SlideShare una empresa de Scribd logo
1 de 29
Descargar para leer sin conexión
Mrr ppt dec2011
Mrr ppt dec2011
Experience the verve of living by the banks and drift
through the historic and scenic beauty of Pasig River.

Project lot area composed of 14,000 square meters
with 62 percent of the area allotted for roads,
landscaped areas and amenities such as
playground, swimming pool , and water-featured
landscapes.

Comprised of 9 buildings ranging from 10 – 14 floors.
LOCATION MAP
LOCATION
LOCATION

• Along the historic and scenic banks of Pasig River in Sta.
  Ana, Manila

• Surrounded by the nation’s busiest economic centers of
  Makati, San Juan, Mandaluyong and Manila

• Close to school areas

• Accessible to public transportation
SITE DEVELOPMENT
SITE DEVELOPMENT

                     PROPOSED SITE DEVELOPMENT @
                   REAR PORTION OF YANGTZE BUILDING
                         FRONTING PASIG RIVER
AMENITIES
 AMENITIES
AMENITIES
SITE FEATURES

Proposed environment friendly features:
• Solar Panel
• Rain water catch basin
• Waste segregation
• Landscaped Park
• Pavillion
• Water featured landscaping
BUILDING FEATURES


 •   Elevator
 •   1.5 meter-wide corridors
 •   Roof deck with landing area
 •   Service stairs
 •   Overhead tanks with water pump
 •   Standby generator for common areas
TYPICAL FLOORPLAN
TYPICAL FLOORPLAN
UNIT FINISHES
• RESIDENTIAL AREA
  A. Floor Finishes
       Living, Dining & Kitchen   Vinyl Planks
       Bedrooms                   Vinyl Planks
       Toilet                     Unglazed ceramic tiles
       Utility Area               Plain cement finish

  B. Wall Finishes         No partition walls for bedroom/s
      Interior walls       1-coat paint on concrete walls
      Toilet               1-coat plain cement finish above tile
UNIT FINISHES
C. Ceiling Finishes
    Living, Dining & Kitchen      1-coat paint on plain cement finish
    Bedrooms                      1-coat paint on plain cement finish
    Toilet                        1-coat paint on ficem board finish

D. Kitchen                Kitchen counter top with sink & faucet. Under
                          counter cabinet door & overhead cabinet are
                          not included.

E. Door Entrance &
   Bedroom door           Solid finger jointed wood with sheet
                          laminated and solid wood core door
                          jambs plus casing

F. Windows                Aluminum windows
UNIT FINISHES
 G. Finishing Hardware          Cylindrical lockset for main
                                Privacy lockset for T & B door.

 H. Toilet & Kitchen Fixtures

 Water and Closet Lavatory      Complete set of water closet and
                                lavatory with fittings & accessories.
      Shower faucet             Complete set of shower with faucet
                                and fittings.

 I. Electricity                 Complete outlet and lighting devices
                                with circuit breaker.
TYPICAL UNIT FLOOR PLAN




     Studio Unit 21.05 sq. m   Provision for 1BR Unit 28.1 sq.m
TYPICAL UNIT FLOOR PLAN




   Provision for 2BR Unit –B   Provision for 2BR Unit – C
          43.25 sq.m                   44.35 sq.m
AFFORDABILITY


• As low as PHP 1.1M for a studio unit
• As low as PHP6,000 per month
• Flexible payment scheme (down payment –
  payable up to 24 months; balance – payable up
  to 30 years through Pag-IBIG)
• Available financing through in-house, bank or
  Pag-IBIG
CERTIFICATE & PERMIT
Construction
   Updates
COLORADO TOWER




                 HALLWAY   BEDROOM
COLORADO TOWER




    T&B TILING   ELEVATOR   KITCHEN CABINET
COLORADO TOWER




    STAIR    TRANSFORMER   PARKING
   RAILING    VAULT ROOM
COLORADO TOWER




     PARKING ENTRANCE   TRANSFORMER
EUPHRATES TOWER




Tiling works    Painting works     Installation
 at Hallway    on walls & ceiling of Main Doors
EUPHRATES TOWER




Tiling works    Painting works     Installation
 at Hallway    on walls & ceiling of Main Doors
Mrr ppt dec2011

Más contenido relacionado

La actualidad más candente

Gulshan Botnia Sector 144 Noida Expressway
Gulshan Botnia Sector 144 Noida ExpresswayGulshan Botnia Sector 144 Noida Expressway
Gulshan Botnia Sector 144 Noida Expresswaymadhyamseo
 
Projects handled at Mistry Architects - - Industrial - 01.
Projects handled at Mistry Architects  -  - Industrial - 01.Projects handled at Mistry Architects  -  - Industrial - 01.
Projects handled at Mistry Architects - - Industrial - 01.Sathyanarayan C V
 
Projects handled at Mistry Architects - Residence - Retreat for H.B. Jairaj -03
Projects handled at Mistry Architects  - Residence - Retreat for H.B. Jairaj -03Projects handled at Mistry Architects  - Residence - Retreat for H.B. Jairaj -03
Projects handled at Mistry Architects - Residence - Retreat for H.B. Jairaj -03Sathyanarayan C V
 
Projects handled at Mistry Architects - Residence - Bungalow for Srinivasulu...
Projects handled at Mistry Architects  - Residence - Bungalow for Srinivasulu...Projects handled at Mistry Architects  - Residence - Bungalow for Srinivasulu...
Projects handled at Mistry Architects - Residence - Bungalow for Srinivasulu...Sathyanarayan C V
 
Slide Show of Construction Projects
Slide Show of Construction ProjectsSlide Show of Construction Projects
Slide Show of Construction Projectsandrewmdayton
 
Tivoli Garden Residences Vacation Resort Condo Great Investment No Spot Downp...
Tivoli Garden Residences Vacation Resort Condo Great Investment No Spot Downp...Tivoli Garden Residences Vacation Resort Condo Great Investment No Spot Downp...
Tivoli Garden Residences Vacation Resort Condo Great Investment No Spot Downp...Alvin Antiquiera
 
Villas at GST road, Chennai
Villas at GST road, ChennaiVillas at GST road, Chennai
Villas at GST road, Chennaiadam05
 
Our Burbank Plus Package
Our Burbank Plus Package Our Burbank Plus Package
Our Burbank Plus Package PatriciaTewaaka
 

La actualidad más candente (12)

Manila Rivercity Residences
Manila Rivercity ResidencesManila Rivercity Residences
Manila Rivercity Residences
 
Gulshan Botnia Sector 144 Noida Expressway
Gulshan Botnia Sector 144 Noida ExpresswayGulshan Botnia Sector 144 Noida Expressway
Gulshan Botnia Sector 144 Noida Expressway
 
Projects handled at Mistry Architects - - Industrial - 01.
Projects handled at Mistry Architects  -  - Industrial - 01.Projects handled at Mistry Architects  -  - Industrial - 01.
Projects handled at Mistry Architects - - Industrial - 01.
 
Ozone Urbana Review
Ozone Urbana ReviewOzone Urbana Review
Ozone Urbana Review
 
Projects handled at Mistry Architects - Residence - Retreat for H.B. Jairaj -03
Projects handled at Mistry Architects  - Residence - Retreat for H.B. Jairaj -03Projects handled at Mistry Architects  - Residence - Retreat for H.B. Jairaj -03
Projects handled at Mistry Architects - Residence - Retreat for H.B. Jairaj -03
 
Penthouse features and finishes 1.4-19
Penthouse features and finishes 1.4-19Penthouse features and finishes 1.4-19
Penthouse features and finishes 1.4-19
 
Projects handled at Mistry Architects - Residence - Bungalow for Srinivasulu...
Projects handled at Mistry Architects  - Residence - Bungalow for Srinivasulu...Projects handled at Mistry Architects  - Residence - Bungalow for Srinivasulu...
Projects handled at Mistry Architects - Residence - Bungalow for Srinivasulu...
 
Slide Show of Construction Projects
Slide Show of Construction ProjectsSlide Show of Construction Projects
Slide Show of Construction Projects
 
Tivoli Garden Residences Vacation Resort Condo Great Investment No Spot Downp...
Tivoli Garden Residences Vacation Resort Condo Great Investment No Spot Downp...Tivoli Garden Residences Vacation Resort Condo Great Investment No Spot Downp...
Tivoli Garden Residences Vacation Resort Condo Great Investment No Spot Downp...
 
Sahyadri premium apartments whitefield Bangalore
Sahyadri premium apartments whitefield BangaloreSahyadri premium apartments whitefield Bangalore
Sahyadri premium apartments whitefield Bangalore
 
Villas at GST road, Chennai
Villas at GST road, ChennaiVillas at GST road, Chennai
Villas at GST road, Chennai
 
Our Burbank Plus Package
Our Burbank Plus Package Our Burbank Plus Package
Our Burbank Plus Package
 

Similar a Mrr ppt dec2011

Similar a Mrr ppt dec2011 (15)

Rent to Own near makati
Rent to Own near makatiRent to Own near makati
Rent to Own near makati
 
MANILA RIVER CITY RESIDENCES
MANILA RIVER CITY RESIDENCESMANILA RIVER CITY RESIDENCES
MANILA RIVER CITY RESIDENCES
 
Mrr ppt feb2011(1)
Mrr ppt feb2011(1)Mrr ppt feb2011(1)
Mrr ppt feb2011(1)
 
affordable condo units for sale
affordable condo units for saleaffordable condo units for sale
affordable condo units for sale
 
San marino ppt (email)
San marino ppt (email)San marino ppt (email)
San marino ppt (email)
 
Mantri espana
Mantri espanaMantri espana
Mantri espana
 
Lions Park Residences
Lions Park ResidencesLions Park Residences
Lions Park Residences
 
Khp durva greens built space
Khp durva greens built spaceKhp durva greens built space
Khp durva greens built space
 
Kileleshwa supert townhouses for sale
Kileleshwa supert townhouses for saleKileleshwa supert townhouses for sale
Kileleshwa supert townhouses for sale
 
Simonds elpis brochures_floor_plan
Simonds elpis brochures_floor_planSimonds elpis brochures_floor_plan
Simonds elpis brochures_floor_plan
 
LUXURY CONDO
LUXURY CONDOLUXURY CONDO
LUXURY CONDO
 
Aeris brochure| Flats in IndiraNagar, Bangalore| Arattukulam Developers
Aeris brochure| Flats in IndiraNagar, Bangalore| Arattukulam DevelopersAeris brochure| Flats in IndiraNagar, Bangalore| Arattukulam Developers
Aeris brochure| Flats in IndiraNagar, Bangalore| Arattukulam Developers
 
Rivergreen Residences
Rivergreen ResidencesRivergreen Residences
Rivergreen Residences
 
Ansal esencia floor
Ansal esencia floorAnsal esencia floor
Ansal esencia floor
 
Akshar Altorios, Hadapsar, Pune
Akshar Altorios, Hadapsar, PuneAkshar Altorios, Hadapsar, Pune
Akshar Altorios, Hadapsar, Pune
 

Último

Upgrade Your Banking Experience with Advanced Core Banking Applications
Upgrade Your Banking Experience with Advanced Core Banking ApplicationsUpgrade Your Banking Experience with Advanced Core Banking Applications
Upgrade Your Banking Experience with Advanced Core Banking ApplicationsIntellect Design Arena Ltd
 
Borderless Access - Global B2B Panel book-unlock 2024
Borderless Access - Global B2B Panel book-unlock 2024Borderless Access - Global B2B Panel book-unlock 2024
Borderless Access - Global B2B Panel book-unlock 2024Borderless Access
 
Fabric RFID Wristbands in Ireland for Events and Festivals
Fabric RFID Wristbands in Ireland for Events and FestivalsFabric RFID Wristbands in Ireland for Events and Festivals
Fabric RFID Wristbands in Ireland for Events and FestivalsWristbands Ireland
 
Borderless Access - Global Panel book-unlock 2024
Borderless Access - Global Panel book-unlock 2024Borderless Access - Global Panel book-unlock 2024
Borderless Access - Global Panel book-unlock 2024Borderless Access
 
PDT 89 - $1.4M - Seed - Plantee Innovations.pdf
PDT 89 - $1.4M - Seed - Plantee Innovations.pdfPDT 89 - $1.4M - Seed - Plantee Innovations.pdf
PDT 89 - $1.4M - Seed - Plantee Innovations.pdfHajeJanKamps
 
Building Your Personal Brand on LinkedIn - Expert Planet- 2024
 Building Your Personal Brand on LinkedIn - Expert Planet-  2024 Building Your Personal Brand on LinkedIn - Expert Planet-  2024
Building Your Personal Brand on LinkedIn - Expert Planet- 2024Stephan Koning
 
NewBase 25 March 2024 Energy News issue - 1710 by Khaled Al Awadi_compress...
NewBase  25 March  2024  Energy News issue - 1710 by Khaled Al Awadi_compress...NewBase  25 March  2024  Energy News issue - 1710 by Khaled Al Awadi_compress...
NewBase 25 March 2024 Energy News issue - 1710 by Khaled Al Awadi_compress...Khaled Al Awadi
 
AMAZON SELLER VIRTUAL ASSISTANT PRODUCT RESEARCH .pdf
AMAZON SELLER VIRTUAL ASSISTANT PRODUCT RESEARCH .pdfAMAZON SELLER VIRTUAL ASSISTANT PRODUCT RESEARCH .pdf
AMAZON SELLER VIRTUAL ASSISTANT PRODUCT RESEARCH .pdfJohnCarloValencia4
 
Team B Mind Map for Organizational Chg..
Team B Mind Map for Organizational Chg..Team B Mind Map for Organizational Chg..
Team B Mind Map for Organizational Chg..dlewis191
 
PDT 88 - 4 million seed - Seed - Protecto.pdf
PDT 88 - 4 million seed - Seed - Protecto.pdfPDT 88 - 4 million seed - Seed - Protecto.pdf
PDT 88 - 4 million seed - Seed - Protecto.pdfHajeJanKamps
 
Introduction to The overview of GAAP LO 1-5.pptx
Introduction to The overview of GAAP LO 1-5.pptxIntroduction to The overview of GAAP LO 1-5.pptx
Introduction to The overview of GAAP LO 1-5.pptxJemalSeid25
 
IIBA® Melbourne - Navigating Business Analysis - Excellence for Career Growth...
IIBA® Melbourne - Navigating Business Analysis - Excellence for Career Growth...IIBA® Melbourne - Navigating Business Analysis - Excellence for Career Growth...
IIBA® Melbourne - Navigating Business Analysis - Excellence for Career Growth...AustraliaChapterIIBA
 
The Vietnam Believer Newsletter_MARCH 25, 2024_EN_Vol. 003
The Vietnam Believer Newsletter_MARCH 25, 2024_EN_Vol. 003The Vietnam Believer Newsletter_MARCH 25, 2024_EN_Vol. 003
The Vietnam Believer Newsletter_MARCH 25, 2024_EN_Vol. 003believeminhh
 
Intellectual Property Licensing Examples
Intellectual Property Licensing ExamplesIntellectual Property Licensing Examples
Intellectual Property Licensing Examplesamberjiles31
 
MoneyBridge Pitch Deck - Investor Presentation
MoneyBridge Pitch Deck - Investor PresentationMoneyBridge Pitch Deck - Investor Presentation
MoneyBridge Pitch Deck - Investor Presentationbaron83
 
Cracking the ‘Business Process Outsourcing’ Code Main.pptx
Cracking the ‘Business Process Outsourcing’ Code Main.pptxCracking the ‘Business Process Outsourcing’ Code Main.pptx
Cracking the ‘Business Process Outsourcing’ Code Main.pptxWorkforce Group
 
Borderless Access - Global B2B Panel book-unlock 2024
Borderless Access - Global B2B Panel book-unlock 2024Borderless Access - Global B2B Panel book-unlock 2024
Borderless Access - Global B2B Panel book-unlock 2024Borderless Access
 
MC Heights construction company in Jhang
MC Heights construction company in JhangMC Heights construction company in Jhang
MC Heights construction company in Jhangmcgroupjeya
 
The End of Business as Usual: Rewire the Way You Work to Succeed in the Consu...
The End of Business as Usual: Rewire the Way You Work to Succeed in the Consu...The End of Business as Usual: Rewire the Way You Work to Succeed in the Consu...
The End of Business as Usual: Rewire the Way You Work to Succeed in the Consu...Brian Solis
 
Slicing Work on Business Agility Meetup Berlin
Slicing Work on Business Agility Meetup BerlinSlicing Work on Business Agility Meetup Berlin
Slicing Work on Business Agility Meetup BerlinAnton Skornyakov
 

Último (20)

Upgrade Your Banking Experience with Advanced Core Banking Applications
Upgrade Your Banking Experience with Advanced Core Banking ApplicationsUpgrade Your Banking Experience with Advanced Core Banking Applications
Upgrade Your Banking Experience with Advanced Core Banking Applications
 
Borderless Access - Global B2B Panel book-unlock 2024
Borderless Access - Global B2B Panel book-unlock 2024Borderless Access - Global B2B Panel book-unlock 2024
Borderless Access - Global B2B Panel book-unlock 2024
 
Fabric RFID Wristbands in Ireland for Events and Festivals
Fabric RFID Wristbands in Ireland for Events and FestivalsFabric RFID Wristbands in Ireland for Events and Festivals
Fabric RFID Wristbands in Ireland for Events and Festivals
 
Borderless Access - Global Panel book-unlock 2024
Borderless Access - Global Panel book-unlock 2024Borderless Access - Global Panel book-unlock 2024
Borderless Access - Global Panel book-unlock 2024
 
PDT 89 - $1.4M - Seed - Plantee Innovations.pdf
PDT 89 - $1.4M - Seed - Plantee Innovations.pdfPDT 89 - $1.4M - Seed - Plantee Innovations.pdf
PDT 89 - $1.4M - Seed - Plantee Innovations.pdf
 
Building Your Personal Brand on LinkedIn - Expert Planet- 2024
 Building Your Personal Brand on LinkedIn - Expert Planet-  2024 Building Your Personal Brand on LinkedIn - Expert Planet-  2024
Building Your Personal Brand on LinkedIn - Expert Planet- 2024
 
NewBase 25 March 2024 Energy News issue - 1710 by Khaled Al Awadi_compress...
NewBase  25 March  2024  Energy News issue - 1710 by Khaled Al Awadi_compress...NewBase  25 March  2024  Energy News issue - 1710 by Khaled Al Awadi_compress...
NewBase 25 March 2024 Energy News issue - 1710 by Khaled Al Awadi_compress...
 
AMAZON SELLER VIRTUAL ASSISTANT PRODUCT RESEARCH .pdf
AMAZON SELLER VIRTUAL ASSISTANT PRODUCT RESEARCH .pdfAMAZON SELLER VIRTUAL ASSISTANT PRODUCT RESEARCH .pdf
AMAZON SELLER VIRTUAL ASSISTANT PRODUCT RESEARCH .pdf
 
Team B Mind Map for Organizational Chg..
Team B Mind Map for Organizational Chg..Team B Mind Map for Organizational Chg..
Team B Mind Map for Organizational Chg..
 
PDT 88 - 4 million seed - Seed - Protecto.pdf
PDT 88 - 4 million seed - Seed - Protecto.pdfPDT 88 - 4 million seed - Seed - Protecto.pdf
PDT 88 - 4 million seed - Seed - Protecto.pdf
 
Introduction to The overview of GAAP LO 1-5.pptx
Introduction to The overview of GAAP LO 1-5.pptxIntroduction to The overview of GAAP LO 1-5.pptx
Introduction to The overview of GAAP LO 1-5.pptx
 
IIBA® Melbourne - Navigating Business Analysis - Excellence for Career Growth...
IIBA® Melbourne - Navigating Business Analysis - Excellence for Career Growth...IIBA® Melbourne - Navigating Business Analysis - Excellence for Career Growth...
IIBA® Melbourne - Navigating Business Analysis - Excellence for Career Growth...
 
The Vietnam Believer Newsletter_MARCH 25, 2024_EN_Vol. 003
The Vietnam Believer Newsletter_MARCH 25, 2024_EN_Vol. 003The Vietnam Believer Newsletter_MARCH 25, 2024_EN_Vol. 003
The Vietnam Believer Newsletter_MARCH 25, 2024_EN_Vol. 003
 
Intellectual Property Licensing Examples
Intellectual Property Licensing ExamplesIntellectual Property Licensing Examples
Intellectual Property Licensing Examples
 
MoneyBridge Pitch Deck - Investor Presentation
MoneyBridge Pitch Deck - Investor PresentationMoneyBridge Pitch Deck - Investor Presentation
MoneyBridge Pitch Deck - Investor Presentation
 
Cracking the ‘Business Process Outsourcing’ Code Main.pptx
Cracking the ‘Business Process Outsourcing’ Code Main.pptxCracking the ‘Business Process Outsourcing’ Code Main.pptx
Cracking the ‘Business Process Outsourcing’ Code Main.pptx
 
Borderless Access - Global B2B Panel book-unlock 2024
Borderless Access - Global B2B Panel book-unlock 2024Borderless Access - Global B2B Panel book-unlock 2024
Borderless Access - Global B2B Panel book-unlock 2024
 
MC Heights construction company in Jhang
MC Heights construction company in JhangMC Heights construction company in Jhang
MC Heights construction company in Jhang
 
The End of Business as Usual: Rewire the Way You Work to Succeed in the Consu...
The End of Business as Usual: Rewire the Way You Work to Succeed in the Consu...The End of Business as Usual: Rewire the Way You Work to Succeed in the Consu...
The End of Business as Usual: Rewire the Way You Work to Succeed in the Consu...
 
Slicing Work on Business Agility Meetup Berlin
Slicing Work on Business Agility Meetup BerlinSlicing Work on Business Agility Meetup Berlin
Slicing Work on Business Agility Meetup Berlin
 

Mrr ppt dec2011

  • 3. Experience the verve of living by the banks and drift through the historic and scenic beauty of Pasig River. Project lot area composed of 14,000 square meters with 62 percent of the area allotted for roads, landscaped areas and amenities such as playground, swimming pool , and water-featured landscapes. Comprised of 9 buildings ranging from 10 – 14 floors.
  • 6. LOCATION • Along the historic and scenic banks of Pasig River in Sta. Ana, Manila • Surrounded by the nation’s busiest economic centers of Makati, San Juan, Mandaluyong and Manila • Close to school areas • Accessible to public transportation
  • 8. SITE DEVELOPMENT PROPOSED SITE DEVELOPMENT @ REAR PORTION OF YANGTZE BUILDING FRONTING PASIG RIVER
  • 11. SITE FEATURES Proposed environment friendly features: • Solar Panel • Rain water catch basin • Waste segregation • Landscaped Park • Pavillion • Water featured landscaping
  • 12. BUILDING FEATURES • Elevator • 1.5 meter-wide corridors • Roof deck with landing area • Service stairs • Overhead tanks with water pump • Standby generator for common areas
  • 15. UNIT FINISHES • RESIDENTIAL AREA A. Floor Finishes Living, Dining & Kitchen Vinyl Planks Bedrooms Vinyl Planks Toilet Unglazed ceramic tiles Utility Area Plain cement finish B. Wall Finishes No partition walls for bedroom/s Interior walls 1-coat paint on concrete walls Toilet 1-coat plain cement finish above tile
  • 16. UNIT FINISHES C. Ceiling Finishes Living, Dining & Kitchen 1-coat paint on plain cement finish Bedrooms 1-coat paint on plain cement finish Toilet 1-coat paint on ficem board finish D. Kitchen Kitchen counter top with sink & faucet. Under counter cabinet door & overhead cabinet are not included. E. Door Entrance & Bedroom door Solid finger jointed wood with sheet laminated and solid wood core door jambs plus casing F. Windows Aluminum windows
  • 17. UNIT FINISHES G. Finishing Hardware Cylindrical lockset for main Privacy lockset for T & B door. H. Toilet & Kitchen Fixtures Water and Closet Lavatory Complete set of water closet and lavatory with fittings & accessories. Shower faucet Complete set of shower with faucet and fittings. I. Electricity Complete outlet and lighting devices with circuit breaker.
  • 18. TYPICAL UNIT FLOOR PLAN Studio Unit 21.05 sq. m Provision for 1BR Unit 28.1 sq.m
  • 19. TYPICAL UNIT FLOOR PLAN Provision for 2BR Unit –B Provision for 2BR Unit – C 43.25 sq.m 44.35 sq.m
  • 20. AFFORDABILITY • As low as PHP 1.1M for a studio unit • As low as PHP6,000 per month • Flexible payment scheme (down payment – payable up to 24 months; balance – payable up to 30 years through Pag-IBIG) • Available financing through in-house, bank or Pag-IBIG
  • 22. Construction Updates
  • 23. COLORADO TOWER HALLWAY BEDROOM
  • 24. COLORADO TOWER T&B TILING ELEVATOR KITCHEN CABINET
  • 25. COLORADO TOWER STAIR TRANSFORMER PARKING RAILING VAULT ROOM
  • 26. COLORADO TOWER PARKING ENTRANCE TRANSFORMER
  • 27. EUPHRATES TOWER Tiling works Painting works Installation at Hallway on walls & ceiling of Main Doors
  • 28. EUPHRATES TOWER Tiling works Painting works Installation at Hallway on walls & ceiling of Main Doors