SlideShare una empresa de Scribd logo
1 de 35
NUSP-2 PROFILE IN
DIRECTORATE GENERAL OF HUMAN SETTLEMENT
MINISTRY OF PUBLIC WORKS AND HOUSING
GOVERNMENT OF INDONESIA
OUTLINE
1. Project Profile
2. NUSP-2 Profile in Bim
3. NSD Jatiwangi
Profile4. Lesson Learned
of Slum
Upgrading in
01
Project Information
Project Location
S-Curve of Loan Process FY 2015 – 2019
Loan Category and Disbursement
PROJECT PROFILE
Infrastructure upgrading in
Kelurahan Jatiwangi
PROJECT
INFORMATION
NEIGHBORHOOD UPGRADING AND
PROJECT PHASE-2
Lender Administration Asian Development Bank
Executing Agency Directorate General of Human Settlements
Ministry of Public Works and Housing
Republic of Indonesia
Loan ID 3122-INO
Signing Date April 23, 2014
Effective Date July 17, 2014
Closing Date December 31, 2019
Total Loan USD 74,400,000
NUSP-2 is a slum alleviation program financed by Asian Development Back (ADB) in Indonesia.
There are 3 (three) components within NUSP-2 i.e: (i) institutional development of the local
government, (ii) slum upgrading, (iii) New Site Development/NSD
20 Cities/Districts *)
209 Neighborhoods
*) 4 out of 20 cities/districts are designated as NSD Location : Kendari, Palopo,
Bima and Kapuas
PROJECT LOCATION
WEST REGION CENTRAL REGION EAST REGION
1. Batam City 1. Serang City 1. Makassar City
2. Tanjung Balai City 2. Sukabumi City 2. Palopo City
3. Bengkulu City 3. Semarang City 3. Bone District
4. Tj Jabung Barat District 4. Pekalongan City 4. Kendari City
5. Palembang City 5. Pasuruan City 5. Ambon City
6. Bandar Lampung City 6. Banjarmasin City 6. Bima City
7. Palangkaraya City
8. Kapuas District
S-CURVE OF LOAN
PROCESS FY 2015 - 2019
Cumulative Actual Disbursement versus Loan Projection of Cumulative Disbursement
LOAN CATEGORY &
DISBURSEMENT
LOAN CATEGORY ALLOCATION % of TOTAL LOAN DISBURSEMENT
1 Civil Works USD 62,700,000 84.27 USD 59,790,644,02 98,50
2 Training and Workshop USD 2,243,000 3.01 USD 1,724,388.64 76,88
3 Consulting Services USD 9,457,000 12.71 USD 9,019,121.62 95,41
TOTAL USD 74,400,000 USD 70,534,154.28 95.37
Register
Number
Project Title/Loan Number
Elapsed Time Ratio Disbursement Ratio
Disbursement
Category
Effective &
Closing Date
( % ) Allocation and
Disbursement
( % )
10882601
Neighborhood Upgarding and
Shelter Project - Phase 2
(NUSP-2)
Loan No. 3122-INO
July 17, 2014
92,42% USD
74.400.000,00
95,37%
Ahead or On
Schedule
Dec 31, 2019 70.534,154.28
Status: August 2019
Loan Status : AHEAD OF SCHEDULE
02
The Profile of Slum Area in Bima City
NUSP-2 Facilitation in Bima City
Documentation of NUSP-2 activities in Bima City
NUSP-2 PROFILE IN BIMA CITY
THE PROFILE OF SLUM AREA IN
BIMA CITY
BASED ON MAYOR’S DECREE ON THE DETERMINATION OF
SLUM NEIGHBORHOODS IN BIMA CITY NO. 620 OF 2016
Slum Settlement Area :
17 Kelurahans
Total Slum Area :
147,36 Hectare
Targeted NUSP-2 Kelurahans :
9 Kelurahans with the total
area of slum : 109,55 Ha
No
NUSP-2 Kelurahan
Targeted
Area
(Ha)
1 Dara 21.39
2 Paruga 9.01
3 Tanjung 14.91
4 Nae 10.12
5 Sarae 7.73
6 Melayu 9.24
7 Jatibaru 16.56
8 Jatiwangi 18.81
9 Rabadompu Barat 1.78
Total 109.55
Berdasarkan : SURAT KEPUTUSAN (SK) WALIKOTA BIMA NO. 371 Tahun 2014 TENTANG
PENETAPAN LOKASI LINGKUNGAN PERUMAHAN DAN PERMUKIMAN KUMUH DI KOTA BIMA
BASED ON MAYOR’S DECREE ON THE DETERMINATION OF
SLUM NEIGHBORHOODS IN BIMA CITY NO. 620 OF 2016
THE PROFILE OF SLUM AREA IN
BIMA CITY
No Fiscal Year Activity
Amount
(IDR) (USD)
1 2016
Community Contract - Slum Upgrading in 9
Kelurahans
9,150,000,000 686,536.90
Complex Civil Works - Slum Upgrading, 1
Package in Tanjung Dara
7,272,665,000 545,374.89
2 2017
Community Contract - Slum Upgrading in 9
Kelurahans
9,000,000,000 674,707.31
Complex Civil Works - Slum Upgrading, 1
Package in Dana Traha
6,777,503,000 501,483.66
3 2018
Community Contract - Slum Upgrading in 3
Kelurahans
2,800,000,000 213,489.65
Complex Civil Works - Slum Upgrading, 1
package in Dana Traha and Sapaga
6,084,000,000 468,052.53
Construction of NSD infrastructure, in Bima
City
4,097,082,000 303,487.55
4 2019
Construction of NSD infrastructure, in Bima
City
7,774,215,000 547,479.92
TOTAL 52,955,465,000 3,940,612.41
NUSP-2 FACILITATION IN BIMA CITY
FY 2016 - 2019NUSP-2 Project Value : IDR 52,955,465,000,-
LEGENDA
Jalan Exsiting
Sungai Polygon
Jalan NUSP-2 2016
Jalan NUSP-2 2017
Jalan Aspal NUSP-2 Skala Kawasan 2108
Saluran Drainase NUSP-2 Skala Kawasan 2018
Air Bersih APBD 2017
Jalan NUSP-2 2018
Saluran NUSP-2 Skala Kawasan 2018
Pengadaan Kontainer NUSP 2018
Lampu Penerangan
Ruang Terbuka Publik
Pembagian Segmen
SEGMEN 1 RT 03,04 ,05
SEGMEN 2 RT 06
4
7
3
14
2
10
9 1
11
8
12
13
6
5
14
INTEGRATED SLUM
ALLLEVIATION MAP
COMMUNITY CONTRACT ACTIVITY Kelurahan Jatibaru, Bima City
PAVING ROAD AND HAND RAILING
Located in RT 3 RW 1, under NUSP-2 community contract in FY 2017, the neighbourhood road
was upgraded from a soil road (jalan tanah) to a paving road and equipped with hand railing.
BEFORE AFTER
KEGIATAN SKALA LINGKUNGANCOMMUNITY CONTRACT ACTIVITY
Kelurahan Jatibaru, Bima City
BEFORE AFTER
PAVING ROAD AND HAND RAILING
Located in RT 3 RW 1, under NUSP-2 community contract in FY 2017, the neighbourhood
road was upgraded from a soil road (jalan tanah) to a paving road and equipped with hand
railing.
.
KEGIATAN SKALA LINGKUNGANCOMMUNITY CONTRACT ACTIVITY
Kelurahan Jatibaru, Bima City
KEGIATAN SKALA LINGKUNGANCOMMUNITY CONTRACT ACTIVITY
Kelurahan Jatibaru, Bima City
BEFORE AFTER
STAIRCASE AND HAND RAILING
Located in RT 4 RW 1, under NUSP-2 community contract in FY 2018, the road was upgraded
and equipped with staircase and hand railing for protection.
NO KEGIATAN
TAHUN
VOLUME
APBN
ANGGARAN (RP)
1 Sumur Bor Dalam 2015 1 Unit APBD
2 Pekerjaan Drainase 2016 1275 M
NUSP /
SWADAYA
3 Pekerjaan Jalan Lingkungan 2016 2428 M
NUSP /
SWADAYA
4 Pekerjaan Drainase 2017 1579 M
NUSP /
SWADAYA
5 Pekerjaan Jalan Lingkungan 2017 2220 M
NUSP /
SWADAYA
6 Pekerjaan Jalan Aspal 2017 3000 M APBD
7 Pemb. Hot Mix & Sal. U-Dith 2017 1528 M APBD
8 Peningkatan Jalan Ekonomi 2017 1000 M APBD
9 Pekerjaan Drainase Tertutup 2018 220
NUSP /
SWADAYA
10 Pekerjaan Penutup Baja Grill 2018 457
NUSP /
SWADAYA
11
Pekerjaan Jalan Beton dan drainase
tertutup
2018 171
NUSP /
SWADAYA
12
Pekerjaan Jalan Beton Bertulang dan
Deucker
2018 13
NUSP /
SWADAYA
13 Pengadaan Motor Sampah 2018 2 Unit NUSP
14
Pengadaan Kontainer dan Landasan
Kontainer
2018 1 Unit NUSP
15 Lampu Penerangan Jalan 2018 24
NUSP /
SWADAYA
16 Septitank Komunal (5-10 KK) 2018 10 Unit APBD
17
Peningkatan dan Pengaspalan Jalan
Lingkungan
2018 400 APBD
RW
01
Deuker Swadaya
17 15 7 6
2 1
14
17
12
16
11
10
5
3
9
4
RW
02
INTEGRATED SLUM
ALLEVIATION MAP
COMMUNITY CONTRACT ACTIVITY Kelurahan Jatiwangi, Bima City
BEFORE AFTER
COMMUNITY CONTRACT ACTIVITY
Kelurahan Jatiwangi, Bima City
NEIGHBORHOOD ROAD
Located in RT 18 RW 4, under NUSP-2 community contract in FY 2017, the road was upgraded
from a soil road io a concrete road.
BEFORE AFTER
NEIGHBORHOOD ROAD
Located in RT 4 RW 1, under NUSP-2 community contract in FY 2018, the road was
upgraded from a soil road to a concrete road above the irrigation canal.
COMMUNITY CONTRACT ACTIVITY
Kelurahan Jatiwangi, Bima City
Diva
Karaoke
BEFORE AFTER
STREET LIGHTING
Located in RT 4 RW 1, under NUSP-2 community contract in FY 2018, the road was equipped
with 20 street lightings plus 4 street lightings by community contribution.
COMMUNITY CONTRACT ACTIVITY
Kelurahan Jatiwangi, Bima City
03
Concept and Approach of NSD Implementation
NSD Jatiwangi Profile
Operation and Maintenance
Development of the Riverbank (ex-squatter)
NSD JATIWANGI PROFILE
NEW SITE DEVELOPMENT (NSD)
CONCEPT AND
APPROACH
NSD is implemented through collaboration between the Local Government (provision of clean and
clear land of minimum 2 ha area) and Ministry of Public Works and Housing (MPWH) for provision of
housing units (financed through national budget) and infrastructure (financed through ADB loan)
NSD Jatiwangi,
Bima City coverage
area is 3,91 Ha
Type of Infrastructure financed by ADB through NUSP-2 project:
• Asphalt Road (within NSD site)
• Drainage system (tertiary drainage,
retention pond canal)
• Water supply system (HDPE pipeline and
meter boxes)
• Waste water management system
(on-site individual system/septic tank)
• Retaining wall
• Solid waste management system (garbage vehicles,
waste containers, temporary waste storage)
• Electricity network includes park lighting, street
light
• Main gate and security station
• Green open space (curb/cansteen, tree planting,
signage)
• The NSD site is designated for
218 housing units.
• Total built housing units : 90
units
• Number of occupied housing
units : 87 units (the remaining
3 units will be occupied by
the end of September).
• The electricity supply for the
houses is provided by the
State Electricity
Company/PLN.
• The water supply will be
supported by the Local Water
Company.
NSD JATIWANGI
PROFILE
Area : 3,91 Ha
Type of housing unit : 28/80
Total number of : 218
housing units
STAGES IN THE
CONSTRUCTION
OF HOUSING UNITS
Note: Construction to be started in July 2019
90 units of twin house
10 units of single house
68 units of twin house
Fiscal Year 2018 (1st Phase)
50 units of twin house
Fiscal Year 2019 (2nd Phase)
Proposed Facilitation in Fiscal Year 2020 (3rd Phase)
Legend:
Kiara Payung Trees
Public facilities
Housing unit
Asphalt Road
Grass
Drainage System
Scale 1:1500
• Access to decent housing units
• Access to adequate infrastructure
• Generate opportunity for additional
income (some HH run kiosk)
BEFORE
(SQUATTER)
• Poor condition of the housing unit
• No access to infrastructure
• No opportunity for economic
improvement
AFTER
(NSD)
NSD JATIWANGI, BIMA CITY
Construction Progress of Infrastructure: 90%
OPERATIONAL AND
MAINTENANCE
To ensure sustainability, the management of NSD uses rental
mechanism in which the beneficiaries will contribute IDR
89.000/HH/month for OM of the infrastructure. The
Management Board will collect the rental retribution and
manages it for the OM activities.
The rental rate is consider to be much cheaper than their
living cost in previous location which was approximately IDR
500.000/HH/months
POST-RELOCATION DEVELO
An illustration of squatter area development by the Local Government of Bima City in
collaboration with JICA in Kelurahan Paruga, an inspection road with public open
space was designed to be built on the riverside of Padolo River
As part of post-relocation
development plan, the
Local Government of Bima
City committed to restore
the land use on the slum
and squatter areas to
prevent the emergence of
new slums. To address the
squatter area, after the
beneficiaries are
relocated to NSD location,
the squatter area will be
transformed into an
inspection road with
public open space on the
riverside of Padolo River.
BEF
ORE
AFT
ER
03
F SLUM UPGRADING IN BIMA CITY
Lesson Learned of Kelurahan Jatibaru, Bima City
Lesson Learned of Kelurahan Jatiwangi, Bima City
Public open space as a
new recreational
place in Kelurahan Jatibaru
LESSON LEARNED ON COMMUNITY CONTRACT
GENDER RESPONSIVE INFRASTRUCTURE
Kelurahan Jatibaru is located on a hilly
topography with a slope of 15 to 35 degree in
which houses and infrastructure were below
the standard quality condition . NUSP-2
facilitated the upgrading of roads, road
railing, public open space.
Through the NUSP-2, the community take
benefit from the upgraded road not only to
bring clean water but also to use it as a sport
track safely and comfortably.
The neighborhood road equipped with a stairscase and
railing in Kelurahan Jatibaru
Kelurahan Jatibaru Bima City
PUBLIC OPEN SPACE
The community of Kelurahan Jatibaru innovated to use a land on the hillside
as a Public Open Space. The Public open space was built in FY 2018 through
community contract.
The community members including children use the public open space to
socialize as a cheap and safe recreational place with beautiful scenery.
Kelurahan Jatibaru Bima City
LESSON LEARNED ON COMMUNITY CONTRACT
NEIGHBORHOOD ROAD
Through the NUSP-2 in FY
2018 program, the road was
upgraded and equipped with
staircase and hand railing
for protection to ensure all
groups of community,
including women,
vulnerables and children
can use it safely and
comfortably . The road, now
is known as the "healthy
heart road".
Kelurahan Jatibaru Bima City
LESSON LEARNED ON COMMUNITY CONTRACT
BEFO
RE
AFTE
R
Kelurahan Jatibaru Bima City
LESSON LEARNED ON COMMUNITY CONTRACT
KEEPING SUSTAINABLE QUALITY SETTLEMENT
WITH LOCAL WISDOM "CAFI SIDI SAMBIA“
The slum alleviation in Kelurahan Jatiwangi was
carried out by involving various parties, one of
which is NUSP-2 Program. NUSP-2 facilitated the
upgrading of roads, road railing, drainage system,
waste management system, and street lighting.
NUSP-2 has succeeded in reviving the local wisdom
"Cafi Sidi Sambia" which means sweeping (cleaning)
in every morning and late afternoon, such activity is
very useful to maintain sustainability.The neighborhood road in Kelurahan Jatiwangi
Kelurahan Jatiwangi Bima City
LESSON LEARNED ON COMMUNITY CONTRACT
BEFO
RE
AFTER
Kelurahan Jatiwangi Bima City
LESSON LEARNED ON COMMUNITY CONTRACT
T H A N K Y O U

Más contenido relacionado

Similar a NUSP-2 Profile in Bima City FY 2019

Sabawon presentation final
Sabawon presentation finalSabawon presentation final
Sabawon presentation finalHazratKhan11
 
Proposal for Slum Rehabilitation in Rajiv Nagar: A Case Study Of Nashik
Proposal for Slum Rehabilitation in Rajiv Nagar: A Case Study Of NashikProposal for Slum Rehabilitation in Rajiv Nagar: A Case Study Of Nashik
Proposal for Slum Rehabilitation in Rajiv Nagar: A Case Study Of NashikIRJET Journal
 
АЗИЙН ХӨГЖЛИЙН БАНКТАЙ ХАМТРАН ХЭРЭГЖҮҮЛЖ БУЙ ТӨСӨЛ 01
АЗИЙН ХӨГЖЛИЙН БАНКТАЙ ХАМТРАН ХЭРЭГЖҮҮЛЖ БУЙ ТӨСӨЛ 01АЗИЙН ХӨГЖЛИЙН БАНКТАЙ ХАМТРАН ХЭРЭГЖҮҮЛЖ БУЙ ТӨСӨЛ 01
АЗИЙН ХӨГЖЛИЙН БАНКТАЙ ХАМТРАН ХЭРЭГЖҮҮЛЖ БУЙ ТӨСӨЛ 01Bayar Tsend
 
Baseline survey final report-14 dec 2013
Baseline survey final report-14 dec 2013Baseline survey final report-14 dec 2013
Baseline survey final report-14 dec 2013Pabitra Basu
 
AIWSP presentation SCM 3 11.09.2018 (1).ppt
AIWSP presentation SCM 3  11.09.2018 (1).pptAIWSP presentation SCM 3  11.09.2018 (1).ppt
AIWSP presentation SCM 3 11.09.2018 (1).pptRajabdeen Amjath
 
Performance Audit of GBPWD.pptx
Performance Audit of GBPWD.pptxPerformance Audit of GBPWD.pptx
Performance Audit of GBPWD.pptxsheikhInayat5
 
Bunaken Island | Nov-15 | Bitung low carbon model town
Bunaken Island | Nov-15 | Bitung low carbon model townBunaken Island | Nov-15 | Bitung low carbon model town
Bunaken Island | Nov-15 | Bitung low carbon model townSmart Villages
 
Government project
Government projectGovernment project
Government projectlutuf Ullah
 
IRJET- Design and Mapping of Underground Sewerage Network using GIS & GPS - A...
IRJET- Design and Mapping of Underground Sewerage Network using GIS & GPS - A...IRJET- Design and Mapping of Underground Sewerage Network using GIS & GPS - A...
IRJET- Design and Mapping of Underground Sewerage Network using GIS & GPS - A...IRJET Journal
 
1.Monday_31.01.2022.pptx
1.Monday_31.01.2022.pptx1.Monday_31.01.2022.pptx
1.Monday_31.01.2022.pptxsuresh992118
 
03_KVC_LAND_AND_HOUSING_APPROACH.pptx
03_KVC_LAND_AND_HOUSING_APPROACH.pptx03_KVC_LAND_AND_HOUSING_APPROACH.pptx
03_KVC_LAND_AND_HOUSING_APPROACH.pptxDennisAtad
 
ARISP III Inspection Report
ARISP III Inspection ReportARISP III Inspection Report
ARISP III Inspection ReportRdc Cordillera
 
Handbook on Best Governance Practices of Karnataka
Handbook on Best Governance Practices of Karnataka Handbook on Best Governance Practices of Karnataka
Handbook on Best Governance Practices of Karnataka Bharatiya Jain Sanghatana
 

Similar a NUSP-2 Profile in Bima City FY 2019 (20)

Sabawon presentation final
Sabawon presentation finalSabawon presentation final
Sabawon presentation final
 
Proposal for Slum Rehabilitation in Rajiv Nagar: A Case Study Of Nashik
Proposal for Slum Rehabilitation in Rajiv Nagar: A Case Study Of NashikProposal for Slum Rehabilitation in Rajiv Nagar: A Case Study Of Nashik
Proposal for Slum Rehabilitation in Rajiv Nagar: A Case Study Of Nashik
 
BEST REAL ESTATE COMPANY IN PATNA
BEST REAL ESTATE COMPANY IN PATNABEST REAL ESTATE COMPANY IN PATNA
BEST REAL ESTATE COMPANY IN PATNA
 
АЗИЙН ХӨГЖЛИЙН БАНКТАЙ ХАМТРАН ХЭРЭГЖҮҮЛЖ БУЙ ТӨСӨЛ 01
АЗИЙН ХӨГЖЛИЙН БАНКТАЙ ХАМТРАН ХЭРЭГЖҮҮЛЖ БУЙ ТӨСӨЛ 01АЗИЙН ХӨГЖЛИЙН БАНКТАЙ ХАМТРАН ХЭРЭГЖҮҮЛЖ БУЙ ТӨСӨЛ 01
АЗИЙН ХӨГЖЛИЙН БАНКТАЙ ХАМТРАН ХЭРЭГЖҮҮЛЖ БУЙ ТӨСӨЛ 01
 
Monthly progress report , Resettlement ,Rehabilitation , Livelihood and Rest...
Monthly progress report , Resettlement  ,Rehabilitation , Livelihood and Rest...Monthly progress report , Resettlement  ,Rehabilitation , Livelihood and Rest...
Monthly progress report , Resettlement ,Rehabilitation , Livelihood and Rest...
 
Baseline survey final report-14 dec 2013
Baseline survey final report-14 dec 2013Baseline survey final report-14 dec 2013
Baseline survey final report-14 dec 2013
 
AIWSP presentation SCM 3 11.09.2018 (1).ppt
AIWSP presentation SCM 3  11.09.2018 (1).pptAIWSP presentation SCM 3  11.09.2018 (1).ppt
AIWSP presentation SCM 3 11.09.2018 (1).ppt
 
PPT_Final_18-02-15
PPT_Final_18-02-15PPT_Final_18-02-15
PPT_Final_18-02-15
 
Performance Audit of GBPWD.pptx
Performance Audit of GBPWD.pptxPerformance Audit of GBPWD.pptx
Performance Audit of GBPWD.pptx
 
UPDATED_NCA.pdf
UPDATED_NCA.pdfUPDATED_NCA.pdf
UPDATED_NCA.pdf
 
exp_sewage.pptx
exp_sewage.pptxexp_sewage.pptx
exp_sewage.pptx
 
Bunaken Island | Nov-15 | Bitung low carbon model town
Bunaken Island | Nov-15 | Bitung low carbon model townBunaken Island | Nov-15 | Bitung low carbon model town
Bunaken Island | Nov-15 | Bitung low carbon model town
 
Government project
Government projectGovernment project
Government project
 
IRJET- Design and Mapping of Underground Sewerage Network using GIS & GPS - A...
IRJET- Design and Mapping of Underground Sewerage Network using GIS & GPS - A...IRJET- Design and Mapping of Underground Sewerage Network using GIS & GPS - A...
IRJET- Design and Mapping of Underground Sewerage Network using GIS & GPS - A...
 
Tender Process
Tender ProcessTender Process
Tender Process
 
Aip 2006 final
Aip 2006 finalAip 2006 final
Aip 2006 final
 
1.Monday_31.01.2022.pptx
1.Monday_31.01.2022.pptx1.Monday_31.01.2022.pptx
1.Monday_31.01.2022.pptx
 
03_KVC_LAND_AND_HOUSING_APPROACH.pptx
03_KVC_LAND_AND_HOUSING_APPROACH.pptx03_KVC_LAND_AND_HOUSING_APPROACH.pptx
03_KVC_LAND_AND_HOUSING_APPROACH.pptx
 
ARISP III Inspection Report
ARISP III Inspection ReportARISP III Inspection Report
ARISP III Inspection Report
 
Handbook on Best Governance Practices of Karnataka
Handbook on Best Governance Practices of Karnataka Handbook on Best Governance Practices of Karnataka
Handbook on Best Governance Practices of Karnataka
 

Más de Bagus ardian

Rakor POKJA CIP NUDP - Tangerang Selatan 14112023.pptx
Rakor POKJA CIP NUDP - Tangerang Selatan 14112023.pptxRakor POKJA CIP NUDP - Tangerang Selatan 14112023.pptx
Rakor POKJA CIP NUDP - Tangerang Selatan 14112023.pptxBagus ardian
 
Complaint Handling Report - Periode Juni 2023.pdf
Complaint Handling Report - Periode Juni 2023.pdfComplaint Handling Report - Periode Juni 2023.pdf
Complaint Handling Report - Periode Juni 2023.pdfBagus ardian
 
Complaint Handling Report - Periode Triwulan 2 - 2023.pdf
Complaint Handling Report - Periode Triwulan 2 - 2023.pdfComplaint Handling Report - Periode Triwulan 2 - 2023.pdf
Complaint Handling Report - Periode Triwulan 2 - 2023.pdfBagus ardian
 
Complaint Handling Report - Periode Triwulan 1 - 2023.pdf
Complaint Handling Report - Periode Triwulan 1 - 2023.pdfComplaint Handling Report - Periode Triwulan 1 - 2023.pdf
Complaint Handling Report - Periode Triwulan 1 - 2023.pdfBagus ardian
 
Laporan Pengaduan Masyarakat P3TB Tahun 2022
Laporan Pengaduan Masyarakat P3TB Tahun 2022Laporan Pengaduan Masyarakat P3TB Tahun 2022
Laporan Pengaduan Masyarakat P3TB Tahun 2022Bagus ardian
 
LAPORAN QAQC BSPS NAHP FY 2022 PERIODE DESEMBER
LAPORAN QAQC BSPS NAHP FY 2022 PERIODE DESEMBERLAPORAN QAQC BSPS NAHP FY 2022 PERIODE DESEMBER
LAPORAN QAQC BSPS NAHP FY 2022 PERIODE DESEMBERBagus ardian
 
Petunjuk Konstruksi Bangunan Rumah BSPS NAHP
Petunjuk Konstruksi Bangunan Rumah BSPS NAHPPetunjuk Konstruksi Bangunan Rumah BSPS NAHP
Petunjuk Konstruksi Bangunan Rumah BSPS NAHPBagus ardian
 
Penilaian Kualitas Rumah Layak Huni - RLH Program BSPS & BP2BT NAHP TA 2021
Penilaian Kualitas Rumah Layak Huni - RLH Program BSPS & BP2BT NAHP TA 2021Penilaian Kualitas Rumah Layak Huni - RLH Program BSPS & BP2BT NAHP TA 2021
Penilaian Kualitas Rumah Layak Huni - RLH Program BSPS & BP2BT NAHP TA 2021Bagus ardian
 
EVALUASI DATA BSPS NAHP TA 2018 - TA 2021
EVALUASI DATA BSPS NAHP TA 2018 - TA 2021EVALUASI DATA BSPS NAHP TA 2018 - TA 2021
EVALUASI DATA BSPS NAHP TA 2018 - TA 2021Bagus ardian
 
Virtual Monitoring November 2021 - BSPS NAHP TA 2021
Virtual Monitoring November 2021 - BSPS NAHP TA 2021Virtual Monitoring November 2021 - BSPS NAHP TA 2021
Virtual Monitoring November 2021 - BSPS NAHP TA 2021Bagus ardian
 
Struktur LED Transparent
Struktur LED Transparent Struktur LED Transparent
Struktur LED Transparent Bagus ardian
 
Pelaksanaan RA & QAQC pada BSPS NAHP TA 2021
Pelaksanaan RA & QAQC pada BSPS NAHP TA 2021Pelaksanaan RA & QAQC pada BSPS NAHP TA 2021
Pelaksanaan RA & QAQC pada BSPS NAHP TA 2021Bagus ardian
 
Penjelasan Pelaksanaan QAQC pada Program BSPS NAHP TA 2020
Penjelasan Pelaksanaan QAQC pada Program BSPS NAHP TA 2020Penjelasan Pelaksanaan QAQC pada Program BSPS NAHP TA 2020
Penjelasan Pelaksanaan QAQC pada Program BSPS NAHP TA 2020Bagus ardian
 
Resume Pelaksanaan New Site Development Kabupaten Kapuas
Resume Pelaksanaan New Site Development Kabupaten KapuasResume Pelaksanaan New Site Development Kabupaten Kapuas
Resume Pelaksanaan New Site Development Kabupaten KapuasBagus ardian
 
Resume Pelaksanaan New Site Development Kota Bima
Resume Pelaksanaan New Site Development Kota BimaResume Pelaksanaan New Site Development Kota Bima
Resume Pelaksanaan New Site Development Kota BimaBagus ardian
 
Resume Pelaksanaan New Site Development Kota Palopo
Resume Pelaksanaan New Site Development Kota PalopoResume Pelaksanaan New Site Development Kota Palopo
Resume Pelaksanaan New Site Development Kota PalopoBagus ardian
 
Resume Pelaksanaan New Site Development Kota Kendari
Resume Pelaksanaan New Site Development Kota KendariResume Pelaksanaan New Site Development Kota Kendari
Resume Pelaksanaan New Site Development Kota KendariBagus ardian
 
New Site Development Kab. Kapuas
New Site Development Kab. KapuasNew Site Development Kab. Kapuas
New Site Development Kab. KapuasBagus ardian
 
Karya Tulis New Site Development Kota Palopo
Karya Tulis New Site Development Kota PalopoKarya Tulis New Site Development Kota Palopo
Karya Tulis New Site Development Kota PalopoBagus ardian
 
Program New Site Development NUSP Phase 2
Program New Site Development NUSP Phase 2Program New Site Development NUSP Phase 2
Program New Site Development NUSP Phase 2Bagus ardian
 

Más de Bagus ardian (20)

Rakor POKJA CIP NUDP - Tangerang Selatan 14112023.pptx
Rakor POKJA CIP NUDP - Tangerang Selatan 14112023.pptxRakor POKJA CIP NUDP - Tangerang Selatan 14112023.pptx
Rakor POKJA CIP NUDP - Tangerang Selatan 14112023.pptx
 
Complaint Handling Report - Periode Juni 2023.pdf
Complaint Handling Report - Periode Juni 2023.pdfComplaint Handling Report - Periode Juni 2023.pdf
Complaint Handling Report - Periode Juni 2023.pdf
 
Complaint Handling Report - Periode Triwulan 2 - 2023.pdf
Complaint Handling Report - Periode Triwulan 2 - 2023.pdfComplaint Handling Report - Periode Triwulan 2 - 2023.pdf
Complaint Handling Report - Periode Triwulan 2 - 2023.pdf
 
Complaint Handling Report - Periode Triwulan 1 - 2023.pdf
Complaint Handling Report - Periode Triwulan 1 - 2023.pdfComplaint Handling Report - Periode Triwulan 1 - 2023.pdf
Complaint Handling Report - Periode Triwulan 1 - 2023.pdf
 
Laporan Pengaduan Masyarakat P3TB Tahun 2022
Laporan Pengaduan Masyarakat P3TB Tahun 2022Laporan Pengaduan Masyarakat P3TB Tahun 2022
Laporan Pengaduan Masyarakat P3TB Tahun 2022
 
LAPORAN QAQC BSPS NAHP FY 2022 PERIODE DESEMBER
LAPORAN QAQC BSPS NAHP FY 2022 PERIODE DESEMBERLAPORAN QAQC BSPS NAHP FY 2022 PERIODE DESEMBER
LAPORAN QAQC BSPS NAHP FY 2022 PERIODE DESEMBER
 
Petunjuk Konstruksi Bangunan Rumah BSPS NAHP
Petunjuk Konstruksi Bangunan Rumah BSPS NAHPPetunjuk Konstruksi Bangunan Rumah BSPS NAHP
Petunjuk Konstruksi Bangunan Rumah BSPS NAHP
 
Penilaian Kualitas Rumah Layak Huni - RLH Program BSPS & BP2BT NAHP TA 2021
Penilaian Kualitas Rumah Layak Huni - RLH Program BSPS & BP2BT NAHP TA 2021Penilaian Kualitas Rumah Layak Huni - RLH Program BSPS & BP2BT NAHP TA 2021
Penilaian Kualitas Rumah Layak Huni - RLH Program BSPS & BP2BT NAHP TA 2021
 
EVALUASI DATA BSPS NAHP TA 2018 - TA 2021
EVALUASI DATA BSPS NAHP TA 2018 - TA 2021EVALUASI DATA BSPS NAHP TA 2018 - TA 2021
EVALUASI DATA BSPS NAHP TA 2018 - TA 2021
 
Virtual Monitoring November 2021 - BSPS NAHP TA 2021
Virtual Monitoring November 2021 - BSPS NAHP TA 2021Virtual Monitoring November 2021 - BSPS NAHP TA 2021
Virtual Monitoring November 2021 - BSPS NAHP TA 2021
 
Struktur LED Transparent
Struktur LED Transparent Struktur LED Transparent
Struktur LED Transparent
 
Pelaksanaan RA & QAQC pada BSPS NAHP TA 2021
Pelaksanaan RA & QAQC pada BSPS NAHP TA 2021Pelaksanaan RA & QAQC pada BSPS NAHP TA 2021
Pelaksanaan RA & QAQC pada BSPS NAHP TA 2021
 
Penjelasan Pelaksanaan QAQC pada Program BSPS NAHP TA 2020
Penjelasan Pelaksanaan QAQC pada Program BSPS NAHP TA 2020Penjelasan Pelaksanaan QAQC pada Program BSPS NAHP TA 2020
Penjelasan Pelaksanaan QAQC pada Program BSPS NAHP TA 2020
 
Resume Pelaksanaan New Site Development Kabupaten Kapuas
Resume Pelaksanaan New Site Development Kabupaten KapuasResume Pelaksanaan New Site Development Kabupaten Kapuas
Resume Pelaksanaan New Site Development Kabupaten Kapuas
 
Resume Pelaksanaan New Site Development Kota Bima
Resume Pelaksanaan New Site Development Kota BimaResume Pelaksanaan New Site Development Kota Bima
Resume Pelaksanaan New Site Development Kota Bima
 
Resume Pelaksanaan New Site Development Kota Palopo
Resume Pelaksanaan New Site Development Kota PalopoResume Pelaksanaan New Site Development Kota Palopo
Resume Pelaksanaan New Site Development Kota Palopo
 
Resume Pelaksanaan New Site Development Kota Kendari
Resume Pelaksanaan New Site Development Kota KendariResume Pelaksanaan New Site Development Kota Kendari
Resume Pelaksanaan New Site Development Kota Kendari
 
New Site Development Kab. Kapuas
New Site Development Kab. KapuasNew Site Development Kab. Kapuas
New Site Development Kab. Kapuas
 
Karya Tulis New Site Development Kota Palopo
Karya Tulis New Site Development Kota PalopoKarya Tulis New Site Development Kota Palopo
Karya Tulis New Site Development Kota Palopo
 
Program New Site Development NUSP Phase 2
Program New Site Development NUSP Phase 2Program New Site Development NUSP Phase 2
Program New Site Development NUSP Phase 2
 

Último

Jewish Efforts to Influence American Immigration Policy in the Years Before t...
Jewish Efforts to Influence American Immigration Policy in the Years Before t...Jewish Efforts to Influence American Immigration Policy in the Years Before t...
Jewish Efforts to Influence American Immigration Policy in the Years Before t...yalehistoricalreview
 
High Class Call Girls Bangalore Komal 7001305949 Independent Escort Service B...
High Class Call Girls Bangalore Komal 7001305949 Independent Escort Service B...High Class Call Girls Bangalore Komal 7001305949 Independent Escort Service B...
High Class Call Girls Bangalore Komal 7001305949 Independent Escort Service B...narwatsonia7
 
Yellow is My Favorite Color By Annabelle.pdf
Yellow is My Favorite Color By Annabelle.pdfYellow is My Favorite Color By Annabelle.pdf
Yellow is My Favorite Color By Annabelle.pdfAmir Saranga
 
How to design healthy team dynamics to deliver successful digital projects.pptx
How to design healthy team dynamics to deliver successful digital projects.pptxHow to design healthy team dynamics to deliver successful digital projects.pptx
How to design healthy team dynamics to deliver successful digital projects.pptxTechSoupConnectLondo
 
Russian Call Girl Hebbagodi ! 7001305949 ₹2999 Only and Free Hotel Delivery 2...
Russian Call Girl Hebbagodi ! 7001305949 ₹2999 Only and Free Hotel Delivery 2...Russian Call Girl Hebbagodi ! 7001305949 ₹2999 Only and Free Hotel Delivery 2...
Russian Call Girl Hebbagodi ! 7001305949 ₹2999 Only and Free Hotel Delivery 2...narwatsonia7
 
call girls in Laxmi Nagar DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️
call girls in Laxmi Nagar DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️call girls in Laxmi Nagar DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️
call girls in Laxmi Nagar DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️saminamagar
 
Call Girls Service AECS Layout Just Call 7001305949 Enjoy College Girls Service
Call Girls Service AECS Layout Just Call 7001305949 Enjoy College Girls ServiceCall Girls Service AECS Layout Just Call 7001305949 Enjoy College Girls Service
Call Girls Service AECS Layout Just Call 7001305949 Enjoy College Girls Servicenarwatsonia7
 
WORLD CREATIVITY AND INNOVATION DAY 2024.
WORLD CREATIVITY AND INNOVATION DAY 2024.WORLD CREATIVITY AND INNOVATION DAY 2024.
WORLD CREATIVITY AND INNOVATION DAY 2024.Christina Parmionova
 
call girls in sector 22 Gurgaon 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️
call girls in sector 22 Gurgaon  🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️call girls in sector 22 Gurgaon  🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️
call girls in sector 22 Gurgaon 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️saminamagar
 
call girls in Punjabi Bagh DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️
call girls in Punjabi Bagh DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️call girls in Punjabi Bagh DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️
call girls in Punjabi Bagh DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️saminamagar
 
history of 1935 philippine constitution.pptx
history of 1935 philippine constitution.pptxhistory of 1935 philippine constitution.pptx
history of 1935 philippine constitution.pptxhellokittymaearciaga
 
Call Girls Near Surya International Hotel New Delhi 9873777170
Call Girls Near Surya International Hotel New Delhi 9873777170Call Girls Near Surya International Hotel New Delhi 9873777170
Call Girls Near Surya International Hotel New Delhi 9873777170Sonam Pathan
 
Start Donating your Old Clothes to Poor People kurnool
Start Donating your Old Clothes to Poor People kurnoolStart Donating your Old Clothes to Poor People kurnool
Start Donating your Old Clothes to Poor People kurnoolSERUDS INDIA
 
Angels_EDProgrammes & Services 2024.pptx
Angels_EDProgrammes & Services 2024.pptxAngels_EDProgrammes & Services 2024.pptx
Angels_EDProgrammes & Services 2024.pptxLizelle Coombs
 
productionpost-productiondiary-240320114322-5004daf6.pptx
productionpost-productiondiary-240320114322-5004daf6.pptxproductionpost-productiondiary-240320114322-5004daf6.pptx
productionpost-productiondiary-240320114322-5004daf6.pptxHenryBriggs2
 
call girls in Model Town DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️
call girls in Model Town  DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️call girls in Model Town  DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️
call girls in Model Town DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️saminamagar
 
Disciplines-and-Ideas-in-the-Applied-Social-Sciences-DLP-.pdf
Disciplines-and-Ideas-in-the-Applied-Social-Sciences-DLP-.pdfDisciplines-and-Ideas-in-the-Applied-Social-Sciences-DLP-.pdf
Disciplines-and-Ideas-in-the-Applied-Social-Sciences-DLP-.pdfDeLeon9
 
call girls in moti bagh DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️
call girls in moti bagh DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️call girls in moti bagh DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️
call girls in moti bagh DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️saminamagar
 
call girls in Kirti Nagar DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️
call girls in Kirti Nagar DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️call girls in Kirti Nagar DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️
call girls in Kirti Nagar DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️saminamagar
 
call girls in West Patel Nagar DELHI 🔝 >༒9540349809 🔝 genuine Escort Service ...
call girls in West Patel Nagar DELHI 🔝 >༒9540349809 🔝 genuine Escort Service ...call girls in West Patel Nagar DELHI 🔝 >༒9540349809 🔝 genuine Escort Service ...
call girls in West Patel Nagar DELHI 🔝 >༒9540349809 🔝 genuine Escort Service ...saminamagar
 

Último (20)

Jewish Efforts to Influence American Immigration Policy in the Years Before t...
Jewish Efforts to Influence American Immigration Policy in the Years Before t...Jewish Efforts to Influence American Immigration Policy in the Years Before t...
Jewish Efforts to Influence American Immigration Policy in the Years Before t...
 
High Class Call Girls Bangalore Komal 7001305949 Independent Escort Service B...
High Class Call Girls Bangalore Komal 7001305949 Independent Escort Service B...High Class Call Girls Bangalore Komal 7001305949 Independent Escort Service B...
High Class Call Girls Bangalore Komal 7001305949 Independent Escort Service B...
 
Yellow is My Favorite Color By Annabelle.pdf
Yellow is My Favorite Color By Annabelle.pdfYellow is My Favorite Color By Annabelle.pdf
Yellow is My Favorite Color By Annabelle.pdf
 
How to design healthy team dynamics to deliver successful digital projects.pptx
How to design healthy team dynamics to deliver successful digital projects.pptxHow to design healthy team dynamics to deliver successful digital projects.pptx
How to design healthy team dynamics to deliver successful digital projects.pptx
 
Russian Call Girl Hebbagodi ! 7001305949 ₹2999 Only and Free Hotel Delivery 2...
Russian Call Girl Hebbagodi ! 7001305949 ₹2999 Only and Free Hotel Delivery 2...Russian Call Girl Hebbagodi ! 7001305949 ₹2999 Only and Free Hotel Delivery 2...
Russian Call Girl Hebbagodi ! 7001305949 ₹2999 Only and Free Hotel Delivery 2...
 
call girls in Laxmi Nagar DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️
call girls in Laxmi Nagar DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️call girls in Laxmi Nagar DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️
call girls in Laxmi Nagar DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️
 
Call Girls Service AECS Layout Just Call 7001305949 Enjoy College Girls Service
Call Girls Service AECS Layout Just Call 7001305949 Enjoy College Girls ServiceCall Girls Service AECS Layout Just Call 7001305949 Enjoy College Girls Service
Call Girls Service AECS Layout Just Call 7001305949 Enjoy College Girls Service
 
WORLD CREATIVITY AND INNOVATION DAY 2024.
WORLD CREATIVITY AND INNOVATION DAY 2024.WORLD CREATIVITY AND INNOVATION DAY 2024.
WORLD CREATIVITY AND INNOVATION DAY 2024.
 
call girls in sector 22 Gurgaon 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️
call girls in sector 22 Gurgaon  🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️call girls in sector 22 Gurgaon  🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️
call girls in sector 22 Gurgaon 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️
 
call girls in Punjabi Bagh DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️
call girls in Punjabi Bagh DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️call girls in Punjabi Bagh DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️
call girls in Punjabi Bagh DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️
 
history of 1935 philippine constitution.pptx
history of 1935 philippine constitution.pptxhistory of 1935 philippine constitution.pptx
history of 1935 philippine constitution.pptx
 
Call Girls Near Surya International Hotel New Delhi 9873777170
Call Girls Near Surya International Hotel New Delhi 9873777170Call Girls Near Surya International Hotel New Delhi 9873777170
Call Girls Near Surya International Hotel New Delhi 9873777170
 
Start Donating your Old Clothes to Poor People kurnool
Start Donating your Old Clothes to Poor People kurnoolStart Donating your Old Clothes to Poor People kurnool
Start Donating your Old Clothes to Poor People kurnool
 
Angels_EDProgrammes & Services 2024.pptx
Angels_EDProgrammes & Services 2024.pptxAngels_EDProgrammes & Services 2024.pptx
Angels_EDProgrammes & Services 2024.pptx
 
productionpost-productiondiary-240320114322-5004daf6.pptx
productionpost-productiondiary-240320114322-5004daf6.pptxproductionpost-productiondiary-240320114322-5004daf6.pptx
productionpost-productiondiary-240320114322-5004daf6.pptx
 
call girls in Model Town DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️
call girls in Model Town  DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️call girls in Model Town  DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️
call girls in Model Town DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️
 
Disciplines-and-Ideas-in-the-Applied-Social-Sciences-DLP-.pdf
Disciplines-and-Ideas-in-the-Applied-Social-Sciences-DLP-.pdfDisciplines-and-Ideas-in-the-Applied-Social-Sciences-DLP-.pdf
Disciplines-and-Ideas-in-the-Applied-Social-Sciences-DLP-.pdf
 
call girls in moti bagh DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️
call girls in moti bagh DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️call girls in moti bagh DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️
call girls in moti bagh DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️
 
call girls in Kirti Nagar DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️
call girls in Kirti Nagar DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️call girls in Kirti Nagar DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️
call girls in Kirti Nagar DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️
 
call girls in West Patel Nagar DELHI 🔝 >༒9540349809 🔝 genuine Escort Service ...
call girls in West Patel Nagar DELHI 🔝 >༒9540349809 🔝 genuine Escort Service ...call girls in West Patel Nagar DELHI 🔝 >༒9540349809 🔝 genuine Escort Service ...
call girls in West Patel Nagar DELHI 🔝 >༒9540349809 🔝 genuine Escort Service ...
 

NUSP-2 Profile in Bima City FY 2019

  • 1. NUSP-2 PROFILE IN DIRECTORATE GENERAL OF HUMAN SETTLEMENT MINISTRY OF PUBLIC WORKS AND HOUSING GOVERNMENT OF INDONESIA
  • 2. OUTLINE 1. Project Profile 2. NUSP-2 Profile in Bim 3. NSD Jatiwangi Profile4. Lesson Learned of Slum Upgrading in
  • 3. 01 Project Information Project Location S-Curve of Loan Process FY 2015 – 2019 Loan Category and Disbursement PROJECT PROFILE Infrastructure upgrading in Kelurahan Jatiwangi
  • 4. PROJECT INFORMATION NEIGHBORHOOD UPGRADING AND PROJECT PHASE-2 Lender Administration Asian Development Bank Executing Agency Directorate General of Human Settlements Ministry of Public Works and Housing Republic of Indonesia Loan ID 3122-INO Signing Date April 23, 2014 Effective Date July 17, 2014 Closing Date December 31, 2019 Total Loan USD 74,400,000 NUSP-2 is a slum alleviation program financed by Asian Development Back (ADB) in Indonesia. There are 3 (three) components within NUSP-2 i.e: (i) institutional development of the local government, (ii) slum upgrading, (iii) New Site Development/NSD
  • 5. 20 Cities/Districts *) 209 Neighborhoods *) 4 out of 20 cities/districts are designated as NSD Location : Kendari, Palopo, Bima and Kapuas PROJECT LOCATION WEST REGION CENTRAL REGION EAST REGION 1. Batam City 1. Serang City 1. Makassar City 2. Tanjung Balai City 2. Sukabumi City 2. Palopo City 3. Bengkulu City 3. Semarang City 3. Bone District 4. Tj Jabung Barat District 4. Pekalongan City 4. Kendari City 5. Palembang City 5. Pasuruan City 5. Ambon City 6. Bandar Lampung City 6. Banjarmasin City 6. Bima City 7. Palangkaraya City 8. Kapuas District
  • 6. S-CURVE OF LOAN PROCESS FY 2015 - 2019 Cumulative Actual Disbursement versus Loan Projection of Cumulative Disbursement
  • 7. LOAN CATEGORY & DISBURSEMENT LOAN CATEGORY ALLOCATION % of TOTAL LOAN DISBURSEMENT 1 Civil Works USD 62,700,000 84.27 USD 59,790,644,02 98,50 2 Training and Workshop USD 2,243,000 3.01 USD 1,724,388.64 76,88 3 Consulting Services USD 9,457,000 12.71 USD 9,019,121.62 95,41 TOTAL USD 74,400,000 USD 70,534,154.28 95.37 Register Number Project Title/Loan Number Elapsed Time Ratio Disbursement Ratio Disbursement Category Effective & Closing Date ( % ) Allocation and Disbursement ( % ) 10882601 Neighborhood Upgarding and Shelter Project - Phase 2 (NUSP-2) Loan No. 3122-INO July 17, 2014 92,42% USD 74.400.000,00 95,37% Ahead or On Schedule Dec 31, 2019 70.534,154.28 Status: August 2019 Loan Status : AHEAD OF SCHEDULE
  • 8. 02 The Profile of Slum Area in Bima City NUSP-2 Facilitation in Bima City Documentation of NUSP-2 activities in Bima City NUSP-2 PROFILE IN BIMA CITY
  • 9. THE PROFILE OF SLUM AREA IN BIMA CITY BASED ON MAYOR’S DECREE ON THE DETERMINATION OF SLUM NEIGHBORHOODS IN BIMA CITY NO. 620 OF 2016
  • 10. Slum Settlement Area : 17 Kelurahans Total Slum Area : 147,36 Hectare Targeted NUSP-2 Kelurahans : 9 Kelurahans with the total area of slum : 109,55 Ha No NUSP-2 Kelurahan Targeted Area (Ha) 1 Dara 21.39 2 Paruga 9.01 3 Tanjung 14.91 4 Nae 10.12 5 Sarae 7.73 6 Melayu 9.24 7 Jatibaru 16.56 8 Jatiwangi 18.81 9 Rabadompu Barat 1.78 Total 109.55 Berdasarkan : SURAT KEPUTUSAN (SK) WALIKOTA BIMA NO. 371 Tahun 2014 TENTANG PENETAPAN LOKASI LINGKUNGAN PERUMAHAN DAN PERMUKIMAN KUMUH DI KOTA BIMA BASED ON MAYOR’S DECREE ON THE DETERMINATION OF SLUM NEIGHBORHOODS IN BIMA CITY NO. 620 OF 2016 THE PROFILE OF SLUM AREA IN BIMA CITY
  • 11. No Fiscal Year Activity Amount (IDR) (USD) 1 2016 Community Contract - Slum Upgrading in 9 Kelurahans 9,150,000,000 686,536.90 Complex Civil Works - Slum Upgrading, 1 Package in Tanjung Dara 7,272,665,000 545,374.89 2 2017 Community Contract - Slum Upgrading in 9 Kelurahans 9,000,000,000 674,707.31 Complex Civil Works - Slum Upgrading, 1 Package in Dana Traha 6,777,503,000 501,483.66 3 2018 Community Contract - Slum Upgrading in 3 Kelurahans 2,800,000,000 213,489.65 Complex Civil Works - Slum Upgrading, 1 package in Dana Traha and Sapaga 6,084,000,000 468,052.53 Construction of NSD infrastructure, in Bima City 4,097,082,000 303,487.55 4 2019 Construction of NSD infrastructure, in Bima City 7,774,215,000 547,479.92 TOTAL 52,955,465,000 3,940,612.41 NUSP-2 FACILITATION IN BIMA CITY FY 2016 - 2019NUSP-2 Project Value : IDR 52,955,465,000,-
  • 12. LEGENDA Jalan Exsiting Sungai Polygon Jalan NUSP-2 2016 Jalan NUSP-2 2017 Jalan Aspal NUSP-2 Skala Kawasan 2108 Saluran Drainase NUSP-2 Skala Kawasan 2018 Air Bersih APBD 2017 Jalan NUSP-2 2018 Saluran NUSP-2 Skala Kawasan 2018 Pengadaan Kontainer NUSP 2018 Lampu Penerangan Ruang Terbuka Publik Pembagian Segmen SEGMEN 1 RT 03,04 ,05 SEGMEN 2 RT 06 4 7 3 14 2 10 9 1 11 8 12 13 6 5 14 INTEGRATED SLUM ALLLEVIATION MAP COMMUNITY CONTRACT ACTIVITY Kelurahan Jatibaru, Bima City
  • 13. PAVING ROAD AND HAND RAILING Located in RT 3 RW 1, under NUSP-2 community contract in FY 2017, the neighbourhood road was upgraded from a soil road (jalan tanah) to a paving road and equipped with hand railing. BEFORE AFTER KEGIATAN SKALA LINGKUNGANCOMMUNITY CONTRACT ACTIVITY Kelurahan Jatibaru, Bima City
  • 14. BEFORE AFTER PAVING ROAD AND HAND RAILING Located in RT 3 RW 1, under NUSP-2 community contract in FY 2017, the neighbourhood road was upgraded from a soil road (jalan tanah) to a paving road and equipped with hand railing. . KEGIATAN SKALA LINGKUNGANCOMMUNITY CONTRACT ACTIVITY Kelurahan Jatibaru, Bima City
  • 15. KEGIATAN SKALA LINGKUNGANCOMMUNITY CONTRACT ACTIVITY Kelurahan Jatibaru, Bima City BEFORE AFTER STAIRCASE AND HAND RAILING Located in RT 4 RW 1, under NUSP-2 community contract in FY 2018, the road was upgraded and equipped with staircase and hand railing for protection.
  • 16. NO KEGIATAN TAHUN VOLUME APBN ANGGARAN (RP) 1 Sumur Bor Dalam 2015 1 Unit APBD 2 Pekerjaan Drainase 2016 1275 M NUSP / SWADAYA 3 Pekerjaan Jalan Lingkungan 2016 2428 M NUSP / SWADAYA 4 Pekerjaan Drainase 2017 1579 M NUSP / SWADAYA 5 Pekerjaan Jalan Lingkungan 2017 2220 M NUSP / SWADAYA 6 Pekerjaan Jalan Aspal 2017 3000 M APBD 7 Pemb. Hot Mix & Sal. U-Dith 2017 1528 M APBD 8 Peningkatan Jalan Ekonomi 2017 1000 M APBD 9 Pekerjaan Drainase Tertutup 2018 220 NUSP / SWADAYA 10 Pekerjaan Penutup Baja Grill 2018 457 NUSP / SWADAYA 11 Pekerjaan Jalan Beton dan drainase tertutup 2018 171 NUSP / SWADAYA 12 Pekerjaan Jalan Beton Bertulang dan Deucker 2018 13 NUSP / SWADAYA 13 Pengadaan Motor Sampah 2018 2 Unit NUSP 14 Pengadaan Kontainer dan Landasan Kontainer 2018 1 Unit NUSP 15 Lampu Penerangan Jalan 2018 24 NUSP / SWADAYA 16 Septitank Komunal (5-10 KK) 2018 10 Unit APBD 17 Peningkatan dan Pengaspalan Jalan Lingkungan 2018 400 APBD RW 01 Deuker Swadaya 17 15 7 6 2 1 14 17 12 16 11 10 5 3 9 4 RW 02 INTEGRATED SLUM ALLEVIATION MAP COMMUNITY CONTRACT ACTIVITY Kelurahan Jatiwangi, Bima City
  • 17. BEFORE AFTER COMMUNITY CONTRACT ACTIVITY Kelurahan Jatiwangi, Bima City NEIGHBORHOOD ROAD Located in RT 18 RW 4, under NUSP-2 community contract in FY 2017, the road was upgraded from a soil road io a concrete road.
  • 18. BEFORE AFTER NEIGHBORHOOD ROAD Located in RT 4 RW 1, under NUSP-2 community contract in FY 2018, the road was upgraded from a soil road to a concrete road above the irrigation canal. COMMUNITY CONTRACT ACTIVITY Kelurahan Jatiwangi, Bima City
  • 19. Diva Karaoke BEFORE AFTER STREET LIGHTING Located in RT 4 RW 1, under NUSP-2 community contract in FY 2018, the road was equipped with 20 street lightings plus 4 street lightings by community contribution. COMMUNITY CONTRACT ACTIVITY Kelurahan Jatiwangi, Bima City
  • 20. 03 Concept and Approach of NSD Implementation NSD Jatiwangi Profile Operation and Maintenance Development of the Riverbank (ex-squatter) NSD JATIWANGI PROFILE
  • 21. NEW SITE DEVELOPMENT (NSD) CONCEPT AND APPROACH NSD is implemented through collaboration between the Local Government (provision of clean and clear land of minimum 2 ha area) and Ministry of Public Works and Housing (MPWH) for provision of housing units (financed through national budget) and infrastructure (financed through ADB loan) NSD Jatiwangi, Bima City coverage area is 3,91 Ha
  • 22. Type of Infrastructure financed by ADB through NUSP-2 project: • Asphalt Road (within NSD site) • Drainage system (tertiary drainage, retention pond canal) • Water supply system (HDPE pipeline and meter boxes) • Waste water management system (on-site individual system/septic tank) • Retaining wall • Solid waste management system (garbage vehicles, waste containers, temporary waste storage) • Electricity network includes park lighting, street light • Main gate and security station • Green open space (curb/cansteen, tree planting, signage) • The NSD site is designated for 218 housing units. • Total built housing units : 90 units • Number of occupied housing units : 87 units (the remaining 3 units will be occupied by the end of September). • The electricity supply for the houses is provided by the State Electricity Company/PLN. • The water supply will be supported by the Local Water Company. NSD JATIWANGI PROFILE
  • 23. Area : 3,91 Ha Type of housing unit : 28/80 Total number of : 218 housing units STAGES IN THE CONSTRUCTION OF HOUSING UNITS Note: Construction to be started in July 2019 90 units of twin house 10 units of single house 68 units of twin house Fiscal Year 2018 (1st Phase) 50 units of twin house Fiscal Year 2019 (2nd Phase) Proposed Facilitation in Fiscal Year 2020 (3rd Phase) Legend: Kiara Payung Trees Public facilities Housing unit Asphalt Road Grass Drainage System Scale 1:1500
  • 24. • Access to decent housing units • Access to adequate infrastructure • Generate opportunity for additional income (some HH run kiosk) BEFORE (SQUATTER) • Poor condition of the housing unit • No access to infrastructure • No opportunity for economic improvement AFTER (NSD)
  • 25. NSD JATIWANGI, BIMA CITY Construction Progress of Infrastructure: 90%
  • 26. OPERATIONAL AND MAINTENANCE To ensure sustainability, the management of NSD uses rental mechanism in which the beneficiaries will contribute IDR 89.000/HH/month for OM of the infrastructure. The Management Board will collect the rental retribution and manages it for the OM activities. The rental rate is consider to be much cheaper than their living cost in previous location which was approximately IDR 500.000/HH/months
  • 27. POST-RELOCATION DEVELO An illustration of squatter area development by the Local Government of Bima City in collaboration with JICA in Kelurahan Paruga, an inspection road with public open space was designed to be built on the riverside of Padolo River As part of post-relocation development plan, the Local Government of Bima City committed to restore the land use on the slum and squatter areas to prevent the emergence of new slums. To address the squatter area, after the beneficiaries are relocated to NSD location, the squatter area will be transformed into an inspection road with public open space on the riverside of Padolo River. BEF ORE AFT ER
  • 28. 03 F SLUM UPGRADING IN BIMA CITY Lesson Learned of Kelurahan Jatibaru, Bima City Lesson Learned of Kelurahan Jatiwangi, Bima City Public open space as a new recreational place in Kelurahan Jatibaru
  • 29. LESSON LEARNED ON COMMUNITY CONTRACT GENDER RESPONSIVE INFRASTRUCTURE Kelurahan Jatibaru is located on a hilly topography with a slope of 15 to 35 degree in which houses and infrastructure were below the standard quality condition . NUSP-2 facilitated the upgrading of roads, road railing, public open space. Through the NUSP-2, the community take benefit from the upgraded road not only to bring clean water but also to use it as a sport track safely and comfortably. The neighborhood road equipped with a stairscase and railing in Kelurahan Jatibaru Kelurahan Jatibaru Bima City
  • 30. PUBLIC OPEN SPACE The community of Kelurahan Jatibaru innovated to use a land on the hillside as a Public Open Space. The Public open space was built in FY 2018 through community contract. The community members including children use the public open space to socialize as a cheap and safe recreational place with beautiful scenery. Kelurahan Jatibaru Bima City LESSON LEARNED ON COMMUNITY CONTRACT
  • 31. NEIGHBORHOOD ROAD Through the NUSP-2 in FY 2018 program, the road was upgraded and equipped with staircase and hand railing for protection to ensure all groups of community, including women, vulnerables and children can use it safely and comfortably . The road, now is known as the "healthy heart road". Kelurahan Jatibaru Bima City LESSON LEARNED ON COMMUNITY CONTRACT
  • 32. BEFO RE AFTE R Kelurahan Jatibaru Bima City LESSON LEARNED ON COMMUNITY CONTRACT
  • 33. KEEPING SUSTAINABLE QUALITY SETTLEMENT WITH LOCAL WISDOM "CAFI SIDI SAMBIA“ The slum alleviation in Kelurahan Jatiwangi was carried out by involving various parties, one of which is NUSP-2 Program. NUSP-2 facilitated the upgrading of roads, road railing, drainage system, waste management system, and street lighting. NUSP-2 has succeeded in reviving the local wisdom "Cafi Sidi Sambia" which means sweeping (cleaning) in every morning and late afternoon, such activity is very useful to maintain sustainability.The neighborhood road in Kelurahan Jatiwangi Kelurahan Jatiwangi Bima City LESSON LEARNED ON COMMUNITY CONTRACT
  • 34. BEFO RE AFTER Kelurahan Jatiwangi Bima City LESSON LEARNED ON COMMUNITY CONTRACT
  • 35. T H A N K Y O U