SlideShare una empresa de Scribd logo
1 de 4
Descargar para leer sin conexión
THE HIGH PERFORMANCE PORTFOLIO:

BUILDING TUNE-UPS


SUMMARY:
A building tune-up is a periodic (every 2-3 years) process intended to identify and implement cost-
effective operational improvements that will improve a building’s energy performance, given current
operating conditions and occupant needs. Changes resulting from a building tune-up usually
require minimal investments and can be accomplished through simple equipment adjustments or
reprogramming of controls. A building tune-up may also identify opportunities where small capital
improvements could make a big difference.

IN DEPTH:
Like your car’s regularly scheduled maintenance, the building tune-up takes a systematic approach to
zeroing in on areas where specific improvements can be made. Over time, many characteristics of a
building can change — the needs of tenants, the character and nature of mechanical equipment, the
experience levels of staff, and the physical structure itself. These changes can accumulate and impact
the operating conditions of the property, potentially degrading energy performance. A building tune-
up identifies and adjusts building operations to changing conditions, and re-aligns building energy
performance with the current goals of the property managers and owners.

Building tune-ups require specialized expertise in the operation of HVAC systems, a sound
understanding of equipment interactions from an energy perspective, strong diagnostic and
analysis skills, and the ability to present recommendations to decision-makers. You may have an
individual or a team of employees in-house with these necessary skills; however, most organizations
benefit greatly from hiring an outside contractor to perform
these activities. When you outsource the building tune-up, be
sure to closely involve building operators in the process so they
can learn more about their systems and become advocates for
the required changes.                                                      Changes can accumulate      and
                                                                            impact the operating conditions
                                                                            of the property, potentially
                                                                            degrading energy performance.
KEY STEPS TO A BUILDING TUNE-UP
        Diagnosing Problems and Opportunities
        •   Information gathering: Review findings from previous studies; perform a walkthrough
            inspection of the building; and interview operations staff to collect the necessary data.
        •   Quick fixes: Some immediate adjustments to building controls may be possible during this
            stage. Perform any obvious, low-cost changes as they’re identified.

        Formulating and Implementing a Building Tune-Up Action Plan
        •   Action plan: Recommend operational changes to improve energy performance, provide cost-
            benefit estimates and specific implementation steps to decision-makers; formulate a plan to
            implement approved changes. Also provide a summary of any quick fixes already performed,
            achieved savings, and recommended maintenance practices to avoid similar problems in the
            future.
        •   Implementation: Assemble and organize resources to carry out the action plan. Involve building
            operations staff in implementing changes, as well as controls and maintenance providers.
        •   Verification: Confirm that the operational changes have been correctly implemented and are
            achieving the desired results.

        Developing Recommendations for Further Action
        •   Enhanced O&M practices: Recommend enhanced O&M practices to help ensure the integrity
            of the newly established operational changes, and maintain system/equipment functionality over
            time. These can include changes to standard O&M management procedures and additional staff
            training.
        •   Equipment replacement: In the process of examining building performance, you may identify
            capital projects that can significantly improve energy performance. Take appropriate steps to
            investigate these opportunities, and contact your local utility for possible technical or financial
            assistance in implementing them.




TUNE-UPS VS. RETROCOMMISSIONING
While a tune-up may identify equipment that need replacing, it is not a project focused on capital improvements.
Nor is it retrocommissioning—a much more comprehensive and expensive process. Retrocommissioning is a
formal, in-depth assessment of the building’s functioning. It involves documenting the intended operation of
building systems and conducting a thorough functional testing of equipment and systems.

A building tune-up focuses on low cost operational improvements and typically includes:
•   Systematically diagnosing and repairing problems
•   Implementing specific operational changes
•   Optimizing controls
•   Scheduling equipment
•   Identifying key performance indicators
COMMON OPPORTUNITIES FOUND DURING TUNE-UPS
           Calibrating and Adjusting Building Controls
           •   Calibrate occupancy sensors. Does a ten-minute timer actually shut the lights down after ten
               minutes? An extra few minutes here and there really add up.
           •   Check dampers and valve controls to be sure they are functioning properly. Adjust dampers to
               reduce the amount of outside air brought in (within codes). This reduces the need to condition
               outside air and lowers HVAC energy usage.
           •   Adjust schedules to reflect occupancy patterns.
           •   Adjust automatic doors to minimize air loss from the building.

           Conducting Lighting System Tune-Up
           •   Establish a strategic lighting maintenance plan of scheduled group relamping and fixture
               cleaning. Cleaning alone may boost fixture light output from 10 to 60 percent.
           •   Calibrate lighting controls (automatic and others). Simple calibration of occupancy sensors and
               photocells can reduce energy used by the lighting system in those areas by 50 percent or more.
                                                 •   Account for seasonal changes to lighting requirements.
                                                 •   Be sure that lighting isn’t obstructed by furniture or décor.
                                                 •   Ensure the building meets illumination level standards set
Confirm that built-in start/stop                     by the Illuminating Engineering Society of North America.

controls are enabled and
                                                 Managing Supplemental Loads
operating according to the
                                                 •   Turn office equipment completely off when it’s not needed
schedule you have established.
                                                     for long periods of time.
                                                 •   Install and use power-management features and low-
                                                     energy screen savers on computers.

           Adjusting Equipment Operating Schedules
           •   Adjust operating schedules to ensure equipment is on only when necessary. Are tenants really
               using the overtime air they requested a year ago? Are you fully conditioning large areas of
               vacant space unnecessarily?
           •   Ensure that lights are turned off when space is not in use.
•    Optimize start-up and power-down time. Can you start your systems 15 minutes later and still
                                achieve the desired temperature by the time the tenants arrive in the morning – or power down
                                45 minutes earlier and “coast” for the rest of the evening? Also confirm that built-in start/stop
                                controls are enabled and operating according to the schedule you have established.
                           •    Conduct testing, adjusting, and balancing – spot-checking for problem areas and making
                                adjustments to bring HVAC systems back into balance, given changes in occupancy levels and
                                space utilization.

                           Fixing Equipment Problems
                           •    Check for leaks or blockages in ductwork.
                           •    Repair air leaks in windows, doors, walls, and roofs
                           •    Clean debris from outside air intakes.




          THE BOTTOM LINE:

          •     A building tune-up is a periodic (every 2-3 years)       •    The key steps include diagnosing problems and
                process intended to identify and implement                    opportunities; formulating and implementing an
                cost-effective operational improvements that will             action plan; and developing recommendations for
                improve a building’s energy performance.                      changes to O&M procedures.
          •     Changes to use and physical characteristics over         •    Building tune-ups are focused on operational, low-
                time may require a tune-up to bring energy                    cost opportunities to reduce energy consumption
                performance back to intended levels.                          such as calibration of controls, adjustments to
                                                                              equipment scheduling, control of outside air and
                                                                              system coordination.




          USEFUL LINKS:
          The High Performance Portfolio Framework              BetterBricks Better Building Operating
          www.betterbricks.com/office/framework                  Performance Resources
          Enhanced Operations and Maintenance                   www.betterbricks.com/operations

          www.betterbricks.com/office/briefs



February 2008                                                                                                   www.betterbricks.com/office/briefs

Más contenido relacionado

La actualidad más candente

Episode 31 : Project Execution Part (2)
Episode 31 :  Project Execution Part (2)Episode 31 :  Project Execution Part (2)
Episode 31 : Project Execution Part (2)SAJJAD KHUDHUR ABBAS
 
Resume-Thomas Mathew
Resume-Thomas MathewResume-Thomas Mathew
Resume-Thomas MathewThomas Mathew
 
Coulter Wood, Hormel Foods, Hormel Foods Auditing Program, Midwest Environmen...
Coulter Wood, Hormel Foods, Hormel Foods Auditing Program, Midwest Environmen...Coulter Wood, Hormel Foods, Hormel Foods Auditing Program, Midwest Environmen...
Coulter Wood, Hormel Foods, Hormel Foods Auditing Program, Midwest Environmen...Kevin Perry
 
Balaram_Panda_Resume
Balaram_Panda_ResumeBalaram_Panda_Resume
Balaram_Panda_Resumebalaram panda
 
Sample process guide_-_change_management
Sample process guide_-_change_managementSample process guide_-_change_management
Sample process guide_-_change_managementbalajimuthu10
 
Development of Calibrated Operational Models for Real-Time Decision Support a...
Development of Calibrated Operational Models for Real-Time Decision Support a...Development of Calibrated Operational Models for Real-Time Decision Support a...
Development of Calibrated Operational Models for Real-Time Decision Support a...Daniel Coakley
 
Episode 34 : Project Execution Part (5)
Episode 34 :  Project Execution Part (5)Episode 34 :  Project Execution Part (5)
Episode 34 : Project Execution Part (5)SAJJAD KHUDHUR ABBAS
 
Pankaj Sharma 2015 Resume
Pankaj Sharma 2015 ResumePankaj Sharma 2015 Resume
Pankaj Sharma 2015 Resumesharmapower
 
Maintenance module1 ppt number 3
Maintenance module1 ppt number 3Maintenance module1 ppt number 3
Maintenance module1 ppt number 3Dhanesh S
 
Episode 30 : Project Execution ( Part 1 )
Episode 30 :  Project Execution ( Part 1 ) Episode 30 :  Project Execution ( Part 1 )
Episode 30 : Project Execution ( Part 1 ) SAJJAD KHUDHUR ABBAS
 
Episode 33 : Project Execution Part (4)
Episode 33 :  Project Execution Part (4)Episode 33 :  Project Execution Part (4)
Episode 33 : Project Execution Part (4)SAJJAD KHUDHUR ABBAS
 
JNTUH B.TECH R16 FM subject Controlling Unit Ppt by PREM KAMAL
JNTUH B.TECH R16 FM subject  Controlling Unit Ppt by PREM KAMAL JNTUH B.TECH R16 FM subject  Controlling Unit Ppt by PREM KAMAL
JNTUH B.TECH R16 FM subject Controlling Unit Ppt by PREM KAMAL prem kamal
 
Ppc unit-4-production scheduling
Ppc   unit-4-production schedulingPpc   unit-4-production scheduling
Ppc unit-4-production schedulingkarthi keyan
 
Advanced Control of Multiple Sulfur Units
Advanced Control of Multiple Sulfur Units Advanced Control of Multiple Sulfur Units
Advanced Control of Multiple Sulfur Units Mary Claire Simoneaux
 

La actualidad más candente (20)

Episode 31 : Project Execution Part (2)
Episode 31 :  Project Execution Part (2)Episode 31 :  Project Execution Part (2)
Episode 31 : Project Execution Part (2)
 
Resume-Thomas Mathew
Resume-Thomas MathewResume-Thomas Mathew
Resume-Thomas Mathew
 
Coulter Wood, Hormel Foods, Hormel Foods Auditing Program, Midwest Environmen...
Coulter Wood, Hormel Foods, Hormel Foods Auditing Program, Midwest Environmen...Coulter Wood, Hormel Foods, Hormel Foods Auditing Program, Midwest Environmen...
Coulter Wood, Hormel Foods, Hormel Foods Auditing Program, Midwest Environmen...
 
RAbella CV
RAbella CVRAbella CV
RAbella CV
 
Balaram_Panda_Resume
Balaram_Panda_ResumeBalaram_Panda_Resume
Balaram_Panda_Resume
 
CV_Ashu Bhatt
CV_Ashu BhattCV_Ashu Bhatt
CV_Ashu Bhatt
 
Process control
Process controlProcess control
Process control
 
RESUME 2016
RESUME 2016RESUME 2016
RESUME 2016
 
Sample process guide_-_change_management
Sample process guide_-_change_managementSample process guide_-_change_management
Sample process guide_-_change_management
 
Development of Calibrated Operational Models for Real-Time Decision Support a...
Development of Calibrated Operational Models for Real-Time Decision Support a...Development of Calibrated Operational Models for Real-Time Decision Support a...
Development of Calibrated Operational Models for Real-Time Decision Support a...
 
GLH resume 2016
GLH resume 2016GLH resume 2016
GLH resume 2016
 
Episode 34 : Project Execution Part (5)
Episode 34 :  Project Execution Part (5)Episode 34 :  Project Execution Part (5)
Episode 34 : Project Execution Part (5)
 
Pankaj Sharma 2015 Resume
Pankaj Sharma 2015 ResumePankaj Sharma 2015 Resume
Pankaj Sharma 2015 Resume
 
Maintenance module1 ppt number 3
Maintenance module1 ppt number 3Maintenance module1 ppt number 3
Maintenance module1 ppt number 3
 
CV D. Maimbolwa
CV D. MaimbolwaCV D. Maimbolwa
CV D. Maimbolwa
 
Episode 30 : Project Execution ( Part 1 )
Episode 30 :  Project Execution ( Part 1 ) Episode 30 :  Project Execution ( Part 1 )
Episode 30 : Project Execution ( Part 1 )
 
Episode 33 : Project Execution Part (4)
Episode 33 :  Project Execution Part (4)Episode 33 :  Project Execution Part (4)
Episode 33 : Project Execution Part (4)
 
JNTUH B.TECH R16 FM subject Controlling Unit Ppt by PREM KAMAL
JNTUH B.TECH R16 FM subject  Controlling Unit Ppt by PREM KAMAL JNTUH B.TECH R16 FM subject  Controlling Unit Ppt by PREM KAMAL
JNTUH B.TECH R16 FM subject Controlling Unit Ppt by PREM KAMAL
 
Ppc unit-4-production scheduling
Ppc   unit-4-production schedulingPpc   unit-4-production scheduling
Ppc unit-4-production scheduling
 
Advanced Control of Multiple Sulfur Units
Advanced Control of Multiple Sulfur Units Advanced Control of Multiple Sulfur Units
Advanced Control of Multiple Sulfur Units
 

Similar a Building tune ups for commercial buildings

General guidelines for building commissioning ppt
General guidelines  for building  commissioning pptGeneral guidelines  for building  commissioning ppt
General guidelines for building commissioning pptDayasagar Govidaraju
 
General guidelines for building commissioning ppt.pptx
General guidelines  for building  commissioning ppt.pptxGeneral guidelines  for building  commissioning ppt.pptx
General guidelines for building commissioning ppt.pptxDayasagar Govidaraju
 
Commissioning Best Practices to Follow during the Turnover Phase
Commissioning Best Practices to Follow during the Turnover PhaseCommissioning Best Practices to Follow during the Turnover Phase
Commissioning Best Practices to Follow during the Turnover PhaseOlivia Wilson
 
Retrocommissioning of Existing Buildings
Retrocommissioning of Existing BuildingsRetrocommissioning of Existing Buildings
Retrocommissioning of Existing BuildingsWIGreenBuilding
 
2: Introduction to Energy Audit Methods in Water Supply
2: Introduction to Energy Audit Methods in Water Supply2: Introduction to Energy Audit Methods in Water Supply
2: Introduction to Energy Audit Methods in Water SupplyAlliance To Save Energy
 
High Performance Buidlings for Brazil
High Performance Buidlings for BrazilHigh Performance Buidlings for Brazil
High Performance Buidlings for Brazilsekkelww
 
COMPUTER ENERGY SIMULATION PROGRAM.pptx
COMPUTER ENERGY SIMULATION PROGRAM.pptxCOMPUTER ENERGY SIMULATION PROGRAM.pptx
COMPUTER ENERGY SIMULATION PROGRAM.pptxthirasaku1
 
Ashrae 90.1 2004 appendix g - performance rating method
Ashrae 90.1   2004 appendix g - performance rating methodAshrae 90.1   2004 appendix g - performance rating method
Ashrae 90.1 2004 appendix g - performance rating methodEduardo Miranda Cáceres
 
1 page facility renewal snapshot
1 page facility renewal snapshot1 page facility renewal snapshot
1 page facility renewal snapshotBarry Lynch
 
IES Faculty - Closing the Performance Gap
IES Faculty - Closing the Performance GapIES Faculty - Closing the Performance Gap
IES Faculty - Closing the Performance GapIES VE
 
commissioning-federal-facilities.pdf
commissioning-federal-facilities.pdfcommissioning-federal-facilities.pdf
commissioning-federal-facilities.pdfVincent Bui
 
Resume - Jason Lewis
Resume - Jason LewisResume - Jason Lewis
Resume - Jason LewisJason Lewis
 
Case study -4 Mort Street
Case study -4 Mort StreetCase study -4 Mort Street
Case study -4 Mort StreetShamitha Reddy
 
Kerry mashford - nef - understanding, delivering and validating building perf...
Kerry mashford - nef - understanding, delivering and validating building perf...Kerry mashford - nef - understanding, delivering and validating building perf...
Kerry mashford - nef - understanding, delivering and validating building perf...constprod99
 
To Reclad or not to Reclad?
To Reclad or not to Reclad?To Reclad or not to Reclad?
To Reclad or not to Reclad?aiahouston
 

Similar a Building tune ups for commercial buildings (20)

RCx
RCxRCx
RCx
 
General guidelines for building commissioning ppt
General guidelines  for building  commissioning pptGeneral guidelines  for building  commissioning ppt
General guidelines for building commissioning ppt
 
General guidelines for building commissioning ppt.pptx
General guidelines  for building  commissioning ppt.pptxGeneral guidelines  for building  commissioning ppt.pptx
General guidelines for building commissioning ppt.pptx
 
Commissioning Best Practices to Follow during the Turnover Phase
Commissioning Best Practices to Follow during the Turnover PhaseCommissioning Best Practices to Follow during the Turnover Phase
Commissioning Best Practices to Follow during the Turnover Phase
 
Retrocommissioning of Existing Buildings
Retrocommissioning of Existing BuildingsRetrocommissioning of Existing Buildings
Retrocommissioning of Existing Buildings
 
Energy Audit 22.9.2022.pptx
Energy Audit 22.9.2022.pptxEnergy Audit 22.9.2022.pptx
Energy Audit 22.9.2022.pptx
 
2: Introduction to Energy Audit Methods in Water Supply
2: Introduction to Energy Audit Methods in Water Supply2: Introduction to Energy Audit Methods in Water Supply
2: Introduction to Energy Audit Methods in Water Supply
 
David Lawrence11
David Lawrence11David Lawrence11
David Lawrence11
 
High Performance Buidlings for Brazil
High Performance Buidlings for BrazilHigh Performance Buidlings for Brazil
High Performance Buidlings for Brazil
 
Zaheer-CV- 2015
Zaheer-CV- 2015Zaheer-CV- 2015
Zaheer-CV- 2015
 
COMPUTER ENERGY SIMULATION PROGRAM.pptx
COMPUTER ENERGY SIMULATION PROGRAM.pptxCOMPUTER ENERGY SIMULATION PROGRAM.pptx
COMPUTER ENERGY SIMULATION PROGRAM.pptx
 
Ashrae 90.1 2004 appendix g - performance rating method
Ashrae 90.1   2004 appendix g - performance rating methodAshrae 90.1   2004 appendix g - performance rating method
Ashrae 90.1 2004 appendix g - performance rating method
 
1 page facility renewal snapshot
1 page facility renewal snapshot1 page facility renewal snapshot
1 page facility renewal snapshot
 
IES Faculty - Closing the Performance Gap
IES Faculty - Closing the Performance GapIES Faculty - Closing the Performance Gap
IES Faculty - Closing the Performance Gap
 
Cli Grp
Cli GrpCli Grp
Cli Grp
 
commissioning-federal-facilities.pdf
commissioning-federal-facilities.pdfcommissioning-federal-facilities.pdf
commissioning-federal-facilities.pdf
 
Resume - Jason Lewis
Resume - Jason LewisResume - Jason Lewis
Resume - Jason Lewis
 
Case study -4 Mort Street
Case study -4 Mort StreetCase study -4 Mort Street
Case study -4 Mort Street
 
Kerry mashford - nef - understanding, delivering and validating building perf...
Kerry mashford - nef - understanding, delivering and validating building perf...Kerry mashford - nef - understanding, delivering and validating building perf...
Kerry mashford - nef - understanding, delivering and validating building perf...
 
To Reclad or not to Reclad?
To Reclad or not to Reclad?To Reclad or not to Reclad?
To Reclad or not to Reclad?
 

Más de BetterBricks

Leasing & Energy Allocations in Commercial Buildings
Leasing & Energy  Allocations in Commercial BuildingsLeasing & Energy  Allocations in Commercial Buildings
Leasing & Energy Allocations in Commercial BuildingsBetterBricks
 
Green Building Rating sSystem
Green Building Rating sSystemGreen Building Rating sSystem
Green Building Rating sSystemBetterBricks
 
Engineering Metrics Checklist for Commercial Buildings
Engineering Metrics Checklist for Commercial BuildingsEngineering Metrics Checklist for Commercial Buildings
Engineering Metrics Checklist for Commercial BuildingsBetterBricks
 
Energy Transparency & Reporting for Commercial Buildings
Energy Transparency & Reporting for Commercial BuildingsEnergy Transparency & Reporting for Commercial Buildings
Energy Transparency & Reporting for Commercial BuildingsBetterBricks
 
Energy Tracking & Accounting for Commercial Buildings
Energy Tracking & Accounting for Commercial BuildingsEnergy Tracking & Accounting for Commercial Buildings
Energy Tracking & Accounting for Commercial BuildingsBetterBricks
 
Energy Efficient Purchasing Guidelines for Commercial Buildings
Energy Efficient Purchasing Guidelines for Commercial BuildingsEnergy Efficient Purchasing Guidelines for Commercial Buildings
Energy Efficient Purchasing Guidelines for Commercial BuildingsBetterBricks
 
Energy Efficiency, Myths and Misperceptions
Energy Efficiency, Myths and MisperceptionsEnergy Efficiency, Myths and Misperceptions
Energy Efficiency, Myths and MisperceptionsBetterBricks
 
Carbon, energy and your building
Carbon, energy and your buildingCarbon, energy and your building
Carbon, energy and your buildingBetterBricks
 
Carbon, energy and your building
Carbon, energy and your buildingCarbon, energy and your building
Carbon, energy and your buildingBetterBricks
 
Carbon, Energy and Your Building
Carbon, Energy and Your BuildingCarbon, Energy and Your Building
Carbon, Energy and Your BuildingBetterBricks
 
The Energy Efficiency Playbook: Everything you need to know about purchasing...
The Energy Efficiency Playbook:  Everything you need to know about purchasing...The Energy Efficiency Playbook:  Everything you need to know about purchasing...
The Energy Efficiency Playbook: Everything you need to know about purchasing...BetterBricks
 
10 Goals for Green Leasing
10 Goals for Green Leasing10 Goals for Green Leasing
10 Goals for Green LeasingBetterBricks
 
Energy in Healthcare Fact Sheet
Energy in Healthcare Fact SheetEnergy in Healthcare Fact Sheet
Energy in Healthcare Fact SheetBetterBricks
 
Targeting 100! Envisioning the High Performance Hospital
Targeting 100! Envisioning the High Performance HospitalTargeting 100! Envisioning the High Performance Hospital
Targeting 100! Envisioning the High Performance HospitalBetterBricks
 
Green Building Index National Overview
Green Building Index National OverviewGreen Building Index National Overview
Green Building Index National OverviewBetterBricks
 

Más de BetterBricks (16)

Leasing & Energy Allocations in Commercial Buildings
Leasing & Energy  Allocations in Commercial BuildingsLeasing & Energy  Allocations in Commercial Buildings
Leasing & Energy Allocations in Commercial Buildings
 
Green Building Rating sSystem
Green Building Rating sSystemGreen Building Rating sSystem
Green Building Rating sSystem
 
Engineering Metrics Checklist for Commercial Buildings
Engineering Metrics Checklist for Commercial BuildingsEngineering Metrics Checklist for Commercial Buildings
Engineering Metrics Checklist for Commercial Buildings
 
Energy Transparency & Reporting for Commercial Buildings
Energy Transparency & Reporting for Commercial BuildingsEnergy Transparency & Reporting for Commercial Buildings
Energy Transparency & Reporting for Commercial Buildings
 
Energy Tracking & Accounting for Commercial Buildings
Energy Tracking & Accounting for Commercial BuildingsEnergy Tracking & Accounting for Commercial Buildings
Energy Tracking & Accounting for Commercial Buildings
 
Energy Efficient Purchasing Guidelines for Commercial Buildings
Energy Efficient Purchasing Guidelines for Commercial BuildingsEnergy Efficient Purchasing Guidelines for Commercial Buildings
Energy Efficient Purchasing Guidelines for Commercial Buildings
 
Energy Efficiency, Myths and Misperceptions
Energy Efficiency, Myths and MisperceptionsEnergy Efficiency, Myths and Misperceptions
Energy Efficiency, Myths and Misperceptions
 
Carbon, energy and your building
Carbon, energy and your buildingCarbon, energy and your building
Carbon, energy and your building
 
Carbon, energy and your building
Carbon, energy and your buildingCarbon, energy and your building
Carbon, energy and your building
 
Carbon, Energy and Your Building
Carbon, Energy and Your BuildingCarbon, Energy and Your Building
Carbon, Energy and Your Building
 
The Energy Efficiency Playbook: Everything you need to know about purchasing...
The Energy Efficiency Playbook:  Everything you need to know about purchasing...The Energy Efficiency Playbook:  Everything you need to know about purchasing...
The Energy Efficiency Playbook: Everything you need to know about purchasing...
 
10 Goals for Green Leasing
10 Goals for Green Leasing10 Goals for Green Leasing
10 Goals for Green Leasing
 
Energy in Healthcare Fact Sheet
Energy in Healthcare Fact SheetEnergy in Healthcare Fact Sheet
Energy in Healthcare Fact Sheet
 
Targeting 100! Envisioning the High Performance Hospital
Targeting 100! Envisioning the High Performance HospitalTargeting 100! Envisioning the High Performance Hospital
Targeting 100! Envisioning the High Performance Hospital
 
Green Building Index National Overview
Green Building Index National OverviewGreen Building Index National Overview
Green Building Index National Overview
 
Powerful Business
Powerful BusinessPowerful Business
Powerful Business
 

Último

New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024BookNet Canada
 
Digital Identity is Under Attack: FIDO Paris Seminar.pptx
Digital Identity is Under Attack: FIDO Paris Seminar.pptxDigital Identity is Under Attack: FIDO Paris Seminar.pptx
Digital Identity is Under Attack: FIDO Paris Seminar.pptxLoriGlavin3
 
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024BookNet Canada
 
Sample pptx for embedding into website for demo
Sample pptx for embedding into website for demoSample pptx for embedding into website for demo
Sample pptx for embedding into website for demoHarshalMandlekar2
 
Time Series Foundation Models - current state and future directions
Time Series Foundation Models - current state and future directionsTime Series Foundation Models - current state and future directions
Time Series Foundation Models - current state and future directionsNathaniel Shimoni
 
DevEX - reference for building teams, processes, and platforms
DevEX - reference for building teams, processes, and platformsDevEX - reference for building teams, processes, and platforms
DevEX - reference for building teams, processes, and platformsSergiu Bodiu
 
Advanced Computer Architecture – An Introduction
Advanced Computer Architecture – An IntroductionAdvanced Computer Architecture – An Introduction
Advanced Computer Architecture – An IntroductionDilum Bandara
 
Gen AI in Business - Global Trends Report 2024.pdf
Gen AI in Business - Global Trends Report 2024.pdfGen AI in Business - Global Trends Report 2024.pdf
Gen AI in Business - Global Trends Report 2024.pdfAddepto
 
TrustArc Webinar - How to Build Consumer Trust Through Data Privacy
TrustArc Webinar - How to Build Consumer Trust Through Data PrivacyTrustArc Webinar - How to Build Consumer Trust Through Data Privacy
TrustArc Webinar - How to Build Consumer Trust Through Data PrivacyTrustArc
 
From Family Reminiscence to Scholarly Archive .
From Family Reminiscence to Scholarly Archive .From Family Reminiscence to Scholarly Archive .
From Family Reminiscence to Scholarly Archive .Alan Dix
 
TeamStation AI System Report LATAM IT Salaries 2024
TeamStation AI System Report LATAM IT Salaries 2024TeamStation AI System Report LATAM IT Salaries 2024
TeamStation AI System Report LATAM IT Salaries 2024Lonnie McRorey
 
Passkey Providers and Enabling Portability: FIDO Paris Seminar.pptx
Passkey Providers and Enabling Portability: FIDO Paris Seminar.pptxPasskey Providers and Enabling Portability: FIDO Paris Seminar.pptx
Passkey Providers and Enabling Portability: FIDO Paris Seminar.pptxLoriGlavin3
 
DevoxxFR 2024 Reproducible Builds with Apache Maven
DevoxxFR 2024 Reproducible Builds with Apache MavenDevoxxFR 2024 Reproducible Builds with Apache Maven
DevoxxFR 2024 Reproducible Builds with Apache MavenHervé Boutemy
 
How to write a Business Continuity Plan
How to write a Business Continuity PlanHow to write a Business Continuity Plan
How to write a Business Continuity PlanDatabarracks
 
The Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptx
The Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptxThe Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptx
The Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptxLoriGlavin3
 
A Journey Into the Emotions of Software Developers
A Journey Into the Emotions of Software DevelopersA Journey Into the Emotions of Software Developers
A Journey Into the Emotions of Software DevelopersNicole Novielli
 
"Debugging python applications inside k8s environment", Andrii Soldatenko
"Debugging python applications inside k8s environment", Andrii Soldatenko"Debugging python applications inside k8s environment", Andrii Soldatenko
"Debugging python applications inside k8s environment", Andrii SoldatenkoFwdays
 
unit 4 immunoblotting technique complete.pptx
unit 4 immunoblotting technique complete.pptxunit 4 immunoblotting technique complete.pptx
unit 4 immunoblotting technique complete.pptxBkGupta21
 
Take control of your SAP testing with UiPath Test Suite
Take control of your SAP testing with UiPath Test SuiteTake control of your SAP testing with UiPath Test Suite
Take control of your SAP testing with UiPath Test SuiteDianaGray10
 
Merck Moving Beyond Passwords: FIDO Paris Seminar.pptx
Merck Moving Beyond Passwords: FIDO Paris Seminar.pptxMerck Moving Beyond Passwords: FIDO Paris Seminar.pptx
Merck Moving Beyond Passwords: FIDO Paris Seminar.pptxLoriGlavin3
 

Último (20)

New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
 
Digital Identity is Under Attack: FIDO Paris Seminar.pptx
Digital Identity is Under Attack: FIDO Paris Seminar.pptxDigital Identity is Under Attack: FIDO Paris Seminar.pptx
Digital Identity is Under Attack: FIDO Paris Seminar.pptx
 
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
 
Sample pptx for embedding into website for demo
Sample pptx for embedding into website for demoSample pptx for embedding into website for demo
Sample pptx for embedding into website for demo
 
Time Series Foundation Models - current state and future directions
Time Series Foundation Models - current state and future directionsTime Series Foundation Models - current state and future directions
Time Series Foundation Models - current state and future directions
 
DevEX - reference for building teams, processes, and platforms
DevEX - reference for building teams, processes, and platformsDevEX - reference for building teams, processes, and platforms
DevEX - reference for building teams, processes, and platforms
 
Advanced Computer Architecture – An Introduction
Advanced Computer Architecture – An IntroductionAdvanced Computer Architecture – An Introduction
Advanced Computer Architecture – An Introduction
 
Gen AI in Business - Global Trends Report 2024.pdf
Gen AI in Business - Global Trends Report 2024.pdfGen AI in Business - Global Trends Report 2024.pdf
Gen AI in Business - Global Trends Report 2024.pdf
 
TrustArc Webinar - How to Build Consumer Trust Through Data Privacy
TrustArc Webinar - How to Build Consumer Trust Through Data PrivacyTrustArc Webinar - How to Build Consumer Trust Through Data Privacy
TrustArc Webinar - How to Build Consumer Trust Through Data Privacy
 
From Family Reminiscence to Scholarly Archive .
From Family Reminiscence to Scholarly Archive .From Family Reminiscence to Scholarly Archive .
From Family Reminiscence to Scholarly Archive .
 
TeamStation AI System Report LATAM IT Salaries 2024
TeamStation AI System Report LATAM IT Salaries 2024TeamStation AI System Report LATAM IT Salaries 2024
TeamStation AI System Report LATAM IT Salaries 2024
 
Passkey Providers and Enabling Portability: FIDO Paris Seminar.pptx
Passkey Providers and Enabling Portability: FIDO Paris Seminar.pptxPasskey Providers and Enabling Portability: FIDO Paris Seminar.pptx
Passkey Providers and Enabling Portability: FIDO Paris Seminar.pptx
 
DevoxxFR 2024 Reproducible Builds with Apache Maven
DevoxxFR 2024 Reproducible Builds with Apache MavenDevoxxFR 2024 Reproducible Builds with Apache Maven
DevoxxFR 2024 Reproducible Builds with Apache Maven
 
How to write a Business Continuity Plan
How to write a Business Continuity PlanHow to write a Business Continuity Plan
How to write a Business Continuity Plan
 
The Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptx
The Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptxThe Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptx
The Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptx
 
A Journey Into the Emotions of Software Developers
A Journey Into the Emotions of Software DevelopersA Journey Into the Emotions of Software Developers
A Journey Into the Emotions of Software Developers
 
"Debugging python applications inside k8s environment", Andrii Soldatenko
"Debugging python applications inside k8s environment", Andrii Soldatenko"Debugging python applications inside k8s environment", Andrii Soldatenko
"Debugging python applications inside k8s environment", Andrii Soldatenko
 
unit 4 immunoblotting technique complete.pptx
unit 4 immunoblotting technique complete.pptxunit 4 immunoblotting technique complete.pptx
unit 4 immunoblotting technique complete.pptx
 
Take control of your SAP testing with UiPath Test Suite
Take control of your SAP testing with UiPath Test SuiteTake control of your SAP testing with UiPath Test Suite
Take control of your SAP testing with UiPath Test Suite
 
Merck Moving Beyond Passwords: FIDO Paris Seminar.pptx
Merck Moving Beyond Passwords: FIDO Paris Seminar.pptxMerck Moving Beyond Passwords: FIDO Paris Seminar.pptx
Merck Moving Beyond Passwords: FIDO Paris Seminar.pptx
 

Building tune ups for commercial buildings

  • 1. THE HIGH PERFORMANCE PORTFOLIO: BUILDING TUNE-UPS SUMMARY: A building tune-up is a periodic (every 2-3 years) process intended to identify and implement cost- effective operational improvements that will improve a building’s energy performance, given current operating conditions and occupant needs. Changes resulting from a building tune-up usually require minimal investments and can be accomplished through simple equipment adjustments or reprogramming of controls. A building tune-up may also identify opportunities where small capital improvements could make a big difference. IN DEPTH: Like your car’s regularly scheduled maintenance, the building tune-up takes a systematic approach to zeroing in on areas where specific improvements can be made. Over time, many characteristics of a building can change — the needs of tenants, the character and nature of mechanical equipment, the experience levels of staff, and the physical structure itself. These changes can accumulate and impact the operating conditions of the property, potentially degrading energy performance. A building tune- up identifies and adjusts building operations to changing conditions, and re-aligns building energy performance with the current goals of the property managers and owners. Building tune-ups require specialized expertise in the operation of HVAC systems, a sound understanding of equipment interactions from an energy perspective, strong diagnostic and analysis skills, and the ability to present recommendations to decision-makers. You may have an individual or a team of employees in-house with these necessary skills; however, most organizations benefit greatly from hiring an outside contractor to perform these activities. When you outsource the building tune-up, be sure to closely involve building operators in the process so they can learn more about their systems and become advocates for the required changes. Changes can accumulate and impact the operating conditions of the property, potentially degrading energy performance.
  • 2. KEY STEPS TO A BUILDING TUNE-UP Diagnosing Problems and Opportunities • Information gathering: Review findings from previous studies; perform a walkthrough inspection of the building; and interview operations staff to collect the necessary data. • Quick fixes: Some immediate adjustments to building controls may be possible during this stage. Perform any obvious, low-cost changes as they’re identified. Formulating and Implementing a Building Tune-Up Action Plan • Action plan: Recommend operational changes to improve energy performance, provide cost- benefit estimates and specific implementation steps to decision-makers; formulate a plan to implement approved changes. Also provide a summary of any quick fixes already performed, achieved savings, and recommended maintenance practices to avoid similar problems in the future. • Implementation: Assemble and organize resources to carry out the action plan. Involve building operations staff in implementing changes, as well as controls and maintenance providers. • Verification: Confirm that the operational changes have been correctly implemented and are achieving the desired results. Developing Recommendations for Further Action • Enhanced O&M practices: Recommend enhanced O&M practices to help ensure the integrity of the newly established operational changes, and maintain system/equipment functionality over time. These can include changes to standard O&M management procedures and additional staff training. • Equipment replacement: In the process of examining building performance, you may identify capital projects that can significantly improve energy performance. Take appropriate steps to investigate these opportunities, and contact your local utility for possible technical or financial assistance in implementing them. TUNE-UPS VS. RETROCOMMISSIONING While a tune-up may identify equipment that need replacing, it is not a project focused on capital improvements. Nor is it retrocommissioning—a much more comprehensive and expensive process. Retrocommissioning is a formal, in-depth assessment of the building’s functioning. It involves documenting the intended operation of building systems and conducting a thorough functional testing of equipment and systems. A building tune-up focuses on low cost operational improvements and typically includes: • Systematically diagnosing and repairing problems • Implementing specific operational changes • Optimizing controls • Scheduling equipment • Identifying key performance indicators
  • 3. COMMON OPPORTUNITIES FOUND DURING TUNE-UPS Calibrating and Adjusting Building Controls • Calibrate occupancy sensors. Does a ten-minute timer actually shut the lights down after ten minutes? An extra few minutes here and there really add up. • Check dampers and valve controls to be sure they are functioning properly. Adjust dampers to reduce the amount of outside air brought in (within codes). This reduces the need to condition outside air and lowers HVAC energy usage. • Adjust schedules to reflect occupancy patterns. • Adjust automatic doors to minimize air loss from the building. Conducting Lighting System Tune-Up • Establish a strategic lighting maintenance plan of scheduled group relamping and fixture cleaning. Cleaning alone may boost fixture light output from 10 to 60 percent. • Calibrate lighting controls (automatic and others). Simple calibration of occupancy sensors and photocells can reduce energy used by the lighting system in those areas by 50 percent or more. • Account for seasonal changes to lighting requirements. • Be sure that lighting isn’t obstructed by furniture or décor. • Ensure the building meets illumination level standards set Confirm that built-in start/stop by the Illuminating Engineering Society of North America. controls are enabled and Managing Supplemental Loads operating according to the • Turn office equipment completely off when it’s not needed schedule you have established. for long periods of time. • Install and use power-management features and low- energy screen savers on computers. Adjusting Equipment Operating Schedules • Adjust operating schedules to ensure equipment is on only when necessary. Are tenants really using the overtime air they requested a year ago? Are you fully conditioning large areas of vacant space unnecessarily? • Ensure that lights are turned off when space is not in use.
  • 4. Optimize start-up and power-down time. Can you start your systems 15 minutes later and still achieve the desired temperature by the time the tenants arrive in the morning – or power down 45 minutes earlier and “coast” for the rest of the evening? Also confirm that built-in start/stop controls are enabled and operating according to the schedule you have established. • Conduct testing, adjusting, and balancing – spot-checking for problem areas and making adjustments to bring HVAC systems back into balance, given changes in occupancy levels and space utilization. Fixing Equipment Problems • Check for leaks or blockages in ductwork. • Repair air leaks in windows, doors, walls, and roofs • Clean debris from outside air intakes. THE BOTTOM LINE: • A building tune-up is a periodic (every 2-3 years) • The key steps include diagnosing problems and process intended to identify and implement opportunities; formulating and implementing an cost-effective operational improvements that will action plan; and developing recommendations for improve a building’s energy performance. changes to O&M procedures. • Changes to use and physical characteristics over • Building tune-ups are focused on operational, low- time may require a tune-up to bring energy cost opportunities to reduce energy consumption performance back to intended levels. such as calibration of controls, adjustments to equipment scheduling, control of outside air and system coordination. USEFUL LINKS: The High Performance Portfolio Framework BetterBricks Better Building Operating www.betterbricks.com/office/framework Performance Resources Enhanced Operations and Maintenance www.betterbricks.com/operations www.betterbricks.com/office/briefs February 2008 www.betterbricks.com/office/briefs