PHYS207 Assignment 5 Open Channel Hydraulics
Q1. An old railway line near Nyngan is drained by a weed-overgrown winding earth channel roughly
0.8 m wide and with bank slopes of about 1:16. The channel is long and shallow, with a bedslope of
about 0.1 mm/m and only 400 mm deep at the lowest point. Engineers estimate the channel will need
to convey a flow of about 0.23 m3
/s in a five year storm, to avoid creating a drainage problem when
the line reopens next year. Does the channel have sufficient capacity or will it need to be cleared and
re-lined?
With no further information on channel length and downstream constraints we have to assume steady
uniform flow, and go to the Manning equation.:
n
S
P
A
n
S
ARVAQ o
/
/
o/
32
35
32
Define the terms:
A = flow area = Wy + ky2
where W is the base width (0.8 m) and k the side slope (1:16 = 1:k ; k = 16)
P = wetted perimeter = W + 2y√(1+k2
)
So = bed slope = 0.0001 m/m
n = channel roughness. Looking up the roughness for a weedy winding channel (study guide) we have
a range of 0.075 to 0.15 to choose from. Assuming the channel is at least well maintained we can use
the lower end of that range: say n = 0.075
A and P depend on the flow depth, y. We can use the maximum depth of the channel as a flow depth,
thus y = 0.4 m
A = Wy + ky2
= 0.8(0.4) + 16(0.42
) = 2.88 m2
P = W + 2y√(1+k2
) = 0.8 + 2(0.4)(1 + 162
)0.5
= 13.62 m
So at a flow depth of 400 mm the channel flowrate would be:
And Q = 2.885/3
0.00010.5
/(13.622/3
0.075) = 0.136 m3
/s
This is too small. Adjusting the roughness coefficient, we find the flowrate reaches 0.23 m3
/s only
when the roughness is at most 0.045, equivalent to a winding natural channel or a grassy formed
channel. The engineer should recommend that the channel be cleared of weeds and maintained with a
hardy native grass bed.
Q2. A concrete channel constructed from inverted box culverts is to be 250 m long and 2.7 m wide. A
maximum flowrate of 22.8 m3
/s is expected. The channel slope is 2 mm/m. Assuming steady uniform
flow, how deep does the channel need to be constructed if a freeboard of 300 mm is required?
Assuming steady uniform flow means “use Manning’s equation”:
n
S
P
A
n
S
ARVAQ o
/
/
o/
32
35
32
However in this case we don’t know the flow depth in advance, so we can’t calculate the area or
wetted perimeter.
Let’s use the approximate depth for wide square channels as a first guess, and see how close it is:
The roughness of manufactured concrete pipes and box sections is tabulated as 0.012 (p.161):
53/
oSW
n.Q
y = (22.8(0.012)/(2.7(0.002)0.5
))3/5
= 1.634 m
Let’s just check the flowrate that this depth gives:
A = Wy = 2.7(1.634) = 4.411 m2
P = W + 2y = 2.7 + 2(1.634) = 5.968 m
And Q = 4.4115/3
0.0020.5
/(5.9682/3
0.012) = 13.44 m3
/s
This is not even nearly right, because the channel cannot be called wide or shallow. It will do as a first
estimate though. To increase the flowrate we need to increase the depth: Say y = 2.5 m
A = Wy = 2.7(2.5) = 6.75 m2
P = W + 2y = 2.7 + 2(2.5) = 7.7 m
Q = 6.755/3
0.0020.5
/(7.72/3
0.012) = 23 m3
/s
That’s a pretty good second guess! Another iteration gives y = 2.49 m. With a freeboard of 300 mm
the channel needs to by 2.49 + 0.3 = 2.79 m deep. Pretty close to square.
Q3. At what critical depth will a 7 m wide spillway with vertical sides flow when the flowrate is 40.1
m3
/s? What depth above the spillway is the still water behind the weir?
Spillways and many other types of depth controls flow at the critical depth for a given discharge:
B
gA
Qc
3
Where A is the flow area and B is the surface flow width. For channels with vertical sides, this
reduces to
32
3
c
c
c ygB
B
Byg
Q
The critical discharge equals the flowrate when the flow depth y = yc:
3
2
2
gB
Q
yc = (40.12
/(9.8(72
))1/3
= 1.496 m
The still water behind the spillway has the same total energy as the spillway itself, but it is all
expressed as potential energy. The kinetic energy of the spillway is expressed as a velocity head:
H = yc + V2
/2g
Where V = Q/A = Q/(Byc) = 40.1/(7(1.496)) = 3.829 m/s
Thus H = yc + V2
/2g = 1.496 + 3.8292
/19.62 = 2.243 m
As a check, try the broad-crested weir equation:
23
LH67.1Q = 1.67(7)2.2431.5
= 39.27 m3
/s OK
Q4. A council garden is to be drained by a grassy v-shaped channel with side slopes of 1:4 and 0.7 m
deep. Assuming a maximum Froude number of 0.8, what is the channel’s maximum bedslope for
subcritical flow? What is the maximum flow velocity within the channel? Is this safe for children?
The Froude number governs the transition from subcritical to supercritical flow. Grassy channels must
be designed for subcritical flow or they will fail due to erosion. A Froude number of 0.8 is a safe
maximum:
gy
V
c
V
Fr
Where V is the normal flow velocity:
n
S
P
A
V o
/ 32
So 80
32
.
gyn
S
P
A
gy
V o
/
For a 1:4 v-shaped drain 0.7 m deep,
A = ky2
= 4(0.72
) = 1.96 m2
P = 2y√(1+k2
) = 2(0.7) √(1+42
) = 5.772 m
The roughness of a short grassy swale is about 0.03:
So
232
80
/
o
A
P
gyn.S = (0.8(0.03)(9.8(0.7))0.5
(5.772/1.96)2/3
)2
= 0.0167 m/m
The velocity of the channel is then
n
S
P
A
V o
/ 32
= (1.96/5.772)2/3
0.01670.5
/0.03 = 2.097 m/s
This fairly fast, and the channel is rather deep. To decide if it is unsafe for children, use the common
formula V.d < 0.4 (p.183 study guide)
V.d = 2.097(0.7) = 1.468
This is too fast and deep for a child to fall into. Try reducing the depth and putting additional flows
underground.
Q5. A rip-rap lined channel 1.4 m wide and with 1:4 bank slopes has two reaches: a 50 m long reach
at bedslope of 0.0017 m/m upstream of a 90 m long reach of bedslope 0.0003 m/m. The channel
outfalls over a stone apron of the same channel shape into a town pond which after ten years of
drought is very low. If the channel carries a flow of 1.45 m3
/s, calculate the flow depth at the apron
and at the upstream point 140 m from the weir.
The standard step method allows us to calculate flow depths in non-uniform flow situations such as
this: beginning with a critical depth calculation at the apron outfall we proceed upstream to determine
the depths at 90 m and 140 m upstream:
Let’s collate some data and formulae:
The roughness of a rip-rap channel is about 0.025
The area, wetted perimeter and surface width of a flow y are given by:
A = Wy + ky2
P = W + 2y√(1+k2
)
B = W + 2ky
At the outfall, critical depth conditions prevail:
B
gA
Qc
3
= Q
We can trial values of y that produce this critical flowrate:
Try y = 0.5:
A = 1.4(0.5) + 4(0.52
) = 1.7 m2
B = 1.4 + 2(4)0.5 = 5.4 m
Qc = (9.8(1.73
)/5.4)0.5
= 2.99 m3
/s
Try y = 0.2:
A = 1.4(0.2) + 4(0.22
) = 0.44 m2
B = 1.4 + 2(4)0.2 = 3.0 m
Qc = (9.8(0.443
)/3.0)0.5
= 0.527 m3
/s
Try y = 0.3:
A = 1.4(0.3) + 4(0.32
) = 0.78 m2
B = 1.4 + 2(4)0.3 = 3.8 m
Qc = (9.8(0.843
)/4.0)0.5
= 1.1 m3
/s
Try y = 0.35:
A = 1.4(0.35) + 4(0.352
) = 0.98 m2
B = 1.4 + 2(4)0.31 = 4.2 m
Qc = (9.8(0.983
)/4.2)0.5
= 1.48 m3
/s
This is close enough given the other uncertainties in the calculation.
So we have a starting depth of 0.35 m. The flow velocity at the weir is
V = Q/A = 1.45/0.98 = 1.48 m/s
The wetted perimeter is then P = W + 2y√(1+k2
) = 1.4 + 2(0.35)(1+42
)0.5
= 4.29 m
And the friction slope at the outfall is
2
32 /f
AR
nQ
S = (0.025(1.45)/(0.98(0.98/4.29)2/3
)2
= 0.0098 m/m
We can now proceed upstream to the next step. The flow will be somewhat deeper than 0.35, tending
towards the normal depth:
By trial and error, normal depth for 0.0003 m/m bedslope occurs at y = 0.78 m (solve Manning’s
equation with this value to confirm)
We can locate where y2 = 0.78 by the step method:
A = 1.4(0.78) + 4(0.782
) = 3.553 m2
P = 1.4 + 2(0.78)(1+42
)0.5
= 7.861 m
V = Q/A = 1.45/3.553 = 0.408 m/s
Sf = (0.025(1.45)/(3.553(3.553/7.861)2/3
)2
= 0.0003 m/m (= bedslope for normal depth)
The average friction slope over the section is
Sf = (0.0098 + 0.0003)/2 = 0.005 m/m
And the Step length is
of SS
y
g
V
y
g
V
L
1
2
1
2
2
2
22
= ((0.4082
/19.62 + 0.78) – (1.482
/19.62 + 0.35))/(0.005 – 0.0003) = 69.6 m
This is less than the reach length of 90 m, so we find the channel has established its normal depth at
69.6 m and will have this same depth at the channel section change at 90 m.
We can perform a similar calculation for the second reach:
By trial and error, normal depth for 0.0017 m/m bedslope occurs at y = 0.530 m (solve Manning’s
equation with this value to confirm)
We can locate where y2 = yo = 0.530 by the step method:
A = 1.4(0.53) + 4(0.532
) = 1.866 m2
P = 1.4 + 2(0.53)(1+42
)0.5
= 5.771 m
V = Q/A = 1.45/1.866 = 0.777 m/s
Sf = (0.025(1.45)/(1.866(1.866/5.771)2/3
)2
= 0.0017 m/m (= bedslope for normal depth)
The average friction slope over the section is
Sf = (0.0017 + 0.0003)/2 = 0.001 m/m
And the Step length is
L = ((0.7772
/19.62 + 0.53) – (0.4082
/19.62 + 0.78))/(0.001 – 0.0017) = 325 m
That is it will take 325 m for the flow to establish at normal depth. We only have 50 m, so we should
find the actual depth somewhere between 0.53 and 0.78 m depth.
Try y2 = 0.7:
A = 1.4(0.7) + 4(0.72
) = 2.94 m2
P = 1.4 + 2(0.7)(1+42
)0.5
= 7.17 m
V = Q/A = 1.45/2.94 = 0.493 m/s
Sf = (0.025(1.45)/(2.94(2.94/7.17)2/3
)2
= 0.0005 m/m
The average friction slope over the section is
Sf = (0.0005 + 0.0003)/2 = 0.0004 m/m
And the Step length is
L = ((0.4932
/19.62 + 0.7) – (0.4082
/19.62 + 0.78))/(0.0004 – 0.0017) = 61 m
Try y2 = 0.71:
A = 1.4(0.71) + 4(0.712
) = 3.01 m2
P = 1.4 + 2(0.71)(1+42
)0.5
= 7.255 m
V = Q/A = 1.45/3.3 = 0.482 m/s
Sf = (0.025(1.45)/(3.01(3.01/7.255)2/3
)2
= 0.00047 m/m
The average friction slope over the section is
Sf = (0.00047 + 0.0003)/2 = 0.00038 m/m
And the Step length is
L = ((0.4822
/19.62 + 0.71) – (0.4082
/19.62 + 0.78))/(0.00038 – 0.0017) = 53 m
This is near enough. The flow depth at the top of the 50 m reach is thus 0.71 m.
This laborious calculation can easily be transmitted to a spreadsheet for much easier trial and error.
Q6. A large dam has a spillway leading into a smooth concrete lined rectangular channel 70 m wide
with shallow bedslope. The spillway releases 170 m3
/s into the channel at a flow depth of 0.30 m. The
normal flow depth in the channel is 1.7 m. Locate the hydraulic jump that must occur in the channel,
the depth before the jump and the power dissipated by the channel and jump.
In this case we need to perform a supercritical standard step method and calculate the momentum
function of the flow until it equals the momentum of the downstream normal flow depth, at which
point a hydraulic jump occurs. This is a complex procedure that will benefit from application of a
spreadsheet:
Create a table of the provided data and calculate the momentum function of the normal depth:
Q 170
W 70
y1 0.3
yo 1.7
Ao 119 =W*yo
Vo 1.429 =Q/Ao
Mo 125.9 =Vo^2*Ao/9.8+yo/2*Ao
Note that the momentum function uses the centroid depth, which is half the total depth.
To start the standard step method, calculate the area, wetted perimeter, velocity and friction slope
associated with y1 (the initial channel depth):
A1 21 =W*y1
P1 70.6 =W+2*y1
V1 8.1 =Q/A1
Sf1 0.056 =(0.013*Q/(A1*(A1/P1)^(2/3)))^2
Now add a guessed y2 (the depth of flow after frictional losses down the channel), and calculate A, P,
V, Sf and the average Sf:
y2 0.5
A2 35 =W*y2
P2 71 =W+2*y2
V2 4.86 =Q/A2
Sf2 0.01 =(0.013*Q/(A2*(A2/P2)^(2/3)))^2
Sf 0.033 =(Sf1+Sf2)/2
Lastly include the step length calculation and the momentum function of the guessed y2:
L 58.7 =-((V2^2/19.62+y2)-(V1^2/19.62+y1))/(Sf)
M1 93 =V2^2*A2/9.8+y2/2*A2
Note that the step length function has a minus sign because in a supercritical step we move from
upstream to downstream, the reverse of the direction (downstream to upstream) by which the formula
was derived. Also note that there is no bedslope So in the denominator, as this is specified only as
“shallow” and can be treated as zero.
Now we can gradually adjust the value of y2 until the momentum function approaches that of the
normal depth yo:
y2 0.35
A2 24.5 =W*Y2
P2 70.7 =W+2*Y2
V2 6.939 =Q/A2
Sf2 0.033 =(0.013*Q/(A2*(A2/P2)^(2/3)))^2
Sf 0.045 =(SF1+SF2)/2
L 18.74 =-((V2^2/19.62+Y2)-(V1^2/19.62+Y1))/(Sf)
M1 124.7 =V2^2*A2/9.8+Y2/2*A2
Here M1 = Mo at a step length L of 18.7 m, where the flow depth is 0.35 m
The power dissipated by the apron and jump is a function of the difference in total head between the
initial depth and the normal depth:
Power = gQ H
H1 3.64 =y1+V1^2/19.62
Ho 1.80 =yo+Vo^2/19.62
Power 3058924 =9800*Q*(H1-Ho)
The total power dissipated is 3.06 MW

More Related Content

What's hot

Chapter 6 design of irrigation channel1
Chapter 6 design of irrigation channel1Chapter 6 design of irrigation channel1
Chapter 6 design of irrigation channel1
Mulugeta Abera
 
Examples-Answers-all-Sections-2up
Examples-Answers-all-Sections-2upExamples-Answers-all-Sections-2up
Examples-Answers-all-Sections-2up
syed ahmed taran
 
Chapter 6 energy and momentum principles
Chapter 6 energy and momentum principlesChapter 6 energy and momentum principles
Chapter 6 energy and momentum principles
Binu Karki
 
design of aqueduct
design of aqueductdesign of aqueduct
design of aqueduct
santhosh2121
 

What's hot (20)

Class lectures on Hydrology by Rabindra Ranjan Saha Lecture 3
Class lectures on Hydrology by Rabindra Ranjan Saha  Lecture 3Class lectures on Hydrology by Rabindra Ranjan Saha  Lecture 3
Class lectures on Hydrology by Rabindra Ranjan Saha Lecture 3
 
Rwss (rural water supply and sanitation)
Rwss (rural water supply and sanitation)Rwss (rural water supply and sanitation)
Rwss (rural water supply and sanitation)
 
Chapter 6 design of irrigation channel1
Chapter 6 design of irrigation channel1Chapter 6 design of irrigation channel1
Chapter 6 design of irrigation channel1
 
energy dissipator in hydraulic structure
energy dissipator  in  hydraulic structure energy dissipator  in  hydraulic structure
energy dissipator in hydraulic structure
 
Earthen dam
Earthen damEarthen dam
Earthen dam
 
Measurement of discharge in channels & Design of lined canal
Measurement of discharge in channels & Design of lined canalMeasurement of discharge in channels & Design of lined canal
Measurement of discharge in channels & Design of lined canal
 
Diversion headworks
Diversion headworksDiversion headworks
Diversion headworks
 
Examples-Answers-all-Sections-2up
Examples-Answers-all-Sections-2upExamples-Answers-all-Sections-2up
Examples-Answers-all-Sections-2up
 
Module 2 ch-1 heytograph and hydrology analysis
Module 2 ch-1 heytograph and hydrology analysisModule 2 ch-1 heytograph and hydrology analysis
Module 2 ch-1 heytograph and hydrology analysis
 
Open Channel Flow
Open Channel FlowOpen Channel Flow
Open Channel Flow
 
4. Construction and design criteria Earthen Dams.pptx
4. Construction and design criteria Earthen Dams.pptx4. Construction and design criteria Earthen Dams.pptx
4. Construction and design criteria Earthen Dams.pptx
 
Uniform flow computations in open channel flow
Uniform flow computations in open channel flowUniform flow computations in open channel flow
Uniform flow computations in open channel flow
 
Open channel flow by pratish awasthi
Open channel flow by pratish awasthiOpen channel flow by pratish awasthi
Open channel flow by pratish awasthi
 
Chapter 6 energy and momentum principles
Chapter 6 energy and momentum principlesChapter 6 energy and momentum principles
Chapter 6 energy and momentum principles
 
design of aqueduct
design of aqueductdesign of aqueduct
design of aqueduct
 
RESERVOIR SEDIMENTATION
RESERVOIR SEDIMENTATIONRESERVOIR SEDIMENTATION
RESERVOIR SEDIMENTATION
 
HARBOURS ENGINEERING
HARBOURS ENGINEERING HARBOURS ENGINEERING
HARBOURS ENGINEERING
 
Spillways
SpillwaysSpillways
Spillways
 
Design Of Hydraulic Structure - Kennedy's Theory
Design Of Hydraulic Structure - Kennedy's TheoryDesign Of Hydraulic Structure - Kennedy's Theory
Design Of Hydraulic Structure - Kennedy's Theory
 
Spillway and its types
Spillway and its typesSpillway and its types
Spillway and its types
 

Viewers also liked

Answers assignment 2 fluid statics-fluid mechanics
Answers assignment 2 fluid statics-fluid mechanicsAnswers assignment 2 fluid statics-fluid mechanics
Answers assignment 2 fluid statics-fluid mechanics
asghar123456
 
assignment 1 properties of fluids-Fluid mechanics
assignment 1 properties of fluids-Fluid mechanicsassignment 1 properties of fluids-Fluid mechanics
assignment 1 properties of fluids-Fluid mechanics
asghar123456
 
Ce154 lecture 3 reservoirs, spillways, & energy dissipators
Ce154   lecture 3 reservoirs, spillways, & energy dissipatorsCe154   lecture 3 reservoirs, spillways, & energy dissipators
Ce154 lecture 3 reservoirs, spillways, & energy dissipators
Sudhir Jagtap
 

Viewers also liked (20)

(Part ii)- open channels
(Part ii)- open channels(Part ii)- open channels
(Part ii)- open channels
 
1 open channel problems 2
1 open channel   problems 21 open channel   problems 2
1 open channel problems 2
 
2011 ras for_managers_11-22
2011 ras for_managers_11-222011 ras for_managers_11-22
2011 ras for_managers_11-22
 
Answers assignment 2 fluid statics-fluid mechanics
Answers assignment 2 fluid statics-fluid mechanicsAnswers assignment 2 fluid statics-fluid mechanics
Answers assignment 2 fluid statics-fluid mechanics
 
Hydraulics
HydraulicsHydraulics
Hydraulics
 
Gradually-Varied Flow in Open Channels ( Lecture notes 06)
Gradually-Varied Flow in Open Channels ( Lecture notes 06)Gradually-Varied Flow in Open Channels ( Lecture notes 06)
Gradually-Varied Flow in Open Channels ( Lecture notes 06)
 
ogee design
ogee designogee design
ogee design
 
assignment 1 properties of fluids-Fluid mechanics
assignment 1 properties of fluids-Fluid mechanicsassignment 1 properties of fluids-Fluid mechanics
assignment 1 properties of fluids-Fluid mechanics
 
Ce154 lecture 3 reservoirs, spillways, & energy dissipators
Ce154   lecture 3 reservoirs, spillways, & energy dissipatorsCe154   lecture 3 reservoirs, spillways, & energy dissipators
Ce154 lecture 3 reservoirs, spillways, & energy dissipators
 
Fuid mechanics and applications
Fuid mechanics and applicationsFuid mechanics and applications
Fuid mechanics and applications
 
Chapter 7 spillway and energy dissipators
Chapter 7 spillway and energy dissipatorsChapter 7 spillway and energy dissipators
Chapter 7 spillway and energy dissipators
 
(Part iii)- open channels
(Part iii)- open channels(Part iii)- open channels
(Part iii)- open channels
 
Spillways
SpillwaysSpillways
Spillways
 
Hydraulics & hydraulic machinery
Hydraulics & hydraulic machineryHydraulics & hydraulic machinery
Hydraulics & hydraulic machinery
 
Chapter 1-Introduction fluids Mechanics
Chapter 1-Introduction fluids MechanicsChapter 1-Introduction fluids Mechanics
Chapter 1-Introduction fluids Mechanics
 
Properties of Fluids
Properties of FluidsProperties of Fluids
Properties of Fluids
 
Fluid statics
Fluid staticsFluid statics
Fluid statics
 
Introduction to fluid mechanics
Introduction to fluid mechanicsIntroduction to fluid mechanics
Introduction to fluid mechanics
 
Design of Hydraulic Structures
Design of Hydraulic StructuresDesign of Hydraulic Structures
Design of Hydraulic Structures
 
Spillways and Flood Control Works
Spillways and Flood Control WorksSpillways and Flood Control Works
Spillways and Flood Control Works
 

Similar to Answers assignment 5 open channel hydraulics-fluid mechanics

Similar to Answers assignment 5 open channel hydraulics-fluid mechanics (20)

hydraulics and advanced hydraulics solved tutorials
hydraulics and advanced hydraulics solved tutorialshydraulics and advanced hydraulics solved tutorials
hydraulics and advanced hydraulics solved tutorials
 
Ground water hydrology .docx
Ground water hydrology .docxGround water hydrology .docx
Ground water hydrology .docx
 
Ch2.ppt
Ch2.pptCh2.ppt
Ch2.ppt
 
Laminar flow
Laminar flowLaminar flow
Laminar flow
 
Computation exam
Computation examComputation exam
Computation exam
 
Design of Lined Channels.pptx
Design of Lined Channels.pptxDesign of Lined Channels.pptx
Design of Lined Channels.pptx
 
Section 7 multistage separation processes
Section 7   multistage separation processesSection 7   multistage separation processes
Section 7 multistage separation processes
 
A109212102 mechanicsoffluids1
A109212102 mechanicsoffluids1A109212102 mechanicsoffluids1
A109212102 mechanicsoffluids1
 
Solution to first semester soil 2015 16
Solution to first semester soil 2015 16Solution to first semester soil 2015 16
Solution to first semester soil 2015 16
 
Ejercicios hidraulica
Ejercicios hidraulicaEjercicios hidraulica
Ejercicios hidraulica
 
pipe lines lec 2.pptx
pipe lines lec 2.pptxpipe lines lec 2.pptx
pipe lines lec 2.pptx
 
UNIT-II FMM
UNIT-II FMMUNIT-II FMM
UNIT-II FMM
 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduits
 
FLUID MECHANICS
FLUID MECHANICSFLUID MECHANICS
FLUID MECHANICS
 
Examination in open channel flow
Examination in open channel flowExamination in open channel flow
Examination in open channel flow
 
pipe lines lec 2.pptx
pipe lines lec 2.pptxpipe lines lec 2.pptx
pipe lines lec 2.pptx
 
أسئلة 1
أسئلة 1أسئلة 1
أسئلة 1
 
Problem solving in fluid mechanics
Problem solving in fluid mechanicsProblem solving in fluid mechanics
Problem solving in fluid mechanics
 
Sediment Transport
Sediment TransportSediment Transport
Sediment Transport
 
009b (PPT) Viscous Flow -2.pdf .
009b (PPT) Viscous Flow -2.pdf           .009b (PPT) Viscous Flow -2.pdf           .
009b (PPT) Viscous Flow -2.pdf .
 

More from asghar123456

Answers assignment 4 real fluids-fluid mechanics
Answers assignment 4 real fluids-fluid mechanicsAnswers assignment 4 real fluids-fluid mechanics
Answers assignment 4 real fluids-fluid mechanics
asghar123456
 
Answers assignment 3 integral methods-fluid mechanics
Answers assignment 3 integral methods-fluid mechanicsAnswers assignment 3 integral methods-fluid mechanics
Answers assignment 3 integral methods-fluid mechanics
asghar123456
 
Buckling test engt110
Buckling test engt110Buckling test engt110
Buckling test engt110
asghar123456
 
Amth250 octave matlab some solutions (4)
Amth250 octave matlab some solutions (4)Amth250 octave matlab some solutions (4)
Amth250 octave matlab some solutions (4)
asghar123456
 
Amth250 octave matlab some solutions (3)
Amth250 octave matlab some solutions (3)Amth250 octave matlab some solutions (3)
Amth250 octave matlab some solutions (3)
asghar123456
 
Amth250 octave matlab some solutions (2)
Amth250 octave matlab some solutions (2)Amth250 octave matlab some solutions (2)
Amth250 octave matlab some solutions (2)
asghar123456
 
Amth250 octave matlab some solutions (1)
Amth250 octave matlab some solutions (1)Amth250 octave matlab some solutions (1)
Amth250 octave matlab some solutions (1)
asghar123456
 

More from asghar123456 (10)

Answers assignment 4 real fluids-fluid mechanics
Answers assignment 4 real fluids-fluid mechanicsAnswers assignment 4 real fluids-fluid mechanics
Answers assignment 4 real fluids-fluid mechanics
 
Answers assignment 3 integral methods-fluid mechanics
Answers assignment 3 integral methods-fluid mechanicsAnswers assignment 3 integral methods-fluid mechanics
Answers assignment 3 integral methods-fluid mechanics
 
Buckling test engt110
Buckling test engt110Buckling test engt110
Buckling test engt110
 
Assignment6
Assignment6Assignment6
Assignment6
 
Assignment5
Assignment5Assignment5
Assignment5
 
Assignment4
Assignment4Assignment4
Assignment4
 
Amth250 octave matlab some solutions (4)
Amth250 octave matlab some solutions (4)Amth250 octave matlab some solutions (4)
Amth250 octave matlab some solutions (4)
 
Amth250 octave matlab some solutions (3)
Amth250 octave matlab some solutions (3)Amth250 octave matlab some solutions (3)
Amth250 octave matlab some solutions (3)
 
Amth250 octave matlab some solutions (2)
Amth250 octave matlab some solutions (2)Amth250 octave matlab some solutions (2)
Amth250 octave matlab some solutions (2)
 
Amth250 octave matlab some solutions (1)
Amth250 octave matlab some solutions (1)Amth250 octave matlab some solutions (1)
Amth250 octave matlab some solutions (1)
 

Recently uploaded

Easier, Faster, and More Powerful – Alles Neu macht der Mai -Wir durchleuchte...
Easier, Faster, and More Powerful – Alles Neu macht der Mai -Wir durchleuchte...Easier, Faster, and More Powerful – Alles Neu macht der Mai -Wir durchleuchte...
Easier, Faster, and More Powerful – Alles Neu macht der Mai -Wir durchleuchte...
panagenda
 
Breaking Down the Flutterwave Scandal What You Need to Know.pdf
Breaking Down the Flutterwave Scandal What You Need to Know.pdfBreaking Down the Flutterwave Scandal What You Need to Know.pdf
Breaking Down the Flutterwave Scandal What You Need to Know.pdf
UK Journal
 

Recently uploaded (20)

Syngulon - Selection technology May 2024.pdf
Syngulon - Selection technology May 2024.pdfSyngulon - Selection technology May 2024.pdf
Syngulon - Selection technology May 2024.pdf
 
ECS 2024 Teams Premium - Pretty Secure
ECS 2024   Teams Premium - Pretty SecureECS 2024   Teams Premium - Pretty Secure
ECS 2024 Teams Premium - Pretty Secure
 
Unpacking Value Delivery - Agile Oxford Meetup - May 2024.pptx
Unpacking Value Delivery - Agile Oxford Meetup - May 2024.pptxUnpacking Value Delivery - Agile Oxford Meetup - May 2024.pptx
Unpacking Value Delivery - Agile Oxford Meetup - May 2024.pptx
 
Google I/O Extended 2024 Warsaw
Google I/O Extended 2024 WarsawGoogle I/O Extended 2024 Warsaw
Google I/O Extended 2024 Warsaw
 
How Red Hat Uses FDO in Device Lifecycle _ Costin and Vitaliy at Red Hat.pdf
How Red Hat Uses FDO in Device Lifecycle _ Costin and Vitaliy at Red Hat.pdfHow Red Hat Uses FDO in Device Lifecycle _ Costin and Vitaliy at Red Hat.pdf
How Red Hat Uses FDO in Device Lifecycle _ Costin and Vitaliy at Red Hat.pdf
 
Behind the Scenes From the Manager's Chair: Decoding the Secrets of Successfu...
Behind the Scenes From the Manager's Chair: Decoding the Secrets of Successfu...Behind the Scenes From the Manager's Chair: Decoding the Secrets of Successfu...
Behind the Scenes From the Manager's Chair: Decoding the Secrets of Successfu...
 
Measures in SQL (a talk at SF Distributed Systems meetup, 2024-05-22)
Measures in SQL (a talk at SF Distributed Systems meetup, 2024-05-22)Measures in SQL (a talk at SF Distributed Systems meetup, 2024-05-22)
Measures in SQL (a talk at SF Distributed Systems meetup, 2024-05-22)
 
What's New in Teams Calling, Meetings and Devices April 2024
What's New in Teams Calling, Meetings and Devices April 2024What's New in Teams Calling, Meetings and Devices April 2024
What's New in Teams Calling, Meetings and Devices April 2024
 
Powerful Start- the Key to Project Success, Barbara Laskowska
Powerful Start- the Key to Project Success, Barbara LaskowskaPowerful Start- the Key to Project Success, Barbara Laskowska
Powerful Start- the Key to Project Success, Barbara Laskowska
 
The Metaverse: Are We There Yet?
The  Metaverse:    Are   We  There  Yet?The  Metaverse:    Are   We  There  Yet?
The Metaverse: Are We There Yet?
 
Choosing the Right FDO Deployment Model for Your Application _ Geoffrey at In...
Choosing the Right FDO Deployment Model for Your Application _ Geoffrey at In...Choosing the Right FDO Deployment Model for Your Application _ Geoffrey at In...
Choosing the Right FDO Deployment Model for Your Application _ Geoffrey at In...
 
Secure Zero Touch enabled Edge compute with Dell NativeEdge via FDO _ Brad at...
Secure Zero Touch enabled Edge compute with Dell NativeEdge via FDO _ Brad at...Secure Zero Touch enabled Edge compute with Dell NativeEdge via FDO _ Brad at...
Secure Zero Touch enabled Edge compute with Dell NativeEdge via FDO _ Brad at...
 
Integrating Telephony Systems with Salesforce: Insights and Considerations, B...
Integrating Telephony Systems with Salesforce: Insights and Considerations, B...Integrating Telephony Systems with Salesforce: Insights and Considerations, B...
Integrating Telephony Systems with Salesforce: Insights and Considerations, B...
 
How we scaled to 80K users by doing nothing!.pdf
How we scaled to 80K users by doing nothing!.pdfHow we scaled to 80K users by doing nothing!.pdf
How we scaled to 80K users by doing nothing!.pdf
 
ASRock Industrial FDO Solutions in Action for Industrial Edge AI _ Kenny at A...
ASRock Industrial FDO Solutions in Action for Industrial Edge AI _ Kenny at A...ASRock Industrial FDO Solutions in Action for Industrial Edge AI _ Kenny at A...
ASRock Industrial FDO Solutions in Action for Industrial Edge AI _ Kenny at A...
 
Free and Effective: Making Flows Publicly Accessible, Yumi Ibrahimzade
Free and Effective: Making Flows Publicly Accessible, Yumi IbrahimzadeFree and Effective: Making Flows Publicly Accessible, Yumi Ibrahimzade
Free and Effective: Making Flows Publicly Accessible, Yumi Ibrahimzade
 
Overview of Hyperledger Foundation
Overview of Hyperledger FoundationOverview of Hyperledger Foundation
Overview of Hyperledger Foundation
 
Easier, Faster, and More Powerful – Alles Neu macht der Mai -Wir durchleuchte...
Easier, Faster, and More Powerful – Alles Neu macht der Mai -Wir durchleuchte...Easier, Faster, and More Powerful – Alles Neu macht der Mai -Wir durchleuchte...
Easier, Faster, and More Powerful – Alles Neu macht der Mai -Wir durchleuchte...
 
Using IESVE for Room Loads Analysis - UK & Ireland
Using IESVE for Room Loads Analysis - UK & IrelandUsing IESVE for Room Loads Analysis - UK & Ireland
Using IESVE for Room Loads Analysis - UK & Ireland
 
Breaking Down the Flutterwave Scandal What You Need to Know.pdf
Breaking Down the Flutterwave Scandal What You Need to Know.pdfBreaking Down the Flutterwave Scandal What You Need to Know.pdf
Breaking Down the Flutterwave Scandal What You Need to Know.pdf
 

Answers assignment 5 open channel hydraulics-fluid mechanics

  • 1. PHYS207 Assignment 5 Open Channel Hydraulics Q1. An old railway line near Nyngan is drained by a weed-overgrown winding earth channel roughly 0.8 m wide and with bank slopes of about 1:16. The channel is long and shallow, with a bedslope of about 0.1 mm/m and only 400 mm deep at the lowest point. Engineers estimate the channel will need to convey a flow of about 0.23 m3 /s in a five year storm, to avoid creating a drainage problem when the line reopens next year. Does the channel have sufficient capacity or will it need to be cleared and re-lined? With no further information on channel length and downstream constraints we have to assume steady uniform flow, and go to the Manning equation.: n S P A n S ARVAQ o / / o/ 32 35 32 Define the terms: A = flow area = Wy + ky2 where W is the base width (0.8 m) and k the side slope (1:16 = 1:k ; k = 16) P = wetted perimeter = W + 2y√(1+k2 ) So = bed slope = 0.0001 m/m n = channel roughness. Looking up the roughness for a weedy winding channel (study guide) we have a range of 0.075 to 0.15 to choose from. Assuming the channel is at least well maintained we can use the lower end of that range: say n = 0.075 A and P depend on the flow depth, y. We can use the maximum depth of the channel as a flow depth, thus y = 0.4 m A = Wy + ky2 = 0.8(0.4) + 16(0.42 ) = 2.88 m2 P = W + 2y√(1+k2 ) = 0.8 + 2(0.4)(1 + 162 )0.5 = 13.62 m So at a flow depth of 400 mm the channel flowrate would be: And Q = 2.885/3 0.00010.5 /(13.622/3 0.075) = 0.136 m3 /s This is too small. Adjusting the roughness coefficient, we find the flowrate reaches 0.23 m3 /s only when the roughness is at most 0.045, equivalent to a winding natural channel or a grassy formed channel. The engineer should recommend that the channel be cleared of weeds and maintained with a hardy native grass bed. Q2. A concrete channel constructed from inverted box culverts is to be 250 m long and 2.7 m wide. A maximum flowrate of 22.8 m3 /s is expected. The channel slope is 2 mm/m. Assuming steady uniform flow, how deep does the channel need to be constructed if a freeboard of 300 mm is required?
  • 2. Assuming steady uniform flow means “use Manning’s equation”: n S P A n S ARVAQ o / / o/ 32 35 32 However in this case we don’t know the flow depth in advance, so we can’t calculate the area or wetted perimeter. Let’s use the approximate depth for wide square channels as a first guess, and see how close it is: The roughness of manufactured concrete pipes and box sections is tabulated as 0.012 (p.161): 53/ oSW n.Q y = (22.8(0.012)/(2.7(0.002)0.5 ))3/5 = 1.634 m Let’s just check the flowrate that this depth gives: A = Wy = 2.7(1.634) = 4.411 m2 P = W + 2y = 2.7 + 2(1.634) = 5.968 m And Q = 4.4115/3 0.0020.5 /(5.9682/3 0.012) = 13.44 m3 /s This is not even nearly right, because the channel cannot be called wide or shallow. It will do as a first estimate though. To increase the flowrate we need to increase the depth: Say y = 2.5 m A = Wy = 2.7(2.5) = 6.75 m2 P = W + 2y = 2.7 + 2(2.5) = 7.7 m Q = 6.755/3 0.0020.5 /(7.72/3 0.012) = 23 m3 /s That’s a pretty good second guess! Another iteration gives y = 2.49 m. With a freeboard of 300 mm the channel needs to by 2.49 + 0.3 = 2.79 m deep. Pretty close to square. Q3. At what critical depth will a 7 m wide spillway with vertical sides flow when the flowrate is 40.1 m3 /s? What depth above the spillway is the still water behind the weir? Spillways and many other types of depth controls flow at the critical depth for a given discharge: B gA Qc 3 Where A is the flow area and B is the surface flow width. For channels with vertical sides, this reduces to 32 3 c c c ygB B Byg Q
  • 3. The critical discharge equals the flowrate when the flow depth y = yc: 3 2 2 gB Q yc = (40.12 /(9.8(72 ))1/3 = 1.496 m The still water behind the spillway has the same total energy as the spillway itself, but it is all expressed as potential energy. The kinetic energy of the spillway is expressed as a velocity head: H = yc + V2 /2g Where V = Q/A = Q/(Byc) = 40.1/(7(1.496)) = 3.829 m/s Thus H = yc + V2 /2g = 1.496 + 3.8292 /19.62 = 2.243 m As a check, try the broad-crested weir equation: 23 LH67.1Q = 1.67(7)2.2431.5 = 39.27 m3 /s OK Q4. A council garden is to be drained by a grassy v-shaped channel with side slopes of 1:4 and 0.7 m deep. Assuming a maximum Froude number of 0.8, what is the channel’s maximum bedslope for subcritical flow? What is the maximum flow velocity within the channel? Is this safe for children? The Froude number governs the transition from subcritical to supercritical flow. Grassy channels must be designed for subcritical flow or they will fail due to erosion. A Froude number of 0.8 is a safe maximum: gy V c V Fr Where V is the normal flow velocity: n S P A V o / 32 So 80 32 . gyn S P A gy V o / For a 1:4 v-shaped drain 0.7 m deep, A = ky2 = 4(0.72 ) = 1.96 m2 P = 2y√(1+k2 ) = 2(0.7) √(1+42 ) = 5.772 m The roughness of a short grassy swale is about 0.03: So 232 80 / o A P gyn.S = (0.8(0.03)(9.8(0.7))0.5 (5.772/1.96)2/3 )2 = 0.0167 m/m
  • 4. The velocity of the channel is then n S P A V o / 32 = (1.96/5.772)2/3 0.01670.5 /0.03 = 2.097 m/s This fairly fast, and the channel is rather deep. To decide if it is unsafe for children, use the common formula V.d < 0.4 (p.183 study guide) V.d = 2.097(0.7) = 1.468 This is too fast and deep for a child to fall into. Try reducing the depth and putting additional flows underground. Q5. A rip-rap lined channel 1.4 m wide and with 1:4 bank slopes has two reaches: a 50 m long reach at bedslope of 0.0017 m/m upstream of a 90 m long reach of bedslope 0.0003 m/m. The channel outfalls over a stone apron of the same channel shape into a town pond which after ten years of drought is very low. If the channel carries a flow of 1.45 m3 /s, calculate the flow depth at the apron and at the upstream point 140 m from the weir. The standard step method allows us to calculate flow depths in non-uniform flow situations such as this: beginning with a critical depth calculation at the apron outfall we proceed upstream to determine the depths at 90 m and 140 m upstream: Let’s collate some data and formulae: The roughness of a rip-rap channel is about 0.025 The area, wetted perimeter and surface width of a flow y are given by: A = Wy + ky2 P = W + 2y√(1+k2 ) B = W + 2ky At the outfall, critical depth conditions prevail: B gA Qc 3 = Q We can trial values of y that produce this critical flowrate: Try y = 0.5: A = 1.4(0.5) + 4(0.52 ) = 1.7 m2 B = 1.4 + 2(4)0.5 = 5.4 m Qc = (9.8(1.73 )/5.4)0.5 = 2.99 m3 /s Try y = 0.2:
  • 5. A = 1.4(0.2) + 4(0.22 ) = 0.44 m2 B = 1.4 + 2(4)0.2 = 3.0 m Qc = (9.8(0.443 )/3.0)0.5 = 0.527 m3 /s Try y = 0.3: A = 1.4(0.3) + 4(0.32 ) = 0.78 m2 B = 1.4 + 2(4)0.3 = 3.8 m Qc = (9.8(0.843 )/4.0)0.5 = 1.1 m3 /s Try y = 0.35: A = 1.4(0.35) + 4(0.352 ) = 0.98 m2 B = 1.4 + 2(4)0.31 = 4.2 m Qc = (9.8(0.983 )/4.2)0.5 = 1.48 m3 /s This is close enough given the other uncertainties in the calculation. So we have a starting depth of 0.35 m. The flow velocity at the weir is V = Q/A = 1.45/0.98 = 1.48 m/s The wetted perimeter is then P = W + 2y√(1+k2 ) = 1.4 + 2(0.35)(1+42 )0.5 = 4.29 m And the friction slope at the outfall is 2 32 /f AR nQ S = (0.025(1.45)/(0.98(0.98/4.29)2/3 )2 = 0.0098 m/m We can now proceed upstream to the next step. The flow will be somewhat deeper than 0.35, tending towards the normal depth: By trial and error, normal depth for 0.0003 m/m bedslope occurs at y = 0.78 m (solve Manning’s equation with this value to confirm) We can locate where y2 = 0.78 by the step method: A = 1.4(0.78) + 4(0.782 ) = 3.553 m2 P = 1.4 + 2(0.78)(1+42 )0.5 = 7.861 m V = Q/A = 1.45/3.553 = 0.408 m/s Sf = (0.025(1.45)/(3.553(3.553/7.861)2/3 )2 = 0.0003 m/m (= bedslope for normal depth) The average friction slope over the section is Sf = (0.0098 + 0.0003)/2 = 0.005 m/m
  • 6. And the Step length is of SS y g V y g V L 1 2 1 2 2 2 22 = ((0.4082 /19.62 + 0.78) – (1.482 /19.62 + 0.35))/(0.005 – 0.0003) = 69.6 m This is less than the reach length of 90 m, so we find the channel has established its normal depth at 69.6 m and will have this same depth at the channel section change at 90 m. We can perform a similar calculation for the second reach: By trial and error, normal depth for 0.0017 m/m bedslope occurs at y = 0.530 m (solve Manning’s equation with this value to confirm) We can locate where y2 = yo = 0.530 by the step method: A = 1.4(0.53) + 4(0.532 ) = 1.866 m2 P = 1.4 + 2(0.53)(1+42 )0.5 = 5.771 m V = Q/A = 1.45/1.866 = 0.777 m/s Sf = (0.025(1.45)/(1.866(1.866/5.771)2/3 )2 = 0.0017 m/m (= bedslope for normal depth) The average friction slope over the section is Sf = (0.0017 + 0.0003)/2 = 0.001 m/m And the Step length is L = ((0.7772 /19.62 + 0.53) – (0.4082 /19.62 + 0.78))/(0.001 – 0.0017) = 325 m That is it will take 325 m for the flow to establish at normal depth. We only have 50 m, so we should find the actual depth somewhere between 0.53 and 0.78 m depth. Try y2 = 0.7: A = 1.4(0.7) + 4(0.72 ) = 2.94 m2 P = 1.4 + 2(0.7)(1+42 )0.5 = 7.17 m V = Q/A = 1.45/2.94 = 0.493 m/s Sf = (0.025(1.45)/(2.94(2.94/7.17)2/3 )2 = 0.0005 m/m The average friction slope over the section is Sf = (0.0005 + 0.0003)/2 = 0.0004 m/m And the Step length is L = ((0.4932 /19.62 + 0.7) – (0.4082 /19.62 + 0.78))/(0.0004 – 0.0017) = 61 m
  • 7. Try y2 = 0.71: A = 1.4(0.71) + 4(0.712 ) = 3.01 m2 P = 1.4 + 2(0.71)(1+42 )0.5 = 7.255 m V = Q/A = 1.45/3.3 = 0.482 m/s Sf = (0.025(1.45)/(3.01(3.01/7.255)2/3 )2 = 0.00047 m/m The average friction slope over the section is Sf = (0.00047 + 0.0003)/2 = 0.00038 m/m And the Step length is L = ((0.4822 /19.62 + 0.71) – (0.4082 /19.62 + 0.78))/(0.00038 – 0.0017) = 53 m This is near enough. The flow depth at the top of the 50 m reach is thus 0.71 m. This laborious calculation can easily be transmitted to a spreadsheet for much easier trial and error. Q6. A large dam has a spillway leading into a smooth concrete lined rectangular channel 70 m wide with shallow bedslope. The spillway releases 170 m3 /s into the channel at a flow depth of 0.30 m. The normal flow depth in the channel is 1.7 m. Locate the hydraulic jump that must occur in the channel, the depth before the jump and the power dissipated by the channel and jump. In this case we need to perform a supercritical standard step method and calculate the momentum function of the flow until it equals the momentum of the downstream normal flow depth, at which point a hydraulic jump occurs. This is a complex procedure that will benefit from application of a spreadsheet: Create a table of the provided data and calculate the momentum function of the normal depth: Q 170 W 70 y1 0.3 yo 1.7 Ao 119 =W*yo Vo 1.429 =Q/Ao Mo 125.9 =Vo^2*Ao/9.8+yo/2*Ao Note that the momentum function uses the centroid depth, which is half the total depth. To start the standard step method, calculate the area, wetted perimeter, velocity and friction slope associated with y1 (the initial channel depth): A1 21 =W*y1 P1 70.6 =W+2*y1 V1 8.1 =Q/A1
  • 8. Sf1 0.056 =(0.013*Q/(A1*(A1/P1)^(2/3)))^2 Now add a guessed y2 (the depth of flow after frictional losses down the channel), and calculate A, P, V, Sf and the average Sf: y2 0.5 A2 35 =W*y2 P2 71 =W+2*y2 V2 4.86 =Q/A2 Sf2 0.01 =(0.013*Q/(A2*(A2/P2)^(2/3)))^2 Sf 0.033 =(Sf1+Sf2)/2 Lastly include the step length calculation and the momentum function of the guessed y2: L 58.7 =-((V2^2/19.62+y2)-(V1^2/19.62+y1))/(Sf) M1 93 =V2^2*A2/9.8+y2/2*A2 Note that the step length function has a minus sign because in a supercritical step we move from upstream to downstream, the reverse of the direction (downstream to upstream) by which the formula was derived. Also note that there is no bedslope So in the denominator, as this is specified only as “shallow” and can be treated as zero. Now we can gradually adjust the value of y2 until the momentum function approaches that of the normal depth yo: y2 0.35 A2 24.5 =W*Y2 P2 70.7 =W+2*Y2 V2 6.939 =Q/A2 Sf2 0.033 =(0.013*Q/(A2*(A2/P2)^(2/3)))^2 Sf 0.045 =(SF1+SF2)/2 L 18.74 =-((V2^2/19.62+Y2)-(V1^2/19.62+Y1))/(Sf) M1 124.7 =V2^2*A2/9.8+Y2/2*A2 Here M1 = Mo at a step length L of 18.7 m, where the flow depth is 0.35 m The power dissipated by the apron and jump is a function of the difference in total head between the initial depth and the normal depth: Power = gQ H H1 3.64 =y1+V1^2/19.62 Ho 1.80 =yo+Vo^2/19.62 Power 3058924 =9800*Q*(H1-Ho) The total power dissipated is 3.06 MW