SlideShare a Scribd company logo
1 of 28
Download to read offline
Product KnowledgeProduct Knowledge
Ruko 3 LantaiRuko 3 Lantai di Jalur Emasdi Jalur Emas
Tol Jakarta Merak, Exit Bitung Km 26
CitraRaya merupakan Landed Development TERBESAR dari CIPUTRA GROUP yang dibangun di
atas lahan seluas 2.760 Ha dengan konsep pengembangan KOTA MANDIRI
Pengembangan dimulai pada tahun 1994
Saat ini CitraRaya adalah Rumah bagi 21 Ribu kepala keluarga
Ir. Ciputra:Ir. Ciputra:
““di Citra Raya kami membangundi Citra Raya kami membangun KehidupanKehidupan””
We BuildWe Build HOMESHOMES not Housesnot Houses
Live life The CIPUTRA WayLive life The CIPUTRA Way
Pristine EnvironmentPristine Environment
Quality LivingQuality Living
Our Existing Facilities and TenantOur Existing Facilities and Tenant
Sekolah Tarakanita, Citra Berkat, Islamic Village
Water Park Theme Park
Feeder Trans
Puluhan Bank dan Finance Office
Diantaranya:
Our Existing Facilities and TenantOur Existing Facilities and Tenant
2 SPBU Pertamina dan Shell utk Motor
Citra Raya Food Festival (CIFFEST)
Pasar Modern
Our Upcoming FacilitiesOur Upcoming Facilities
(On Progress)(On Progress)
World of WonderWorld of Wonder
Theme Park ExtensionTheme Park Extension
(On Progress)(On Progress)
Office Park (on Progress)Office Park (on Progress)
Mall dan HotelMall dan Hotel
(tahap design,pembicaraan dgn Anchor Tenant)(tahap design,pembicaraan dgn Anchor Tenant)
ECoPlaza (Food Plaza dan EcoClub House
(Design dan pembicaran dgn Anchor Tenant)
OnOn
ProgressProgress
Jalur Emas
Gerbang Utama
Master Plan : 2.760 Ha
Future Toll Road
Gerbang Utama
Ciputra Hospital
Office Park
Mall,Hotel
Water World
Worl of Wonder Theme Park
Future Toll Road
Future Toll Road
Future Development
100Ha
Future Development
50Ha
Future
Development
CBD Area 10Ha
Cluster
Rafflesia
Cluster
Segovia
Cluster
Sevilla
Cluster
Sevilla
Cluster
Serdang Asri
Cluster
Picasso
Cluster
Catania
Cluster
Sienna
Cluster
Savanna
Cluster
Florence
Sekolah Citra Berkat
CBD
Area
CBD
Area
CBD
Area
CBD
Area
Residential
25Ha
Residential
25Ha
Jalan Arteri Panongan
Jalan Arteri Pasar Curug
Future Development
CBD Area 10Ha
Lokasi Strategis di Jalur Emas Citra Raya dan dekat Future CBD Area seluas 10Ha
Design Tampak Muka Mewah dan Modern
Tampak Muka dan Struktur Bangunan sudah 3 LantaiTampak Muka dan Struktur Bangunan sudah 3 Lantai
Semua Unit Menghadap Boulevard Utama ROW 42
Konsep Parkir On Street
Pedestrian Walkway dan Bicycle Track terkoneksi sepanjang komersial area
Ruko 3 LantaiRuko 3 Lantai di Jalur Emasdi Jalur Emas
Strategically located at the main
boulevard ROW 42 Citra Raya,
connected to CBD Area and
surrounded by a large population
based
your business will surely Flourish
here
Gambar Potongan Boulevard ROW 42
Total unit: 260
Tahap 1: 78 unit
Tahap 1
Cluster Rafflesia
Cluster Lavender
Cluster Segovia
Cluster Rafflesia
D 01
D 01
S 1A
S 1A
CBD area 10Ha
Blok D 1
Blok S 1A
Cluster Rafflesia
Cluster Lavender
Cluster Rafflesia
Cluster Lavender
Blok D 1
Blok S 1A
Photo Actual per 23 April 2014
Photo Actual Progress Pembangunan Boulevard ROW 42 sepanjang 2km
Lantai 1 Lantai 2 Lantai 3
Tipe Standard 5x16 Lb 164/Lt 80
Lantai 1 Lantai 2
Lantai 3
Denah Tipe Sudut 6x16  Lb 197/Lt 96
a
Gambar Potongan Samping
PLAFOND
Expose Beton (Lt. 1 & Lt.2)
Gypsum (Lt.3)
Spesifikasi TeknisSpesifikasi Teknis
PONDASI :Tiang Pancang
STRUKTUR:Beton Bertulang
DINDING
Bata / Hebel / Celcon diplester
Finishing Cat Exterior ex. Mowilex Weathercoat /setara
Finishing Cat Interior ex. Mowilex/setara
PLAFOND
Expose Beton (Lt. 1 & Lt.2)
Gypsum (Lt.3)
GRC Board (K. Mandi, Teras & Overstek)
LANTAI
Homogeneous Tile 60x60 (R. Utama)
Keramik 20x20 (Teras & KM) ex. Roman / Setara
SANITAIR
Bak Fiberglass
Closet Duduk ex. American Standard / Setara
Wastafel ex. American Standard / Setara
RANGKA ATAP :Rangka Baja
PENUTUP ATAP :Atap  Metal
JENDELA
Kusen Alumunium
Jendela Alumunium + Kaca
 
PINTU
Kusen Alumunium
Pintu Alumunium + Kaca (Pintu Utama)
Pintu Kayu (Pintu Dalam & Belakang)
 
INSTALASI LISTRIK :PLN 2200 W
 
INSTALASI AIR :Air Bersih Standar PAM
 
INSTALASI AC :
Lt. 1 & Lt. 2 : 2 titik
Lantai 3              : 1 Titik
Total 5 Titik
INSTALASI TELEPON
1 Line Telepon (Langung Kring), Gratis 1 Tahun Abodemen Sejak Serah
Terima
 
INSTALASI INTERNET
Koneksi Internet & TV Kabel, Gratis 1 Tahun Sejak Serah Terima
 
SPESIFIKASI LINGKUNGAN
Jalan ROW 42
Penerangan Jalan Umum Lampu LED
Jaringan Kabel Bawah Tanah
Saluran Drainase Lingkungan Tertutup
Product Knowledge : Minggu, 4 Mei 2014 di Marketing Office Citra Raya Pkl 10.00
Pendaftaran NUP : 5 Mei – 17 Mei 2014, Biaya NUP (Booking Fee) 15 juta/unit
Penjualan Perdana : 18 Mei 2014 Pkl 10.00
1 Formulir NUP bisa mendaftar 1 unit (satuan) atau 2 unit (Gandeng)
1 KTP hanya boleh mendaftar maksimal 2 Formulir NUP
Total Unit Ruko: 260 Unit
Penjualan Tahap 1 : 78 unit
Serah Terima : 24 Bulan sejak Uang Tanda Jadi (Booking Fee)
Tipe yang dipasarkan:
Standard (Ukuran 5x16)  Harga Mulai (termasuk PPN) 1,59M sd 1,85M
Standard/Sudut (Ukuran 6x16)  Harga Mulai (termasuk PPN) 2M sd 2,4M
Program Khusus Pembelian 18 Mei 2014:Program Khusus Pembelian 18 Mei 2014:
TERM OF PAYMENTTERM OF PAYMENT
• Harga Cash 1 bulan  cicil 12x (30% cicil 3x, 70% cicil 9x)
• Harga Bertahap 12x  cicil 24x (30% cicil 3x, 70% cicil 21x)
• Harga Bertahap 24x  cicil 36x (30% cicil 3x, 70% cicil 33x)
• KPR 1: DP 30% cicil 3 bulan  Subsidi Bunga KPR 2% (2 tahun pertama)
• KPR 2: DP 50% cicil 24Bulan (30% cicil 3x, 20% cicil 21x)
PENGALIHAN HAK (PH)/GANTI NAMAPENGALIHAN HAK (PH)/GANTI NAMA
• Biaya PH 5%+1%, berlaku untuk 1x pengalihan hak, untuk pengalihan hak ke 2, dst menjadi 5%+5%
Note:
- PH hanya bisa dilakukan jika pembeli pertama minimal telah membayar 30% dari total harga pembelian
- Jika pembeli ke 2 bermaksud menggunakan cara bayar KPR, maka sebelum terjadinya pengalihan wajib
menunjukkan Surat Persetujuan Kredit dari Bank pemberi Kredit (jika bermaksud menggunakan KPR 2 maka
pengalihan hak tidak bisa dilaksanakan sampai serah terima dilakukan)
BANK KERJASAMA KPR :
Biaya Pendaftaran NUP : Rp 15.000.000 / unitBiaya Pendaftaran NUP : Rp 15.000.000 / unit
(Refundable jika unit yang diinginkan sudah Terjual)(Refundable jika unit yang diinginkan sudah Terjual)
For further information please call us at: 021 5960888
www.citraraya.com

More Related Content

Viewers also liked

Smart product strategy 2013
Smart product strategy 2013Smart product strategy 2013
Smart product strategy 2013Maxpromotion
 
Sara electronics presentation 1
Sara electronics presentation 1Sara electronics presentation 1
Sara electronics presentation 1Maxpromotion
 
Jupiter training center ppt slides.2
Jupiter training center ppt slides.2Jupiter training center ppt slides.2
Jupiter training center ppt slides.2Maxpromotion
 
Premium medical oktobris
Premium medical oktobrisPremium medical oktobris
Premium medical oktobrisPremiumMedical
 
Spanish socioeconomic report
Spanish socioeconomic reportSpanish socioeconomic report
Spanish socioeconomic reportCarmen Ortiz
 
Sarah Rodrigo e Raphael Turma 401
Sarah Rodrigo e Raphael Turma 401Sarah Rodrigo e Raphael Turma 401
Sarah Rodrigo e Raphael Turma 401Haiashi
 

Viewers also liked (12)

Smart product strategy 2013
Smart product strategy 2013Smart product strategy 2013
Smart product strategy 2013
 
Maxiox casestudy
Maxiox casestudyMaxiox casestudy
Maxiox casestudy
 
Sara electronics presentation 1
Sara electronics presentation 1Sara electronics presentation 1
Sara electronics presentation 1
 
Tirupati Corner
Tirupati CornerTirupati Corner
Tirupati Corner
 
Jupiter training center ppt slides.2
Jupiter training center ppt slides.2Jupiter training center ppt slides.2
Jupiter training center ppt slides.2
 
Bluestar Broucher
Bluestar BroucherBluestar Broucher
Bluestar Broucher
 
Hands On Google+ Training
Hands On Google+ TrainingHands On Google+ Training
Hands On Google+ Training
 
Premium medical oktobris
Premium medical oktobrisPremium medical oktobris
Premium medical oktobris
 
Spanish socioeconomic report
Spanish socioeconomic reportSpanish socioeconomic report
Spanish socioeconomic report
 
Sarah Rodrigo e Raphael Turma 401
Sarah Rodrigo e Raphael Turma 401Sarah Rodrigo e Raphael Turma 401
Sarah Rodrigo e Raphael Turma 401
 
Jquery mobile
Jquery mobileJquery mobile
Jquery mobile
 
Gernsback continuum
Gernsback continuumGernsback continuum
Gernsback continuum
 

Product Knowledge Ruko Grand Boulevard April 2014

  • 1. Product KnowledgeProduct Knowledge Ruko 3 LantaiRuko 3 Lantai di Jalur Emasdi Jalur Emas
  • 2. Tol Jakarta Merak, Exit Bitung Km 26
  • 3. CitraRaya merupakan Landed Development TERBESAR dari CIPUTRA GROUP yang dibangun di atas lahan seluas 2.760 Ha dengan konsep pengembangan KOTA MANDIRI Pengembangan dimulai pada tahun 1994 Saat ini CitraRaya adalah Rumah bagi 21 Ribu kepala keluarga
  • 4. Ir. Ciputra:Ir. Ciputra: ““di Citra Raya kami membangundi Citra Raya kami membangun KehidupanKehidupan”” We BuildWe Build HOMESHOMES not Housesnot Houses Live life The CIPUTRA WayLive life The CIPUTRA Way Pristine EnvironmentPristine Environment Quality LivingQuality Living
  • 5. Our Existing Facilities and TenantOur Existing Facilities and Tenant Sekolah Tarakanita, Citra Berkat, Islamic Village Water Park Theme Park Feeder Trans
  • 6. Puluhan Bank dan Finance Office Diantaranya: Our Existing Facilities and TenantOur Existing Facilities and Tenant 2 SPBU Pertamina dan Shell utk Motor Citra Raya Food Festival (CIFFEST) Pasar Modern
  • 7. Our Upcoming FacilitiesOur Upcoming Facilities (On Progress)(On Progress) World of WonderWorld of Wonder Theme Park ExtensionTheme Park Extension (On Progress)(On Progress) Office Park (on Progress)Office Park (on Progress) Mall dan HotelMall dan Hotel (tahap design,pembicaraan dgn Anchor Tenant)(tahap design,pembicaraan dgn Anchor Tenant) ECoPlaza (Food Plaza dan EcoClub House (Design dan pembicaran dgn Anchor Tenant) OnOn ProgressProgress
  • 8. Jalur Emas Gerbang Utama Master Plan : 2.760 Ha Future Toll Road
  • 9. Gerbang Utama Ciputra Hospital Office Park Mall,Hotel Water World Worl of Wonder Theme Park Future Toll Road Future Toll Road Future Development 100Ha Future Development 50Ha Future Development CBD Area 10Ha
  • 10. Cluster Rafflesia Cluster Segovia Cluster Sevilla Cluster Sevilla Cluster Serdang Asri Cluster Picasso Cluster Catania Cluster Sienna Cluster Savanna Cluster Florence Sekolah Citra Berkat CBD Area CBD Area CBD Area CBD Area Residential 25Ha Residential 25Ha Jalan Arteri Panongan Jalan Arteri Pasar Curug
  • 11.
  • 13. Lokasi Strategis di Jalur Emas Citra Raya dan dekat Future CBD Area seluas 10Ha Design Tampak Muka Mewah dan Modern Tampak Muka dan Struktur Bangunan sudah 3 LantaiTampak Muka dan Struktur Bangunan sudah 3 Lantai Semua Unit Menghadap Boulevard Utama ROW 42 Konsep Parkir On Street Pedestrian Walkway dan Bicycle Track terkoneksi sepanjang komersial area Ruko 3 LantaiRuko 3 Lantai di Jalur Emasdi Jalur Emas
  • 14.
  • 15. Strategically located at the main boulevard ROW 42 Citra Raya, connected to CBD Area and surrounded by a large population based your business will surely Flourish here
  • 17. Total unit: 260 Tahap 1: 78 unit
  • 18. Tahap 1 Cluster Rafflesia Cluster Lavender Cluster Segovia Cluster Rafflesia D 01 D 01 S 1A S 1A
  • 19. CBD area 10Ha Blok D 1 Blok S 1A Cluster Rafflesia Cluster Lavender
  • 20. Cluster Rafflesia Cluster Lavender Blok D 1 Blok S 1A Photo Actual per 23 April 2014
  • 21. Photo Actual Progress Pembangunan Boulevard ROW 42 sepanjang 2km
  • 22. Lantai 1 Lantai 2 Lantai 3 Tipe Standard 5x16 Lb 164/Lt 80
  • 23. Lantai 1 Lantai 2 Lantai 3 Denah Tipe Sudut 6x16  Lb 197/Lt 96
  • 24. a Gambar Potongan Samping PLAFOND Expose Beton (Lt. 1 & Lt.2) Gypsum (Lt.3)
  • 25. Spesifikasi TeknisSpesifikasi Teknis PONDASI :Tiang Pancang STRUKTUR:Beton Bertulang DINDING Bata / Hebel / Celcon diplester Finishing Cat Exterior ex. Mowilex Weathercoat /setara Finishing Cat Interior ex. Mowilex/setara PLAFOND Expose Beton (Lt. 1 & Lt.2) Gypsum (Lt.3) GRC Board (K. Mandi, Teras & Overstek) LANTAI Homogeneous Tile 60x60 (R. Utama) Keramik 20x20 (Teras & KM) ex. Roman / Setara SANITAIR Bak Fiberglass Closet Duduk ex. American Standard / Setara Wastafel ex. American Standard / Setara RANGKA ATAP :Rangka Baja PENUTUP ATAP :Atap  Metal JENDELA Kusen Alumunium Jendela Alumunium + Kaca   PINTU Kusen Alumunium Pintu Alumunium + Kaca (Pintu Utama) Pintu Kayu (Pintu Dalam & Belakang)   INSTALASI LISTRIK :PLN 2200 W   INSTALASI AIR :Air Bersih Standar PAM   INSTALASI AC : Lt. 1 & Lt. 2 : 2 titik Lantai 3              : 1 Titik Total 5 Titik INSTALASI TELEPON 1 Line Telepon (Langung Kring), Gratis 1 Tahun Abodemen Sejak Serah Terima   INSTALASI INTERNET Koneksi Internet & TV Kabel, Gratis 1 Tahun Sejak Serah Terima   SPESIFIKASI LINGKUNGAN Jalan ROW 42 Penerangan Jalan Umum Lampu LED Jaringan Kabel Bawah Tanah Saluran Drainase Lingkungan Tertutup
  • 26. Product Knowledge : Minggu, 4 Mei 2014 di Marketing Office Citra Raya Pkl 10.00 Pendaftaran NUP : 5 Mei – 17 Mei 2014, Biaya NUP (Booking Fee) 15 juta/unit Penjualan Perdana : 18 Mei 2014 Pkl 10.00 1 Formulir NUP bisa mendaftar 1 unit (satuan) atau 2 unit (Gandeng) 1 KTP hanya boleh mendaftar maksimal 2 Formulir NUP Total Unit Ruko: 260 Unit Penjualan Tahap 1 : 78 unit Serah Terima : 24 Bulan sejak Uang Tanda Jadi (Booking Fee) Tipe yang dipasarkan: Standard (Ukuran 5x16)  Harga Mulai (termasuk PPN) 1,59M sd 1,85M Standard/Sudut (Ukuran 6x16)  Harga Mulai (termasuk PPN) 2M sd 2,4M
  • 27. Program Khusus Pembelian 18 Mei 2014:Program Khusus Pembelian 18 Mei 2014: TERM OF PAYMENTTERM OF PAYMENT • Harga Cash 1 bulan  cicil 12x (30% cicil 3x, 70% cicil 9x) • Harga Bertahap 12x  cicil 24x (30% cicil 3x, 70% cicil 21x) • Harga Bertahap 24x  cicil 36x (30% cicil 3x, 70% cicil 33x) • KPR 1: DP 30% cicil 3 bulan  Subsidi Bunga KPR 2% (2 tahun pertama) • KPR 2: DP 50% cicil 24Bulan (30% cicil 3x, 20% cicil 21x) PENGALIHAN HAK (PH)/GANTI NAMAPENGALIHAN HAK (PH)/GANTI NAMA • Biaya PH 5%+1%, berlaku untuk 1x pengalihan hak, untuk pengalihan hak ke 2, dst menjadi 5%+5% Note: - PH hanya bisa dilakukan jika pembeli pertama minimal telah membayar 30% dari total harga pembelian - Jika pembeli ke 2 bermaksud menggunakan cara bayar KPR, maka sebelum terjadinya pengalihan wajib menunjukkan Surat Persetujuan Kredit dari Bank pemberi Kredit (jika bermaksud menggunakan KPR 2 maka pengalihan hak tidak bisa dilaksanakan sampai serah terima dilakukan) BANK KERJASAMA KPR :
  • 28. Biaya Pendaftaran NUP : Rp 15.000.000 / unitBiaya Pendaftaran NUP : Rp 15.000.000 / unit (Refundable jika unit yang diinginkan sudah Terjual)(Refundable jika unit yang diinginkan sudah Terjual) For further information please call us at: 021 5960888 www.citraraya.com