Se ha denunciado esta presentación.
Se está descargando tu SlideShare. ×

Bathroom Renovation Student Gant Chart.pdf

Anuncio
Anuncio
Anuncio
Anuncio
Anuncio
Anuncio
Anuncio
Anuncio
Anuncio
Anuncio
Anuncio
Anuncio

Eche un vistazo a continuación

1 de 3 Anuncio

Más Contenido Relacionado

Presentaciones para usted (20)

Similares a Bathroom Renovation Student Gant Chart.pdf (20)

Anuncio

Más de Canberra Institute of technology (20)

Más reciente (20)

Anuncio

Bathroom Renovation Student Gant Chart.pdf

  1. 1. Bathroom Renovation Carpenter Plan and Prepare Preliminaries Particulars Day 1 Day 2 Day 3 Day 4 Day 5 Day 6 Day 7 Day 8 Day 9 Day 10 Day 11 Contact Client Asbestos Site Services Rubbish Electrician Plumber Materials PC item Materials Storage Site Toilet Client Bathroom Plasterer Waterproofing Tiler Joiner Electrician Plumber Painter Shower Screen Carpenter
  2. 2. Organise Carpentry Tasks page 1 Task Day 1 Day 2 Day 3 Day 4 Day 5 Day 6 Day 7 Day 8 Day 9 Day 10 Day 11 Carpenter Carpenter Carpenter Carpenter Carpenter Carpenter Carpenter Carpenter Electrician Plumber Carpenter Carpenter Carpenter Carpenter Carpenter Plasterer Carpenter Waterproofing Electrician Tiler Tiler Carpenter Tiler Shower screen i ll Carpenter Plumber Carpenter Electrician Painter Shower screen i ll Carpenter Carpenter Carpenter
  3. 3. Tasks Notify start day Notify start day Notify start day Notify start day wet seal Tidy up for client return. call plumber book in fit off and shower screen installer for site measure Site measure Tiler walls Architraves window &door Tile floor Beds shower base and floor Install under-tile heating Install shower screen and mirrors Paint ceiling architrave reveals, door Fit off Towel rails, fixtures and fittings including mirror Fit off Fit vanity Sheet ceiling/walls Call electrician confirm under tile heating install and fit off Install Tile underlay over existing floor Set joins Plasterboard ceiling villa board walls ensure plasterer uses wet area base coat to walls Hand over to builder to inspect Silicone Clean and detail Notify start day Notify start day Notify start day Rough in Rough in Tidy ready for client/ call plasterer for day 5 Batten ceiling ensure battens don’t coincide with downlight or exhaust fan positions Clean and vacuum dust from framework prior to sheeting Mark out Position of services prior to sheeting Insulate ceiling/walls Organise from stock & cut temporary floor covering , drop sheets & temporary wall & door protection Tentatively book day 3 morning plumber afternoon electrician Strip out existing Bathroom Remove rubbish as you go. Remove to skip Make good De-nail /remove and replace bad frame/floor Pre sheet Block, trimmers for fixtures Install ducting for exhaust fan to eaves. Tidy ready for client Confirm electrician & plumber for rough in Ensure all PC items are onsite prior to starting Arrange with client an appropriate storage area Order /client Prepare for portable bathroom i Notify start day Arrangements Confirm Start date - Schedule - What to expect ie dust, noise, household disruption -Temp bathroom and toilet facilities Check with builder That existing FC sheeting has been tested and clear of asbestos Identify and locate Electrical switch board and main switch, Locate water main and check it works correctly, Locate gas main and bidcock prior to starting. Organise site skip Make Safe for demolition Cap off plumbing and drainage prior to demolition

×