut system
• Excavation
• Placing
• Covering
Visit www.seminarlinks.blogspot.com to download
NEED FOR THE ALTERNATIVE
• Present day Intensity of Traffic, both Rail & Road due to the
fast development, is very heavy it cannot the disturbed, for
construction of under bridges or Canal Crossings, drainage
etc by conventional i.e. open cut system.
• Box Pushing Technique is developed where in R.C.C. Boxes
in segments are cast out side and pushed through the heavy
embankments of Rail or Road by Jacking.
METHODOLOGY
• Excavation
• Casting of Thrust Bed
• Fabrication of Front and Rear shield
• Box Casting and placing
• Pushing-shifting-pushing operation
• Miscellaneous works
• Precautions
Excavation and casting of thrust bed
Open excavation is carried out for construction of Thrust bed
Thrust bed
• The Thrustbed and Thrust Beam and keys are designed in R.C.C. to
resist the required Thrust extorted by Jacking force and transfer it to
soil at bottom and sides.
• In cohesive soils even shallow piles are required to transfer the load.
• Provision for Jacking supports is made by providing suitable Pockets
in the bed to accommodate pin supports.
• On completion of Jacking the thrust bed is utilised as floor bed, and so
it is left in place.
Box Casting And Pushing
• The RCC Box is cast in segments
of convenient lengths of Total
pushing length.
• The Box section is designed as per
IRS / IRC codes of practice for
loading. Concrete grade normally
kept as M-35.
Front Cutting Shield & Rear Jacking Shield
• The First Segment of the precast box is provided with a specially
designed structure named as cutting shield which forms the front
working face with a cutting edge fabricated from 16 to 20 mm thick M.S.
Plates and housed on RCC Box section with suitable anchor bolts.
• Necessary strengthening is provided by stiffeners and face plates of Box
in front on completion of jacking the outer shell of the shield is cut and
removed
• The Rear Jacking shield is provided by anchoring steel plate on the
face of Bottom slab of RCC Box suitably designed to distribute the
jacking load uniformly on concrete area.
Fabrication of Front Shield
It is fabricated for cutting action and to provide support , to prevent caving in of soil.
Fabrication of Rear Shield
It is provided by anchoring steel plates on the face of bottom slab of
RCC box to suitably distribute the jacking load.
Intermediate Jacking Station
• As total length of Box is cast in Segments, each segment is
pushed turn by turn with necessary jacking force and so for this
necessary intermediate jacking stations are provided, with jacking
pockets in bed & walls.
Pushing Operation of the Box
• The purpose of pushing of Box is to form a horizontal opening below ground or
through embankments, can say a tunnel, by providing precast box units
underground or an embankment, without disturbing the overhead amenities, like
traffic & structures.
• To reduce the frictional resistance, a thin film of Grease and thick gauge plastic
sheet is provided between the top of the thrustbed & Bottom of the Box.
• This is done before casting of the Bottom slab of the box.
• A Glossy Epoxy layer is also provided to reduce friction on the top and prevent the
disturbance of the mass over box to least during progress of pushing
• Where mass of embankment is less or the soil is of poor quality, drag sheet
system is also considered for least resistance of friction and disturbance of mass
above box.
• Auxiliary beds are also provided for casting of the other segments with thin
film of grease and plastic and segments are then brought in alignment of
pushing as and when required as pushing progresses.
• With the progress of jacking, the front unit with shield penetrates into
the embankment and there after excavation within the shield is done
either manually or mechanically and the excavated stuff is transported
outside the working area.
• After the first segment advances to the end of the thrustbed, the second
segment is brought in alignment of the front Box & intermediate jacking
space is lift between the two.
• The progress of pushing is kept continuous and the system of side shifting of
remaining box segments from Auxiliary bed and bring in pushing alignment is
adopted till total length is pushed.
Hydraulic Equipment
• The entire Box Pushing system is matter of proper selection of Hydraulic
equipment, as tremendous driving force is required for pushing of medium to
large size of Boxes.
• So for this, Number of Jack units are provided in series for distribution of
pushing load evenly on the face of the concrete, and all Jacks are operated
simultaneously with a common power pack, which supplies uniform flow of
pressure through network of Hydraulic pipes of required pressure capacity,
commencing from front unit to rear unit. Jacking force is applied in sequence.
• This way pushing cycles are repeated till total pushing is completed.
Precautions
• Cutting edge of front shield is
fabricated with adequate
thickness of steel plate and the
front edges of the steel plate are
sharpened to facilitate
penetration into the soil.
• To prevent caving of earth
during excavation quantity of
earth shall be removed to barest
minimum duly following the slop
of cutting edge.
• Guide channels to be provided in the
thrust bed to guide the segments to
ensure straight alignment
• The level of the boxes should be
continuously checked.
• The Speed limit should be set to 20 km/h
at the site of construction
• The work should be stopped when a train
is passing over the work.
Conclusion
The entire system is purely technical, dependent on Hydraulic system, &
safest method of crossing underground / Embankment, without
disturbing overhead traffic / structures for R.U.B., Canal siphon and
other drainage crossings.
Visit www.seminarlinks.blogspot.com to download
Photo Gallery
Box Pushing Technique
Box Pushing Technique
Thank YouVisit www.seminarlinks.blogspot.com to download

Más contenido relacionado

La actualidad más candente

Prestressed concrete
Prestressed concretePrestressed concrete
Prestressed concreteUdisha15
 
CABLE ANCHORING AND GROUTING / Diaphragm Walls
CABLE ANCHORING AND GROUTING / Diaphragm Walls CABLE ANCHORING AND GROUTING / Diaphragm Walls
CABLE ANCHORING AND GROUTING / Diaphragm Walls Manvinder Kingra
 
Design & Construction Errors- Building Maintenance and Repairs
Design & Construction Errors- Building Maintenance and Repairs Design & Construction Errors- Building Maintenance and Repairs
Design & Construction Errors- Building Maintenance and Repairs Srishti Wakhloo
 
Construction of residential building summer training ppt
 Construction of residential building summer training ppt Construction of residential building summer training ppt
Construction of residential building summer training pptSumit Singh
 
Self compacting concrete (scc)
Self compacting concrete (scc)Self compacting concrete (scc)
Self compacting concrete (scc)y Sahaja
 
FLEXIBLE And Rigid Pavement
FLEXIBLE And Rigid PavementFLEXIBLE And Rigid Pavement
FLEXIBLE And Rigid PavementKhaliqur Rahman
 
AN INTERNSHIP REPORT ON RESIDENTIAL BUILDING CONSTRUCTION
AN INTERNSHIP  REPORT  ON  RESIDENTIAL  BUILDING  CONSTRUCTIONAN INTERNSHIP  REPORT  ON  RESIDENTIAL  BUILDING  CONSTRUCTION
AN INTERNSHIP REPORT ON RESIDENTIAL BUILDING CONSTRUCTIONAbhishek Singh
 
Prestressed concrete
Prestressed concretePrestressed concrete
Prestressed concreteRajesh Burde
 
Dewatering techniques
Dewatering techniquesDewatering techniques
Dewatering techniquesjamali husain
 
Vibration method for ground improvement technique
Vibration method for ground improvement techniqueVibration method for ground improvement technique
Vibration method for ground improvement techniqueABHISHEK THAKKAE
 
Chapter 3 shallow foundations
Chapter 3 shallow foundationsChapter 3 shallow foundations
Chapter 3 shallow foundationsKHUSHBU SHAH
 

La actualidad más candente (20)

Construction of diaphragm wall
Construction of diaphragm wallConstruction of diaphragm wall
Construction of diaphragm wall
 
Prestressed concrete
Prestressed concretePrestressed concrete
Prestressed concrete
 
CABLE ANCHORING AND GROUTING / Diaphragm Walls
CABLE ANCHORING AND GROUTING / Diaphragm Walls CABLE ANCHORING AND GROUTING / Diaphragm Walls
CABLE ANCHORING AND GROUTING / Diaphragm Walls
 
Reinforced soil
Reinforced soilReinforced soil
Reinforced soil
 
Design & Construction Errors- Building Maintenance and Repairs
Design & Construction Errors- Building Maintenance and Repairs Design & Construction Errors- Building Maintenance and Repairs
Design & Construction Errors- Building Maintenance and Repairs
 
Design of rigid pavements
Design of rigid pavementsDesign of rigid pavements
Design of rigid pavements
 
Construction of residential building summer training ppt
 Construction of residential building summer training ppt Construction of residential building summer training ppt
Construction of residential building summer training ppt
 
Self compacting concrete (scc)
Self compacting concrete (scc)Self compacting concrete (scc)
Self compacting concrete (scc)
 
Retaining wall
 Retaining wall  Retaining wall
Retaining wall
 
FLEXIBLE And Rigid Pavement
FLEXIBLE And Rigid PavementFLEXIBLE And Rigid Pavement
FLEXIBLE And Rigid Pavement
 
AN INTERNSHIP REPORT ON RESIDENTIAL BUILDING CONSTRUCTION
AN INTERNSHIP  REPORT  ON  RESIDENTIAL  BUILDING  CONSTRUCTIONAN INTERNSHIP  REPORT  ON  RESIDENTIAL  BUILDING  CONSTRUCTION
AN INTERNSHIP REPORT ON RESIDENTIAL BUILDING CONSTRUCTION
 
Prestressed concrete
Prestressed concretePrestressed concrete
Prestressed concrete
 
Dewatering techniques
Dewatering techniquesDewatering techniques
Dewatering techniques
 
Bridge report
Bridge reportBridge report
Bridge report
 
Placing of concrete
Placing of concretePlacing of concrete
Placing of concrete
 
Shotcrete
ShotcreteShotcrete
Shotcrete
 
Vibration method for ground improvement technique
Vibration method for ground improvement techniqueVibration method for ground improvement technique
Vibration method for ground improvement technique
 
Chapter 3 shallow foundations
Chapter 3 shallow foundationsChapter 3 shallow foundations
Chapter 3 shallow foundations
 
Concrete repair
Concrete repairConcrete repair
Concrete repair
 
Polymer concrete
Polymer concretePolymer concrete
Polymer concrete
 

Similar a Box Pushing Technique

Box Pushing Technology Presentation.pptx
Box Pushing Technology Presentation.pptxBox Pushing Technology Presentation.pptx
Box Pushing Technology Presentation.pptxcharantinku6799
 
Module 1 - Jacking techniques.pptx
Module 1 - Jacking techniques.pptxModule 1 - Jacking techniques.pptx
Module 1 - Jacking techniques.pptxChinnuNinan
 
UMAID IQBAL SEMINAR.pptx
UMAID IQBAL SEMINAR.pptxUMAID IQBAL SEMINAR.pptx
UMAID IQBAL SEMINAR.pptxPraveendubey82
 
Cement Manufacturing Plant Construction
Cement Manufacturing Plant ConstructionCement Manufacturing Plant Construction
Cement Manufacturing Plant ConstructionShyam Anandjiwala
 
Construction portfolio (manvi)
Construction portfolio (manvi)Construction portfolio (manvi)
Construction portfolio (manvi)ManviVarshney2
 
Construction Sequence.pptx
Construction Sequence.pptxConstruction Sequence.pptx
Construction Sequence.pptxssuser480182
 
Box Pushing Technology Presentation.pptx
Box Pushing Technology Presentation.pptxBox Pushing Technology Presentation.pptx
Box Pushing Technology Presentation.pptxpateljatin15
 
Building construction
Building constructionBuilding construction
Building constructionnhmurad
 
ppt on sub structure construction.pptx
ppt on sub structure construction.pptxppt on sub structure construction.pptx
ppt on sub structure construction.pptxRaviUraiya1
 
R22 bunker storage of grains
R22 bunker storage of grainsR22 bunker storage of grains
R22 bunker storage of grainsMaya Sharma
 
EXCAVATION FOR FOUNDATION - Methods & Temporary Earth Retaining Structures
EXCAVATION FOR FOUNDATION - Methods & Temporary Earth Retaining StructuresEXCAVATION FOR FOUNDATION - Methods & Temporary Earth Retaining Structures
EXCAVATION FOR FOUNDATION - Methods & Temporary Earth Retaining StructuresShivananda Roy
 
Asif2 CONSTRUCTION_OF_RIGID_PAVEMENT.pptx
Asif2 CONSTRUCTION_OF_RIGID_PAVEMENT.pptxAsif2 CONSTRUCTION_OF_RIGID_PAVEMENT.pptx
Asif2 CONSTRUCTION_OF_RIGID_PAVEMENT.pptxsfQyoom
 
Construction of well foundation
Construction of well foundation Construction of well foundation
Construction of well foundation dilip patidar
 
MODULE 4 Special Concrete (1).ppt
MODULE 4 Special Concrete (1).pptMODULE 4 Special Concrete (1).ppt
MODULE 4 Special Concrete (1).pptVaibhavSoni742163
 
MODULE 4 Special Concrete (1).ppt
MODULE 4 Special Concrete (1).pptMODULE 4 Special Concrete (1).ppt
MODULE 4 Special Concrete (1).pptHarshKumarEname
 
Road, Culvert & Bridge Training
Road, Culvert & Bridge TrainingRoad, Culvert & Bridge Training
Road, Culvert & Bridge TrainingAbhishek Bharti
 

Similar a Box Pushing Technique (20)

Box Pushing Technology Presentation.pptx
Box Pushing Technology Presentation.pptxBox Pushing Technology Presentation.pptx
Box Pushing Technology Presentation.pptx
 
Module 1 - Jacking techniques.pptx
Module 1 - Jacking techniques.pptxModule 1 - Jacking techniques.pptx
Module 1 - Jacking techniques.pptx
 
UMAID IQBAL SEMINAR.pptx
UMAID IQBAL SEMINAR.pptxUMAID IQBAL SEMINAR.pptx
UMAID IQBAL SEMINAR.pptx
 
Cement Manufacturing Plant Construction
Cement Manufacturing Plant ConstructionCement Manufacturing Plant Construction
Cement Manufacturing Plant Construction
 
Construction portfolio (manvi)
Construction portfolio (manvi)Construction portfolio (manvi)
Construction portfolio (manvi)
 
Lining in tunnels
Lining in tunnelsLining in tunnels
Lining in tunnels
 
Construction Sequence.pptx
Construction Sequence.pptxConstruction Sequence.pptx
Construction Sequence.pptx
 
Box Pushing Technology Presentation.pptx
Box Pushing Technology Presentation.pptxBox Pushing Technology Presentation.pptx
Box Pushing Technology Presentation.pptx
 
Building construction
Building constructionBuilding construction
Building construction
 
Segmental bridge construction
Segmental bridge constructionSegmental bridge construction
Segmental bridge construction
 
Pavements PPT
 Pavements PPT  Pavements PPT
Pavements PPT
 
ppt on sub structure construction.pptx
ppt on sub structure construction.pptxppt on sub structure construction.pptx
ppt on sub structure construction.pptx
 
R22 bunker storage of grains
R22 bunker storage of grainsR22 bunker storage of grains
R22 bunker storage of grains
 
EXCAVATION FOR FOUNDATION - Methods & Temporary Earth Retaining Structures
EXCAVATION FOR FOUNDATION - Methods & Temporary Earth Retaining StructuresEXCAVATION FOR FOUNDATION - Methods & Temporary Earth Retaining Structures
EXCAVATION FOR FOUNDATION - Methods & Temporary Earth Retaining Structures
 
Asif2 CONSTRUCTION_OF_RIGID_PAVEMENT.pptx
Asif2 CONSTRUCTION_OF_RIGID_PAVEMENT.pptxAsif2 CONSTRUCTION_OF_RIGID_PAVEMENT.pptx
Asif2 CONSTRUCTION_OF_RIGID_PAVEMENT.pptx
 
Construction of well foundation
Construction of well foundation Construction of well foundation
Construction of well foundation
 
MODULE 4 Special Concrete (1).ppt
MODULE 4 Special Concrete (1).pptMODULE 4 Special Concrete (1).ppt
MODULE 4 Special Concrete (1).ppt
 
MODULE 4 Special Concrete (1).ppt
MODULE 4 Special Concrete (1).pptMODULE 4 Special Concrete (1).ppt
MODULE 4 Special Concrete (1).ppt
 
Road, Culvert & Bridge Training
Road, Culvert & Bridge TrainingRoad, Culvert & Bridge Training
Road, Culvert & Bridge Training
 
UNIT 1a.pdf
UNIT 1a.pdfUNIT 1a.pdf
UNIT 1a.pdf
 

Más de Seminar Links

Artificial Intelligence (A.I.) in Schools (PPT)
Artificial Intelligence (A.I.) in Schools (PPT)Artificial Intelligence (A.I.) in Schools (PPT)
Artificial Intelligence (A.I.) in Schools (PPT)Seminar Links
 
Sustainable Materials Management (SMM)
Sustainable Materials Management (SMM)Sustainable Materials Management (SMM)
Sustainable Materials Management (SMM)Seminar Links
 
Are Top Grades Enough (PPT)
Are Top Grades Enough (PPT)Are Top Grades Enough (PPT)
Are Top Grades Enough (PPT)Seminar Links
 
AI and Youth Employment (PPT)
AI and Youth Employment (PPT)AI and Youth Employment (PPT)
AI and Youth Employment (PPT)Seminar Links
 
Environmental Impacts of COVID-19 Pandemic: PPT
Environmental Impacts of COVID-19 Pandemic: PPTEnvironmental Impacts of COVID-19 Pandemic: PPT
Environmental Impacts of COVID-19 Pandemic: PPTSeminar Links
 
20 Latest Computer Science Seminar Topics on Emerging Technologies
20 Latest Computer Science Seminar Topics on Emerging Technologies20 Latest Computer Science Seminar Topics on Emerging Technologies
20 Latest Computer Science Seminar Topics on Emerging TechnologiesSeminar Links
 
Claytronics | Programmable Matter | PPT
Claytronics | Programmable Matter | PPTClaytronics | Programmable Matter | PPT
Claytronics | Programmable Matter | PPTSeminar Links
 
Three-dimensional Holographic Projection Technology PPT | 2018
Three-dimensional Holographic Projection Technology PPT | 2018Three-dimensional Holographic Projection Technology PPT | 2018
Three-dimensional Holographic Projection Technology PPT | 2018Seminar Links
 
MicroLED : Latest Display Technology | PPT
MicroLED : Latest Display Technology | PPTMicroLED : Latest Display Technology | PPT
MicroLED : Latest Display Technology | PPTSeminar Links
 
Performance of 400 kV line insulators under pollution | PDF | DOC | PPT
Performance of 400 kV line insulators under pollution | PDF | DOC | PPTPerformance of 400 kV line insulators under pollution | PDF | DOC | PPT
Performance of 400 kV line insulators under pollution | PDF | DOC | PPTSeminar Links
 
Highest Largest Tallest Longest in India 2018
Highest Largest Tallest Longest in India 2018Highest Largest Tallest Longest in India 2018
Highest Largest Tallest Longest in India 2018Seminar Links
 
Atmospheric Vortex Engine (AVE)
Atmospheric Vortex Engine (AVE) Atmospheric Vortex Engine (AVE)
Atmospheric Vortex Engine (AVE) Seminar Links
 
Artificial photosynthesis PPT
Artificial photosynthesis PPTArtificial photosynthesis PPT
Artificial photosynthesis PPTSeminar Links
 
How to prevent WannaCry Ransomware
How to prevent WannaCry RansomwareHow to prevent WannaCry Ransomware
How to prevent WannaCry RansomwareSeminar Links
 
Babbitt material ppt
Babbitt material pptBabbitt material ppt
Babbitt material pptSeminar Links
 
Carbon Foam Military Applications
Carbon Foam Military ApplicationsCarbon Foam Military Applications
Carbon Foam Military ApplicationsSeminar Links
 
Future challenges in computer science
Future challenges in computer scienceFuture challenges in computer science
Future challenges in computer scienceSeminar Links
 

Más de Seminar Links (20)

Artificial Intelligence (A.I.) in Schools (PPT)
Artificial Intelligence (A.I.) in Schools (PPT)Artificial Intelligence (A.I.) in Schools (PPT)
Artificial Intelligence (A.I.) in Schools (PPT)
 
Sustainable Materials Management (SMM)
Sustainable Materials Management (SMM)Sustainable Materials Management (SMM)
Sustainable Materials Management (SMM)
 
Are Top Grades Enough (PPT)
Are Top Grades Enough (PPT)Are Top Grades Enough (PPT)
Are Top Grades Enough (PPT)
 
AI and Youth Employment (PPT)
AI and Youth Employment (PPT)AI and Youth Employment (PPT)
AI and Youth Employment (PPT)
 
Environmental Impacts of COVID-19 Pandemic: PPT
Environmental Impacts of COVID-19 Pandemic: PPTEnvironmental Impacts of COVID-19 Pandemic: PPT
Environmental Impacts of COVID-19 Pandemic: PPT
 
20 Latest Computer Science Seminar Topics on Emerging Technologies
20 Latest Computer Science Seminar Topics on Emerging Technologies20 Latest Computer Science Seminar Topics on Emerging Technologies
20 Latest Computer Science Seminar Topics on Emerging Technologies
 
Claytronics | Programmable Matter | PPT
Claytronics | Programmable Matter | PPTClaytronics | Programmable Matter | PPT
Claytronics | Programmable Matter | PPT
 
Three-dimensional Holographic Projection Technology PPT | 2018
Three-dimensional Holographic Projection Technology PPT | 2018Three-dimensional Holographic Projection Technology PPT | 2018
Three-dimensional Holographic Projection Technology PPT | 2018
 
MicroLED : Latest Display Technology | PPT
MicroLED : Latest Display Technology | PPTMicroLED : Latest Display Technology | PPT
MicroLED : Latest Display Technology | PPT
 
Performance of 400 kV line insulators under pollution | PDF | DOC | PPT
Performance of 400 kV line insulators under pollution | PDF | DOC | PPTPerformance of 400 kV line insulators under pollution | PDF | DOC | PPT
Performance of 400 kV line insulators under pollution | PDF | DOC | PPT
 
Highest Largest Tallest Longest in India 2018
Highest Largest Tallest Longest in India 2018Highest Largest Tallest Longest in India 2018
Highest Largest Tallest Longest in India 2018
 
Atmospheric Vortex Engine (AVE)
Atmospheric Vortex Engine (AVE) Atmospheric Vortex Engine (AVE)
Atmospheric Vortex Engine (AVE)
 
Artificial photosynthesis PPT
Artificial photosynthesis PPTArtificial photosynthesis PPT
Artificial photosynthesis PPT
 
How to prevent WannaCry Ransomware
How to prevent WannaCry RansomwareHow to prevent WannaCry Ransomware
How to prevent WannaCry Ransomware
 
Dams PPT
Dams PPTDams PPT
Dams PPT
 
Bio mass Energy
Bio mass EnergyBio mass Energy
Bio mass Energy
 
Babbitt material ppt
Babbitt material pptBabbitt material ppt
Babbitt material ppt
 
Ceramic Bearing ppt
Ceramic Bearing pptCeramic Bearing ppt
Ceramic Bearing ppt
 
Carbon Foam Military Applications
Carbon Foam Military ApplicationsCarbon Foam Military Applications
Carbon Foam Military Applications
 
Future challenges in computer science
Future challenges in computer scienceFuture challenges in computer science
Future challenges in computer science
 

Último

Summer training report on BUILDING CONSTRUCTION for DIPLOMA Students.pdf
Summer training report on BUILDING CONSTRUCTION for DIPLOMA Students.pdfSummer training report on BUILDING CONSTRUCTION for DIPLOMA Students.pdf
Summer training report on BUILDING CONSTRUCTION for DIPLOMA Students.pdfNaveenVerma126
 
Phase noise transfer functions.pptx
Phase noise transfer      functions.pptxPhase noise transfer      functions.pptx
Phase noise transfer functions.pptxSaiGouthamSunkara
 
A Seminar on Electric Vehicle Software Simulation
A Seminar on Electric Vehicle Software SimulationA Seminar on Electric Vehicle Software Simulation
A Seminar on Electric Vehicle Software SimulationMohsinKhanA
 
cme397 surface engineering unit 5 part A questions and answers
cme397 surface engineering unit 5 part A questions and answerscme397 surface engineering unit 5 part A questions and answers
cme397 surface engineering unit 5 part A questions and answerskarthi keyan
 
Mohs Scale of Hardness, Hardness Scale.pptx
Mohs Scale of Hardness, Hardness Scale.pptxMohs Scale of Hardness, Hardness Scale.pptx
Mohs Scale of Hardness, Hardness Scale.pptxKISHAN KUMAR
 
How to Write a Good Scientific Paper.pdf
How to Write a Good Scientific Paper.pdfHow to Write a Good Scientific Paper.pdf
How to Write a Good Scientific Paper.pdfRedhwan Qasem Shaddad
 
Introduction to Machine Learning Unit-3 for II MECH
Introduction to Machine Learning Unit-3 for II MECHIntroduction to Machine Learning Unit-3 for II MECH
Introduction to Machine Learning Unit-3 for II MECHC Sai Kiran
 
SATELITE COMMUNICATION UNIT 1 CEC352 REGULATION 2021 PPT BASICS OF SATELITE ....
SATELITE COMMUNICATION UNIT 1 CEC352 REGULATION 2021 PPT BASICS OF SATELITE ....SATELITE COMMUNICATION UNIT 1 CEC352 REGULATION 2021 PPT BASICS OF SATELITE ....
SATELITE COMMUNICATION UNIT 1 CEC352 REGULATION 2021 PPT BASICS OF SATELITE ....santhyamuthu1
 
sdfsadopkjpiosufoiasdoifjasldkjfl a asldkjflaskdjflkjsdsdf
sdfsadopkjpiosufoiasdoifjasldkjfl a asldkjflaskdjflkjsdsdfsdfsadopkjpiosufoiasdoifjasldkjfl a asldkjflaskdjflkjsdsdf
sdfsadopkjpiosufoiasdoifjasldkjfl a asldkjflaskdjflkjsdsdfJulia Kaye
 
CSR Managerial Round Questions and answers.pptx
CSR Managerial Round Questions and answers.pptxCSR Managerial Round Questions and answers.pptx
CSR Managerial Round Questions and answers.pptxssusera0771e
 
solar wireless electric vechicle charging system
solar wireless electric vechicle charging systemsolar wireless electric vechicle charging system
solar wireless electric vechicle charging systemgokuldongala
 
Gender Bias in Engineer, Honors 203 Project
Gender Bias in Engineer, Honors 203 ProjectGender Bias in Engineer, Honors 203 Project
Gender Bias in Engineer, Honors 203 Projectreemakb03
 
Basic Principle of Electrochemical Sensor
Basic Principle of  Electrochemical SensorBasic Principle of  Electrochemical Sensor
Basic Principle of Electrochemical SensorTanvir Moin
 
News web APP using NEWS API for web platform to enhancing user experience
News web APP using NEWS API for web platform to enhancing user experienceNews web APP using NEWS API for web platform to enhancing user experience
News web APP using NEWS API for web platform to enhancing user experienceAkashJha84
 
Popular-NO1 Kala Jadu Expert Specialist In Germany Kala Jadu Expert Specialis...
Popular-NO1 Kala Jadu Expert Specialist In Germany Kala Jadu Expert Specialis...Popular-NO1 Kala Jadu Expert Specialist In Germany Kala Jadu Expert Specialis...
Popular-NO1 Kala Jadu Expert Specialist In Germany Kala Jadu Expert Specialis...Amil baba
 
Vertical- Machining - Center - VMC -LMW-Machine-Tool-Division.pptx
Vertical- Machining - Center - VMC -LMW-Machine-Tool-Division.pptxVertical- Machining - Center - VMC -LMW-Machine-Tool-Division.pptx
Vertical- Machining - Center - VMC -LMW-Machine-Tool-Division.pptxLMW Machine Tool Division
 
me3493 manufacturing technology unit 1 Part A
me3493 manufacturing technology unit 1 Part Ame3493 manufacturing technology unit 1 Part A
me3493 manufacturing technology unit 1 Part Akarthi keyan
 

Último (20)

計劃趕得上變化
計劃趕得上變化計劃趕得上變化
計劃趕得上變化
 
Summer training report on BUILDING CONSTRUCTION for DIPLOMA Students.pdf
Summer training report on BUILDING CONSTRUCTION for DIPLOMA Students.pdfSummer training report on BUILDING CONSTRUCTION for DIPLOMA Students.pdf
Summer training report on BUILDING CONSTRUCTION for DIPLOMA Students.pdf
 
Phase noise transfer functions.pptx
Phase noise transfer      functions.pptxPhase noise transfer      functions.pptx
Phase noise transfer functions.pptx
 
A Seminar on Electric Vehicle Software Simulation
A Seminar on Electric Vehicle Software SimulationA Seminar on Electric Vehicle Software Simulation
A Seminar on Electric Vehicle Software Simulation
 
cme397 surface engineering unit 5 part A questions and answers
cme397 surface engineering unit 5 part A questions and answerscme397 surface engineering unit 5 part A questions and answers
cme397 surface engineering unit 5 part A questions and answers
 
Mohs Scale of Hardness, Hardness Scale.pptx
Mohs Scale of Hardness, Hardness Scale.pptxMohs Scale of Hardness, Hardness Scale.pptx
Mohs Scale of Hardness, Hardness Scale.pptx
 
Présentation IIRB 2024 Chloe Dufrane.pdf
Présentation IIRB 2024 Chloe Dufrane.pdfPrésentation IIRB 2024 Chloe Dufrane.pdf
Présentation IIRB 2024 Chloe Dufrane.pdf
 
How to Write a Good Scientific Paper.pdf
How to Write a Good Scientific Paper.pdfHow to Write a Good Scientific Paper.pdf
How to Write a Good Scientific Paper.pdf
 
Introduction to Machine Learning Unit-3 for II MECH
Introduction to Machine Learning Unit-3 for II MECHIntroduction to Machine Learning Unit-3 for II MECH
Introduction to Machine Learning Unit-3 for II MECH
 
SATELITE COMMUNICATION UNIT 1 CEC352 REGULATION 2021 PPT BASICS OF SATELITE ....
SATELITE COMMUNICATION UNIT 1 CEC352 REGULATION 2021 PPT BASICS OF SATELITE ....SATELITE COMMUNICATION UNIT 1 CEC352 REGULATION 2021 PPT BASICS OF SATELITE ....
SATELITE COMMUNICATION UNIT 1 CEC352 REGULATION 2021 PPT BASICS OF SATELITE ....
 
sdfsadopkjpiosufoiasdoifjasldkjfl a asldkjflaskdjflkjsdsdf
sdfsadopkjpiosufoiasdoifjasldkjfl a asldkjflaskdjflkjsdsdfsdfsadopkjpiosufoiasdoifjasldkjfl a asldkjflaskdjflkjsdsdf
sdfsadopkjpiosufoiasdoifjasldkjfl a asldkjflaskdjflkjsdsdf
 
CSR Managerial Round Questions and answers.pptx
CSR Managerial Round Questions and answers.pptxCSR Managerial Round Questions and answers.pptx
CSR Managerial Round Questions and answers.pptx
 
solar wireless electric vechicle charging system
solar wireless electric vechicle charging systemsolar wireless electric vechicle charging system
solar wireless electric vechicle charging system
 
Gender Bias in Engineer, Honors 203 Project
Gender Bias in Engineer, Honors 203 ProjectGender Bias in Engineer, Honors 203 Project
Gender Bias in Engineer, Honors 203 Project
 
Lecture 2 .pdf
Lecture 2                           .pdfLecture 2                           .pdf
Lecture 2 .pdf
 
Basic Principle of Electrochemical Sensor
Basic Principle of  Electrochemical SensorBasic Principle of  Electrochemical Sensor
Basic Principle of Electrochemical Sensor
 
News web APP using NEWS API for web platform to enhancing user experience
News web APP using NEWS API for web platform to enhancing user experienceNews web APP using NEWS API for web platform to enhancing user experience
News web APP using NEWS API for web platform to enhancing user experience
 
Popular-NO1 Kala Jadu Expert Specialist In Germany Kala Jadu Expert Specialis...
Popular-NO1 Kala Jadu Expert Specialist In Germany Kala Jadu Expert Specialis...Popular-NO1 Kala Jadu Expert Specialist In Germany Kala Jadu Expert Specialis...
Popular-NO1 Kala Jadu Expert Specialist In Germany Kala Jadu Expert Specialis...
 
Vertical- Machining - Center - VMC -LMW-Machine-Tool-Division.pptx
Vertical- Machining - Center - VMC -LMW-Machine-Tool-Division.pptxVertical- Machining - Center - VMC -LMW-Machine-Tool-Division.pptx
Vertical- Machining - Center - VMC -LMW-Machine-Tool-Division.pptx
 
me3493 manufacturing technology unit 1 Part A
me3493 manufacturing technology unit 1 Part Ame3493 manufacturing technology unit 1 Part A
me3493 manufacturing technology unit 1 Part A
 

Box Pushing Technique

  • 2. CONVENTIONAL METHOD Demerits • Increased time for execution • Interruption in traffic • Cost factor was high Open cut system • Excavation • Placing • Covering Visit www.seminarlinks.blogspot.com to download
  • 3. NEED FOR THE ALTERNATIVE • Present day Intensity of Traffic, both Rail & Road due to the fast development, is very heavy it cannot the disturbed, for construction of under bridges or Canal Crossings, drainage etc by conventional i.e. open cut system. • Box Pushing Technique is developed where in R.C.C. Boxes in segments are cast out side and pushed through the heavy embankments of Rail or Road by Jacking.
  • 4. METHODOLOGY • Excavation • Casting of Thrust Bed • Fabrication of Front and Rear shield • Box Casting and placing • Pushing-shifting-pushing operation • Miscellaneous works • Precautions
  • 5. Excavation and casting of thrust bed Open excavation is carried out for construction of Thrust bed
  • 6. Thrust bed • The Thrustbed and Thrust Beam and keys are designed in R.C.C. to resist the required Thrust extorted by Jacking force and transfer it to soil at bottom and sides. • In cohesive soils even shallow piles are required to transfer the load. • Provision for Jacking supports is made by providing suitable Pockets in the bed to accommodate pin supports. • On completion of Jacking the thrust bed is utilised as floor bed, and so it is left in place.
  • 7. Box Casting And Pushing • The RCC Box is cast in segments of convenient lengths of Total pushing length. • The Box section is designed as per IRS / IRC codes of practice for loading. Concrete grade normally kept as M-35.
  • 8. Front Cutting Shield & Rear Jacking Shield • The First Segment of the precast box is provided with a specially designed structure named as cutting shield which forms the front working face with a cutting edge fabricated from 16 to 20 mm thick M.S. Plates and housed on RCC Box section with suitable anchor bolts. • Necessary strengthening is provided by stiffeners and face plates of Box in front on completion of jacking the outer shell of the shield is cut and removed • The Rear Jacking shield is provided by anchoring steel plate on the face of Bottom slab of RCC Box suitably designed to distribute the jacking load uniformly on concrete area.
  • 9. Fabrication of Front Shield It is fabricated for cutting action and to provide support , to prevent caving in of soil.
  • 10. Fabrication of Rear Shield It is provided by anchoring steel plates on the face of bottom slab of RCC box to suitably distribute the jacking load.
  • 11. Intermediate Jacking Station • As total length of Box is cast in Segments, each segment is pushed turn by turn with necessary jacking force and so for this necessary intermediate jacking stations are provided, with jacking pockets in bed & walls.
  • 12. Pushing Operation of the Box • The purpose of pushing of Box is to form a horizontal opening below ground or through embankments, can say a tunnel, by providing precast box units underground or an embankment, without disturbing the overhead amenities, like traffic & structures. • To reduce the frictional resistance, a thin film of Grease and thick gauge plastic sheet is provided between the top of the thrustbed & Bottom of the Box. • This is done before casting of the Bottom slab of the box. • A Glossy Epoxy layer is also provided to reduce friction on the top and prevent the disturbance of the mass over box to least during progress of pushing • Where mass of embankment is less or the soil is of poor quality, drag sheet system is also considered for least resistance of friction and disturbance of mass above box.
  • 13. • Auxiliary beds are also provided for casting of the other segments with thin film of grease and plastic and segments are then brought in alignment of pushing as and when required as pushing progresses. • With the progress of jacking, the front unit with shield penetrates into the embankment and there after excavation within the shield is done either manually or mechanically and the excavated stuff is transported outside the working area. • After the first segment advances to the end of the thrustbed, the second segment is brought in alignment of the front Box & intermediate jacking space is lift between the two. • The progress of pushing is kept continuous and the system of side shifting of remaining box segments from Auxiliary bed and bring in pushing alignment is adopted till total length is pushed.
  • 14. Hydraulic Equipment • The entire Box Pushing system is matter of proper selection of Hydraulic equipment, as tremendous driving force is required for pushing of medium to large size of Boxes. • So for this, Number of Jack units are provided in series for distribution of pushing load evenly on the face of the concrete, and all Jacks are operated simultaneously with a common power pack, which supplies uniform flow of pressure through network of Hydraulic pipes of required pressure capacity, commencing from front unit to rear unit. Jacking force is applied in sequence. • This way pushing cycles are repeated till total pushing is completed.
  • 15. Precautions • Cutting edge of front shield is fabricated with adequate thickness of steel plate and the front edges of the steel plate are sharpened to facilitate penetration into the soil. • To prevent caving of earth during excavation quantity of earth shall be removed to barest minimum duly following the slop of cutting edge. • Guide channels to be provided in the thrust bed to guide the segments to ensure straight alignment • The level of the boxes should be continuously checked. • The Speed limit should be set to 20 km/h at the site of construction • The work should be stopped when a train is passing over the work.
  • 16. Conclusion The entire system is purely technical, dependent on Hydraulic system, & safest method of crossing underground / Embankment, without disturbing overhead traffic / structures for R.U.B., Canal siphon and other drainage crossings. Visit www.seminarlinks.blogspot.com to download