8. Range of CEM Flywheel Systems Designs Lab Bearing Amps Flywheel Transformer Rectifier Assembly Lab Safety Disconnect Converter Transit Bus Flywheel 150 kW (peak), 100 kW (cont.), 2 kW-h Advanced Locomotive Propulsion System Flywheel 3 MW (peak), 2 MW (cont.), 100 kW-h Combat Hybrid Power Systems (CHPS) Flywheel 5 MW (peak), 350 kW (cont.), 7 kW-h Space Station Flywheel (FESS) 5.0 kW (peak), 3.66 kW (cont.), 3.66 kW-h
9.
10.
11.
12. Coupon-Level Characterization Single cycle hydroburst fixture Fatigue cycle hydroburst fixture Hydroburst specimen Fixtures can be configured for elevated temperature testing
17. Final Prototype Build and Commissioning Tests Final 2 Arbors In process winding of an arbor pair BUILD Rotor shafts with structural and cooling arbor assemblies installed FINAL PRODUCT In process winding of a B2 outer banding Twin rotors shown in incomplete assembly state ( some outer banding assemblies remain)
18.
19.
20. CEMWIND Outputs CEMWIND FE Mesh & Material Property Files Arbor Ply Thickness Build Profile Fiber motion files for input into CEM’s filament winding machine
21. CEMWIND Output Showing Arbor Shear Stress Profile Outputs ply-level stress and strain results. Direct comparison with fiber tow-level material allowables Arbor Stresses at 50 Krpm: Shear Stress Profile