1. Introduction
Coal is the mainstay of commercial energy catering 55% of the total demand.
Therefore, developing a thriving coal market would go a long way for reaching the targeted
growth of the country. Creating transport infrastructures and managing logistics to transport
coal from point of origin to consumption centers are major challenges for sustainable
development of coal market. This paper will discuss the role of logistics for development of coal
market in the perspective of emerging growth in energy requirement of the Country.
At the time of Independence, the country had poor infrastructure in terms of energy
production and supply logistics. Per capita consumption of energy had been abysmally low and
the access to energy was very inadequate for the common people. The economy was dependent
largely on the non-commercial sources of energy for meeting the requirements of the households
and on animal and human energy in case of agriculture and transport. During the 60 years that
followed Independence, the demand for energy, particularly for commercial energy, registered a
high rate of growth contributed largely by the changes in the demographic structure. Rapid
urbanization necessitated need for socio-economic development and attaining sustainable self
reliance through economic development of different sectors.
Over the years, the high rate of growth of energy demand could be sustained
primarily through increased dependence on commercial energy sources such as coal, oil,
natural gas and hydel. However, the energy supply system that has developed over the years
has tended to depend more and more on non-renewable energy resources, coal in particular.
The development of these energy sources has made possible progress in the infrastructure front
mainly transport sector like rail, ports, with shipping and intermodal means of transport as well as
handling infrastructure at loading and terminal ends.

2.

The Primary Energy Resource Endowment

Per se India is not endowed with large primary energy reserves in keeping with her large
geographical area, growing population and increasing final energy needs. The current
assessment in regard to the primary commercial energy resources indicates that coal is the
major energy resource of the country. The gross reserves of coal are presently estimated at
around 264 Billion Tonnes (Bt). The proven resources of coal are placed at 98 Bt. Therefore, if
the rate of growth in coal consumption continues to be 8%, the reserve would be exhausted by
the Seventies of current century. There are some lignite deposits also which are estimated to be
more than 27 Bt. As far as hydrocarbons are concerned, the balance of recoverable reserves is
placed at about 73 Million Tonnes (Mt) of crude oil and 660 Billion Cubic meter of natural gas.
The hydro-electric potential as assessed by the Central Water Commission and the Central
Electricity Authority is 600 TWh. The available energy resources compelled planners to stress
more on coal to meet the growing need of power generation. In fact, 80% of coal production of
the Country is consumed for power generation only.
FUEL WISE BREAK UP OF POWER GENERATION CAPACITY (All India)
(End of July, 2008)

Type

MW

Total Thermal

93,115

Coal
Gas
Oil

77199
14716
1199
36159
4120
12194
145588

Hydro
Nuclear
Renewable
Total
3.

%
64%
53%
10%
1%
25%
3%
8%
100%

Skewed regional distribution of Coal Reserves:

The distribution of primary commercial energy resources is quite skewed. Whereas the Eastern
region accounts for nearly 70% of the total coal reserves, the Western region has over 70% of the
hydrocarbons reserves in the country. Similarly, more than 70% of the total hydel potential in the
country is located in the Northern and the North-Eastern regions put together. The Southern
region, which has only 6% of the coal reserves and 10% of the total hydel potential, has most of
the lignite deposits occurring in the country.
The above spread and distribution of energy resources entail a complex matrix of movement and
the supporting logistics. Since coal is the bedrock of commercial energy resources in the
country, this paper will try to deal in the logistics associated with movement and
transportation of coal through out the length and breadth of the country through the various
modes of transport.
Coal deposits occur largely in the east-central and south-eastern region of geographical India.
The state wise inventory of geological reserves of coal indicates that the proved category of coal
is mainly distributed in Jharkhand and Orissa followed by West Bengal, Chhattisgarh, Andhra
Pradesh and Madhya Pradesh. However, the industrial load centers are mainly located in North
India in the Capital region, Punjab & Haryana, in the West in Maharashtra & Gujarat and in South
in Tamil Nadu, Northern Karnataka and in the eastern Andhra Pradesh. Coal based thermal
Power plants as well as large industrial plants have been built up in these states. Coal markets
thus are all located away from coal sources necessitating long distance coal haulage in
most cases.
4.

Modes of coal transport

Coal is consumed in bulk to produce energy or to be used as feedstock. Likewise coal is
moved in bulk and the external dispatches of coal from the collieries are through a variety of
modes. Important modes of transport of coal are Rail, Road and the Rail-cum-Sea route and
captive modes such as, Merry-Go-Round (MGR) Systems, Conveyor Belts & Ropeways. Mode
wise dispatch details of coal and coal products (external and internal movement) in the country
for 2007-08 are as follows:
Modewise Despatches of Coal & products during 2007-08 (All India)
Source
CIL

Other
Public units

Private
sector

Country

Type
Raw coal
Coal pdts
Internal
Raw coal
Raw coal
Coal pdts
Internal
Raw coal
Raw coal
Coal pdts
Internal
Raw coal
Raw coal
Coal pdts
Internal
Raw coal
Total

Rail
186.78
17.10
1.67

Road
72.49
0.22
18.66

MGR
81.35

21.67

12.46
0.59

Belt
7.36

(in Mt)
Rope
Total
6.16
354.14
17.32
20.33

8.64

0.49
0.15

43.26
0.59
0.57

10.04

2.60

21.04
10.98
13.43

7.36

6.65

10.46

2.75

418.44
28.89
34.33

17.82

9.40

481.66

0.42
4.32
5.32

16.72
5.66
0.79

212.77
22.42
1.67

101.67
6.47
19.45

89.99

236.86

127.59

89.99

The following pie-chart illustrates the shares of various modes of transport (internal and
external) in 2007-08 in India.

MODES OF TRANSPORT
(Total offtake-482 Mt)- 2007-08

5.65%
Belt/Rope
26.50%
Road

49.20%
Railways

18.65%
MGR
Economic consideration in choosing a coal transportation mode
Coal is consumed in bulk quantities by Utilities and Industries throughout the length and breadth
of the country while coal production is mostly concentrated in a few states only. Indian Coal
contains high ash to the extent of more than 40% by weight. This is essentially an in-built
handicap for coal transport logistics system. Reliability of the transport system has a direct
bearing on cost of inventory and its management. All these issues are required to be factored into
a cost-efficient coal transportation system. It is important to note that there cannot be a
straightjacket best system applicable for transportation of coal to all consumption centres. In fact,
depending upon the situation and specific needs, the market does use various options available
in modes of coal transportations, sometimes singularly and sometimes in a mix. It is needless to
mention that most suitable transportation system from among various optional modes is critical to
the nation's economic well-being and energy security and therefore, special attentions are
needed to develop assets accordingly.

The practical considerations
By the end of 2030, country's coal production and consumption will increase almost five folds.
Transportation of such volume in itself is a gigantic task, as bulk of the coal has to be transported
to power utility and user industries. Depending on the volume of annual coal consumption by the
user and the distance that the coal has to move from the source, the choice of mode will be
determined.
With the technological advancement in reducing transmission loss and development of national
grid, more power plants are being planned near pitheads. These mega pithead power utilities
would be using a large share of the total coal. In other words, there would be a perceptible
shift in the location of the coal market. Pithead power utility companies will be developing their
captive transport infrastructure like Merry-Go-Rounds, a closed-circuit railway system, or medium
distance cross-country conveyors and short to medium distance aerial ropeways. This
endeavours, in fact would be saving a substantial portion of the cost so far involved in hauling
about 40% of un-useable part of coal.
An alternative means of transportation of coal is the option of coal slurry pipeline technology,
as in vogue in USA. Initial studies, during 1976-78 and detailed study in 1992, have observed
that the pipeline transport is high capital intensive but cheaper than rail only for throughputs of
over 10 million tonnes per year, and for distance over 800 Km in flat terrain. If the technology is
proved to be techno-economically attractive, one cross country pipeline from Northern Karanpura
to Northern power houses and another pipeline from coalfields in Orissa to the Western Sectors
power houses could be contemplated. Incidentally, in our country throughputs of more than 10Mt
is applicable for Utilities and in view of the successful operation of the national electricity grid, this
mode of transportation for Utilities appears to be not-so-attractive, particularly in view of the
quantum of investment involved.
The larger circuits, i.e. those going beyond 50 km. have to operate through rail or road systems.
The major share of coal will however move by Rail since road transportation is cost effective up to
250 Km. in comparison to rail.

Creating an integrated rail system planning for optimum outcome.
The High Density (Rail) Network (HDN), which connects the four metro cities of Delhi, Kolkata,
Chennai & Mumbai and is popularly called as Golden Quadrilateral including the diagonals
though comprising only 16% of the network, carries about 65% of the freight traffic and 55% of
passenger traffic. These lines are apparently saturated. Hence for future transport of coal
dedicated rail lines comprising special north-south corridor and east-west corridor for freight
transport may have to be considered by railways.
It is well known that payload to tare weight ratio of wagons in Indian Railways is one of the
lowest in the world. Payload to tare weight ratio of BG wagons varies between 2.0 to 2.6 only,
which in US railroad and Western Railroads are in between 3.5 to 4.5. While Indian Railways
carry about 450Kg of dead weight for every 1000 kg freight, in US the dead weight does not
exceed more than 170Kg. The net to tare ratio could be improved by introducing lighter wagons.
In order to optimize utilization of upgraded axle load, Railways are required to introduce lighter
wagons with higher volume capacity so that payload tare weight ratio is more than 4.
Considering average bulk density of crushed coal as 0.75 Tonnes/cubic meter, wagons having
volumetric capacity of around 129 cubic meters would be required to accommodate about
97tonnes of net weight of coal. If the tare weight of lighter wagons is around 23 tonnes, then
only payload to tare weight ratio could be of about 4.
In other advanced countries, for example, in Australia, railway transport of coal is by rakes,
which are having, as many as six locomotives, capable of hauling 148 wagons aggregating to a
length of 2 kms. A rake of that size carries about 8500 tonnes of coal. The latest move is to have
wagons of maximum payload of 80 tonnes has designed for maximum speed of 115 kms per
hour with Axle loading up to 25 tonnes to accommodate further increase in its standards. Also an
important infusion in Queensland (Australia) is the development of aluminum wagons equipped
with rotate coupling which enable the wagon to be entailed by paying turn up side down to
reduce unloading time.
For transportation of such large volume of coal, railways shall have to consider increasing the
payload of the wagons and/ or the train size to have fast turnaround cycle through the dedicated
coal corridor. In case railways are not in position to build such network all by themselves then
such network may have to be constructed on BOO basis by a consortium of user industries
utilizing the coal corridor. This could also be built on public-private partnership basis.
In fact, there is immense scope on developing core business competence in coal transport
logistics encompassing activities in road/belt transportation of coal from pithead to railway siding,
managing tracks and rolling stocks for rail transportation of coal and then shifting coal from
railway terminals to points of consumptions. Only specialized Coal transport Companies, can
possibly offer definite run schedule for coal movement by commissioning advanced Information
Technology based cargo tracking system, which would be saving both inventory costs of buyers
and infrastructure idling costs of coal producers.
5.

Logistics requirement for coal transportation in 2030 – an overview

Based on the present trends available in the rate of urbanization, the share of urban population is
projected to increase from 25.38% in 1990-91 to 43% in the year 2020 and say 50% by 2030.
The growth in GDP and its structural changes will have an effect on the demand for energy and
the energy supply mix in future. The GDP, which grew at a rate of almost 7% in X Plan Period, is
targeted to grow by 9% in XI Plan period. It is projected that these upward trends in GDP growth
are likely to continue in future as well. The high rate of economic growth is likely to be
accompanied by an increasing per capita income and changes in life styles. This will have an
effect on the energy demand as well. In view of the rising awareness in regard to the
environmental protection and conservation, the future growth in energy sector must consider such
concerns in order to develop in a manner which is environmentally benign.
The Integrated Energy Policy (IEP) report (Planning Commission May, 2006), has projected the
total energy demand in terms of different fuels with reference to a GDP growth of 8% and 9%.
The IEP Report has estimated that the coal market for power generation would then be 1659
million tones by 2031-32. This coal requirement excludes the non-power use of coal which has
additional market for about 684 million tonnes. The total indigenous market demand for coal in
2031-32 thus adds upto 2343 million tones that includes lignite anticipated to be consumed for
power generation amounting to 120 million tonnes (coal demand net of lignite consumption being
2223 MT.). Another 30 million tones of lignite would be consumed in industries, which in any case
is not included in coal requirement of non-power uses. The total coal requirement for power
generation as per IEP Report should have been 1539 (1659 –120) million tones assuming 9%
growth in GDP.
However, traditionally any shortfall in the production of electricity from non-fuel resources is being
met from coal. Therefore, the total demand for coal for 2031-32 can only be noted in broad
magnitudes. In the road map for coal sector reforms drawn up by the Expert Committee, the total
of demand for coal including both non- power and power uses in 2031-32 adds up to 2373 million
tones inclusive of lignite consumption of 150 million tones. The rate of growth implied in this
forecast of coal demand is around 6.50% per year as against 5.2% achieved in the past 25 years.
Thus an estimate of 2223 million tones of coal demand (excluding lignite) can be taken for
long term planning of logistics for coal movement.
The steep increase in the growth of coal demand and production puts up a challenge
before the country because the projected demand satisfaction and production can be
achieved only by taking up well planned execution of infrastructure and logistics for
transportation of coal. As a strategic measure, both in the perspective of economic and
environmental consideration, the Country may decide to source a portion of its coal
requirement from overseas properties or through straightaway international trade. In any
case to meet the demand of metallurgical coal and low ash steaming coal, the Country has
to depend on imports. Therefore, development of port infrastructure for coal handling and
movement of coal from Ports to hinterlands also need to be seen in proper perspective.
These issues add new dimension to the logistics problems.
Coal transport scenario - AD 2030
By the turn of 2030, India's coal production is slated to increase to 2000 million tonnes from
various sources, which would include sources owned, by private, public and captive etc.
Transportation of such volume in itself is a gigantic task and bulk of the coal would get
transported to power utility companies. It is envisaged that many of the new power plants will be
located near pithead and more than 800 million tonnes of coal will be used by such pit head
power utility companies. These pithead power utility companies will transport their coal by MGR
system or by long distance cross-country conveyors. Assuming that 50% of the raw coal feed is
beneficiated at the pit-mouth, about 700 Million tones (both raw and clean coal) would be carted
by captive modes like MGR/Aerial Ropeway and Belt-conveyors. This would leave about 1200
million tones of coal meant for power utility companies and other sectors, 90% of which it is
assumed would be utilized only after deshaling and beneficiation. About 85% of the output of coal
washeries/ coal products would be move by rail-transport network including carting of bulk coal to
load ports within the country and by shipment thereafter to unload ports within the country thus
entailing double movement of coal by rail system. By estimating various demand projections,
it is considered that such coal traffic by rail mode would surpass 830 Million tones
including coastal rail –sea mode (which would cross 100 million tones by 2030 from the
present level of about 20 million tones). Besides, the road transportation to various consumers
upto a cut-off level of 400 Km. would take care of external movement of coal to an extent of 125
Mt.
Projection showing the share of coal transport by various modes
by 2031-32 (external dispatches only)
Envisaged coal
supply
(Mt
per year)
800 Mt(400 Raw coal
& balance eq. clean
coal)
1075 Mt (110 Raw
coal & balance eq.
clean coal)
125 Mt (Mainly raw
coal)
2000

% of share

40.0

53.75

6.25

Proposed mode of
transport

Remarks

MGR system or crosscountry
conveyors/ropeway
National Rail network/Rail
cum sea

Pit head power plants &
other ultra mega projects

Coal by road

For consumers located
within 400 km. of coalfield
areas

For consumers located
beyond coalfield areas

100

The projections above are exclusive of internal coal movements mainly as feed to washeries.
REQUIREMENTS OF RAIL NETWORK & INFRUSTRUCTURE IN COAL TRANSPORTATION –
THEN, NOW & FUTURE
From a level of 78 Mt in 1971, coal production reached to 456 Mt in 2007-08. During 2007-08,
coal including imported coal moved by rail was 245 Mt which is more than 50% of
indigenous coal production.
It is an accepted and established fact that rail transportation is the most economical
means of moving coal in bulk. Rail-links also reduce logistics cost for transporting coal and is
the mainstay of the coal transportation in the country. This dependence on the rail system would
increase further in the coming decades. Moreover the coalfields are located on the east
central & southeastern part of the country and larger volumes of coal need to be
transported to Northern & Western part of the country. This places burden on the already
heavily loaded rail network. Hence for future transport of coal, dedicated rail lines comprising of
special east-north corridor and east-west corridor for freight transport need to be considered.
THE DEDICATED RAIL FREIGHT CORRIDOR PROJECT:

As outlined above, to meet the growing demand for logistic support arising from impressive
growth of over 9 percent of the Indian economy, the Ministry of Railways announced in its
budget of 2006 that Indian Railways (IR) shall construct two dedicated Freight Corridors (DFCs)
at an estimated cost of about Rs.28181 crores. This can be termed as the single largest project of
independent India to be carried out by an SPV styled as “Dedicated Freight Corridor Corporation
of India Ltd.” (DFCCIL)
These two DFCs, one referred to as the Western Corridor (i.e. connecting Jawaharlal Nehru Port
Trust in Mumbai to Dadri/Tuglakabad near Delhi) and another known as the Eastern Corridor (i.e.
from Ludhiana in Punjab to Sonnagar in Bihar) would run parallel to so called golden quadrilateral
linking Delhi, Kolkata, Mumbai, Chennai and other high density corridors.
The first 2 lines will be:
Delhi- Sonnagar with a length of around 1279 km.
Delhi-Mumbai with a length of around 1483 km.
In the first phase of the Eastern Corridor Project, a separate freight corridor will be built from
Ludhiana to Sonnagar via Ambala, Saharanpur, Khurja and Allahabad. The primary feeder routes
from Sonnagar to Durgapur via Gomoh, Sonnagar to Tatanagar via Garhwa Road and Barkakana
to Bokaro via Chandrapura would be upgraded in order to carry heavier trains of coal and steel
traffic. In the subsequent budget proposal of 2008, Railway Minister had already declared that the
Eastern Corridor would be extended from Sonenagar to Kolkata to ensure Port Connectivity with
hinterland. The primary feeder routes are expected to be converted to dedicated freight corridor
at the appropriate time.
The Western Corridor would start from Jawaharlal Nehru Port and will be routed via Vadodara,
Ahmedabad, Palanpur, Jaipur and Rewari to Tuglakabad and Dadri. Both the corridors would be
joined by a link between Dadri and Khurja. The feeder routes of the Western Corridor connecting
ports of Gujarat would be upgraded. While DELHI-HWH corridor will be a Heavy haul corridor
mainly to cater the bulk traffic, DELHI-MUMBAI freight corridor will be a state-of-the-art multimodal rail freight corridor, which would serve the western and northern hinterlands from Mumbai,
the country’s premier port and smaller ports of Gujarat. Both corridors would also have several
small feeder routes to bring in goods traffic from ports and plants in nearby towns and the
hinterland.
Development of Feeder Routes for coal :
East-North DFC between Ludhiana and Sonnagar will cater largely to coal traffic. Feeder routes
linking high growth colliery area and power houses are identified and being strengthened as
follows :
1.Sonnagar- Garwa Road- Barkakana (311 Kms)
2.Patratu- Gomoh including PD Branch Line (128 Kms)
3.Sonnagar-Gaya-Gomoh (249 Kms)
Gomoh-Pradhankhunta (39 Kms) including Kusunda -Tetulmari (4.5 Kms),
4.Katrasgarh – Nichitpur, Pradhankhunta - Pathardih links (24 Kms)
5.Pradhankhunta-Asansol-Andal including coal branch lines (75 Kms)
6.Andal-Sainthia-Pakur (151 Kms)
7.Chandrapura- Dhanbad (36 Kms)
8.Bhojidih –Mohuda –Gomoh (44 Kms)
9.Aligarh – Harduaganj (15 Kms)
10.Kanpur – Paricha (198 Kms)
11.Mughalsarai – Unchahar via Janghai, Phaphamau(205 Kms)
12.Varanasi-Sultanpur-Utratia –Rosa ( 558 Kms)
13.Zafrabad – Tanda ( 99 Kms)
14.Ludhiana –Beas-Govindwal Sahib ( 112 Kms)
15.Rajpura – Dhuri – Bhatinda (Lehra Mohabbat ) ( 173 Kms)
16.Sirhind – Rupnagar – Nangal Dam (104 Kms)
17.Hissar-Bhatinda-Suratgarh (298 Kms)
There is another route, viz. Howrah-Nasik which requires augmentation in order to cater to
increased evacuation of coal in the future. While a dedicated third track is necessary exclusively
for coal, some rail infrastructure developments in the connected IB –Valley, Talcher coalfields and
Korba C.F. feeding the east-west trunk route and Paradeep Port are also vital for evacuation of
coal.
OTHER RAIL INFRASTRUCTURE DEVELOPMENTS

Talcher area

•Sambalpur-Jharsuguda doubling
•Khurda Road-Barang third line
•Rajatgarh – Barang doubling
•Talcher-Paradeep electrification
•Talcher-Bimlagarh new line

Korba / IB Area

•Bilaspur-Anuppur doubling
•Jharsuguda bypass
•Champa-Bilaspur-Bhilai-Durg third line
•Bina-Kota electrification
•Jharsuguda-Sardega new line to serve the new collieries in IB area

Public – private partnership to augment infrastructure facilities:
To bolster logistics and links for coal evacuation in the not too distant future, the non-mining
infrastructure required to handle the coal would be gargantuan as compared to the present.
At present, coal companies in both private and public sectors have built up coal handling plants
with capacity of about 300 MT per annum so as to maximize dispatches of crushed/sized coal to
the consumers. In addition, the washeries at BCCL, CCL, WCL and NCL have adequate
crushing/sizing facilities to the tune of about 39.4 million tones in their system for generation of
different washery products. Therefore the existing facilities can barely handle the current annual
production of raw coal in the country. Similarly about 200 sidings move out only 235 Mt of
indigenous coal per annum by rail presently. A massive siding build-up is required to evacuate
coal by rail @ 1 BT per annum.
To crank up the coal evacuation from 450 Mt per annum to over 2000 Mt in a span of 20 years,
a huge effort is required to bring about a quantum jump in coal processing and coal delivery
systems. A whopping investment is required in terms of creation of sidings, washeries and
CHPS for which the coal producing companies may not be in a position to mobilize the required
funds fully and look after the day to day management of such non-mining affairs. There are two
ways to handle the logistics gap in the coal-mining sector.
1)
Outsource these capital infrastructure projects through suitable Build - Operate Maintain schemes.
2)
Create a SPV to take up the infrastructure development and tap private investors
for bridging the capacity gaps.

Innovation in logistics development:

Coal-by-wire – Power-grid networking, over the years, have immensely helped in
curbing requirement of physical movement of coal, particularly in long haul. It is
envisaged that generation capacity of pithead power stations would grow @ 13.3% in XI
Plan from a level of 2.7% in X Plan.
Coal Beneficiation - CIL by end of XI Plan would be dispatching only beneficiated coal
to all consumers excepting those who are located at pitheads. This would likely to reduce
haulage need by 6-10%.
Coal-by-pipeline – In-situ coal gasification and Coal Bed Methane exploration would be
the major ventures in years to come in the energy market of the Country bringing a new
vista in transportation logistics.
Conclusion
The use of energy is slated to go up exponentially in the country. Coal will remain the mainstay of
the energy mix and along with it the tables will be set for increased transportation of coal to feed
the new emerging coal markets. Adequate demand satisfaction can be possible only with the
augmentation of infrastructure in a holistic manner. The colliery projects need to add up sidings
and associated equipments, plants/ machineries to handle and deliver the coal in ever increasing
volumes. The loading infrastructure at the mine end needs to be fully mechanized and a similar
infrastructure built-up is necessary at the terminal end where coal is unloaded in bulk round the
clock. The rail-cum-sea transportation of coal beyond 100 Mt per year as envisaged by 2030’s will
be a reality once large no. of dedicated coal berths come in place along with matching bulk
reclaiming equipments in the various load / unload ports in the country. In sequel to this
development of hinterland connectivity of ports would be another important issue. In a similar
vein, the captive modes of coal evacuation viz. Aerial ropeway, Conveyor –belt and Merry-GoRound rail systems etc. are required to be created and re-vamped wherever necessary as part of
the users’ coal-handling infrastructure.
In the end it may be stated that only a synergic augmentation and up gradation of related
infrastructure capacities as outlined above in tune with the transport capacity for coal in
the country can make possible the projected coal delivery @ 2 Billion tonnes per annum.
Possibly, coal transport logistics would emerge as a specialized business area in the
emerging coal market, independent of traditional transporting enterprises like Railways,
Port Authorities or Roadways, connecting coal producers and consumers.

=xxxx=

Recomendados

11v3 ch10 por
11v3 ch1011v3 ch10
11v3 ch10SUCHI1405
698 vistas52 diapositivas
Ass 1 por
Ass 1Ass 1
Ass 1sivapriya31
203 vistas19 diapositivas
Presentation coal oil and gas scenario in the context of power sector-by-rake... por
Presentation coal oil and gas scenario in the context of power sector-by-rake...Presentation coal oil and gas scenario in the context of power sector-by-rake...
Presentation coal oil and gas scenario in the context of power sector-by-rake...Prashantkarhade72
974 vistas24 diapositivas
Energy por
EnergyEnergy
Energychrisdaniel94
70 vistas47 diapositivas
Energy in pakistan por
Energy in pakistanEnergy in pakistan
Energy in pakistanFreelanced
623 vistas25 diapositivas
Smart Grids and Load Profiles in the GCC Region por
Smart Grids and Load Profiles in the GCC RegionSmart Grids and Load Profiles in the GCC Region
Smart Grids and Load Profiles in the GCC RegionPower System Operation
95 vistas13 diapositivas

Más contenido relacionado

La actualidad más candente

World Energy Scenarios 2016 (preliminary) por
World Energy Scenarios 2016 (preliminary)World Energy Scenarios 2016 (preliminary)
World Energy Scenarios 2016 (preliminary)IEA-ETSAP
5.6K vistas27 diapositivas
AMAZING CHAMPIONS OF ENERGY ACE Case Study Submitted to Cairn India por
AMAZING CHAMPIONS OF ENERGY ACE Case Study Submitted to Cairn IndiaAMAZING CHAMPIONS OF ENERGY ACE Case Study Submitted to Cairn India
AMAZING CHAMPIONS OF ENERGY ACE Case Study Submitted to Cairn IndiaAkhilesh Mishra
763 vistas10 diapositivas
Gulf Gas Development: A Rational Development Strategy por
Gulf Gas Development: A Rational Development StrategyGulf Gas Development: A Rational Development Strategy
Gulf Gas Development: A Rational Development StrategyGeorgetown University School of Foreign Service in Qatar
1.2K vistas16 diapositivas
The Coal Power Decommissioning Market 2013-2023 por
The Coal Power Decommissioning Market 2013-2023The Coal Power Decommissioning Market 2013-2023
The Coal Power Decommissioning Market 2013-2023Visiongain
755 vistas23 diapositivas
Review of Indian coal sector por
Review of Indian coal sectorReview of Indian coal sector
Review of Indian coal sectorManoj Jhawar
5.6K vistas36 diapositivas
Shivee Energy integrated energy complex por
Shivee Energy integrated energy complexShivee Energy integrated energy complex
Shivee Energy integrated energy complexTumee Gantumur
515 vistas16 diapositivas

La actualidad más candente(20)

World Energy Scenarios 2016 (preliminary) por IEA-ETSAP
World Energy Scenarios 2016 (preliminary)World Energy Scenarios 2016 (preliminary)
World Energy Scenarios 2016 (preliminary)
IEA-ETSAP5.6K vistas
AMAZING CHAMPIONS OF ENERGY ACE Case Study Submitted to Cairn India por Akhilesh Mishra
AMAZING CHAMPIONS OF ENERGY ACE Case Study Submitted to Cairn IndiaAMAZING CHAMPIONS OF ENERGY ACE Case Study Submitted to Cairn India
AMAZING CHAMPIONS OF ENERGY ACE Case Study Submitted to Cairn India
Akhilesh Mishra763 vistas
The Coal Power Decommissioning Market 2013-2023 por Visiongain
The Coal Power Decommissioning Market 2013-2023The Coal Power Decommissioning Market 2013-2023
The Coal Power Decommissioning Market 2013-2023
Visiongain755 vistas
Review of Indian coal sector por Manoj Jhawar
Review of Indian coal sectorReview of Indian coal sector
Review of Indian coal sector
Manoj Jhawar5.6K vistas
Shivee Energy integrated energy complex por Tumee Gantumur
Shivee Energy integrated energy complexShivee Energy integrated energy complex
Shivee Energy integrated energy complex
Tumee Gantumur515 vistas
The Status of Sovereignty, Mining and Extraction Rights of the Rim Nations of... por IPPAI
The Status of Sovereignty, Mining and Extraction Rights of the Rim Nations of...The Status of Sovereignty, Mining and Extraction Rights of the Rim Nations of...
The Status of Sovereignty, Mining and Extraction Rights of the Rim Nations of...
IPPAI640 vistas
Gloomy Power Scene By Arjumand Ansar por IEEEP Karachi
Gloomy Power Scene By Arjumand AnsarGloomy Power Scene By Arjumand Ansar
Gloomy Power Scene By Arjumand Ansar
IEEEP Karachi621 vistas
010 bmcg 2123 week 1 por fuencheecky
010 bmcg 2123   week 1010 bmcg 2123   week 1
010 bmcg 2123 week 1
fuencheecky472 vistas
Wp 100 eberhard_future_of_south_african_coal por ABDUL RAZZAQ SHAHID
Wp 100 eberhard_future_of_south_african_coalWp 100 eberhard_future_of_south_african_coal
Wp 100 eberhard_future_of_south_african_coal
ABDUL RAZZAQ SHAHID1.3K vistas
Using methanol for power generation por abodin
Using methanol for power generationUsing methanol for power generation
Using methanol for power generation
abodin657 vistas
National energy policy ppt por ghildiyal8811
National energy policy pptNational energy policy ppt
National energy policy ppt
ghildiyal88116.9K vistas
Asia builds hundreds of coal fired power plants as cop26 targets coal por aditi agarwal
Asia builds hundreds of coal fired power plants as cop26 targets coalAsia builds hundreds of coal fired power plants as cop26 targets coal
Asia builds hundreds of coal fired power plants as cop26 targets coal
aditi agarwal48 vistas
Implications of the global transition to non fossil energy por Sampe Purba
Implications of the global transition to non fossil energyImplications of the global transition to non fossil energy
Implications of the global transition to non fossil energy
Sampe Purba94 vistas
ENSURING AFFORDABLE FUEL SECURITY FOR NTPC por Santosh Verma
ENSURING AFFORDABLE FUEL SECURITY FOR NTPCENSURING AFFORDABLE FUEL SECURITY FOR NTPC
ENSURING AFFORDABLE FUEL SECURITY FOR NTPC
Santosh Verma1.3K vistas

Destacado

THE COMPLETE GUIDE TO CREATING A PERFECT DIGITAL MARKETING STRATEGY por
THE COMPLETE GUIDE TO CREATING A PERFECT DIGITAL MARKETING STRATEGYTHE COMPLETE GUIDE TO CREATING A PERFECT DIGITAL MARKETING STRATEGY
THE COMPLETE GUIDE TO CREATING A PERFECT DIGITAL MARKETING STRATEGYVinodh Ramakannan
385 vistas17 diapositivas
Kevin Getch - Visualize a customer centric digital marketing strategy - Seatt... por
Kevin Getch - Visualize a customer centric digital marketing strategy - Seatt...Kevin Getch - Visualize a customer centric digital marketing strategy - Seatt...
Kevin Getch - Visualize a customer centric digital marketing strategy - Seatt...Seattle Interactive Conference
987 vistas72 diapositivas
The Most Epic Digital Marketing Strategy for 2017 por
The Most Epic Digital Marketing Strategy for 2017The Most Epic Digital Marketing Strategy for 2017
The Most Epic Digital Marketing Strategy for 2017Cult LDN
1.5K vistas35 diapositivas
Shell Digital Marketing Strategy por
 Shell Digital Marketing Strategy Shell Digital Marketing Strategy
Shell Digital Marketing StrategyMichigan State University
21.6K vistas10 diapositivas
Mix Digital Marketing Agency Credentials por
Mix Digital Marketing Agency CredentialsMix Digital Marketing Agency Credentials
Mix Digital Marketing Agency CredentialsMix Digital Marketing Agency
48.4K vistas22 diapositivas
Shell por
ShellShell
ShellEmma Mia
128.7K vistas49 diapositivas

Destacado(8)

THE COMPLETE GUIDE TO CREATING A PERFECT DIGITAL MARKETING STRATEGY por Vinodh Ramakannan
THE COMPLETE GUIDE TO CREATING A PERFECT DIGITAL MARKETING STRATEGYTHE COMPLETE GUIDE TO CREATING A PERFECT DIGITAL MARKETING STRATEGY
THE COMPLETE GUIDE TO CREATING A PERFECT DIGITAL MARKETING STRATEGY
Vinodh Ramakannan385 vistas
The Most Epic Digital Marketing Strategy for 2017 por Cult LDN
The Most Epic Digital Marketing Strategy for 2017The Most Epic Digital Marketing Strategy for 2017
The Most Epic Digital Marketing Strategy for 2017
Cult LDN1.5K vistas
Shell por Emma Mia
ShellShell
Shell
Emma Mia128.7K vistas
Digital Marketing Strategy Guide por pixelbuilders
Digital Marketing Strategy GuideDigital Marketing Strategy Guide
Digital Marketing Strategy Guide
pixelbuilders74.9K vistas
Why You Need an Integrated Digital Marketing Strategy por Kevin Gibbons
Why You Need an Integrated Digital Marketing StrategyWhy You Need an Integrated Digital Marketing Strategy
Why You Need an Integrated Digital Marketing Strategy
Kevin Gibbons30.3K vistas

Similar a Roleoflogisticsandinfrastructureinthedevelopmentofcoalmarketinthecountry coalindia-120401025039-phpapp02

Managment ppt por
Managment pptManagment ppt
Managment pptM.MUZAMMAL JUTT
400 vistas46 diapositivas
Longwall exp india-expectations por
Longwall exp india-expectationsLongwall exp india-expectations
Longwall exp india-expectationsVR M
2.1K vistas13 diapositivas
Coal in india 2015 por
Coal in india 2015Coal in india 2015
Coal in india 2015Angel Dass
796 vistas4 diapositivas
Role of logistics and infrastructure in the development of coal market in the... por
Role of logistics and infrastructure in the development of coal market in the...Role of logistics and infrastructure in the development of coal market in the...
Role of logistics and infrastructure in the development of coal market in the...Athar Naseem Shaikh
3.1K vistas10 diapositivas
Underground coal mining in india por
Underground coal mining in indiaUnderground coal mining in india
Underground coal mining in indiaMD.Suresh Kumar
19.6K vistas11 diapositivas
Thermal energy por
Thermal energyThermal energy
Thermal energyfauzia samreen
180 vistas21 diapositivas

Similar a Roleoflogisticsandinfrastructureinthedevelopmentofcoalmarketinthecountry coalindia-120401025039-phpapp02(20)

Longwall exp india-expectations por VR M
Longwall exp india-expectationsLongwall exp india-expectations
Longwall exp india-expectations
VR M2.1K vistas
Coal in india 2015 por Angel Dass
Coal in india 2015Coal in india 2015
Coal in india 2015
Angel Dass796 vistas
Role of logistics and infrastructure in the development of coal market in the... por Athar Naseem Shaikh
Role of logistics and infrastructure in the development of coal market in the...Role of logistics and infrastructure in the development of coal market in the...
Role of logistics and infrastructure in the development of coal market in the...
Athar Naseem Shaikh3.1K vistas
Underground coal mining in india por MD.Suresh Kumar
Underground coal mining in indiaUnderground coal mining in india
Underground coal mining in india
MD.Suresh Kumar19.6K vistas
Amc strategies for green mining at mcl por AMIT SAHU
Amc strategies for green mining at mclAmc strategies for green mining at mcl
Amc strategies for green mining at mcl
AMIT SAHU226 vistas
Hydrogen_Valley_Feasibility_Study_Report_Final_Version.pdf por kyaq0011
Hydrogen_Valley_Feasibility_Study_Report_Final_Version.pdfHydrogen_Valley_Feasibility_Study_Report_Final_Version.pdf
Hydrogen_Valley_Feasibility_Study_Report_Final_Version.pdf
kyaq001114 vistas
Coal an energy source for present and future por IAEME Publication
Coal an energy source for present and futureCoal an energy source for present and future
Coal an energy source for present and future
IAEME Publication475 vistas
4th Annual Conference on Global Domestic Coal Outlook : Need for logistics op... por Infraline Energy
4th Annual Conference on Global Domestic Coal Outlook : Need for logistics op...4th Annual Conference on Global Domestic Coal Outlook : Need for logistics op...
4th Annual Conference on Global Domestic Coal Outlook : Need for logistics op...
Infraline Energy460 vistas
Challenges of coal to power and prospects of renewable energy in nigeria por Donald ofoegbu
Challenges of coal to power and prospects of renewable   energy in nigeriaChallenges of coal to power and prospects of renewable   energy in nigeria
Challenges of coal to power and prospects of renewable energy in nigeria
Donald ofoegbu762 vistas
Access to Central Asian energy resources for Asian consumers por IPPAI
Access to Central Asian energy resources for Asian consumersAccess to Central Asian energy resources for Asian consumers
Access to Central Asian energy resources for Asian consumers
IPPAI578 vistas
Energy Sector Pakistan por Ultraspectra
Energy Sector PakistanEnergy Sector Pakistan
Energy Sector Pakistan
Ultraspectra21.8K vistas
Wer 2013 1_coal por vhovo
Wer 2013 1_coalWer 2013 1_coal
Wer 2013 1_coal
vhovo401 vistas
Captive Power Plants por Koos Smit
Captive Power PlantsCaptive Power Plants
Captive Power Plants
Koos Smit374 vistas

Último

Vertical User Stories por
Vertical User StoriesVertical User Stories
Vertical User StoriesMoisés Armani Ramírez
14 vistas16 diapositivas
Future of AR - Facebook Presentation por
Future of AR - Facebook PresentationFuture of AR - Facebook Presentation
Future of AR - Facebook Presentationssuserb54b561
15 vistas27 diapositivas
MVP and prioritization.pdf por
MVP and prioritization.pdfMVP and prioritization.pdf
MVP and prioritization.pdfrahuldharwal141
31 vistas8 diapositivas
Evolving the Network Automation Journey from Python to Platforms por
Evolving the Network Automation Journey from Python to PlatformsEvolving the Network Automation Journey from Python to Platforms
Evolving the Network Automation Journey from Python to PlatformsNetwork Automation Forum
13 vistas21 diapositivas
The Research Portal of Catalonia: Growing more (information) & more (services) por
The Research Portal of Catalonia: Growing more (information) & more (services)The Research Portal of Catalonia: Growing more (information) & more (services)
The Research Portal of Catalonia: Growing more (information) & more (services)CSUC - Consorci de Serveis Universitaris de Catalunya
80 vistas25 diapositivas
Igniting Next Level Productivity with AI-Infused Data Integration Workflows por
Igniting Next Level Productivity with AI-Infused Data Integration Workflows Igniting Next Level Productivity with AI-Infused Data Integration Workflows
Igniting Next Level Productivity with AI-Infused Data Integration Workflows Safe Software
280 vistas86 diapositivas

Último(20)

Future of AR - Facebook Presentation por ssuserb54b561
Future of AR - Facebook PresentationFuture of AR - Facebook Presentation
Future of AR - Facebook Presentation
ssuserb54b56115 vistas
Igniting Next Level Productivity with AI-Infused Data Integration Workflows por Safe Software
Igniting Next Level Productivity with AI-Infused Data Integration Workflows Igniting Next Level Productivity with AI-Infused Data Integration Workflows
Igniting Next Level Productivity with AI-Infused Data Integration Workflows
Safe Software280 vistas
Serverless computing with Google Cloud (2023-24) por wesley chun
Serverless computing with Google Cloud (2023-24)Serverless computing with Google Cloud (2023-24)
Serverless computing with Google Cloud (2023-24)
wesley chun11 vistas
SAP Automation Using Bar Code and FIORI.pdf por Virendra Rai, PMP
SAP Automation Using Bar Code and FIORI.pdfSAP Automation Using Bar Code and FIORI.pdf
SAP Automation Using Bar Code and FIORI.pdf
Virendra Rai, PMP23 vistas
TouchLog: Finger Micro Gesture Recognition Using Photo-Reflective Sensors por sugiuralab
TouchLog: Finger Micro Gesture Recognition  Using Photo-Reflective SensorsTouchLog: Finger Micro Gesture Recognition  Using Photo-Reflective Sensors
TouchLog: Finger Micro Gesture Recognition Using Photo-Reflective Sensors
sugiuralab21 vistas
Special_edition_innovator_2023.pdf por WillDavies22
Special_edition_innovator_2023.pdfSpecial_edition_innovator_2023.pdf
Special_edition_innovator_2023.pdf
WillDavies2218 vistas
Data Integrity for Banking and Financial Services por Precisely
Data Integrity for Banking and Financial ServicesData Integrity for Banking and Financial Services
Data Integrity for Banking and Financial Services
Precisely25 vistas
ESPC 2023 - Protect and Govern your Sensitive Data with Microsoft Purview in ... por Jasper Oosterveld
ESPC 2023 - Protect and Govern your Sensitive Data with Microsoft Purview in ...ESPC 2023 - Protect and Govern your Sensitive Data with Microsoft Purview in ...
ESPC 2023 - Protect and Govern your Sensitive Data with Microsoft Purview in ...
Jasper Oosterveld19 vistas
6g - REPORT.pdf por Liveplex
6g - REPORT.pdf6g - REPORT.pdf
6g - REPORT.pdf
Liveplex10 vistas
Unit 1_Lecture 2_Physical Design of IoT.pdf por StephenTec
Unit 1_Lecture 2_Physical Design of IoT.pdfUnit 1_Lecture 2_Physical Design of IoT.pdf
Unit 1_Lecture 2_Physical Design of IoT.pdf
StephenTec12 vistas

Roleoflogisticsandinfrastructureinthedevelopmentofcoalmarketinthecountry coalindia-120401025039-phpapp02

  • 1. ROLE OF LOGISTICS AND INFRASTRUCTURE IN THE DEVELOPMENT OF COAL MARKET IN THE COUNTRY Jawahar Lal Goel Chief General Manager (S&M) Coal India Limited 1. Introduction Coal is the mainstay of commercial energy catering 55% of the total demand. Therefore, developing a thriving coal market would go a long way for reaching the targeted growth of the country. Creating transport infrastructures and managing logistics to transport coal from point of origin to consumption centers are major challenges for sustainable development of coal market. This paper will discuss the role of logistics for development of coal market in the perspective of emerging growth in energy requirement of the Country. At the time of Independence, the country had poor infrastructure in terms of energy production and supply logistics. Per capita consumption of energy had been abysmally low and the access to energy was very inadequate for the common people. The economy was dependent largely on the non-commercial sources of energy for meeting the requirements of the households and on animal and human energy in case of agriculture and transport. During the 60 years that followed Independence, the demand for energy, particularly for commercial energy, registered a high rate of growth contributed largely by the changes in the demographic structure. Rapid urbanization necessitated need for socio-economic development and attaining sustainable self reliance through economic development of different sectors. Over the years, the high rate of growth of energy demand could be sustained primarily through increased dependence on commercial energy sources such as coal, oil, natural gas and hydel. However, the energy supply system that has developed over the years has tended to depend more and more on non-renewable energy resources, coal in particular. The development of these energy sources has made possible progress in the infrastructure front mainly transport sector like rail, ports, with shipping and intermodal means of transport as well as handling infrastructure at loading and terminal ends. 2. The Primary Energy Resource Endowment Per se India is not endowed with large primary energy reserves in keeping with her large geographical area, growing population and increasing final energy needs. The current assessment in regard to the primary commercial energy resources indicates that coal is the major energy resource of the country. The gross reserves of coal are presently estimated at around 264 Billion Tonnes (Bt). The proven resources of coal are placed at 98 Bt. Therefore, if the rate of growth in coal consumption continues to be 8%, the reserve would be exhausted by the Seventies of current century. There are some lignite deposits also which are estimated to be more than 27 Bt. As far as hydrocarbons are concerned, the balance of recoverable reserves is placed at about 73 Million Tonnes (Mt) of crude oil and 660 Billion Cubic meter of natural gas. The hydro-electric potential as assessed by the Central Water Commission and the Central Electricity Authority is 600 TWh. The available energy resources compelled planners to stress more on coal to meet the growing need of power generation. In fact, 80% of coal production of the Country is consumed for power generation only.
  • 2. FUEL WISE BREAK UP OF POWER GENERATION CAPACITY (All India) (End of July, 2008) Type MW Total Thermal 93,115 Coal Gas Oil 77199 14716 1199 36159 4120 12194 145588 Hydro Nuclear Renewable Total 3. % 64% 53% 10% 1% 25% 3% 8% 100% Skewed regional distribution of Coal Reserves: The distribution of primary commercial energy resources is quite skewed. Whereas the Eastern region accounts for nearly 70% of the total coal reserves, the Western region has over 70% of the hydrocarbons reserves in the country. Similarly, more than 70% of the total hydel potential in the country is located in the Northern and the North-Eastern regions put together. The Southern region, which has only 6% of the coal reserves and 10% of the total hydel potential, has most of the lignite deposits occurring in the country. The above spread and distribution of energy resources entail a complex matrix of movement and the supporting logistics. Since coal is the bedrock of commercial energy resources in the country, this paper will try to deal in the logistics associated with movement and transportation of coal through out the length and breadth of the country through the various modes of transport. Coal deposits occur largely in the east-central and south-eastern region of geographical India. The state wise inventory of geological reserves of coal indicates that the proved category of coal is mainly distributed in Jharkhand and Orissa followed by West Bengal, Chhattisgarh, Andhra Pradesh and Madhya Pradesh. However, the industrial load centers are mainly located in North India in the Capital region, Punjab & Haryana, in the West in Maharashtra & Gujarat and in South in Tamil Nadu, Northern Karnataka and in the eastern Andhra Pradesh. Coal based thermal Power plants as well as large industrial plants have been built up in these states. Coal markets thus are all located away from coal sources necessitating long distance coal haulage in most cases. 4. Modes of coal transport Coal is consumed in bulk to produce energy or to be used as feedstock. Likewise coal is moved in bulk and the external dispatches of coal from the collieries are through a variety of modes. Important modes of transport of coal are Rail, Road and the Rail-cum-Sea route and captive modes such as, Merry-Go-Round (MGR) Systems, Conveyor Belts & Ropeways. Mode wise dispatch details of coal and coal products (external and internal movement) in the country for 2007-08 are as follows:
  • 3. Modewise Despatches of Coal & products during 2007-08 (All India) Source CIL Other Public units Private sector Country Type Raw coal Coal pdts Internal Raw coal Raw coal Coal pdts Internal Raw coal Raw coal Coal pdts Internal Raw coal Raw coal Coal pdts Internal Raw coal Total Rail 186.78 17.10 1.67 Road 72.49 0.22 18.66 MGR 81.35 21.67 12.46 0.59 Belt 7.36 (in Mt) Rope Total 6.16 354.14 17.32 20.33 8.64 0.49 0.15 43.26 0.59 0.57 10.04 2.60 21.04 10.98 13.43 7.36 6.65 10.46 2.75 418.44 28.89 34.33 17.82 9.40 481.66 0.42 4.32 5.32 16.72 5.66 0.79 212.77 22.42 1.67 101.67 6.47 19.45 89.99 236.86 127.59 89.99 The following pie-chart illustrates the shares of various modes of transport (internal and external) in 2007-08 in India. MODES OF TRANSPORT (Total offtake-482 Mt)- 2007-08 5.65% Belt/Rope 26.50% Road 49.20% Railways 18.65% MGR
  • 4. Economic consideration in choosing a coal transportation mode Coal is consumed in bulk quantities by Utilities and Industries throughout the length and breadth of the country while coal production is mostly concentrated in a few states only. Indian Coal contains high ash to the extent of more than 40% by weight. This is essentially an in-built handicap for coal transport logistics system. Reliability of the transport system has a direct bearing on cost of inventory and its management. All these issues are required to be factored into a cost-efficient coal transportation system. It is important to note that there cannot be a straightjacket best system applicable for transportation of coal to all consumption centres. In fact, depending upon the situation and specific needs, the market does use various options available in modes of coal transportations, sometimes singularly and sometimes in a mix. It is needless to mention that most suitable transportation system from among various optional modes is critical to the nation's economic well-being and energy security and therefore, special attentions are needed to develop assets accordingly. The practical considerations By the end of 2030, country's coal production and consumption will increase almost five folds. Transportation of such volume in itself is a gigantic task, as bulk of the coal has to be transported to power utility and user industries. Depending on the volume of annual coal consumption by the user and the distance that the coal has to move from the source, the choice of mode will be determined. With the technological advancement in reducing transmission loss and development of national grid, more power plants are being planned near pitheads. These mega pithead power utilities would be using a large share of the total coal. In other words, there would be a perceptible shift in the location of the coal market. Pithead power utility companies will be developing their captive transport infrastructure like Merry-Go-Rounds, a closed-circuit railway system, or medium distance cross-country conveyors and short to medium distance aerial ropeways. This endeavours, in fact would be saving a substantial portion of the cost so far involved in hauling about 40% of un-useable part of coal. An alternative means of transportation of coal is the option of coal slurry pipeline technology, as in vogue in USA. Initial studies, during 1976-78 and detailed study in 1992, have observed that the pipeline transport is high capital intensive but cheaper than rail only for throughputs of over 10 million tonnes per year, and for distance over 800 Km in flat terrain. If the technology is proved to be techno-economically attractive, one cross country pipeline from Northern Karanpura to Northern power houses and another pipeline from coalfields in Orissa to the Western Sectors power houses could be contemplated. Incidentally, in our country throughputs of more than 10Mt is applicable for Utilities and in view of the successful operation of the national electricity grid, this mode of transportation for Utilities appears to be not-so-attractive, particularly in view of the quantum of investment involved. The larger circuits, i.e. those going beyond 50 km. have to operate through rail or road systems. The major share of coal will however move by Rail since road transportation is cost effective up to 250 Km. in comparison to rail. Creating an integrated rail system planning for optimum outcome. The High Density (Rail) Network (HDN), which connects the four metro cities of Delhi, Kolkata, Chennai & Mumbai and is popularly called as Golden Quadrilateral including the diagonals though comprising only 16% of the network, carries about 65% of the freight traffic and 55% of passenger traffic. These lines are apparently saturated. Hence for future transport of coal
  • 5. dedicated rail lines comprising special north-south corridor and east-west corridor for freight transport may have to be considered by railways. It is well known that payload to tare weight ratio of wagons in Indian Railways is one of the lowest in the world. Payload to tare weight ratio of BG wagons varies between 2.0 to 2.6 only, which in US railroad and Western Railroads are in between 3.5 to 4.5. While Indian Railways carry about 450Kg of dead weight for every 1000 kg freight, in US the dead weight does not exceed more than 170Kg. The net to tare ratio could be improved by introducing lighter wagons. In order to optimize utilization of upgraded axle load, Railways are required to introduce lighter wagons with higher volume capacity so that payload tare weight ratio is more than 4. Considering average bulk density of crushed coal as 0.75 Tonnes/cubic meter, wagons having volumetric capacity of around 129 cubic meters would be required to accommodate about 97tonnes of net weight of coal. If the tare weight of lighter wagons is around 23 tonnes, then only payload to tare weight ratio could be of about 4. In other advanced countries, for example, in Australia, railway transport of coal is by rakes, which are having, as many as six locomotives, capable of hauling 148 wagons aggregating to a length of 2 kms. A rake of that size carries about 8500 tonnes of coal. The latest move is to have wagons of maximum payload of 80 tonnes has designed for maximum speed of 115 kms per hour with Axle loading up to 25 tonnes to accommodate further increase in its standards. Also an important infusion in Queensland (Australia) is the development of aluminum wagons equipped with rotate coupling which enable the wagon to be entailed by paying turn up side down to reduce unloading time. For transportation of such large volume of coal, railways shall have to consider increasing the payload of the wagons and/ or the train size to have fast turnaround cycle through the dedicated coal corridor. In case railways are not in position to build such network all by themselves then such network may have to be constructed on BOO basis by a consortium of user industries utilizing the coal corridor. This could also be built on public-private partnership basis. In fact, there is immense scope on developing core business competence in coal transport logistics encompassing activities in road/belt transportation of coal from pithead to railway siding, managing tracks and rolling stocks for rail transportation of coal and then shifting coal from railway terminals to points of consumptions. Only specialized Coal transport Companies, can possibly offer definite run schedule for coal movement by commissioning advanced Information Technology based cargo tracking system, which would be saving both inventory costs of buyers and infrastructure idling costs of coal producers. 5. Logistics requirement for coal transportation in 2030 – an overview Based on the present trends available in the rate of urbanization, the share of urban population is projected to increase from 25.38% in 1990-91 to 43% in the year 2020 and say 50% by 2030. The growth in GDP and its structural changes will have an effect on the demand for energy and the energy supply mix in future. The GDP, which grew at a rate of almost 7% in X Plan Period, is targeted to grow by 9% in XI Plan period. It is projected that these upward trends in GDP growth are likely to continue in future as well. The high rate of economic growth is likely to be accompanied by an increasing per capita income and changes in life styles. This will have an effect on the energy demand as well. In view of the rising awareness in regard to the environmental protection and conservation, the future growth in energy sector must consider such concerns in order to develop in a manner which is environmentally benign. The Integrated Energy Policy (IEP) report (Planning Commission May, 2006), has projected the total energy demand in terms of different fuels with reference to a GDP growth of 8% and 9%. The IEP Report has estimated that the coal market for power generation would then be 1659
  • 6. million tones by 2031-32. This coal requirement excludes the non-power use of coal which has additional market for about 684 million tonnes. The total indigenous market demand for coal in 2031-32 thus adds upto 2343 million tones that includes lignite anticipated to be consumed for power generation amounting to 120 million tonnes (coal demand net of lignite consumption being 2223 MT.). Another 30 million tones of lignite would be consumed in industries, which in any case is not included in coal requirement of non-power uses. The total coal requirement for power generation as per IEP Report should have been 1539 (1659 –120) million tones assuming 9% growth in GDP. However, traditionally any shortfall in the production of electricity from non-fuel resources is being met from coal. Therefore, the total demand for coal for 2031-32 can only be noted in broad magnitudes. In the road map for coal sector reforms drawn up by the Expert Committee, the total of demand for coal including both non- power and power uses in 2031-32 adds up to 2373 million tones inclusive of lignite consumption of 150 million tones. The rate of growth implied in this forecast of coal demand is around 6.50% per year as against 5.2% achieved in the past 25 years. Thus an estimate of 2223 million tones of coal demand (excluding lignite) can be taken for long term planning of logistics for coal movement. The steep increase in the growth of coal demand and production puts up a challenge before the country because the projected demand satisfaction and production can be achieved only by taking up well planned execution of infrastructure and logistics for transportation of coal. As a strategic measure, both in the perspective of economic and environmental consideration, the Country may decide to source a portion of its coal requirement from overseas properties or through straightaway international trade. In any case to meet the demand of metallurgical coal and low ash steaming coal, the Country has to depend on imports. Therefore, development of port infrastructure for coal handling and movement of coal from Ports to hinterlands also need to be seen in proper perspective. These issues add new dimension to the logistics problems. Coal transport scenario - AD 2030 By the turn of 2030, India's coal production is slated to increase to 2000 million tonnes from various sources, which would include sources owned, by private, public and captive etc. Transportation of such volume in itself is a gigantic task and bulk of the coal would get transported to power utility companies. It is envisaged that many of the new power plants will be located near pithead and more than 800 million tonnes of coal will be used by such pit head power utility companies. These pithead power utility companies will transport their coal by MGR system or by long distance cross-country conveyors. Assuming that 50% of the raw coal feed is beneficiated at the pit-mouth, about 700 Million tones (both raw and clean coal) would be carted by captive modes like MGR/Aerial Ropeway and Belt-conveyors. This would leave about 1200 million tones of coal meant for power utility companies and other sectors, 90% of which it is assumed would be utilized only after deshaling and beneficiation. About 85% of the output of coal washeries/ coal products would be move by rail-transport network including carting of bulk coal to load ports within the country and by shipment thereafter to unload ports within the country thus entailing double movement of coal by rail system. By estimating various demand projections, it is considered that such coal traffic by rail mode would surpass 830 Million tones including coastal rail –sea mode (which would cross 100 million tones by 2030 from the present level of about 20 million tones). Besides, the road transportation to various consumers upto a cut-off level of 400 Km. would take care of external movement of coal to an extent of 125 Mt.
  • 7. Projection showing the share of coal transport by various modes by 2031-32 (external dispatches only) Envisaged coal supply (Mt per year) 800 Mt(400 Raw coal & balance eq. clean coal) 1075 Mt (110 Raw coal & balance eq. clean coal) 125 Mt (Mainly raw coal) 2000 % of share 40.0 53.75 6.25 Proposed mode of transport Remarks MGR system or crosscountry conveyors/ropeway National Rail network/Rail cum sea Pit head power plants & other ultra mega projects Coal by road For consumers located within 400 km. of coalfield areas For consumers located beyond coalfield areas 100 The projections above are exclusive of internal coal movements mainly as feed to washeries. REQUIREMENTS OF RAIL NETWORK & INFRUSTRUCTURE IN COAL TRANSPORTATION – THEN, NOW & FUTURE From a level of 78 Mt in 1971, coal production reached to 456 Mt in 2007-08. During 2007-08, coal including imported coal moved by rail was 245 Mt which is more than 50% of indigenous coal production. It is an accepted and established fact that rail transportation is the most economical means of moving coal in bulk. Rail-links also reduce logistics cost for transporting coal and is the mainstay of the coal transportation in the country. This dependence on the rail system would increase further in the coming decades. Moreover the coalfields are located on the east central & southeastern part of the country and larger volumes of coal need to be transported to Northern & Western part of the country. This places burden on the already heavily loaded rail network. Hence for future transport of coal, dedicated rail lines comprising of special east-north corridor and east-west corridor for freight transport need to be considered. THE DEDICATED RAIL FREIGHT CORRIDOR PROJECT: As outlined above, to meet the growing demand for logistic support arising from impressive growth of over 9 percent of the Indian economy, the Ministry of Railways announced in its budget of 2006 that Indian Railways (IR) shall construct two dedicated Freight Corridors (DFCs) at an estimated cost of about Rs.28181 crores. This can be termed as the single largest project of independent India to be carried out by an SPV styled as “Dedicated Freight Corridor Corporation of India Ltd.” (DFCCIL) These two DFCs, one referred to as the Western Corridor (i.e. connecting Jawaharlal Nehru Port Trust in Mumbai to Dadri/Tuglakabad near Delhi) and another known as the Eastern Corridor (i.e. from Ludhiana in Punjab to Sonnagar in Bihar) would run parallel to so called golden quadrilateral linking Delhi, Kolkata, Mumbai, Chennai and other high density corridors. The first 2 lines will be: Delhi- Sonnagar with a length of around 1279 km. Delhi-Mumbai with a length of around 1483 km.
  • 8. In the first phase of the Eastern Corridor Project, a separate freight corridor will be built from Ludhiana to Sonnagar via Ambala, Saharanpur, Khurja and Allahabad. The primary feeder routes from Sonnagar to Durgapur via Gomoh, Sonnagar to Tatanagar via Garhwa Road and Barkakana to Bokaro via Chandrapura would be upgraded in order to carry heavier trains of coal and steel traffic. In the subsequent budget proposal of 2008, Railway Minister had already declared that the Eastern Corridor would be extended from Sonenagar to Kolkata to ensure Port Connectivity with hinterland. The primary feeder routes are expected to be converted to dedicated freight corridor at the appropriate time. The Western Corridor would start from Jawaharlal Nehru Port and will be routed via Vadodara, Ahmedabad, Palanpur, Jaipur and Rewari to Tuglakabad and Dadri. Both the corridors would be joined by a link between Dadri and Khurja. The feeder routes of the Western Corridor connecting ports of Gujarat would be upgraded. While DELHI-HWH corridor will be a Heavy haul corridor mainly to cater the bulk traffic, DELHI-MUMBAI freight corridor will be a state-of-the-art multimodal rail freight corridor, which would serve the western and northern hinterlands from Mumbai, the country’s premier port and smaller ports of Gujarat. Both corridors would also have several small feeder routes to bring in goods traffic from ports and plants in nearby towns and the hinterland. Development of Feeder Routes for coal : East-North DFC between Ludhiana and Sonnagar will cater largely to coal traffic. Feeder routes linking high growth colliery area and power houses are identified and being strengthened as follows : 1.Sonnagar- Garwa Road- Barkakana (311 Kms) 2.Patratu- Gomoh including PD Branch Line (128 Kms) 3.Sonnagar-Gaya-Gomoh (249 Kms) Gomoh-Pradhankhunta (39 Kms) including Kusunda -Tetulmari (4.5 Kms), 4.Katrasgarh – Nichitpur, Pradhankhunta - Pathardih links (24 Kms) 5.Pradhankhunta-Asansol-Andal including coal branch lines (75 Kms) 6.Andal-Sainthia-Pakur (151 Kms) 7.Chandrapura- Dhanbad (36 Kms) 8.Bhojidih –Mohuda –Gomoh (44 Kms) 9.Aligarh – Harduaganj (15 Kms) 10.Kanpur – Paricha (198 Kms) 11.Mughalsarai – Unchahar via Janghai, Phaphamau(205 Kms) 12.Varanasi-Sultanpur-Utratia –Rosa ( 558 Kms) 13.Zafrabad – Tanda ( 99 Kms) 14.Ludhiana –Beas-Govindwal Sahib ( 112 Kms) 15.Rajpura – Dhuri – Bhatinda (Lehra Mohabbat ) ( 173 Kms) 16.Sirhind – Rupnagar – Nangal Dam (104 Kms) 17.Hissar-Bhatinda-Suratgarh (298 Kms) There is another route, viz. Howrah-Nasik which requires augmentation in order to cater to increased evacuation of coal in the future. While a dedicated third track is necessary exclusively for coal, some rail infrastructure developments in the connected IB –Valley, Talcher coalfields and Korba C.F. feeding the east-west trunk route and Paradeep Port are also vital for evacuation of coal. OTHER RAIL INFRASTRUCTURE DEVELOPMENTS Talcher area •Sambalpur-Jharsuguda doubling •Khurda Road-Barang third line
  • 9. •Rajatgarh – Barang doubling •Talcher-Paradeep electrification •Talcher-Bimlagarh new line Korba / IB Area •Bilaspur-Anuppur doubling •Jharsuguda bypass •Champa-Bilaspur-Bhilai-Durg third line •Bina-Kota electrification •Jharsuguda-Sardega new line to serve the new collieries in IB area Public – private partnership to augment infrastructure facilities: To bolster logistics and links for coal evacuation in the not too distant future, the non-mining infrastructure required to handle the coal would be gargantuan as compared to the present. At present, coal companies in both private and public sectors have built up coal handling plants with capacity of about 300 MT per annum so as to maximize dispatches of crushed/sized coal to the consumers. In addition, the washeries at BCCL, CCL, WCL and NCL have adequate crushing/sizing facilities to the tune of about 39.4 million tones in their system for generation of different washery products. Therefore the existing facilities can barely handle the current annual production of raw coal in the country. Similarly about 200 sidings move out only 235 Mt of indigenous coal per annum by rail presently. A massive siding build-up is required to evacuate coal by rail @ 1 BT per annum. To crank up the coal evacuation from 450 Mt per annum to over 2000 Mt in a span of 20 years, a huge effort is required to bring about a quantum jump in coal processing and coal delivery systems. A whopping investment is required in terms of creation of sidings, washeries and CHPS for which the coal producing companies may not be in a position to mobilize the required funds fully and look after the day to day management of such non-mining affairs. There are two ways to handle the logistics gap in the coal-mining sector. 1) Outsource these capital infrastructure projects through suitable Build - Operate Maintain schemes. 2) Create a SPV to take up the infrastructure development and tap private investors for bridging the capacity gaps. Innovation in logistics development: Coal-by-wire – Power-grid networking, over the years, have immensely helped in curbing requirement of physical movement of coal, particularly in long haul. It is envisaged that generation capacity of pithead power stations would grow @ 13.3% in XI Plan from a level of 2.7% in X Plan. Coal Beneficiation - CIL by end of XI Plan would be dispatching only beneficiated coal to all consumers excepting those who are located at pitheads. This would likely to reduce haulage need by 6-10%. Coal-by-pipeline – In-situ coal gasification and Coal Bed Methane exploration would be the major ventures in years to come in the energy market of the Country bringing a new vista in transportation logistics.
  • 10. Conclusion The use of energy is slated to go up exponentially in the country. Coal will remain the mainstay of the energy mix and along with it the tables will be set for increased transportation of coal to feed the new emerging coal markets. Adequate demand satisfaction can be possible only with the augmentation of infrastructure in a holistic manner. The colliery projects need to add up sidings and associated equipments, plants/ machineries to handle and deliver the coal in ever increasing volumes. The loading infrastructure at the mine end needs to be fully mechanized and a similar infrastructure built-up is necessary at the terminal end where coal is unloaded in bulk round the clock. The rail-cum-sea transportation of coal beyond 100 Mt per year as envisaged by 2030’s will be a reality once large no. of dedicated coal berths come in place along with matching bulk reclaiming equipments in the various load / unload ports in the country. In sequel to this development of hinterland connectivity of ports would be another important issue. In a similar vein, the captive modes of coal evacuation viz. Aerial ropeway, Conveyor –belt and Merry-GoRound rail systems etc. are required to be created and re-vamped wherever necessary as part of the users’ coal-handling infrastructure. In the end it may be stated that only a synergic augmentation and up gradation of related infrastructure capacities as outlined above in tune with the transport capacity for coal in the country can make possible the projected coal delivery @ 2 Billion tonnes per annum. Possibly, coal transport logistics would emerge as a specialized business area in the emerging coal market, independent of traditional transporting enterprises like Railways, Port Authorities or Roadways, connecting coal producers and consumers. =xxxx=