Temperature Controls
         “Why Don’t They Work?
                  Harry Demetrulias
Top 5 Reasons
                            Control
                           Systems
                         Don’t Work


1.   Many Controls Contractors ARE Crooks!
2.   Mechanical Design Problems
3.   Mechanical Installation Problems and
     Equipment Malfunction
4.   Operator Errors and Overrides
5.   Controls Installations: Misapplied Field
     Devices, Sensor Locations, Lack of
     Calibration, and PID Loop Tuning
Blame the Owners
 “Owners are too demanding and
unrealistic in their cost expectations”



 Lower!


             How
             Low?
Blame The
    Architects
  “Architects are too
focused on aesthetics,
    and do not allow
  adequate space for
   building systems:
Mechanical Rooms and
   Interstitial Space”
Blame the Generals
General Contractors punch out projects
 without scheduling adequate time for
Start-up, Checkout, Test & Balance, and
        Commissioning activities
Blame the
              Engineers


“Mechanical
 Engineers
Overworked
   and
Underpaid!”
Blame the Suppliers
“Equipment Suppliers
       Just
    SELL STUFF
and Don’t Support it!”
Blame the Balancer
 “Do you really trust
those Test & Balance
     Reports?”
“Should we blame those
Design/Build Mechanical
     Contractors?
Finger-pointing
                                    is easy




Working toward
     Solutions   Requires Professional

                 COLLABORATION
Function or
 Malfunction is
without exception
 a collaborative
 effort between
   Consultant,
   Mechanical
   Contractor,
    Controls
 Contractor and
     Facility
   Operations.
Temperature Control is simple.
Building Automation is complex…



           How can we promote
                Collaboration?
Delivering Truly Integrated Building Systems To Owners
                  Requires Collaboration




- Engineers     - Controls Contractors      - Mechanical Contractors
- Equipment Suppliers    - Facility Operations
When Temperature Control
  Becomes Complicated
• Economizer Mode
• Variable Volume/Flow
• Dynamic Resets
• Warm-up/Cool-down Modes
• Building Pressurization Control
• Smoke Control
•Underfloor Systems
• IAQ
• Load Shedding Programs
•TOD Scheduling
• PRAC Self-Tuning

• Integrations to 3rd Parties

• Validated Systems
Controls Contractor’s
    Perspective:
 The Consultant as
  PROBLEM…or
     Solution
Market Pressure
& the Design Community

 •   Hyper-competition
 •   Below Market Design Fees
 •   Allotted Billable hours for
     quality designs and
     specifications
 •   Lack of onsite Project
     Engineering
 •   Reliance on draftsmen to
     incorporate last minute
     changes
 •   Addenda Ad Infinitum
The Key:
       Publish Quality
          Documents
Installation is only as
good as the design
Errors on P&S result
in problems in the
field
Malfunction begins in
the mind of the
designer
Unedited Master
Specifications       Lower engineering
                     cost but…
                     Many Change
                     Orders/retrofit
                     corrections
Example #1: Nonspecific Specifications

• “DDC controllers shall be BACnet. Lonmark AND N2
  Open Protocol compliant…”
• “Acceptable manufacturers are Alerton, Andover, Delta,
  Honeywell, Invensys, Johnson Controls, Siemens,
  Staefa Controls, Trane, or approved equal.”
2. Electric, Electronic, and DDC Systems:
                                 a. Alerton Technologies, Inc.
    Example #2:                  b. Andover Controls Corp.
                                 c. Automated Logic Corporation.
Healthcare project…              d. Auto-Matrix, Inc.; Auto-Flow Division.
                                 e. CSI Control Systems International, Inc.
                                 f. Danfoss Automatic Controls.
                                 g. Delta Controls Inc.
                                 h. EDA Controls Corp.
                                 i. Electronic Systems USA, Inc.
                                 j. G C Controls, Inc.
                                 k. Honeywell, Inc.; Home & Building Control.
                                 I. Impact Energy Controls Corp
                                 m. Johnson Controls, Inc.; Controls Group.
                                 n. KMC Controls/Kreuter Manufacturing Company.
                                 o. Landis & Staefa, Inc.
                                 p. Luwa Bahnson Inc.
                                 q. McQuay Intemational.
                                 r. Neles-Jamesbury.
                                 LOWEST TOTAL COST OF OWNERSHIP
                                 s. Pneuline Controls Co.; National Energy Controls Corp.
                                 t. Scientific-Atlanta, Inc.; Control Systems Div.
                                 u. Siebe Environmental Controls; Barber-Coleman/Robertshaw

               Anyone            Products
                                 v. Solidyne Corp.
                                 w. TCS/BASYS Controls
               Missing?          x. Teletrol Systems Inc.
                                 y. Trane Co. (The); North American Commercial Group.
                                 z. Triangle MicroSystems, Inc.
                                 aa. Uni-Line North America; Robertshaw Division.

                          3. Systems must interface seamlessly with existing front end control
                          system
Damper Control: When the unit is commanded on, the
 Example #3:                                outside air damper shall fully open. When the unit is
                                            commanded off, the outside air damper shall close. The
                                            exhaust damper shall remain closed and the mixed air
                                            damper shall remain open.                                              8            RF1ISO-S        RA-F1




                                                                                                                                   NC



                                                              RA-SD          RA-T
                                                             (Div. 16)       RA-H
                                                                                                                                                VSD
          NC

EA                                                                                                                                                                                  RA
                                                                                                                   10           RF2ISO-S        RA-F2


                                                                                                       HSP1-A
                                                                                                       Set @4"                     NC




                                                                                                        H   L
                                                                                                                                                VSD
                                                                                               SF-F1    SF1ISO-S        7                               HUM-O
                 NO                                                                                                                                                                      0-7.5"
                                                                                                                                                        10-27

                      PFILT-A                                                                               NC
                                                                                                                                           FFILT-A
                                                                                                                                                                                         SA-P
                      Set @ 1"                                                                                                             Set @ 1"


                       H   L                                                                                                                H   L                                        H   L
                                                  LT-ALM                                        VSD
                                     MA-T                                                              HSP2-A                                                            SA-SD
     3   DPR-O                                  (38 Deg F)                                                                                              HUM-HL   SA-T
                                                                                                       Set @4"                                                          (Div. 16)

                                                                    C
OA        NC                                                             C
                                                                                                        H   L                                                                                     SA
                                                                              4
                                                                                               SF-F2    SF2ISO-S            9
                                 4            CLG-O

                                                                              HUM-VLV

                                     RETURN                                                                 NC


                                               NO
                                                                                         STM
                                                                                    NC
                                     SUPPLY                                                     VSD




     Discharge Air Temperature Control: When the unit is
     commanded on, the outside air damper, return air damper, and
     relief air damper will be open. Discharge temperature sensor SA-
     T through the DDC Controller will modulate the cooling coil 2-way
     control valve CLG-O to maintain setting. The discharge air
     temperature will be controlled to maintain a 55°F setpoint.
Specify SPECIFICS…



                       Specify limited qualified
                       bidders that are suitable for

                               • market type
                         LOWEST TOTAL COST OF OWNERSHIP
                           • product application
                           • contractor expertise



      Balance First Cost with Operating Cost
BAS                                Cross-
            FIRE
                                     VIDEO-
                                       ON-
                                                       Referencing
                                     DEMAND



                                              HOTEL
 ELEVATOR                                  OPERATING
                                            SYSTEM



                   IT NETWORK
LIGHTING                                       PABX    Write Specifications
                                                       that refer to other
                                                       sections and
                                                       technologies.
    CENTRAL
     PLANT                                PAGING
                                                       Detail the
                                                       responsibilities
               CCTV                                    Furnished by…
             SECURITY
                                   CMMS
                                                       Installed by…
                           15
                        BUILDING
                                                       Wired by…
                        SERVICES
Sequence of Operation
EXHAUST SYSTEM: EF-1 and EF-2
                       EF-       EF-
Isolation Exhaust Fans EF-1 and EF-2:
                          EF-       EF-
On command from the BAS, the fans shall start. If
                                                    Include at Minimum:
for any reason the fan status does not match its
commanded value, an alarm will be generated.
ISOLATION ROOM MONITORS                             Flow Diagrams
System Description:
The Isolation Rooms shall be monitored by a Space
Pressure Monitor as described in controls
specification at minimum and shall generate an      Point Charts
alarm at the BAS upon general alarm or deviation
from space pressurization setpoint (adj).
                                    adj).
                                                    Sequences
P.E.
                 Professional
                    Enforcer
Enforce your
specifications
Guard against cheating
in hyper-competitive
market
Get involved in
checkout, functional
testing and
commissioning
Specify Commissioning
Expectations
                  Review Checkout
                  Sheets
                   Verify that field
                   devices match the
                   specification
Resist De-Value Engineering
10. Delete lab VAV: Constant volume labs
9. Delete DDC from FCUs
8. Delete SAT Sensors on VAV w/RH
7. Delete DPs across filter racks
6. Delete interfaces to Chillers, Boilers and VFDs
5. Delete AFMS from AHUs SA/RA/OA
4. Delete VAV zones and combine multiple zones
3. Delete Custom Controls on RTUs in lieu of
  packaged
2. Delete RH Coils in lieu of Cooling Only VAV
1. Delete DDC from VAV/CAV terminals
Technology


       Capabilities of
        Technology



          Cost of
        Technology       Technology is more
                         affordable than ever.
                         But it has made
                         building controls more
                         complicated for
1990     2006            Specifying Engineers
Get Help from Your
    Local Controls Experts
     and Sales Engineers




The System Selection Tool was
designed to help specifying engineers
quickly develop detailed, accurate
plans and specifications for heating,
ventilation and air conditioning (HVAC)
Summary:        A New
              Level of
        Engineering Value




$   Step 1 Publish Quality Documents
    Step 2 Resist De-Value Engineering
    Step 3 List Qualified Bidders
    Step 4 Enforce Specifications
    Step 5 Get Support and Consultation
    from Reputable Controls Companies
Less quality in                              More value out




     Design/Build and Value Engineering
       Exploiting Owner’s Lowest First Cost Demands?
“We can do it
                                                     cheaper and
                                                         faster!”




Less quality in                                      More value out




           Hyper/Competitive Market and the D/B Model:
           Contractors Control Design
              - Reliance on Equipment Suppliers for TC
              - Packaged systems w/canned programs
Slam it in                             Commission it later




             Hard Bid/Design/Build
                       Can this building be fixed?
Problem: Mechanical Design & Controls Issues



                     –   Building Pressurization Problems
                     –   Toggling RTU Modes
                     –   Uneven Underfloor Distribution
                     –   Overly cool interior zones
                     –   Overly warm exterior zones
   Symptoms
                     –   No humidity control
   Building # 1
                     –   Energy Hog—could not qualify for Energy
   D/B Debacle           Star rating




    ASHRAE        Temperature Controls: “Why Don’t They Work?”
                                             Don’       Work?”
Problem: Mechanical Design & Controls Issues




                     –   VAV w/General Exhaust System
                     –   No trunks to distribute UFS
        Causes       –   Improperly placed pressure sensing devices
                     –   No calibrated primary T/H devices
    Building # 1
                     –   Cooling mode problems
    D/B Debacle
                     –   Dueling PID Loop Control on RTU
                     –   Inability to alter or augment canned RTU
                         program—limitations




    ASHRAE         Temperature Controls: “Why Don’t They Work?”
                                              Don’       Work?”
Problem: Mechanical Design & Controls Issues




                 –   Hire a COMMISSIONING AGENT!
                 –   Add return fans
                 –   Add trunks to distribute UFS
   Solutions     –   Relocate pressure sensing devices
Building # 1     –   Calibrate primary T/H devices
D/B Debacle      –   Replace misapplied DDC hardware
                 –   Reprogram and recommission
                 –   Work with commissioning agent




 ASHRAE        Temperature Controls: “Why Don’t They Work?”
                                          Don’       Work?”
Manual Control



Automation does not
work well in the “HAND”
position
“It’s always a
      Controls
    Problem!”




…often times it is…
The Controls Contractor as Part of the
Solution…
Controls Industry
    Boilers
                                   as the Problem:
                  Pumping & VFDs



    Chiller



                    Absorption



   Power



                    Generators
                                   Today’s Technology is less expensive
 Fan Systems                       But the Labor is not
                                   Margin Expectations Continue to Rise
                    Fire Alarm     Competition is driving the quality out

Surgical Suites



                     Lighting



 Fume Hood
Today’s Technicians often
know computers but lack
understanding of basic
mechanical systems
Application Engineering &
Commissioning Challenges
   Decreased skill sets in
   controls software
   engineering
   Protocols do NOT control
   buildings
   Software illiteracy
   Reliance on automated
Person at Metasys
   processes
workstation
   Lack of Quality
   Management processes
   What is Commissioning?
COMPLEXITY
        Building Technology Has
Complicated Simple Temperature
                        Controls

   Comfort
   Lighting
   Security
   Scheduling
   Access control
   Fire safety
                    Communications
                    Fuel conservation
                    Power load
                    management
                    Maintenance
                    management
Controls Industry
as the Problem:



     Value Added
        Services?
Phase 1 Low First cost
Phase 2 Prices just went up!
Phase 3 Delivering less value
over time
Solution 1:
        Can we consider
        a new
                 Level of Value?


Phase 1 Low First cost
Phase 2 Open Book Pricing
Phase 3 Pricing Agreements
Phase 4 Meet the Specifications
Phase 5 Exceed Customer Expectations
Solution 2:       Expert
Services
Provide support and
educational services to the
engineering community
Offer design review services
and provide input on
sequences, points lists and
specifications
Review Bid Documents and
write good clear RFIs early in
the process
Solution 3:
              Customer & Design Team
                                                                             Deliver as
                                                                             Promised


                        General                                            Behave more like
                                                                             consulting
                                                                             experts, less like
                                                                             the proverbial
                                                                             Crooks

                                                                           Be professional and
                                                                             deliver on
                                                                             Performance
           Mechanical              Electrical               Windows
                                                            Raised Floor     Specifications
           Contractor             Contractor                etc


                                                                           Submit proper
Controls     HVAC                  Lighting          Fire                    checkout and
                                                                             commissioning
                                                                             documentation to
                                                            Power            Consultants
                                          Security
                                                            Mgmt

                                                                           Make Buildings Work
Quality Assurance…
                     Apply ASHRAE Standards
                     Due diligence on
                     installations and checkout
                     practices
                     Tune loops and set up
                     trends during checkout and
                     commissioning
                     Work with Designers as
                     fellow engineers, not
                     combative contractors




                                       Review Checkout
                                       Sheets
                                       Verify that field devices
                                       match the specification
Working Together
  we can deliver
better design and
   construction
 projects and the
High Performance
  Buildings that
    Owners are
    paying for.
Temperature Controls
          “Why Don’t They Work?
                          Q&A

Más contenido relacionado

Destacado

Industrial Training at Suratgarh Super Thermal Power Plant ppt
Industrial Training at Suratgarh Super Thermal Power Plant pptIndustrial Training at Suratgarh Super Thermal Power Plant ppt
Industrial Training at Suratgarh Super Thermal Power Plant pptMSHRISTISAHU
 
Thermal power-plant
Thermal power-plantThermal power-plant
Thermal power-plantjsoni332
 
Ppt of refrigerator temperature controller
Ppt of refrigerator temperature controllerPpt of refrigerator temperature controller
Ppt of refrigerator temperature controllerashwinigolghate
 
Suratgarh thermal power station
Suratgarh  thermal  power  stationSuratgarh  thermal  power  station
Suratgarh thermal power stationGaurav Gunjan
 
A best ppt on kota super thermal power station
A best ppt on kota super thermal power stationA best ppt on kota super thermal power station
A best ppt on kota super thermal power stationNaveen Kumar
 
ROLE OF CONTROL AND INSTRUMENTATION IN THERMAL POWER PLANT
ROLE OF CONTROL AND INSTRUMENTATION IN THERMAL POWER PLANTROLE OF CONTROL AND INSTRUMENTATION IN THERMAL POWER PLANT
ROLE OF CONTROL AND INSTRUMENTATION IN THERMAL POWER PLANTGaurav Rai
 
Chilled water systems
Chilled water systemsChilled water systems
Chilled water systemsJason Abston
 
Thermal power plant
Thermal power plantThermal power plant
Thermal power plantfoxycrow
 
Humidity Management for Indoor Growers
Humidity Management for Indoor GrowersHumidity Management for Indoor Growers
Humidity Management for Indoor GrowersUpstart University
 
Thermal Power Plants
Thermal Power PlantsThermal Power Plants
Thermal Power PlantsHarshad Desai
 
THERMAL POWER PLANT (COAL TO POWER)
THERMAL POWER PLANT (COAL TO POWER)THERMAL POWER PLANT (COAL TO POWER)
THERMAL POWER PLANT (COAL TO POWER)Baibhav Saha
 
Instrumentation & Control For Thermal Power Plant
Instrumentation & Control For Thermal Power PlantInstrumentation & Control For Thermal Power Plant
Instrumentation & Control For Thermal Power PlantSHIVAJI CHOUDHURY
 
Thermal plant instrumentation and control
Thermal plant instrumentation and controlThermal plant instrumentation and control
Thermal plant instrumentation and controlShilpa Shukla
 
Thermal power plant
Thermal power plant Thermal power plant
Thermal power plant Ankur Mahajan
 
Thermal Power Plant - Full Detail About Plant and Parts (Also Contain Animate...
Thermal Power Plant - Full Detail About Plant and Parts (Also Contain Animate...Thermal Power Plant - Full Detail About Plant and Parts (Also Contain Animate...
Thermal Power Plant - Full Detail About Plant and Parts (Also Contain Animate...Shubham Thakur
 
Water Chilled Airconditioning
Water Chilled AirconditioningWater Chilled Airconditioning
Water Chilled AirconditioningAljon Altiche
 

Destacado (20)

Industrial Training at Suratgarh Super Thermal Power Plant ppt
Industrial Training at Suratgarh Super Thermal Power Plant pptIndustrial Training at Suratgarh Super Thermal Power Plant ppt
Industrial Training at Suratgarh Super Thermal Power Plant ppt
 
Centrifugal Pump
Centrifugal PumpCentrifugal Pump
Centrifugal Pump
 
Thermal power-plant
Thermal power-plantThermal power-plant
Thermal power-plant
 
Ppt of refrigerator temperature controller
Ppt of refrigerator temperature controllerPpt of refrigerator temperature controller
Ppt of refrigerator temperature controller
 
Suratgarh thermal power station
Suratgarh  thermal  power  stationSuratgarh  thermal  power  station
Suratgarh thermal power station
 
A best ppt on kota super thermal power station
A best ppt on kota super thermal power stationA best ppt on kota super thermal power station
A best ppt on kota super thermal power station
 
Blowroom
BlowroomBlowroom
Blowroom
 
ROLE OF CONTROL AND INSTRUMENTATION IN THERMAL POWER PLANT
ROLE OF CONTROL AND INSTRUMENTATION IN THERMAL POWER PLANTROLE OF CONTROL AND INSTRUMENTATION IN THERMAL POWER PLANT
ROLE OF CONTROL AND INSTRUMENTATION IN THERMAL POWER PLANT
 
Thermal Power Plant Hazards
Thermal Power Plant HazardsThermal Power Plant Hazards
Thermal Power Plant Hazards
 
Chilled water systems
Chilled water systemsChilled water systems
Chilled water systems
 
Thermal power plant
Thermal power plantThermal power plant
Thermal power plant
 
Humidity Management for Indoor Growers
Humidity Management for Indoor GrowersHumidity Management for Indoor Growers
Humidity Management for Indoor Growers
 
Thermal Power Plants
Thermal Power PlantsThermal Power Plants
Thermal Power Plants
 
THERMAL POWER PLANT (COAL TO POWER)
THERMAL POWER PLANT (COAL TO POWER)THERMAL POWER PLANT (COAL TO POWER)
THERMAL POWER PLANT (COAL TO POWER)
 
Instrumentation & Control For Thermal Power Plant
Instrumentation & Control For Thermal Power PlantInstrumentation & Control For Thermal Power Plant
Instrumentation & Control For Thermal Power Plant
 
Thermal plant instrumentation and control
Thermal plant instrumentation and controlThermal plant instrumentation and control
Thermal plant instrumentation and control
 
Thermal power plant
Thermal power plant Thermal power plant
Thermal power plant
 
Thermal Power Plant - Full Detail About Plant and Parts (Also Contain Animate...
Thermal Power Plant - Full Detail About Plant and Parts (Also Contain Animate...Thermal Power Plant - Full Detail About Plant and Parts (Also Contain Animate...
Thermal Power Plant - Full Detail About Plant and Parts (Also Contain Animate...
 
Water Chilled Airconditioning
Water Chilled AirconditioningWater Chilled Airconditioning
Water Chilled Airconditioning
 
Thermal power point
Thermal power pointThermal power point
Thermal power point
 

Similar a Temperature Control Sysems And Why They Dont Work

Mw training slide
Mw training slideMw training slide
Mw training slidededoyin
 
Ed3 pc & ed4-pc skid weigh plus
Ed3 pc & ed4-pc skid weigh plusEd3 pc & ed4-pc skid weigh plus
Ed3 pc & ed4-pc skid weigh plustedjurca
 
Ed3 pc & ed4-pc skid weigh plus
Ed3 pc & ed4-pc skid weigh plusEd3 pc & ed4-pc skid weigh plus
Ed3 pc & ed4-pc skid weigh plustedjurca
 
An engineering perspective on biometric sensor integration in wearables
An engineering perspective on biometric sensor integration in wearablesAn engineering perspective on biometric sensor integration in wearables
An engineering perspective on biometric sensor integration in wearablesValencell, Inc
 
Hands-On Lab: Learn How to Harness CA Application Performance Management Di...
Hands-On Lab: Learn How to Harness CA Application Performance Management  Di...Hands-On Lab: Learn How to Harness CA Application Performance Management  Di...
Hands-On Lab: Learn How to Harness CA Application Performance Management Di...CA Technologies
 
Ed3 & ed4 at installation & calibration v!)!
Ed3 & ed4 at installation & calibration v!)!Ed3 & ed4 at installation & calibration v!)!
Ed3 & ed4 at installation & calibration v!)!tedjurca
 
Ed3 & ed4 sm installation & calibration v101
Ed3 & ed4 sm installation & calibration v101Ed3 & ed4 sm installation & calibration v101
Ed3 & ed4 sm installation & calibration v101tedjurca
 
Ed3 & ed4 sm installation & calibration v101
Ed3 & ed4 sm installation & calibration v101Ed3 & ed4 sm installation & calibration v101
Ed3 & ed4 sm installation & calibration v101tedjurca
 
To develope and design compensator system
To develope and design compensator  systemTo develope and design compensator  system
To develope and design compensator systemVk7821
 
Ed3 & ed4 print installation & calibration v!)!
Ed3 & ed4 print installation & calibration v!)!Ed3 & ed4 print installation & calibration v!)!
Ed3 & ed4 print installation & calibration v!)!tedjurca
 
Ed2 2 x-sm installation & calibration v101
Ed2 2 x-sm installation & calibration v101Ed2 2 x-sm installation & calibration v101
Ed2 2 x-sm installation & calibration v101tedjurca
 
Joshua Yari JD Template - all Staff (003)
Joshua Yari JD Template - all Staff (003)Joshua Yari JD Template - all Staff (003)
Joshua Yari JD Template - all Staff (003)Joshua Yari
 
1.45 inch Amoled(280x280) Datasheet
1.45 inch Amoled(280x280) Datasheet1.45 inch Amoled(280x280) Datasheet
1.45 inch Amoled(280x280) DatasheetPanox Display
 
Nyhuis_Resume_CoverLetter
Nyhuis_Resume_CoverLetterNyhuis_Resume_CoverLetter
Nyhuis_Resume_CoverLetterRobert Nyhuis
 
Ed2 rtlt installation & calibration
Ed2 rtlt installation & calibrationEd2 rtlt installation & calibration
Ed2 rtlt installation & calibrationtedjurca
 

Similar a Temperature Control Sysems And Why They Dont Work (20)

Mw training slide
Mw training slideMw training slide
Mw training slide
 
Plc by Mohamed Al-Emam, Session2
Plc by Mohamed Al-Emam, Session2Plc by Mohamed Al-Emam, Session2
Plc by Mohamed Al-Emam, Session2
 
Ed3 pc & ed4-pc skid weigh plus
Ed3 pc & ed4-pc skid weigh plusEd3 pc & ed4-pc skid weigh plus
Ed3 pc & ed4-pc skid weigh plus
 
Ed3 pc & ed4-pc skid weigh plus
Ed3 pc & ed4-pc skid weigh plusEd3 pc & ed4-pc skid weigh plus
Ed3 pc & ed4-pc skid weigh plus
 
An engineering perspective on biometric sensor integration in wearables
An engineering perspective on biometric sensor integration in wearablesAn engineering perspective on biometric sensor integration in wearables
An engineering perspective on biometric sensor integration in wearables
 
Hands-On Lab: Learn How to Harness CA Application Performance Management Di...
Hands-On Lab: Learn How to Harness CA Application Performance Management  Di...Hands-On Lab: Learn How to Harness CA Application Performance Management  Di...
Hands-On Lab: Learn How to Harness CA Application Performance Management Di...
 
Ed3 & ed4 at installation & calibration v!)!
Ed3 & ed4 at installation & calibration v!)!Ed3 & ed4 at installation & calibration v!)!
Ed3 & ed4 at installation & calibration v!)!
 
Ed3 & ed4 sm installation & calibration v101
Ed3 & ed4 sm installation & calibration v101Ed3 & ed4 sm installation & calibration v101
Ed3 & ed4 sm installation & calibration v101
 
Ed3 & ed4 sm installation & calibration v101
Ed3 & ed4 sm installation & calibration v101Ed3 & ed4 sm installation & calibration v101
Ed3 & ed4 sm installation & calibration v101
 
To develope and design compensator system
To develope and design compensator  systemTo develope and design compensator  system
To develope and design compensator system
 
Raja CV Instrument
Raja CV InstrumentRaja CV Instrument
Raja CV Instrument
 
Ed3 & ed4 print installation & calibration v!)!
Ed3 & ed4 print installation & calibration v!)!Ed3 & ed4 print installation & calibration v!)!
Ed3 & ed4 print installation & calibration v!)!
 
Ed2 2 x-sm installation & calibration v101
Ed2 2 x-sm installation & calibration v101Ed2 2 x-sm installation & calibration v101
Ed2 2 x-sm installation & calibration v101
 
Joshua Yari JD Template - all Staff (003)
Joshua Yari JD Template - all Staff (003)Joshua Yari JD Template - all Staff (003)
Joshua Yari JD Template - all Staff (003)
 
Fahad CV
Fahad CVFahad CV
Fahad CV
 
Pneumatic ESD Actuation
Pneumatic ESD ActuationPneumatic ESD Actuation
Pneumatic ESD Actuation
 
Matt Instr CV
Matt Instr CVMatt Instr CV
Matt Instr CV
 
1.45 inch Amoled(280x280) Datasheet
1.45 inch Amoled(280x280) Datasheet1.45 inch Amoled(280x280) Datasheet
1.45 inch Amoled(280x280) Datasheet
 
Nyhuis_Resume_CoverLetter
Nyhuis_Resume_CoverLetterNyhuis_Resume_CoverLetter
Nyhuis_Resume_CoverLetter
 
Ed2 rtlt installation & calibration
Ed2 rtlt installation & calibrationEd2 rtlt installation & calibration
Ed2 rtlt installation & calibration
 

Más de ASHRAE Region VI

Controls Why They Dont Work
Controls Why They Dont WorkControls Why They Dont Work
Controls Why They Dont WorkASHRAE Region VI
 
ASHRAE 90 1 The Big Picture
ASHRAE 90 1 The Big PictureASHRAE 90 1 The Big Picture
ASHRAE 90 1 The Big PictureASHRAE Region VI
 
ASHRAE's Latest and Greatest Hits
ASHRAE's Latest and Greatest HitsASHRAE's Latest and Greatest Hits
ASHRAE's Latest and Greatest HitsASHRAE Region VI
 
Fundamentals Of Hydronic System Design
Fundamentals Of Hydronic System DesignFundamentals Of Hydronic System Design
Fundamentals Of Hydronic System DesignASHRAE Region VI
 
Benchmarking/Performance Measuring
Benchmarking/Performance MeasuringBenchmarking/Performance Measuring
Benchmarking/Performance MeasuringASHRAE Region VI
 
High Performance Building Design Strategies
High Performance Building Design StrategiesHigh Performance Building Design Strategies
High Performance Building Design StrategiesASHRAE Region VI
 
High Performance Buildings: What are They?
High Performance Buildings: What are They?High Performance Buildings: What are They?
High Performance Buildings: What are They?ASHRAE Region VI
 

Más de ASHRAE Region VI (11)

Controls Why They Dont Work
Controls Why They Dont WorkControls Why They Dont Work
Controls Why They Dont Work
 
The Consultants Role
The Consultants RoleThe Consultants Role
The Consultants Role
 
ASHRAE 90 1 The Big Picture
ASHRAE 90 1 The Big PictureASHRAE 90 1 The Big Picture
ASHRAE 90 1 The Big Picture
 
ASHRAE's Latest and Greatest Hits
ASHRAE's Latest and Greatest HitsASHRAE's Latest and Greatest Hits
ASHRAE's Latest and Greatest Hits
 
ASHRAE Staff Presentation
ASHRAE Staff PresentationASHRAE Staff Presentation
ASHRAE Staff Presentation
 
President's Address
President's AddressPresident's Address
President's Address
 
Fundamentals Of Hydronic System Design
Fundamentals Of Hydronic System DesignFundamentals Of Hydronic System Design
Fundamentals Of Hydronic System Design
 
LEED Version 3
LEED Version 3LEED Version 3
LEED Version 3
 
Benchmarking/Performance Measuring
Benchmarking/Performance MeasuringBenchmarking/Performance Measuring
Benchmarking/Performance Measuring
 
High Performance Building Design Strategies
High Performance Building Design StrategiesHigh Performance Building Design Strategies
High Performance Building Design Strategies
 
High Performance Buildings: What are They?
High Performance Buildings: What are They?High Performance Buildings: What are They?
High Performance Buildings: What are They?
 

Último

办理学位证(TheAuckland证书)新西兰奥克兰大学毕业证成绩单原版一比一
办理学位证(TheAuckland证书)新西兰奥克兰大学毕业证成绩单原版一比一办理学位证(TheAuckland证书)新西兰奥克兰大学毕业证成绩单原版一比一
办理学位证(TheAuckland证书)新西兰奥克兰大学毕业证成绩单原版一比一Fi L
 
2024新版美国旧金山州立大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree
2024新版美国旧金山州立大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree2024新版美国旧金山州立大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree
2024新版美国旧金山州立大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degreeyuu sss
 
办理学位证(NTU证书)新加坡南洋理工大学毕业证成绩单原版一比一
办理学位证(NTU证书)新加坡南洋理工大学毕业证成绩单原版一比一办理学位证(NTU证书)新加坡南洋理工大学毕业证成绩单原版一比一
办理学位证(NTU证书)新加坡南洋理工大学毕业证成绩单原版一比一A SSS
 
3D Printing And Designing Final Report.pdf
3D Printing And Designing Final Report.pdf3D Printing And Designing Final Report.pdf
3D Printing And Designing Final Report.pdfSwaraliBorhade
 
Dubai Calls Girl Tapes O525547819 Real Tapes Escort Services Dubai
Dubai Calls Girl Tapes O525547819 Real Tapes Escort Services DubaiDubai Calls Girl Tapes O525547819 Real Tapes Escort Services Dubai
Dubai Calls Girl Tapes O525547819 Real Tapes Escort Services Dubaikojalkojal131
 
'CASE STUDY OF INDIRA PARYAVARAN BHAVAN DELHI ,
'CASE STUDY OF INDIRA PARYAVARAN BHAVAN DELHI ,'CASE STUDY OF INDIRA PARYAVARAN BHAVAN DELHI ,
'CASE STUDY OF INDIRA PARYAVARAN BHAVAN DELHI ,Aginakm1
 
ARt app | UX Case Study
ARt app | UX Case StudyARt app | UX Case Study
ARt app | UX Case StudySophia Viganò
 
1比1办理美国北卡罗莱纳州立大学毕业证成绩单pdf电子版制作修改
1比1办理美国北卡罗莱纳州立大学毕业证成绩单pdf电子版制作修改1比1办理美国北卡罗莱纳州立大学毕业证成绩单pdf电子版制作修改
1比1办理美国北卡罗莱纳州立大学毕业证成绩单pdf电子版制作修改yuu sss
 
原版美国亚利桑那州立大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree
原版美国亚利桑那州立大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree原版美国亚利桑那州立大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree
原版美国亚利桑那州立大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degreeyuu sss
 
Mookuthi is an artisanal nose ornament brand based in Madras.
Mookuthi is an artisanal nose ornament brand based in Madras.Mookuthi is an artisanal nose ornament brand based in Madras.
Mookuthi is an artisanal nose ornament brand based in Madras.Mookuthi
 
DAKSHIN BIHAR GRAMIN BANK: REDEFINING THE DIGITAL BANKING EXPERIENCE WITH A U...
DAKSHIN BIHAR GRAMIN BANK: REDEFINING THE DIGITAL BANKING EXPERIENCE WITH A U...DAKSHIN BIHAR GRAMIN BANK: REDEFINING THE DIGITAL BANKING EXPERIENCE WITH A U...
DAKSHIN BIHAR GRAMIN BANK: REDEFINING THE DIGITAL BANKING EXPERIENCE WITH A U...Rishabh Aryan
 
PORTFOLIO DE ARQUITECTURA CRISTOBAL HERAUD 2024
PORTFOLIO DE ARQUITECTURA CRISTOBAL HERAUD 2024PORTFOLIO DE ARQUITECTURA CRISTOBAL HERAUD 2024
PORTFOLIO DE ARQUITECTURA CRISTOBAL HERAUD 2024CristobalHeraud
 
Pharmaceutical Packaging for the elderly.pdf
Pharmaceutical Packaging for the elderly.pdfPharmaceutical Packaging for the elderly.pdf
Pharmaceutical Packaging for the elderly.pdfAayushChavan5
 
毕业文凭制作#回国入职#diploma#degree澳洲弗林德斯大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree
毕业文凭制作#回国入职#diploma#degree澳洲弗林德斯大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree 毕业文凭制作#回国入职#diploma#degree澳洲弗林德斯大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree
毕业文凭制作#回国入职#diploma#degree澳洲弗林德斯大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree ttt fff
 
cda.pptx critical discourse analysis ppt
cda.pptx critical discourse analysis pptcda.pptx critical discourse analysis ppt
cda.pptx critical discourse analysis pptMaryamAfzal41
 
Call Girls Aslali 7397865700 Ridhima Hire Me Full Night
Call Girls Aslali 7397865700 Ridhima Hire Me Full NightCall Girls Aslali 7397865700 Ridhima Hire Me Full Night
Call Girls Aslali 7397865700 Ridhima Hire Me Full Nightssuser7cb4ff
 
PORTAFOLIO 2024_ ANASTASIYA KUDINOVA
PORTAFOLIO   2024_  ANASTASIYA  KUDINOVAPORTAFOLIO   2024_  ANASTASIYA  KUDINOVA
PORTAFOLIO 2024_ ANASTASIYA KUDINOVAAnastasiya Kudinova
 
Untitled presedddddddddddddddddntation (1).pptx
Untitled presedddddddddddddddddntation (1).pptxUntitled presedddddddddddddddddntation (1).pptx
Untitled presedddddddddddddddddntation (1).pptxmapanig881
 
原版1:1定制堪培拉大学毕业证(UC毕业证)#文凭成绩单#真实留信学历认证永久存档
原版1:1定制堪培拉大学毕业证(UC毕业证)#文凭成绩单#真实留信学历认证永久存档原版1:1定制堪培拉大学毕业证(UC毕业证)#文凭成绩单#真实留信学历认证永久存档
原版1:1定制堪培拉大学毕业证(UC毕业证)#文凭成绩单#真实留信学历认证永久存档208367051
 

Último (20)

办理学位证(TheAuckland证书)新西兰奥克兰大学毕业证成绩单原版一比一
办理学位证(TheAuckland证书)新西兰奥克兰大学毕业证成绩单原版一比一办理学位证(TheAuckland证书)新西兰奥克兰大学毕业证成绩单原版一比一
办理学位证(TheAuckland证书)新西兰奥克兰大学毕业证成绩单原版一比一
 
2024新版美国旧金山州立大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree
2024新版美国旧金山州立大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree2024新版美国旧金山州立大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree
2024新版美国旧金山州立大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree
 
办理学位证(NTU证书)新加坡南洋理工大学毕业证成绩单原版一比一
办理学位证(NTU证书)新加坡南洋理工大学毕业证成绩单原版一比一办理学位证(NTU证书)新加坡南洋理工大学毕业证成绩单原版一比一
办理学位证(NTU证书)新加坡南洋理工大学毕业证成绩单原版一比一
 
3D Printing And Designing Final Report.pdf
3D Printing And Designing Final Report.pdf3D Printing And Designing Final Report.pdf
3D Printing And Designing Final Report.pdf
 
Dubai Calls Girl Tapes O525547819 Real Tapes Escort Services Dubai
Dubai Calls Girl Tapes O525547819 Real Tapes Escort Services DubaiDubai Calls Girl Tapes O525547819 Real Tapes Escort Services Dubai
Dubai Calls Girl Tapes O525547819 Real Tapes Escort Services Dubai
 
'CASE STUDY OF INDIRA PARYAVARAN BHAVAN DELHI ,
'CASE STUDY OF INDIRA PARYAVARAN BHAVAN DELHI ,'CASE STUDY OF INDIRA PARYAVARAN BHAVAN DELHI ,
'CASE STUDY OF INDIRA PARYAVARAN BHAVAN DELHI ,
 
ARt app | UX Case Study
ARt app | UX Case StudyARt app | UX Case Study
ARt app | UX Case Study
 
1比1办理美国北卡罗莱纳州立大学毕业证成绩单pdf电子版制作修改
1比1办理美国北卡罗莱纳州立大学毕业证成绩单pdf电子版制作修改1比1办理美国北卡罗莱纳州立大学毕业证成绩单pdf电子版制作修改
1比1办理美国北卡罗莱纳州立大学毕业证成绩单pdf电子版制作修改
 
原版美国亚利桑那州立大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree
原版美国亚利桑那州立大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree原版美国亚利桑那州立大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree
原版美国亚利桑那州立大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree
 
Mookuthi is an artisanal nose ornament brand based in Madras.
Mookuthi is an artisanal nose ornament brand based in Madras.Mookuthi is an artisanal nose ornament brand based in Madras.
Mookuthi is an artisanal nose ornament brand based in Madras.
 
DAKSHIN BIHAR GRAMIN BANK: REDEFINING THE DIGITAL BANKING EXPERIENCE WITH A U...
DAKSHIN BIHAR GRAMIN BANK: REDEFINING THE DIGITAL BANKING EXPERIENCE WITH A U...DAKSHIN BIHAR GRAMIN BANK: REDEFINING THE DIGITAL BANKING EXPERIENCE WITH A U...
DAKSHIN BIHAR GRAMIN BANK: REDEFINING THE DIGITAL BANKING EXPERIENCE WITH A U...
 
PORTFOLIO DE ARQUITECTURA CRISTOBAL HERAUD 2024
PORTFOLIO DE ARQUITECTURA CRISTOBAL HERAUD 2024PORTFOLIO DE ARQUITECTURA CRISTOBAL HERAUD 2024
PORTFOLIO DE ARQUITECTURA CRISTOBAL HERAUD 2024
 
Pharmaceutical Packaging for the elderly.pdf
Pharmaceutical Packaging for the elderly.pdfPharmaceutical Packaging for the elderly.pdf
Pharmaceutical Packaging for the elderly.pdf
 
Call Girls in Pratap Nagar, 9953056974 Escort Service
Call Girls in Pratap Nagar,  9953056974 Escort ServiceCall Girls in Pratap Nagar,  9953056974 Escort Service
Call Girls in Pratap Nagar, 9953056974 Escort Service
 
毕业文凭制作#回国入职#diploma#degree澳洲弗林德斯大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree
毕业文凭制作#回国入职#diploma#degree澳洲弗林德斯大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree 毕业文凭制作#回国入职#diploma#degree澳洲弗林德斯大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree
毕业文凭制作#回国入职#diploma#degree澳洲弗林德斯大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree
 
cda.pptx critical discourse analysis ppt
cda.pptx critical discourse analysis pptcda.pptx critical discourse analysis ppt
cda.pptx critical discourse analysis ppt
 
Call Girls Aslali 7397865700 Ridhima Hire Me Full Night
Call Girls Aslali 7397865700 Ridhima Hire Me Full NightCall Girls Aslali 7397865700 Ridhima Hire Me Full Night
Call Girls Aslali 7397865700 Ridhima Hire Me Full Night
 
PORTAFOLIO 2024_ ANASTASIYA KUDINOVA
PORTAFOLIO   2024_  ANASTASIYA  KUDINOVAPORTAFOLIO   2024_  ANASTASIYA  KUDINOVA
PORTAFOLIO 2024_ ANASTASIYA KUDINOVA
 
Untitled presedddddddddddddddddntation (1).pptx
Untitled presedddddddddddddddddntation (1).pptxUntitled presedddddddddddddddddntation (1).pptx
Untitled presedddddddddddddddddntation (1).pptx
 
原版1:1定制堪培拉大学毕业证(UC毕业证)#文凭成绩单#真实留信学历认证永久存档
原版1:1定制堪培拉大学毕业证(UC毕业证)#文凭成绩单#真实留信学历认证永久存档原版1:1定制堪培拉大学毕业证(UC毕业证)#文凭成绩单#真实留信学历认证永久存档
原版1:1定制堪培拉大学毕业证(UC毕业证)#文凭成绩单#真实留信学历认证永久存档
 

Temperature Control Sysems And Why They Dont Work

  • 1. Temperature Controls “Why Don’t They Work? Harry Demetrulias
  • 2. Top 5 Reasons Control Systems Don’t Work 1. Many Controls Contractors ARE Crooks! 2. Mechanical Design Problems 3. Mechanical Installation Problems and Equipment Malfunction 4. Operator Errors and Overrides 5. Controls Installations: Misapplied Field Devices, Sensor Locations, Lack of Calibration, and PID Loop Tuning
  • 3. Blame the Owners “Owners are too demanding and unrealistic in their cost expectations” Lower! How Low?
  • 4. Blame The Architects “Architects are too focused on aesthetics, and do not allow adequate space for building systems: Mechanical Rooms and Interstitial Space”
  • 5. Blame the Generals General Contractors punch out projects without scheduling adequate time for Start-up, Checkout, Test & Balance, and Commissioning activities
  • 6. Blame the Engineers “Mechanical Engineers Overworked and Underpaid!”
  • 7. Blame the Suppliers “Equipment Suppliers Just SELL STUFF and Don’t Support it!”
  • 8. Blame the Balancer “Do you really trust those Test & Balance Reports?”
  • 9. “Should we blame those Design/Build Mechanical Contractors?
  • 10.
  • 11. Finger-pointing is easy Working toward Solutions Requires Professional COLLABORATION
  • 12. Function or Malfunction is without exception a collaborative effort between Consultant, Mechanical Contractor, Controls Contractor and Facility Operations.
  • 13. Temperature Control is simple. Building Automation is complex… How can we promote Collaboration?
  • 14. Delivering Truly Integrated Building Systems To Owners Requires Collaboration - Engineers - Controls Contractors - Mechanical Contractors - Equipment Suppliers - Facility Operations
  • 15. When Temperature Control Becomes Complicated • Economizer Mode • Variable Volume/Flow • Dynamic Resets • Warm-up/Cool-down Modes • Building Pressurization Control • Smoke Control •Underfloor Systems • IAQ • Load Shedding Programs •TOD Scheduling • PRAC Self-Tuning • Integrations to 3rd Parties • Validated Systems
  • 16. Controls Contractor’s Perspective: The Consultant as PROBLEM…or Solution
  • 17. Market Pressure & the Design Community • Hyper-competition • Below Market Design Fees • Allotted Billable hours for quality designs and specifications • Lack of onsite Project Engineering • Reliance on draftsmen to incorporate last minute changes • Addenda Ad Infinitum
  • 18. The Key: Publish Quality Documents Installation is only as good as the design Errors on P&S result in problems in the field Malfunction begins in the mind of the designer Unedited Master Specifications Lower engineering cost but… Many Change Orders/retrofit corrections
  • 19. Example #1: Nonspecific Specifications • “DDC controllers shall be BACnet. Lonmark AND N2 Open Protocol compliant…” • “Acceptable manufacturers are Alerton, Andover, Delta, Honeywell, Invensys, Johnson Controls, Siemens, Staefa Controls, Trane, or approved equal.”
  • 20. 2. Electric, Electronic, and DDC Systems: a. Alerton Technologies, Inc. Example #2: b. Andover Controls Corp. c. Automated Logic Corporation. Healthcare project… d. Auto-Matrix, Inc.; Auto-Flow Division. e. CSI Control Systems International, Inc. f. Danfoss Automatic Controls. g. Delta Controls Inc. h. EDA Controls Corp. i. Electronic Systems USA, Inc. j. G C Controls, Inc. k. Honeywell, Inc.; Home & Building Control. I. Impact Energy Controls Corp m. Johnson Controls, Inc.; Controls Group. n. KMC Controls/Kreuter Manufacturing Company. o. Landis & Staefa, Inc. p. Luwa Bahnson Inc. q. McQuay Intemational. r. Neles-Jamesbury. LOWEST TOTAL COST OF OWNERSHIP s. Pneuline Controls Co.; National Energy Controls Corp. t. Scientific-Atlanta, Inc.; Control Systems Div. u. Siebe Environmental Controls; Barber-Coleman/Robertshaw Anyone Products v. Solidyne Corp. w. TCS/BASYS Controls Missing? x. Teletrol Systems Inc. y. Trane Co. (The); North American Commercial Group. z. Triangle MicroSystems, Inc. aa. Uni-Line North America; Robertshaw Division. 3. Systems must interface seamlessly with existing front end control system
  • 21. Damper Control: When the unit is commanded on, the Example #3: outside air damper shall fully open. When the unit is commanded off, the outside air damper shall close. The exhaust damper shall remain closed and the mixed air damper shall remain open. 8 RF1ISO-S RA-F1 NC RA-SD RA-T (Div. 16) RA-H VSD NC EA RA 10 RF2ISO-S RA-F2 HSP1-A Set @4" NC H L VSD SF-F1 SF1ISO-S 7 HUM-O NO 0-7.5" 10-27 PFILT-A NC FFILT-A SA-P Set @ 1" Set @ 1" H L H L H L LT-ALM VSD MA-T HSP2-A SA-SD 3 DPR-O (38 Deg F) HUM-HL SA-T Set @4" (Div. 16) C OA NC C H L SA 4 SF-F2 SF2ISO-S 9 4 CLG-O HUM-VLV RETURN NC NO STM NC SUPPLY VSD Discharge Air Temperature Control: When the unit is commanded on, the outside air damper, return air damper, and relief air damper will be open. Discharge temperature sensor SA- T through the DDC Controller will modulate the cooling coil 2-way control valve CLG-O to maintain setting. The discharge air temperature will be controlled to maintain a 55°F setpoint.
  • 22. Specify SPECIFICS… Specify limited qualified bidders that are suitable for • market type LOWEST TOTAL COST OF OWNERSHIP • product application • contractor expertise Balance First Cost with Operating Cost
  • 23. BAS Cross- FIRE VIDEO- ON- Referencing DEMAND HOTEL ELEVATOR OPERATING SYSTEM IT NETWORK LIGHTING PABX Write Specifications that refer to other sections and technologies. CENTRAL PLANT PAGING Detail the responsibilities CCTV Furnished by… SECURITY CMMS Installed by… 15 BUILDING Wired by… SERVICES
  • 24. Sequence of Operation EXHAUST SYSTEM: EF-1 and EF-2 EF- EF- Isolation Exhaust Fans EF-1 and EF-2: EF- EF- On command from the BAS, the fans shall start. If Include at Minimum: for any reason the fan status does not match its commanded value, an alarm will be generated. ISOLATION ROOM MONITORS Flow Diagrams System Description: The Isolation Rooms shall be monitored by a Space Pressure Monitor as described in controls specification at minimum and shall generate an Point Charts alarm at the BAS upon general alarm or deviation from space pressurization setpoint (adj). adj). Sequences
  • 25. P.E. Professional Enforcer Enforce your specifications Guard against cheating in hyper-competitive market Get involved in checkout, functional testing and commissioning Specify Commissioning Expectations Review Checkout Sheets Verify that field devices match the specification
  • 26. Resist De-Value Engineering 10. Delete lab VAV: Constant volume labs 9. Delete DDC from FCUs 8. Delete SAT Sensors on VAV w/RH 7. Delete DPs across filter racks 6. Delete interfaces to Chillers, Boilers and VFDs 5. Delete AFMS from AHUs SA/RA/OA 4. Delete VAV zones and combine multiple zones 3. Delete Custom Controls on RTUs in lieu of packaged 2. Delete RH Coils in lieu of Cooling Only VAV 1. Delete DDC from VAV/CAV terminals
  • 27. Technology Capabilities of Technology Cost of Technology Technology is more affordable than ever. But it has made building controls more complicated for 1990 2006 Specifying Engineers
  • 28. Get Help from Your Local Controls Experts and Sales Engineers The System Selection Tool was designed to help specifying engineers quickly develop detailed, accurate plans and specifications for heating, ventilation and air conditioning (HVAC)
  • 29. Summary: A New Level of Engineering Value $ Step 1 Publish Quality Documents Step 2 Resist De-Value Engineering Step 3 List Qualified Bidders Step 4 Enforce Specifications Step 5 Get Support and Consultation from Reputable Controls Companies
  • 30. Less quality in More value out Design/Build and Value Engineering Exploiting Owner’s Lowest First Cost Demands?
  • 31. “We can do it cheaper and faster!” Less quality in More value out Hyper/Competitive Market and the D/B Model: Contractors Control Design - Reliance on Equipment Suppliers for TC - Packaged systems w/canned programs
  • 32. Slam it in Commission it later Hard Bid/Design/Build Can this building be fixed?
  • 33. Problem: Mechanical Design & Controls Issues – Building Pressurization Problems – Toggling RTU Modes – Uneven Underfloor Distribution – Overly cool interior zones – Overly warm exterior zones Symptoms – No humidity control Building # 1 – Energy Hog—could not qualify for Energy D/B Debacle Star rating ASHRAE Temperature Controls: “Why Don’t They Work?” Don’ Work?”
  • 34. Problem: Mechanical Design & Controls Issues – VAV w/General Exhaust System – No trunks to distribute UFS Causes – Improperly placed pressure sensing devices – No calibrated primary T/H devices Building # 1 – Cooling mode problems D/B Debacle – Dueling PID Loop Control on RTU – Inability to alter or augment canned RTU program—limitations ASHRAE Temperature Controls: “Why Don’t They Work?” Don’ Work?”
  • 35. Problem: Mechanical Design & Controls Issues – Hire a COMMISSIONING AGENT! – Add return fans – Add trunks to distribute UFS Solutions – Relocate pressure sensing devices Building # 1 – Calibrate primary T/H devices D/B Debacle – Replace misapplied DDC hardware – Reprogram and recommission – Work with commissioning agent ASHRAE Temperature Controls: “Why Don’t They Work?” Don’ Work?”
  • 36. Manual Control Automation does not work well in the “HAND” position
  • 37. “It’s always a Controls Problem!” …often times it is… The Controls Contractor as Part of the Solution…
  • 38. Controls Industry Boilers as the Problem: Pumping & VFDs Chiller Absorption Power Generators Today’s Technology is less expensive Fan Systems But the Labor is not Margin Expectations Continue to Rise Fire Alarm Competition is driving the quality out Surgical Suites Lighting Fume Hood
  • 39. Today’s Technicians often know computers but lack understanding of basic mechanical systems Application Engineering & Commissioning Challenges Decreased skill sets in controls software engineering Protocols do NOT control buildings Software illiteracy Reliance on automated Person at Metasys processes workstation Lack of Quality Management processes What is Commissioning?
  • 40. COMPLEXITY Building Technology Has Complicated Simple Temperature Controls Comfort Lighting Security Scheduling Access control Fire safety Communications Fuel conservation Power load management Maintenance management
  • 41. Controls Industry as the Problem: Value Added Services? Phase 1 Low First cost Phase 2 Prices just went up! Phase 3 Delivering less value over time
  • 42. Solution 1: Can we consider a new Level of Value? Phase 1 Low First cost Phase 2 Open Book Pricing Phase 3 Pricing Agreements Phase 4 Meet the Specifications Phase 5 Exceed Customer Expectations
  • 43. Solution 2: Expert Services Provide support and educational services to the engineering community Offer design review services and provide input on sequences, points lists and specifications Review Bid Documents and write good clear RFIs early in the process
  • 44. Solution 3: Customer & Design Team Deliver as Promised General Behave more like consulting experts, less like the proverbial Crooks Be professional and deliver on Performance Mechanical Electrical Windows Raised Floor Specifications Contractor Contractor etc Submit proper Controls HVAC Lighting Fire checkout and commissioning documentation to Power Consultants Security Mgmt Make Buildings Work
  • 45. Quality Assurance… Apply ASHRAE Standards Due diligence on installations and checkout practices Tune loops and set up trends during checkout and commissioning Work with Designers as fellow engineers, not combative contractors Review Checkout Sheets Verify that field devices match the specification
  • 46. Working Together we can deliver better design and construction projects and the High Performance Buildings that Owners are paying for.
  • 47. Temperature Controls “Why Don’t They Work? Q&A