SlideShare a Scribd company logo
1 of 4
Bhupendra Deshwal
Flat No. B-502, JURS COUNTRY, HARIDWAR
Phone: +91-9634683841,+91-8764194932, E-mail: bdeshwal@gmail.com
Career Objective: A versatile engineer with over Ten years of experience seeking assignments to lead and
manage manufacturing Operations, Enhancing Supply chain capabilities and Employee Involvement .
Area Of Expertise:
Production Management:
• Work content reduction, cost reduction and fatigue reduction.
• Plan for achieving production target.
• Increase the productivity thru eliminating wastages using VSM.
• Active participation in cost reduction.
• Plan for reduction in rework and rejection.
• Identification and elimination of unsafe working condition. Train the operator regarding safety awareness,
Process / operational awareness, fixture maintenance etc.
Process Engineering and Improvement:
• Analyzing existing processes/procedures and conducting critical analysis for finding out shortcomings and
suggesting improvements measures.
• Designing and implementation of new projects to reduce cost, operation time, work content and fatigue.
People Management:
• Developing, managing and monitoring the performance of multi-skilled work force and conceptualizing need
based training programs for performing manufacturing operation.
Technical Qualification:
• B.Tech. (Electrical Engg.), from Delhi College of Engg. Delhi in 2002.
Total Professional Experience: 13 years
Present Occupation:
Presently working with M/s LUMAX INDUSTRIES LTD. – Dharuhera as Sr. Manager – Production & PPC,
since Aug.2012. The company is ISO/TS-16949:2008, ISO-14001 certified & manufactures Head Lamps & Tail
Lamps for all major OEM’s Maruti Suzuki, Honda ,Toyota, GM, TATA Motors etc.
Responsibility:
• Overall responsibility of Production
• Ensure optimized planning of production for maximum usage of resources
• Overall responsibility of SAP implementation
• Managing store and dispatch activity.
• Overall inventory control through proper planning and SAP.
• Capacity planning for all shops for future requirements.
• Ensuring implementation of corrective action & follow up of improvement activity suggested in
CAPA report.
• Monitoring new product development & maintaining their related documents.
• Monitoring of in house rejection through process control & improvement
• Monitoring team KRA’s points through DWM (Daily Works Management) activity
• As an active member of CFT team, involvement in FMEA updation & Process improvement.
• Performing KAIZEN activity by utilization of waste reduction method & manufacturing method.
• Monitoring internal audit & 5-S observation & verifying their planned corrective actions.
• Monitoring & reviewing with analysis the monthly MIS data,
Major Improvements Through Wastage Reduction:
• Reduction of rejection & process by through process improvement .
• Inventory Anayalsis through Runner, repeater and stranger category
• Inventory Control in defined ITR for local, imported parts.
• Material handling improved by the introduction of VSM.
• Productivity improved by 25% through introduction of intermediate sub station for reducing
product takt time .
• Cost reduction through VA/VE method.
• Controlling of in house rejection through process control, improvement and involvement of working
members .
• Productivity increased in Assy. Line by 25% by doing the line balancing and reducing cycle time in
assy.
• Major Cost saving through other various projects like improving cycle time, material, reusing of
rejection, product packing, modifying trolley design.
• Major saving per month reusing of metallising parts after regrinding in moulding
Past Experience:
1) Worked with M/s MINDA INDUSTRIES LTD. (Lighting Division) - Manesar as Manager –
Manufacturing , from Oct.2004 to Jul 2012(8 years). The company is ISO/TS-16949:2008, ISO-14001
& FORD Q1 certified & manufactures Head Lamps & Tail Lamps for all major OEM’s Volks Wagen,
Maruti Suzuki, Toyota, GM, TATA Motors etc.
Responsibilities:
• Ensure optimized planning of production for maximum usage of resources
• Ensure effective ECN implementation and related system updation
• Ensure BOM verification and validation for production
• Ensure real time production booking in SAP as physical
• Maintain Bill of material of all and new parts
• Overall responsibility of SAP implementation
• Team leader for SAP PP module
• Managing store and dispatch activity.
• Overall inventory control through proper planning.
• Capacity planning for all shops for future requirements.
1) M/s Sun Vacuum Pvt .Ltd. Gurgaon from Apr’02 to Sep’04 (02 Years)as an Engineer (Maintenance). The
company is ISO/TS-16949:2002 certified & manufactures automobile parts and a major suppliers for
OEM’s such as Maruti Suzuki, GM, etc.
Responsibilities:
• Overall responsibilities of maintenance
• Planning of preventive maintenance and predictive maintenance
• Root cause analysis of repeated failure and take corrective action to reduce breakdown time of
machines
• Spare parts planning to Control down time
• Responsible for giving training to workers on operating instruments, safety guidelines.
• Monitoring & preparing with analysis the monthly MIS data,
MAJOR ACHIEVEMENTS :
o Member of Tail Lamp project (2004-05) and Head Lamp project team(2009-10).
o Establishing plant for Tail Lamp and Head Lamp with coordination with TYC Brothers Ltd, Taiwan.
o Installation of Injection moulding, BMC moulding, Double Colour moulding machines and successful
trail of these machines.
o Installation of Class 100000 cleanroom for Tail lamp and Class 10000 for Head lamp.
Computer Literacy: MS-Word/MS-Excel
My Strength: Sincerity, Honesty and Hard work.
Date of Birth : 02/03/1976
Salary Drawn: 10 lakh/annum
Salary Expected: Negotiable
Thanking you in anticipation
Yours Sincerely
(Bhupendra Deshwal)

More Related Content

What's hot

What's hot (20)

PRODUCTION PLANNING AND CONTROL
PRODUCTION PLANNING AND CONTROLPRODUCTION PLANNING AND CONTROL
PRODUCTION PLANNING AND CONTROL
 
Processs planning
Processs planningProcesss planning
Processs planning
 
Prerequisites of ppc
Prerequisites of ppcPrerequisites of ppc
Prerequisites of ppc
 
Production planning and control
Production planning and controlProduction planning and control
Production planning and control
 
Ppc unit-2-work study
Ppc   unit-2-work studyPpc   unit-2-work study
Ppc unit-2-work study
 
Production planning
Production planningProduction planning
Production planning
 
Routing and scheduling
Routing and schedulingRouting and scheduling
Routing and scheduling
 
Computer Aided Process Planning (CAPP)
Computer Aided Process Planning (CAPP)Computer Aided Process Planning (CAPP)
Computer Aided Process Planning (CAPP)
 
Production planning and control and computerised process planning
Production planning and control and computerised process planningProduction planning and control and computerised process planning
Production planning and control and computerised process planning
 
RMV1
RMV1RMV1
RMV1
 
Production and planning control
Production  and planning controlProduction  and planning control
Production and planning control
 
Ppc
PpcPpc
Ppc
 
About Production Planning Process of a RMG !!!
About Production Planning Process of a RMG !!!About Production Planning Process of a RMG !!!
About Production Planning Process of a RMG !!!
 
Production planning & control
Production planning & controlProduction planning & control
Production planning & control
 
Anand Jha-Updated CV
Anand Jha-Updated CVAnand Jha-Updated CV
Anand Jha-Updated CV
 
MY JOB DESCRIPTION
MY JOB DESCRIPTIONMY JOB DESCRIPTION
MY JOB DESCRIPTION
 
Unit 4 ppc
Unit 4 ppcUnit 4 ppc
Unit 4 ppc
 
Production planning control ppt
Production planning control pptProduction planning control ppt
Production planning control ppt
 
Mohan bhaltadak.
Mohan bhaltadak.Mohan bhaltadak.
Mohan bhaltadak.
 
Sachin be mech_8_yrs_exp
Sachin be mech_8_yrs_expSachin be mech_8_yrs_exp
Sachin be mech_8_yrs_exp
 

Viewers also liked

VAISHALI_DESAI_RESUME.doc (1) (1)
VAISHALI_DESAI_RESUME.doc (1) (1)VAISHALI_DESAI_RESUME.doc (1) (1)
VAISHALI_DESAI_RESUME.doc (1) (1)
Vaishali Desai
 
Tema 1 la sociedad del conocimiento.pptx
Tema 1 la sociedad del conocimiento.pptxTema 1 la sociedad del conocimiento.pptx
Tema 1 la sociedad del conocimiento.pptx
Guille santos
 
MC-CATALOGUE 100616
MC-CATALOGUE 100616MC-CATALOGUE 100616
MC-CATALOGUE 100616
Rhesa Lessey
 

Viewers also liked (8)

VAISHALI_DESAI_RESUME.doc (1) (1)
VAISHALI_DESAI_RESUME.doc (1) (1)VAISHALI_DESAI_RESUME.doc (1) (1)
VAISHALI_DESAI_RESUME.doc (1) (1)
 
Elisa kits for acute pulmonary edema research
Elisa kits for acute pulmonary edema researchElisa kits for acute pulmonary edema research
Elisa kits for acute pulmonary edema research
 
Elisa kits for bronchial asthma research
Elisa kits for bronchial asthma researchElisa kits for bronchial asthma research
Elisa kits for bronchial asthma research
 
Tema 1 la sociedad del conocimiento.pptx
Tema 1 la sociedad del conocimiento.pptxTema 1 la sociedad del conocimiento.pptx
Tema 1 la sociedad del conocimiento.pptx
 
MC-CATALOGUE 100616
MC-CATALOGUE 100616MC-CATALOGUE 100616
MC-CATALOGUE 100616
 
地價稅自用住宅優惠稅率省很大
地價稅自用住宅優惠稅率省很大地價稅自用住宅優惠稅率省很大
地價稅自用住宅優惠稅率省很大
 
房屋稅
房屋稅房屋稅
房屋稅
 
Metalcon manual de_construccion
Metalcon manual de_construccionMetalcon manual de_construccion
Metalcon manual de_construccion
 

Similar to Resume (20)

Pranshu Resume (Jan16)
Pranshu Resume (Jan16)Pranshu Resume (Jan16)
Pranshu Resume (Jan16)
 
CV Mohan
CV MohanCV Mohan
CV Mohan
 
vinayaktiwari (1)
vinayaktiwari (1)vinayaktiwari (1)
vinayaktiwari (1)
 
ARVINDER_SINGH
ARVINDER_SINGHARVINDER_SINGH
ARVINDER_SINGH
 
arun
arunarun
arun
 
latestResume_Sushant
latestResume_SushantlatestResume_Sushant
latestResume_Sushant
 
Deva resume march3032019
Deva resume march3032019Deva resume march3032019
Deva resume march3032019
 
Rajesh P
Rajesh PRajesh P
Rajesh P
 
karthigairaj Process control andTechnical service resume
karthigairaj Process control andTechnical service resumekarthigairaj Process control andTechnical service resume
karthigairaj Process control andTechnical service resume
 
My resume (1)
My resume  (1)My resume  (1)
My resume (1)
 
CV D. Maimbolwa
CV D. MaimbolwaCV D. Maimbolwa
CV D. Maimbolwa
 
NItya Resume ..
NItya Resume ..NItya Resume ..
NItya Resume ..
 
sathish resume -MAY 2016 updated
sathish resume -MAY 2016 updatedsathish resume -MAY 2016 updated
sathish resume -MAY 2016 updated
 
Resume new Yogesh
Resume new YogeshResume new Yogesh
Resume new Yogesh
 
Resume -UD
Resume -UDResume -UD
Resume -UD
 
Ramanujan
RamanujanRamanujan
Ramanujan
 
Resume 04.10.2015
Resume 04.10.2015Resume 04.10.2015
Resume 04.10.2015
 
MHCCV_02-08-16
MHCCV_02-08-16MHCCV_02-08-16
MHCCV_02-08-16
 
Resume1 (2).doc0305
Resume1 (2).doc0305Resume1 (2).doc0305
Resume1 (2).doc0305
 
vikas goel
vikas goelvikas goel
vikas goel
 

Resume

  • 1. Bhupendra Deshwal Flat No. B-502, JURS COUNTRY, HARIDWAR Phone: +91-9634683841,+91-8764194932, E-mail: bdeshwal@gmail.com Career Objective: A versatile engineer with over Ten years of experience seeking assignments to lead and manage manufacturing Operations, Enhancing Supply chain capabilities and Employee Involvement . Area Of Expertise: Production Management: • Work content reduction, cost reduction and fatigue reduction. • Plan for achieving production target. • Increase the productivity thru eliminating wastages using VSM. • Active participation in cost reduction. • Plan for reduction in rework and rejection. • Identification and elimination of unsafe working condition. Train the operator regarding safety awareness, Process / operational awareness, fixture maintenance etc. Process Engineering and Improvement: • Analyzing existing processes/procedures and conducting critical analysis for finding out shortcomings and suggesting improvements measures. • Designing and implementation of new projects to reduce cost, operation time, work content and fatigue. People Management: • Developing, managing and monitoring the performance of multi-skilled work force and conceptualizing need based training programs for performing manufacturing operation. Technical Qualification: • B.Tech. (Electrical Engg.), from Delhi College of Engg. Delhi in 2002. Total Professional Experience: 13 years Present Occupation: Presently working with M/s LUMAX INDUSTRIES LTD. – Dharuhera as Sr. Manager – Production & PPC, since Aug.2012. The company is ISO/TS-16949:2008, ISO-14001 certified & manufactures Head Lamps & Tail Lamps for all major OEM’s Maruti Suzuki, Honda ,Toyota, GM, TATA Motors etc. Responsibility: • Overall responsibility of Production
  • 2. • Ensure optimized planning of production for maximum usage of resources • Overall responsibility of SAP implementation • Managing store and dispatch activity. • Overall inventory control through proper planning and SAP. • Capacity planning for all shops for future requirements. • Ensuring implementation of corrective action & follow up of improvement activity suggested in CAPA report. • Monitoring new product development & maintaining their related documents. • Monitoring of in house rejection through process control & improvement • Monitoring team KRA’s points through DWM (Daily Works Management) activity • As an active member of CFT team, involvement in FMEA updation & Process improvement. • Performing KAIZEN activity by utilization of waste reduction method & manufacturing method. • Monitoring internal audit & 5-S observation & verifying their planned corrective actions. • Monitoring & reviewing with analysis the monthly MIS data, Major Improvements Through Wastage Reduction: • Reduction of rejection & process by through process improvement . • Inventory Anayalsis through Runner, repeater and stranger category • Inventory Control in defined ITR for local, imported parts. • Material handling improved by the introduction of VSM. • Productivity improved by 25% through introduction of intermediate sub station for reducing product takt time . • Cost reduction through VA/VE method. • Controlling of in house rejection through process control, improvement and involvement of working members . • Productivity increased in Assy. Line by 25% by doing the line balancing and reducing cycle time in assy. • Major Cost saving through other various projects like improving cycle time, material, reusing of rejection, product packing, modifying trolley design. • Major saving per month reusing of metallising parts after regrinding in moulding
  • 3. Past Experience: 1) Worked with M/s MINDA INDUSTRIES LTD. (Lighting Division) - Manesar as Manager – Manufacturing , from Oct.2004 to Jul 2012(8 years). The company is ISO/TS-16949:2008, ISO-14001 & FORD Q1 certified & manufactures Head Lamps & Tail Lamps for all major OEM’s Volks Wagen, Maruti Suzuki, Toyota, GM, TATA Motors etc. Responsibilities: • Ensure optimized planning of production for maximum usage of resources • Ensure effective ECN implementation and related system updation • Ensure BOM verification and validation for production • Ensure real time production booking in SAP as physical • Maintain Bill of material of all and new parts • Overall responsibility of SAP implementation • Team leader for SAP PP module • Managing store and dispatch activity. • Overall inventory control through proper planning. • Capacity planning for all shops for future requirements. 1) M/s Sun Vacuum Pvt .Ltd. Gurgaon from Apr’02 to Sep’04 (02 Years)as an Engineer (Maintenance). The company is ISO/TS-16949:2002 certified & manufactures automobile parts and a major suppliers for OEM’s such as Maruti Suzuki, GM, etc. Responsibilities: • Overall responsibilities of maintenance • Planning of preventive maintenance and predictive maintenance • Root cause analysis of repeated failure and take corrective action to reduce breakdown time of machines • Spare parts planning to Control down time • Responsible for giving training to workers on operating instruments, safety guidelines. • Monitoring & preparing with analysis the monthly MIS data,
  • 4. MAJOR ACHIEVEMENTS : o Member of Tail Lamp project (2004-05) and Head Lamp project team(2009-10). o Establishing plant for Tail Lamp and Head Lamp with coordination with TYC Brothers Ltd, Taiwan. o Installation of Injection moulding, BMC moulding, Double Colour moulding machines and successful trail of these machines. o Installation of Class 100000 cleanroom for Tail lamp and Class 10000 for Head lamp. Computer Literacy: MS-Word/MS-Excel My Strength: Sincerity, Honesty and Hard work. Date of Birth : 02/03/1976 Salary Drawn: 10 lakh/annum Salary Expected: Negotiable Thanking you in anticipation Yours Sincerely (Bhupendra Deshwal)