IS : 2430-1986
Indian Standard
METHODS FOR
SAMPLING OF AGGREGATES
FOR CONCRETE
( First Revision
Third Reprint SEPTEMBER 1993
UDC 666.972.12:620.113
@ Copyfight1987
BUREAU OF INDIAN STANDARD S
MANAKBHAVAN, 9 BAHADUFt SHAH ZAFARMARG
NEW DELHI 110002
Gr3 3wu 1987
( Reaffirmed 1995 )
IS:2430-1986
Indian Standard
METHODS FOR
SAMPLING OF AGGREGATES
FOR CONCRETE
( First Revision )
Building Materials and Components Sampling Sectional Committee,
BDC 31
Chairman
DR MOEAN RAI
Members
Represrnling
Central Building Research Institute ( CSIR ),
Roorkee
SIiRIS. K. Goswanr ( Al&safe to
Dr Mohan Rai )
SHRI S. K. BANERJEE National Test House, Calcutta
DR P. Ray CHAUDRURI Centgralhyd Research Institute ( CSIR ), New
SBRI L. A. GOKHALE Mini~;iykXwTransport, Department of Railways,
Sam B. K. JAIN ( Alfrmutr )
SHRI S. C. KUYAR Development Commiuioner, Small Scale Industries.
New Delhi
SHRI K. V. K. RAJU ( Allrmare )
SHRI M. V. LAKSF~XANASAMY Indian Statistical Institute, Calcutta
DR A. G. MADHAVA RAO Struc;;;iaFineering Research Centre ( CSIR ),
SHRI D. S. RAYACHANDRA
MURTHY ( Alinnate )
SHRI J. P. MAIKWRI
SHRI P. P. SAXENA ( Akrrnatc )
Export Inspection Council of India, New Delhi
DR A. K. MULLICK Nati~$“,t$l for Cement and Building Materiala,
e
SHRI K. H. BABU ( Alternate )
SERI S. S. RAJPUT
SRRIK.S. SRINIVASAN
Forest Research Institute and Colleges. Dehra Dun
National Buildings Organization, New Delhi
SHRI T. R. BHATIA ( Akmutr )
SHRI N. VEERABADHU
SHRI S. B. JAISWAL ( Aftrrnotc )
Central Public Worka Department, New Delhi
SHRI G. VENXATESULU Ministry of Shipping and Transport, New Delhi
SHRI PRAFULLA KUMAB ( Afternate )
SHRX G. W. DATEY, Director General, BIS ( Ero@cio Mmbn )
Director ( Stat: )
SIcretafy
SYT ANDPAM GUPTA
Deputy Director ( Stat ), BIS
@ Cowight 1987
BUREAU OF INDIAN STANDARDS
This publication is protected under the Indian Co@yriiht Act ( XIV of 1957) and
reproduction in whole or in part by any means except with written permission of the
publisher shall be deemed to be an infringement of copyright under the said Art.
IS : 2430- 1986
Indian Standard
METHODS FOR
SAMPLING OF AGGREGATES
FOR CONCRETE
( First Revision
0. FOREWORD
0.1 This Indian Standard ( First Revision ) was adopted by the Indian
Standards Institution on 28 November 1986, after the draft finalized by
the Building Materials and Components Sampling Sectional Committee
had been approved by the Civil Engineering Division Council.
0.2 Sampling is of equal importance to testing and a man drawing
samples shall use every precaution to obtain samples that will show the
true nature and condition of the materials which they represent.
0.3 One of the major contributing factors to the quality of concrete
is the quality of aggregates used therein. It is, therefore, imperative
that due consideration is given to sampling procedures which will help
in the proper and objective evaluation of the quality of aggregates.
0.4 This standard was originally issued in 1969. This has been revised
so as to make it more easily implementable in practice and bring it in
line with the current national and international trade practices. [ In
this revised version, the weight of the gross sample and number of
increments have been modified so that it may be more economical to
use them in practice.]
0.5 In preparing this standard, assistance has been derived from the
following publications:
ASTM/D 75-1982 Standard practice for sampling aggregates
ISO/DIS 4847 Concrete - Sampling of normal weight aggregates.
0.6 For reporting the results of a test or analysis, if the final value,
observed or calculated, is to be rounded off, it shall be done in accordance
with IS : 2-1960*.
*Ruler for rounding off numerical values ( rsckad ).
2
E.,-..r I.._. - ._._ I___. “_._..
IS : 2430 - 1986
1. SCOPE
1.1 This standard prescribes the methods of sampling for coarse and
fine aggregates for the following purposes:
a) PreIiminary investigation of source of suppl’y,
b) Inspection of shipment of materials, and
c) Inspection of materials on the site of work.
1.2 This standard also specifies methods of sample reduction, packing
and forwarding them for examination and testing.
2. TERMINOLOGY
2.0 For the purpose of this standard, the following definitions shall
apply-
2.1 Aggregates - Crushed stone, crushed boulders, gravel, sand,
industrial by-products or such other inert material.
2.2 Fine Aggregates - Aggregates most of which pass thtough
4’75 mm IS Sieve.
2.2.1 Natural Sand - Fine aggregates resulting from the natural
disintegration of rock and which have been deposited by streams or
glacial agencies.
2.2.2 Crushed Stone Sand - Fine a’ggregates produced by crushing
hard stone.
2.2.3 Crushed Gravel Sand - Fine aggregates produced by crushing
natural gravel.
2.3 Coarse Aggregates - Aggregates most of which are retained on
4’75 mm IS Sieve.
2.4 All-in Aggregates - Material composed of fine aggregates and
coarse aggregates.
2.5 Lot - The quantity of aggregates of the same class, nominal size,
source and offered for inspection at one time. The lot may consist of
the whole or a part of the quantity ordered for.
2.6 Sub-lot - The quantity of aggregates in each of the parts into
which a lot is divided for the purpose of sampling. As far as possible
sub-lots should be of equal size.
2.7 Increment - The quantity of aggregates obtained by a sampling
device at one time.
2.8 Unit Sample - The quantity of aggregates collected at one point
in sectional -ampling or at one time from the conveyor.
3
IS : 2430 - 1986
2.9 Gross Sample - Sample as collected from a sub-lot, that is, the
quantity of aggregates consisting of one Or several increments or unit
samples taken from a sub-lot.
2.10 Laboratory Sample - The quantity of aggregates obtained by
reducing a gross sample following a specified procedure and intended
for laboratory testing.
2.11 Composite Sample ( for the Lot ) - The quantity of
aggregates obtained by mixing together equal quantities from each of
the laboratory samples.
3. SAMPLING FOR PRELIMINARY INVESTIGATION OF
SOURCE OF SUPPLY
3.1 Stone from Ledges for Quarries
3.1.1 The ledge or quarry face of the stone shall be inspected to
determine any discernible variations or strata. Differences in colour
and texture shall be observed.
3.1.2 Separate samples having a mass of at least 25 kg of stone should
be obtained from each discernible strata. The sample should not
include material weathered to such an extent that it is no longer useful
for the purpose intended.
3.2 Field Stone and Boulders
3.i.l A detailed inspection of the deposits of field stone and boulders,
over the area from where the supply is to be obtained, shall be made.
The different kinds of stone and their condition in various deposits shall
be recorded.
3.2.2 Separate samples shall be selected of all classes of stone that
visual examination indicates would be considered for use in construction.
These individual samples shall weigh at least 25 kg each.
3.3 Sand and Gravel ( Road Side, Bank Run Sand and Gravel
Deposits )
3.3.1 Road side production is the production of materials with
portable or semi-portable crushing, screening, or washing plants estab-
lished or reopened in the vicinity of the work on a designated project
for the purpose of supplying materials for that project.
3.3.2 Potential sources of bank run sand may include previously worked
pits from which there is an exposed face or potential deposits discovered
through air-photq, interpretation, geo-physical exploration or other
types of investigation.
3.3.3 Samples shall be so chosen from each of the different strata in
the deposit discernible to the sampler. An estimate of the quantity of
different materials shall be made.
1
IS : 2430 - 1986
3.3.4 If the deposit is worked as an open-face bank or pit, the sample
shall be taken by channelling the face vertically, top to bottom, so as
to represent the materials proposed for use. Over-burden and disturbed
material shall not be included in the sample. Test holes shall be
excavated or drilled at numerous locations in the deposit to determine
quality of material and the extent of the deposit ljeyocd the exposed
face, if any. The number and depth of these lest holes will depend
upon the quantity of the materia1 to be used, topography of the area,
nature of the deposit, character of the material and potential value of
the material in the deposit. Separate samI>les shall be obtained from
the face of the bank and from test holes. If visual inspection indicates
that there is considerable variation in material, indivii;ual samples shall
be selected from the material in each well defined stratum. Each sample
shall be thoroughly mixed and quartered, if necessary, so that the.gross
sample obtained wail be of at least 12 kg for sand and 33 kg If the
deposit contains an appreciable amount of coarse aggregates. If the
deposit being in,estiqated does not have an open face, sample shall
be obtained entirely from test holes as outlined herein.
4. SAMPLING FOR INSPECTION OF SHIPMENT OF
MATERIALS AND OF MATERIALS ON THE SITE OF
WORK
4.1 The samples shall be selected and examined from each lot ( see 2.5 )
separately.
4.1.1 For obtaining reliable conclusions, it is recommended that as
far as possible aggregates be sampled when in motion, that is, from
conveyors or during loading and unloading,
4.2 Sampling from Conveyors
4.2.1 Sub-lots - For the purpose of sampling a lot, while it is being
discharged over a conveyor, shall be divided into a number of sub-lots
of approximately equal size as specified in Table 1.
TABLE 1 NUMBER OF SUB-LOTS INTO WHICH A LOT IS
TO BE DIVIDED
( Clauses4.2.1, 4.3.1 and 4.4.3 )
LOT STZE No. OF SrjB-LOTS
(md)
(1) (2)
101 to 500 3
501 to 1 500 5
I 501 to 5 000 7
NOTE - In case the lot contains 100 ms or less of aggregates, the sampling shall
be subject to agreement between the purchaser and the supplier.
5
IS :2430- 1986
4.2.1.1 A representative gross sample shall be drawn from each of
the sub-lots and shall be kept separately. Thus there will be as many
gross samples as the number of sub-lots into which the lot has been
divided.
4.2.2 The weight of the grocs sample shall depend on the maximum
nominal size of aggregates and shall be according to Table 2. In order
to obtain this weight of gross sample, at least 10 increments of a suitable
weight, each not less than 1 kg, shall be taken. Increments shall be
taken with the help of a suitable scoop ( see Fig. 1 ) at regular intervals.
TABLE 2 WEIGHT OF GROSS SAMPLE
M_cama NOMINAL SIZE OF MINIMUMWEIGHT OF
AGGREGATES
(mm)
2.36
475
9.5
10'0
12-5
13’2
l&O
19.0
20’0
251)
37.5
40.0
50.0
63.0
75.0
80’0
90’0
GROSSSA~~PLE
( kg )
Fine Aggregates
10
10
Coarse’Aggregates
10
10
15
15
20
25
25
50
75
80
100
125
150
160
175
NOTE 1 - For aggregates, the maximum nominal size of particles is the largest
sieve size upon which any material is permitted to be retained.
NOTE 2 -For all-in-aggregates, minimum weight of gross sample shall be the
mass of coarse aggregates ( minimum ) plus 10 kg.
6
IS:2430-1986
Dimansions ofthe Scoopin mm
~-.--‘-~--h----~~-~
A B c D E
’10 250 250 120 200 300
5 200 200 90 175 240
2 150 150 75 125 180
FIG. 1 SAMPLINGShoop
IS : 2430 - 1986
4.2.2.1 The increments shall be taken at equal intervals preferably
from the cross section and thickness of the stream in one operation.
When the aggregates are in motion, the most reliable means of taking
such increments is to sample at a point where the material discharges
from the belt. The best possible increment is one which cuts across
entirely the falling steam of the material by means of a suitable
receptacle passed from one side of the steam to the other without
allowing the receptacle to overflow. If the whole of the steam cannot
be covered by one increment without overflowing the receptacle, the
steam should be sampled systematically by taking material from all
portions.
4.2.2.2 If’it is not possible to sample satisfactorily at the point of
discharge, increments may be drawn from the moving belt itself. In
this case, the increments shall be col1ecte.d from the centre and the
left and right side of the belt along the same width. To ensure that very
small material is also correctly obtained, a scoop should sweep the
conveyor.
4.2.3 The material collected from various increments in a sub-lot
shall be combined and mixed together to constitute a gross sample.
4.3 Sampling from Transportation Units ( Wagons, Trucks and
Boats )
4.3.1 Sub-lots - For the purpose of sampling, all the carriers ( wagons/
trucks/boats ) in a lot shall be divided into a suitable number of sub-lots
of approximately equal size in accordance with the requirements of
Table 1.
4.3.1.1 A representative gross sample shall be drawn from each of
the sub-lots and shall be kept separately. Thus, there will be as many
gross samples as the number of sub-lots into which a lot has been
divided.
4.3.2 In order to get a representative gross sample, the aggregates
shall be sampled as far as possible when in motion, during loading or
unloading.
4.3.2.1 A minimum of 25 percent of the carriers shall be selected
at random from the sub-lot. ‘For the random selection of carriers, the
procedure given in 3.1 of IS : 4905-1968” may be followed. Ten
increments shall be taken from the selected carriers and a suitable
weight of the increment, not less than 1 ks, shall be used SO that a
Fross sample of the quantity required m Table 2 is obtained. The
Increments shall be evenly distributed over the selected carriers with a
*Methods for random sampling.
8
IS : 2430 - 1986
view to determine the necessary number of increments that should
be ,collected from e&h of the carriers in the sub-lot ‘for making up the
grogs sample. These increments shall be drawn with the help of a
suitable scoop ( see Fig. 1 ) at regular intervals, at the time of loading
or unloading of the carriers.
4.3.3 When the samples are to be collected from the 1Qaded carriers,
for collecting ten required increments, an equal number of points shall
be located at random on the entire aggregate surface of all the carriers
in a sub-lot. At every selected point, an increment shall be collected by
the sectional sampling method.
4.3.3.1 Sectional sam/ding - At every selected point an increment shall
be collected by taking the whole section of’ aggregates from top to
bottom over the area of a circle of 20 cm diameter for aggregates more
than 20 mm nominal size. For doing so, aggregate from the surface up
to a depth of approximately 45 cm shall be collected at first. The
bottom of the hole so formed shall then be covered by a plate and the
aggregate lying on the sides shall be removed up to that plate so that,
when the hole is dug further, the material from the sides does not fill
up the hole by falling down. The procedure is repeated till the bottom
is reached. For aggregates up to 20 mm nominal size and fine aggre-
gates a sampling auger may be used in a casing pipe of 15 cm diameter
and length slightly more than the height of the sub-lot. The casing
pipe is pushed vertically down till it touches the bottom of the lot. The
entire material from the inside of the ca$ing pipe is removed by the
auger to give an increment.
4.3.3.2 In sampling coarse aggregates from loaded carriers effort
should be made to enlist’ the services of power equipment capable of
exposing the material at various levels and random locations. When
power equipment is not available the procedure given in 4.3.3.1 may
be followed.
4.4 Sampling from Stacks or Stock Piles
4.4.1 For sampling material from stock piles or stacks, it is very
difficult lo ensure unbiased samples, due to the segregation which often
occurs when material is stacked, with coarser particles rolling to the
outside face of the pile. For coarse or all-in aggregates every effort
should be made to procure a power equipment to develop a separate,
small sampling pile composed of materials drawn from various levels
and locations in the main pile after which several increments may be
combined to compose the gross sample. If it is necessary to indicate
the degree of variability existing within the main pile, separate samples
should be drawn from separate areas of the pile.
4.4.2 Where power equipment is not available, samples from sack
piles should be made up of the required number of increments taken
9
IS:2430-1986
equally from top third, at the mid point and at the bottom third of the
volume of the pile. A board put vertically into the pile just above the
sampling point helps in preventing further segregation. In sampling
stock piles of the aggregates, the outer layer which may have become
segregated, should be removed and the sample taken from the material
beneath.
4.4.3 Sub-lots - For the purpose of sampling, the quantity of
aggregates in a stack shall be divided into a suitable number of sub-lots
of approximately equal size in accordance with Table 1.
4.4.3.1 A representative gross sample shall be drawn f;om each of
the sub-lots. Thus there will be as many gross samples as the number
of sub-lots into which the lot has been divided.
4.4.4 Sampling of aggregates from stacks shall be carried out as far
as possible, during the making ( or breaking ) of the stack.
4.4.4.1 A minimum of ten increments shall be taken from a sub-lot
for making up a gross sample. The weight of the gross sample shall be
according to Table 2 for various sizes of aggregates. The weight of
the increment shall be governed by the weight of the gross simple and
minimum number of increments i.e. 10. This weight of increment
shall not be less than 1 kg. The number of increments shall be equally
distributed over the sub-lot. Increments shall be drawn with the help
of a suitable scoop ( see Fig. 1 ) at regular intervals in the course of
making or unmaking of the stacks.
4.4.5 When it becomes necessary to sample a stationary stack, trench
sampling method ( see 4.4.5.1 and 4.4.5.2 ) may be used. This method
is applicable for stacks up to a maximum height of 1’5 m only.
4.4.5.1 The weight of the gross sample shall be according to
Tabfe 2 and minimum number of increments from a sub-lot shall be ten.
These increments shall be collected according to 4.4.5.2.
4.4.5.2 Along a randomly chosen line on the aggregates surface of
the sub-lot, a trench shall be dug right down to the ground level. From
the trenches so dug, the required number of increments shall be collected
with the help of a suitable sampling scoop ( see Fig. 1 ) at various
points randomly spread over the two exposed sides of the trenches. In
case of large stacks, in addition to the trench, the sides of the piles may
also be opened to expose the aggregates down to the bottom at places
where the trench does not expose the aggregates inside.
5. REDUCTION OF GROSS SAMPLE
5.1 Each gross sample shall be reduced separately. The process of
mixing and reduction of each gross sample shall be repeated until the
material required for each test, as specified in the relevant test method
specification, IS : 2386 ( Parts 1 to 8 )-1963* is obtained.
*For titles of the various parts of IS : 2386, see page 12.
10
L,.,._..“._--_--. I.-_
IS : 2430 - 1986
5.2 Reduction by Riffle Divider - The aggregates shall be well mixed
and poured into the riffle. This process shall be repeated using different
size riffles according to the size of the aggregates.
5.3 Coning and Quartering Method - The aggregates shall be
mixed and then scooped into a cone-shaped pile. Care shall be taken
to drop each scoopful exactly over the same spot as otherwise the central
axis of the, cone will be slackened and an uneven distribution of the
particle sizes will result. After the cone is formed, it shall be flattened
by pressing the top of the cone with the smooth surface of the scoop.
Then it is cut into quarters by two lines which intersect at right angles
at the centre of the cone. The bulk of the sample is reduced by
rejecting any two diagonally opposite quarters. Accuracy in quartering
is most easily attained, in the case of fine and all-in-aggregates, with
damp material.
6. PACKING AND MARKING OF SAMPLES
6.1 Each sample shall be packed separately and despatched to the
testing laboratory, great care being taken in packing to prevent the loss
of any fine material.
6.1.1 Coarse aggregates shall be packed in secure containers or sample
bags.
6.1.2 Fine aggregates and all-in aggregates shall be packed in tight
containers or closely woven bags so that there is no loss of the finer
particles.
642 Each package shall include a card, suitably protected from damage
by moisture and abrasion, giving the name and address of the sender
and the information required in 6.2.1.
6.2.1 As much as possible the following information about the origin
of the material shall accoinpany each sample:
a) Name of the quarry, pit, river-bed, etc, and address;
b) Proposed use for the material; and
c) Geographic location, and shipping facilities.
7. NUMBER OF TESTS AND REPORTING OF TEST RESULTS
7.1 Unless otherwise stated each sample shall be tested individually for
all the requirements and test results reported in accordance with
IS : 2386 ( Parts 1 to 8 )-1963*.
*For titles of the variousparts of IS : 2386, see page 12.
11
IS : 2430 - 1986
Titles of Various Parts of IS : 2&%X
IS : 2386 ( Part 1 )-I963
IS : 2386 (Part 2 )-1963
IS : 2386 ( Part 3 )-I963
IS : 2386 ( Part 4 )-I963
IS : 2386 ( Part 5 )-I963
IS : 2386 ( Part 6 )-1963
IS : 2386 ( Part 7 )-1963
IS : 2386 ( Part 8 )-1963
Methods of test for aggregates for concrete: Part 1 Particle
size and shape
Methods of test for aggregates for concrete: Part 2 Estimation
of deleterious materials and organic impurities
Methods of test for aggregates for concrete: Part 3 Specific
gravity, density, voids, absorption and bulking
Methods of test for aggregates for concrete: Part 4 Mechani-
cal properties
Methods of test for aggregates for concrc te: Part 5 Soundness
Methods of test for aggregates for concrete: Part 6 Measuring
mortar making properties of fine aggregate
Methods of test for aggregates for concrete: Part 7 Alkali
aggregate reactivity
Methods of test for aggregates for concrete: Part 8 Petro-
graphic examination
12
6lJREtiU OF INDIAN STANDARDS
Headquarters :
Manak Bhavan, 9 Bahadur Shah Zafar Marg. NEW DELHI 110002
Telephones : 331 01 31 Telegrams : Manaksansthe
331 13 75 (Common to all Offices)
Telephone
I
331 01 31
 331 1375
37 86 62
Regional Offices :
Central : Manak Bhavan, 9, Bahadur Shah Zafar Marg.
NEW DELHI 110002
l Eastern : l/l4 C.I.T. Scheme VII M,
V.I.P. Road, Maniktola. CALCUTTA 700054
Northern : SC0 445-446, Sector 35-C, CHANDIGARH 160036
Southern
t Western
: C.I.T. Campus, IV Cross Road, MADRAS 600113
: Manakalaya, E9 MIDC. Marol. Andheri (East),
BOMBAY 400093
Branch Offices :
‘Pushpak’, Nurmohamed Shaikh Marg. Khanpur, AHMADABAD 380001
t Peenya Industrial Area, 1st Stage, Bangalore-Tumkur Road,
BANGALORE 560058
Gangotri Complex, 5th Floor, Bhadbhada Road, T.T. Nagar. 55 40 21
BHOPAL 462003
Plot No, 82/83, Lewis Road, BHUBANESHWAR 751002 5 36 27
Kalai Kathir Bullding, 6/48-A Avanasi Road, COIMBATORE 641037 2 67 05
Quality Marking Centre. N.H. IV. N.I.T., FARIDABAD 121001 -
Savitri Complex, 116 G. T. Road, GHAZIABAD 201001 8-71 19 96
5315 Ward No. 29, R.G. Barua Road, 5th Bv-lane. 3 31 77
GUWAHATI 781003
58-56C L. N. Gupta Marg. ( Nampally Station Road )
HYDERABAD 500001
R14 Yudhister Marg, C Scheme. JAlPUR 302005 *
117/418 B Sarvodaya Nagar, KANPUR 208005
Plot No. A-9, House No. 561/63. Sindhu Nagar, Kanpur Roaa
LUCKNOW 226005
Patliputra Industrial Estate, PATNA 800013
Distnct Industries Centre Complex. Bagh-e-Ali Maidan.
SRINAGAR 190011
T. C. No. 14/1421. University P. O., Palayam.
THIRUVANANTHAPURAM 695034
Inspection Offices (With Sale Point) :
Pushpanjali. First Floor, 205-A West High Court Road.
Shankar Nagar Square, NAGPUR 440010
Institution of Engineers (India) Building. 1332 Shivaji Nagar.
PUNE 411005
21843
41 29 16
6 32 92 95
2 63 48
39 49 55
231083
6 34 71
21 68 76
5 56 07
6 2, 05
-
6 21 04
52 51 71
5 24 35
‘Sales Office Calcutta is at 5 Chowringhea Approach.
P. 0. Princep Street, CALCUTTA
t Sales Office is.at Novelty Chambers, Grant Road, BOMBAY
2 Sales. Office isat Unity Building, Narasimharaja Square,
BANGALORE
27 68 00
89 65 28
2239 71
Reprography Unit, BIS, New Delhi, India

Más contenido relacionado

La actualidad más candente

Material testing-lab-manual PRC I manual
Material  testing-lab-manual PRC I manualMaterial  testing-lab-manual PRC I manual
Material testing-lab-manual PRC I manualShahzad Ali
 
FDR Mix Design
FDR Mix DesignFDR Mix Design
FDR Mix Designciviloscar
 
Statistical modeling to forecast the strength of concrete using accelerated c...
Statistical modeling to forecast the strength of concrete using accelerated c...Statistical modeling to forecast the strength of concrete using accelerated c...
Statistical modeling to forecast the strength of concrete using accelerated c...eSAT Journals
 
04-Superpave Binder Testing ( Highway and Airport Engineering Dr. Sherif El-B...
04-Superpave Binder Testing ( Highway and Airport Engineering Dr. Sherif El-B...04-Superpave Binder Testing ( Highway and Airport Engineering Dr. Sherif El-B...
04-Superpave Binder Testing ( Highway and Airport Engineering Dr. Sherif El-B...Hossam Shafiq I
 
The Effect of Temperature and Rock Permeability on Oil-Water Relative Permeab...
The Effect of Temperature and Rock Permeability on Oil-Water Relative Permeab...The Effect of Temperature and Rock Permeability on Oil-Water Relative Permeab...
The Effect of Temperature and Rock Permeability on Oil-Water Relative Permeab...IJERA Editor
 
Column in gas chromatography
Column in gas chromatographyColumn in gas chromatography
Column in gas chromatographyKomalShambharakar
 
IRJET- Meliorate Strength of Concrete by using Fly Ash
IRJET-  	  Meliorate Strength of Concrete by using Fly AshIRJET-  	  Meliorate Strength of Concrete by using Fly Ash
IRJET- Meliorate Strength of Concrete by using Fly AshIRJET Journal
 
Durability Studies on Geopolymer Concrete using Ground Granulated Blast Furna...
Durability Studies on Geopolymer Concrete using Ground Granulated Blast Furna...Durability Studies on Geopolymer Concrete using Ground Granulated Blast Furna...
Durability Studies on Geopolymer Concrete using Ground Granulated Blast Furna...IRJET Journal
 
Selection Of Column For Gas Chromatography
Selection Of Column For Gas Chromatography Selection Of Column For Gas Chromatography
Selection Of Column For Gas Chromatography Zohaib HUSSAIN
 
Corrosion inhibitor compatibility with other chemicals
Corrosion inhibitor compatibility with other chemicalsCorrosion inhibitor compatibility with other chemicals
Corrosion inhibitor compatibility with other chemicalsSanjeev Saraf
 
Numerical modelling of two types of MBR
Numerical modelling of two types of MBRNumerical modelling of two types of MBR
Numerical modelling of two types of MBRNicolas Ratkovich
 
Asphalt Binders Used in Mongolia in the view of Superpave Specification,jul...
Asphalt Binders Used  in Mongolia in the view of  Superpave Specification,jul...Asphalt Binders Used  in Mongolia in the view of  Superpave Specification,jul...
Asphalt Binders Used in Mongolia in the view of Superpave Specification,jul...Bayar Tsend
 

La actualidad más candente (20)

Material testing-lab-manual PRC I manual
Material  testing-lab-manual PRC I manualMaterial  testing-lab-manual PRC I manual
Material testing-lab-manual PRC I manual
 
FDR Mix Design
FDR Mix DesignFDR Mix Design
FDR Mix Design
 
Summary and data sheet lab
Summary and data sheet labSummary and data sheet lab
Summary and data sheet lab
 
2386 2
2386 22386 2
2386 2
 
Statistical modeling to forecast the strength of concrete using accelerated c...
Statistical modeling to forecast the strength of concrete using accelerated c...Statistical modeling to forecast the strength of concrete using accelerated c...
Statistical modeling to forecast the strength of concrete using accelerated c...
 
04-Superpave Binder Testing ( Highway and Airport Engineering Dr. Sherif El-B...
04-Superpave Binder Testing ( Highway and Airport Engineering Dr. Sherif El-B...04-Superpave Binder Testing ( Highway and Airport Engineering Dr. Sherif El-B...
04-Superpave Binder Testing ( Highway and Airport Engineering Dr. Sherif El-B...
 
The Effect of Temperature and Rock Permeability on Oil-Water Relative Permeab...
The Effect of Temperature and Rock Permeability on Oil-Water Relative Permeab...The Effect of Temperature and Rock Permeability on Oil-Water Relative Permeab...
The Effect of Temperature and Rock Permeability on Oil-Water Relative Permeab...
 
2386 3
2386 32386 3
2386 3
 
ct0019
ct0019ct0019
ct0019
 
Column in gas chromatography
Column in gas chromatographyColumn in gas chromatography
Column in gas chromatography
 
IRJET- Meliorate Strength of Concrete by using Fly Ash
IRJET-  	  Meliorate Strength of Concrete by using Fly AshIRJET-  	  Meliorate Strength of Concrete by using Fly Ash
IRJET- Meliorate Strength of Concrete by using Fly Ash
 
Cold mix asphalt
Cold mix asphaltCold mix asphalt
Cold mix asphalt
 
Durability Studies on Geopolymer Concrete using Ground Granulated Blast Furna...
Durability Studies on Geopolymer Concrete using Ground Granulated Blast Furna...Durability Studies on Geopolymer Concrete using Ground Granulated Blast Furna...
Durability Studies on Geopolymer Concrete using Ground Granulated Blast Furna...
 
Ijmet 10 01_145
Ijmet 10 01_145Ijmet 10 01_145
Ijmet 10 01_145
 
silica gel for column chromatography mesh size
silica gel for column chromatography mesh sizesilica gel for column chromatography mesh size
silica gel for column chromatography mesh size
 
Selection Of Column For Gas Chromatography
Selection Of Column For Gas Chromatography Selection Of Column For Gas Chromatography
Selection Of Column For Gas Chromatography
 
Corrosion inhibitor compatibility with other chemicals
Corrosion inhibitor compatibility with other chemicalsCorrosion inhibitor compatibility with other chemicals
Corrosion inhibitor compatibility with other chemicals
 
Numerical modelling of two types of MBR
Numerical modelling of two types of MBRNumerical modelling of two types of MBR
Numerical modelling of two types of MBR
 
Astm
AstmAstm
Astm
 
Asphalt Binders Used in Mongolia in the view of Superpave Specification,jul...
Asphalt Binders Used  in Mongolia in the view of  Superpave Specification,jul...Asphalt Binders Used  in Mongolia in the view of  Superpave Specification,jul...
Asphalt Binders Used in Mongolia in the view of Superpave Specification,jul...
 

Destacado (8)

5751
57515751
5751
 
875 2
875 2875 2
875 2
 
1200 11
1200 111200 11
1200 11
 
875 4
875 4875 4
875 4
 
1791
17911791
1791
 
6441 6
6441 66441 6
6441 6
 
457
457457
457
 
10297
1029710297
10297
 

Similar a 2430

Soil investigation jda_13_194
Soil investigation jda_13_194Soil investigation jda_13_194
Soil investigation jda_13_194Ahmed Abbas
 
Coal quality sampling &; preparation as per indian standard
Coal quality  sampling &; preparation as per indian standardCoal quality  sampling &; preparation as per indian standard
Coal quality sampling &; preparation as per indian standardprakash deshmukh
 
InspectionSamplingProceduresFineCoarseAggregates.pdf
InspectionSamplingProceduresFineCoarseAggregates.pdfInspectionSamplingProceduresFineCoarseAggregates.pdf
InspectionSamplingProceduresFineCoarseAggregates.pdfRiSovannaphumi
 
DETERMINATION OF STRENGTH OF SOIL AND ITS STABILITY USING NON DESTRUCTIVE TESTS
DETERMINATION OF STRENGTH OF SOIL AND ITS STABILITY USING NON DESTRUCTIVE TESTSDETERMINATION OF STRENGTH OF SOIL AND ITS STABILITY USING NON DESTRUCTIVE TESTS
DETERMINATION OF STRENGTH OF SOIL AND ITS STABILITY USING NON DESTRUCTIVE TESTSIRJET Journal
 
IRJET- Self-Compacting Concrete - Procedure and Mix Design
IRJET-  	  Self-Compacting Concrete - Procedure and Mix DesignIRJET-  	  Self-Compacting Concrete - Procedure and Mix Design
IRJET- Self-Compacting Concrete - Procedure and Mix DesignIRJET Journal
 
A Laboratory Study on Soil Reinforced with Fly Ash Columns with and without E...
A Laboratory Study on Soil Reinforced with Fly Ash Columns with and without E...A Laboratory Study on Soil Reinforced with Fly Ash Columns with and without E...
A Laboratory Study on Soil Reinforced with Fly Ash Columns with and without E...IRJET Journal
 
Soil Test and Surveys
Soil Test and SurveysSoil Test and Surveys
Soil Test and SurveysJerome Jaime
 
Transportation-Engg.-LABORATORY_MANUAL.pdf
Transportation-Engg.-LABORATORY_MANUAL.pdfTransportation-Engg.-LABORATORY_MANUAL.pdf
Transportation-Engg.-LABORATORY_MANUAL.pdfRESHMAFEGADE
 
EXPERIMENTAL INVESTIGATION ON CONCRETE USING RECYCLED COARSE AGGREGATE
EXPERIMENTAL INVESTIGATION ON CONCRETE USING RECYCLED COARSE AGGREGATEEXPERIMENTAL INVESTIGATION ON CONCRETE USING RECYCLED COARSE AGGREGATE
EXPERIMENTAL INVESTIGATION ON CONCRETE USING RECYCLED COARSE AGGREGATEIRJET Journal
 

Similar a 2430 (20)

6441 2
6441 26441 2
6441 2
 
6441 9
6441 96441 9
6441 9
 
2386 1
2386 12386 1
2386 1
 
2386 6
2386 62386 6
2386 6
 
516
516516
516
 
Soil investigation jda_13_194
Soil investigation jda_13_194Soil investigation jda_13_194
Soil investigation jda_13_194
 
1199
11991199
1199
 
Napesco Geotechnical Service Profile
Napesco Geotechnical Service ProfileNapesco Geotechnical Service Profile
Napesco Geotechnical Service Profile
 
Coal quality sampling &; preparation as per indian standard
Coal quality  sampling &; preparation as per indian standardCoal quality  sampling &; preparation as per indian standard
Coal quality sampling &; preparation as per indian standard
 
InspectionSamplingProceduresFineCoarseAggregates.pdf
InspectionSamplingProceduresFineCoarseAggregates.pdfInspectionSamplingProceduresFineCoarseAggregates.pdf
InspectionSamplingProceduresFineCoarseAggregates.pdf
 
DETERMINATION OF STRENGTH OF SOIL AND ITS STABILITY USING NON DESTRUCTIVE TESTS
DETERMINATION OF STRENGTH OF SOIL AND ITS STABILITY USING NON DESTRUCTIVE TESTSDETERMINATION OF STRENGTH OF SOIL AND ITS STABILITY USING NON DESTRUCTIVE TESTS
DETERMINATION OF STRENGTH OF SOIL AND ITS STABILITY USING NON DESTRUCTIVE TESTS
 
IRJET- Self-Compacting Concrete - Procedure and Mix Design
IRJET-  	  Self-Compacting Concrete - Procedure and Mix DesignIRJET-  	  Self-Compacting Concrete - Procedure and Mix Design
IRJET- Self-Compacting Concrete - Procedure and Mix Design
 
A Laboratory Study on Soil Reinforced with Fly Ash Columns with and without E...
A Laboratory Study on Soil Reinforced with Fly Ash Columns with and without E...A Laboratory Study on Soil Reinforced with Fly Ash Columns with and without E...
A Laboratory Study on Soil Reinforced with Fly Ash Columns with and without E...
 
6923
69236923
6923
 
Soil Test and Surveys
Soil Test and SurveysSoil Test and Surveys
Soil Test and Surveys
 
Transportation-Engg.-LABORATORY_MANUAL.pdf
Transportation-Engg.-LABORATORY_MANUAL.pdfTransportation-Engg.-LABORATORY_MANUAL.pdf
Transportation-Engg.-LABORATORY_MANUAL.pdf
 
EXPERIMENTAL INVESTIGATION ON CONCRETE USING RECYCLED COARSE AGGREGATE
EXPERIMENTAL INVESTIGATION ON CONCRETE USING RECYCLED COARSE AGGREGATEEXPERIMENTAL INVESTIGATION ON CONCRETE USING RECYCLED COARSE AGGREGATE
EXPERIMENTAL INVESTIGATION ON CONCRETE USING RECYCLED COARSE AGGREGATE
 
383.pdf
383.pdf383.pdf
383.pdf
 
383
383383
383
 
2386 8
2386 82386 8
2386 8
 

Más de Boopathi Yoganathan (20)

28-5.21 Company Profile of Pyrmaid structural consultant.pptx
28-5.21 Company Profile of Pyrmaid structural consultant.pptx28-5.21 Company Profile of Pyrmaid structural consultant.pptx
28-5.21 Company Profile of Pyrmaid structural consultant.pptx
 
Front page upto content new
Front page upto content newFront page upto content new
Front page upto content new
 
Book report new
Book report newBook report new
Book report new
 
Fem
FemFem
Fem
 
Exopy injection
Exopy injectionExopy injection
Exopy injection
 
Embedded
EmbeddedEmbedded
Embedded
 
Earthquakes seminar
Earthquakes seminarEarthquakes seminar
Earthquakes seminar
 
10334
1033410334
10334
 
10302
1030210302
10302
 
9527 1
9527 19527 1
9527 1
 
9459
94599459
9459
 
9456
94569456
9456
 
9429
94299429
9429
 
9417
94179417
9417
 
7873
78737873
7873
 
7563
75637563
7563
 
7500
75007500
7500
 
7436 2
7436 27436 2
7436 2
 
7436 1
7436 17436 1
7436 1
 
7251
72517251
7251
 

Último

Student Profile Sample - We help schools to connect the data they have, with ...
Student Profile Sample - We help schools to connect the data they have, with ...Student Profile Sample - We help schools to connect the data they have, with ...
Student Profile Sample - We help schools to connect the data they have, with ...Seán Kennedy
 
ENGLISH6-Q4-W3.pptxqurter our high choom
ENGLISH6-Q4-W3.pptxqurter our high choomENGLISH6-Q4-W3.pptxqurter our high choom
ENGLISH6-Q4-W3.pptxqurter our high choomnelietumpap1
 
Barangay Council for the Protection of Children (BCPC) Orientation.pptx
Barangay Council for the Protection of Children (BCPC) Orientation.pptxBarangay Council for the Protection of Children (BCPC) Orientation.pptx
Barangay Council for the Protection of Children (BCPC) Orientation.pptxCarlos105
 
How to do quick user assign in kanban in Odoo 17 ERP
How to do quick user assign in kanban in Odoo 17 ERPHow to do quick user assign in kanban in Odoo 17 ERP
How to do quick user assign in kanban in Odoo 17 ERPCeline George
 
Keynote by Prof. Wurzer at Nordex about IP-design
Keynote by Prof. Wurzer at Nordex about IP-designKeynote by Prof. Wurzer at Nordex about IP-design
Keynote by Prof. Wurzer at Nordex about IP-designMIPLM
 
Transaction Management in Database Management System
Transaction Management in Database Management SystemTransaction Management in Database Management System
Transaction Management in Database Management SystemChristalin Nelson
 
AUDIENCE THEORY -CULTIVATION THEORY - GERBNER.pptx
AUDIENCE THEORY -CULTIVATION THEORY -  GERBNER.pptxAUDIENCE THEORY -CULTIVATION THEORY -  GERBNER.pptx
AUDIENCE THEORY -CULTIVATION THEORY - GERBNER.pptxiammrhaywood
 
Inclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdf
Inclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdfInclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdf
Inclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdfTechSoup
 
Culture Uniformity or Diversity IN SOCIOLOGY.pptx
Culture Uniformity or Diversity IN SOCIOLOGY.pptxCulture Uniformity or Diversity IN SOCIOLOGY.pptx
Culture Uniformity or Diversity IN SOCIOLOGY.pptxPoojaSen20
 
GRADE 4 - SUMMATIVE TEST QUARTER 4 ALL SUBJECTS
GRADE 4 - SUMMATIVE TEST QUARTER 4 ALL SUBJECTSGRADE 4 - SUMMATIVE TEST QUARTER 4 ALL SUBJECTS
GRADE 4 - SUMMATIVE TEST QUARTER 4 ALL SUBJECTSJoshuaGantuangco2
 
Like-prefer-love -hate+verb+ing & silent letters & citizenship text.pdf
Like-prefer-love -hate+verb+ing & silent letters & citizenship text.pdfLike-prefer-love -hate+verb+ing & silent letters & citizenship text.pdf
Like-prefer-love -hate+verb+ing & silent letters & citizenship text.pdfMr Bounab Samir
 
4.16.24 21st Century Movements for Black Lives.pptx
4.16.24 21st Century Movements for Black Lives.pptx4.16.24 21st Century Movements for Black Lives.pptx
4.16.24 21st Century Movements for Black Lives.pptxmary850239
 
Judging the Relevance and worth of ideas part 2.pptx
Judging the Relevance  and worth of ideas part 2.pptxJudging the Relevance  and worth of ideas part 2.pptx
Judging the Relevance and worth of ideas part 2.pptxSherlyMaeNeri
 
Grade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdf
Grade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdfGrade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdf
Grade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdfJemuel Francisco
 
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptx
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptxMULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptx
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptxAnupkumar Sharma
 
Global Lehigh Strategic Initiatives (without descriptions)
Global Lehigh Strategic Initiatives (without descriptions)Global Lehigh Strategic Initiatives (without descriptions)
Global Lehigh Strategic Initiatives (without descriptions)cama23
 

Último (20)

Student Profile Sample - We help schools to connect the data they have, with ...
Student Profile Sample - We help schools to connect the data they have, with ...Student Profile Sample - We help schools to connect the data they have, with ...
Student Profile Sample - We help schools to connect the data they have, with ...
 
ENGLISH6-Q4-W3.pptxqurter our high choom
ENGLISH6-Q4-W3.pptxqurter our high choomENGLISH6-Q4-W3.pptxqurter our high choom
ENGLISH6-Q4-W3.pptxqurter our high choom
 
Barangay Council for the Protection of Children (BCPC) Orientation.pptx
Barangay Council for the Protection of Children (BCPC) Orientation.pptxBarangay Council for the Protection of Children (BCPC) Orientation.pptx
Barangay Council for the Protection of Children (BCPC) Orientation.pptx
 
How to do quick user assign in kanban in Odoo 17 ERP
How to do quick user assign in kanban in Odoo 17 ERPHow to do quick user assign in kanban in Odoo 17 ERP
How to do quick user assign in kanban in Odoo 17 ERP
 
Keynote by Prof. Wurzer at Nordex about IP-design
Keynote by Prof. Wurzer at Nordex about IP-designKeynote by Prof. Wurzer at Nordex about IP-design
Keynote by Prof. Wurzer at Nordex about IP-design
 
Transaction Management in Database Management System
Transaction Management in Database Management SystemTransaction Management in Database Management System
Transaction Management in Database Management System
 
AUDIENCE THEORY -CULTIVATION THEORY - GERBNER.pptx
AUDIENCE THEORY -CULTIVATION THEORY -  GERBNER.pptxAUDIENCE THEORY -CULTIVATION THEORY -  GERBNER.pptx
AUDIENCE THEORY -CULTIVATION THEORY - GERBNER.pptx
 
Inclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdf
Inclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdfInclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdf
Inclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdf
 
Culture Uniformity or Diversity IN SOCIOLOGY.pptx
Culture Uniformity or Diversity IN SOCIOLOGY.pptxCulture Uniformity or Diversity IN SOCIOLOGY.pptx
Culture Uniformity or Diversity IN SOCIOLOGY.pptx
 
FINALS_OF_LEFT_ON_C'N_EL_DORADO_2024.pptx
FINALS_OF_LEFT_ON_C'N_EL_DORADO_2024.pptxFINALS_OF_LEFT_ON_C'N_EL_DORADO_2024.pptx
FINALS_OF_LEFT_ON_C'N_EL_DORADO_2024.pptx
 
Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
 
YOUVE_GOT_EMAIL_PRELIMS_EL_DORADO_2024.pptx
YOUVE_GOT_EMAIL_PRELIMS_EL_DORADO_2024.pptxYOUVE_GOT_EMAIL_PRELIMS_EL_DORADO_2024.pptx
YOUVE_GOT_EMAIL_PRELIMS_EL_DORADO_2024.pptx
 
GRADE 4 - SUMMATIVE TEST QUARTER 4 ALL SUBJECTS
GRADE 4 - SUMMATIVE TEST QUARTER 4 ALL SUBJECTSGRADE 4 - SUMMATIVE TEST QUARTER 4 ALL SUBJECTS
GRADE 4 - SUMMATIVE TEST QUARTER 4 ALL SUBJECTS
 
Like-prefer-love -hate+verb+ing & silent letters & citizenship text.pdf
Like-prefer-love -hate+verb+ing & silent letters & citizenship text.pdfLike-prefer-love -hate+verb+ing & silent letters & citizenship text.pdf
Like-prefer-love -hate+verb+ing & silent letters & citizenship text.pdf
 
4.16.24 21st Century Movements for Black Lives.pptx
4.16.24 21st Century Movements for Black Lives.pptx4.16.24 21st Century Movements for Black Lives.pptx
4.16.24 21st Century Movements for Black Lives.pptx
 
Judging the Relevance and worth of ideas part 2.pptx
Judging the Relevance  and worth of ideas part 2.pptxJudging the Relevance  and worth of ideas part 2.pptx
Judging the Relevance and worth of ideas part 2.pptx
 
Grade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdf
Grade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdfGrade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdf
Grade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdf
 
LEFT_ON_C'N_ PRELIMS_EL_DORADO_2024.pptx
LEFT_ON_C'N_ PRELIMS_EL_DORADO_2024.pptxLEFT_ON_C'N_ PRELIMS_EL_DORADO_2024.pptx
LEFT_ON_C'N_ PRELIMS_EL_DORADO_2024.pptx
 
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptx
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptxMULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptx
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptx
 
Global Lehigh Strategic Initiatives (without descriptions)
Global Lehigh Strategic Initiatives (without descriptions)Global Lehigh Strategic Initiatives (without descriptions)
Global Lehigh Strategic Initiatives (without descriptions)
 

2430

  • 1. yr --____--_~_ IS : 2430-1986 Indian Standard METHODS FOR SAMPLING OF AGGREGATES FOR CONCRETE ( First Revision Third Reprint SEPTEMBER 1993 UDC 666.972.12:620.113 @ Copyfight1987 BUREAU OF INDIAN STANDARD S MANAKBHAVAN, 9 BAHADUFt SHAH ZAFARMARG NEW DELHI 110002 Gr3 3wu 1987 ( Reaffirmed 1995 )
  • 2. IS:2430-1986 Indian Standard METHODS FOR SAMPLING OF AGGREGATES FOR CONCRETE ( First Revision ) Building Materials and Components Sampling Sectional Committee, BDC 31 Chairman DR MOEAN RAI Members Represrnling Central Building Research Institute ( CSIR ), Roorkee SIiRIS. K. Goswanr ( Al&safe to Dr Mohan Rai ) SHRI S. K. BANERJEE National Test House, Calcutta DR P. Ray CHAUDRURI Centgralhyd Research Institute ( CSIR ), New SBRI L. A. GOKHALE Mini~;iykXwTransport, Department of Railways, Sam B. K. JAIN ( Alfrmutr ) SHRI S. C. KUYAR Development Commiuioner, Small Scale Industries. New Delhi SHRI K. V. K. RAJU ( Allrmare ) SHRI M. V. LAKSF~XANASAMY Indian Statistical Institute, Calcutta DR A. G. MADHAVA RAO Struc;;;iaFineering Research Centre ( CSIR ), SHRI D. S. RAYACHANDRA MURTHY ( Alinnate ) SHRI J. P. MAIKWRI SHRI P. P. SAXENA ( Akrrnatc ) Export Inspection Council of India, New Delhi DR A. K. MULLICK Nati~$“,t$l for Cement and Building Materiala, e SHRI K. H. BABU ( Alternate ) SERI S. S. RAJPUT SRRIK.S. SRINIVASAN Forest Research Institute and Colleges. Dehra Dun National Buildings Organization, New Delhi SHRI T. R. BHATIA ( Akmutr ) SHRI N. VEERABADHU SHRI S. B. JAISWAL ( Aftrrnotc ) Central Public Worka Department, New Delhi SHRI G. VENXATESULU Ministry of Shipping and Transport, New Delhi SHRI PRAFULLA KUMAB ( Afternate ) SHRX G. W. DATEY, Director General, BIS ( Ero@cio Mmbn ) Director ( Stat: ) SIcretafy SYT ANDPAM GUPTA Deputy Director ( Stat ), BIS @ Cowight 1987 BUREAU OF INDIAN STANDARDS This publication is protected under the Indian Co@yriiht Act ( XIV of 1957) and reproduction in whole or in part by any means except with written permission of the publisher shall be deemed to be an infringement of copyright under the said Art.
  • 3. IS : 2430- 1986 Indian Standard METHODS FOR SAMPLING OF AGGREGATES FOR CONCRETE ( First Revision 0. FOREWORD 0.1 This Indian Standard ( First Revision ) was adopted by the Indian Standards Institution on 28 November 1986, after the draft finalized by the Building Materials and Components Sampling Sectional Committee had been approved by the Civil Engineering Division Council. 0.2 Sampling is of equal importance to testing and a man drawing samples shall use every precaution to obtain samples that will show the true nature and condition of the materials which they represent. 0.3 One of the major contributing factors to the quality of concrete is the quality of aggregates used therein. It is, therefore, imperative that due consideration is given to sampling procedures which will help in the proper and objective evaluation of the quality of aggregates. 0.4 This standard was originally issued in 1969. This has been revised so as to make it more easily implementable in practice and bring it in line with the current national and international trade practices. [ In this revised version, the weight of the gross sample and number of increments have been modified so that it may be more economical to use them in practice.] 0.5 In preparing this standard, assistance has been derived from the following publications: ASTM/D 75-1982 Standard practice for sampling aggregates ISO/DIS 4847 Concrete - Sampling of normal weight aggregates. 0.6 For reporting the results of a test or analysis, if the final value, observed or calculated, is to be rounded off, it shall be done in accordance with IS : 2-1960*. *Ruler for rounding off numerical values ( rsckad ). 2
  • 4. E.,-..r I.._. - ._._ I___. “_._.. IS : 2430 - 1986 1. SCOPE 1.1 This standard prescribes the methods of sampling for coarse and fine aggregates for the following purposes: a) PreIiminary investigation of source of suppl’y, b) Inspection of shipment of materials, and c) Inspection of materials on the site of work. 1.2 This standard also specifies methods of sample reduction, packing and forwarding them for examination and testing. 2. TERMINOLOGY 2.0 For the purpose of this standard, the following definitions shall apply- 2.1 Aggregates - Crushed stone, crushed boulders, gravel, sand, industrial by-products or such other inert material. 2.2 Fine Aggregates - Aggregates most of which pass thtough 4’75 mm IS Sieve. 2.2.1 Natural Sand - Fine aggregates resulting from the natural disintegration of rock and which have been deposited by streams or glacial agencies. 2.2.2 Crushed Stone Sand - Fine a’ggregates produced by crushing hard stone. 2.2.3 Crushed Gravel Sand - Fine aggregates produced by crushing natural gravel. 2.3 Coarse Aggregates - Aggregates most of which are retained on 4’75 mm IS Sieve. 2.4 All-in Aggregates - Material composed of fine aggregates and coarse aggregates. 2.5 Lot - The quantity of aggregates of the same class, nominal size, source and offered for inspection at one time. The lot may consist of the whole or a part of the quantity ordered for. 2.6 Sub-lot - The quantity of aggregates in each of the parts into which a lot is divided for the purpose of sampling. As far as possible sub-lots should be of equal size. 2.7 Increment - The quantity of aggregates obtained by a sampling device at one time. 2.8 Unit Sample - The quantity of aggregates collected at one point in sectional -ampling or at one time from the conveyor. 3
  • 5. IS : 2430 - 1986 2.9 Gross Sample - Sample as collected from a sub-lot, that is, the quantity of aggregates consisting of one Or several increments or unit samples taken from a sub-lot. 2.10 Laboratory Sample - The quantity of aggregates obtained by reducing a gross sample following a specified procedure and intended for laboratory testing. 2.11 Composite Sample ( for the Lot ) - The quantity of aggregates obtained by mixing together equal quantities from each of the laboratory samples. 3. SAMPLING FOR PRELIMINARY INVESTIGATION OF SOURCE OF SUPPLY 3.1 Stone from Ledges for Quarries 3.1.1 The ledge or quarry face of the stone shall be inspected to determine any discernible variations or strata. Differences in colour and texture shall be observed. 3.1.2 Separate samples having a mass of at least 25 kg of stone should be obtained from each discernible strata. The sample should not include material weathered to such an extent that it is no longer useful for the purpose intended. 3.2 Field Stone and Boulders 3.i.l A detailed inspection of the deposits of field stone and boulders, over the area from where the supply is to be obtained, shall be made. The different kinds of stone and their condition in various deposits shall be recorded. 3.2.2 Separate samples shall be selected of all classes of stone that visual examination indicates would be considered for use in construction. These individual samples shall weigh at least 25 kg each. 3.3 Sand and Gravel ( Road Side, Bank Run Sand and Gravel Deposits ) 3.3.1 Road side production is the production of materials with portable or semi-portable crushing, screening, or washing plants estab- lished or reopened in the vicinity of the work on a designated project for the purpose of supplying materials for that project. 3.3.2 Potential sources of bank run sand may include previously worked pits from which there is an exposed face or potential deposits discovered through air-photq, interpretation, geo-physical exploration or other types of investigation. 3.3.3 Samples shall be so chosen from each of the different strata in the deposit discernible to the sampler. An estimate of the quantity of different materials shall be made. 1
  • 6. IS : 2430 - 1986 3.3.4 If the deposit is worked as an open-face bank or pit, the sample shall be taken by channelling the face vertically, top to bottom, so as to represent the materials proposed for use. Over-burden and disturbed material shall not be included in the sample. Test holes shall be excavated or drilled at numerous locations in the deposit to determine quality of material and the extent of the deposit ljeyocd the exposed face, if any. The number and depth of these lest holes will depend upon the quantity of the materia1 to be used, topography of the area, nature of the deposit, character of the material and potential value of the material in the deposit. Separate samI>les shall be obtained from the face of the bank and from test holes. If visual inspection indicates that there is considerable variation in material, indivii;ual samples shall be selected from the material in each well defined stratum. Each sample shall be thoroughly mixed and quartered, if necessary, so that the.gross sample obtained wail be of at least 12 kg for sand and 33 kg If the deposit contains an appreciable amount of coarse aggregates. If the deposit being in,estiqated does not have an open face, sample shall be obtained entirely from test holes as outlined herein. 4. SAMPLING FOR INSPECTION OF SHIPMENT OF MATERIALS AND OF MATERIALS ON THE SITE OF WORK 4.1 The samples shall be selected and examined from each lot ( see 2.5 ) separately. 4.1.1 For obtaining reliable conclusions, it is recommended that as far as possible aggregates be sampled when in motion, that is, from conveyors or during loading and unloading, 4.2 Sampling from Conveyors 4.2.1 Sub-lots - For the purpose of sampling a lot, while it is being discharged over a conveyor, shall be divided into a number of sub-lots of approximately equal size as specified in Table 1. TABLE 1 NUMBER OF SUB-LOTS INTO WHICH A LOT IS TO BE DIVIDED ( Clauses4.2.1, 4.3.1 and 4.4.3 ) LOT STZE No. OF SrjB-LOTS (md) (1) (2) 101 to 500 3 501 to 1 500 5 I 501 to 5 000 7 NOTE - In case the lot contains 100 ms or less of aggregates, the sampling shall be subject to agreement between the purchaser and the supplier. 5
  • 7. IS :2430- 1986 4.2.1.1 A representative gross sample shall be drawn from each of the sub-lots and shall be kept separately. Thus there will be as many gross samples as the number of sub-lots into which the lot has been divided. 4.2.2 The weight of the grocs sample shall depend on the maximum nominal size of aggregates and shall be according to Table 2. In order to obtain this weight of gross sample, at least 10 increments of a suitable weight, each not less than 1 kg, shall be taken. Increments shall be taken with the help of a suitable scoop ( see Fig. 1 ) at regular intervals. TABLE 2 WEIGHT OF GROSS SAMPLE M_cama NOMINAL SIZE OF MINIMUMWEIGHT OF AGGREGATES (mm) 2.36 475 9.5 10'0 12-5 13’2 l&O 19.0 20’0 251) 37.5 40.0 50.0 63.0 75.0 80’0 90’0 GROSSSA~~PLE ( kg ) Fine Aggregates 10 10 Coarse’Aggregates 10 10 15 15 20 25 25 50 75 80 100 125 150 160 175 NOTE 1 - For aggregates, the maximum nominal size of particles is the largest sieve size upon which any material is permitted to be retained. NOTE 2 -For all-in-aggregates, minimum weight of gross sample shall be the mass of coarse aggregates ( minimum ) plus 10 kg. 6
  • 8. IS:2430-1986 Dimansions ofthe Scoopin mm ~-.--‘-~--h----~~-~ A B c D E ’10 250 250 120 200 300 5 200 200 90 175 240 2 150 150 75 125 180 FIG. 1 SAMPLINGShoop
  • 9. IS : 2430 - 1986 4.2.2.1 The increments shall be taken at equal intervals preferably from the cross section and thickness of the stream in one operation. When the aggregates are in motion, the most reliable means of taking such increments is to sample at a point where the material discharges from the belt. The best possible increment is one which cuts across entirely the falling steam of the material by means of a suitable receptacle passed from one side of the steam to the other without allowing the receptacle to overflow. If the whole of the steam cannot be covered by one increment without overflowing the receptacle, the steam should be sampled systematically by taking material from all portions. 4.2.2.2 If’it is not possible to sample satisfactorily at the point of discharge, increments may be drawn from the moving belt itself. In this case, the increments shall be col1ecte.d from the centre and the left and right side of the belt along the same width. To ensure that very small material is also correctly obtained, a scoop should sweep the conveyor. 4.2.3 The material collected from various increments in a sub-lot shall be combined and mixed together to constitute a gross sample. 4.3 Sampling from Transportation Units ( Wagons, Trucks and Boats ) 4.3.1 Sub-lots - For the purpose of sampling, all the carriers ( wagons/ trucks/boats ) in a lot shall be divided into a suitable number of sub-lots of approximately equal size in accordance with the requirements of Table 1. 4.3.1.1 A representative gross sample shall be drawn from each of the sub-lots and shall be kept separately. Thus, there will be as many gross samples as the number of sub-lots into which a lot has been divided. 4.3.2 In order to get a representative gross sample, the aggregates shall be sampled as far as possible when in motion, during loading or unloading. 4.3.2.1 A minimum of 25 percent of the carriers shall be selected at random from the sub-lot. ‘For the random selection of carriers, the procedure given in 3.1 of IS : 4905-1968” may be followed. Ten increments shall be taken from the selected carriers and a suitable weight of the increment, not less than 1 ks, shall be used SO that a Fross sample of the quantity required m Table 2 is obtained. The Increments shall be evenly distributed over the selected carriers with a *Methods for random sampling. 8
  • 10. IS : 2430 - 1986 view to determine the necessary number of increments that should be ,collected from e&h of the carriers in the sub-lot ‘for making up the grogs sample. These increments shall be drawn with the help of a suitable scoop ( see Fig. 1 ) at regular intervals, at the time of loading or unloading of the carriers. 4.3.3 When the samples are to be collected from the 1Qaded carriers, for collecting ten required increments, an equal number of points shall be located at random on the entire aggregate surface of all the carriers in a sub-lot. At every selected point, an increment shall be collected by the sectional sampling method. 4.3.3.1 Sectional sam/ding - At every selected point an increment shall be collected by taking the whole section of’ aggregates from top to bottom over the area of a circle of 20 cm diameter for aggregates more than 20 mm nominal size. For doing so, aggregate from the surface up to a depth of approximately 45 cm shall be collected at first. The bottom of the hole so formed shall then be covered by a plate and the aggregate lying on the sides shall be removed up to that plate so that, when the hole is dug further, the material from the sides does not fill up the hole by falling down. The procedure is repeated till the bottom is reached. For aggregates up to 20 mm nominal size and fine aggre- gates a sampling auger may be used in a casing pipe of 15 cm diameter and length slightly more than the height of the sub-lot. The casing pipe is pushed vertically down till it touches the bottom of the lot. The entire material from the inside of the ca$ing pipe is removed by the auger to give an increment. 4.3.3.2 In sampling coarse aggregates from loaded carriers effort should be made to enlist’ the services of power equipment capable of exposing the material at various levels and random locations. When power equipment is not available the procedure given in 4.3.3.1 may be followed. 4.4 Sampling from Stacks or Stock Piles 4.4.1 For sampling material from stock piles or stacks, it is very difficult lo ensure unbiased samples, due to the segregation which often occurs when material is stacked, with coarser particles rolling to the outside face of the pile. For coarse or all-in aggregates every effort should be made to procure a power equipment to develop a separate, small sampling pile composed of materials drawn from various levels and locations in the main pile after which several increments may be combined to compose the gross sample. If it is necessary to indicate the degree of variability existing within the main pile, separate samples should be drawn from separate areas of the pile. 4.4.2 Where power equipment is not available, samples from sack piles should be made up of the required number of increments taken 9
  • 11. IS:2430-1986 equally from top third, at the mid point and at the bottom third of the volume of the pile. A board put vertically into the pile just above the sampling point helps in preventing further segregation. In sampling stock piles of the aggregates, the outer layer which may have become segregated, should be removed and the sample taken from the material beneath. 4.4.3 Sub-lots - For the purpose of sampling, the quantity of aggregates in a stack shall be divided into a suitable number of sub-lots of approximately equal size in accordance with Table 1. 4.4.3.1 A representative gross sample shall be drawn f;om each of the sub-lots. Thus there will be as many gross samples as the number of sub-lots into which the lot has been divided. 4.4.4 Sampling of aggregates from stacks shall be carried out as far as possible, during the making ( or breaking ) of the stack. 4.4.4.1 A minimum of ten increments shall be taken from a sub-lot for making up a gross sample. The weight of the gross sample shall be according to Table 2 for various sizes of aggregates. The weight of the increment shall be governed by the weight of the gross simple and minimum number of increments i.e. 10. This weight of increment shall not be less than 1 kg. The number of increments shall be equally distributed over the sub-lot. Increments shall be drawn with the help of a suitable scoop ( see Fig. 1 ) at regular intervals in the course of making or unmaking of the stacks. 4.4.5 When it becomes necessary to sample a stationary stack, trench sampling method ( see 4.4.5.1 and 4.4.5.2 ) may be used. This method is applicable for stacks up to a maximum height of 1’5 m only. 4.4.5.1 The weight of the gross sample shall be according to Tabfe 2 and minimum number of increments from a sub-lot shall be ten. These increments shall be collected according to 4.4.5.2. 4.4.5.2 Along a randomly chosen line on the aggregates surface of the sub-lot, a trench shall be dug right down to the ground level. From the trenches so dug, the required number of increments shall be collected with the help of a suitable sampling scoop ( see Fig. 1 ) at various points randomly spread over the two exposed sides of the trenches. In case of large stacks, in addition to the trench, the sides of the piles may also be opened to expose the aggregates down to the bottom at places where the trench does not expose the aggregates inside. 5. REDUCTION OF GROSS SAMPLE 5.1 Each gross sample shall be reduced separately. The process of mixing and reduction of each gross sample shall be repeated until the material required for each test, as specified in the relevant test method specification, IS : 2386 ( Parts 1 to 8 )-1963* is obtained. *For titles of the various parts of IS : 2386, see page 12. 10
  • 12. L,.,._..“._--_--. I.-_ IS : 2430 - 1986 5.2 Reduction by Riffle Divider - The aggregates shall be well mixed and poured into the riffle. This process shall be repeated using different size riffles according to the size of the aggregates. 5.3 Coning and Quartering Method - The aggregates shall be mixed and then scooped into a cone-shaped pile. Care shall be taken to drop each scoopful exactly over the same spot as otherwise the central axis of the, cone will be slackened and an uneven distribution of the particle sizes will result. After the cone is formed, it shall be flattened by pressing the top of the cone with the smooth surface of the scoop. Then it is cut into quarters by two lines which intersect at right angles at the centre of the cone. The bulk of the sample is reduced by rejecting any two diagonally opposite quarters. Accuracy in quartering is most easily attained, in the case of fine and all-in-aggregates, with damp material. 6. PACKING AND MARKING OF SAMPLES 6.1 Each sample shall be packed separately and despatched to the testing laboratory, great care being taken in packing to prevent the loss of any fine material. 6.1.1 Coarse aggregates shall be packed in secure containers or sample bags. 6.1.2 Fine aggregates and all-in aggregates shall be packed in tight containers or closely woven bags so that there is no loss of the finer particles. 642 Each package shall include a card, suitably protected from damage by moisture and abrasion, giving the name and address of the sender and the information required in 6.2.1. 6.2.1 As much as possible the following information about the origin of the material shall accoinpany each sample: a) Name of the quarry, pit, river-bed, etc, and address; b) Proposed use for the material; and c) Geographic location, and shipping facilities. 7. NUMBER OF TESTS AND REPORTING OF TEST RESULTS 7.1 Unless otherwise stated each sample shall be tested individually for all the requirements and test results reported in accordance with IS : 2386 ( Parts 1 to 8 )-1963*. *For titles of the variousparts of IS : 2386, see page 12. 11
  • 13. IS : 2430 - 1986 Titles of Various Parts of IS : 2&%X IS : 2386 ( Part 1 )-I963 IS : 2386 (Part 2 )-1963 IS : 2386 ( Part 3 )-I963 IS : 2386 ( Part 4 )-I963 IS : 2386 ( Part 5 )-I963 IS : 2386 ( Part 6 )-1963 IS : 2386 ( Part 7 )-1963 IS : 2386 ( Part 8 )-1963 Methods of test for aggregates for concrete: Part 1 Particle size and shape Methods of test for aggregates for concrete: Part 2 Estimation of deleterious materials and organic impurities Methods of test for aggregates for concrete: Part 3 Specific gravity, density, voids, absorption and bulking Methods of test for aggregates for concrete: Part 4 Mechani- cal properties Methods of test for aggregates for concrc te: Part 5 Soundness Methods of test for aggregates for concrete: Part 6 Measuring mortar making properties of fine aggregate Methods of test for aggregates for concrete: Part 7 Alkali aggregate reactivity Methods of test for aggregates for concrete: Part 8 Petro- graphic examination 12
  • 14. 6lJREtiU OF INDIAN STANDARDS Headquarters : Manak Bhavan, 9 Bahadur Shah Zafar Marg. NEW DELHI 110002 Telephones : 331 01 31 Telegrams : Manaksansthe 331 13 75 (Common to all Offices) Telephone I 331 01 31 331 1375 37 86 62 Regional Offices : Central : Manak Bhavan, 9, Bahadur Shah Zafar Marg. NEW DELHI 110002 l Eastern : l/l4 C.I.T. Scheme VII M, V.I.P. Road, Maniktola. CALCUTTA 700054 Northern : SC0 445-446, Sector 35-C, CHANDIGARH 160036 Southern t Western : C.I.T. Campus, IV Cross Road, MADRAS 600113 : Manakalaya, E9 MIDC. Marol. Andheri (East), BOMBAY 400093 Branch Offices : ‘Pushpak’, Nurmohamed Shaikh Marg. Khanpur, AHMADABAD 380001 t Peenya Industrial Area, 1st Stage, Bangalore-Tumkur Road, BANGALORE 560058 Gangotri Complex, 5th Floor, Bhadbhada Road, T.T. Nagar. 55 40 21 BHOPAL 462003 Plot No, 82/83, Lewis Road, BHUBANESHWAR 751002 5 36 27 Kalai Kathir Bullding, 6/48-A Avanasi Road, COIMBATORE 641037 2 67 05 Quality Marking Centre. N.H. IV. N.I.T., FARIDABAD 121001 - Savitri Complex, 116 G. T. Road, GHAZIABAD 201001 8-71 19 96 5315 Ward No. 29, R.G. Barua Road, 5th Bv-lane. 3 31 77 GUWAHATI 781003 58-56C L. N. Gupta Marg. ( Nampally Station Road ) HYDERABAD 500001 R14 Yudhister Marg, C Scheme. JAlPUR 302005 * 117/418 B Sarvodaya Nagar, KANPUR 208005 Plot No. A-9, House No. 561/63. Sindhu Nagar, Kanpur Roaa LUCKNOW 226005 Patliputra Industrial Estate, PATNA 800013 Distnct Industries Centre Complex. Bagh-e-Ali Maidan. SRINAGAR 190011 T. C. No. 14/1421. University P. O., Palayam. THIRUVANANTHAPURAM 695034 Inspection Offices (With Sale Point) : Pushpanjali. First Floor, 205-A West High Court Road. Shankar Nagar Square, NAGPUR 440010 Institution of Engineers (India) Building. 1332 Shivaji Nagar. PUNE 411005 21843 41 29 16 6 32 92 95 2 63 48 39 49 55 231083 6 34 71 21 68 76 5 56 07 6 2, 05 - 6 21 04 52 51 71 5 24 35 ‘Sales Office Calcutta is at 5 Chowringhea Approach. P. 0. Princep Street, CALCUTTA t Sales Office is.at Novelty Chambers, Grant Road, BOMBAY 2 Sales. Office isat Unity Building, Narasimharaja Square, BANGALORE 27 68 00 89 65 28 2239 71 Reprography Unit, BIS, New Delhi, India